[
  {
    "id": "prj-htr-pm-shidaowan",
    "slug": "htr-pm-shidaowan",
    "name": "HTR-PM Shidaowan demonstration",
    "country": "CN",
    "country_name": "China",
    "stage": "operating",
    "stage_label": "Operating",
    "technology": "HTGR",
    "technology_label": "High-temperature gas-cooled reactor (HTGR)",
    "design_name": "HTR-PM",
    "design_id": "dsn-htr-pm",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 210,
    "electrical_basis": "gross",
    "thermal_mwth": 500,
    "capacity_scope": "plant",
    "capacity_display": "210 MWe (gross) \u00b7 plant",
    "module_count_planned": 2,
    "operators": [
      "China Huaneng Group"
    ],
    "vendors": [
      "China National Nuclear Corporation"
    ],
    "company_ids": [
      "org-cnnc",
      "org-huaneng"
    ],
    "company_slugs": [
      "china-national-nuclear-corporation",
      "china-huaneng-group"
    ],
    "companies": [
      {
        "id": "org-cnnc",
        "name": "China National Nuclear Corporation",
        "ticker": null
      },
      {
        "id": "org-huaneng",
        "name": "China Huaneng Group",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Shidaowan / Shidao Bay",
    "location_precision": "approximate",
    "lat": 36.969,
    "lon": 122.52,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/htr-pm-shidaowan/",
    "summary": "Twin-module HTGR demonstration plant reported in commercial operation."
  },
  {
    "id": "prj-lomonosov",
    "slug": "akademik-lomonosov",
    "name": "Akademik Lomonosov floating NPP",
    "country": "RU",
    "country_name": "Russia",
    "stage": "operating",
    "stage_label": "Operating",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "KLT-40S",
    "design_id": "dsn-klt40s",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 70,
    "electrical_basis": "gross",
    "thermal_mwth": 300,
    "capacity_scope": "plant",
    "capacity_display": "70 MWe (gross) \u00b7 plant",
    "module_count_planned": 2,
    "operators": [
      "Rosatom"
    ],
    "vendors": [
      "Rosatom"
    ],
    "company_ids": [
      "org-rosatom"
    ],
    "company_slugs": [
      "rosatom"
    ],
    "companies": [
      {
        "id": "org-rosatom",
        "name": "Rosatom",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Pevek floating NPP berth",
    "location_precision": "approximate",
    "lat": 69.7,
    "lon": 170.3,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/akademik-lomonosov/",
    "summary": "Floating twin KLT-40S heat-and-power plant at Pevek."
  },
  {
    "id": "prj-linglong-one",
    "slug": "linglong-one-changjiang",
    "name": "Linglong One (ACP100) Changjiang",
    "country": "CN",
    "country_name": "China",
    "stage": "commissioning",
    "stage_label": "Commissioning",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "ACP100 (Linglong One)",
    "design_id": "dsn-acp100",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 125,
    "electrical_basis": "gross",
    "thermal_mwth": 385,
    "capacity_scope": "module",
    "capacity_display": "125 MWe (gross) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "China National Nuclear Corporation"
    ],
    "vendors": [
      "China National Nuclear Corporation"
    ],
    "company_ids": [
      "org-cnnc"
    ],
    "company_slugs": [
      "china-national-nuclear-corporation"
    ],
    "companies": [
      {
        "id": "org-cnnc",
        "name": "China National Nuclear Corporation",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Changjiang Nuclear Power Plant site",
    "location_precision": "approximate",
    "lat": 19.46,
    "lon": 108.885,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/linglong-one-changjiang/",
    "summary": "Land-based ACP100 SMR in pre-commissioning/testing; commercial operation targeted in 2026 but not treated as achieved here without PRIS confirmation."
  },
  {
    "id": "prj-carem25",
    "slug": "carem-25",
    "name": "CAREM-25",
    "country": "AR",
    "country_name": "Argentina",
    "stage": "suspended",
    "stage_label": "Suspended",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "CAREM-25",
    "design_id": "dsn-carem25",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 25,
    "electrical_basis": "net",
    "thermal_mwth": 100,
    "capacity_scope": "module",
    "capacity_display": "25 MWe (net) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "CNEA (Argentina)"
    ],
    "vendors": [
      "CNEA (Argentina)"
    ],
    "company_ids": [
      "org-cnea"
    ],
    "company_slugs": [
      "cnea-argentina"
    ],
    "companies": [
      {
        "id": "org-cnea",
        "name": "CNEA (Argentina)",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "CAREM site (Lima, Z\u00e1rate)",
    "location_precision": "approximate",
    "lat": -34.0,
    "lon": -59.2,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/carem-25/",
    "summary": "Argentine prototype iPWR; construction widely reported incomplete/halted (~85% in secondary sources). Treat stage as suspended pending fresh primary confirmation."
  },
  {
    "id": "prj-darlington-bwrx",
    "slug": "darlington-bwrx-300",
    "name": "Darlington BWRX-300 Unit 1",
    "country": "CA",
    "country_name": "Canada",
    "stage": "construction",
    "stage_label": "Construction",
    "technology": "BWR",
    "technology_label": "Boiling water reactor (BWR)",
    "design_name": "BWRX-300",
    "design_id": "dsn-bwrx-300",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 300,
    "electrical_basis": "net",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "300 MWe (net) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "Ontario Power Generation"
    ],
    "vendors": [
      "GE Vernova Hitachi Nuclear Energy"
    ],
    "company_ids": [
      "org-gevh",
      "org-opg"
    ],
    "company_slugs": [
      "ge-vernova-hitachi-nuclear-energy",
      "ontario-power-generation"
    ],
    "companies": [
      {
        "id": "org-gevh",
        "name": "GE Vernova Hitachi Nuclear Energy",
        "ticker": null
      },
      {
        "id": "org-opg",
        "name": "Ontario Power Generation",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Darlington New Nuclear Project site",
    "location_precision": "exact",
    "lat": 43.8725,
    "lon": -78.7197,
    "mappable": true,
    "confidence": "high",
    "url": "/projects/darlington-bwrx-300/",
    "summary": "First Western FOAK BWRX-300 under CNSC licence to construct; OPG applied for licence to operate in March 2026. Up to three additional units possible later."
  },
  {
    "id": "prj-natrium-kemmerer",
    "slug": "natrium-kemmerer",
    "name": "Natrium Kemmerer Unit 1",
    "country": "US",
    "country_name": "United States",
    "stage": "construction",
    "stage_label": "Construction",
    "technology": "SFR",
    "technology_label": "Sodium-cooled fast reactor (SFR)",
    "design_name": "Natrium",
    "design_id": "dsn-natrium",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 345,
    "electrical_basis": "net",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "345 MWe (net) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "TerraPower"
    ],
    "vendors": [
      "TerraPower"
    ],
    "company_ids": [
      "org-terrapower"
    ],
    "company_slugs": [
      "terrapower"
    ],
    "companies": [
      {
        "id": "org-terrapower",
        "name": "TerraPower",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Kemmerer Natrium site",
    "location_precision": "approximate",
    "lat": 41.7922,
    "lon": -110.5377,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/natrium-kemmerer/",
    "summary": "Natrium demonstration plant at Kemmerer; NRC construction permit and nuclear construction reported in 2026 secondary sources \u2014 confirm ADAMS ML package for high-confidence legal citation."
  },
  {
    "id": "prj-hermes-1",
    "slug": "kairos-hermes-1",
    "name": "Kairos Hermes 1",
    "country": "US",
    "country_name": "United States",
    "stage": "construction",
    "stage_label": "Construction",
    "technology": "FHR",
    "technology_label": "Fluoride-salt-cooled high-temperature reactor (FHR)",
    "design_name": "Hermes / KP-FHR",
    "design_id": "dsn-hermes",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": null,
    "electrical_basis": "thermal_only",
    "thermal_mwth": 35,
    "capacity_scope": "module",
    "capacity_display": "35 MWth (thermal only)",
    "module_count_planned": 1,
    "operators": [
      "Kairos Power"
    ],
    "vendors": [
      "Kairos Power"
    ],
    "company_ids": [
      "org-kairos"
    ],
    "company_slugs": [
      "kairos-power"
    ],
    "companies": [
      {
        "id": "org-kairos",
        "name": "Kairos Power",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)",
    "location_precision": "approximate",
    "lat": 35.9333,
    "lon": -84.3867,
    "mappable": true,
    "confidence": "high",
    "url": "/projects/kairos-hermes-1/",
    "summary": "Non-power fluoride-salt-cooled test reactor under NRC construction permit. Not an electrical generator."
  },
  {
    "id": "prj-hermes-2",
    "slug": "kairos-hermes-2",
    "name": "Kairos Hermes 2",
    "country": "US",
    "country_name": "United States",
    "stage": "construction",
    "stage_label": "Construction",
    "technology": "FHR",
    "technology_label": "Fluoride-salt-cooled high-temperature reactor (FHR)",
    "design_name": "Hermes / KP-FHR",
    "design_id": "dsn-hermes",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 50,
    "electrical_basis": "net",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "50 MWe (net) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "Kairos Power"
    ],
    "vendors": [
      "Kairos Power"
    ],
    "company_ids": [
      "org-kairos"
    ],
    "company_slugs": [
      "kairos-power"
    ],
    "companies": [
      {
        "id": "org-kairos",
        "name": "Kairos Power",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)",
    "location_precision": "approximate",
    "lat": 35.9333,
    "lon": -84.3867,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/kairos-hermes-2/",
    "summary": "Power-producing Hermes 2 demonstration; groundbreaking reported April 2026 in secondary sources."
  },
  {
    "id": "prj-long-mott",
    "slug": "long-mott-xe-100",
    "name": "Long Mott Generating Facility (Xe-100 at Dow Seadrift)",
    "country": "US",
    "country_name": "United States",
    "stage": "licensing",
    "stage_label": "Licensing",
    "technology": "HTGR",
    "technology_label": "High-temperature gas-cooled reactor (HTGR)",
    "design_name": "Xe-100",
    "design_id": "dsn-xe-100",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 320,
    "electrical_basis": "net",
    "thermal_mwth": null,
    "capacity_scope": "plant",
    "capacity_display": "320 MWe (net) \u00b7 plant",
    "module_count_planned": 4,
    "operators": [
      "Dow"
    ],
    "vendors": [
      "X-energy"
    ],
    "company_ids": [
      "org-xenergy",
      "org-dow"
    ],
    "company_slugs": [
      "x-energy",
      "dow"
    ],
    "companies": [
      {
        "id": "org-xenergy",
        "name": "X-energy",
        "ticker": "XE"
      },
      {
        "id": "org-dow",
        "name": "Dow",
        "ticker": null
      }
    ],
    "tickers": [
      "XE"
    ],
    "site_name": "Dow UCC Seadrift / Long Mott",
    "location_precision": "approximate",
    "lat": 28.415,
    "lon": -96.711,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/long-mott-xe-100/",
    "summary": "Four Xe-100 modules proposed for industrial electricity and steam. Construction permit under NRC review; EA/FONSI reported May 2026. Final investment decision not claimed."
  },
  {
    "id": "prj-clinch-river-bwrx",
    "slug": "clinch-river-bwrx-300",
    "name": "TVA Clinch River BWRX-300",
    "country": "US",
    "country_name": "United States",
    "stage": "licensing",
    "stage_label": "Licensing",
    "technology": "BWR",
    "technology_label": "Boiling water reactor (BWR)",
    "design_name": "BWRX-300",
    "design_id": "dsn-bwrx-300",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 300,
    "electrical_basis": "net",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "300 MWe (net) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "Tennessee Valley Authority"
    ],
    "vendors": [
      "GE Vernova Hitachi Nuclear Energy"
    ],
    "company_ids": [
      "org-gevh",
      "org-tva"
    ],
    "company_slugs": [
      "ge-vernova-hitachi-nuclear-energy",
      "tennessee-valley-authority"
    ],
    "companies": [
      {
        "id": "org-gevh",
        "name": "GE Vernova Hitachi Nuclear Energy",
        "ticker": null
      },
      {
        "id": "org-tva",
        "name": "Tennessee Valley Authority",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Clinch River Nuclear Site",
    "location_precision": "approximate",
    "lat": 35.8906,
    "lon": -84.3828,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/clinch-river-bwrx-300/",
    "summary": "TVA Clinch River BWRX-300 construction permit proceeding before the NRC (status evolving through 2026 hearings)."
  },
  {
    "id": "prj-aurora-inl",
    "slug": "oklo-aurora-inl",
    "name": "Oklo Aurora-INL",
    "country": "US",
    "country_name": "United States",
    "stage": "construction",
    "stage_label": "Construction",
    "technology": "SFR",
    "technology_label": "Sodium-cooled fast reactor (SFR)",
    "design_name": "Aurora",
    "design_id": "dsn-aurora",
    "design_class": "microreactor",
    "design_class_label": "Microreactor",
    "electrical_mwe": 75,
    "electrical_basis": "nameplate_unspecified",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "75 MWe (nameplate) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "Oklo Inc."
    ],
    "vendors": [
      "Oklo Inc."
    ],
    "company_ids": [
      "org-oklo"
    ],
    "company_slugs": [
      "oklo-inc"
    ],
    "companies": [
      {
        "id": "org-oklo",
        "name": "Oklo Inc.",
        "ticker": "OKLO"
      }
    ],
    "tickers": [
      "OKLO"
    ],
    "site_name": "Idaho National Laboratory \u2014 Aurora site",
    "location_precision": "approximate",
    "lat": 43.533,
    "lon": -112.947,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/oklo-aurora-inl/",
    "summary": "Compact Aurora powerhouse under DOE Reactor Pilot Program at INL (not an NRC operating licence). Microreactor label applied."
  },
  {
    "id": "prj-arc100-lepreau",
    "slug": "arc-100-point-lepreau",
    "name": "NB Power ARC-100 at Point Lepreau",
    "country": "CA",
    "country_name": "Canada",
    "stage": "siting",
    "stage_label": "Siting",
    "technology": "SFR",
    "technology_label": "Sodium-cooled fast reactor (SFR)",
    "design_name": "ARC-100",
    "design_id": "dsn-arc-100",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 100,
    "electrical_basis": "net",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "100 MWe (net) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "NB Power"
    ],
    "vendors": [
      "ARC Clean Technology"
    ],
    "company_ids": [
      "org-arc",
      "org-nbpower"
    ],
    "company_slugs": [
      "arc-clean-technology",
      "nb-power"
    ],
    "companies": [
      {
        "id": "org-arc",
        "name": "ARC Clean Technology",
        "ticker": null
      },
      {
        "id": "org-nbpower",
        "name": "NB Power",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Point Lepreau Nuclear Generating Station site",
    "location_precision": "exact",
    "lat": 45.0686,
    "lon": -66.455,
    "mappable": true,
    "confidence": "high",
    "url": "/projects/arc-100-point-lepreau/",
    "summary": "Licence to prepare site application under CNSC review since June 2023; installed capacity listed TBD by CNSC page."
  },
  {
    "id": "prj-brest-od-300",
    "slug": "brest-od-300",
    "name": "BREST-OD-300 Seversk",
    "country": "RU",
    "country_name": "Russia",
    "stage": "construction",
    "stage_label": "Construction",
    "technology": "LFR",
    "technology_label": "Lead-cooled fast reactor (LFR)",
    "design_name": "BREST-OD-300",
    "design_id": "dsn-brest-od-300",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 300,
    "electrical_basis": "gross",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "300 MWe (gross) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "Rosatom"
    ],
    "vendors": [
      "Rosatom"
    ],
    "company_ids": [
      "org-rosatom"
    ],
    "company_slugs": [
      "rosatom"
    ],
    "companies": [
      {
        "id": "org-rosatom",
        "name": "Rosatom",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Seversk BREST-OD-300 site",
    "location_precision": "approximate",
    "lat": 56.6,
    "lon": 84.85,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/brest-od-300/",
    "summary": "Lead-cooled fast demonstration reactor under construction at Seversk."
  },
  {
    "id": "prj-ritm-jizzakh",
    "slug": "ritm-200n-jizzakh",
    "name": "RITM-200N Jizzakh",
    "country": "UZ",
    "country_name": "Uzbekistan",
    "stage": "construction",
    "stage_label": "Construction",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "RITM-200N",
    "design_id": "dsn-ritm-200n",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 55,
    "electrical_basis": "gross",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "55 MWe (gross) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "Rosatom"
    ],
    "vendors": [
      "Rosatom"
    ],
    "company_ids": [
      "org-rosatom"
    ],
    "company_slugs": [
      "rosatom"
    ],
    "companies": [
      {
        "id": "org-rosatom",
        "name": "Rosatom",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Jizzakh RITM-200N site",
    "location_precision": "approximate",
    "lat": 40.12,
    "lon": 67.84,
    "mappable": true,
    "confidence": "low",
    "url": "/projects/ritm-200n-jizzakh/",
    "summary": "Reported first land-based RITM-200N export construction in Uzbekistan. Low coordinate confidence; verify against Uzatom/Rosatom primaries."
  },
  {
    "id": "prj-rr-wylfa",
    "slug": "rolls-royce-smr-wylfa",
    "name": "Rolls-Royce SMR Wylfa",
    "country": "GB",
    "country_name": "United Kingdom",
    "stage": "announced",
    "stage_label": "Announced",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "Rolls-Royce SMR",
    "design_id": "dsn-rr-smr",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 1410,
    "electrical_basis": "net",
    "thermal_mwth": null,
    "capacity_scope": "plant",
    "capacity_display": "1410 MWe (net) \u00b7 plant",
    "module_count_planned": 3,
    "operators": [],
    "vendors": [
      "Rolls-Royce SMR"
    ],
    "company_ids": [
      "org-rolls-royce-smr"
    ],
    "company_slugs": [
      "rolls-royce-smr"
    ],
    "companies": [
      {
        "id": "org-rolls-royce-smr",
        "name": "Rolls-Royce SMR",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Wylfa Newydd site",
    "location_precision": "approximate",
    "lat": 53.417,
    "lon": -4.483,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/rolls-royce-smr-wylfa/",
    "summary": "Three-unit Wylfa selection/contract reported 2026; GDA in progress. No nuclear concrete claimed. Electrical total is 3\u00d7~470 MWe."
  },
  {
    "id": "prj-nuscale-romania",
    "slug": "nuscale-doicesti",
    "name": "NuScale VOYGR Doice\u0219ti (Romania)",
    "country": "RO",
    "country_name": "Romania",
    "stage": "announced",
    "stage_label": "Announced",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "NuScale VOYGR (US460 / NPM)",
    "design_id": "dsn-voygr",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 462,
    "electrical_basis": "gross",
    "thermal_mwth": null,
    "capacity_scope": "plant",
    "capacity_display": "462 MWe (gross) \u00b7 plant",
    "module_count_planned": 6,
    "operators": [],
    "vendors": [
      "NuScale Power"
    ],
    "company_ids": [
      "org-nuscale"
    ],
    "company_slugs": [
      "nuscale-power"
    ],
    "companies": [
      {
        "id": "org-nuscale",
        "name": "NuScale Power",
        "ticker": "SMR"
      }
    ],
    "tickers": [
      "SMR"
    ],
    "site_name": "Doice\u0219ti NuScale site",
    "location_precision": "approximate",
    "lat": 44.97,
    "lon": 25.4,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/nuscale-doicesti/",
    "summary": "Romania VOYGR project reported to have taken FID in secondary 2026 coverage; treat schedule and FID as medium confidence until primary filings are linked."
  },
  {
    "id": "prj-holtec-palisades",
    "slug": "holtec-smr-300-palisades",
    "name": "Holtec SMR-300 Palisades area",
    "country": "US",
    "country_name": "United States",
    "stage": "announced",
    "stage_label": "Announced",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "Holtec SMR-300",
    "design_id": "dsn-smr-300",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 300,
    "electrical_basis": "net",
    "thermal_mwth": null,
    "capacity_scope": "module",
    "capacity_display": "300 MWe (net) \u00b7 module",
    "module_count_planned": 1,
    "operators": [
      "Holtec International"
    ],
    "vendors": [
      "Holtec International"
    ],
    "company_ids": [
      "org-holtec"
    ],
    "company_slugs": [
      "holtec-international"
    ],
    "companies": [
      {
        "id": "org-holtec",
        "name": "Holtec International",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Palisades Nuclear Plant area",
    "location_precision": "approximate",
    "lat": 42.323,
    "lon": -86.314,
    "mappable": true,
    "confidence": "medium",
    "url": "/projects/holtec-smr-300-palisades/",
    "summary": "Proposed SMR-300 near Palisades; early planned stage."
  },
  {
    "id": "prj-uamps-cfpp",
    "slug": "uamps-cfpp-cancelled",
    "name": "UAMPS Carbon Free Power Project (cancelled)",
    "country": "US",
    "country_name": "United States",
    "stage": "cancelled",
    "stage_label": "Cancelled",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "NuScale VOYGR (US460 / NPM)",
    "design_id": "dsn-voygr",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": 462,
    "electrical_basis": "gross",
    "thermal_mwth": null,
    "capacity_scope": "plant",
    "capacity_display": "462 MWe (gross) \u00b7 plant",
    "module_count_planned": 6,
    "operators": [
      "Utah Associated Municipal Power Systems"
    ],
    "vendors": [
      "NuScale Power"
    ],
    "company_ids": [
      "org-nuscale",
      "org-uamps"
    ],
    "company_slugs": [
      "nuscale-power",
      "utah-associated-municipal-power-systems"
    ],
    "companies": [
      {
        "id": "org-nuscale",
        "name": "NuScale Power",
        "ticker": "SMR"
      },
      {
        "id": "org-uamps",
        "name": "Utah Associated Municipal Power Systems",
        "ticker": null
      }
    ],
    "tickers": [
      "SMR"
    ],
    "site_name": "INL / CFPP proposed NuScale site",
    "location_precision": "approximate",
    "lat": 43.51,
    "lon": -113.0,
    "mappable": true,
    "confidence": "high",
    "url": "/projects/uamps-cfpp-cancelled/",
    "summary": "Cancelled NuScale VOYGR municipal project at INL. Retained for historical SMR program coverage \u2014 not an active deployment."
  },
  {
    "id": "prj-rr-pipeline-undisclosed",
    "slug": "rolls-royce-smr-undisclosed",
    "name": "Rolls-Royce SMR additional sites (undisclosed pins)",
    "country": "GB",
    "country_name": "United Kingdom",
    "stage": "announced",
    "stage_label": "Announced",
    "technology": "iPWR",
    "technology_label": "Integral pressurized water reactor (iPWR)",
    "design_name": "Rolls-Royce SMR",
    "design_id": "dsn-rr-smr",
    "design_class": "smr",
    "design_class_label": "SMR",
    "electrical_mwe": null,
    "electrical_basis": "unknown",
    "thermal_mwth": null,
    "capacity_scope": "unknown",
    "capacity_display": "\u2014",
    "module_count_planned": null,
    "operators": [],
    "vendors": [
      "Rolls-Royce SMR"
    ],
    "company_ids": [
      "org-rolls-royce-smr"
    ],
    "company_slugs": [
      "rolls-royce-smr"
    ],
    "companies": [
      {
        "id": "org-rolls-royce-smr",
        "name": "Rolls-Royce SMR",
        "ticker": null
      }
    ],
    "tickers": [],
    "site_name": "Undisclosed / multi-site Rolls-Royce pipeline",
    "location_precision": "undisclosed",
    "lat": null,
    "lon": null,
    "mappable": false,
    "confidence": "low",
    "url": "/projects/rolls-royce-smr-undisclosed/",
    "summary": "Buyer discussions beyond Wylfa are searchable here without inventing map coordinates."
  }
]
