[
  {
    "stable_id": "pol-us-nrc-radiation-proposed-20260715",
    "slug": "us-nrc-radiation-protection-proposal",
    "name": "Proposed modernization of NRC radiation-protection standards",
    "short_label": "Radiation-protection proposal",
    "category": "proposed",
    "instrument_type": "proposed_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 43456, FR Doc. 2026-14208, docket NRC-2025-1140, RIN 3150-AL47",
    "legal_scope": "Proposed revisions to 10 CFR Parts 19, 20, 34, 35, 40, 50, 53, 61, 71 and 72 and draft implementing guidance. This crosscutting proposal includes reactor licensing but is not a project-specific applicability finding.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-07-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-nrc-radiation-proposed-20260715"
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-nrc-radiation-proposed-20260715",
      "version": "Proposed rule and draft implementing guidance",
      "document_date": "2026-07-15"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      }
    ],
    "applicability": [],
    "unapproved": "The opened notice is a proposal. It establishes no final rule, effective date, approved design or project permission. The 31 August 2026 comment deadline it sets is in the past. No later extension notice was reviewed here.",
    "summary": "NRC proposed revisions to its radiation-protection standards on 15 July 2026, with comments due 31 August. The proposal includes rules used in reactor licensing and draft implementing guidance. No final rule or effective date is established by this notice, and it grants no reactor permission.",
    "sources": [
      "src-fr-nrc-radiation-proposed-20260715"
    ],
    "confidence": "high",
    "last_checked": "2026-10-17",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-nepa-proposed-20260707",
    "slug": "us-nrc-nepa-implementation-proposal",
    "name": "Proposed revisions to NRC implementation of NEPA",
    "short_label": "Environmental-review proposal",
    "category": "proposed",
    "instrument_type": "proposed_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 42086, FR Doc. 2026-13687, docket NRC-2025-0478, RIN 3150-AL38",
    "legal_scope": "Proposed NRC environmental-review revisions across 10 CFR Parts 2, 30, 40, 50, 51, 52, 53, 54, 61, 70, 72, 76 and 110, with draft NUREG-2270. No project-specific exemption, environmental decision or construction permission is established.",
    "affects": [
      "nrc_licensing",
      "environmental_review"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-07-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-nrc-nepa-proposed-20260707"
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-nrc-nepa-proposed-20260707",
      "version": "Proposed rule and draft NUREG-2270",
      "document_date": "2026-07-07"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      }
    ],
    "applicability": [],
    "unapproved": "The opened notice is a proposal, not an effective final rule or completed project review. The 21 August 2026 comment deadline it sets is in the past. No later extension notice was reviewed here. Project applicability needs its own assessment.",
    "summary": "NRC proposed changes to its NEPA environmental-review procedures on 7 July 2026, with comments due 21 August. Proposed changes concern review scope, procedures, categorical exclusions and draft guidance. The notice establishes no final rule or effective date and grants no project exemption, construction permit or operating authority.",
    "sources": [
      "src-fr-nrc-nepa-proposed-20260707"
    ],
    "confidence": "high",
    "last_checked": "2026-10-17",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-advance-act-2024",
    "slug": "us-advance-act-2024",
    "name": "ADVANCE Act of 2024",
    "short_label": "ADVANCE Act of 2024",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Congress",
    "citation": "Pub. L. 118-67, division B (approved 9 July 2024)",
    "legal_scope": "Federal statute binding on the NRC. Section 201 requires reduced hourly review fees for eligible advanced nuclear reactor applicants and pre-applicants; other sections cover prizes and NRC licensing modernization.",
    "affects": [
      "licensing_fees",
      "nrc_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2024-07-09",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-govinfo-plaw-118-67"
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2025-10-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-nrc-advanced-reactor-fees",
        "note": "The reduced hourly rate first applied from this date at $148 an hour (against $318 full cost) under the FY2025 fee rule. The FY2026 fee rule set it at $154 against $337 from 17 August 2026."
      }
    ],
    "effective_date": {
      "value": "2024-07-09",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-govinfo-plaw-118-67",
      "version": "Public Law (GovInfo)",
      "document_date": "2024-07-09"
    },
    "legal_definitions": [
      {
        "term": "advanced nuclear reactor",
        "section": "Sec. 2",
        "paraphrase": "Takes the meaning given in section 3 of the Nuclear Energy Innovation and Modernization Act (Pub. L. 115-439).",
        "source_id": "src-govinfo-plaw-118-67",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "related"
      },
      {
        "policy_id": "pol-us-nrc-fy2026-fee-rule",
        "relation": "related"
      },
      {
        "policy_id": "pol-us-nrc-mandatory-hearing-flexibility-2026",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Eligibility for the reduced rate is decided per applicant by the NRC; no project's eligibility is recorded here.",
    "summary": "Federal law enacted on 9 July 2024. The NRC applies its reduced advanced-reactor review rate from 1 October 2025. The Act does not license, fund or approve any particular reactor.",
    "sources": [
      "src-govinfo-plaw-118-67",
      "src-nrc-advanced-reactor-fees",
      "src-pr-us-fee-rule-fy2026-text"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-06-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-part-53-2026",
    "slug": "us-nrc-part-53",
    "name": "10 CFR Part 53: risk-informed, technology-inclusive licensing framework",
    "short_label": "10 CFR Part 53: risk-informed, technology-inclusive licensing framework",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 15696 (final rule, 30 March 2026); docket NRC-2019-0062",
    "legal_scope": "NRC regulation adding a risk-informed, performance-based and technology-inclusive licensing framework for commercial nuclear plants, issued in response to the Nuclear Energy Innovation and Modernization Act.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2024-10-31",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-part53-proposed-2024"
      },
      {
        "event": "published",
        "date": {
          "value": "2026-03-30",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-part53-final-2026"
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-04-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-part53-final-2026"
      }
    ],
    "effective_date": {
      "value": "2026-04-29",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-part53-final-2026",
      "version": "Final rule as corrected (91 FR 18772; 91 FR 47128)",
      "document_date": "2026-03-30"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-advance-act-2024",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Which applicants will use Part 53 is not recorded; no application under Part 53 is recorded here. The NRC corrected the final rule twice, on 13 April 2026 (errors and conflicting amendatory instructions with the categorical exclusions rule) and on 28 July 2026 (the Part 75 definition of facilities).",
    "summary": "The NRC's Part 53 licensing framework took effect on 29 April 2026. It sets how applications may be reviewed; it approves no design, site or reactor.",
    "sources": [
      "src-fr-part53-final-2026",
      "src-fr-part53-proposed-2024",
      "src-pr-us-nrc-rules-listing-20261030"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-new-reactor-geis-2026",
    "slug": "us-nrc-new-reactor-geis",
    "name": "Generic environmental impact statement rule for licensing new nuclear reactors",
    "short_label": "Generic environmental impact statement rule for licensing new nuclear reactors",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 22394 (final rule, 24 April 2026); docket NRC-2020-0101",
    "legal_scope": "NRC regulation codifying the generic findings of its Generic Environmental Impact Statement for Licensing of New Nuclear Reactors in the environmental reviews of new reactor applications under NEPA.",
    "affects": [
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2024-10-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-new-reactor-geis-2026",
        "note": "Proposed rule 89 FR 80797."
      },
      {
        "event": "published",
        "date": {
          "value": "2026-04-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-new-reactor-geis-2026"
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-05-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-new-reactor-geis-2026"
      }
    ],
    "effective_date": {
      "value": "2026-05-26",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-new-reactor-geis-2026",
      "version": "Final rule",
      "document_date": "2026-04-24"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Each application still needs its own site-specific environmental review and decision.",
    "summary": "Final NRC rule effective 26 May 2026 that lets environmental reviews of new reactor applications rely on generic findings. It is not an environmental decision on any project.",
    "sources": [
      "src-fr-new-reactor-geis-2026"
    ],
    "confidence": "high",
    "last_checked": "2026-10-03",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-microreactor-proposed-2026",
    "slug": "us-nrc-microreactor-licensing-proposal",
    "name": "Proposed licensing requirements for microreactors and comparable reactors",
    "short_label": "Microreactor licensing proposal",
    "category": "proposed",
    "instrument_type": "proposed_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 23628 (proposed rule, 1 May 2026); docket NRC-2025-0379",
    "legal_scope": "Proposed NRC regulation for a risk-informed, performance-based framework for rapid licensing and high-volume deployment of microreactors and other reactors with comparable risk profiles.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-05-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-microreactor-proposed-2026"
      },
      {
        "event": "comment_period_closed",
        "date": {
          "value": "2026-06-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-microreactor-proposed-2026"
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-microreactor-proposed-2026",
      "version": "Proposed rule (as corrected 15 May 2026)",
      "document_date": "2026-05-01"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      }
    ],
    "applicability": [],
    "unapproved": "Not adopted: no final rule had been published when this record was last checked. A printed correction to the proposal appeared on 15 May 2026 (91 FR 27870). NRC's planned rulemaking list estimates 26 January 2027 for publishing the final rule, with no Federal Register citation yet. NRC says such dates are subject to change. That is a plan, not a rule.",
    "summary": "NRC proposal published 1 May 2026; the comment period closed on 15 June 2026. It is not in effect.",
    "sources": [
      "src-fr-microreactor-proposed-2026",
      "src-pr-us-docket-nrc-2025-0379",
      "src-pr-us-microreactor-correction",
      "src-nrc-planned-rulemaking-export"
    ],
    "confidence": "high",
    "last_checked": "2026-11-04",
    "status_checked": "2026-10-31",
    "next_review": "2027-01-27",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-licensing-siting-proposed-2026",
    "slug": "us-nrc-licensing-siting-proposal",
    "name": "Proposed modernization of reactor licensing, safety oversight and siting practices",
    "short_label": "Licensing and siting proposal",
    "category": "proposed",
    "instrument_type": "proposed_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 44560 (proposed rule, 16 July 2026); docket NRC-2025-0975",
    "legal_scope": "Proposed NRC revisions to reactor licensing, safety oversight and siting practices, presented as addressing sections 5(f), 5(h) and 5(i) of Executive Order 14300.",
    "affects": [
      "nrc_licensing",
      "siting"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-07-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-licensing-siting-proposed-2026"
      },
      {
        "event": "comment_period_closed",
        "date": {
          "value": "2026-08-31",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-licensing-siting-proposed-2026",
        "reader": {
          "headline": "Comments close on NRC proposal to modernize reactor licensing, oversight and siting",
          "what": "Comments closed on the NRC proposal, published on 16 July 2026 under the Commission's revision of its rules ordered by Executive Order 14300.",
          "limit": "The proposal is not in effect."
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-licensing-siting-proposed-2026",
      "version": "Proposed rule (as corrected 27 Jul 2026)",
      "document_date": "2026-07-16"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      }
    ],
    "applicability": [],
    "unapproved": "Not adopted: no final rule had been published when this record was last checked. A correction published on 27 July 2026 (91 FR 46869) withdrew a guidance document issued with the proposal because it contained outdated and incorrect information. NRC's planned rulemaking list estimates 26 February 2027 for publishing the final rule, with no Federal Register citation yet. NRC says such dates are subject to change. That is a plan, not a rule.",
    "summary": "NRC proposal published 16 July 2026 under the Commission's revision of its rules ordered by Executive Order 14300; comments closed 31 August 2026. It is not in effect.",
    "sources": [
      "src-fr-licensing-siting-proposed-2026",
      "src-pr-us-docket-nrc-2025-0975",
      "src-pr-us-licensing-siting-correction",
      "src-nrc-planned-rulemaking-export"
    ],
    "confidence": "high",
    "last_checked": "2026-11-04",
    "status_checked": "2026-10-31",
    "next_review": "2027-02-27",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-eo-14299",
    "slug": "us-eo-14299",
    "name": "Executive Order 14299: advanced reactors for national security",
    "short_label": "EO 14299 (national security reactors)",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "President of the United States",
    "citation": "Executive Order 14299, 90 FR 22581 (signed 23 May 2025)",
    "legal_scope": "Directs the Departments of Energy and Defense on deploying advanced reactors at federal and military sites, including an Army-regulated reactor at a domestic base by 30 September 2028 and a goal of operating an advanced reactor at the first DOE-designated site within 30 months.",
    "affects": [
      "testing_authorization",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-05-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-eo-14299"
      },
      {
        "event": "published",
        "date": {
          "value": "2025-05-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-eo-14299"
      }
    ],
    "effective_date": {
      "value": "2025-05-23",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-eo-14299",
      "version": "Federal Register",
      "document_date": "2025-05-29"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Agency actions under the order are separate; none is recorded here as complete.",
    "summary": "Directive to federal agencies, signed 23 May 2025. It sets agency goals; it does not license or approve any particular reactor.",
    "sources": [
      "src-fr-eo-14299"
    ],
    "confidence": "high",
    "last_checked": "2026-11-03",
    "next_review": "2027-05-02",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-eo-14300",
    "slug": "us-eo-14300",
    "name": "Executive Order 14300: reform of the Nuclear Regulatory Commission",
    "short_label": "EO 14300 (NRC reform)",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "President of the United States",
    "citation": "Executive Order 14300, 90 FR 22587 (signed 23 May 2025)",
    "legal_scope": "Directs the NRC to reform its regulations and licensing practices, including final rules and guidance to conclude a wholesale revision within 18 months of the order.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-05-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-eo-14300"
      },
      {
        "event": "published",
        "date": {
          "value": "2025-05-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-eo-14300"
      },
      {
        "event": "milestone",
        "date": {
          "value": "2026-11",
          "precision": "month",
          "basis": "target"
        },
        "source": "src-fr-eo-14300",
        "note": "Section 5: final rules and guidance to conclude the NRC's revision within 18 months of the order, signed 23 May 2025. The order gives the period, not a calendar date; November 2026 is the month it ends. A target, not a result."
      }
    ],
    "effective_date": {
      "value": "2025-05-23",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-eo-14300",
      "version": "Federal Register",
      "document_date": "2025-05-29"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-nrc-microreactor-proposed-2026",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-us-nrc-licensing-siting-proposed-2026",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-us-nrc-radiation-proposed-20260715",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-us-nrc-nepa-proposed-20260707",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-us-nrc-enhancements-proposed-20260924",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-us-nrc-prior-doe-dod-authorizations-20261026",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-us-nrc-fy2026-fee-rule",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-us-nrc-mandatory-hearing-flexibility-2026",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-us-nrc-modernization-direct-final-2026",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "The order licenses nothing itself. NRC final rules issued in response to it include the mandatory-hearing rule (in force 15 May 2026), the FY2026 fee rule with fixed fee caps (in force 17 August 2026) and the NRC Modernization direct final rule (in force 26 October 2026). A further final rule linked here, on prior DOE or defense authorizations, takes effect on 25 November 2026. The other revisions linked here remain proposed.",
    "summary": "Directive to the NRC, signed 23 May 2025, with an 18-month target (late November 2026) for final revised rules. It grants no licence itself.",
    "sources": [
      "src-fr-eo-14300",
      "src-pr-us-nrc-rules-listing-20261030"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2026-11-24",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-eo-14301",
    "slug": "us-eo-14301",
    "name": "Executive Order 14301: reactor testing at the Department of Energy",
    "short_label": "EO 14301 (DOE reactor testing)",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "President of the United States",
    "citation": "Executive Order 14301, 90 FR 22591 (signed 23 May 2025)",
    "legal_scope": "Directs DOE to run a pilot programme for reactor construction and operation outside the national laboratories under DOE authorization, approving at least three reactors with a goal of criticality in each by 4 July 2026.",
    "affects": [
      "testing_authorization"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-05-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-eo-14301"
      },
      {
        "event": "published",
        "date": {
          "value": "2025-05-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-eo-14301"
      }
    ],
    "effective_date": {
      "value": "2025-05-23",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-eo-14301",
      "version": "Federal Register",
      "document_date": "2025-05-29"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-doe-reactor-pilot-program",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "DOE authorization of a test reactor is not an NRC licence for commercial operation.",
    "summary": "Directive to DOE, signed 23 May 2025, that led to the DOE Reactor Pilot Program.",
    "sources": [
      "src-fr-eo-14301"
    ],
    "confidence": "high",
    "last_checked": "2026-10-03",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-eo-14302",
    "slug": "us-eo-14302",
    "name": "Executive Order 14302: nuclear industrial base",
    "short_label": "EO 14302 (industrial base)",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "President of the United States",
    "citation": "Executive Order 14302, 90 FR 22595 (signed 23 May 2025)",
    "legal_scope": "Directs federal action on the nuclear fuel supply, financing, plant construction and workforce.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-05-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-eo-14302"
      },
      {
        "event": "published",
        "date": {
          "value": "2025-05-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-eo-14302"
      }
    ],
    "effective_date": {
      "value": "2025-05-23",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-eo-14302",
      "version": "Federal Register",
      "document_date": "2025-05-29"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Funding decisions under the order are separate records when made.",
    "summary": "Directive to federal agencies, signed 23 May 2025. It appropriates no money and makes no project award.",
    "sources": [
      "src-fr-eo-14302"
    ],
    "confidence": "high",
    "last_checked": "2026-10-03",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-doe-reactor-pilot-program",
    "slug": "us-doe-reactor-pilot-program",
    "name": "DOE Reactor Pilot Program",
    "short_label": "DOE Reactor Pilot Program",
    "category": "funding_programme",
    "instrument_type": "authorization_programme",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy",
    "citation": "DOE request for applications DE-FOA-0003569 (18 June 2025)",
    "legal_scope": "DOE pathway for building and operating test reactors outside the national laboratories under DOE authorization, which DOE presents as a way to fast-track later commercial licensing.",
    "affects": [
      "testing_authorization"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "opened",
        "date": {
          "value": "2025-06-18",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-reactor-pilot-program",
        "note": "Request for applications issued."
      },
      {
        "event": "selected",
        "date": {
          "value": "2025-08-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-reactor-pilot-program",
        "note": "Initial selections: ten companies, Oklo with two projects."
      },
      {
        "event": "milestone",
        "date": {
          "value": "2026-07",
          "precision": "month",
          "basis": "actual"
        },
        "source": "src-doe-golden-era-2026",
        "note": "DOE reports four zero-power criticality demonstrations by July 2026."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-doe-reactor-pilot-program",
      "version": "DOE programme page",
      "document_date": "2026-10-03"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14301",
        "relation": "implements"
      }
    ],
    "programme_ids": [
      "prg-us-doe-reactor-pilot-program"
    ],
    "applicability": [
      {
        "project_id": "prj-antares-mark0-inl",
        "basis": "DOE lists this reactor's criticality demonstration under the Reactor Pilot Program.",
        "source_id": "src-doe-golden-era-2026"
      },
      {
        "project_id": "prj-ward-250",
        "basis": "DOE lists this reactor's criticality demonstration under the Reactor Pilot Program.",
        "source_id": "src-doe-golden-era-2026"
      },
      {
        "project_id": "prj-unity-inl",
        "basis": "DOE lists this reactor's criticality demonstration under the Reactor Pilot Program.",
        "source_id": "src-doe-golden-era-2026"
      },
      {
        "project_id": "prj-aalo-x-inl",
        "basis": "DOE lists this reactor's criticality demonstration under the Reactor Pilot Program.",
        "source_id": "src-doe-golden-era-2026"
      }
    ],
    "unapproved": "Selection is not authorization to operate; each reactor needs its own DOE approvals, and commercial operation needs NRC licensing.",
    "summary": "DOE programme opened in June 2025, with initial selections on 12 August 2025. DOE counts four zero-power criticality demonstrations toward its goal by July 2026, one of them under its Nuclear Energy Launch Pad. A DOE authorization is not an NRC commercial licence.",
    "sources": [
      "src-doe-reactor-pilot-program",
      "src-doe-golden-era-2026"
    ],
    "confidence": "high",
    "last_checked": "2026-11-03",
    "next_review": "2027-02-01",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-doe-ardp",
    "slug": "us-doe-ardp",
    "name": "DOE Advanced Reactor Demonstration Program (demonstration awards)",
    "short_label": "DOE Advanced Reactor Demonstration Program (demonstration awards)",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy",
    "citation": "DOE Advanced Reactor Demonstration Program",
    "legal_scope": "Federal cost-shared funding to build two advanced reactor demonstrations to be licensed for commercial operation.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "awarded",
        "date": {
          "value": "2020-10-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-ardp-awards-2020",
        "note": "First awards: TerraPower and X-energy."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-doe-ardp-projects",
      "version": "DOE programme page",
      "document_date": "2026-10-03"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Funding beyond the initial awards depends on future appropriations.",
    "summary": "DOE programme that made its first demonstration awards on 13 October 2020; continued funding depends on appropriations and DOE approval.",
    "sources": [
      "src-doe-ardp-awards-2020",
      "src-doe-ardp-projects"
    ],
    "confidence": "high",
    "last_checked": "2026-10-03",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-ardp-award-terrapower-2020",
    "slug": "us-ardp-award-terrapower",
    "name": "ARDP demonstration award: TerraPower (Natrium)",
    "short_label": "ARDP demonstration award: TerraPower (Natrium)",
    "category": "funding_award",
    "instrument_type": "award",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy",
    "citation": "ARDP initial award to TerraPower, 13 October 2020",
    "legal_scope": "Initial cost-shared DOE funding of $80 million to TerraPower for the Natrium demonstration, which DOE now places at Kemmerer, Wyoming.",
    "affects": [
      "project_funding"
    ],
    "status": "awarded",
    "lifecycle": [
      {
        "event": "awarded",
        "date": {
          "value": "2020-10-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-ardp-awards-2020"
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-doe-ardp-awards-2020",
      "version": "DOE award announcement",
      "document_date": "2020-10-13"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-doe-ardp",
        "relation": "award_under"
      }
    ],
    "applicability": [
      {
        "project_id": "prj-natrium-kemmerer",
        "basis": "DOE's ARDP projects page places the funded Natrium demonstration at Kemmerer, Wyoming.",
        "source_id": "src-doe-ardp-projects"
      }
    ],
    "unapproved": "The award is funding, not a licence; total federal support depends on later appropriations.",
    "summary": "DOE awarded TerraPower $80 million in initial ARDP funding on 13 October 2020 for the Natrium demonstration.",
    "sources": [
      "src-doe-ardp-awards-2020",
      "src-doe-ardp-projects"
    ],
    "confidence": "high",
    "last_checked": "2026-10-03",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-ardp-award-xenergy-2020",
    "slug": "us-ardp-award-x-energy",
    "name": "ARDP demonstration award: X-energy (Xe-100)",
    "short_label": "ARDP demonstration award: X-energy (Xe-100)",
    "category": "funding_award",
    "instrument_type": "award",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy",
    "citation": "ARDP initial award to X-energy, 13 October 2020",
    "legal_scope": "Initial cost-shared DOE funding of $80 million to X-energy for the Xe-100 demonstration, which DOE now places at Dow's Seadrift Operations, Texas.",
    "affects": [
      "project_funding"
    ],
    "status": "awarded",
    "lifecycle": [
      {
        "event": "awarded",
        "date": {
          "value": "2020-10-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-ardp-awards-2020"
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-doe-ardp-awards-2020",
      "version": "DOE award announcement",
      "document_date": "2020-10-13"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-doe-ardp",
        "relation": "award_under"
      }
    ],
    "applicability": [
      {
        "project_id": "prj-long-mott",
        "basis": "DOE's ARDP projects page places the funded Xe-100 demonstration at Dow's Seadrift Operations.",
        "source_id": "src-doe-ardp-projects"
      }
    ],
    "unapproved": "The award is funding, not a licence; the Long Mott construction permit application is still under NRC review.",
    "summary": "DOE awarded X-energy $80 million in initial ARDP funding on 13 October 2020 for the Xe-100 demonstration.",
    "sources": [
      "src-doe-ardp-awards-2020",
      "src-doe-ardp-projects"
    ],
    "confidence": "high",
    "last_checked": "2026-10-03",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-doe-gen3-smr-program",
    "slug": "us-doe-gen3-smr-program",
    "name": "DOE Generation III+ Small Modular Reactor programme",
    "short_label": "DOE Generation III+ Small Modular Reactor programme",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy",
    "citation": "DOE Gen III+ SMR solicitation (16 October 2024; modified 24 March 2025)",
    "legal_scope": "Federal cost-shared funding for first deployments of light-water Gen III+ SMRs (Tier 1, up to $800 million in federal funds) and for supply-chain and other barriers (Tier 2), from a $900 million solicitation; DOE pays no more than 50% of project costs.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "opened",
        "date": {
          "value": "2024-10-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-gen3-smr-qa"
      },
      {
        "event": "amended",
        "date": {
          "value": "2025-03-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-gen3-smr-qa"
      },
      {
        "event": "selected",
        "date": {
          "value": "2025-12-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-gen3-smr-selections-2025",
        "note": "Two first-mover selections of up to $400 million each."
      },
      {
        "event": "selected",
        "date": {
          "value": "2026-05-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-gen3-tier2-selections-2026",
        "note": "Eight further selections totalling more than $94 million."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-doe-gen3-smr-qa",
      "version": "DOE programme Q&A",
      "document_date": "2026-10-03"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14302",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Selections for federal cost-shared funding are not disbursements. DOE's Q&A says award milestones and payments are negotiated after selection; final award terms are not recorded here.",
    "summary": "DOE programme with two first-mover selections on 2 December 2025 (TVA and Holtec, up to $400 million each) and eight further selections on 14 May 2026 (more than $94 million for early site permits and supply chains). DOE's programme page says applications closed on 23 April 2025.",
    "sources": [
      "src-doe-gen3-smr-qa",
      "src-doe-gen3-smr-selections-2025",
      "src-doe-gen3-tier2-selections-2026",
      "src-doe-gen3-smr-program-page"
    ],
    "confidence": "high",
    "last_checked": "2026-11-04",
    "next_review": "2027-02-02",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-gen3-selection-tva-2025",
    "slug": "us-gen3-selection-tva",
    "name": "Gen III+ SMR selection: TVA (Clinch River BWRX-300)",
    "short_label": "Gen III+ SMR selection: TVA (Clinch River BWRX-300)",
    "category": "funding_award",
    "instrument_type": "award",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy",
    "citation": "DOE Gen III+ SMR selection of TVA, 2 December 2025",
    "legal_scope": "Selection of TVA for up to $400 million in federal cost-shared funding for a GE Vernova Hitachi BWRX-300 at the Clinch River site, Tennessee.",
    "affects": [
      "project_funding"
    ],
    "status": "selected",
    "lifecycle": [
      {
        "event": "selected",
        "date": {
          "value": "2025-12-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-gen3-smr-selections-2025"
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-doe-gen3-smr-selections-2025",
      "version": "DOE announcement",
      "document_date": "2025-12-02"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-doe-gen3-smr-program",
        "relation": "award_under"
      }
    ],
    "applicability": [
      {
        "project_id": "prj-clinch-river-bwrx",
        "basis": "DOE names the BWRX-300 at TVA's Clinch River site.",
        "source_id": "src-doe-gen3-smr-selections-2025"
      }
    ],
    "unapproved": "A selection of up to $400 million is not a disbursement; final award terms are not recorded.",
    "summary": "DOE selected TVA on 2 December 2025 for up to $400 million in cost-shared funding for its first BWRX-300 at Clinch River.",
    "sources": [
      "src-doe-gen3-smr-selections-2025",
      "src-doe-gen3-smr-program-page"
    ],
    "confidence": "high",
    "last_checked": "2026-11-04",
    "next_review": "2027-02-02",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-gen3-selection-holtec-2025",
    "slug": "us-gen3-selection-holtec",
    "name": "Gen III+ SMR selection: Holtec (Palisades SMR-300)",
    "short_label": "Gen III+ SMR selection: Holtec (Palisades SMR-300)",
    "category": "funding_award",
    "instrument_type": "award",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy",
    "citation": "DOE Gen III+ SMR selection of Holtec, 2 December 2025",
    "legal_scope": "Selection of Holtec Government Services for up to $400 million in federal cost-shared funding for two SMR-300 reactors at the Palisades site in Covert, Michigan.",
    "affects": [
      "project_funding"
    ],
    "status": "selected",
    "lifecycle": [
      {
        "event": "selected",
        "date": {
          "value": "2025-12-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-gen3-smr-selections-2025"
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-doe-gen3-smr-selections-2025",
      "version": "DOE announcement",
      "document_date": "2025-12-02"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-doe-gen3-smr-program",
        "relation": "award_under"
      }
    ],
    "applicability": [
      {
        "project_id": "prj-holtec-palisades",
        "basis": "DOE names two SMR-300 reactors at the Palisades site.",
        "source_id": "src-doe-gen3-smr-selections-2025"
      }
    ],
    "unapproved": "A selection of up to $400 million is not a disbursement; final award terms are not recorded.",
    "summary": "DOE selected Holtec on 2 December 2025 for up to $400 million in cost-shared funding for two SMR-300 units at Palisades.",
    "sources": [
      "src-doe-gen3-smr-selections-2025",
      "src-doe-gen3-smr-program-page"
    ],
    "confidence": "high",
    "last_checked": "2026-11-04",
    "next_review": "2027-02-02",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-gen3-tier2-selections-2026",
    "slug": "us-gen3-tier2-selections-2026",
    "name": "Gen III+ SMR selections of May 2026: early site permits and supply chain",
    "short_label": "Gen III+ selections, May 2026",
    "category": "funding_award",
    "instrument_type": "award",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy",
    "citation": "DOE Gen III+ SMR selections of eight companies, 14 May 2026",
    "legal_scope": "Selections of eight companies for more than $94 million in federal cost-shared funding: Constellation SMR Development and Nebraska Public Power District to pursue NRC early site permits (for a location in New York and a location in Nebraska), and six supply-chain projects (BWXT, Container Technologies Industries, Framatome U.S. Government Solutions, Global Nuclear Fuel Americas, North American Forgemasters (American Forgemasters in DOE's 14 May release), Scot Forge).",
    "affects": [
      "project_funding",
      "siting"
    ],
    "status": "selected",
    "lifecycle": [
      {
        "event": "selected",
        "date": {
          "value": "2026-05-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-gen3-tier2-selections-2026"
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-doe-gen3-tier2-selections-2026",
      "version": "DOE announcement",
      "document_date": "2026-05-14"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-doe-gen3-smr-program",
        "relation": "award_under"
      }
    ],
    "applicability": [],
    "unapproved": "Selections are not disbursements, and an early site permit effort is not a permit; no SMRMap project is linked because the announcement names a state, not a site.",
    "summary": "DOE selected eight companies on 14 May 2026 for more than $94 million in cost-shared funding, including two early site permit efforts whose sites the announcement does not name.",
    "sources": [
      "src-doe-gen3-tier2-selections-2026",
      "src-doe-gen3-smr-program-page"
    ],
    "confidence": "high",
    "last_checked": "2026-11-04",
    "next_review": "2027-02-02",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-smr-emergency-preparedness-2023",
    "slug": "us-nrc-smr-emergency-preparedness",
    "name": "Emergency preparedness rule for small modular reactors and other new technologies",
    "short_label": "SMR emergency preparedness rule",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "88 FR 80050 (final rule, 16 November 2023); docket NRC-2015-0225",
    "legal_scope": "NRC regulation adding alternative, performance-based emergency preparedness requirements that applicants for small modular reactors and other new technologies may use instead of the large light-water reactor requirements.",
    "affects": [
      "nrc_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2023-11-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-smr-emergency-preparedness-2023"
      },
      {
        "event": "effective",
        "date": {
          "value": "2023-12-18",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-smr-emergency-preparedness-2023"
      }
    ],
    "effective_date": {
      "value": "2023-12-18",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-smr-emergency-preparedness-2023",
      "version": "Final rule",
      "document_date": "2023-11-16"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Each applicant's emergency plan is reviewed in its own licensing case.",
    "summary": "Final NRC rule in effect since 18 December 2023 offering SMRs and other new technologies an alternative emergency preparedness framework. It approves no emergency plan for any site.",
    "sources": [
      "src-fr-smr-emergency-preparedness-2023"
    ],
    "confidence": "high",
    "last_checked": "2026-10-03",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-tx-hb14-2025",
    "slug": "tx-hb14-2025",
    "name": "Texas HB 14 (2025): Texas Advanced Nuclear Energy Office and development fund",
    "short_label": "Texas HB 14 (2025)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-TX",
    "jurisdiction_level": "state",
    "issuing_authority": "Texas Legislature",
    "citation": "89(R) HB 14; Texas Government Code chapter 483",
    "legal_scope": "State law creating the Texas Advanced Nuclear Energy Office in the Office of the Governor and the Texas Advanced Nuclear Development Fund, with grant programmes for advanced nuclear projects in Texas.",
    "affects": [
      "project_funding",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-06-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-tx-hb14-history"
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-09-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-tx-hb14-history"
      }
    ],
    "effective_date": {
      "value": "2025-09-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": {
      "date": {
        "value": "2035-09-01",
        "precision": "day",
        "basis": "planned"
      },
      "condition": "The office is abolished and chapter 483 expires on this date unless continued under the Texas Sunset Act."
    },
    "operative_source": {
      "source_id": "src-tx-hb14-enrolled",
      "version": "Enrolled",
      "document_date": "2025-06-20"
    },
    "legal_definitions": [
      {
        "term": "advanced nuclear reactor",
        "section": "Gov't Code 483.001(2)",
        "paraphrase": "Reactor technologies the NRC determines to be Generation III+ or IV, including large light-water reactors, small modular reactors, microreactors and nuclear cogeneration.",
        "source_id": "src-tx-hb14-enrolled",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged. This definition includes large reactors that SMRMap does not cover."
      }
    ],
    "related": [
      {
        "policy_id": "pol-tx-tandf",
        "relation": "establishes"
      },
      {
        "policy_id": "pol-tx-taneo-grant-rules-2026",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "Grants depend on the fund's rules and award decisions; none is recorded here.",
    "summary": "Texas law signed on 20 June 2025 and effective 1 September 2025. It creates a state nuclear office and fund; it does not license or approve any reactor, which remains the NRC's role.",
    "sources": [
      "src-tx-hb14-history",
      "src-tx-hb14-enrolled",
      "src-tx-gov-code-483"
    ],
    "confidence": "high",
    "last_checked": "2026-11-04",
    "next_review": "2027-05-04",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-tx-tandf",
    "slug": "tx-advanced-nuclear-development-fund",
    "name": "Texas Advanced Nuclear Development Fund",
    "short_label": "Texas nuclear development fund",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "US-TX",
    "jurisdiction_level": "state",
    "issuing_authority": "Texas Advanced Nuclear Energy Office",
    "citation": "Texas Government Code chapter 483 (HB 14, 2025)",
    "legal_scope": "State fund administered by TANEO through two reimbursement programmes: project development and supply chain, and advanced nuclear construction.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "opened",
        "date": {
          "value": "2025-09-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-tx-hb14-history",
        "note": "Fund created when HB 14 took effect."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-tx-taneo-tandf",
      "version": "TANEO programme page",
      "document_date": "2026-10-03"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-tx-hb14-2025",
        "relation": "established_by"
      }
    ],
    "applicability": [],
    "unapproved": "No awards recorded: TANEO listed no grant recipients when this record was last checked.",
    "summary": "TANEO says $350 million is appropriated to the fund's programmes and its requests for applications have closed. No grant recipient was listed when this record was last checked.",
    "sources": [
      "src-tx-taneo-tandf",
      "src-tx-hb14-history"
    ],
    "confidence": "high",
    "last_checked": "2026-11-03",
    "next_review": "2027-02-01",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-tx-taneo-grant-rules-2026",
    "slug": "tx-taneo-grant-rules",
    "name": "TANEO grant rules (10 TAC chapter 331)",
    "short_label": "Texas grant rules",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US-TX",
    "jurisdiction_level": "state",
    "issuing_authority": "Texas Advanced Nuclear Energy Office",
    "citation": "10 TAC §§331.1-331.9, 331.20, 331.21, 331.30-331.32 (adopted, Texas Register 13 March 2026)",
    "legal_scope": "State rules for the Texas Advanced Nuclear Development Fund's application, review and award process under HB 14, for its project development and supply chain programme and its construction reimbursement programme.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-01-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-texreg-taneo-proposed-2026"
      },
      {
        "event": "published",
        "date": {
          "value": "2026-03-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-texreg-taneo-adopted-2026",
        "note": "Adoption notice; section 331.32 adopted with changes."
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-03-19",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-texreg-taneo-adopted-2026"
      }
    ],
    "effective_date": {
      "value": "2026-03-19",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-texreg-taneo-adopted-2026",
      "version": "Adopted rule (Texas Register)",
      "document_date": "2026-03-13"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-tx-hb14-2025",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "No grant recipient is recorded; the rules do not license or approve any reactor.",
    "summary": "TANEO's grant rules took effect on 19 March 2026 after a January proposal. They set how grants are applied for and decided; they award nothing themselves.",
    "sources": [
      "src-texreg-taneo-adopted-2026",
      "src-texreg-taneo-proposed-2026"
    ],
    "confidence": "high",
    "last_checked": "2026-10-03",
    "next_review": "2026-11-02",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-smr-certificate-statute",
    "slug": "in-smr-certificate-statute",
    "name": "Indiana Code 8-1-8.5-12.1: small modular nuclear reactor certificates",
    "short_label": "Indiana SMR certificate law",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-IN",
    "jurisdiction_level": "state",
    "issuing_authority": "Indiana General Assembly",
    "citation": "IC 8-1-8.5-12.1 (added by P.L.155-2022; amended through P.L.48-2025)",
    "legal_scope": "State law defining small modular nuclear reactors for Indiana utility certificates and requiring the IURC to adopt rules on certificates for building, buying or leasing them. SEA 424 (P.L.48-2025) also lets a utility seek recovery of project-development costs before a certificate. NRC licensing remains required.",
    "affects": [
      "cost_recovery",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "2023-04-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-in-senate-sea176-2023",
        "note": "Caucus release: SEA 176 signed; it reports the capacity limit raised from 350 MW to 470 MW. Not the code text."
      },
      {
        "event": "amended",
        "date": {
          "value": "2025-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-in-sea424-enrolled-2025",
        "note": "SEA 424's amendment of this section took effect. The definition moved from subsection (a) to (b). Signature of SEA 424 is a separate date on that act's record."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-in-sea424-enrolled-2025",
      "version": "Enrolled SEA 424 amendment of IC 8-1-8.5-12.1; effective 1 July 2025",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "small modular nuclear reactor",
        "section": "IC 8-1-8.5-12.1(b)",
        "paraphrase": "SEA 424 places the definition in subsection (b): a nuclear reactor with a rated electric generating capacity of not more than 470 megawatts, capable of being constructed and operated alone or with similar reactors at one site, and required to be licensed by the NRC. The term includes such a reactor that uses a process to produce hydrogen. The enrolled amendment is effective 1 July 2025. An undated IURC copy still states the pre-2023 limit of not more than 350 MW in former subsection (a). Current compiled-code text has not been independently confirmed from a preserved rendered capture.",
        "source_id": "src-in-sea424-enrolled-2025",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-in-sea424-2025",
        "relation": "amended_by"
      }
    ],
    "applicability": [],
    "unapproved": "Approves no reactor; a utility needs an IURC certificate and NRC licences for any project. The original effective date of the 2022 statute is not recorded on this record.",
    "summary": "Indiana's definition and certificate framework for small modular reactors. The enrolled SEA 424 amendment places the definition in subsection (b), at not more than 470 megawatts. The saved IURC PDF is an older 350 MW copy. Current compiled-code reconciliation is pending; no separate effective date is recorded for the section as a whole.",
    "sources": [
      "src-in-sea424-enrolled-2025",
      "src-iurc-ic-8-1-8-5-12-1",
      "src-in-senate-sea176-2023"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2026-11-04",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-sea424-2025",
    "slug": "in-sea-424-2025",
    "name": "Indiana SEA 424 (2025): SMR development cost recovery",
    "short_label": "Indiana SEA 424 (2025)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-IN",
    "jurisdiction_level": "state",
    "issuing_authority": "Indiana General Assembly",
    "citation": "Senate Enrolled Act 424 (2025)",
    "legal_scope": "State law amending IC 8-1-8.5-12.1. It re-letters the small modular nuclear reactor definition and lets a utility petition the IURC for timely recovery of project development costs through an adjustable rate mechanism (80% tracked, 20% deferred to the next base rate case). It does not apply to a project merely because the project is in Indiana.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-04-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-in-gov-billwatch-2025",
        "note": "Governor's Bill Watch records the signature. The enrolled PDF's signature line is blank."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-in-sea424-enrolled-2025",
        "note": "The enrolled act states an effective date of 1 July 2025. That date is separate from the 10 April 2025 signature recorded by Bill Watch."
      }
    ],
    "effective_date": {
      "value": "2025-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-in-sea424-enrolled-2025",
      "version": "Enrolled act (Senate Enrolled Act No. 424)",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-in-sea423-2025",
        "relation": "companion"
      },
      {
        "policy_id": "pol-in-smr-certificate-statute",
        "relation": "amends"
      }
    ],
    "applicability": [],
    "unapproved": "Cost recovery needs a utility petition and an IURC order; none is recorded here. The act does not license a reactor.",
    "summary": "Signed on 10 April 2025 and effective 1 July 2025. It amends IC 8-1-8.5-12.1: project development costs are defined in subsection (a), and the small modular nuclear reactor definition moves to subsection (b) at not more than 470 megawatts of rated electric generating capacity. A public utility may petition the IURC before a certificate to incur those costs and to recover 80 percent through a periodic rate adjustment, with 20 percent deferred. Signature and effectiveness are different dates.",
    "sources": [
      "src-in-sea424-enrolled-2025",
      "src-in-gov-billwatch-2025",
      "src-iurc-annual-report-2025"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-sea423-2025",
    "slug": "in-sea-423-2025",
    "name": "Indiana SEA 423 (2025): SMR pilot programme and partnerships",
    "short_label": "Indiana SEA 423 (2025)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-IN",
    "jurisdiction_level": "state",
    "issuing_authority": "Indiana General Assembly",
    "citation": "Senate Enrolled Act 423 (2025)",
    "legal_scope": "State law adding IC 8-1-44, a partnership pilot for utility-led small modular reactor projects. A project's presence in Indiana does not make it part of the pilot. SEA 423's enrolled SMR cross-reference uses IC 8-1-8.5-12.1(a), while the enrolled SEA 424 amendment moves the definition to (b). The current compiled chapter has not been independently confirmed.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-05-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-in-gov-billwatch-2025",
        "note": "Governor's Bill Watch records the signature."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-in-sea423-enrolled-2025",
        "note": "The enrolled act states that the new chapter is effective 1 July 2025. That date is separate from the 1 May 2025 signature recorded by Bill Watch."
      }
    ],
    "effective_date": {
      "value": "2025-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": {
      "date": {
        "value": "2035-07-01",
        "precision": "day",
        "basis": "planned"
      },
      "condition": "SEA 423 section 17 states that IC 8-1-44 expires on 1 July 2035. That expiry has not occurred."
    },
    "operative_source": {
      "source_id": "src-in-sea423-enrolled-2025",
      "version": "Enrolled act (Senate Enrolled Act No. 423)",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "small modular nuclear reactor",
        "section": "IC 8-1-44-11, cross-referencing IC 8-1-8.5-12.1(a)",
        "paraphrase": "The enrolled SEA 423 defines SMR by cross-reference to IC 8-1-8.5-12.1(a). The enrolled SEA 424 amendment instead places project development costs in subsection (a) and the reactor definition of not more than 470 megawatts in subsection (b). Whether the current compiled code corrects that cross-reference is unresolved: the saved Title 8 fetches contain only a JavaScript shell, not the chapter text.",
        "source_id": "src-in-sea423-enrolled-2025",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-in-sea424-2025",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "Any project still needs an IURC order and NRC licences; none is recorded here. The act does not itself approve a partnership or a reactor.",
    "summary": "Signed on 1 May 2025 and effective 1 July 2025. It adds IC 8-1-44, a small modular nuclear reactor partnership pilot program, and section 17 says that chapter expires on 1 July 2035. Section 11 cross-references IC 8-1-8.5-12.1(a), whereas the enrolled SEA 424 amendment places the reactor definition in (b). Reconciliation with current compiled chapter text remains unresolved. Signature, effectiveness and expiry are different dates.",
    "sources": [
      "src-in-sea423-enrolled-2025",
      "src-in-gov-billwatch-2025",
      "src-iurc-annual-report-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ca-prc-25524-1",
    "slug": "ca-prc-25524-1",
    "name": "California Public Resources Code § 25524.1: reprocessing condition",
    "short_label": "California PRC § 25524.1",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-CA",
    "jurisdiction_level": "state",
    "issuing_authority": "California Legislature",
    "citation": "Cal. Pub. Res. Code § 25524.1 (amended by Stats. 1994, Ch. 1145, Sec. 16)",
    "legal_scope": "Current California code. Except named Diablo Canyon Units 1 and 2 and San Onofre Units 2 and 3, and except a vested right as defined in the section, no nuclear fission thermal powerplant requiring the reprocessing of fuel rods may receive a land-use permit or, where applicable, a commission certification until the stated reprocessing findings are made and reported. The opened subsections do not display a separate vested-right definition. The section states no reactor-size class, and it is not an NRC licensing bar.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "1995-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ca-leginfo-prc-25524-1",
        "note": "The official code says this section was amended by 1994 chapter 1145, section 16, effective 1 January 1995. The original enactment date is not on this page. The condition is a state land-use and certification limit, not an NRC decision and not an SMR-only rule."
      }
    ],
    "effective_date": {
      "value": "1995-01-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ca-leginfo-prc-25524-1",
      "version": "California Law current section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "nuclear fission thermal powerplant requiring the reprocessing of fuel rods",
        "section": "§ 25524.1(a)",
        "paraphrase": "The section uses this class rather than a small-modular-reactor definition. Named existing Diablo Canyon and San Onofre units are excepted, as is a vested right as defined in the section.",
        "source_id": "src-ca-leginfo-prc-25524-1",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ca-prc-25524-2",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "The opened code does not record a commission finding that the reprocessing conditions are met or unmet. It does not certify or approve any plant. A California location does not bring a tracked project under this section.",
    "summary": "California's current code conditions land-use permission and commission certification for nuclear fission thermal powerplants that require reprocessing of fuel rods. The 1994 amendment took effect on 1 January 1995. Named existing units are excepted. This is not an SMR-only statute and it does not approve a reactor.",
    "sources": [
      "src-ca-leginfo-prc-25524-1"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ca-prc-25524-2",
    "slug": "ca-prc-25524-2",
    "name": "California Public Resources Code § 25524.2: waste-disposal condition",
    "short_label": "California PRC § 25524.2",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-CA",
    "jurisdiction_level": "state",
    "issuing_authority": "California Legislature",
    "citation": "Cal. Pub. Res. Code § 25524.2 (amended by Stats. 1994, Ch. 1145, Sec. 17)",
    "legal_scope": "Current California code. Except named Diablo Canyon Units 1 and 2 and San Onofre Units 2 and 3, no nuclear fission thermal powerplant may receive a land-use permit or, where applicable, commission certification until the commission finds that an approved demonstrated technology or means exists for disposal of high-level nuclear waste and reports that finding to the Legislature. The disposal definition is a method for permanent and terminal disposition; the section does not require disposal facilities to exist when the finding is made. Permanent construction may not start until the section is met. The section states no reactor-size class, and it is not an NRC licensing bar.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "1995-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ca-leginfo-prc-25524-2",
        "note": "The official code says this section was amended by 1994 chapter 1145, section 17, effective 1 January 1995. It conditions state land use and certification on a high-level-waste finding. It does not approve a plant."
      }
    ],
    "effective_date": {
      "value": "1995-01-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ca-leginfo-prc-25524-2",
      "version": "California Law current section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "technology or means for the disposal of high-level nuclear waste",
        "section": "§ 25524.2(c)",
        "paraphrase": "A method for the permanent and terminal disposition of high-level nuclear waste. The section does not require disposal facilities to be available when the commission makes its finding, and the disposition does not preclude an approved process for retrieval.",
        "source_id": "src-ca-leginfo-prc-25524-2",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ca-prc-25524-1",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "The opened code does not record a commission finding that the waste-disposal condition is met or unmet. It does not approve any plant. A California location does not bring a tracked project under this section.",
    "summary": "California's current code conditions land-use permission and commission certification for a nuclear fission thermal powerplant on a high-level-waste disposal finding and a report to the Legislature. The 1994 amendment took effect on 1 January 1995. Named existing units are excepted. This is not an SMR-only statute and it does not approve a reactor.",
    "sources": [
      "src-ca-leginfo-prc-25524-2"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-mn-216b243-3b",
    "slug": "mn-216b243-subd-3b",
    "name": "Minnesota Statutes § 216B.243, subdivision 3b: nuclear certificate of need",
    "short_label": "Minnesota § 216B.243, subd. 3b",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-MN",
    "jurisdiction_level": "state",
    "issuing_authority": "Minnesota Legislature",
    "citation": "Minn. Stat. § 216B.243, subd. 3b",
    "legal_scope": "Current Minnesota Statutes. The commission may not issue a certificate of need for construction of a new nuclear-powered electric generating plant. A certificate of need for additional spent-fuel storage at a facility seeking a license extension must address continued-operation impacts. This is a state certificate-of-need bar, not an NRC licensing bar, and the section does not define or limit itself to small modular reactors. The 1994 session law's original subdivision was the construction sentence only.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "1994-05-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mn-laws-1994-c641",
        "note": "Chapter 641 records that the governor signed it on 10 May 1994. Article 2 added the certificate-of-need bar for a new nuclear-powered electric generating plant."
      },
      {
        "event": "effective",
        "date": {
          "value": "1994-05-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mn-laws-1994-c641",
        "note": "Article 2 says it is effective the day following final enactment. The same chapter records the 10 May 1994 signature, so that following day is 11 May 1994."
      },
      {
        "event": "amended",
        "date": {
          "value": "2003",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-mn-revisor-216b243",
        "note": "The current code's history line says 2003 c. 11, art. 1, s. 4 amended subdivision 3b. The 2003 session law was not opened, so the day of that amendment is not recorded. The current text includes the spent-fuel storage sentence, which was not in the 1994 subdivision."
      }
    ],
    "effective_date": {
      "value": "1994-05-11",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-mn-revisor-216b243",
      "version": "Minnesota Revisor current section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "nuclear-powered electric generating plant",
        "section": "subd. 3b(a)",
        "paraphrase": "The subdivision uses this term and does not define small modular reactor, module size, or a megawatt threshold.",
        "source_id": "src-mn-revisor-216b243",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "No Minnesota commission order finding an exception was opened. 2026 c. 47, shown on the same code page, amends subdivision 8 rather than subdivision 3b. No award, appropriation, or project approval is in this section. Minnesota has no tracked site in this dataset, and geography would not create a link.",
    "summary": "Minnesota's current certificate-of-need statute says the commission may not issue a certificate of need to construct a new nuclear-powered electric generating plant. The prohibition was signed on 10 May 1994 and took effect the next day. A 2003 amendment is recorded by year only. The bar is not limited to small modular reactors and is not an NRC decision.",
    "sources": [
      "src-mn-revisor-216b243",
      "src-mn-laws-1994-c641"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-va-56-585-1-14",
    "slug": "va-56-585-1-14",
    "name": "Virginia § 56-585.1:14: Phase II small modular reactor development-cost recovery",
    "short_label": "Virginia § 56-585.1:14",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-VA",
    "jurisdiction_level": "state",
    "issuing_authority": "Virginia General Assembly",
    "citation": "Va. Code § 56-585.1:14 (2024 Acts, c. 789; SB 454)",
    "legal_scope": "Current Code of Virginia, effective until 31 December 2029. A Phase II utility may petition the State Corporation Commission to recover development costs for one small modular reactor facility. The Commission may approve or deny the petition. Costs incurred before 1 July 2024, and 20 percent of costs incurred after that date, are not eligible for accelerated recovery under this section. The annual revenue requirement may not raise a typical Virginia residential 1,000 kWh bill by more than $1.40. Cost recovery is not a construction permit or an operating license.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2024-04-17",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-va-chap-789-2024",
        "note": "Chapter 789 states that it was approved on 17 April 2024. It lets a Phase II utility ask the State Corporation Commission to recover small modular reactor development costs. It does not approve a reactor."
      }
    ],
    "effective_date": null,
    "expiry": {
      "date": {
        "value": "2029-12-31",
        "precision": "day",
        "basis": "planned"
      },
      "condition": "Chapter 789, enactment clause 2, says the provisions of the act expire on 31 December 2029. The current code header repeats that date. The expiry has not occurred."
    },
    "operative_source": {
      "source_id": "src-va-chap-789-2024",
      "version": "2024 Acts of Assembly, Chapter 789",
      "document_date": "2024-04-17"
    },
    "legal_definitions": [
      {
        "term": "Small modular reactor",
        "section": "§ 56-585.1:14(A)",
        "paraphrase": "A nuclear reactor that produces nuclear power and has a nameplate capacity that does not exceed 500 megawatts of generating capacity per reactor.",
        "source_id": "src-va-chap-789-2024",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-va-56-585-1-15",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "No Commission rate-adjustment order was opened. The act preserves the Commission's authority to approve or deny a petition. The chapter does not state a separate day on which it took effect. A Virginia location does not make a tracked project eligible.",
    "summary": "Virginia approved Chapter 789 on 17 April 2024. It allows a Phase II utility to seek recovery of development costs for one small modular reactor facility, with a 500-megawatt nameplate definition and a $1.40 residential cap. The act expires on 31 December 2029. It does not license or approve a reactor.",
    "sources": [
      "src-va-chap-789-2024",
      "src-va-code-56-585-1-14"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-va-56-585-1-15",
    "slug": "va-56-585-1-15",
    "name": "Virginia § 56-585.1:15: Phase I small modular nuclear facility development-cost recovery",
    "short_label": "Virginia § 56-585.1:15",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-VA",
    "jurisdiction_level": "state",
    "issuing_authority": "Virginia General Assembly",
    "citation": "Va. Code § 56-585.1:15 (2024 Acts, c. 836)",
    "legal_scope": "Current Code of Virginia, effective until 1 July 2034. A Phase I utility, defined from its 1 July 1999 rate-case status, may ask the State Corporation Commission to review project development costs for a potential small modular nuclear facility before a certificate, no earlier than 1 July 2024. Approved costs may be recovered through a rate-adjustment clause beginning with filings from 1 July 2025. The annual revenue requirement may not exceed $25 million, and recovered project development costs may not exceed $125 million excluding site acquisition. A clause may not be implemented before 1 January 2026. The facility may serve customers in the Commonwealth or West Virginia, with Virginia's share limited to the share of energy and capacity assigned to Virginia customers. This is cost recovery, not a reactor approval.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2024-04-17",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-va-chap-836-2024",
        "note": "Chapter 836 states that it was approved on 17 April 2024. It lets a Phase I utility seek recovery of small modular nuclear facility development costs, capped at $25 million a year and $125 million overall excluding the site. It does not approve a reactor."
      }
    ],
    "effective_date": null,
    "expiry": {
      "date": {
        "value": "2034-07-01",
        "precision": "day",
        "basis": "planned"
      },
      "condition": "Chapter 836, enactment clause 2, says the provisions of the act expire on 1 July 2034. The current code header repeats that date. The expiry has not occurred."
    },
    "operative_source": {
      "source_id": "src-va-chap-836-2024",
      "version": "2024 Acts of Assembly, Chapter 836",
      "document_date": "2024-04-17"
    },
    "legal_definitions": [
      {
        "term": "Small modular nuclear facility",
        "section": "§ 56-585.1:15(A)",
        "paraphrase": "A nuclear reactor that has a rated electric generating capacity of not more than 500 megawatts that is capable of being constructed and operated either alone or in combination with one or more similar reactors at a single site.",
        "source_id": "src-va-chap-836-2024",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-va-56-585-1-14",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "No Commission order approving a rate-adjustment clause or a facility was opened. The earliest implementation date of 1 January 2026 is not evidence that a clause exists. The chapter does not state a separate day on which it took effect. No project is named.",
    "summary": "Virginia approved Chapter 836 on 17 April 2024. It allows a Phase I utility to seek recovery of development costs for a small modular nuclear facility, using a 500-megawatt definition that is separate from the Phase II section. Annual recovery is capped at $25 million and overall recovery at $125 million excluding the site. The act expires on 1 July 2034 and does not approve a reactor.",
    "sources": [
      "src-va-chap-836-2024",
      "src-va-code-56-585-1-15"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-id-eo-2025-06",
    "slug": "id-eo-2025-06",
    "name": "Idaho Executive Order 2025-06: Advanced Nuclear Energy Task Force",
    "short_label": "Idaho EO 2025-06",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US-ID",
    "jurisdiction_level": "state",
    "issuing_authority": "Governor of Idaho",
    "citation": "Idaho Executive Order No. 2025-06 (22 September 2025)",
    "legal_scope": "Governor's order establishing an advisory Idaho Advanced Nuclear Energy Task Force of no more than 20 members. The task force assesses, recommends and reports. It does not issue a license, site a reactor, appropriate funds, or approve a project. The order names Idaho National Laboratory as a research institution and a possible member seat, not as a particular reactor project. The witness clause places the signature at the Capitol in Boise on 22 September 2025. The same press page's news sentence says the signing was at Idaho National Laboratory.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-09-22",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-id-eo-2025-06-press",
        "note": "The order's witness clause is 22 September 2025 at the Capitol in Boise. The order creates an advisory task force. It does not license a reactor. The press sentence locating the signing at Idaho National Laboratory is a separate sentence on the same page."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-id-eo-2025-06-press",
      "version": "Governor's page reproducing Executive Order 2025-06",
      "document_date": "2025-09-22"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-id-eo-2021-02",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "No statute, commission order, appropriation, or reactor permission is created by this order. The press page says the task force replaces the Leadership in Nuclear Energy Commission; that sentence is not in the order text that follows it. Idaho reactor projects are not linked. The official PDF is a scan; OCR corroborates the title, number, advisory paragraphs and Boise witness clause. Executive Order 2021-02 was opened. Its text continues the Leadership in Nuclear Energy Commission and does not say that the 2025 order rescinds it.",
    "summary": "On 22 September 2025 Governor Brad Little signed Executive Order 2025-06 creating the Idaho Advanced Nuclear Energy Task Force. The order tells the task force to advise on nuclear policy, including small modular reactors among other technologies. It does not approve, fund, or license a reactor. The order text signs at the Capitol in Boise; the press sentence says Idaho National Laboratory.",
    "sources": [
      "src-id-eo-2025-06-press",
      "src-id-eo-2025-06-pdf",
      "src-id-eo-index",
      "src-id-eo-2021-02"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-me-35a-4302",
    "slug": "me-35a-4302",
    "name": "Maine Title 35-A, § 4302: nuclear construction referendum",
    "short_label": "Maine § 4302 referendum",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-ME",
    "jurisdiction_level": "state",
    "issuing_authority": "Maine Legislature",
    "citation": "Me. Rev. Stat. tit. 35-A, § 4302",
    "legal_scope": "Current Maine statute. Before construction of any nuclear power plant in the state, the question of approving that construction must be submitted to voters at the next statewide election. If a majority favor construction, the Governor proclaims that fact. The opened section does not define nuclear power plant and does not limit the requirement to small modular reactors. It is not an NRC licensing bar.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1987",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-me-35a-4302",
        "note": "The official history line says PL 1987, c. 141, §A6 enacted this section. The day is not on the page. The requirement is a statewide voter question before construction, not an approval of a plant."
      },
      {
        "event": "amended",
        "date": {
          "value": "1999",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-me-35a-4302",
        "note": "The official history line says PL 1999, c. 398, §A95 amended the section. The day and the changed words were not opened in the 1999 act."
      }
    ],
    "effective_date": {
      "value": "1987",
      "precision": "year",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-me-35a-4302",
      "version": "Maine Legislature current section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The opened section does not record that a referendum has been held or that the Governor has proclaimed a result. It does not approve a plant. No Maine site is tracked in this dataset.",
    "summary": "Maine's current statute requires a statewide voter referendum before construction of any nuclear power plant. The section was enacted in 1987 and amended in 1999; the days are not on the opened page. A favorable vote is proclaimed by the Governor. The requirement is not limited to small modular reactors and does not approve a reactor.",
    "sources": [
      "src-me-35a-4302"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-wv-sb4-2022",
    "slug": "wv-sb4-2022",
    "name": "West Virginia Enrolled Senate Bill 4 (2022): repeal of the nuclear-construction article",
    "short_label": "West Virginia SB 4 repeal",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-WV",
    "jurisdiction_level": "state",
    "issuing_authority": "West Virginia Legislature",
    "citation": "2022 W. Va. Acts, Enrolled Senate Bill 4",
    "legal_scope": "Enrolled act repealing West Virginia Code §§16-27A-1 and 16-27A-2, the article whose heading is a ban on construction of nuclear power plants. Current official code pages opened the same day display both section bodies as repealed and still show that article heading. The repeal is not a certificate, siting approval, or license for any reactor, and the act states no small-modular-reactor definition.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "2022-01-31",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wv-sb4-enrolled-2022",
        "note": "The enrolled act says it passed on 31 January 2022. It repeals the two sections of the nuclear-construction article. Repeal is not approval of a reactor."
      },
      {
        "event": "effective",
        "date": {
          "value": "2022-05-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wv-sb4-enrolled-2022",
        "note": "The enrolled act says it is in effect 90 days from passage. Ninety days after 31 January 2022 is 1 May 2022. Current code pages display both repealed sections."
      }
    ],
    "effective_date": {
      "value": "2022-05-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-wv-sb4-enrolled-2022",
      "version": "Enrolled Senate Bill 4, 2022 regular session",
      "document_date": "2022-01-31"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "No replacement construction or siting statute was opened. The current code still titles the article as a ban even though both section bodies say repealed. No reactor approval is granted. No West Virginia site is tracked in this dataset.",
    "summary": "West Virginia Enrolled Senate Bill 4, passed on 31 January 2022, repeals Code sections 16-27A-1 and 16-27A-2. It took effect 90 days from passage, on 1 May 2022. Official code pages still use the ban article heading and display both sections as repealed. The repeal does not approve a reactor.",
    "sources": [
      "src-wv-sb4-enrolled-2022",
      "src-wv-code-16-27a-1",
      "src-wv-code-16-27a-2"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ky-164-2805",
    "slug": "ky-krs-164-2805",
    "name": "Kentucky KRS 164.2805: Nuclear Reactor Site Readiness Pilot Program",
    "short_label": "Kentucky KRS 164.2805",
    "category": "funding_programme",
    "instrument_type": "authorization_programme",
    "jurisdiction": "US-KY",
    "jurisdiction_level": "state",
    "issuing_authority": "Kentucky General Assembly",
    "citation": "Ky. Rev. Stat. § 164.2805 (2026 Ky. Acts ch. 56, sec. 1)",
    "legal_scope": "Current compiled statute, effective 15 July 2026. The Kentucky Nuclear Energy Development Authority is directed to create a pilot program to help applicants seek NRC early site permits, construction permits, or combined licenses for new nuclear energy generating facilities in the Commonwealth. On the Authority's recommendation, the General Assembly may award a grant of up to one-third of actual application costs, not to exceed $25 million per project. The facility definition is Generation III Plus, Generation IV, or later, selling at least some electricity to the public. It is not a small-modular-reactor definition. A grant authorization is not an award, and neither is an NRC permit.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2026-04-08",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ky-ch56-2026",
        "note": "The session-law PDF prints Signed by Governor April 8, 2026. It does not print the 15 July 2026 effective line. That date remains the compiled section."
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-07-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ky-krs-164-2805",
        "note": "The compiled statute says it was created by 2026 Ky. Acts ch. 56, section 1, effective 15 July 2026. It authorizes a site-readiness grant process. The compiled page records no award. The session-law PDF prints the 8 April 2026 signature and does not print this effective line."
      }
    ],
    "effective_date": {
      "value": "2026-07-15",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ky-krs-164-2805",
      "version": "Kentucky Legislative Research Commission compiled section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "Nuclear energy generating facility",
        "section": "KRS 164.2805(1)(i)",
        "paraphrase": "A facility containing a nuclear reactor of Generation III Plus, Generation IV, or later design that produces electricity, at least some of which is sold to the public.",
        "source_id": "src-ky-krs-164-2805",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ky-278-615",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "No awards recorded. The statute says the General Assembly may award up to one-third of costs, not to exceed $25,000,000 per project. This page records no applicant, no recommendation, no appropriation, and no award. Forfeiture conditions apply if a recipient misses later NRC or construction deadlines. No project is named. A Kentucky location does not create eligibility.",
    "summary": "Kentucky's compiled KRS 164.2805 took effect on 15 July 2026. It creates a nuclear site-readiness pilot and allows the General Assembly, on the Authority's recommendation, to award application-cost grants capped at $25 million per project. The covered facility is Generation III Plus, Generation IV, or later, not a small modular reactor as such. KNEDA issued an RFI on 16 October 2026, with voluntary responses due 6 November at 5 PM Eastern, to inform the future application and administration process. This is information gathering, not a funding application, eligibility determination, grant award, funding commitment or NRC permission. No award is recorded.",
    "sources": [
      "src-ky-krs-164-2805",
      "src-ky-ch56-2026",
      "src-kneda-site-readiness-rfi-20261016"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ky-278-615",
    "slug": "ky-krs-278-615",
    "name": "Kentucky KRS 278.615: nuclear permit and license cost recovery",
    "short_label": "Kentucky KRS 278.615",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-KY",
    "jurisdiction_level": "state",
    "issuing_authority": "Kentucky General Assembly",
    "citation": "Ky. Rev. Stat. § 278.615 (2026 Ky. Acts ch. 56, sec. 2)",
    "legal_scope": "Current compiled statute, effective 15 July 2026. On application by a regulated utility, the commission may allow recovery of costs not already in rates that were incurred to apply for and procure an NRC early site permit, construction permit, or combined license for a new nuclear energy generating facility in the Commonwealth. Recovery is not allowed for amounts offset by a KRS 164.2805 grant. The facility definition matches the Generation III Plus, Generation IV, or later definition. Permission to seek cost recovery is not permission to construct or operate.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2026-04-08",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ky-ch56-2026",
        "note": "The session-law PDF prints Signed by Governor April 8, 2026. It does not print the 15 July 2026 effective line. That date remains the compiled section."
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-07-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ky-krs-278-615",
        "note": "The compiled statute says it was created by 2026 Ky. Acts ch. 56, section 2, effective 15 July 2026. It lets the commission consider cost recovery for specified NRC permit costs. It does not approve a plant. The session-law PDF prints the 8 April 2026 signature and does not print this effective line."
      }
    ],
    "effective_date": {
      "value": "2026-07-15",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ky-krs-278-615",
      "version": "Kentucky Legislative Research Commission compiled section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "Nuclear energy generating facility",
        "section": "KRS 278.615(1)(f)",
        "paraphrase": "A facility containing a nuclear reactor of Generation III Plus, Generation IV, or later design that produces electricity, at least some of which is sold to the public.",
        "source_id": "src-ky-krs-278-615",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ky-164-2805",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "No commission cost-recovery order was opened. The statute says the commission may allow recovery; it does not require it. Amounts offset by a KRS 164.2805 grant are excluded, and no such grant is recorded. No project is named.",
    "summary": "Kentucky's compiled KRS 278.615 took effect on 15 July 2026. It allows the commission to consider recovery of a regulated utility's costs of seeking specified NRC permits for a new nuclear energy generating facility in the state. The facility class is Generation III Plus, Generation IV, or later. No recovery order was opened, and the statute does not approve a reactor.",
    "sources": [
      "src-ky-krs-278-615",
      "src-ky-ch56-2026"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-wi-act-2015-344",
    "slug": "wi-act-2015-344",
    "name": "2015 Wisconsin Act 344: repeal of the nuclear-construction conditions",
    "short_label": "2015 Wisconsin Act 344",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-WI",
    "jurisdiction_level": "state",
    "issuing_authority": "Wisconsin Legislature",
    "citation": "2015 Wisconsin Act 344",
    "legal_scope": "Session law that repeals Wis. Stat. § 196.493 and strikes the words 'and s. 196.493' from § 196.491(3)(d) (intro.). It also creates § 1.12(4)(cm). The current § 1.12(4) list, opened the same day, places that item after combustible renewable resources and before nonrenewable combustible resources. The item covers a reactor design, or an amended reactor design, approved after 31 December 2010 by the U.S. Nuclear Regulatory Commission. The opened act does not restate the repealed section. Repeal of the conditions is not a certificate or a licence.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2016-04-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wi-act-2015-344",
        "note": "The official act states its date of enactment as 1 April 2016. It is 2015 Assembly Bill 384. Enactment is not a Public Service Commission certificate."
      },
      {
        "event": "published",
        "date": {
          "value": "2016-04-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wi-act-2015-344",
        "note": "The official act states its date of publication as 2 April 2016."
      },
      {
        "event": "effective",
        "date": {
          "value": "2016-04-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wi-stat-991-11",
        "note": "The act page quotes s. 991.11, and the current section says an act that does not prescribe its own time takes effect the day after publication. This act prescribes no other time. The day after 2 April 2016 is 3 April 2016."
      }
    ],
    "effective_date": {
      "value": "2016-04-03",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-wi-act-2015-344",
      "version": "2015 Wisconsin Act 344, official act page, opened 4 October 2026",
      "document_date": "2016-04-01"
    },
    "legal_definitions": [
      {
        "term": "Advanced nuclear energy",
        "section": "§ 1.12(4)(cm)",
        "paraphrase": "A reactor design, or an amended reactor design, approved after 31 December 2010 by the U.S. Nuclear Regulatory Commission. The current section places this item in the state's energy-priority list. It is not a small-modular-reactor definition.",
        "source_id": "src-wi-stat-1-12",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-wi-act-2025-12",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The opened act does not restate former § 196.493, and the old section URL returned HTTP 404. No certificate of public convenience and necessity is recorded. A Wisconsin location would not by itself come under this act. No governor order or commission rule was opened with it.",
    "summary": "2015 Wisconsin Act 344 repeals § 196.493 and removes that cross-reference from the certificate statute. The date of enactment is 1 April 2016, publication is 2 April 2016, and s. 991.11 makes it effective on 3 April 2016. Current § 1.12(4)(cm) still lists advanced nuclear energy approved by the NRC after 31 December 2010, after combustible renewables and before nonrenewable combustible resources. The repeal does not approve a plant.",
    "sources": [
      "src-wi-act-2015-344",
      "src-wi-stat-1-12",
      "src-wi-stat-991-11"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-wi-act-2025-12",
    "slug": "wi-act-2025-12",
    "name": "2025 Wisconsin Act 12: nuclear power siting study",
    "short_label": "2025 Wisconsin Act 12",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-WI",
    "jurisdiction_level": "state",
    "issuing_authority": "Wisconsin Legislature",
    "citation": "2025 Wisconsin Act 12",
    "legal_scope": "Session law creating Wis. Stat. § 196.025(8). The Public Service Commission must study nuclear and fusion siting, including advanced nuclear reactors and small modular reactors, and may contract for the work. The opened current-code page displays the subsection heading and the definition sentence and certifies the statutes in effect on 1 October 2026. The duty list was read from the act. A study is not a certificate, and the act names no site.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025-07-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wi-act-2025-12",
        "note": "The official act states its date of enactment as 2 July 2025. It is 2025 Senate Bill 125. Enactment orders a study. It does not approve a reactor."
      },
      {
        "event": "published",
        "date": {
          "value": "2025-07-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wi-act-2025-12",
        "note": "The official act states its date of publication as 3 July 2025."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-07-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wi-stat-991-11",
        "note": "Current s. 991.11 says an act that does not expressly prescribe its time takes effect the day after publication. This act prescribes no other effective time. The day after 3 July 2025 is 4 July 2025. The bracketed report date is a separate insert."
      }
    ],
    "effective_date": {
      "value": "2025-07-04",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-wi-act-2025-12",
      "version": "2025 Wisconsin Act 12, official act page, opened 4 October 2026",
      "document_date": "2025-07-02"
    },
    "legal_definitions": [
      {
        "term": "advanced nuclear reactor",
        "section": "§ 196.025(8)(a)",
        "paraphrase": "The subsection gives this term the meaning in 42 USC 16271(b)(1) and does not restate that federal definition. The study's duties also name small modular reactors among fission and fusion technologies.",
        "source_id": "src-wi-act-2025-12",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-wi-act-2015-344",
        "relation": "related"
      }
    ],
    "programme_ids": [
      "prg-us-wisconsin-psc-uw-nuclear-siting-study"
    ],
    "applicability": [],
    "unapproved": "The opened act leaves the study-report date as an LRB insert, and the opened current-code page does not display a filled calendar date. No commission report, contract, or certificate was opened. The study does not approve a site. No appropriation figure is in the act.",
    "summary": "2025 Wisconsin Act 12 creates a Public Service Commission nuclear power siting study. The date of enactment is 2 July 2025, publication is 3 July 2025, and s. 991.11 makes it effective on 4 July 2025. The study covers nuclear and fusion generation, including small modular reactors. The report date on the opened act is an LRB insert, not a calendar day. A study is not permission to build.",
    "sources": [
      "src-wi-act-2025-12",
      "src-wi-stat-196-025",
      "src-wi-stat-991-11"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-id-39-3027",
    "slug": "id-39-3027",
    "name": "Idaho Code § 39-3027: voter submission before a law prohibiting nuclear generation",
    "short_label": "Idaho Code § 39-3027",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-ID",
    "jurisdiction_level": "state",
    "issuing_authority": "Idaho Legislature",
    "citation": "Idaho Code § 39-3027 (1982 Initiative Measure 3)",
    "legal_scope": "Current official section, opened 4 October 2026. The legislature's page says the statutes are updated on 1 July following the session. No Idaho law may prohibit the use of nuclear energy to generate electricity unless that proposed measure is first submitted to voters at the next earliest general election. The result is advisory and does not prevent the legislature from acting. The section is not a site certificate, a construction permit, or a limit that applies only to one reactor size. It was added in 1982 by Initiative Measure 3. The day is not on the page.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1982",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-id-code-39-3027",
        "note": "The official history line says the section was added in 1982 by Initiative Measure 3. The day is not on the page. The section limits a prohibition; it does not approve a plant."
      }
    ],
    "effective_date": {
      "value": "1982",
      "precision": "year",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-id-code-39-3027",
      "version": "Idaho Legislature current section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "No vote under this section was opened. The section does not approve a reactor, name a site, or appropriate funds. Section 39-3020, the Western Interstate Nuclear Compact, was opened separately and is its own record. Senate Concurrent Resolution 113 was opened as a support resolution and is not an enactment.",
    "summary": "Idaho Code § 39-3027, added in 1982, says the state may not enact a law prohibiting nuclear generation of electricity unless the proposal is first put to voters. The vote is advisory. The opened section is not a reactor approval and is not limited to one class of reactor.",
    "sources": [
      "src-id-code-39-3027"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-id-eo-2021-02",
    "slug": "id-eo-2021-02",
    "name": "Idaho Executive Order 2021-02: Leadership in Nuclear Energy Commission",
    "short_label": "Idaho EO 2021-02",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US-ID",
    "jurisdiction_level": "state",
    "issuing_authority": "Governor of Idaho",
    "citation": "Idaho Executive Order No. 2021-02 (26 January 2021)",
    "legal_scope": "Governor Brad Little's order continuing the Leadership in Nuclear Energy Commission. The commission advises the governor on the Idaho National Laboratory and associated industries. Its duties are advisory. Membership is appointed by and serves at the pleasure of the governor. The witness clause is the Capitol in Boise on 26 January 2021. The order does not license a reactor, appropriate money, or say that it expires.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2021-01-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-id-eo-2021-02",
        "note": "The witness clause is 26 January 2021 at the Capitol in Boise. The order continues an advisory commission. It does not license a reactor."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-id-eo-2021-02",
      "version": "Official PDF of Executive Order 2021-02",
      "document_date": "2021-01-26"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-id-eo-2025-06",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Executive Order 2025-06 does not say that it rescinds this order. A sentence on the 2025 press page says the later task force replaces the Leadership in Nuclear Energy Commission; that sentence is not in the 2025 order text. No commission report or appropriation was opened. No Idaho project is linked.",
    "summary": "On 26 January 2021 Governor Brad Little signed Executive Order 2021-02 continuing the Leadership in Nuclear Energy Commission as an advisory body. The order does not approve or fund a reactor. The later 2025 task-force order does not, in its own text, rescind this one.",
    "sources": [
      "src-id-eo-2021-02",
      "src-id-eo-2025-06-press"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-mi-hb4128-2025",
    "slug": "mi-hb4128-2025",
    "name": "Michigan 2025 House Bill 4128: proposed credit for small modular reactor and uprate electricity",
    "short_label": "Michigan HB 4128 (House-passed)",
    "category": "proposed",
    "instrument_type": "bill",
    "jurisdiction": "US-MI",
    "jurisdiction_level": "state",
    "issuing_authority": "Michigan House of Representatives",
    "citation": "2025 Michigan House Bill 4128 (H-3), as passed by the House",
    "legal_scope": "House-passed substitute H-3, not an enrolled act and not part of the Michigan Compiled Laws. For tax years beginning on or after the amendatory act's effective date, a taxpayer could claim a nonrefundable credit of $1.00 per kilowatt hour of electricity produced with small modular reactors, an extended power uprate, or a stretch power uprate at a qualified facility and sold to an unrelated person. The credit would be available for the first 10 years of operation and only for the first 10,000 megawatt hours from a single qualified facility, with a 15-year carryforward. A qualified facility can be an existing nuclear facility or an advanced nuclear reactor facility. The House-passed small-modular-reactor definition states no megawatt limit. The enacting section says the act does not take effect unless House Bills 4124, 4125, 4126, 4127 and 4129 are also enacted. The House passed this bill on 28 October 2025 and gave it immediate effect. That vote is not enactment.",
    "affects": [],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "introduced",
        "date": {
          "value": "2025-02-25",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mi-hb4128-status",
        "note": "The status page says Representative Greg VanWoerkom introduced the bill on 25 February 2025. The introduced text is not the House-passed substitute."
      },
      {
        "event": "passed",
        "date": {
          "value": "2025-10-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mi-hb4128-status",
        "note": "The House passed substitute H-3 on 28 October 2025 and gave it immediate effect, yeas 78, nays 26. The Senate referred the bill to the Committee on Energy and Environment on 30 October 2025. House passage is not enactment."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-mi-hb4128-house-passed",
      "version": "As passed by the House, 28 October 2025, substitute H-3",
      "document_date": "2025-10-28"
    },
    "legal_definitions": [
      {
        "term": "Small modular reactors",
        "section": "H-3 Sec. 678(5)(f)",
        "paraphrase": "Small-scale advanced nuclear reactors that use fission to generate electricity and may be constructed and operated in combination with similar reactors at a single site. The House-passed sentence states no megawatt limit.",
        "source_id": "src-mi-hb4128-house-passed",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The bill is not enacted. The Senate referral on 30 October 2025 is the last action on the opened status page. The House-passed text says it does not take effect unless House Bills 4124, 4125, 4126, 4127 and 4129 are enacted; those bills were not opened. No taxpayer, facility, or megawatt-hour total is named. The credit would not be a reactor licence. No Michigan project is linked.",
    "summary": "The Michigan House passed a proposed corporate-income-tax credit on 28 October 2025 for electricity from small modular reactors or power uprates. The credit would be $1.00 per kilowatt hour, limited to the first 10,000 megawatt hours at a qualified facility. The Senate has not passed it, and the bill says it cannot take effect unless five tied bills are also enacted. It approves no reactor.",
    "sources": [
      "src-mi-hb4128-status",
      "src-mi-hb4128-house-passed"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "status_checked": "2026-10-31",
    "next_review": "2027-01-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-wy-ch103-2022",
    "slug": "wy-ch103-2022",
    "name": "Wyoming 2022 Chapter 103: advanced nuclear reactor requirements",
    "short_label": "Wyoming Chapter 103 (2022)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-WY",
    "jurisdiction_level": "state",
    "issuing_authority": "Wyoming Legislature",
    "citation": "2022 Wyo. Sess. Laws ch. 103 (House Enrolled Act 59)",
    "legal_scope": "2022 session law, signed 21 March 2022 and assigned Chapter 103 the same day. The enrolled text amends the former small-modular wording so the section covers an advanced nuclear reactor: a nuclear reactor, including necessary ancillary facilities or structures, that is an improvement over reactors placed in service before 1 January 2021 and that has a United States Nuclear Regulatory Commission license. On-site storage of spent fuel or high-level waste from that reactor still requires the Commission requirements to be met. The Industrial Development Information and Siting Act applies only so far as it does not interfere with, contradict, or duplicate Commission requirements. A public utility that replaces a coal-fired plant with such a reactor operated in Wyoming is outside the cost-recovery limitation in W.S. 37-3-117. The production-tax exemption for a test or demonstration reactor continues, and from 1 July 2035 it is available only for a month in which at least 80 percent of the uranium used to produce electricity came from mines in the United States. The act says it is effective immediately when the steps in Wyoming Constitution Article 4, Section 8 are complete. Section 2 repeals W.S. 35-11-1506(e)(ii) through (v), W.S. 35-11-2101(a), and W.S. 35-11-2101(d)(iii)(A) through (C). Section 3 directs the Department of Environmental Quality and the Environmental Quality Council to adopt the rules needed to carry out the act. This record is the 2022 act. The Title 35 compilation was opened on 4 October 2026 and is stored separately.",
    "affects": [
      "siting",
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "2022-03-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wy-hb0131-digest",
        "note": "The digest records House concurrence on 11 March 2022, assignment of House Enrolled Act No. 0059 that day, and the signatures of the Speaker and the President of the Senate that day. Passage is not the governor's signature."
      },
      {
        "event": "signed",
        "date": {
          "value": "2022-03-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wy-hb0131-digest",
        "note": "The digest says the governor signed House Enrolled Act No. 0059 on 21 March 2022 and the act was assigned Chapter 103 the same day. The enrolled PDF leaves its approval-date lines blank; the digest supplies the day."
      },
      {
        "event": "effective",
        "date": {
          "value": "2022-03-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wy-hb0131-enrolled",
        "note": "The enrolled act says it is effective immediately upon completion of all acts necessary for a bill to become law under Article 4, Section 8 of the Wyoming Constitution. The digest records the signature and chapter number on 21 March 2022. The constitution section itself was not opened."
      }
    ],
    "effective_date": {
      "value": "2022-03-21",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-wy-hb0131-enrolled",
      "version": "Enrolled Act No. 59, 2022 budget session",
      "document_date": "2022-03-21"
    },
    "legal_definitions": [
      {
        "term": "Advanced nuclear reactor",
        "section": "W.S. 35-11-2101(d)(iii), as amended by 2022 Chapter 103",
        "paraphrase": "A nuclear reactor, including any necessary ancillary facilities or structures, that is an improvement over nuclear reactors placed in service before January 1, 2021, and that has a license issued by the United States Nuclear Regulatory Commission. The enrolled print replaces the earlier small-modular label with this wording.",
        "source_id": "src-wy-hb0131-enrolled",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The Title 35 compilation was opened on 4 October 2026. It still marks subsection (a) and definition subparts (A) through (C) repealed by this chapter and presents the spent-fuel, Commission-authority, definition, industrial-siting, and pre-construction report provisions. Tax and cost-recovery sections outside that compilation were not reopened. The rules directed by Section 3 were not opened. The act does not issue a Commission licence or approve a reactor. No award or project is named. The 1 July 2035 uranium condition is a future limit on the tax exemption, not a statement that an exemption has been claimed.",
    "summary": "Wyoming's governor signed Chapter 103 on 21 March 2022. The act sets conditions for advanced nuclear reactors, including spent-fuel storage, a limited state siting role beside Commission requirements, and a coal-replacement cost-recovery exemption. Its definition is not limited to small modular reactors. It does not approve a reactor. The Title 35 compilation opened on 4 October 2026 still presents that repeal and the license requirement.",
    "sources": [
      "src-wy-hb0131-enrolled",
      "src-wy-hb0131-digest"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-fl-366-93",
    "slug": "fl-366-93",
    "name": "Florida Statutes § 366.93: nuclear and gasification plant cost recovery",
    "short_label": "Fla. Stat. § 366.93",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-FL",
    "jurisdiction_level": "state",
    "issuing_authority": "Florida Legislature",
    "citation": "Fla. Stat. § 366.93 (2026 official compilation)",
    "legal_scope": "Current official section in the 2026 Florida Statutes, opened 4 October 2026. An electric utility may seek commission approval to recover prudent costs of siting, designing, licensing and constructing a nuclear power plant, and the same section gives that treatment to an integrated gasification combined cycle plant. During the effort to obtain a Nuclear Regulatory Commission combined license, recovery is limited to costs of that licensing. Further preconstruction and the start of construction need commission findings that the plant remains feasible and that projected costs are reasonable. If construction has not begun within 10 years after the license, the commission decides whether the utility still intends to build. After 20 years without construction, future costs for that plant are not recoverable under this section. When the plant enters commercial service, its jurisdictional revenue requirements go into base rates. If the utility does not finish, prudent costs incurred after a determination of need may still be recovered. The section is not a site certificate, a combined license, or a limit that applies only to small modular reactors.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2006",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-fl-366-93",
        "note": "The official history line begins with section 44 of chapter 2006-230 and also cites chapters 2007-5, 2007-117, 2008-227 and 2013-184. Those acts were not opened. The year is the first chapter number on that line, not a calendar effective date for the current text."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fl-366-93",
      "version": "2026 Florida Statutes section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "Nuclear power plant",
        "section": "Fla. Stat. § 366.93(1)(d)",
        "paraphrase": "An electrical power plant, as that term is defined in section 403.503(14), which uses nuclear materials for fuel. Section 403.503(14) was not opened, so that cross-definition is not restated.",
        "source_id": "src-fl-366-93",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The session laws named in the history line were not opened, so no calendar effective date and no amendment-by-amendment text are recorded. The commission rules required by subsection (2) were not opened. Sections 403.503(14) and 366.8255 were not opened. No commission order or utility petition was opened. No project is linked. The section does not approve a reactor.",
    "summary": "Florida's official 2026 compilation of section 366.93 lets a utility ask to recover prudent costs of a nuclear power plant, and it gives the same treatment to an integrated gasification combined cycle plant. The opened text is not limited to small modular reactors and it does not approve a plant. The session laws and commission rules were not opened.",
    "sources": [
      "src-fl-366-93"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nj-pl2026-c9",
    "slug": "nj-pl2026-c9",
    "name": "New Jersey P.L. 2026, chapter 9: nuclear facility permit finding",
    "short_label": "N.J. P.L. 2026, c.9",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-NJ",
    "jurisdiction_level": "state",
    "issuing_authority": "New Jersey Legislature",
    "citation": "N.J. P.L. 2026, c.9 (S3870)",
    "legal_scope": "Official chapter text opened 4 October 2026. P.L. 2026, chapter 9 amends section 11 of P.L. 1973, chapter 185 (C.13:19-11). The section heading covers grounds for denial of a permit application, a conditional permit, and approval of a nuclear electricity generating facility. The opened text says the commissioner shall not approve construction and operation of a nuclear electricity generating facility unless the commissioner finds that the proposed method for storage or disposal of the radioactive waste the facility will produce will be safe, conforms to Nuclear Regulatory Commission standards, and will effectively remove danger to life and the environment from that waste. The chapter says it was approved on 8 April 2026 and that it takes effect immediately. It does not limit the facility to a small modular reactor, and it does not issue a Nuclear Regulatory Commission license.",
    "affects": [
      "siting",
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2026-04-08",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-nj-pl2026-c9",
        "note": "The official chapter page says Approved April 8, 2026."
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-04-08",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-nj-pl2026-c9",
        "note": "Section 2 says the act takes effect immediately."
      }
    ],
    "effective_date": {
      "value": "2026-04-08",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-nj-pl2026-c9",
      "version": "P.L. 2026, c.9 chapter text, opened 4 October 2026",
      "document_date": "2026-04-08"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The text of C.13:19-11 as it stood before this amendment was not opened, so the words this chapter changed are not separately recorded. The Nuclear Regulatory Commission standards named in the finding were not opened. No commissioner decision and no project were opened. The act does not approve a reactor.",
    "summary": "New Jersey P.L. 2026, chapter 9 amends the permit section on approval of a nuclear electricity generating facility. The commissioner shall not approve construction and operation unless the stated radioactive-waste finding is made. The opened chapter is not limited to small modular reactors and it is not a reactor license. The prior section text was not opened.",
    "sources": [
      "src-nj-pl2026-c9"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-oh-4164",
    "slug": "oh-4164",
    "name": "Ohio Revised Code Chapter 4164: Nuclear Development Authority",
    "short_label": "Ohio Rev. Code ch. 4164",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-OH",
    "jurisdiction_level": "state",
    "issuing_authority": "Ohio General Assembly",
    "citation": "Ohio Rev. Code Chapter 4164 (official compilation, sections effective 3 October 2023)",
    "legal_scope": "Official chapter page opened 4 October 2026. It displays sections 4164.01, 4164.02, 4164.04, 4164.05, 4164.051, 4164.053, 4164.07, 4164.08, 4164.10, 4164.11, 4164.12, 4164.13, 4164.15, 4164.16, 4164.18 and 4164.19. Each displayed section is marked effective 3 October 2023 under House Bill 33 of the 135th General Assembly. The chapter creates the Ohio Nuclear Development Authority inside the Department of Development. Its stated purposes are to be an information resource on advanced-nuclear-research reactors, isotopes and isotope technologies, and to pursue state leadership in development and construction of new-type advanced-nuclear-research reactors, in commercial isotope production and research, and in high-level-nuclear-waste reduction and storage technology. The opened powers are to adopt bylaws, adopt a strategic plan, foster partnerships, and identify education programs related to the isotope industry. Section 4164.15 directs work with industrial and academic institutions and the United States Department of Energy or branches of the United States military on commercialization of advanced-nuclear-reactor components. Section 4164.19 says the chapter does not supersede an agreement between the Department of Health and the Nuclear Regulatory Commission under section 3748.03. The chapter does not issue a reactor license or a site certificate.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2023-10-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-oh-4164",
        "note": "The official chapter page marks each displayed section effective 3 October 2023 and names House Bill 33 of the 135th General Assembly. The enrolled bill was opened on 4 October 2026 and lists these sections. An approval line was not isolated, so this effective date is unchanged."
      }
    ],
    "effective_date": {
      "value": "2023-10-03",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-oh-4164",
      "version": "Official chapter page, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "Authority",
        "section": "Ohio Rev. Code § 4164.01",
        "paraphrase": "The Ohio nuclear development authority created and constituted under section 4164.04. The opened sections do not define advanced-nuclear-research reactor or advanced-nuclear-reactor.",
        "source_id": "src-oh-4164",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Enrolled Amended Substitute House Bill 33 was opened and lists the chapter 4164 sections. An approval line was not isolated in that text. No appointment, strategic plan, annual report, appropriation or award was opened. Section 3748.03 was not opened. No project is linked. The chapter does not approve a reactor.",
    "summary": "Ohio Revised Code Chapter 4164 creates the Ohio Nuclear Development Authority and states purposes that include advanced-nuclear-research reactors and isotope work. The opened powers do not include licensing a reactor. The text is not limited to small modular reactors. The enrolled House Bill 33 text was opened. An approval line was not isolated.",
    "sources": [
      "src-oh-4164",
      "src-oh-hb33-enrolled"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-wa-rcw-80-50",
    "slug": "wa-rcw-80-50",
    "name": "Washington RCW 80.50: energy facility site certification",
    "short_label": "RCW 80.50",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-WA",
    "jurisdiction_level": "state",
    "issuing_authority": "Washington State Legislature",
    "citation": "RCW 80.50.010, 80.50.020, 80.50.060, 80.50.100 and 80.50.120 (official sections opened 4 October 2026)",
    "legal_scope": "Official sections of chapter 80.50 RCW opened 4 October 2026. Section 80.50.020(14)(a) treats any fission nuclear power facility whose primary purpose is to produce and sell electricity as an energy plant. The same definition section also covers stated nonnuclear plants, and subsection (13) excludes facilities operated by and for the armed services for military purposes, or by other federal authority for the national defense, from the chapter's energy-facility definition. Section 80.50.060 applies the chapter to new construction of energy facilities and says that construction may not be undertaken, except as the chapter otherwise provides, without certification. Reconstruction or enlargement is covered where the increase meets the capacities or dimensions in sections 80.50.020(14) and 80.50.020(29). Some other facilities, including fusion energy facilities, may choose certification; that option is separate from the fission energy-plant rule. Section 80.50.100 says the council reports a recommendation to the governor, and that within 60 days the governor approves and executes the draft certification, rejects the application, or directs reconsideration. After reconsideration the governor approves and executes, or rejects, within 60 days. A rejection is final as to that application and does not bar a later application for the same site on changed conditions or new information. Section 80.50.120 says a certification binds the state and its political subdivisions on approval of the site and on construction and operation, and that issuance is in lieu of state and local permits. The note opened on the section 80.50.010 page says 2022 chapter 183 takes effect 30 June 2022. Section 80.50.060's history line also cites 2026 chapter 244, 2025 chapter 261 and 2023 chapter 229, which were not opened.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "2022-06-30",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-wa-rcw-80-50-010",
        "note": "The official note on the RCW 80.50.010 page says 2022 chapter 183 takes effect 30 June 2022. Later amendatory citations on section 80.50.060 were not opened, so this is not a calendar effective date for the current text of every opened section."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-wa-rcw-80-50-060",
      "version": "Official sections opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "Energy plant",
        "section": "RCW 80.50.020(14)(a)",
        "paraphrase": "Any fission nuclear power facility whose primary purpose is to produce and sell electricity. The opened definition also covers stated nonnuclear facilities. It is not limited to small modular reactors.",
        "source_id": "src-wa-rcw-80-50-020",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "RCW 80.50.110, the council's rules, and the effective-date notes for 2026 chapter 244, 2025 chapter 261 and 2023 chapter 229 were not opened. No certification application or governor decision was opened. No project is linked. State certification does not approve a reactor under federal law.",
    "summary": "Washington chapter 80.50 RCW, in the sections opened on 4 October 2026, requires site certification before construction of an energy facility, and it defines an energy plant to include any fission nuclear power facility whose primary purpose is to produce and sell electricity. The governor approves or rejects the council's recommendation. Certification binds state and local permitting and does not replace a Nuclear Regulatory Commission license. The opened text is not limited to small modular reactors.",
    "sources": [
      "src-wa-rcw-80-50-010",
      "src-wa-rcw-80-50-020",
      "src-wa-rcw-80-50-060",
      "src-wa-rcw-80-50-100",
      "src-wa-rcw-80-50-120"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ak-ch4-sla-2022",
    "slug": "ak-ch4-sla-2022",
    "name": "Alaska Chapter 4, SLA 2022: microreactor siting",
    "short_label": "Alaska ch. 4, SLA 2022",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-AK",
    "jurisdiction_level": "state",
    "issuing_authority": "Alaska State Legislature",
    "citation": "Chapter 4, SLA 2022 (CSSB 177(RES))",
    "legal_scope": "Enrolled CSSB 177(RES) opened 4 October 2026, with the legislature's bill history recording it as Chapter 4, SLA 2022, signed into law on 24 May 2022 and effective 22 August 2022. The act amends the nuclear-facility siting statute. The opened permit sentence still says a permit may not be issued until the municipality with jurisdiction approves it or, in an unorganized borough, until the legislature approves it. A new subsection says that, notwithstanding the undesignated-land subsection, a person otherwise compliant with the chapter may construct a microreactor on land the legislature has not designated. Another new subsection says the study requirements of the existing section do not apply to the presence of microreactors. If the Department of Environmental Conservation is notified that a person has applied to the Nuclear Regulatory Commission for a license for a microreactor in the state, the department coordinates and submits the named agencies' comments in that federal licensing process. The act does not issue a state permit or a Nuclear Regulatory Commission license.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2022-05-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ak-sb177-history",
        "note": "The official bill history says signed into law 5/24, Chapter 4 SLA 22. The journal row that carries that sentence is dated 5 October 2022. The enrolled PDF's chapter-number field is blank, so the chapter number is taken from this history line."
      },
      {
        "event": "effective",
        "date": {
          "value": "2022-08-22",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ak-sb177-history",
        "note": "The same bill history says the effective date of the law is 8/22/22. The enrolled PDF that was opened contains no effective-date section."
      }
    ],
    "effective_date": {
      "value": "2022-08-22",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ak-sb177-enrolled",
      "version": "Enrolled CSSB 177(RES) PDF, opened 4 October 2026",
      "document_date": "2022-05-24"
    },
    "legal_definitions": [
      {
        "term": "microreactor",
        "section": "AS 18.45.900(9), as added by Chapter 4, SLA 2022",
        "paraphrase": "A nuclear utilization facility that is a nuclear fission reactor consistent with the definition of advanced nuclear reactor in 42 U.S.C. 16271, and capable of generating not more than 50 megawatts of electric energy. Section 16271 was not opened, so that federal definition is not restated.",
        "source_id": "src-ak-sb177-enrolled",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The current Title 18 compilation was opened on 4 October 2026 and contains the same microreactor permit exception, study exemption, and 50-megawatt-electric definition. No compilation edition date is printed in the opened header. The pre-existing subsections cross-referenced by the act were not opened, so the notwithstanding clause is not restated as a description of that older text. Department of Environmental Conservation regulations were not opened. 42 U.S.C. 16271 was not opened. The Senate Journal records that enrolling corrected a manifest error by inserting the word 'the' after 'from' on page 2, line 4; the opened enrolled PDF already reads that way. No project is linked. The act does not approve a reactor.",
    "summary": "Alaska's 2022 session law lets a defined microreactor be constructed on land the legislature has not designated, while the opened permit sentence still requires municipal approval or, in an unorganized borough, legislative approval before a permit is issued. The definition is a fission reactor of not more than 50 megawatts electric, tied to a federal definition that was not opened. It is not a permit and not a Nuclear Regulatory Commission license. The current Title 18 compilation was opened and contains those microreactor provisions. No compilation edition date is printed. The department's regulations were not opened.",
    "sources": [
      "src-ak-sb177-enrolled",
      "src-ak-sb177-history",
      "src-ak-sb177-journal-3020",
      "src-ak-title18-compilation"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-sc-58-33-196",
    "slug": "sc-58-33-196",
    "name": "South Carolina section 58-33-196: advanced nuclear study costs",
    "short_label": "S.C. Code § 58-33-196",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-SC",
    "jurisdiction_level": "state",
    "issuing_authority": "South Carolina General Assembly",
    "citation": "S.C. Code Ann. § 58-33-196",
    "legal_scope": "Official Title 58, Chapter 33 page opened 4 October 2026. Section 58-33-196 says electrical utilities and the Public Service Authority are encouraged to explore fusion energy and advanced nuclear facilities, including small modular nuclear facilities, at suitable sites. Suitable sites may include current nuclear sites, sites where nuclear facilities were proposed but not built, and other brownfield sites such as coal-generation sites. A utility pursuing such facilities must report progress annually to the commission and the Public Utilities Review Committee. A utility whose rates the commission regulates must give the commission cost estimates for the studies, including planning, licensing and project development. If the commission finds those estimated costs reasonable, prudent and in the public interest, the costs may be recovered through rates as incurred. The section says it does not relieve an electrical utility of filing for a certificate under the article and obtaining commission approvals before construction. The history line says 2025 Act No. 41 (H.3309), Section 11, effective 12 May 2025. The section does not issue a certificate or a Nuclear Regulatory Commission license, and it is not limited to small modular reactors.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2025-05-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-sc-t58c033",
        "note": "The official compilation's history line says 2025 Act No. 41 (H.3309), Section 11, effective 12 May 2025. The enrolled act was not opened as a separate document."
      }
    ],
    "effective_date": {
      "value": "2025-05-12",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-sc-t58c033",
      "version": "Official Title 58, Chapter 33 compilation, opened 4 October 2026",
      "document_date": "2025-05-12"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Enrolled 2025 Act No. 41 was not opened, so the act's other sections are not restated except for the editor's note printed on this page. That note quotes Section 33 findings about a mix of long-lead resources that may include nuclear and advanced nuclear, biomass, hydrogen-capable resources and fusion. Section 12-63-20 was not opened. No commission order, certificate docket or appropriation was opened. No project is linked. The section does not approve a reactor.",
    "summary": "South Carolina's official code encourages utilities to study fusion and advanced nuclear facilities, including small modular facilities, and allows recovery of study costs if the commission finds the estimates reasonable, prudent and in the public interest. The same section keeps the certificate requirement before construction. It is not limited to small modular reactors and it does not approve a facility. The enrolled 2025 act was not opened separately.",
    "sources": [
      "src-sc-t58c033"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-sc-blra-2007",
    "slug": "sc-base-load-review-act",
    "name": "South Carolina Base Load Review Act",
    "short_label": "S.C. Base Load Review Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-SC",
    "jurisdiction_level": "state",
    "issuing_authority": "South Carolina General Assembly",
    "citation": "S.C. Code Ann. §§ 58-33-210 to 58-33-280 (Base Load Review Act)",
    "legal_scope": "Official Title 58, Chapter 33 page opened 4 October 2026. Article 4 is printed as the Base Load Review Act. Its history line says 2007 Act No. 16 became law without the governor's signature on 3 May 2007. The printed definition of a base load plant is a new coal or nuclear fueled generating unit or facility designed to run at a capacity factor above 70 percent a year, with a gross initial generation capacity of 350 megawatts or more, intended at least in part to serve the utility's South Carolina retail customers. The same page prints a 2018 editor's note quoting Act No. 258: as of that act's effective date, the Public Service Commission must not accept a base load review application or consider other requests under Article 4 except in a docket then pending, and Article 4 is repealed upon the conclusion of litigation concerning the abandonment of V.C. Summer Units 2 and 3. The page also still prints the article's cost-recovery sections, including preconstruction costs of a nuclear-powered facility. This record does not find that the litigation has ended or that the article has been repealed. The definition is not a small modular reactor category, and the article does not issue a reactor license.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2007-05-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-sc-t58c033",
        "note": "The compilation's history line for section 58-33-210 says 2007 Act No. 16, Section 2, effective upon approval, and that it became law without the governor's signature on 3 May 2007. Act No. 16 was not opened as a separate document."
      }
    ],
    "effective_date": {
      "value": "2007-05-03",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-sc-t58c033",
      "version": "Official Title 58, Chapter 33 compilation, opened 4 October 2026",
      "document_date": "2007-05-03"
    },
    "legal_definitions": [
      {
        "term": "Base load plant",
        "section": "S.C. Code Ann. § 58-33-220(2)",
        "paraphrase": "A new coal or nuclear fueled electrical generating unit or units or facility, designed for a capacity factor exceeding 70 percent annually, with a gross initial generation capacity of 350 megawatts or more, and intended in whole or in part to serve retail customers of a utility in South Carolina. The coal-plant emissions clause in the same definition is not restated.",
        "source_id": "src-sc-t58c033",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "2018 Act No. 258 and 2018 Joint Resolution 285 were not opened as separate documents. No court record was opened, so the compilation's statement that Article 4 is repealed when the V.C. Summer Units 2 and 3 abandonment litigation concludes is not a finding that the litigation has ended. 2007 Act No. 16 was not opened beyond the text and history printed on the chapter page. No project is linked. The article does not approve a reactor.",
    "summary": "The official South Carolina code still prints the Base Load Review Act and also prints a 2018 editor's note that bars a new base load review application, other than a docket then pending, and says the article is repealed when specified V.C. Summer abandonment litigation concludes. The printed plant definition covers new coal or nuclear units of at least 350 megawatts gross. It is not a small modular reactor category. The 2018 act and the litigation record were not opened.",
    "sources": [
      "src-sc-t58c033"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nc-gs-62-133-8",
    "slug": "nc-gs-62-133-8",
    "name": "North Carolina G.S. 62-133.8: clean energy portfolio standard",
    "short_label": "G.S. 62-133.8",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-NC",
    "jurisdiction_level": "state",
    "issuing_authority": "North Carolina General Assembly",
    "citation": "N.C. Gen. Stat. § 62-133.8",
    "legal_scope": "The official current section opened on 4 October 2026 is the Clean Energy and Energy Efficiency Portfolio Standard. A clean energy facility includes a renewable energy facility, a nuclear energy facility, including an uprate, or a fusion energy facility. A new clean energy facility includes a new renewable energy facility and, for facilities placed into service on or after 1 January 2007, a nuclear energy facility, including an uprate, or a fusion energy facility. The opened section does not define nuclear energy facility and does not limit that term to a small modular reactor. It uses renewable energy certificates to track compliance. Registration under the section is for certificate eligibility and is not a construction certificate. The history line cites Session Law 2023-138, section 1(a), and Session Law 2025-25, section 29(5). Session Law 2025-25 was not opened.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2023-10-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-nc-sl2023-138",
        "note": "Session Law 2023-138 became law notwithstanding the Governor's objections at 1:29 p.m. on 10 October 2023. The current compilation also cites 2025-25, s. 29(5), which was not opened, so this is not a single effective date for every sentence of the current section."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-nc-gs-62-133-8",
      "version": "Official current section opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "Clean energy facility",
        "section": "G.S. 62-133.8(a)(1)",
        "paraphrase": "A renewable energy facility, a nuclear energy facility, including an uprate to a nuclear energy facility, or a fusion energy facility.",
        "source_id": "src-nc-gs-62-133-8",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      },
      {
        "term": "Clean energy resource",
        "section": "G.S. 62-133.8(a)(1a)",
        "paraphrase": "Renewable energy resources, nuclear energy resources, including an uprate to a nuclear energy facility, and fusion energy.",
        "source_id": "src-nc-gs-62-133-8",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      },
      {
        "term": "Fusion",
        "section": "G.S. 62-133.8(a)(4a)",
        "paraphrase": "A reaction in which at least one heavier, more stable nucleus is produced from two lighter, less stable nuclei, typically through high temperatures and pressures, emitting energy as a result.",
        "source_id": "src-nc-gs-62-133-8",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      },
      {
        "term": "New clean energy facility",
        "section": "G.S. 62-133.8(a)(4c)",
        "paraphrase": "A new renewable energy facility, or a facility placed into service on or after 1 January 2007 that is a nuclear energy facility, including an uprate, or a fusion energy facility.",
        "source_id": "src-nc-gs-62-133-8",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Session Law 2025-25 was not opened. The current certificate section amended by Session Law 2023-138 was not opened, and the session-law display mixes struck and inserted certificate text, so that change is not restated as current law. No Utilities Commission order was opened. No project is linked. The portfolio standard does not approve a reactor.",
    "summary": "North Carolina's current clean-energy portfolio statute counts nuclear energy facilities, including uprates, and fusion energy facilities as clean energy. It is not a small-modular category and it does not grant a construction certificate or a federal license.",
    "sources": [
      "src-nc-gs-62-133-8",
      "src-nc-sl2023-138"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nc-gs-166a-29",
    "slug": "nc-gs-166a-29",
    "name": "North Carolina G.S. 166A-29: fixed nuclear facility emergency-planning fee",
    "short_label": "G.S. 166A-29",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-NC",
    "jurisdiction_level": "state",
    "issuing_authority": "North Carolina General Assembly",
    "citation": "N.C. Gen. Stat. § 166A-29",
    "legal_scope": "The official current section requires a person licensed to construct or operating a fixed nuclear facility for the production of electricity to pay two annual fees when the facility is in North Carolina or has a plume exposure pathway emergency planning zone partly in the state. One fee is at least $30,000 to the Department of Public Safety for Federal Emergency Management Agency emergency-response planning. The other is at least $36,000, not above the cost of the service, to that department for the Radiation Protection Section. The opened current text says each fee is paid on a schedule set by the Department of Public Safety. The minimum of the first fee may be increased by agreement with the licensees or operators. Fees do not revert at the end of a fiscal year, and amounts carried forward are considered in setting the next subsection (a) fee. The section is not limited to small modular reactors. It is not a construction certificate and not a Nuclear Regulatory Commission license.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2020-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-nc-sl2020-83",
        "note": "Session Law 2020-83 was approved at 5:37 p.m. on 1 July 2020. Section 11.1(b) says that section becomes effective 1 July 2020 and applies to fees assessed on or after that date. The current compilation's history ends with that section."
      }
    ],
    "effective_date": {
      "value": "2020-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-nc-gs-166a-29",
      "version": "Official current section opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "No Department of Public Safety fee schedule or assessment order was opened. No project is linked. The fee does not authorize construction.",
    "summary": "North Carolina charges an annual emergency-planning fee, and a second radiation-protection fee, for each fixed nuclear facility that produces electricity and is in the state or has a plume emergency-planning zone partly in the state. The opened text sets minimums and leaves the payment schedule to the Department of Public Safety.",
    "sources": [
      "src-nc-gs-166a-29",
      "src-nc-sl2020-83"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ar-act707-2025",
    "slug": "ar-act-707-2025",
    "name": "Arkansas Act 707 of 2025: nuclear generation feasibility study",
    "short_label": "Act 707 (2025)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-AR",
    "jurisdiction_level": "state",
    "issuing_authority": "Arkansas General Assembly",
    "citation": "Arkansas Act 707 of 2025",
    "legal_scope": "Uncodified temporary session law. The Department of Energy and Environment must engage a consultant to study new nuclear generation in Arkansas, including small modular nuclear reactors and microreactors. The hiring duty starts 60 days after the effective date on which the act is funded. A report is due to the Governor and named legislative officers no later than 15 months after the act's effective date. The act authorizes no plant and states no appropriation.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025-04-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ar-act707-2025",
        "note": "The enrolled act prints APPROVED: 4/16/25."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-04-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ar-act707-2025",
        "note": "Emergency clause: the act is effective on the date of the Governor's approval. Section 1(a) starts the consultant engagement only within 60 days after the effective date on which the act is funded. The opened act does not show that funding, so the study duty is not recorded as started."
      }
    ],
    "effective_date": {
      "value": "2025-04-16",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ar-act707-2025",
      "version": "Enrolled Act 707 PDF opened 4 October 2026",
      "document_date": "2025-04-16"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The study engagement waits until the act is funded, and no appropriation or award was opened. No executive order and no Arkansas Public Service Commission order were opened. No project is linked. The study does not approve a reactor.",
    "summary": "Arkansas Act 707, approved 16 April 2025, requires a state feasibility study of new nuclear generation, including small modular reactors and microreactors, but only after the act is funded. It is temporary uncodified language and it does not permit a plant.",
    "sources": [
      "src-ar-act707-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ar-act373-2025",
    "slug": "ar-act-373-2025",
    "name": "Arkansas Act 373 of 2025: advanced-energy strategic investment rider",
    "short_label": "Act 373 § 23-4-1308",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-AR",
    "jurisdiction_level": "state",
    "issuing_authority": "Arkansas General Assembly",
    "citation": "Arkansas Code § 23-4-1308, enacted by Act 373 of 2025",
    "legal_scope": "Enrolled session law enacting a Public Service Commission cost-recovery section. After a public-interest finding, a utility may recover commission-approved strategic investments and feasibility-study costs for advanced energy technologies through a rider. Modular nuclear reactors are one listed technology, alongside non-nuclear technologies. A facility already using advanced energy technologies to serve Arkansas customers, including nuclear generation, is not subject to the new public-interest prerequisite. Recovery follows an existing siting or prudence approval path. The act does not issue a siting certificate.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025-03-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ar-act373-2025",
        "note": "The enrolled act prints APPROVED: 3/20/25."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-03-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ar-act373-2025",
        "note": "Emergency clause: the enrolled act is effective on the date of the Governor's approval. The current code page returned HTTP 500 and an empty file, so this status is the enrolled act, not a confirmation that the compiled section still reads this way."
      }
    ],
    "effective_date": {
      "value": "2025-03-20",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ar-act373-2025",
      "version": "Enrolled Act 373 PDF opened 4 October 2026; current code compilation not opened",
      "document_date": "2025-03-20"
    },
    "legal_definitions": [
      {
        "term": "Advanced energy technologies",
        "section": "Arkansas Code § 23-4-1308(a)(3), as enacted by Act 373 of 2025",
        "paraphrase": "Includes, without limitation, modular nuclear reactors, new nuclear generation technologies, and several non-nuclear technologies such as hydrogen, geothermal, renewable natural gas, biomass, hydroelectric generation, and specified emissions-capture equipment.",
        "source_id": "src-ar-act373-2025",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "No commission public-interest finding or rider order was opened. The current code compilation was not opened, so a later amendment is not ruled out. No award amount is stated. No project is linked. The rider does not permit a reactor.",
    "summary": "Arkansas Act 373, approved 20 March 2025, lets a utility recover commission-approved strategic investments in advanced energy technologies, a term that includes modular nuclear reactors and other technologies. Existing nuclear generation already serving Arkansas customers is carved out of the new public-interest prerequisite. The act is cost recovery, not a construction permit.",
    "sources": [
      "src-ar-act373-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-pa-rpa-402-1",
    "slug": "pa-rpa-402-1",
    "name": "Pennsylvania Radiation Protection Act section 402.1: small modular reactor and microreactor fees",
    "short_label": "Radiation Protection Act § 402.1",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-PA",
    "jurisdiction_level": "state",
    "issuing_authority": "Pennsylvania General Assembly",
    "citation": "Radiation Protection Act, Act of July 10, 1984, P.L. 688, No. 147, § 402.1",
    "legal_scope": "Official compilation of the Radiation Protection Act, plus the official Act 37 of 2026 law-information page. Section 402.1 charges a person who already holds an NRC construction permit or operating license for a microreactor or small modular reactor on a Pennsylvania site. The fee is per site, not per reactor, and the compilation appropriates the receiving funds for duties under the act. It does not grant the NRC permit. The act page prints an enactment date of July 20, 2026, and Effective 60 DAYS, without a calendar effective date.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "2026-07-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pa-act-1984-147-compilation",
        "note": "The official compilation's compiler note says section 402.1 was added July 20, 2026, P.L. 464, No. 37. The official act page says the act was enacted from HB 2017 on that date and prints Effective 60 DAYS. No calendar effective date is printed, so none is stored, and the section's 30-day payment clock is not converted into a day."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pa-act-1984-147-compilation",
      "version": "Official compilation and Act 37 law-information page opened 4 October 2026; calendar effective date not printed",
      "document_date": "2026-10-04"
    },
    "legal_definitions": [
      {
        "term": "Microreactor",
        "section": "Radiation Protection Act, definitions, added by the Act of July 20, 2026, P.L. 464, No. 37",
        "paraphrase": "An advanced nuclear reactor with a rated nameplate capacity of 100 electrical megawatts or less that can be constructed and operated with similar reactors at a single site.",
        "source_id": "src-pa-act-1984-147-compilation",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      },
      {
        "term": "Small modular reactor",
        "section": "Radiation Protection Act, definitions, added by the Act of July 20, 2026, P.L. 464, No. 37",
        "paraphrase": "An advanced nuclear reactor with a rated nameplate capacity of 400 electrical megawatts or less that can be constructed and operated with similar reactors at a single site.",
        "source_id": "src-pa-act-1984-147-compilation",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The act page prints Effective 60 DAYS and does not print a calendar day, so no effective date is stored and the 30-day payment clock is not dated. The fee applies only to a person who already holds an NRC construction permit or operating license; it does not grant that permit. No implementing fee regulation was opened. No project is linked. Governor, commission, and siting sources for Pennsylvania were not opened in the bounded review.",
    "summary": "Pennsylvania's official compilation of the Radiation Protection Act adds section 402.1 for reactors the statute defines as a microreactor (100 MWe nameplate or less) or a small modular reactor (400 MWe nameplate or less). A person who already holds an NRC construction permit or operating license for such a reactor on a Pennsylvania site pays the Department $10,000 to $50,000 per site, plus two further bands of the same size for emergency-response planning and for nonagency equipment, planning, training, and exercises. The fee is per site regardless of reactor count. The compilation says those payments are deposited into the Radiation Protection Fund and the named emergency-response funds and are appropriated for the act's duties. The official act page says Act 37 of 2026 is effective in 60 days and does not print the calendar day. The fee does not grant the federal permit. Those megawatt definitions are the statute's, not SMRMap's inclusion rule.",
    "sources": [
      "src-pa-act-1984-147-compilation",
      "src-pa-act37-2026-info"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-id-ipuc-37049",
    "slug": "id-ipuc-37049",
    "name": "Idaho PUC Order 37049: Kemmerer Unit 1 solicitation waiver",
    "short_label": "Order 37049",
    "category": "enacted_binding",
    "instrument_type": "commission_order",
    "jurisdiction": "US-ID",
    "jurisdiction_level": "state",
    "issuing_authority": "Idaho Public Utilities Commission",
    "citation": "Idaho Public Utilities Commission Order No. 37049, Case No. PAC-E-25-20",
    "legal_scope": "Final commission order served 22 May 2026. It grants Rocky Mountain Power a waiver of the commission's solicitation procedure for a power-purchase agreement for Kemmerer Power Station Unit 1. It also requires project information at least 90 days before a later general rate case or ECAM filing in which the company seeks a prudence determination, and status updates in future integrated resource plans. Staff discussion of ordinary power-purchase cost recovery is not the order.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-05-22",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-id-ipuc-37049",
        "note": "The order is done on the 22nd day of May 2026, and the service header is 22 May 2026. The order does not state an effective date. It waives solicitation for the Kemmerer Unit 1 power-purchase agreement. It does not permit the reactor or approve rate recovery."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-id-ipuc-37049",
      "version": "Final order PDF opened 4 October 2026",
      "document_date": "2026-05-22"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [
      {
        "project_id": "prj-natrium-kemmerer",
        "basis": "Order 37049 waives Idaho's solicitation procedure for the power-purchase agreement for Kemmerer Unit 1. It does not permit the reactor and does not approve rate recovery.",
        "source_id": "src-id-ipuc-37049"
      }
    ],
    "unapproved": "The order recites the company's description of a 345-megawatt sodium-cooled plant with molten-salt storage. That recital is not a commission capacity finding. No construction permit, operating licence, or prudence determination is granted. Idaho funding and an INL siting permit were not opened.",
    "summary": "On 22 May 2026 the Idaho Public Utilities Commission waived its solicitation procedure for Rocky Mountain Power's power-purchase agreement for Kemmerer Unit 1, the Natrium reactor. The utility must still provide project information before any later rate filing in which it asks the commission to judge prudence. The order does not permit the reactor and does not approve rate recovery.",
    "sources": [
      "src-id-ipuc-37049"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-la-act111-2025",
    "slug": "la-act-111-2025",
    "name": "Louisiana Act 111 of 2025: small modular reactor environmental permitting",
    "short_label": "Act 111",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-LA",
    "jurisdiction_level": "state",
    "issuing_authority": "Louisiana Legislature",
    "citation": "La. R.S. 30:2014.5, as amended by 2025 La. Acts No. 111",
    "legal_scope": "Enrolled act amending the state expedited environmental-permitting programme. For a nuclear application, the applicant must state that the purpose is development and construction of a small modular reactor and that the application is consistent with a letter of collaboration on file with the department. The letter may be with the president or a named federal department or the Nuclear Regulatory Commission. The secretary adopts Administrative Procedure Act rules for the programme. The opened act uses small modular reactor without a megawatt threshold.",
    "affects": [
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-la-act111-2025",
        "note": "The PDF is the 2025 regular session enrolled Act No. 111. The APPROVED line is blank, so no day is stored."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-la-act111-2025",
      "version": "Enrolled Act 111 PDF opened 4 October 2026; approval line blank"
    },
    "legal_definitions": [
      {
        "term": "Small modular reactor",
        "section": "R.S. 30:2014.5, as amended by Act 111 of 2025",
        "paraphrase": "The opened act uses this term for the reactor whose development and construction is the stated purpose of a qualifying environmental application. It states no megawatt threshold.",
        "source_id": "src-la-act111-2025",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The APPROVED line is blank, so no signature day or effective day is stored. The act authorizes a state environmental-permitting programme. It does not issue an environmental permit or a Nuclear Regulatory Commission licence. No project is linked.",
    "summary": "Louisiana's enrolled Act 111 of 2025 amends the environmental expedited-permitting statute so a qualifying small modular reactor application can use a federal permitting-parity programme. The applicant must state that purpose and point to a federal letter of collaboration on file. The act does not itself issue the permit, and the enrolled PDF does not print an approval date.",
    "sources": [
      "src-la-act111-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-la-act462-2025",
    "slug": "la-act-462-2025",
    "name": "Louisiana Act 462 of 2025: green energy includes nuclear reactors",
    "short_label": "Act 462",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-LA",
    "jurisdiction_level": "state",
    "issuing_authority": "Louisiana Legislature",
    "citation": "La. R.S. 30:1501 and 1502, enacted by 2025 La. Acts No. 462",
    "legal_scope": "Enrolled act creating the energy-grid chapter. Green energy includes energy generated by nuclear reactors, and that definition applies to state programmes that fund green energy or clean energy. The domestic-fuel priority does not apply to nuclear resources and generation. The cost-comparison rule does not apply to advanced nuclear resources or advanced nuclear generation. The act does not appropriate money and does not certificate a plant.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-la-act462-2025",
        "note": "The enrolled header prints 2025 Regular Session and ACT No. 462. The APPROVED line does not print a day, so no signature day is stored."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-la-act462-2025",
      "version": "Enrolled Act 462 PDF opened 4 October 2026; approval line has no day"
    },
    "legal_definitions": [
      {
        "term": "Green energy",
        "section": "R.S. 30:1502(D), enacted by Act 462 of 2025",
        "paraphrase": "Includes energy generated by nuclear reactors, and also energy generated using natural gas, in addition to listed federal renewable sources and qualifying hydrocarbons. The definition applies to state programmes that fund green energy or clean energy.",
        "source_id": "src-la-act462-2025",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The APPROVED line does not print a day, and the opened act prints no effective date. It is not an appropriation and not a commission order. No project is linked. The definition does not approve a reactor.",
    "summary": "Louisiana's enrolled Act 462 of 2025 says energy generated by nuclear reactors is green energy for state programmes that fund green energy or clean energy. The domestic-fuel priority and the cost-comparison rule do not apply to nuclear generation. The enrolled signature line does not print an approval day, and the act does not appropriate money.",
    "sources": [
      "src-la-act462-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-az-ch56-2025",
    "slug": "az-chapter-56-2025",
    "name": "Arizona Chapter 56 of 2025: nuclear emergency management fund appropriation",
    "short_label": "Chapter 56",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-AZ",
    "jurisdiction_level": "state",
    "issuing_authority": "Arizona Legislature",
    "citation": "2025 Ariz. Sess. Laws ch. 56 (S.B. 1009)",
    "legal_scope": "Emergency session law appropriating money from the nuclear emergency management fund for off-site response at a commercial nuclear generating station, and assessing the same totals against each consortium constructing or operating such a station. The opened page prints a fiscal year 2025-2026 total of $2,617,991 and a fiscal year 2026-2027 total of $2,711,339. It also prints four allocation lines for each year. Those lines, added as printed, do not equal the printed totals. The act is not a construction permit.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-04-18",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-az-ch56-2025",
        "note": "The chapter prints APPROVED BY THE GOVERNOR APRIL 18, 2025. The same page prints FILED IN THE OFFICE OF THE SECRETARY OF STATE APRIL 21, 2025. The emergency clause says the act is operative immediately as provided by law and does not print a separate calendar operative day."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-az-ch56-2025",
      "version": "Chapter 56 page opened 4 October 2026",
      "document_date": "2025-04-18"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "No calendar effective date is stored. The opened chapter limits the appropriation and the assessment to fiscal year 2025-2026 and fiscal year 2026-2027. It does not print the calendar end of either fiscal year, so no expiry date is stored. The four allocation lines as printed do not add to the printed yearly totals, and this record does not reconcile them. No project is linked. The appropriation does not approve a reactor.",
    "summary": "Arizona Chapter 56, approved 18 April 2025, appropriates $2,617,991 for fiscal year 2025-2026 and $2,711,339 for fiscal year 2026-2027 from the nuclear emergency management fund and assesses those totals on consortia that construct or operate a commercial nuclear generating station. The opened page also prints four smaller lines for each year, and those lines do not add to the printed totals. The act does not permit a plant.",
    "sources": [
      "src-az-ch56-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-va-pur-2025-00085",
    "slug": "va-pur-2025-00085",
    "name": "Virginia SCC final order: Appalachian Power Joshua Falls development costs",
    "short_label": "PUR-2025-00085",
    "category": "enacted_binding",
    "instrument_type": "commission_order",
    "jurisdiction": "US-VA",
    "jurisdiction_level": "state",
    "issuing_authority": "Virginia State Corporation Commission",
    "citation": "Case No. PUR-2025-00085 (final order, 12 November 2025)",
    "legal_scope": "Final order on Appalachian Power Company's petition under Code section 56-585.1:15 to review its decision to incur early project-development costs for a possible small modular reactor at the Joshua Falls site in Campbell County. The Commission approves that petition. The company did not seek cost recovery in this case. If the company does not apply in 2026 for a rate adjustment clause for these costs, it must file a progress report in this docket by 31 December 2026. The order then dismisses the matter.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2025-11-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-va-pur-2025-00085",
        "note": "The caption prints AT RICHMOND, NOVEMBER 12, 2025. The order states no later effective date."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-va-pur-2025-00085",
      "version": "Final order PDF opened 4 October 2026",
      "document_date": "2025-11-12"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [
      {
        "project_id": "prj-aep-joshua-falls",
        "basis": "The order names Appalachian Power Company's Joshua Falls site and approves the decision to incur early small-modular-reactor development costs there.",
        "source_id": "src-va-pur-2025-00085"
      }
    ],
    "unapproved": "The order does not state an effective date. 12 November 2025 is the caption and order date. The order does not grant a construction permit, an NRC licence, or cost recovery. A rate case was not opened. The 31 December 2026 report is a condition if no 2026 rate application is filed, not a finding that the report exists. Reactor technology is not selected in the order.",
    "summary": "On 12 November 2025 the Virginia State Corporation Commission approved Appalachian Power's decision to incur early development costs for a possible small modular reactor at Joshua Falls. The order does not approve cost recovery or construction, and it closes the case.",
    "sources": [
      "src-va-pur-2025-00085"
    ],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-la-eo-jml-25-074",
    "slug": "la-eo-jml-25-074",
    "name": "Louisiana Executive Order JML 25-074: environmental permitting review",
    "short_label": "JML 25-074",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US-LA",
    "jurisdiction_level": "state",
    "issuing_authority": "Governor of Louisiana",
    "citation": "Louisiana Executive Order No. JML 25-074 (24 June 2025)",
    "legal_scope": "The governor directs the secretary of the Department of Environmental Quality to adopt procedures that include preparation for potential expansion of nuclear energy generation, and to report by 31 December 2025 on planned reforms, deficiencies, and any statutory or regulatory changes the secretary recommends. The order is effective on signature and lasts until the governor changes or ends it or it ends by operation of law.",
    "affects": [
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-06-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-la-eo-jml-25-074",
        "note": "Witnessed at Baton Rouge on the 24th day of June 2025. Effective upon signature. The 31 December 2025 report deadline is not a finding that the report was delivered."
      }
    ],
    "effective_date": {
      "value": "2025-06-24",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-la-eo-jml-25-074",
      "version": "Signed PDF opened 4 October 2026",
      "document_date": "2025-06-24"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Delivery of the 31 December 2025 report was not opened. The order does not permit a plant or issue an environmental permit. No project is linked.",
    "summary": "On 24 June 2025 the governor ordered the environmental-quality department to prepare its permitting procedures for possible nuclear expansion and to report by the end of 2025. The order stays in effect until the governor changes it or it ends by law. It does not approve a reactor.",
    "sources": [
      "src-la-eo-jml-25-074"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-oh-4906-01",
    "slug": "oh-4906-01",
    "name": "Ohio power-siting definition of a major utility facility",
    "short_label": "R.C. 4906.01",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-OH",
    "jurisdiction_level": "state",
    "issuing_authority": "Ohio General Assembly",
    "citation": "Ohio Rev. Code § 4906.01",
    "legal_scope": "Official compilation of the power-siting definitions. A major utility facility includes an electric generating plant and associated facilities designed for, or capable of, operation at fifty megawatts or more. The page prints an effective date of 14 August 2025 and names House Bill 15 of the 136th General Assembly as the latest legislation. The opened section does not use the word nuclear.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2025-08-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-oh-4906-01",
        "note": "The official section page prints Effective August 14, 2025. That date is not the effective date of section 4906.04."
      }
    ],
    "effective_date": {
      "value": "2025-08-14",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-oh-4906-01",
      "version": "Official section page opened 4 October 2026",
      "document_date": "2025-08-14"
    },
    "legal_definitions": [
      {
        "term": "Major utility facility",
        "section": "Ohio Rev. Code § 4906.01(B)(1)(a)",
        "paraphrase": "Includes an electric generating plant and associated facilities designed for, or capable of, operation at a capacity of fifty megawatts or more.",
        "source_id": "src-oh-4906-01",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The definition is general generation siting law. It does not name a nuclear technology or certificate any project. House Bill 15 itself was not opened. The Ohio nuclear chapter already published separately is Chapter 4164.",
    "summary": "Ohio's current power-siting definition treats an electric generating plant of fifty megawatts or more as a major utility facility. The official page dates this section text 14 August 2025. The certificate duty in section 4906.04 has a different effective date and is a separate record.",
    "sources": [
      "src-oh-4906-01"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-oh-4906-04",
    "slug": "oh-4906-04",
    "name": "Ohio certificate required before major-utility construction",
    "short_label": "R.C. 4906.04",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-OH",
    "jurisdiction_level": "state",
    "issuing_authority": "Ohio General Assembly",
    "citation": "Ohio Rev. Code § 4906.04",
    "legal_scope": "No person shall commence to construct a major utility facility in Ohio without first obtaining a certificate. Replacement of an existing facility with a like facility, as determined by the power siting board, is not construction of a major utility facility, and that replacement remains subject to other state or local requirements. The page prints an effective date of 15 November 1981 and names House Bill 694 of the 114th General Assembly.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "1981-11-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-oh-4906-04",
        "note": "The official section page prints Effective November 15, 1981. The fifty-megawatt definition's 14 August 2025 date is stored on the section 4906.01 record."
      }
    ],
    "effective_date": {
      "value": "1981-11-15",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-oh-4906-04",
      "version": "Official section page opened 4 October 2026",
      "document_date": "1981-11-15"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-oh-4906-01",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "A certificate under this section was not opened for any tracked project. The section does not name Elementl Letart or the Pike County proposal. The like-facility exception is the board's determination, not a nuclear exemption.",
    "summary": "Ohio requires a power-siting certificate before construction of a major utility facility. The official page dates this duty 15 November 1981. Whether a particular nuclear plant meets the fifty-megawatt definition is a separate question, and this section does not certificate one.",
    "sources": [
      "src-oh-4906-04"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-wy-35-11-2101",
    "slug": "wy-35-11-2101",
    "name": "Wyoming advanced nuclear reactor requirements",
    "short_label": "W.S. 35-11-2101",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-WY",
    "jurisdiction_level": "state",
    "issuing_authority": "Wyoming Legislature",
    "citation": "Wyo. Stat. Ann. § 35-11-2101",
    "legal_scope": "Current Title 35 compilation. Subsection (a) and definition subparts (A) through (C) are marked repealed by Laws 2022, chapter 103, section 2. The remaining text requires Nuclear Regulatory Commission requirements before on-site storage of that reactor's spent fuel or high-level waste, says the section does not affect Commission authority, defines an advanced nuclear reactor as one that improves on reactors in service before 1 January 2021 and has a Commission license, limits the Industrial Development Information and Siting Act where it would conflict with or duplicate Commission requirements, and requires a jobs report to the department at least 30 days before construction when another named report is not required.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "2022",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-wy-title35-compilation",
        "note": "The compilation marks subsection (a) and definition subparts (A) through (C) repealed by Laws 2022, chapter 103, section 2. It does not print the day. The day is on the separate 2022 session-law record."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-wy-title35-compilation",
      "version": "Title 35 compilation PDF opened 4 October 2026; file date is not an effective date"
    },
    "legal_definitions": [
      {
        "term": "Advanced nuclear reactor",
        "section": "W.S. 35-11-2101(d)(iii)",
        "paraphrase": "A nuclear reactor, including necessary ancillary facilities or structures, that is an improvement over nuclear reactors placed in service before 1 January 2021 and that has a license issued by the United States Nuclear Regulatory Commission.",
        "source_id": "src-wy-title35-compilation",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-wy-ch103-2022",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The compilation does not decide whether any construction permit meets the statute's license wording. It does not approve a reactor. Tax and cost-recovery sections from the 2022 act were not in the portion stored here. The department rules were not opened. No project is linked.",
    "summary": "Wyoming's current advanced-nuclear section still requires a Nuclear Regulatory Commission license in its definition, bars on-site spent-fuel storage that does not meet Commission requirements, and limits state industrial siting where it would conflict with those requirements. Subsection (a) remains marked repealed by the 2022 act. The section does not approve a project.",
    "sources": [
      "src-wy-title35-compilation"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ny-psc-26-e-0335",
    "slug": "ny-psc-26-e-0335",
    "name": "New York PSC nuclear reliability backbone process",
    "short_label": "Case 26-E-0335",
    "category": "enacted_binding",
    "instrument_type": "commission_order",
    "jurisdiction": "US-NY",
    "jurisdiction_level": "state",
    "issuing_authority": "New York Public Service Commission",
    "citation": "New York Public Service Commission, Case 26-E-0335, Order Establishing a Nuclear Reliability Backbone Process",
    "legal_scope": "Order issued and effective 11 June 2026. It establishes a process led by the Department of Public Service to consider a nuclear reliability backbone. Staff must file a white paper within five months of the effective date. The order describes the state's four operating reactors, including Nine Mile Point 1 and 2, as existing generation of about 27.5 terawatt hours a year. That description is context, not a new approval.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2026-06-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ny-psc-26-e-0335",
        "note": "The order prints Issued and Effective June 11, 2026. Staff's white paper is due within five months. That period is not stored as a calendar day."
      }
    ],
    "effective_date": {
      "value": "2026-06-11",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ny-psc-26-e-0335",
      "version": "Order PDF opened 4 October 2026",
      "document_date": "2026-06-11"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The five-month white-paper period is not converted to a date. The order does not approve a new reactor, a Nine Mile Point application, Fort Drum, or the North Tonawanda proposal. Public Authorities Law section 1005 returned HTTP 403 and was not retried. Assembly bill A.6705 is not stored as a record.",
    "summary": "On 11 June 2026 the New York Public Service Commission opened a process for considering a nuclear reliability backbone and told staff to file a white paper within five months. The order discusses the four reactors already operating in the state. It does not approve a new project.",
    "sources": [
      "src-ny-psc-26-e-0335"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-mt-75-20-206",
    "slug": "mt-75-20-206",
    "name": "Montana legislative conditions for uranium conversion and enrichment",
    "short_label": "MCA 75-20-206",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-MT",
    "jurisdiction_level": "state",
    "issuing_authority": "Montana Legislature",
    "citation": "Mont. Code Ann. § 75-20-206 (2025)",
    "legal_scope": "The 2025 compilation says the legislature authorizes siting of a uranium conversion or enrichment facility only if the stated conditions are met. Those conditions include operation to convert and enrich uranium that was mined and milled in Montana or brought from outside the state, and a Nuclear Regulatory Commission license to convert and enrich. The history line is Chapter 503, Laws of 2025, with no day. The section defines uranium conversion and uranium enrichment. It does not mention a power reactor.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-mt-75-20-206",
        "note": "History: enacted as section 1, Chapter 503, Laws of 2025. The compilation prints no calendar day."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-mt-75-20-206",
      "version": "2025 Montana Code Annotated page opened 4 October 2026"
    },
    "legal_definitions": [
      {
        "term": "Uranium enrichment",
        "section": "Mont. Code Ann. § 75-20-206",
        "paraphrase": "The process used to enrich uranium through gaseous diffusion, gas centrifuges, or laser isotope separation.",
        "source_id": "src-mt-75-20-206",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "No calendar effective date is printed. The section is not a power-reactor permit and does not name the Malmstrom proposal. Chapter 409 of the 2021 laws was not opened because the official PDF routes returned HTTP 404. The ionizing-radiation part and the executive order were not stored in this record.",
    "summary": "Montana's 2025 code authorizes siting of a uranium conversion or enrichment facility only when the statute's conditions, including a federal license for that fuel-cycle activity, are met. It is not a permit for a power reactor, and the compilation gives the 2025 chapter without a day.",
    "sources": [
      "src-mt-75-20-206"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ia-hf2757-2026",
    "slug": "ia-hf2757-2026",
    "name": "Iowa House File 2757: nuclear generation tax treatment and workforce fund",
    "short_label": "HF 2757",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-IA",
    "jurisdiction_level": "state",
    "issuing_authority": "Iowa General Assembly",
    "citation": "2026 Iowa Acts, House File 2757",
    "legal_scope": "The governor's 1 June 2026 letter approves an act creating sales and use tax exemptions and refunds for commencing or restarting nuclear electric generation facilities. The enrolled text in the same PDF also establishes a nuclear energy workforce fund under the state board of regents and appropriates the fund for workforce programmes at the board's institutions. No dollar amount was read as a stored appropriation figure.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2026-06-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ia-hf2757-2026",
        "note": "The governor's letter says House File 2757 is approved on 1 June 2026. No separate effective-date clause was stored."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-ia-hf2757-2026",
      "version": "Governor's approval PDF, including enrolled text, opened 4 October 2026",
      "document_date": "2026-06-01"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "No effective date, repeal date, or appropriation dollar amount is stored. The act does not certificate a plant. Iowa Code chapter 476A was fetched and is not part of this record.",
    "summary": "Governor Reynolds approved House File 2757 on 1 June 2026. The act creates sales and use tax exemptions and refunds for commencing or restarting a nuclear electric generation facility and a nuclear energy workforce fund controlled by the board of regents. The opened PDF does not state a calendar effective date.",
    "sources": [
      "src-ia-hf2757-2026"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ia-eo17-2026",
    "slug": "ia-eo17-2026",
    "name": "Iowa Executive Order 17: Nuclear Energy Task Force",
    "short_label": "EO 17",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US-IA",
    "jurisdiction_level": "state",
    "issuing_authority": "Governor of Iowa",
    "citation": "Iowa Executive Order Number Seventeen (5 January 2026)",
    "legal_scope": "The order establishes the Iowa Nuclear Energy Task Force to advise the governor, the General Assembly, and state agencies on development and advancement of nuclear energy technologies and infrastructure. It applies prospectively as of its effective date. The signature block is the fifth day of January 2026.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2026-01-05",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ia-eo17-2026",
        "note": "Signature block: the fifth day of January 2026. The order says it applies prospectively as of its effective date and does not say that day is the signature day."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-ia-eo17-2026",
      "version": "Official PDF opened 4 October 2026",
      "document_date": "2026-01-05"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The signature day is not stored as the effective date. The task force's later advice was not opened. The order does not permit a plant or appropriate money. No project is linked.",
    "summary": "On 5 January 2026 the governor signed an order creating an advisory Nuclear Energy Task Force. The order says it applies prospectively as of its effective date and does not state that day. It does not approve a reactor or spend money.",
    "sources": [
      "src-ia-eo17-2026"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-mi-pa235-2023",
    "slug": "mi-pa235-2023",
    "name": "Michigan 2023 Public Act 235: nuclear generation in the clean-energy standard",
    "short_label": "2023 PA 235",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-MI",
    "jurisdiction_level": "state",
    "issuing_authority": "Michigan Legislature",
    "citation": "2023 Mich. Pub. Acts 235",
    "legal_scope": "The official act page says the governor approved it on 28 November 2023, it was filed on 29 November 2023, and it is effective 27 February 2024. A clean energy system includes a facility that generates electricity or steam without emitting greenhouse gas, and the act names nuclear generation as an example. A separate prong covers natural gas with carbon capture and storage. The act is an electric-provider planning statute, not a construction permit.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2023-11-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mi-pa235-2023",
        "note": "Approved by the Governor on 28 November 2023 and filed with the Secretary of State on 29 November 2023."
      },
      {
        "event": "effective",
        "date": {
          "value": "2024-02-27",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mi-pa235-2023",
        "note": "The act page prints EFFECTIVE DATE: February 27, 2024."
      }
    ],
    "effective_date": {
      "value": "2024-02-27",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-mi-pa235-2023",
      "version": "Official public-act page opened 4 October 2026",
      "document_date": "2024-02-27"
    },
    "legal_definitions": [
      {
        "term": "Clean energy system",
        "section": "2023 Mich. Pub. Acts 235",
        "paraphrase": "Includes an electricity generation facility or system that generates electricity or steam without emitting greenhouse gas, and the act names nuclear generation. A different prong covers natural gas using carbon capture and storage.",
        "source_id": "src-mi-pa235-2023",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The act does not permit a plant and does not name Palisades. House Bill 4128 remains a separate proposed bill. The 2025 House-passed bills were not enacted by this act.",
    "summary": "Michigan's 2023 energy act, effective 27 February 2024, counts nuclear generation among the ways an electric provider can meet the clean-energy standard when the facility produces electricity or steam without greenhouse-gas emissions. Approval was 28 November 2023. The act is not a construction permit.",
    "sources": [
      "src-mi-pa235-2023"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-mi-pa218-2022",
    "slug": "mi-pa218-2022",
    "name": "Michigan 2022 Public Act 218: nuclear feasibility study",
    "short_label": "2022 PA 218",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-MI",
    "jurisdiction_level": "state",
    "issuing_authority": "Michigan Legislature",
    "citation": "2022 Mich. Pub. Acts 218",
    "legal_scope": "The official act page says the governor approved it, it was filed, and it took effect on 14 October 2022. It directs a feasibility study of nuclear energy generation in Michigan, including a report to the governor and the senate majority leader. The opened page does not show that the study was delivered.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2022-10-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mi-pa218-2022",
        "note": "Approved by the Governor, filed with the Secretary of State, and effective on 14 October 2022."
      }
    ],
    "effective_date": {
      "value": "2022-10-14",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-mi-pa218-2022",
      "version": "Official public-act page opened 4 October 2026",
      "document_date": "2022-10-14"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The study report was not opened, so delivery is not recorded. The act does not permit a plant and does not name Palisades.",
    "summary": "Michigan's 2022 Public Act 218, effective 14 October 2022, requires a feasibility study of nuclear generation and a report to the governor and legislative leadership. The act page does not show that the report was delivered, and it does not approve a plant.",
    "sources": [
      "src-mi-pa218-2022"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-sc-act41-nuclear-advisory-council",
    "slug": "sc-act41-nuclear-advisory-council",
    "name": "South Carolina Act 41 of 2025: Governor's Nuclear Advisory Council",
    "short_label": "Act 41 council",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-SC",
    "jurisdiction_level": "state",
    "issuing_authority": "South Carolina General Assembly",
    "citation": "2025 S.C. Acts No. 41, S.C. Code Ann. §§ 13-7-810 to 13-7-860",
    "legal_scope": "The official bill page records the governor's signature on 12 May 2025 for the South Carolina Energy Security Act. Section 46 says the act takes effect upon approval by the Governor. The act places the Governor's Nuclear Advisory Council in the SC Nexus for Advanced Resilient Energy at the Department of Commerce. The council reports to the governor. Its duties include advice on use, handling, transportation, storage, or disposal of nuclear materials in South Carolina. It has eleven members. This record is those council sections, not the rest of the act.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-05-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-sc-h3309-2025",
        "note": "The bill page records Governor's Action: May 12, 2025, Signed. The act text prints Approved the 12th day of May, 2025."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-05-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-sc-h3309-2025",
        "note": "Section 46 says this act takes effect upon approval by the Governor. No separate council effective date is printed."
      }
    ],
    "effective_date": {
      "value": "2025-05-12",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-sc-h3309-2025",
      "version": "Official bill page opened 4 October 2026",
      "document_date": "2025-05-12"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The council advises. It does not approve the Savannah River proposals or any other project. Other Act 41 sections, including any small-modular definition and any permit-review deadline, are not this record. Sections 58-33-196 and the Base Load Review Act remain separate published records.",
    "summary": "South Carolina's governor signed Act 41 on 12 May 2025, and section 46 says the act takes effect upon that approval. The nuclear-advisory-council article creates an eleven-member council in the Department of Commerce to advise the governor on nuclear materials. The council does not permit a plant.",
    "sources": [
      "src-sc-h3309-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-il-eo-2026-01",
    "slug": "il-eo-2026-01",
    "name": "Illinois Executive Order 2026-01: nuclear notice of inquiry",
    "short_label": "EO 2026-01",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US-IL",
    "jurisdiction_level": "state",
    "issuing_authority": "Governor of Illinois",
    "citation": "Illinois Executive Order 2026-01 (18 February 2026)",
    "legal_scope": "The governor requests that the Illinois Power Agency and the Illinois Commerce Commission, within 60 days and after consulting other agencies as appropriate, issue a notice of inquiry to potential developers of new nuclear generation that would benefit residential ratepayers. The request covers information such as capacity and technology, financing, sites, and timing. The order recites other statutes. Those statutes were not opened.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2026-02-18",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-il-eo-2026-01",
        "note": "The order is dated 18 February 2026 and requests a notice of inquiry within 60 days. That period is not stored as a calendar day."
      }
    ],
    "effective_date": {
      "value": "2026-02-18",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-il-eo-2026-01",
      "version": "Official governor page opened 4 October 2026",
      "document_date": "2026-02-18"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The 60-day period is not converted to a date. The notice of inquiry, if issued, was not opened. The order's recital that another law lifted a nuclear restriction is not treated as the text of that law; the General Assembly site could not be opened. The order does not permit the Valmeyer proposal or any other plant.",
    "summary": "On 18 February 2026 the governor asked the Power Agency and the Commerce Commission to open a notice of inquiry to developers of new nuclear plants within 60 days. The order gathers information. It does not permit a reactor, and the statutes it mentions were not opened.",
    "sources": [
      "src-il-eo-2026-01"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-co-ch45-2025",
    "slug": "co-ch45-2025",
    "name": "Colorado Chapter 45 of 2025: nuclear energy in the clean-energy definitions",
    "short_label": "HB 25-1040",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-CO",
    "jurisdiction_level": "state",
    "issuing_authority": "Colorado General Assembly",
    "citation": "2025 Colo. Sess. Laws ch. 45 (HB 25-1040)",
    "legal_scope": "Session law approved 31 March 2025. It adds nuclear energy, including projects awarded funding through United States Department of Energy advanced nuclear reactor programmes, to the statutory clean-energy and clean-energy-resource definitions. For property taxation under section 39-4-101, the clean-energy-resource definition does not include nuclear energy. The session law says the act takes effect at 12:01 a.m. on the day after a 90-day period following final adjournment, unless a referendum petition is filed, in which case it takes effect only if approved at the November 2026 election. The General Assembly bill page, opened 5 October 2026, states status Became Law and an effective date of 6 August 2025. The 2025 Digest of Bills, compiled in June and July 2025, states that the General Assembly adjourned sine die on 7 May 2025, that the 90-day period expired on 5 August 2025, and that the default effective time for a bill without a safety clause was 12:01 a.m. on 6 August 2025. The Secretary of State certified 14 statewide measures for the 3 November 2026 general election on 4 September 2026. The opened list is Proposition NN, Amendments 81 through 87, and Propositions 132 through 137. It does not include a referendum on this act.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-03-31",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-co-ch45-2025",
        "note": "The session law prints Approved: March 31, 2025."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-08-06",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-co-hb25-1040-page",
        "note": "The bill page opened 5 October 2026 states Effective Date 08/06/2025. The June and July 2025 digest calculated the same default day before the petition deadline and is not the finding that no petition was filed."
      }
    ],
    "effective_date": {
      "value": "2025-08-06",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-co-hb25-1040-page",
      "version": "Bill page opened 5 October 2026",
      "document_date": "2025-08-06"
    },
    "legal_definitions": [
      {
        "term": "Clean energy resource",
        "section": "Colo. Rev. Stat. § 40-2-125.5(2)(b), as amended by Chapter 45",
        "paraphrase": "Includes nuclear energy, including nuclear energy projects awarded funding through the United States Department of Energy's advanced nuclear reactor programmes. The property-tax definition in section 39-4-101 does not include nuclear energy.",
        "source_id": "src-co-ch45-2025",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The June and July 2025 digest was compiled before 5 August 2025, so it is not the finding that no referendum petition was filed. The effective date is the date stated on the General Assembly bill page opened 5 October 2026. The Secretary of State's 4 September 2026 certification lists 14 statewide measures and does not include this act. Local ballot measures are certified by county clerks and were not opened. The act does not certificate a plant. The property-tax definition still does not include nuclear energy. No project is linked. Governor and commission pages that returned HTTP 403 on 4 October 2026 were not retried.",
    "summary": "Colorado's Chapter 45, approved 31 March 2025, adds nuclear energy to the clean-energy definitions, including projects funded through a federal advanced-reactor programme. The property-tax definition does not include nuclear energy. The General Assembly bill page states an effective date of 6 August 2025, and the Secretary of State's 4 September 2026 certified statewide ballot does not include a referendum on this act. The act does not certificate a plant.",
    "sources": [
      "src-co-ch45-2025",
      "src-co-hb25-1040-page",
      "src-co-digest-2025",
      "src-co-sos-ballot-20260904"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-or-469-595",
    "slug": "or-469-595",
    "name": "Oregon conditions for a nuclear-fueled thermal power plant",
    "short_label": "ORS 469.595",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-OR",
    "jurisdiction_level": "state",
    "issuing_authority": "Oregon Legislative Assembly",
    "citation": "ORS 469.594 to 469.601 (2025 edition)",
    "legal_scope": "The 2025 edition of the laws relating to the Public Utility Commission presents these sections as current and cites 1981 chapter 1 for the initiative text. Before a site certificate for a nuclear-fueled thermal power plant, the Energy Facility Siting Council must find that a federal agency has licensed an adequate repository for the plant's high-level waste. The repository must provide for terminal disposition, with or without retrieval for reprocessing. If the council proposes to issue the certificate, the proposal goes to the state's electors at the next available statewide general election, and the certificate shall not be issued until they approve it. The Public Utility Commission shall not authorize financing for such a plant until the repository finding is made. High-level waste should not be stored at the plant after the operating licence expires, and the operator remains responsible for temporary storage until removal.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1981",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-or-puc-lawbook-2025",
        "note": "The 2025 edition cites 1981 chapter 1 for these sections. It does not print a calendar day. Later amendment years printed on the storage section are not stored as this record's effective date."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-or-puc-lawbook-2025",
      "version": "2025 edition, Title 36A page 69, opened 4 October 2026"
    },
    "legal_definitions": [
      {
        "term": "High-level radioactive waste",
        "section": "ORS 469.590",
        "paraphrase": "Spent nuclear fuel or the radioactive by-products from the reprocessing of spent nuclear fuel.",
        "source_id": "src-or-puc-lawbook-2025",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The earlier official chapter HTML timed out and the compiled PDF route returned HTTP 404. Those routes were not retried. This 2025 law book is the text that was read. No Oregon project is linked. The sections do not issue a site certificate.",
    "summary": "Oregon's 2025 official law book still requires a federally licensed high-level-waste repository before a site certificate for a nuclear-fueled thermal power plant, and it requires approval by the state's electors at the next available statewide general election. The certificate shall not be issued until that vote. The text cites a 1981 measure and does not approve a plant.",
    "sources": [
      "src-or-puc-lawbook-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-az-sb1418-2026",
    "slug": "az-sb1418-2026",
    "name": "Arizona S.B. 1418, vetoed: corporation commission and small modular reactors",
    "short_label": "SB 1418 vetoed",
    "category": "proposed",
    "instrument_type": "bill",
    "jurisdiction": "US-AZ",
    "jurisdiction_level": "state",
    "issuing_authority": "Arizona State Senate",
    "citation": "S.B. 1418, 57th Legislature, 2nd Regular Session (vetoed)",
    "legal_scope": "Senate fact sheet for an amended bill the governor vetoed. The sheet says the bill would have let a utility, after 30 days' written notice to the Arizona Corporation Commission, construct a small modular reactor co-located with an extra-high-load-factor customer without applying for a certificate of environmental compatibility. It also describes a change to the plant definition and a definition of small modular reactor. The veto means those changes are not law.",
    "affects": [
      "siting"
    ],
    "status": "failed",
    "lifecycle": [
      {
        "event": "failed",
        "date": {
          "value": "2026-06-19",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-az-sb1418-factsheet",
        "note": "The fact sheet prints Vetoed by the Governor 6/19/26. Senate Research prepared the sheet on 25 June 2026. The governor's 19 June 2026 action page lists SB 1418 under Vetoed."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-az-sb1418-factsheet",
      "version": "Vetoed amended fact sheet opened 4 October 2026",
      "document_date": "2026-06-25"
    },
    "legal_definitions": [
      {
        "term": "Small modular reactor",
        "section": "S.B. 1418 fact sheet item 8",
        "paraphrase": "The fact sheet says the bill defines a small modular reactor as a generation III+ or generation IV nuclear generating unit with a nameplate rating of not more 300 megawatts. That phrasing is the fact sheet's. The enrolled bill was not opened, and the veto means this definition is not law.",
        "source_id": "src-az-sb1418-factsheet",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The enrolled bill and the veto letter were not opened. Current A.R.S. sections 40-360 and 40-360.03 were opened: a plant includes a nuclear unit of 100 megawatts or more, with a pre-13 August 1971 commitment exception, and a utility must apply for a certificate before construction. Those pages print no enactment date, so they are not a separate record. This veto does not decide any project.",
    "summary": "Arizona S.B. 1418 was vetoed on 19 June 2026. The Senate fact sheet describes a certificate exemption for a co-located small modular reactor and a definition whose printed nameplate phrase is not more 300 megawatts. The veto means that text is not law.",
    "sources": [
      "src-az-sb1418-factsheet",
      "src-az-hobbs-20260619"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-az-eo-2025-13",
    "slug": "az-eo-2025-13",
    "name": "Arizona Executive Order 2025-13: energy task force",
    "short_label": "EO 2025-13",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US-AZ",
    "jurisdiction_level": "state",
    "issuing_authority": "Governor of Arizona",
    "citation": "Ariz. Exec. Order No. 2025-13",
    "legal_scope": "Order dated 15 September 2025 establishing the Arizona Energy Promise Taskforce. By 1 March 2026 the task force is to deliver reports, including an energy strategy that covers emerging technologies such as geothermal and advanced nuclear generation. The Office of Resiliency is told to coordinate support so eligible solar, wind, storage, advanced geothermal, and nuclear projects can start construction in time for federal tax credits. The order says it confers no legal rights or remedies. The Corporation Commission is outside the order's definition of an executive-branch agency.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-09-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-az-eo-2025-13",
        "note": "The governor's order page prints Executive Order 2025-13 and September 15, 2025. The 1 March 2026 report dates are directions. Delivery was not opened."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-az-eo-2025-13",
      "version": "Governor order page opened 4 October 2026",
      "document_date": "2025-09-15"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The order does not permit a reactor, certificate a site, or appropriate state money for a nuclear project. The 30-day land-department report and the 1 March 2026 reports were not checked for delivery. No project is linked.",
    "summary": "Arizona Executive Order 2025-13, dated 15 September 2025, sets up an energy task force and tells agencies to help eligible nuclear projects, among other technologies, start construction for federal tax credits. It creates no project approval and says it confers no legal rights.",
    "sources": [
      "src-az-eo-2025-13"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-hi-xi-8",
    "slug": "hi-const-xi-8",
    "name": "Hawaii Constitution article XI, section 8: nuclear fission plants",
    "short_label": "Haw. Const. art. XI, § 8",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-HI",
    "jurisdiction_level": "state",
    "issuing_authority": "Hawaii Constitutional Convention and electorate",
    "citation": "Haw. Const. art. XI, § 8",
    "legal_scope": "Constitutional section, stored with the statute instrument type because the dataset has no separate constitution type. No nuclear fission power plant shall be constructed, and no radioactive material shall be disposed of, in the state without prior approval by a two-thirds vote in each house of the legislature. The Legislative Reference Bureau text marks it added by the 1978 constitutional convention and the election of 7 November 1978.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1978-11-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-hi-const-lrb",
        "note": "The compilation prints Add Const Con 1978 and election Nov 7, 1978. It does not print a separate effective date."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-hi-const-lrb",
      "version": "LRB constitution text opened 4 October 2026",
      "document_date": "1978-11-07"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The section does not itself approve a plant. HRS section 269-91 returned HTTP 403 and was not retried. A 2025 Hawaii State Energy Office report was opened and recommends no constitutional or renewable-portfolio amendment and no legislation; it is not a second instrument here. No project is linked.",
    "summary": "Hawaii's constitution requires a two-thirds vote of each legislative house before a nuclear fission power plant is constructed or radioactive material is disposed of in the state. The official text ties that section to the 7 November 1978 election.",
    "sources": [
      "src-hi-const-lrb"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ks-nuclear-siting",
    "slug": "ks-nuclear-siting",
    "name": "Kansas nuclear generation facility siting permit",
    "short_label": "K.S.A. 66-1,158 and 66-1,159",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-KS",
    "jurisdiction_level": "state",
    "issuing_authority": "Kansas Legislature",
    "citation": "K.S.A. 66-1,158 and 66-1,159",
    "legal_scope": "2025 compilation. A nuclear generation facility is a physical plant that uses nuclear energy as the primary fuel for electricity. The definition excludes remodeling or retrofit, nonnuclear capacity at a nuclear site, an addition or new facility within three miles of an existing reactor, and certain out-of-state facilities serving a small share of Kansas retail customers. An electric utility may not begin site preparation or construction, or use eminent domain for that purpose, without a Kansas Corporation Commission permit. The commission sets a public hearing not less than 30 and not more than 180 days after the application is filed.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "2007-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ks-66-1158",
        "note": "Both sections' history lines end with L. 2007, ch. 113 and then July 1, without repeating the year. The effective day is stored as 1 July 2007 from that session-law line. Earlier amendment years are not this record's effective date."
      }
    ],
    "effective_date": {
      "value": "2007-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ks-66-1158",
      "version": "2025 Kansas Statutes PDF and statute page opened 4 October 2026",
      "document_date": "2007-07-01"
    },
    "legal_definitions": [
      {
        "term": "Nuclear generation facility",
        "section": "K.S.A. 66-1,158(f)",
        "paraphrase": "Any physical plant using nuclear energy as the primary fuel for electricity. The same subsection excludes remodeling or retrofit, nonnuclear capacity at a nuclear site, additions and new facilities within three miles of an existing reactor, and specified out-of-state facilities. An existing facility is one in existence on 1 January 2007.",
        "source_id": "src-ks-66-1158",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ks-79-266",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The permit requirement does not issue a permit. The 30-to-180-day hearing window is not a calendar date. The governor's executive-order page returned HTTP 403 and was not retried. No Kansas project is linked.",
    "summary": "Kansas requires a Corporation Commission permit before an electric utility starts site preparation or construction of a nuclear generation facility, using a definition that excludes several nearby and out-of-state cases. The 2025 compilation's last history line is the 2007 session law, effective 1 July on that line.",
    "sources": [
      "src-ks-66-1158",
      "src-ks-66-1159"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ks-79-266",
    "slug": "ks-79-266",
    "name": "Kansas property-tax exemption for certain new electric generation, including nuclear",
    "short_label": "K.S.A. 79-266",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-KS",
    "jurisdiction_level": "state",
    "issuing_authority": "Kansas Legislature",
    "citation": "K.S.A. 79-266",
    "legal_scope": "2025 compilation. New electric generation facilities, new additions, and specified new pollution-control devices are exempt from property and ad valorem taxes. A new electric generation facility includes a facility that uses nuclear energy to generate electricity. Wind, solar, biomass, landfill gas, and other renewable conversion are excluded. The exemption runs from the start of construction or installation and for the 10 taxable years after the taxable year in which construction or installation is completed. It applies to taxable years beginning after 31 December 2024.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "2024-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ks-79-266",
        "note": "The history line prints L. 2024, ch. 81, § 2; July 1, without repeating the year. The effective day is stored as 1 July 2024 from that session-law line."
      }
    ],
    "effective_date": {
      "value": "2024-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ks-79-266",
      "version": "2025 Kansas Statutes PDF opened 4 October 2026",
      "document_date": "2024-07-01"
    },
    "legal_definitions": [
      {
        "term": "New electric generation facility",
        "section": "K.S.A. 79-266(c)(3)",
        "paraphrase": "Includes any electric generation facility that uses nuclear energy to generate electricity, if construction began on or after 1 January 2025 and the facility is one described in the cited utility statutes. It does not include a facility that converts wind, solar, biomass, landfill gas, or another renewable source to electricity.",
        "source_id": "src-ks-79-266",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ks-nuclear-siting",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "This is a property-tax exemption, not an appropriation, a grant, or a construction permit. The 10-year period runs per property after completion. It is not a sunset of the statute. Sections 79-257 and 79-258, cited for discontinuation of certain exemptions, were not opened. No project is linked.",
    "summary": "Kansas exempts qualifying new electric generation property, including nuclear generation, from property tax from the start of construction and for 10 taxable years after completion. Renewable conversion is excluded. The exemption is not a permit to build.",
    "sources": [
      "src-ks-79-266"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nd-hb1025-2025",
    "slug": "nd-hb1025-2025",
    "name": "North Dakota 2025 House Bill 1025: advanced nuclear study and appropriation",
    "short_label": "HB 1025",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-ND",
    "jurisdiction_level": "state",
    "issuing_authority": "North Dakota Legislative Assembly",
    "citation": "2025 N.D. Sess. Laws, H.B. 1025",
    "legal_scope": "Enrolled act of the 69th Legislative Assembly, regular session commencing 7 January 2025. During the 2025-26 interim, legislative management shall study the feasibility, siting, and deployment of advanced nuclear power plants, including small modular and microreactors and century-code restrictions. It appropriates $300,000 from the general fund, or so much as necessary, and $300,000 from special funds derived from nonstate grants or donations, to the legislative council for consulting, for the biennium beginning 1 July 2025 and ending 30 June 2027. The funding is one-time. The enrolled signature lines are blank. The legislative overview says the governor signed on 04/18 and the bill was filed with the Secretary of State on 04/16.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-nd-hb1025-enrolled",
        "note": "The enrolled print is the 2025 regular session. The signature lines are blank. The overview prints Signed on 04/18 and Filed with Secretary of State 04/16, so no day is stored."
      }
    ],
    "effective_date": null,
    "expiry": {
      "date": {
        "value": "2027-06-30",
        "precision": "day",
        "basis": "actual"
      },
      "condition": "Section 2 appropriates the consulting funds for the biennium ending this date and calls that funding a one-time item. This date is not a repeal of the study direction, and it is not a finding that the money remains unspent."
    },
    "operative_source": {
      "source_id": "src-nd-hb1025-enrolled",
      "version": "Enrolled PDF opened 4 October 2026",
      "document_date": "2025"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The enrolled signature lines are blank. The overview prints a governor signature on 04/18 and a Secretary of State filing on 04/16, so no day is stored. The act orders a study and a consulting appropriation. It does not site or permit a reactor. The 1 July 2025 date is the biennium start printed in the appropriation, not a stored effective date of the act. The 30 June 2027 date is the printed end of that one-time appropriation, not a finding that the funds remain unspent. Chapters 38-23 and 49-22 were opened and are not this record: the waste chapter prohibits high-level radioactive waste placement in the state, and the siting chapter requires a certificate before construction of an electric energy conversion facility, including non-wind generation above 50 megawatts. Those compilations print no enactment date for the operative sections. No project is linked.",
    "summary": "North Dakota's 2025 House Bill 1025 orders an interim study of advanced nuclear plants, including small modular and microreactors, and appropriates up to $300,000 in general funds and up to $300,000 in nonstate special funds for consulting through 30 June 2027. The enrolled signature lines are blank, and the overview's 16 April filing and 18 April signing lines conflict, so no signature day is stored.",
    "sources": [
      "src-nd-hb1025-enrolled",
      "src-nd-hb1025-overview"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ok-osl491-2025",
    "slug": "ok-osl491-2025",
    "name": "Oklahoma 2025 chapter 491: nuclear energy feasibility study",
    "short_label": "2025 O.S.L. 491",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-OK",
    "jurisdiction_level": "state",
    "issuing_authority": "Oklahoma Legislature",
    "citation": "2025 O.S.L. 491",
    "legal_scope": "Enrolled act approved 9 June 2025. The Oklahoma Corporation Commission is directed to start, within 90 days after the effective date, engaging an outside firm for a technical and legal feasibility study of nuclear energy generation. The study list includes small modular nuclear reactor and microreactor capability and siting criteria. Findings are to be delivered within nine months after the effective date. An emergency clause says the act takes effect upon passage and approval. The page caption prints HB 0130. The enrolled line prints Senate Bill No. 130.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-06-09",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ok-osl491-2025",
        "note": "The page prints approval on the 9th day of June, 2025. Senate passage is printed as 22 May 2025 and House passage as 27 May 2025. The emergency clause makes the act effective on passage and approval."
      }
    ],
    "effective_date": {
      "value": "2025-06-09",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ok-osl491-2025",
      "version": "OSCN session-law page opened 4 October 2026",
      "document_date": "2025-06-09"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The 90-day engagement period and the nine-month delivery period are not converted to calendar days. Delivery of the study was not opened. The act contains no appropriation in the text that was read. The HB 0130 caption and the Senate Bill 130 enrolled line are both printed and are not resolved. The act does not permit a reactor. No project is linked.",
    "summary": "Oklahoma's 2025 chapter 491, approved 9 June 2025, orders a Corporation Commission feasibility study of nuclear generation, including small modular reactors and microreactors. It takes effect on approval. It does not permit a plant or appropriate money in the text that was opened.",
    "sources": [
      "src-ok-osl491-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nv-459-910",
    "slug": "nv-459-910",
    "name": "Nevada prohibition on storing high-level radioactive waste",
    "short_label": "NRS 459.910",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-NV",
    "jurisdiction_level": "state",
    "issuing_authority": "Nevada Legislature",
    "citation": "Nev. Rev. Stat. § 459.910",
    "legal_scope": "It is unlawful for any person or governmental entity to store high-level radioactive waste in Nevada. The section uses the meaning of high-level radioactive waste in 10 C.F.R. 60.2. The compilation says the section was added to NRS in 1989. It does not print a day.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1989",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-nv-nrs-459",
        "note": "The source note prints Added to NRS by 1989, 2113. No calendar day is printed."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-nv-nrs-459",
      "version": "NRS chapter 459 opened 4 October 2026",
      "document_date": "1989"
    },
    "legal_definitions": [
      {
        "term": "High-level radioactive waste",
        "section": "NRS 459.910(2)",
        "paraphrase": "The section adopts the meaning ascribed to high-level radioactive waste in 10 C.F.R. 60.2. That federal section was not opened for this record.",
        "source_id": "src-nv-nrs-459",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "This is a storage prohibition. It is not a power-reactor construction permit and it does not approve a project. The federal definition it incorporates was not opened. The utility-facility permit statute in NRS chapter 704 was opened separately and is not this record. No project is linked.",
    "summary": "Nevada law makes it unlawful to store high-level radioactive waste in the state. The 1989 source note prints no day. The section points to a federal definition that was not opened here, and it does not license a reactor.",
    "sources": [
      "src-nv-nrs-459"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ri-39-31-5",
    "slug": "ri-39-31-5",
    "name": "Rhode Island authorization to participate in nuclear-power procurement",
    "short_label": "R.I. Gen. Laws § 39-31-5",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-RI",
    "jurisdiction_level": "state",
    "issuing_authority": "Rhode Island General Assembly",
    "citation": "R.I. Gen. Laws § 39-31-5",
    "legal_scope": "The distribution utility, in consultation with the office of energy resources and the division of public utilities and carriers, is authorized to participate voluntarily in efforts to procure nuclear power, among other resources, for electric ratepayers. The history line prints P.L. 2025, ch. 101 and ch. 102, each effective 23 June 2025.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2025-06-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ri-39-31-5",
        "note": "The history line prints effective June 23, 2025 for both 2025 public laws cited on the page."
      }
    ],
    "effective_date": {
      "value": "2025-06-23",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ri-39-31-5",
      "version": "Official statute page opened 4 October 2026",
      "document_date": "2025-06-23"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-ri-42-98-4",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The section authorizes voluntary participation in procurement. It does not require a purchase and it does not site or permit a reactor. Any procurement the same section addresses must be commercially reasonable. No project is linked.",
    "summary": "From 23 June 2025, Rhode Island law authorizes the distribution utility to participate voluntarily in procuring nuclear power for ratepayers. That authorization is not a permit to build a reactor.",
    "sources": [
      "src-ri-39-31-5"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ri-42-98-4",
    "slug": "ri-42-98-4",
    "name": "Rhode Island energy facility siting licence",
    "short_label": "R.I. Gen. Laws § 42-98-4",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-RI",
    "jurisdiction_level": "state",
    "issuing_authority": "Rhode Island General Assembly",
    "citation": "R.I. Gen. Laws § 42-98-4",
    "legal_scope": "No person shall site, construct, or alter a major energy facility in the state without a licence from the siting board. A major energy facility includes electricity generation of forty megawatts or more and, separately, facilities for the processing, enrichment, storage, or disposal of nuclear fuels or nuclear byproducts. The licence section's history is P.L. 1986, chapter 531, section 1, with no day.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1986",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-ri-42-98-4",
        "note": "The licence section history prints P.L. 1986, ch. 531, § 1. It does not print a day."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-ri-42-98-4",
      "version": "Official statute page opened 4 October 2026",
      "document_date": "1986"
    },
    "legal_definitions": [
      {
        "term": "Major energy facility",
        "section": "R.I. Gen. Laws § 42-98-3",
        "paraphrase": "Includes facilities for generation of electricity designed or capable of operating at a gross capacity of forty megawatts or more, and facilities for the processing, enrichment, storage, or disposal of nuclear fuels or nuclear byproducts. The opened definition does not use the word reactor.",
        "source_id": "src-ri-42-98-3",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ri-39-31-5",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The statute does not issue a licence. Generation below forty megawatts is not decided by the generation prong. The nuclear-fuel prong is separate. No project is linked.",
    "summary": "Rhode Island requires a siting-board licence before a person sites, constructs, or alters a major energy facility. The opened definition includes generation of forty megawatts or more and nuclear-fuel processing, enrichment, storage, or disposal facilities. It does not itself grant a licence.",
    "sources": [
      "src-ri-42-98-4",
      "src-ri-42-98-3"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-sd-49-41b-4",
    "slug": "sd-49-41b-4",
    "name": "South Dakota energy facility construction permit",
    "short_label": "SDCL 49-41B-4",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-SD",
    "jurisdiction_level": "state",
    "issuing_authority": "South Dakota Legislature",
    "citation": "S.D. Codified Laws § 49-41B-4",
    "legal_scope": "No utility may begin construction of a facility in the state on or after 1 July 1979 without a Public Utilities Commission permit. A water-transport associated facility does not need that permit if the water management board has issued a water-appropriation permit. The source line runs through session law 1983, chapter 349. The opened facility definition covers generation of one hundred megawatts or more and does not use the word nuclear.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "1983",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-sd-49-41b-4",
        "note": "The source line prints SL 1977, ch 390, § 4 and SL 1983, ch 349. It does not print a day. The 1 July 1979 date is the construction threshold in the section, not a stored effective date."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-sd-49-41b-4",
      "version": "Legislature API text opened 4 October 2026",
      "document_date": "1983"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The section does not issue a permit and does not name nuclear energy. The 1 July 1979 date stays in the construction sentence. The statute-browser page was a loading shell and was not used. No adopted siting rule text was opened. No project is linked.",
    "summary": "South Dakota requires a Public Utilities Commission permit before a utility begins construction of a covered facility on or after 1 July 1979. The opened definition is a generation threshold of one hundred megawatts and does not say nuclear. The latest source line is 1983, with no day.",
    "sources": [
      "src-sd-49-41b-4",
      "src-sd-49-41b-2"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nm-17-9-592",
    "slug": "nm-17-9-592",
    "name": "New Mexico location approval for a large capacity plant",
    "short_label": "NMAC 17.9.592",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US-NM",
    "jurisdiction_level": "state",
    "issuing_authority": "New Mexico Public Regulation Commission",
    "citation": "N.M. Admin. Code § 17.9.592.8",
    "legal_scope": "No person shall begin construction of a large capacity plant or transmission line without prior commission approval. A large capacity plant is generation within New Mexico designed for or capable of operation at 300 megawatts or more, for sale to the public. The part states an effective date of 1 May 2004 unless a later date is cited at the end of a section. The approval section's own history line is 5/1/2004.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2004-05-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-nm-17-9-592",
        "note": "The part prints EFFECTIVE DATE: May 1, 2004, unless a later date is cited at the end of a section. Section 17.9.592.8's history line is 5/1/2004."
      }
    ],
    "effective_date": {
      "value": "2004-05-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-nm-17-9-592",
      "version": "Official NMAC text opened 4 October 2026",
      "document_date": "2004-05-01"
    },
    "legal_definitions": [
      {
        "term": "Large capacity plant",
        "section": "NMAC 17.9.592",
        "paraphrase": "An electric generating plant within New Mexico designed for, or capable of, operation at a capacity of 300 megawatts or more, for sale to the public within or without New Mexico. The opened rule does not use the word nuclear.",
        "source_id": "src-nm-17-9-592",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The rule does not approve a plant. It does not say nuclear, so it does not decide a unit below 300 megawatts. Other sections of the same part print a 27 December 2022 amendment. That date is not this approval section's effective date. The cited NMSA sections were not opened. No project is linked.",
    "summary": "New Mexico requires commission approval before construction of a large capacity plant, defined as generation of 300 megawatts or more. The approval section is effective 1 May 2004. The opened text does not say nuclear and does not grant an approval.",
    "sources": [
      "src-nm-17-9-592"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ky-ch51-2025",
    "slug": "ky-chapter-51-2025",
    "name": "Kentucky Chapter 51 of 2025: nuclear energy development grant appropriation",
    "short_label": "Chapter 51",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-KY",
    "jurisdiction_level": "state",
    "issuing_authority": "Kentucky General Assembly",
    "citation": "2025 Ky. Acts ch. 51",
    "legal_scope": "Session law amending a University of Kentucky quasi-endowment appropriation. Of $20,000,000 in each fiscal year, $8,000,000 may be used in fiscal year 2025-2026 for the Nuclear Energy Development Grant Program. A separate $2,000,000 is dedicated to a laser and photonics program and is not a nuclear grant. Interest on the investment supports administration of the Kentucky Nuclear Energy Development Authority. An emergency clause makes the act effective upon passage and approval. The act does not award a grant or permit a plant.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2025-03-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ky-ch51-2025",
        "note": "The act prints Signed by Governor March 24, 2025. The emergency clause says the act takes effect upon passage and approval by the Governor or upon its otherwise becoming a law."
      }
    ],
    "effective_date": {
      "value": "2025-03-24",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ky-ch51-2025",
      "version": "Chapter 51 PDF opened 4 October 2026",
      "document_date": "2025-03-24"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The $8,000,000 figure is permission to use part of the university quasi-endowment in fiscal year 2025-2026. The opened act does not print the calendar end of that fiscal year, and no official Kentucky fiscal-year definition was in the opened texts, so no expiry date is stored. No grant award and no recipient are recorded. The $2,000,000 laser and photonics line is not nuclear funding. No project is linked. The act does not approve a reactor.",
    "summary": "Kentucky's 2025 chapter 51, signed 24 March 2025, lets the University of Kentucky use $8,000,000 of a quasi-endowment in fiscal year 2025-2026 for the Nuclear Energy Development Grant Program. A separate $2,000,000 laser line is not part of that program. No grant award is recorded, and the act does not permit a plant.",
    "sources": [
      "src-ky-ch51-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "expiry": null,
    "related": [],
    "applicability": [],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified",
    "jurisdiction_level": "state",
    "legal_definitions": [],
    "stable_id": "pol-id-39-3020",
    "slug": "id-39-3020",
    "name": "Idaho Code § 39-3020: Western Interstate Nuclear Compact",
    "short_label": "Idaho Code § 39-3020",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-ID",
    "issuing_authority": "Idaho Legislature",
    "citation": "Idaho Code § 39-3020 (1969, ch. 34, sec. 1)",
    "legal_scope": "Current official section, opened 4 October 2026. Idaho enacts the Western Interstate Nuclear Compact and enters it as a party. The compact's stated purpose is cooperation among party states on nuclear and related scientific and technological resources. The history line says the section was added in 1969, chapter 34, section 1, page 61. No day is printed. The compact is not a site certificate or a construction permit.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1969",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-id-code-39-3020",
        "note": "The official history line says the section was added in 1969 by chapter 34, section 1, page 61. The day is not on the page. That year is not the compact's initial effective date."
      }
    ],
    "effective_date": null,
    "operative_source": {
      "source_id": "src-id-code-39-3020",
      "version": "Idaho Legislature current section, opened 4 October 2026",
      "document_date": "2026-10-04"
    },
    "unapproved": "No day is printed. The 1969 history line is the year the section was added, not an effective date. The compact text says it shall not become initially effective until enacted into law by five states, and this page does not say when that happened. The section says the compact is in full force and effect between Idaho and any other state joining under its terms. The compact does not approve a reactor, name an Idaho site, or appropriate funds. Executive Order 2024-10 was saved without extractable words and is not part of this record.",
    "summary": "Idaho Code § 39-3020, added in 1969, enacts the Western Interstate Nuclear Compact. The compact says it does not become initially effective until five states enact it, and this page does not date that. The opened page prints no day. The compact is a cooperation statute, not a reactor approval.",
    "sources": [
      "src-id-code-39-3020"
    ]
  },
  {
    "expiry": null,
    "related": [],
    "applicability": [],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified",
    "jurisdiction_level": "state",
    "legal_definitions": [],
    "stable_id": "pol-ky-164-2803",
    "slug": "ky-krs-164-2803",
    "name": "Kentucky KRS 164.2803: nuclear energy development grant cap",
    "short_label": "KRS 164.2803 cap",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-KY",
    "issuing_authority": "Kentucky General Assembly",
    "citation": "Ky. Rev. Stat. § 164.2803, as amended by 2026 Ky. Acts ch. 56, sec. 5",
    "legal_scope": "2026 Acts chapter 56, section 5, amends KRS 164.2803. The amended text says the Kentucky Nuclear Energy Development Authority creates and implements the Nuclear Energy Development Grant Program for fission and fusion projects in the nuclear energy ecosystem. A subcommittee makes grant awards not to exceed $2,000,000 per individual grant. The session-law PDF prints Signed by Governor April 8, 2026. It does not print an effective date for section 5. The cap is what the amended text states. This record does not say the act created the cap.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2026-04-08",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ky-ch56-2026",
        "note": "The session-law PDF prints Signed by Governor April 8, 2026. It does not print an effective date for section 5. No award is named."
      }
    ],
    "effective_date": null,
    "operative_source": {
      "source_id": "src-ky-ch56-2026",
      "version": "2026 Ky. Acts ch. 56 PDF, opened 4 October 2026",
      "document_date": "2026-04-08"
    },
    "unapproved": "No applicant and no award are named. The $2,000,000 figure is a per-grant cap in the amended text, not a recorded disbursement. The session-law PDF does not print section 5's effective date. The 15 July 2026 date on the compiled companion sections is not copied here.",
    "summary": "Kentucky's 2026 chapter 56, signed 8 April 2026, contains the amended nuclear energy development grant section. That text caps an individual grant at $2,000,000. The PDF does not print section 5's effective date, and no award is recorded.",
    "sources": [
      "src-ky-ch56-2026"
    ]
  },
  {
    "expiry": null,
    "related": [],
    "applicability": [],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified",
    "jurisdiction_level": "state",
    "legal_definitions": [],
    "stable_id": "pol-nj-eo-2-2026",
    "slug": "nj-eo-2-2026",
    "name": "New Jersey Executive Order No. 2: Nuclear Power Task Force",
    "short_label": "EO No. 2",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US-NJ",
    "issuing_authority": "Governor of New Jersey",
    "citation": "New Jersey Executive Order No. 2 (20 January 2026)",
    "legal_scope": "The order establishes an interagency Nuclear Power Task Force to coordinate a strategy for development of new nuclear generation facilities, including coordination with the federal government and other states. The task force is charged with facilitating planning and advancement of new advanced nuclear generation, assessing financing options, and exploring federal and interstate opportunities. It takes effect immediately. It states that it confers no legal right on regulated entities and creates no private right of action. It does not appropriate money or permit a reactor.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2026-01-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-nj-eo-2-2026",
        "note": "The order says it is given the 20th day of January, Two Thousand and Twenty-Six, and that it takes effect immediately."
      }
    ],
    "effective_date": {
      "value": "2026-01-20",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-nj-eo-2-2026",
      "version": "Official order PDF opened 4 October 2026",
      "document_date": "2026-01-20"
    },
    "unapproved": "The order creates a task force. It does not name a site, a developer, or an appropriation. No project is linked. The pre-2026 coastal-statute URL returned a script shell and is not this record.",
    "summary": "New Jersey Executive Order No. 2, signed 20 January 2026, creates a Nuclear Power Task Force to plan new nuclear generation and assess financing. It takes effect immediately. It does not permit a reactor or appropriate money.",
    "sources": [
      "src-nj-eo-2-2026"
    ]
  },
  {
    "expiry": {
      "date": {
        "value": "2028-09-30",
        "precision": "day",
        "basis": "planned"
      },
      "condition": "Section 811(6)(e) of the opened act prints 30 September 2028 as the tentative completion date of the targeted-energy work project. The part 1 line is a one-time appropriation for the fiscal year ending 30 September 2024. A later budget document, the grant agreement, and a Department of Energy conditional commitment were not opened."
    },
    "related": [],
    "applicability": [],
    "confidence": "high",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified",
    "jurisdiction_level": "state",
    "legal_definitions": [],
    "stable_id": "pol-mi-pa121-2024",
    "slug": "mi-pa121-2024",
    "name": "Michigan 2024 Public Act 121: targeted energy investment",
    "short_label": "2024 PA 121",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-MI",
    "issuing_authority": "Michigan Legislature",
    "citation": "2024 Mich. Pub. Acts 121, § 811",
    "legal_scope": "Enrolled Senate Bill 747, Act No. 121 of the Public Acts of 2024. The governor approved it on 24 July 2024, it was filed the same day, and the act prints that effective date. Item vetoes are listed on the first page and do not include section 811. For the fiscal year ending 30 September 2024, part 1 lists a one-time targeted energy investment of 150,000,000. Section 811 says those funds must support efforts to restart a Michigan-based nuclear power generation reactor capable of producing less than 1,000 megawatts that was in service as of 1 January 2022 but is not currently producing electricity. Funding is contingent on conditional commitments from the United States Department of Energy. The department of labor and economic opportunity must execute a grant agreement with the described facility. Not more than half may be advanced. Unexpended funds are a work project through 30 September 2028. The act does not name the facility.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2024-07-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mi-pa121-2024",
        "note": "The act prints Approved by the Governor on 24 July 2024, filed the same day. The first-page item-veto list does not include section 811."
      },
      {
        "event": "effective",
        "date": {
          "value": "2024-07-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mi-pa121-2024",
        "note": "The act prints EFFECTIVE DATE: July 24, 2024."
      }
    ],
    "effective_date": {
      "value": "2024-07-24",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-mi-pa121-2024",
      "version": "2024 Public Act 121 PDF, opened 4 October 2026",
      "document_date": "2024-07-24"
    },
    "unapproved": "The act does not name the facility, the owner, or Palisades. No grant agreement was opened, so no disbursement is recorded. Section 811(2) makes the funding contingent on a Department of Energy conditional commitment, and that commitment was not opened. Section 811(6) designates unexpended funds as a work project with a tentative completion date of 30 September 2028. The 150,000,000 figure is the part 1 line for the fiscal year ending 30 September 2024 and the section's estimated project cost. No project is linked.",
    "summary": "Michigan's 2024 Public Act 121, approved and effective 24 July 2024, appropriates 150,000,000 for a targeted energy investment to restart an unnamed Michigan reactor under 1,000 megawatts that was in service on 1 January 2022 and is not producing electricity. Payment depends on a federal conditional commitment and a grant agreement. The act does not name the plant.",
    "sources": [
      "src-mi-pa121-2024"
    ]
  },
  {
    "expiry": null,
    "related": [],
    "applicability": [],
    "confidence": "medium",
    "last_checked": "2026-10-04",
    "next_review": "2027-04-15",
    "review_state": "verified",
    "jurisdiction_level": "state",
    "legal_definitions": [],
    "stable_id": "pol-tn-pc530-2025",
    "slug": "tn-pc530-2025",
    "name": "Tennessee Public Chapter 530: nuclear supply-chain carry-forward",
    "short_label": "Public Chapter 530",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-TN",
    "issuing_authority": "Tennessee General Assembly",
    "citation": "2025 Tenn. Pub. Acts ch. 530 (House Bill 1409)",
    "legal_scope": "Public Chapter No. 530, House Bill No. 1409, an appropriations act for the fiscal years beginning 1 July 2024 and 1 July 2025. The act prints that it passed on 16 April 2025. Item 90 is in Section 36. That section says its provisions take effect upon becoming a law, and it authorizes the Department of Economic and Community Development to carry forward an unexpended nuclear energy supply-chain balance not to exceed $60,000,000, subject to funding available at 30 June 2025 and to approval by the Commissioner of Finance and Administration. Section 64 says the act otherwise takes effect on 1 July 2025, except provisions that authorize prior or immediate expenditures and any section or item that specifies an immediate effective date. The approval line names Governor Bill Lee and prints the year 2025. The day and month on that line are not legible, so no calendar effective day is stored. Item 76 authorizes stated departments to spend from the revenues and reserves of the nuclear safety fund under Tennessee Code Annotated section 65-15-114 and states no dollar amount.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "2025-04-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-tn-pc530-2025",
        "note": "The act prints PASSED: April 16, 2025, with the House and Senate speakers named. Passage is not the approval day."
      },
      {
        "event": "signed",
        "date": {
          "value": "2025",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-tn-pc530-2025",
        "note": "The approval line prints APPROVED, the year 2025, and Governor Bill Lee. The day and month are not legible in the opened extract."
      }
    ],
    "effective_date": null,
    "operative_source": {
      "source_id": "src-tn-pc530-2025",
      "version": "Public Chapter 530 PDF, opened 4 October 2026",
      "document_date": "2025"
    },
    "unapproved": "The approval day and month are not legible, so only the year 2025 is stored for the signature and no calendar effective day is stored. Section 36 takes effect upon becoming a law, so Section 64's 1 July 2025 general date is not this item's effective date. The carry-forward is subject to funding available at 30 June 2025 and to commissioner approval, and those conditions were not opened as a balance or an approval. The $60,000,000 figure is a cap on carrying forward an unexpended balance. It is not recorded as a new award or as a named recipient. Item 76 states no dollar amount. No project is linked. Two other Tennessee PDFs returned HTTP 403 and are not this record.",
    "summary": "Tennessee Public Chapter 530 passed on 16 April 2025. Item 90, in Section 36, lets an unexpended nuclear energy supply-chain balance of up to $60,000,000 be carried forward, and that section takes effect upon becoming law. The governor's approval line shows 2025, and the day and month are not legible, so no calendar effective day is stored. Section 64's 1 July 2025 date is the general act date. The act records no award.",
    "sources": [
      "src-tn-pc530-2025"
    ]
  },
  {
    "stable_id": "pol-mo-393-1400",
    "slug": "mo-393-1400",
    "name": "Missouri section 393.1400: new nuclear units excluded from qualifying-plant rate treatment",
    "short_label": "RSMo 393.1400",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-MO",
    "jurisdiction_level": "state",
    "issuing_authority": "Missouri General Assembly",
    "citation": "RSMo 393.1400",
    "legal_scope": "Current compilation of section 393.1400. The revisor page prints Effective - 28 Aug 2025 and says the section has three histories. Those earlier acts were not opened. A qualifying electric plant is all rate-base additions except additions for new coal-fired generating units, new nuclear generating units, or additions that increase revenues by allowing service to new customer premises. Subsection 7 says the section expires on 31 December 2040, except that amortization of regulatory asset balances arising under the section continues in rates and remaining balances stay in rate base on the treatment the commission already approved. The exclusion is from this rate treatment. It is not a certificate for a plant, and it is not a ban on nuclear construction.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2025-08-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mo-393-1400",
        "note": "The revisor page prints Effective - 28 Aug 2025. The three histories named on that line were not opened."
      }
    ],
    "effective_date": {
      "value": "2025-08-28",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": {
      "date": {
        "value": "2040-12-31",
        "precision": "day",
        "basis": "planned"
      },
      "condition": "The section says it expires on this date, except that amortization of regulatory asset balances arising under the section continues and remaining balances stay in rate base on the treatment the commission already approved. That date has not occurred."
    },
    "operative_source": {
      "source_id": "src-mo-393-1400",
      "version": "Revisor section page opened 4 October 2026",
      "document_date": "2025-08-28"
    },
    "legal_definitions": [
      {
        "term": "Qualifying electric plant",
        "section": "RSMo 393.1400(1)(3)",
        "paraphrase": "All rate-base additions, except rate-base additions for new coal-fired generating units, new nuclear generating units, or rate-base additions that increase revenues by allowing service to new customer premises.",
        "source_id": "src-mo-393-1400",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The three histories were not opened, so this record does not say which act created the nuclear exclusion. No unspent balance or award is stated. The section does not certificate a plant. The governor's order creating the Missouri Advanced Nuclear Energy Task Force was not opened; a catalog card is not the order. No project is linked. Missouri's other opened sections are not this instrument.",
    "summary": "Missouri's current section 393.1400, effective 28 August 2025, excludes new nuclear generating units from the qualifying-electric-plant rate treatment. The section states that it expires on 31 December 2040, with amortization of existing regulatory-asset balances continuing. It does not certificate a plant.",
    "sources": [
      "src-mo-393-1400"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-vt-act52-2021",
    "slug": "vt-act52-2021",
    "name": "Vermont Act 52 of 2021: radiological emergency response plan fund",
    "short_label": "Act 52 (2021)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-VT",
    "jurisdiction_level": "state",
    "issuing_authority": "Vermont General Assembly",
    "citation": "2021 Vt. Acts & Resolves No. 52, Sec. 16 (20 V.S.A. § 38)",
    "legal_scope": "Enrolled Act 52 of 2021. The governor signed it on 3 June 2021. Section 16 amends 20 V.S.A. section 38. The opened text creates a radiological emergency response plan fund. An entity operating a nuclear reactor, or storing nuclear fuel and radioactive waste, deposits the appropriated amount. Section 18 says sections 12 through 17 take effect on 1 July 2021. The enrolled section 16 uses an ellipsis between later subsections, so the omitted subsections were not read. This funds the state's radiological emergency plan. It is not a construction permit and not an operating licence.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2021-06-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-vt-act52-2021",
        "note": "The enrolled PDF prints Date Governor signed bill: June 3, 2021."
      },
      {
        "event": "effective",
        "date": {
          "value": "2021-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-vt-act52-2021",
        "note": "Section 18 says sections 12 through 17, including the fund amendment in section 16, take effect on July 1, 2021."
      }
    ],
    "effective_date": {
      "value": "2021-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-vt-act52-2021",
      "version": "As-enacted PDF opened 4 October 2026",
      "document_date": "2021-06-03"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Subsections omitted by the enrolled act's ellipsis were not read. The official code for 30 V.S.A. sections 248 and 254 was not opened. No dollar balance, award, or named recipient is stored. No project is linked. This is not permission to construct or operate a reactor.",
    "summary": "Vermont Act 52, signed 3 June 2021, amends the radiological emergency response plan fund effective 1 July 2021. An entity operating a nuclear reactor or storing nuclear fuel and radioactive waste deposits the appropriated amount. Subsections omitted by an ellipsis were not read. The act is not a construction permit.",
    "sources": [
      "src-vt-act52-2021"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ne-71-3505",
    "slug": "ne-71-3505",
    "name": "Nebraska section 71-3505: nuclear-plant emergency-response and surveillance fee",
    "short_label": "§ 71-3505",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-NE",
    "jurisdiction_level": "state",
    "issuing_authority": "Nebraska Legislature",
    "citation": "Neb. Rev. Stat. § 71-3505(1)(g) and (2)",
    "legal_scope": "Current compilation of section 71-3505. Subsection (1)(g) directs collection of a fee for emergency response or environmental surveillance, or both, offsite from each nuclear power plant, equal to the cost of that work and any associated report. The fee shall not exceed the lesser of actual costs or eighty-two thousand dollars per plant per year. Beginning 1 January 2018, an inflation adjustment based on the Consumer Price Index may be recommended and shall not exceed five percent per year. The fee is credited to the Health and Human Services Cash Fund and used solely for those costs at Cooper Nuclear Station and Fort Calhoun Station. A plant that has implemented a permanent defueled emergency plan and no longer requires protective actions beyond the site boundary is not subject to the fee. Subsection (2) says that if one plant is no longer subject, the remaining plant's fee shall not exceed the lesser of actual costs or one hundred ten thousand dollars per year. The opened page prints no effective date for the section.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "provision_effective",
        "date": {
          "value": "2018-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ne-71-3505",
        "note": "The subsection says the inflation-adjustment recommendation commences on this date. It is not the section's enactment date, and no adjusted dollar amount is stored."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-ne-71-3505",
      "version": "Compilation page opened 4 October 2026",
      "document_date": "2017"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The compilation prints no effective date for the section. The source line ends with Laws 2017, LB430, section 1, and that act was not opened, so 2017 is the document year of the latest cited source line only. The eighty-two-thousand-dollar and one-hundred-ten-thousand-dollar figures are statutory caps in the opened text. No inflation-adjusted amount, collected balance, or award is stored. The text does not say which plant, if either, is still subject to the fee. No project is linked. This is a state surveillance fee, not an NRC review fee and not permission to construct or operate.",
    "summary": "Nebraska's current section 71-3505 sets a statutory cap of eighty-two thousand dollars per nuclear power plant per year for offsite emergency response or environmental surveillance, or one hundred ten thousand dollars for the remaining plant if only one is still subject. The opened text names Cooper Nuclear Station and Fort Calhoun Station as the places the fee is used. It prints no effective date and no collected balance. The fee is not a construction permit.",
    "sources": [
      "src-ne-71-3505"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nh-162-f-1",
    "slug": "nh-162-f-1",
    "name": "New Hampshire RSA 162-F:1: decommissioning funding responsibility",
    "short_label": "RSA 162-F:1",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-NH",
    "jurisdiction_level": "state",
    "issuing_authority": "New Hampshire General Court",
    "citation": "RSA 162-F:1",
    "legal_scope": "Current compilation of RSA 162-F:1. The legislature requires adequate funding by each owner of a nuclear electric generating facility for decommissioning and for later surveillance of the site to the extent needed to keep it from becoming a hazard. The source line cites 1971, 357:1; 1981, 109:1; 1991, 295:2; and 2001, 193:3, effective 3 September 2001. The earlier acts were not opened. The section does not name a plant, state a dollar balance, or grant a construction permit.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "amended",
        "date": {
          "value": "2001-09-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-nh-162-f-1",
        "note": "The source line prints 2001, 193:3, eff. Sept. 3, 2001. That is the latest cited amendment, not a finding about the 1971, 1981, or 1991 acts."
      }
    ],
    "effective_date": {
      "value": "2001-09-03",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-nh-162-f-1",
      "version": "Compilation page opened 4 October 2026",
      "document_date": "2001-09-03"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The effective date is the date the source line prints for 2001, chapter 193, section 3. The 1971, 1981, and 1991 acts were not opened. No plant is named and no dollar balance is stated. The 2025 Nuclear Decommissioning Financing Committee order returned HTTP 403 and was not read. No project is linked. This section does not permit construction or operation.",
    "summary": "New Hampshire's current RSA 162-F:1 requires each owner of a nuclear electric generating facility to provide funding for decommissioning and later site surveillance. The compilation prints 3 September 2001 as the effective date of the latest cited amendment. It names no plant and states no balance. It is not a construction permit.",
    "sources": [
      "src-nh-162-f-1"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-eo-25-48",
    "slug": "in-eo-25-48",
    "name": "Indiana Executive Order 25-48: Nuclear Indiana Coalition",
    "short_label": "EO 25-48",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "US-IN",
    "jurisdiction_level": "state",
    "issuing_authority": "Governor of Indiana",
    "citation": "Indiana Executive Order 25-48 (10 April 2025)",
    "legal_scope": "Executive order titled Creating Economic Opportunity and Securing Indiana's Energy Future Through Advanced Nuclear Development. It directs the Secretary of Energy and Natural Resources to establish the Nuclear Indiana Coalition as an ongoing effort to advance nuclear energy and small modular reactors in Indiana and to attract supply partners. The coalition is to explore federal programmes that reduce deployment cost, address regulatory constraints and coordination with the Nuclear Regulatory Commission, engage developers, utilities and large electricity consumers, develop state-level policies and assess feasibility, streamline permitting, including pursuing state primacy on federal permitting programmes, and provide education and outreach. The order number and the signature date are not legible in the copy opened; the Office of Energy Development's December 2025 annual report gives the number and an issue date of 10 April 2025. The text after the start of the coalition's membership list was not readable.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2025-04-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-in-oed-eo-25-48-report-2025",
        "note": "Issue date as reported; no signature date was read. The Office of Energy Development's December 2025 annual report says Executive Order 25-48 was issued on 10 April 2025. The order copy opened does not print a legible date, and no separate effective date was read."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-in-eo-25-48",
      "version": "Order PDF opened 5 October 2026; first page readable",
      "document_date": "2025-04-10"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The order creates a coalition and directs coordination. It does not license, fund or site a reactor. Pursuing state primacy on federal permitting is a direction to pursue it, not a grant of primacy. No effective date separate from the issue date was read. No project is linked.",
    "summary": "Indiana Executive Order 25-48, issued 10 April 2025 according to the state's own annual report, directs the Secretary of Energy and Natural Resources to establish the Nuclear Indiana Coalition to advance nuclear energy and small modular reactors in the state. It does not license, fund or site a reactor.",
    "sources": [
      "src-in-eo-25-48",
      "src-in-oed-eo-25-48-report-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-mp-2-cmc-1326",
    "slug": "mp-2-cmc-1326",
    "name": "Northern Mariana Islands 2 CMC § 1326: small modular reactor exemption from the nuclear-free zone law",
    "short_label": "2 CMC § 1326",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US-MP",
    "jurisdiction_level": "territory",
    "issuing_authority": "Northern Mariana Islands Commonwealth Legislature",
    "citation": "2 CMC § 1326 (Public Law 17-10, § 6)",
    "legal_scope": "Section of the Commonwealth Code chapter that establishes a nuclear and chemical free zone; 2 CMC § 1313 sets that zone equal to the exclusive economic zone. Section 1326 says the chapter does not apply to radioactive materials used in building, operating and maintaining small modular reactors, or later passive modular designs, that are used solely to generate electrical power, meet the safety certification criteria of the Nuclear Regulatory Commission and the U.S. Department of Energy, and, in the section's words, \"pose no known public health hazards equal to or less than fossil fuel power plants\". The text names a Los Alamos National Laboratory programme with Hyperion Power Generation, or any other U.S. licensed company. Radioactive waste or left-over material from that use may not be dumped in the Commonwealth or its zone, and may be stored only for a reasonable period before shipment to a licensed facility outside the Commonwealth. The section's source line is Public Law 17-10, section 6, 28 July 2010. The copy opened prints no compilation date.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2010-07-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mp-2-cmc-1326",
        "note": "The Law Revision Commission's comment says Public Law 17-10 took effect on 28 July 2010; the section's source line gives the same date. The public law itself was not opened."
      }
    ],
    "effective_date": {
      "value": "2010-07-28",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-mp-2-cmc-1326",
      "version": "Commonwealth Law Revision Commission copy opened 5 October 2026",
      "document_date": "2010-07-28"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The section is an exemption from a territorial zone law. It does not license, fund or site a reactor, and it names no project. No utility-commission rule, order or proposal under this section was opened. Public Law 17-10 was read only through the commission's comment. This record does not state how any federal measure applies in the Northern Mariana Islands.",
    "summary": "The Northern Mariana Islands' nuclear and chemical free zone law does not apply to radioactive materials used to build, operate and maintain small modular reactors used solely for electricity that meet federal safety certification and the section's public-health condition, under a section added by Public Law 17-10 and in effect since 28 July 2010. Waste may not be dumped or kept long-term in the Commonwealth. The section licenses nothing and names no project.",
    "sources": [
      "src-mp-2-cmc-1326",
      "src-mp-2-cmc-1313"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-pr-pc1092-2026",
    "slug": "pr-pc1092-2026",
    "name": "Puerto Rico House Bill 1092 (2026): nuclear energy and small modular reactors in the energy policy act",
    "short_label": "P. de la C. 1092",
    "category": "proposed",
    "instrument_type": "bill",
    "jurisdiction": "US-PR",
    "jurisdiction_level": "territory",
    "issuing_authority": "Puerto Rico House of Representatives",
    "citation": "P. de la C. 1092, 20th Legislative Assembly, as passed by the House on 15 June 2026",
    "legal_scope": "Bill to amend Articles 1.2, 1.4 and 2.3 of Act 82-2010, Puerto Rico's energy diversification policy act. As passed by the House, it adds small modular reactors to the emerging technologies the policy contemplates, defines nuclear energy as a form of clean energy and lists it among sustainable or clean renewable sources, and provides that wherever this or any other law, administrative order or regulation refers to the Renewable Energy Portfolio or to renewable energy, the reference means any clean, alternative, sustainable or renewable source as defined in the act. It directs the University of Puerto Rico to develop curricula, research and community education on nuclear energy. Section 6 would repeal any Puerto Rico law, regulation or order that restricts or prohibits generation by nuclear reactors, make research, licensing and regulation of nuclear energy subject exclusively to federal law, including Nuclear Regulatory Commission rules, bar local requirements beyond federal ones on the operation of nuclear reactors while keeping functions that federal agencies have delegated to Puerto Rico agencies, direct the Planning Board, the permits office and the economic development department to set a permitting framework that meets Nuclear Regulatory Commission requirements, and treat small modular reactors as strategic projects for permitting. The bill would take effect immediately on approval.",
    "affects": [
      "siting",
      "programme_administration"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "introduced",
        "date": {
          "value": "2026-01-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-pc1092-filed-2026",
        "note": "Filed on 29 January 2026. It was first read and referred to the House Government Committee on 2 February 2026, then on 5 February 2026 to the House Economic Development Committee, which reported it with amendments in June 2026. The filed text is not the text the House passed."
      },
      {
        "event": "passed",
        "date": {
          "value": "2026-06-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-pc1092-tracker",
        "note": "The House passed the bill in final vote on 15 June 2026, 35 in favour and 11 against. It had its first reading in the Senate and was referred to the Senate Government Committee on 19 June 2026. House passage is not enactment."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-pc1092-house-text-2026",
      "version": "Text of final approval by the House, 15 June 2026",
      "document_date": "2026-06-15"
    },
    "legal_definitions": [
      {
        "term": "Reactores Modulares Pequeños (Small Modular Reactors, SMR)",
        "section": "Section 3, proposed Article 1.4(36)",
        "paraphrase": "Advanced nuclear reactors with a limited generating capacity per unit, lower than that of traditional power reactors, able to produce large amounts of low-carbon electricity. The proposed definition states no megawatt limit.",
        "source_id": "src-pr-pc1092-house-text-2026",
        "note": "Legal definition proposed by this bill only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The bill is not law. It passed the House on 15 June 2026 and was referred to the Senate Government Committee on 19 June 2026; the legislature's tracker, read on 5 October 2026, lists no Senate vote and no action by the governor. Act 82-2010 is unchanged unless the bill is enacted. Nothing in the bill licenses, funds or sites a reactor, and no project is linked.",
    "summary": "A Puerto Rico bill would write nuclear energy and small modular reactors into the territory's energy diversification policy act, define nuclear energy as clean energy, repeal local restrictions on nuclear generation and leave licensing to federal law. It passed the House 35 to 11 on 15 June 2026 and is before the Senate. It is not law.",
    "sources": [
      "src-pr-pc1092-house-text-2026",
      "src-pr-pc1092-filed-2026",
      "src-pr-pc1092-tracker"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "status_checked": "2026-10-31",
    "next_review": "2026-11-24",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-mn-rule-7855",
    "slug": "mn-rule-7855",
    "name": "Minnesota Rules chapter 7855: certificate applications for nuclear fuel and waste facilities",
    "short_label": "Minn. R. 7855",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US-MN",
    "jurisdiction_level": "state",
    "issuing_authority": "Minnesota Public Utilities Commission",
    "citation": "Minn. R. 7855.0030 and 7855.0600",
    "legal_scope": "Current certificate-of-need rules. Rule 7855.0030 lists a new nuclear fuel processing facility, an expansion of one, a new nuclear waste storage or disposal facility, and an expansion of one among the large energy facilities whose applications must supply the information the chapter requires. Rule 7855.0600 states what an application for a nuclear waste storage or disposal facility must describe. The revisor's electronic publication line is 14 November 2003. The history line is Laws 1983, chapter 289, section 115. The part page does not print a separate adoption day.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2003-11-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mn-rule-7855",
        "note": "The revisor prints Published Electronically: November 14, 2003. That line is not stored as an adoption date."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-mn-rule-7855",
      "version": "Revisor rule parts opened 5 October 2026",
      "document_date": "2003-11-14"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The rules govern applications for nuclear fuel-processing and nuclear waste storage or disposal facilities. They do not permit a power reactor. The electronic publication line is not an adoption date. Minnesota Statutes section 216B.243 remains the separate certificate statute.",
    "summary": "Minnesota's certificate-of-need rules require specified information for a new nuclear fuel processing facility and a new nuclear waste storage or disposal facility. A separate rule states what a waste-facility application must describe. The revisor posts the parts as current and marks them published electronically on 14 November 2003. They do not approve a power reactor.",
    "sources": [
      "src-mn-rule-7855"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-mo-psc-eo-2024-0056",
    "slug": "mo-psc-eo-2024-0056",
    "name": "Missouri PSC order on Wolf Creek decommissioning costs",
    "short_label": "EO-2024-0056",
    "category": "enacted_binding",
    "instrument_type": "commission_order",
    "jurisdiction": "US-MO",
    "jurisdiction_level": "state",
    "issuing_authority": "Missouri Public Service Commission",
    "citation": "Mo. PSC File No. EO-2024-0056",
    "legal_scope": "Order issued 4 January 2024 and effective 3 February 2024. It approves the 15 December 2023 agreement, finds that the 2023 cost study meets the three-year nuclear-unit decommissioning study requirement, and finds that Evergy Missouri Metro's Missouri retail decommissioning accrual and trust payment continue at the existing level of $1,281,264. The file was ordered closed on 4 February 2024.",
    "affects": [
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2024-01-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mo-psc-eo-2024-0056",
        "note": "Issue date printed on the order: January 4, 2024."
      },
      {
        "event": "effective",
        "date": {
          "value": "2024-02-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-mo-psc-eo-2024-0056",
        "note": "The order says it shall be effective on February 3, 2024."
      }
    ],
    "effective_date": {
      "value": "2024-02-03",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-mo-psc-eo-2024-0056",
      "version": "Commission order opened 5 October 2026",
      "document_date": "2024-01-04"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The order continues an existing decommissioning accrual for Wolf Creek. It does not permit a new reactor, approve construction, or change the accrual amount. The attached agreement was not treated as a second instrument.",
    "summary": "On 4 January 2024 the Missouri Public Service Commission approved continuation of Evergy Missouri Metro's existing Wolf Creek decommissioning accrual and trust payment. The order is effective 3 February 2024. It does not permit a new reactor.",
    "sources": [
      "src-mo-psc-eo-2024-0056"
    ],
    "confidence": "high",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ri-445-ricr-1",
    "slug": "ri-445-ricr-1",
    "name": "Rhode Island Energy Facility Siting Board rules",
    "short_label": "445-RICR-00-00-1",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US-RI",
    "jurisdiction_level": "state",
    "issuing_authority": "Rhode Island Energy Facility Siting Board",
    "citation": "445-RICR-00-00-1",
    "legal_scope": "Active rules of practice and procedure. The Department of State page gives an effective date of 4 January 2022. The definition of a major energy facility includes any facility for the processing, enrichment, storage or disposal of nuclear fuels and nuclear byproducts. It also includes electricity generation of 40 megawatts or more, without naming nuclear generation as its own category.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "effective",
        "date": {
          "value": "2022-01-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ri-445-ricr-1",
        "note": "The Department of State rules page prints Regulation Status Active and Effective 01/04/2022."
      }
    ],
    "effective_date": {
      "value": "2022-01-04",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ri-445-ricr-1",
      "version": "Department of State rule page opened 5 October 2026",
      "document_date": "2022-01-04"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The definition identifies facilities that the siting rules cover. It does not grant a construction permit or an operating approval. The siting statute is a separate instrument.",
    "summary": "Rhode Island's active Energy Facility Siting Board rules, effective 4 January 2022, treat a facility that processes, enriches, stores or disposes of nuclear fuels or nuclear byproducts as a major energy facility. The rule does not itself approve a reactor.",
    "sources": [
      "src-ri-445-ricr-1"
    ],
    "confidence": "high",
    "last_checked": "2026-10-05",
    "next_review": "2027-04-15",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-hr-nuclear-development-law-2026",
    "slug": "croatia-nuclear-development-law-2026",
    "name": "Croatia: Law on the Development of Nuclear Energy for Civil Purposes (NN 55/2026)",
    "short_label": "Croatia nuclear development law 2026",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "HR",
    "jurisdiction_level": "national",
    "issuing_authority": "Hrvatski sabor (Croatian Parliament)",
    "citation": "Narodne novine 55/2026, article 691; adopted 15 May 2026; proclaimed 20 May 2026; published 27 May 2026; in force 4 June 2026",
    "legal_scope": "National framework statute for civil nuclear-energy development in Croatia. Defines small modular reactors (MMR/SMR), micro nuclear reactors (MNR) and advanced modular reactors; directs a Government Action Plan and a Sabor Programme to 2040; states that nuclear application includes construction of a nuclear power plant including plants using SMRs; requires a separate law to designate the plant site after evaluation. Does not itself authorise construction, select a vendor/design, or licence a reactor.",
    "affects": [
      "programme_administration",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "2026-05-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-hr-nn-55-2026-nuclear-development-law"
      },
      {
        "event": "signed",
        "date": {
          "value": "2026-05-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-hr-nn-55-2026-nuclear-development-law",
        "note": "Presidential proclamation of the law."
      },
      {
        "event": "published",
        "date": {
          "value": "2026-05-27",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-hr-nn-55-2026-nuclear-development-law"
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-06-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-hr-nn-55-2026-nuclear-development-law",
        "note": "Eighth day after publication (Article 15)."
      }
    ],
    "effective_date": {
      "value": "2026-06-04",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-hr-nn-55-2026-nuclear-development-law",
      "version": "NN 55/2026 art. 691 (official gazette HTML)",
      "document_date": "2026-05-27"
    },
    "legal_definitions": [
      {
        "term": "mali modularni reaktori (MMR / SMR)",
        "section": "Article 4",
        "paraphrase": "Advanced nuclear systems of small and medium power, designed for serial construction, flexible operation and increased safety within Generation III and III+ technologies.",
        "source_id": "src-hr-nn-55-2026-nuclear-development-law",
        "note": "Legal definition used by this Croatian statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      },
      {
        "term": "mikro nuklearni reaktori (MNR)",
        "section": "Article 4",
        "paraphrase": "Very small-power nuclear reactors designed to be compact, safe and simple to install.",
        "source_id": "src-hr-nn-55-2026-nuclear-development-law",
        "note": "Legal definition used by this Croatian statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "No plant site is designated (a later separate law is required after evaluation). The Government Action Plan due within six months of entry into force and the Sabor Programme to 2040 due within 12 months after that Plan have not been verified as published. No named SMR design, vendor, or project company is selected in the statute.",
    "summary": "Croatia enacted a civil nuclear-development framework law (NN 55/2026) that explicitly includes small modular reactors among technologies for a future nuclear plant, sets a programme path toward at least 30% nuclear in annual electricity by 2040, and leaves site selection and later licensing steps to subsequent instruments. This is national programme legislation, not a deployment project.",
    "sources": [
      "src-hr-nn-55-2026-nuclear-development-law",
      "src-hr-mingo-nuclear-law-final-proposal-2026"
    ],
    "confidence": "high",
    "last_checked": "2026-10-06",
    "next_review": "2026-12-04",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ca-ita-127-45-small-nuclear-itc",
    "slug": "canada-clean-technology-itc-small-nuclear",
    "name": "Canada: Clean technology investment tax credit for small nuclear energy property (Income Tax Act s. 127.45)",
    "short_label": "Canada clean technology ITC (small nuclear)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "CA",
    "jurisdiction_level": "national",
    "issuing_authority": "Parliament of Canada",
    "citation": "Income Tax Act, s. 127.45, added by S.C. 2024, c. 15, s. 36 (assented to 20 June 2024) and amended by S.C. 2024, c. 17, s. 80 and S.C. 2026, c. 3, s. 52 (assented to 26 March 2026)",
    "legal_scope": "Federal investment tax credit: paragraph (a) of the definition of a qualifying taxpayer's clean technology investment tax credit for a taxation year is the total of all amounts each of which is the specified percentage of the capital cost to the taxpayer of clean technology property acquired in the year, and clean technology property includes small nuclear energy property. The consolidated text current to 21 September 2026 sets the specified percentage at nil for property acquired before 28 March 2023, 30% for property acquired on or after 28 March 2023 and before 1 January 2034, 15% for property acquired in 2034 and nil after 2034. Small nuclear energy property is listed equipment of a fixed-location system used all or substantially all to generate electricity or heat from nuclear fission, as determined on an annual basis, at a nuclear facility where the total combined gross-rated thermal generating capacity of all planned and existing fission reactors is reasonably expected not to exceed 1,400 MWth when the property becomes available for use; nuclear fuel, waste storage or disposal property, transmission and distribution equipment and vehicles are excluded. As enacted in 2024 the section instead defined a small modular nuclear reactor by a system gross rated generating capacity of not more than 300 MWe (or an energy-balance equivalent of 1,000 MWth) built from factory-assembled modules; S.C. 2026, c. 3, s. 52(1) repealed that definition, and s. 52(18) deems subsections 52(1) to (3), among others, to have come into force on 28 March 2023. The 28 March 2023 date is therefore an acquisition date for the credit and the deemed commencement of those subsections, not the date the section was enacted (20 June 2024). The credit does not license, site or select any reactor or project.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2024-06-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ca-sc-2024-c15",
        "note": "Royal Assent to S.C. 2024, c. 15; s. 36 added s. 127.45."
      },
      {
        "event": "amended",
        "date": {
          "value": "2026-03-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ca-sc-2026-c3",
        "note": "Royal Assent to S.C. 2026, c. 3; s. 52(1) repealed the small modular nuclear reactor definition and s. 52(3) replaced subparagraphs (d)(i) to (vii) of the clean technology property definition."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-ca-ita-127-45",
      "version": "Consolidated Income Tax Act s. 127.45, current to 2026-09-21, last amended 2026-06-18",
      "document_date": "2026-09-21"
    },
    "legal_definitions": [
      {
        "term": "small nuclear energy property",
        "section": "s. 127.45(1)",
        "paraphrase": "Listed reactor, containment, cooling, fuel-handling, generating and heat-distribution equipment of a fixed-location system used all or substantially all, as determined on an annual basis, to generate electricity or heat from nuclear fission, at a nuclear facility where the total combined gross-rated thermal generating capacity of all planned and existing fission reactors is reasonably expected not to exceed 1,400 MWth when the property becomes available for use.",
        "source_id": "src-ca-ita-127-45",
        "note": "Legal definition used by this Canadian provision only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "No taxpayer's or project's eligibility, claim or receipt of the credit is established here. The lifecycle is selective: the S.C. 2024, c. 17, s. 80 amendment was not opened, and labour requirements, recapture rules and application provisions (not included in the consolidated text) were not assessed.",
    "summary": "Section 127.45 of Canada's Income Tax Act defines small nuclear energy property (facilities expected to total no more than 1,400 MWth) as clean technology property and sets specified percentages of 30% for property acquired from 28 March 2023 through 2033, 15% in 2034 and nil after. These percentages do not establish any taxpayer's eligibility or actual credit. It is a federal tax measure, not a licence, site decision or project award.",
    "sources": [
      "src-ca-ita-127-45",
      "src-ca-sc-2024-c15",
      "src-ca-sc-2026-c3"
    ],
    "confidence": "high",
    "last_checked": "2026-10-08",
    "next_review": "2026-12-08",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ca-physical-activities-regs-item-27",
    "slug": "canada-physical-activities-regulations-new-reactors",
    "name": "Canada: Physical Activities Regulations, Schedule item 27 – new fission or fusion reactors (SOR/2019-285)",
    "short_label": "Canada impact assessment thresholds for new reactors",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "CA",
    "jurisdiction_level": "national",
    "issuing_authority": "Governor General in Council, on the recommendation of the Minister of the Environment",
    "citation": "Physical Activities Regulations, SOR/2019-285, Schedule, item 27; P.C. 2019-1182 of 7 August 2019, registered 8 August 2019, made under ss. 109 and 188 of the Impact Assessment Act",
    "legal_scope": "Lists the physical activities that are designated projects under the Impact Assessment Act. Item 27 lists site preparation for, and construction, operation and decommissioning of, one or more new nuclear fission or fusion reactors if (a) the activity is within the licensed boundaries of an existing Class IA nuclear facility and the new reactors have a combined thermal capacity of more than 900 MWth, or (b) the activity is outside such boundaries and the new reactors have a combined thermal capacity of more than 200 MWth. These are combined thermal thresholds, not module electrical ratings. Designated-project status is distinct from any later assessment decision, and the Regulations do not license reactors.",
    "affects": [
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2019-08-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ca-sor-2019-285",
        "note": "Order in Council P.C. 2019-1182; registered as SOR/2019-285 on 8 August 2019."
      },
      {
        "event": "effective",
        "date": {
          "value": "2019-08-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-ca-sor-2019-285",
        "note": "Editorial note in the consolidated text: in force 28 August 2019 (SI/2019-86)."
      }
    ],
    "effective_date": {
      "value": "2019-08-28",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-ca-sor-2019-285",
      "version": "Consolidated regulations current to 2026-09-30, last amended 2026-09-03",
      "document_date": "2026-09-30"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Does not say whether any specific Canadian SMR project is or is not a designated project; that depends on licensed boundaries and combined thermal capacity, which were not assessed for any project. Other schedule items, ministerial designation under the Impact Assessment Act, transitional rules and provincial environmental assessment were not reviewed. The consolidated text read on 9 October 2026, and re-read on 18 October 2026 (current to 30 September 2026), shows that SOR/2026-185 (the amendment behind the 2026-09-03 last-amended date) repealed a definition and schedule items 30 to 33, 39 and 41; item 27 carries no amendment citation.",
    "summary": "Under item 27 of Canada's Physical Activities Regulations, new fission or fusion reactors are designated projects under the Impact Assessment Act when their combined thermal capacity is more than 900 MWth within an existing Class IA facility's licensed boundaries, or more than 200 MWth outside them. This record does not establish any project's designation, assessment outcome or licence.",
    "sources": [
      "src-ca-sor-2019-285"
    ],
    "confidence": "high",
    "last_checked": "2026-10-18",
    "next_review": "2026-12-08",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-enhancements-proposed-20260924",
    "slug": "us-nrc-licensing-decommissioning-oversight-proposal",
    "name": "Proposed regulatory enhancements for reactor licensing, decommissioning and operational oversight",
    "short_label": "Licensing and oversight proposal",
    "category": "proposed",
    "instrument_type": "proposed_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 60702 (proposed rule, 24 September 2026), FR Doc. 2026-19568, docket NRC-2025-1138, RIN 3150-AL45",
    "legal_scope": "Proposed revisions to 10 CFR Parts 20, 21, 50, 52, 53, 55, 70, 72 and 75 concerning reactor licensing, decommissioning and oversight. The executive summary includes reporting, design approvals and early-site-permit environmental review provisions. This summary is not a project-specific applicability determination.",
    "affects": [
      "nrc_licensing",
      "environmental_review"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-09-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-nrc-enhancements-proposed-20260924",
        "reader": {
          "headline": "NRC proposes changes to reactor licensing, decommissioning and operational oversight",
          "what": "The NRC published a proposal for reactor licensing, decommissioning and operational oversight, with comments due on 9 November.",
          "limit": "The proposed changes are not in effect."
        }
      },
      {
        "event": "comment_period_closed",
        "date": {
          "value": "2026-11-09",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-nrc-enhancements-proposed-20260924",
        "reader": {
          "headline": "Comments close on NRC licensing, decommissioning and oversight proposal",
          "what": "Comments closed on 9 November 2026 on the proposal published on 24 September 2026.",
          "limit": "The proposed changes are not in effect."
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-nrc-enhancements-proposed-20260924",
      "version": "Proposed rule and draft regulatory guides, request for comment",
      "document_date": "2026-09-24"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      }
    ],
    "applicability": [],
    "unapproved": "A proposal, not an effective rule, design approval or project permission. Its stated 9 November 2026 comment deadline has passed; that does not establish adoption. This is distinct from the July 2026 licensing/siting proposal in docket NRC-2025-0975.",
    "summary": "NRC published a separate proposal on 24 September 2026 for reactor licensing, decommissioning and operational oversight; comments closed on 9 November. The proposed changes are not in effect. No reactor application, construction permission or operating authority follows from this proposal.",
    "sources": [
      "src-fr-nrc-enhancements-proposed-20260924"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ca-nuclear-safety-and-control-act",
    "slug": "canada-nuclear-safety-and-control-act",
    "name": "Canada: Nuclear Safety and Control Act (S.C. 1997, c. 9)",
    "short_label": "Canada Nuclear Safety and Control Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "CA",
    "jurisdiction_level": "national",
    "issuing_authority": "Parliament of Canada",
    "citation": "Nuclear Safety and Control Act, S.C. 1997, c. 9; assented to 20 March 1997; in force 31 May 2000 (SI/2000-42)",
    "legal_scope": "Federal statute that establishes the Canadian Nuclear Safety Commission (s. 8), whose objects include regulating the development, production and use of nuclear energy to prevent unreasonable risk to the environment, health, safety and national security (s. 9). Section 26(e) prohibits anyone from preparing a site for, constructing, operating, modifying, decommissioning or abandoning a nuclear facility except in accordance with a licence. Under s. 24 the Commission may establish classes of licences and may issue, renew, suspend, amend, revoke or replace a licence on receipt of an application in the prescribed form, with the prescribed information and fee. A nuclear facility includes a nuclear fission or fusion reactor or subcritical nuclear assembly and a vehicle equipped with a nuclear reactor. The Act does not itself license, site or approve any reactor, design or project; licence application content is set by regulations such as the Class I Nuclear Facilities Regulations.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1997-03-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ca-nsca",
        "note": "Royal Assent to S.C. 1997, c. 9."
      },
      {
        "event": "effective",
        "date": {
          "value": "2000-05-31",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ca-nsca",
        "note": "Editorial note in the consolidated text: Act in force 31 May 2000 (SI/2000-42)."
      }
    ],
    "effective_date": {
      "value": "2000-05-31",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-ca-nsca",
      "version": "Consolidated Act current to 2026-09-30, last amended 2017-01-01",
      "document_date": "2026-09-30"
    },
    "legal_definitions": [
      {
        "term": "nuclear facility",
        "section": "s. 2",
        "paraphrase": "Includes a nuclear fission or fusion reactor or subcritical nuclear assembly, a particle accelerator, listed uranium, thorium and plutonium facilities, a facility for disposal of nuclear substances generated elsewhere, a vehicle equipped with a nuclear reactor, and other prescribed facilities.",
        "source_id": "src-p1-ca-nsca",
        "note": "Legal definition used by this Canadian statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ca-class-i-nuclear-facilities-regulations",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "Establishes no licence, licence decision or project status. Amendments not yet in force (S.C. 2023, c. 32, s. 49, on firearms and high-security sites), the General Nuclear Safety and Control Regulations and the Commission's regulatory documents were not assessed. Federal impact assessment is separate (see the Physical Activities Regulations record).",
    "summary": "Canada's Nuclear Safety and Control Act establishes the Canadian Nuclear Safety Commission and prohibits preparing a site for, constructing, operating, modifying, decommissioning or abandoning a nuclear facility, including a fission reactor, except under a Commission licence. It sets the national licensing framework; it does not license or approve any reactor or project.",
    "sources": [
      "src-p1-ca-nsca"
    ],
    "confidence": "high",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ca-class-i-nuclear-facilities-regulations",
    "slug": "canada-class-i-nuclear-facilities-regulations",
    "name": "Canada: Class I Nuclear Facilities Regulations (SOR/2000-204)",
    "short_label": "Canada Class I Nuclear Facilities Regulations",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "CA",
    "jurisdiction_level": "national",
    "issuing_authority": "Canadian Nuclear Safety Commission, approved by the Governor in Council",
    "citation": "Class I Nuclear Facilities Regulations, SOR/2000-204; made by the CNSC on 31 May 2000 under s. 44 of the Nuclear Safety and Control Act; approved by P.C. 2000-784 of 31 May 2000",
    "legal_scope": "Regulations under the Nuclear Safety and Control Act that apply to Class I nuclear facilities. A Class IA nuclear facility is a nuclear fission or fusion reactor or subcritical nuclear assembly, or a vehicle equipped with a nuclear reactor. They set the information required in applications for separate licences to prepare a site (s. 4: site evaluation process, susceptibility to human activity and natural phenomena, environmental baseline programme), to construct (s. 5: proposed design and how site characteristics are taken into account), to operate (s. 6: including a final safety analysis report), to decommission (s. 7) and to abandon (s. 8). For a licence to prepare a site, the Commission must decide within 60 days whether the application is sufficient to begin review and must render its decision within 24 months of posting notice of the review, excluding listed periods (ss. 8.1-8.3). The Regulations do not issue any licence.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2000-05-31",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ca-class1-regs",
        "note": "Made by the CNSC and approved by P.C. 2000-784; registered 31 May 2000."
      },
      {
        "event": "effective",
        "date": {
          "value": "2000-05-31",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ca-class1-regs",
        "note": "Section 15: in force on the day approved by the Governor in Council (P.C. 2000-784 dated 31 May 2000)."
      }
    ],
    "effective_date": {
      "value": "2000-05-31",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-ca-class1-regs",
      "version": "Consolidated regulations current to 2026-09-30, last amended 2025-10-30",
      "document_date": "2026-09-30"
    },
    "legal_definitions": [
      {
        "term": "Class IA nuclear facility",
        "section": "s. 1",
        "paraphrase": "A nuclear fission or fusion reactor or subcritical nuclear assembly, or a vehicle that is equipped with a nuclear reactor.",
        "source_id": "src-p1-ca-class1-regs",
        "note": "Legal definition used by these Canadian regulations only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ca-nuclear-safety-and-control-act",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "Establishes no licence or project status. The content of the 2025-10-30 amendment (SOR/2025-219, cited at s. 3) and the 2012 timeline amendment (SOR/2012-288) were not opened separately; CNSC regulatory documents on site evaluation and design were not reviewed.",
    "summary": "Canada's Class I Nuclear Facilities Regulations set what an applicant must submit for separate CNSC licences to prepare a site for, construct, operate, decommission or abandon a reactor facility, and require a decision on a site-preparation licence within 24 months of the review notice, excluding listed periods. They do not issue any licence.",
    "sources": [
      "src-p1-ca-class1-regs"
    ],
    "confidence": "high",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ca-nrcan-enabling-smr-program",
    "slug": "canada-enabling-small-modular-reactors-program",
    "name": "Canada: Enabling Small Modular Reactors Program (Natural Resources Canada)",
    "short_label": "Canada Enabling SMRs Program",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "CA",
    "jurisdiction_level": "national",
    "issuing_authority": "Natural Resources Canada",
    "citation": "Natural Resources Canada, Enabling Small Modular Reactors Program (programme page, modified 2024-12-20)",
    "legal_scope": "Federal programme of non-repayable contributions for research and development projects on radioactive waste management for SMRs and on SMR manufacturing and fuel supply chains. Projects may request up to $5,000,000, with the programme providing up to 75% of total project costs (up to 100% for projects led by Indigenous applicants with 51% or more Indigenous ownership); applicants must be legal entities registered or incorporated in Canada. Projects should exclude reactor research, development and demonstration, including commercial installation. The application period closed on 21 April 2023 and funding is available for projects until 31 March 2027. The programme does not fund, license or site any reactor.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "milestone",
        "date": {
          "value": "2023-04-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ca-nrcan-esmr",
        "note": "Application period closed."
      }
    ],
    "effective_date": null,
    "expiry": {
      "date": {
        "value": "2027-03-31",
        "precision": "day",
        "basis": "planned"
      },
      "condition": "The programme page says funding is available for projects until 31 March 2027. That date has not passed."
    },
    "operative_source": {
      "source_id": "src-p1-ca-nrcan-esmr",
      "version": "Programme page, date modified 2024-12-20",
      "document_date": "2024-12-20"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The programme's total budget and opening date are not stated on the page read. The funded-projects page lists research contributions to organizations such as the Nuclear Waste Management Organization and Prodigy Clean Energy; none is recorded here as an award, and none is reactor construction funding or a link to any SMRMap project. Canada Infrastructure Bank and other federal financing were not reviewed.",
    "summary": "Natural Resources Canada's Enabling Small Modular Reactors Program gives non-repayable contributions of up to $5 million (up to 75% of costs) for research on SMR waste management and SMR manufacturing and fuel supply chains, excluding reactor demonstration and commercial installation. Applications closed on 21 April 2023; project funding runs to 31 March 2027.",
    "sources": [
      "src-p1-ca-nrcan-esmr",
      "src-p1-ca-nrcan-esmr-funded"
    ],
    "confidence": "high",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-07",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-se-act-on-nuclear-activities-1984-3",
    "slug": "sweden-act-on-nuclear-activities",
    "name": "Sweden: Act on Nuclear Activities (SFS 1984:3, lag om kärnteknisk verksamhet)",
    "short_label": "Sweden Act on Nuclear Activities",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "SE",
    "jurisdiction_level": "national",
    "issuing_authority": "Sveriges riksdag",
    "citation": "Lag (1984:3) om kärnteknisk verksamhet; issued 12 January 1984; in force 1 February 1984; reprinted SFS 1992:1536; amended up to SFS 2026:1365",
    "legal_scope": "Swedish framework statute on nuclear activities. Section 5 prohibits conducting nuclear activities without a licence under the Act; nuclear activities include building, possessing or operating a nuclear facility, which includes a nuclear power reactor and any other facility where a self-sustaining nuclear reaction can occur, such as a research reactor (s. 2). As amended by SFS 2026:587 (in force 17 June 2026), a licence for a facility the Government has approved under the Act (2026:585) on Government approval of nuclear facilities is decided by the authority the Government designates; other licence questions are decided by the Government or that authority; and no licence may be granted while an approval case under that Act is pending. Sections 6 to 6 d provide, on request, a binding advance ruling on whether a facility's design meets this Act and the Radiation Protection Act, valid for 5 to 15 years. Under the Ordinance (1984:14) the Swedish Radiation Safety Authority (Strålsäkerhetsmyndigheten) decides licences for Government-approved facilities (s. 17), decides on advance rulings (s. 2 d) and holds preparatory dialogue with intending applicants (s. 2 a). Environmental Code permits and the Government's permissibility review are separate. The Act does not itself approve any site, design or project.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "1984-01-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-act-1984-3",
        "note": "Utfärdad 1984-01-12."
      },
      {
        "event": "effective",
        "date": {
          "value": "1984-02-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-act-1984-3",
        "note": "Transitional provision 1984:3 point 1."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2026-06-17",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-act-1984-3",
        "note": "Amendments by SFS 2026:587 (licensing split, advance rulings on design) in force 17 June 2026 per their transitional provisions."
      }
    ],
    "effective_date": {
      "value": "1984-02-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-se-act-1984-3",
      "version": "Consolidated text amended up to SFS 2026:1365 (Riksdagen, from Regeringskansliet)",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "kärnteknisk anläggning (nuclear facility)",
        "section": "s. 2 point 2",
        "paraphrase": "A facility for extracting nuclear energy (nuclear power reactor), another facility in which a self-sustaining nuclear reaction can occur such as a research reactor, and listed fuel-cycle, storage and waste facilities.",
        "source_id": "src-p1-se-act-1984-3",
        "note": "Legal definition used by this Swedish statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Grants no licence or advance ruling to any project or design. The amending acts SFS 2026:587 and 2026:1365 and the Swedish Radiation Safety Authority's regulations were not opened separately; the Radiation Protection Act was not reviewed.",
    "summary": "Sweden's Act on Nuclear Activities prohibits building, possessing or operating a nuclear power or research reactor without a licence. Since 17 June 2026, licences for facilities the Government has approved under the 2026 facility-approval Act are decided by the designated authority, which the 1984 Ordinance makes the Swedish Radiation Safety Authority, and binding advance rulings on designs are available. It approves no site, design or project.",
    "sources": [
      "src-p1-se-act-1984-3",
      "src-p1-se-ordinance-1984-14"
    ],
    "confidence": "high",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-se-government-approval-nuclear-facilities-2026-585",
    "slug": "sweden-government-approval-nuclear-facilities-act-2026",
    "name": "Sweden: Act on Government Approval of Nuclear Facilities (SFS 2026:585)",
    "short_label": "Sweden nuclear facility approval act 2026",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "SE",
    "jurisdiction_level": "national",
    "issuing_authority": "Sveriges riksdag",
    "citation": "Lag (2026:585) om regeringens godkännande av kärntekniska anläggningar; issued 13 May 2026; in force 17 June 2026",
    "legal_scope": "Swedish statute on Government approval of nuclear facilities and on facility plans (anläggningsplan). A person intending to build a new nuclear facility whose waste activity will at some time exceed 10 TBq, or 10 GBq from alpha emitters, may apply to the Government for approval (s. 3), with information on the facility, the site, emergency planning zones and urgent protective actions (s. 4). The Government may approve a facility if the type of activity is justified, it is not unsuitable to build and operate it at the intended site from an emergency-preparedness perspective, and the nuclear material or waste can be managed (s. 8), and only if a valid facility plan covers it (s. 9). A facility plan states which types and how many nuclear facilities may be built, where, and what area is needed (s. 11); it is valid for 5 to 15 years (s. 14) and is subject to strategic environmental assessment (s. 12). Approval and the plan require the consent of the municipality or municipalities in the plan area, valid five years; only interim storage or disposal may be approved without it, on national-interest grounds (s. 18). The Act may be applied to applications filed after 10 March 2026. Under Environmental Code chapter 17 s. 1 (as amended by SFS 2026:586), a new nuclear facility not approved under this Act remains subject to the Government's permissibility review, which under chapter 17 s. 6 also requires municipal council consent; chapter 17 s. 6 a now contains only a justification requirement, and no reactor-number cap or existing-site restriction appears in chapter 17. The Act does not license construction or operation; licences under the Act on Nuclear Activities and Environmental Code permits remain separate.",
    "affects": [
      "siting",
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2026-05-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-act-2026-585",
        "note": "Utfärdad 2026-05-13."
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-06-17",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-act-2026-585",
        "note": "Transitional provision 1; point 2 allows application to applications filed after 10 March 2026."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2026-06-17",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-environmental-code",
        "note": "Companion Environmental Code amendments (SFS 2026:586) to chapter 17 ss. 1 and 6 a in force 17 June 2026."
      }
    ],
    "effective_date": {
      "value": "2026-06-17",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-se-act-2026-585",
      "version": "SFS 2026:585 full text (Riksdagen open data, from Regeringskansliet), no amendment listed",
      "document_date": "2026-05-13"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-se-act-on-nuclear-activities-1984-3",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Approves no facility and adopts no facility plan for any project. Government decisions, facility plans and county board assignments made under the Act were not reviewed here. The amending act SFS 2026:586 and the earlier acts that changed Environmental Code chapter 17 were not opened separately.",
    "summary": "Sweden's 2026 Act lets the Government approve a new nuclear facility, including its site, if the activity is justified, the site is suitable for emergency preparedness and fuel and waste can be managed, but only under a Government facility plan stating how many facilities of which types may be built where, and only with consent of the affected municipalities. In force 17 June 2026; it grants no construction or operating licence.",
    "sources": [
      "src-p1-se-act-2026-585",
      "src-p1-se-environmental-code"
    ],
    "confidence": "high",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-se-state-support-new-nuclear-2025-587",
    "slug": "sweden-state-support-new-nuclear-act-2025",
    "name": "Sweden: Act on State Support for Investment in New Nuclear Power (SFS 2025:587)",
    "short_label": "Sweden new nuclear state support act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "SE",
    "jurisdiction_level": "national",
    "issuing_authority": "Sveriges riksdag",
    "citation": "Lag (2025:587) om statligt stöd för investeringar i ny kärnkraft; issued 28 May 2025; published 3 June 2025; in force 1 August 2025; amended by SFS 2026:1079",
    "legal_scope": "Swedish statute on state support to companies for investment in new nuclear power reactors in Sweden. Support may take the form of state loans for construction and trial operation and for design and other preparatory measures, and two-way contracts for difference for routine operation (ss. 2-4), on conditions set in an agreement with the state that reflects the state's risk, its ability to enforce its rights and its control needs (s. 5). The Government decides on application (s. 6). Support may be given only if the new reactors are located at the same site in Sweden and have a combined installed electrical capacity of at least 300 MW, unless the Government finds special reasons (s. 6); only to a company whose business is exclusively or almost exclusively to build, own and operate those reactors (s. 7); only together with the agreement (s. 8); only after the company has applied for the licences required under the Act on Nuclear Activities and the Environmental Code (s. 9); and only if qualified owners and management are suitable (s. 10, as amended by SFS 2026:1079). The Ordinance (2025:808) requires a written application to the Government with ownership, management and a project plan covering siting, grid connection, reactor technology options, number of reactors and electrical output. The Act does not itself grant support to any company or project.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2025-05-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-sfs-2025-587",
        "note": "Utfärdad den 28 maj 2025 (Prop. 2024/25:150, bet. 2024/25:NU20, rskr. 2024/25:217)."
      },
      {
        "event": "published",
        "date": {
          "value": "2025-06-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-sfs-2025-587"
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-08-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-se-sfs-2025-587",
        "note": "Commencement clause of SFS 2025:587."
      }
    ],
    "effective_date": {
      "value": "2025-08-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-se-act-2025-587",
      "version": "Consolidated text amended by SFS 2026:1079 (Riksdagen open data, from Regeringskansliet)",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-se-act-on-nuclear-activities-1984-3",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "No support decision, loan, contract for difference or agreement under the Act was reviewed, so no company's or project's receipt of support is established. An application for support is not an award. The commencement date of the Ordinance (2025:808) and the content of the amending act SFS 2026:1079 beyond s. 10 were not checked.",
    "summary": "Sweden's 2025 Act lets the Government grant state loans for building new nuclear power reactors and two-way contracts for difference for their operation, mainly for reactors totalling at least 300 MW of installed electrical capacity at one site, to a dedicated project company that has already applied for its nuclear and environmental licences. In force 1 August 2025; it awards support to no one by itself.",
    "sources": [
      "src-p1-se-act-2025-587",
      "src-p1-se-sfs-2025-587",
      "src-p1-se-ordinance-2025-808"
    ],
    "confidence": "high",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ro-law-111-1996-nuclear-activities",
    "slug": "romania-law-111-1996-nuclear-activities",
    "name": "Romania: Law 111/1996 on the safe conduct, regulation, licensing and control of nuclear activities",
    "short_label": "Romania nuclear activities law 111/1996",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "RO",
    "jurisdiction_level": "national",
    "issuing_authority": "Parlamentul României",
    "citation": "Legea nr. 111/1996 din 10 octombrie 1996, republicată în Monitorul Oficial, Partea I nr. 552 din 27 iunie 2006, cu modificările ulterioare (ultima în consolidarea citită: Legea nr. 234/2023)",
    "legal_scope": "Romanian framework statute on the safe conduct, regulation, licensing and control of nuclear activities for exclusively peaceful purposes. Article 1 makes the National Commission for Nuclear Activities Control (CNCAN) a specialised central public administration body subordinate to the Government. The Act covers research, design, siting, construction, commissioning, trial operation, operation, modification and decommissioning of nuclear installations (art. 2(a)), and CNCAN licenses these activities by registration certificate or licence (art. 8(1)). Article 8(8^1), introduced by Law 234/2023, sets the licensing phases for nuclear reactors: design authorisation where applicable, siting, construction and assembly, commissioning, operation and decommissioning; partial licences may be issued for these phases (art. 8(9)). Under article 37(3) the environmental agreement is a prerequisite for CNCAN's siting licence. The Act does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1996-10-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ro-law-111-1996",
        "note": "Law dated 10 October 1996."
      },
      {
        "event": "effective",
        "date": {
          "value": "1996-12-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ro-law-111-1996",
        "note": "Consolidated text header: in force from 28 December 1996."
      },
      {
        "event": "published",
        "date": {
          "value": "2006-06-27",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ro-law-111-1996",
        "note": "Republication in Monitorul Oficial, Partea I nr. 552."
      },
      {
        "event": "amended",
        "date": {
          "value": "2023-08-19",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ro-law-111-1996",
        "note": "Consolidation records Law 234/2023 changes, including art. 8(8^1), as applying from 19 August 2023."
      }
    ],
    "effective_date": {
      "value": "1996-12-28",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-ro-law-111-1996",
      "version": "Consolidated text of 19 August 2023 published by CNCAN (republication 2006 plus amendments through Law 234/2023)",
      "document_date": "2023-08-19"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Establishes no licence for any project or design. Amendments after August 2023 were not verified because the national legislation portal was unreachable; CNCAN's licensing norms for nuclear installations (NSN-22) and environmental-agreement procedure were not read.",
    "summary": "Romania's Law 111/1996 makes CNCAN the authority that licenses nuclear activities, and since Law 234/2023 lists separate licensing phases for nuclear reactors: design authorisation where applicable, siting, construction and assembly, commissioning, operation and decommissioning. An environmental agreement must precede a siting licence. It approves no reactor or project.",
    "sources": [
      "src-p1-ro-law-111-1996",
      "src-p1-ro-cncan-laws-list"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ro-cncan-nsn-01-npp-siting",
    "slug": "romania-cncan-nsn-01-nuclear-power-plant-siting",
    "name": "Romania: CNCAN nuclear safety norms on the siting of nuclear power plants (NSN-01)",
    "short_label": "Romania NPP siting norms NSN-01",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "RO",
    "jurisdiction_level": "national",
    "issuing_authority": "Comisia Națională pentru Controlul Activităților Nucleare (CNCAN)",
    "citation": "Norme de securitate nucleară privind amplasarea centralelor nuclearoelectrice (NSN-01), normă din 23 noiembrie 2010, Monitorul Oficial, Partea I nr. 836 din 14 decembrie 2010",
    "legal_scope": "CNCAN nuclear safety norms issued under Law 111/1996 that set general nuclear safety requirements for siting nuclear power plants and the documentation an applicant for a siting licence must submit to CNCAN (art. 1). They apply to CNCAN's licensing of new sites for new nuclear power plants, and meeting them is a necessary condition for CNCAN to license siting of any nuclear power plant regardless of technology; CNCAN may impose additional requirements for a given site and design. Site selection must be justified by safety assessments of external natural and human-induced events and of impacts on the environment and population (arts. 6-7). An exclusion zone and a low-population zone are sized from a postulated severe accident: a person at the exclusion-zone boundary must not receive more than 100 mSv effective dose or 300 mSv thyroid dose in two hours, and a person at the outer boundary of the low-population zone not more than 10 mSv or 30 mSv during plume passage (art. 8); permanent settlements are not allowed in the exclusion zone (art. 10). Applicants are recommended to start submitting siting documentation at least 12 months before the desired site approval (art. 24), and a CNCAN siting licence is valid for 10 years (art. 25). The norms approve no site.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2010-11-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ro-nsn-01",
        "note": "Norm dated 23 November 2010."
      },
      {
        "event": "published",
        "date": {
          "value": "2010-12-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-ro-nsn-01",
        "note": "Monitorul Oficial, Partea I nr. 836."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-ro-nsn-01",
      "version": "NSN-01 as published in MO 836/14.12.2010 (CNCAN PDF)",
      "document_date": "2010-11-23"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-ro-law-111-1996-nuclear-activities",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "Approves no site and does not establish whether any project's site meets the norms. The approving CNCAN order, the entry-into-force date and any later amendment are not shown in the document read; the regulator's current list includes NSN-01 with its 2010 publication only.",
    "summary": "Romania's NSN-01 norms set the nuclear safety requirements CNCAN applies when licensing new sites for new nuclear power plants of any technology, including exclusion-zone and low-population-zone dose criteria from a postulated severe accident, no permanent settlements in the exclusion zone, and a 10-year validity for a siting licence. They approve no site.",
    "sources": [
      "src-p1-ro-nsn-01",
      "src-p1-ro-cncan-safety-norms-list"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-br-law-14222-2021-ansn",
    "slug": "brazil-law-14222-2021-ansn",
    "name": "Brazil: Law 14.222/2021 creating the National Nuclear Safety Authority (ANSN)",
    "short_label": "Brazil ANSN law 14.222/2021",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "BR",
    "jurisdiction_level": "national",
    "issuing_authority": "Congresso Nacional (sanctioned by the President of the Republic)",
    "citation": "Lei nº 14.222, de 15 de outubro de 2021, Diário Oficial da União de 18 de outubro de 2021",
    "legal_scope": "Federal statute that creates the National Nuclear Safety Authority (ANSN), a federal autarchy split from the National Nuclear Energy Commission (CNEN) (art. 1), whose purpose is to monitor, regulate and inspect nuclear safety and radiological protection of nuclear activities and installations in Brazil (art. 2). Article 6, V(a) gives ANSN competence to assess safety, inspect and issue licences, authorisations, approvals and certifications for site selection and approval, construction, commissioning, operation, modification and decommissioning of nuclear installations; naval vessels with embarked nuclear plants are regulated by the Navy Command (art. 7). Articles 34 and 40 amend Law 6.189/1974, including CNEN's functions, and revoke several of its provisions. The Act entered into force on publication, but apart from changes to the licensing, control and inspection fee (from 1 January 2022) its provisions take effect when the decree approving ANSN's regimental structure enters into force (art. 41). It does not itself license any reactor.",
    "affects": [
      "reactor_licensing",
      "licensing_fees"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2021-10-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-br-law-14222-dou"
      },
      {
        "event": "published",
        "date": {
          "value": "2021-10-18",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-br-senado-norma-14222",
        "note": "Diário Oficial da União, p. 2."
      },
      {
        "event": "effective",
        "date": {
          "value": "2021-10-18",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-br-law-14222-dou",
        "note": "Art. 41: in force on publication; most provisions take effect when the decree approving ANSN's regimental structure enters into force."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2022-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p1-br-law-14222-dou",
        "note": "Art. 41, I: changes to the licensing, control and inspection fee (TLC)."
      }
    ],
    "effective_date": {
      "value": "2021-10-18",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-br-law-14222-dou",
      "version": "Original text as published in the Diário Oficial da União of 18 October 2021 (Senate legislation database)",
      "document_date": "2021-10-15"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-br-constitution-art-225-6-nuclear-plant-location",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Establishes no licence for any project. The compiled current texts of this Act and of Law 6.189/1974 were unreachable, so later amendments are not verified; Decree 11.142/2022 (named by ANSN as approving its regimental structure) was not read, so the date the deferred provisions took effect is not recorded; ANSN regulatory norms were not reviewed.",
    "summary": "Brazil's Law 14.222/2021 split the National Nuclear Safety Authority (ANSN) from CNEN and gives it competence to issue licences and authorisations for site selection, construction, commissioning, operation and decommissioning of nuclear installations. Most provisions take effect with the decree approving ANSN's structure. It licenses no reactor itself.",
    "sources": [
      "src-p1-br-law-14222-dou",
      "src-p1-br-senado-norma-14222",
      "src-p1-br-ansn-legal-basis"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-br-constitution-art-225-6-nuclear-plant-location",
    "slug": "brazil-constitution-nuclear-plant-location",
    "name": "Brazil: Federal Constitution art. 225 § 6, location of nuclear power plants defined by federal law",
    "short_label": "Brazil constitution nuclear plant location rule",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "BR",
    "jurisdiction_level": "national",
    "issuing_authority": "Assembleia Nacional Constituinte (Federal Constitution of 1988)",
    "citation": "Constituição da República Federativa do Brasil de 1988, art. 225, § 6º (read with art. 21, XXIII, a, and art. 49, XIV)",
    "legal_scope": "Constitutional provision, recorded under the statute type: power plants that operate with a nuclear reactor must have their location defined in federal law, without which they may not be installed (art. 225, § 6). Related provisions read in the same official compilation: the Union is competent to explore nuclear services and installations of any nature and holds a state monopoly over research, mining, enrichment, reprocessing, industrialisation and trade of nuclear ores and derivatives, and all nuclear activity in national territory is admitted only for peaceful purposes and with the approval of the National Congress (art. 21, XXIII, a); the National Congress has exclusive competence to approve Executive initiatives concerning nuclear activities (art. 49, XIV). The provision does not itself designate any site. How it applies to research, test or non-power reactors is not addressed here.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1988",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-p1-br-stf-cf-art-225",
        "note": "The compilation identifies the text as the 1988 Federal Constitution (CF/1988); the promulgation day is not stated on the page read."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-p1-br-stf-cf-art-225",
      "version": "STF 'A Constituição e o Supremo' compilation, art. 225, read 2026-10-18",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-br-law-14222-2021-ansn",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "No federal law defining the location of any new nuclear power plant was reviewed, and none is recorded here. Pending constitutional amendment proposals on the nuclear monopoly or on state consent to plant siting were not verified. Whether a given SMR or microreactor needs a siting law is not established.",
    "summary": "Brazil's 1988 Constitution requires that power plants operating with a nuclear reactor have their location defined in federal law before they can be installed, and makes all nuclear activity subject to National Congress approval within a Union monopoly over nuclear installations and ores. It designates no site itself.",
    "sources": [
      "src-p1-br-stf-cf-art-225",
      "src-p1-br-stf-cf-art-21",
      "src-p1-br-stf-cf-art-49"
    ],
    "confidence": "high",
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-cn-nuclear-safety-law-2017",
    "slug": "china-nuclear-safety-law-2017",
    "name": "China: Nuclear Safety Law of the People's Republic of China (2017)",
    "short_label": "China Nuclear Safety Law",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "CN",
    "issuing_authority": "Standing Committee of the National People's Congress (全国人民代表大会常务委员会)",
    "citation": "中华人民共和国核安全法 (Nuclear Safety Law of the PRC); adopted 1 September 2017 at the 29th session of the Standing Committee of the 12th National People's Congress; in force 1 January 2018 (Article 94)",
    "legal_scope": "National statute on nuclear safety. Article 6 makes the State Council's nuclear safety regulatory department responsible for nuclear safety supervision (the text does not use the name of the agency). Article 22 sets up a nuclear facility safety licensing system: operators apply to that department for siting, construction, operation and decommissioning. Article 23 requires a siting safety analysis report and a site selection review opinion; Article 25 requires a construction application with a preliminary safety analysis report and environmental impact documents; Article 26 limits a construction licence to ten years; Article 27 requires an operation application before first fuel loading and sets the operating licence term at the design life; Article 28 requires an extension application five years before expiry. Article 21 has provincial governments protect planned sites of nuclear power plants and other important facilities and draw planning restricted zones around them with the regulator's consent, and bans flammable, explosive or corrosive facilities and densely populated places in those zones. It does not license any facility.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "2017-09-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-cn-nsl-npc",
        "note": "Adopted by the NPC Standing Committee."
      },
      {
        "event": "effective",
        "date": {
          "value": "2018-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-cn-nsl-npc",
        "note": "Article 94."
      }
    ],
    "effective_date": {
      "value": "2018-01-01",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-cn-nsl-npc",
      "version": "Text as adopted on 1 September 2017 (NPC website; no amendment shown)",
      "document_date": "2017-09-01"
    },
    "legal_definitions": [
      {
        "term": "核设施营运单位 (nuclear facility operator)",
        "section": "Article 93",
        "paraphrase": "A unit within the PRC that applies for or holds a nuclear facility safety licence and may operate the nuclear facility.",
        "source_id": "src-p2-cn-nsl-npc",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-cn-atomic-energy-law-2025",
        "relation": "related"
      },
      {
        "policy_id": "pol-cn-mee-order-8-licensing-procedure-2019",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "Implementing administrative regulations, NNSA siting and design safety regulations and the planning restricted-zone decisions of individual provinces were not reviewed. Whether the statute has been amended since 2017 was checked only against the NPC page. It licenses nothing by itself; project licences are separate regulator decisions.",
    "summary": "China's Nuclear Safety Law (in force since 1 January 2018) requires operators to obtain licences from the State Council's nuclear safety regulator for siting, construction, operation and decommissioning of nuclear facilities, including a site selection review opinion, a construction licence of up to ten years and an operating licence for the design life. It also requires planning restricted zones around nuclear power plants. It is a framework statute, not a project permission.",
    "sources": [
      "src-p2-cn-nsl-npc"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-cn-atomic-energy-law-2025",
    "slug": "china-atomic-energy-law-2025",
    "name": "China: Atomic Energy Law of the People's Republic of China (2025)",
    "short_label": "China Atomic Energy Law",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "CN",
    "issuing_authority": "Standing Committee of the National People's Congress (全国人民代表大会常务委员会)",
    "citation": "中华人民共和国原子能法 (Atomic Energy Law of the PRC); adopted 12 September 2025 at the 17th session of the Standing Committee of the 14th National People's Congress; in force 15 January 2026 (Article 62)",
    "legal_scope": "Basic national statute on research, development and peaceful use of atomic energy (eight chapters, 62 articles). Article 5 assigns management and supervision to the State Council's nuclear industry, energy and nuclear safety departments according to their duties. Article 27 states that the state develops nuclear power actively, safely and in an orderly way and encourages and supports the application of advanced nuclear reactors. Article 28 makes the State Council energy department responsible for nuclear power management and for the national nuclear power development plan, which goes to the State Council for approval, and provides that nuclear power plant construction projects are approved (核准) by the State Council. Article 29 supports reactor use for power, heating, desalination, hydrogen production, isotope production and research. Article 30 requires reactor siting, design, construction, commissioning and operation to follow other laws and administrative regulations. Article 38 gives the nuclear safety regulatory and nuclear industry departments nuclear safety supervision within their remits.",
    "affects": [
      "reactor_licensing",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "2025-09-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-cn-ael-npc",
        "note": "Adopted by the NPC Standing Committee."
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-01-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-cn-ael-npc",
        "note": "Article 62."
      }
    ],
    "effective_date": {
      "value": "2026-01-15",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-cn-ael-npc",
      "version": "Text as adopted on 12 September 2025 (NPC website)",
      "document_date": "2025-09-12"
    },
    "legal_definitions": [
      {
        "term": "核反应堆 (nuclear reactor)",
        "section": "Article 61(4)",
        "paraphrase": "A device built to use the energy, neutrons, nuclides and other products of nuclear reactions.",
        "source_id": "src-p2-cn-ael-npc",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-cn-nuclear-safety-law-2017",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The national nuclear power development plan and State Council project approvals made under Article 28 were not reviewed; the statute names no project, design or site. Implementing measures and the policy-support provisions of Article 6 (finance and tax support under state rules) were not traced to any programme.",
    "summary": "China's Atomic Energy Law took effect on 15 January 2026. It assigns atomic energy management to the State Council's nuclear industry, energy and nuclear safety departments, says the state encourages and supports advanced reactors, and requires State Council approval of nuclear power plant construction projects, while leaving siting, construction and operation to the nuclear safety licensing laws. It does not approve or fund any project.",
    "sources": [
      "src-p2-cn-ael-npc"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-cn-mee-order-8-licensing-procedure-2019",
    "slug": "china-nuclear-facility-licensing-procedure-rule-2019",
    "name": "China: Safety licensing procedure for nuclear power plants, research reactors and fuel cycle facilities (MEE Order No. 8, 2019)",
    "short_label": "China nuclear licensing procedure rule",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "CN",
    "issuing_authority": "Ministry of Ecology and Environment (生态环境部); applications are decided by the National Nuclear Safety Administration (国家核安全局)",
    "citation": "核动力厂、研究堆、核燃料循环设施安全许可程序规定, 生态环境部令第8号 (MEE Order No. 8); adopted 11 July 2019; published 26 August 2019; in force 1 October 2019",
    "legal_scope": "Ministerial rule made under the Nuclear Safety Law, the Administrative Licensing Law and the civil nuclear facility safety regulations. It governs the procedure for safety licences for siting, construction, operation and decommissioning of civil nuclear power plants (including nuclear heat-and-power and heating plants), research reactors and fuel cycle facilities in China's territory and other sea areas under its jurisdiction, and for transfer, change of operator and relocation (Articles 2-4). Article 6 requires the operator to complete the site safety evaluation and submit a site selection review application and a siting safety analysis report to NNSA to obtain a site selection review opinion. Article 7 allows construction of safety-important structures or pouring of basemat concrete only after a construction licence (valid up to ten years). Article 8 allows a combined siting and construction application, with the site opinion issued together with the construction licence, for listed cases including factory-built or factory-assembled floating or mobile nuclear power units whose first fuel loading and commissioning are completed in the factory, where NNSA has already approved the safety evaluation of the site.",
    "affects": [
      "siting",
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2019-08-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-cn-mee-order-8-2019",
        "note": "Adopted by the ministry meeting on 11 July 2019 and promulgated on 26 August 2019."
      },
      {
        "event": "effective",
        "date": {
          "value": "2019-10-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-cn-mee-order-8-2019"
      }
    ],
    "effective_date": {
      "value": "2019-10-01",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-cn-mee-order-8-2019",
      "version": "MEE Order No. 8 as published on the MEE government information page",
      "document_date": "2019-08-26"
    },
    "legal_definitions": [
      {
        "term": "核动力厂 (nuclear power plant, as used in this rule)",
        "section": "Article 3(1)",
        "paraphrase": "Nuclear power plants, nuclear heat-and-power plants, nuclear steam-supply and heating plants and similar nuclear power plants and units.",
        "source_id": "src-p2-cn-mee-order-8-2019",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-cn-nuclear-safety-law-2017",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "Technical siting criteria in NNSA safety regulations and standards were not reviewed, and later amendments to this rule were not checked. The combined-application route depends on a prior NNSA approval of the site; no floating or mobile unit is identified by the rule.",
    "summary": "China's 2019 safety licensing procedure rule sets how operators apply to the National Nuclear Safety Administration for a site selection review opinion and for construction, operation and decommissioning licences. It allows a combined siting and construction application for some research reactors and for factory-built floating or mobile nuclear power units on an already approved site. It is a procedure rule, not a project permission.",
    "sources": [
      "src-p2-cn-mee-order-8-2019"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-jp-reactor-regulation-act",
    "slug": "japan-reactor-regulation-act",
    "name": "Japan: Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors (Act No. 166 of 1957)",
    "short_label": "Japan Reactor Regulation Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "JP",
    "issuing_authority": "National Diet of Japan; administered by the Nuclear Regulation Authority (原子力規制委員会)",
    "citation": "核原料物質、核燃料物質及び原子炉の規制に関する法律 (昭和三十二年法律第百六十六号), promulgated 10 June 1957; current text as amended by Act No. 44 of 2023 (provisions enforced 6 June 2025)",
    "legal_scope": "National statute regulating nuclear source and fuel material and reactors. Article 23 requires Nuclear Regulation Authority (NRA) permission to install a reactor other than a power reactor (test and research reactors, including ship reactors), with criteria in Article 24. Article 43-3-5 requires NRA permission to install a power reactor; the application states reactor type, thermal output and number of units, location, the location, structure and equipment of the reactor facility and other items. Under Article 43-3-6 the NRA may grant permission only if criteria are met, including that location, structure and equipment meet standards in NRA rules; a type certificate for specified equipment is deemed to meet the technical part of that standard. Since 6 June 2025 Article 43-3-32 requires NRA approval of a long-term facility management plan before a power reactor is operated beyond 30 years from its first confirmation, in periods of up to ten years; before then the same article set a 40-year operating period, extendable once by up to 20 years with NRA approval.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1957-06-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-jp-reactor-act-egov",
        "note": "Promulgation date of Act No. 166 of 1957."
      },
      {
        "event": "amended",
        "date": {
          "value": "2023-06-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-jp-reactor-act-revisions",
        "note": "Act No. 44 of 2023 (GX decarbonized power supply act) promulgated."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2025-06-06",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-jp-reactor-act-revisions",
        "note": "Revision from Act No. 44 of 2023 enforced; Article 43-3-32 replaced by the long-term facility management plan system."
      }
    ],
    "effective_date": null,
    "operative_source": {
      "source_id": "src-p2-jp-reactor-act-egov",
      "version": "e-Gov consolidated text, current enforced revision of 6 June 2025 (Act No. 44 of 2023)",
      "document_date": "2025-06-06"
    },
    "legal_definitions": [
      {
        "term": "発電用原子炉 (power reactor)",
        "section": "Article 2(5)",
        "paraphrase": "A reactor used for power generation, excluding reactors at the research and development stage designated by Cabinet Order, reactors used for testing and research, and reactors installed in ships.",
        "source_id": "src-p2-jp-reactor-act-egov",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-jp-nra-rule-5-power-reactor-siting-standards",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "Where any operating-period limit now sits after the 2025 change (outside this Act) was not reviewed. Cabinet Order designations of research-stage reactors, NRA review guides and fees were not reviewed. The Act names no project; permissions are separate NRA decisions. On 29 October 2026 the NRA opened public comments, to 27 November 2026, on a draft outline of changes to the licensing and domestic safeguards systems under this Act and related law. It proposes stronger operator responsibility from the design stage and a way to have natural-hazard design conditions confirmed before applying for installation permission, including for test and research reactors. It is a draft for comment and no change is in effect.",
    "summary": "Japan's Reactor Regulation Act requires Nuclear Regulation Authority permission to install a power reactor or a test and research reactor, with criteria covering peaceful use, technical and financial capability and NRA standards for location, structure and equipment. Since 6 June 2025 a power reactor needs NRA approval of a long-term facility management plan to run beyond 30 years, replacing the former 40-year period with one extension. It is a framework statute, not a project permission.",
    "sources": [
      "src-p2-jp-reactor-act-egov",
      "src-p2-jp-reactor-act-revisions",
      "src-p2-jp-reactor-act-2025-06-01",
      "src-nra-licensing-review-comment-20261029",
      "src-nra-licensing-review-outline-20261029"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2026-12-11",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-jp-nra-rule-5-power-reactor-siting-standards",
    "slug": "japan-nra-power-reactor-location-structure-standards",
    "name": "Japan: NRA rule on standards for the location, structure and equipment of commercial power reactors (NRA Rule No. 5 of 2013)",
    "short_label": "Japan NRA power reactor location standards",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "JP",
    "issuing_authority": "Nuclear Regulation Authority (原子力規制委員会)",
    "citation": "実用発電用原子炉及びその附属施設の位置、構造及び設備の基準に関する規則 (平成二十五年原子力規制委員会規則第五号), promulgated 28 June 2013, in force 8 July 2013; current text as last amended by NRA Rule No. 7 of 2026 (in force 11 September 2026)",
    "legal_scope": "Applies to commercial power reactors and their attached facilities (Article 1). Article 3 requires design-basis facilities to sit on ground that can sufficiently support them under the applicable seismic forces, and requires seismically important facilities to sit on ground where deformation would not impair their safety functions and where no ground displacement is likely to occur. Article 4 requires resistance to seismic forces, including the design-basis ground motion for seismically important facilities and slope failure caused by earthquakes, and Article 5 requires that design-basis facilities not lose safety functions from the design-basis tsunami. These are binding location and design standards, not a site approval.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2013-06-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-jp-nra-rule-5-egov",
        "note": "Promulgation date."
      },
      {
        "event": "effective",
        "date": {
          "value": "2013-07-08",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-jp-nra-rule-5-egov",
        "note": "Supplementary provision 1."
      },
      {
        "event": "amended",
        "date": {
          "value": "2026-09-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-jp-nra-rule-5-revisions",
        "note": "NRA Rule No. 7 of 2026, enforced the same day; its content was not reviewed.",
        "reader": {
          "headline": "Japan's NRA amends its rule on power-reactor location and structure standards",
          "what": "NRA Rule No. 7 of 2026 amended the 2013 rule on the location, structure and equipment of commercial power reactors, in force 11 September 2026.",
          "limit": "The content of the amendment was not reviewed; the rule approves no site.",
          "date_label": "In force"
        }
      }
    ],
    "effective_date": {
      "value": "2013-07-08",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-jp-nra-rule-5-egov",
      "version": "e-Gov consolidated text, current revision of 11 September 2026",
      "document_date": "2026-09-11"
    },
    "legal_definitions": [
      {
        "term": "耐震重要施設 (seismically important facilities)",
        "section": "Article 3(1)",
        "paraphrase": "Design-basis facilities whose loss of safety function from an earthquake would have a particularly large radiological effect on the public.",
        "source_id": "src-p2-jp-nra-rule-5-egov",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-jp-reactor-regulation-act",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "Does not cover test and research reactors such as the HTTR, which have a separate NRA rule that was not reviewed. NRA review guides on faults, ground motion and siting were not reviewed. The rule approves no site.",
    "summary": "Japan's Nuclear Regulation Authority rule on the location, structure and equipment of commercial power reactors requires seismically important facilities to be built on ground where no displacement is likely and that can support them, and sets earthquake and tsunami protection standards. It applies to commercial power reactors only and approves no site.",
    "sources": [
      "src-p2-jp-nra-rule-5-egov",
      "src-p2-jp-nra-rule-5-revisions"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-jp-long-term-decarbonization-power-auction",
    "slug": "japan-long-term-decarbonization-power-source-auction",
    "name": "Japan: Long-Term Decarbonization Power Source Auction (capacity market, from FY2023)",
    "short_label": "Japan long-term decarbonization auction",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "JP",
    "issuing_authority": "Organization for Cross-regional Coordination of Transmission Operators (OCCTO), under guidelines of the Agency for Natural Resources and Energy (METI)",
    "citation": "長期脱炭素電源オークション (Long-Term Decarbonization Power Source Auction), part of the capacity market operated by OCCTO since FY2023; FY2026 bidding round governed by OCCTO's final application rules of 2 September 2026",
    "legal_scope": "Auction for new investment in decarbonized power sources (new build or replacement), with contract payments funded by retailers' capacity contributions. Capacity-revenue support normally lasts 20 years, beginning in the fiscal year after supply starts. Nuclear bidders may request a longer period in whole years up to 30 years; the 40-year upper limit in the rules applies to other source types, not nuclear. Nuclear is an eligible source type for new build, replacement and safety investment in existing plants (investment for the July 2013 new regulatory standards), with a minimum of 100,000 kW sending-end capacity. The area is all of Japan except Okinawa and other remote islands. The supply-start deadline for nuclear is the end of the fiscal year containing the date 17 years (12 years if a statutory or ordinance environmental assessment is complete) after the capacity-contract date. For FY2026 the decarbonized-source volume is 5 million kW, of which safety investment in existing nuclear plants is capped at 1.5 million kW.",
    "affects": [
      "project_funding",
      "cost_recovery"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "opened",
        "date": {
          "value": "2023",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-p2-jp-occto-ltda-fy2026",
        "note": "OCCTO states the auction was opened as part of the capacity market from FY2023."
      }
    ],
    "effective_date": {
      "value": "2023",
      "precision": "year",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-jp-occto-long-term-auction-rules-fy2026",
      "version": "OCCTO final application rules for the FY2026 bidding round (2 September 2026)",
      "document_date": "2026-09-02"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The ANRE auction guideline itself was not readable; the operative text is OCCTO's final FY2026 application rules of 2 September 2026. No nuclear award or bid is recorded here, and no SMR project is named. Plants below 100,000 kW sending-end capacity are outside the eligibility table read.",
    "summary": "Japan's Long-Term Decarbonization Power Source Auction, run by OCCTO since FY2023, pays winning new or replacement low-carbon capacity a fixed capacity revenue, and nuclear new build or replacement of at least 100,000 kW is eligible. Under OCCTO's final FY2026 rules, capacity-revenue support normally lasts 20 years, beginning in the fiscal year after supply starts; nuclear bidders may request a longer period in whole years up to 30 years. It is a support mechanism, not an award to any project.",
    "sources": [
      "src-p2-jp-occto-ltda-fy2026",
      "src-jp-occto-long-term-auction-rules-fy2026"
    ],
    "confidence": "medium",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ru-federal-law-170-fz-atomic-energy",
    "slug": "russia-federal-law-170-fz-use-of-atomic-energy",
    "name": "Russia: Federal Law No. 170-FZ 'On the Use of Atomic Energy' (1995)",
    "short_label": "Russia Law on the Use of Atomic Energy",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "RU",
    "issuing_authority": "Federal Assembly of the Russian Federation; signed by the President of the Russian Federation",
    "citation": "Федеральный закон от 21.11.1995 № 170-ФЗ «Об использовании атомной энергии»; adopted by the State Duma 20 October 1995; consolidated text as amended through Federal Law No. 98-FZ of 21 April 2025",
    "legal_scope": "Federal framework statute for peaceful and defence uses of atomic energy. Article 24 assigns state safety regulation to federal executive bodies acting as state safety regulation bodies, independent of other state bodies and of organisations using atomic energy; the law itself does not name the body. Article 26 provides that permits (licences) for work in the field of atomic energy are issued by the safety regulation bodies to operating organisations and contractors, state the holder, safety conditions and term, and are required for siting, construction, operation and decommissioning of nuclear installations, radiation sources and storage facilities, among other activities. It does not license any installation.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "1995-10-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-ru-170fz-kremlin-p1",
        "note": "Adopted by the State Duma."
      },
      {
        "event": "signed",
        "date": {
          "value": "1995-11-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-ru-170fz-kremlin-p1"
      },
      {
        "event": "amended",
        "date": {
          "value": "2025-04-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-ru-98fz-2025-kremlin",
        "note": "Federal Law No. 98-FZ, the last amendment in the consolidated text read."
      }
    ],
    "effective_date": null,
    "operative_source": {
      "source_id": "src-p2-ru-170fz-kremlin-p3",
      "version": "Consolidated text on the President's website, amendments through No. 98-FZ of 21 April 2025",
      "document_date": "2025-04-21"
    },
    "legal_definitions": [
      {
        "term": "разрешение (лицензия) на право ведения работ в области использования атомной энергии (permit or licence)",
        "section": "Article 26",
        "paraphrase": "A properly issued document confirming the right to carry out a specified activity on condition that the safety of atomic energy facilities and work is ensured.",
        "source_id": "src-p2-ru-170fz-kremlin-p3",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ru-np-032-19-npp-site-safety-requirements",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "The government decrees that designate the safety regulation body and its licensing regulations were not opened, and amendments after No. 98-FZ were not checked. The chapter on siting and construction decisions was not reviewed. No project permission is established here.",
    "summary": "Russia's Federal Law on the Use of Atomic Energy (No. 170-FZ of 1995, consolidated to April 2025) requires licences from the independent state safety regulation bodies for siting, construction, operation and decommissioning of nuclear installations. The law does not itself name the regulator. It is a framework statute, not a project permission.",
    "sources": [
      "src-p2-ru-170fz-kremlin-p1",
      "src-p2-ru-170fz-kremlin-p3",
      "src-p2-ru-98fz-2025-kremlin"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ru-np-032-19-npp-site-safety-requirements",
    "slug": "russia-np-032-19-npp-site-safety-requirements",
    "name": "Russia: Federal norms and rules NP-032-19 'Nuclear power plant site. Safety requirements' (Rostekhnadzor Order No. 287, 2019)",
    "short_label": "Russia NP-032-19 NPP site requirements",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "RU",
    "issuing_authority": "Federal Service for Environmental, Technological and Nuclear Supervision (Rostekhnadzor)",
    "citation": "Приказ Ростехнадзора от 19.07.2019 № 287 «Об утверждении федеральных норм и правил в области использования атомной энергии «Площадка атомной станции. Требования безопасности» (НП-032-19)»; registered by the Ministry of Justice 2 December 2019, No. 56661; official publication No. 0001201912020071; in force 13 December 2019",
    "legal_scope": "Federal norms and rules made under Article 6 of Federal Law No. 170-FZ. They set basic safety criteria and requirements for siting nuclear power plants, for site evaluation against natural and human-made hazards, for environmental monitoring and for accounting for plant effects on people and the environment, over the full plant life cycle (items 1-3). They do not apply to floating nuclear power plants (item 4). Item 12 prohibits siting a plant on sites lying directly on active faults; on sites whose maximum design earthquake exceeds intensity VIII on the MSK-64 scale (maximum acceleration 4 m/s2 or more); in areas with sulfate or salt karst or thermokarst; on territories where environmental-protection laws forbid a plant; and on sites exposed to volcanic eruption effects. They replace NP-032-01.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2019-07-19",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-ru-np-032-19-official",
        "note": "Rostekhnadzor Order No. 287; registered by the Ministry of Justice on 2 December 2019 (No. 56661)."
      },
      {
        "event": "effective",
        "date": {
          "value": "2019-12-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-ru-np-032-19-secnrs",
        "note": "Entry-into-force date as given by the regulator's technical support catalogue."
      }
    ],
    "effective_date": {
      "value": "2019-12-13",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-ru-np-032-19-official",
      "version": "Official publication of Order No. 287 with the approved norms (scanned original)",
      "document_date": "2019-07-19"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-ru-federal-law-170-fz-atomic-energy",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "Floating plants are excluded and the norms that apply to them were not reviewed. Whether NP-032-19 has been amended since 2019 was not verified. Siting decisions and site licences for individual projects are separate.",
    "summary": "Russia's federal norms NP-032-19, in force since December 2019, set safety requirements for nuclear power plant sites and forbid plants on active faults, on sites with design earthquakes above intensity VIII (MSK-64), in karst or thermokarst areas, where environmental laws forbid them, or where volcanic effects can reach. They do not apply to floating plants. They are siting rules, not a site approval.",
    "sources": [
      "src-p2-ru-np-032-19-official",
      "src-p2-ru-np-032-19-secnrs"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ru-general-scheme-power-facilities-2042",
    "slug": "russia-general-scheme-power-facilities-2042",
    "name": "Russia: General Scheme for the placement of electric power facilities to 2042 (Government Order No. 4153-r, 2024)",
    "short_label": "Russia General Scheme to 2042",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "RU",
    "issuing_authority": "Government of the Russian Federation",
    "citation": "Распоряжение Правительства Российской Федерации от 30 декабря 2024 г. № 4153-р (Генеральная схема размещения объектов электроэнергетики до 2042 года)",
    "legal_scope": "Government order approving the General Scheme, a long-term planning document for the power sector developed under the 2022 rules on long-term power-sector planning documents. It directs the Ministry of Energy to submit, within six months, changes to the federal territorial planning scheme for energy, and repeals the 2017, 2021 and 2022 orders. The scheme's tables of nuclear plants planned for construction list, among others, the Norilsk small nuclear plant (RITM-400 units, Norilsk), the Yakutsk small nuclear plant (RITM-200N units, Ust-Kuyga, Ust-Yansky ulus), the Chukotka small nuclear plant (Shelf-M, Iultinsky district), the Baimsky modernised floating power units (RITM-200S, Cape Nagloynyn, Pevek) and the BREST-OD-300 pilot demonstration unit at Seversk. Footnotes state that the Chukotka, Baimsky and Norilsk projects will be confirmed only after consumer agreements fixing consumption volumes and prices, or another supply arrangement, and that a second Yakutsk unit depends on such agreements.",
    "affects": [
      "programme_administration",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2024-12-30",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-govru-general-scheme-2042"
      }
    ],
    "effective_date": null,
    "operative_source": {
      "source_id": "src-govru-general-scheme-2042",
      "version": "Order No. 4153-r with the approved General Scheme (government PDF)",
      "document_date": "2024-12-30"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [
      {
        "project_id": "prj-norilsk-asmm-ritm400",
        "basis": "The General Scheme lists the Norilsk small nuclear plant (Krasnoyarsk Krai, Norilsk) with RITM-400 units among planned nuclear plants, subject to consumer agreements.",
        "source_id": "src-govru-general-scheme-2042"
      },
      {
        "project_id": "prj-yakutia-ritm",
        "basis": "The General Scheme lists the Yakutsk small nuclear plant at Ust-Kuyga (Ust-Yansky ulus) with RITM-200N units among planned nuclear plants.",
        "source_id": "src-govru-general-scheme-2042"
      },
      {
        "project_id": "prj-baimsky-floating",
        "basis": "The General Scheme lists the Baimsky modernised floating power units (RITM-200S) at Cape Nagloynyn, Pevek urban district, subject to consumer agreements.",
        "source_id": "src-govru-general-scheme-2042"
      },
      {
        "project_id": "prj-brest-od-300",
        "basis": "The General Scheme lists the pilot demonstration unit at Seversk (Tomsk Oblast) with BREST-OD-300 among planned nuclear units.",
        "source_id": "src-govru-general-scheme-2042"
      }
    ],
    "unapproved": "Inclusion in the scheme is planning, not a construction decision, licence or funding; listed years are planned. The Chukotka small plant (Shelf-M, Iultinsky district) is not linked to a project record because the scheme does not name the deposit it would serve. The state programme for the nuclear industry was not reviewed.",
    "summary": "Russia's General Scheme for the placement of power facilities to 2042, approved by Government Order No. 4153-r of 30 December 2024, lists planned nuclear plants including small plants at Norilsk, Ust-Kuyga (Yakutia) and in Chukotka, the Baimsky floating power units and the BREST-OD-300 unit at Seversk. Several small-plant entries depend on consumer agreements. It is a planning document, not a construction decision or licence.",
    "sources": [
      "src-govru-general-scheme-2042"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-uz-law-zru-565-peaceful-atomic-energy",
    "slug": "uzbekistan-law-peaceful-use-of-atomic-energy",
    "name": "Uzbekistan: Law No. ZRU-565 on the Use of Atomic Energy for Peaceful Purposes (2019)",
    "short_label": "Uzbekistan peaceful atomic energy law",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "UZ",
    "issuing_authority": "Oliy Majlis of the Republic of Uzbekistan; signed by the President of the Republic of Uzbekistan",
    "citation": "Закон Республики Узбекистан от 09.09.2019 г. № ЗРУ-565 «Об использовании атомной энергии в мирных целях»; in force 10 September 2019; amended by Law No. ZRU-1140 of 21 April 2026",
    "legal_scope": "National framework statute (ten chapters, 59 articles). Article 16, as amended in 2026, names the Committee for Industrial, Radiation and Nuclear Safety under the Cabinet of Ministers as the specially authorised state safety regulation body. Article 20 has that body issue licences to operating organisations; licensed activities include construction and operation of nuclear installations and storage facilities. Article 25 provides that the decision to build a nuclear installation is taken by the President on the Cabinet of Ministers' proposal, that the site is chosen by the Cabinet of Ministers, and that the regulator organises a state review of the site safety case and issues a permit to use the site. Article 27 requires a sanitary protection zone, an observation zone and a safety zone, and bars housing, public buildings and children's institutions from the sanitary protection zone. Article 12, as amended, names the Atomic Energy Agency under the Cabinet of Ministers as the authorised state body.",
    "affects": [
      "reactor_licensing",
      "siting",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2019-09-09",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-uz-zru-565-lex"
      },
      {
        "event": "effective",
        "date": {
          "value": "2019-09-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-uz-zru-565-lex"
      },
      {
        "event": "amended",
        "date": {
          "value": "2026-04-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-uz-zru-1140-lex",
        "note": "Law No. ZRU-1140; in force on official publication."
      }
    ],
    "effective_date": {
      "value": "2019-09-10",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-uz-zru-565-lex",
      "version": "LexUz current Russian edition of 21 April 2026 (amended parts marked as unofficial translation of the Uzbek text)",
      "document_date": "2026-04-21"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-uz-committee-resolution-39-npp-site-requirements",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "The Russian text of the 2026 amendments is marked as an unofficial translation; the Uzbek official text was not compared. The 2021 amendment was not opened. No presidential construction decision, Cabinet site decision or site permit for a specific project is established here.",
    "summary": "Uzbekistan's 2019 Law on the Use of Atomic Energy for Peaceful Purposes requires licences from the Committee for Industrial, Radiation and Nuclear Safety for building and operating nuclear installations, reserves the construction decision to the President and the site choice to the Cabinet of Ministers, and requires a regulator permit to use the site. It was last amended in April 2026. It is a framework statute, not a project permission.",
    "sources": [
      "src-p2-uz-zru-565-lex",
      "src-p2-uz-zru-1140-lex"
    ],
    "confidence": "medium",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-uz-committee-resolution-39-npp-site-requirements",
    "slug": "uzbekistan-npp-site-and-territory-requirements-2026",
    "name": "Uzbekistan: Requirements for the site and territory of a nuclear power plant (Committee resolution No. 39, 2026)",
    "short_label": "Uzbekistan NPP site requirements",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "UZ",
    "issuing_authority": "Committee for Industrial, Radiation and Nuclear Safety under the Cabinet of Ministers of the Republic of Uzbekistan",
    "citation": "Resolution No. 39 of 16 February 2026 approving the Requirements for the site and territory of a nuclear power plant (Атом электр станцияси майдончаси ва ҳудудига қўйиладиган талаблар); registered by the Ministry of Justice 6 March 2026, No. 3785; in force 7 March 2026",
    "legal_scope": "Binding regulator resolution adopted under Presidential Decree PF-224 of 24 December 2024 and agreed with the national ecology committee, the construction ministry, the Atomic Energy Agency and the Academy of Sciences. Item 4 (Uzbek text) provides that a nuclear power plant may not be sited if the site suitability assessment finds active faults, a high groundwater level, seismicity with a maximum design earthquake above 8 points on the MSK-64 scale (maximum acceleration 4 m/s2 or more), sulfate or salt karst, or a prohibition under nature-protection legislation. Item 1 defines an active fault as a tectonic fault with relative displacement of 0.5 m or more between adjoining crustal blocks. Later chapters cover natural and human-made hazard assessment, environmental monitoring and environmental effects in site selection.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2026-02-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-uz-res-39-site-requirements",
        "note": "Resolution No. 39; registered by the Ministry of Justice on 6 March 2026 (No. 3785)."
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-03-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-uz-res-39-site-requirements"
      }
    ],
    "effective_date": {
      "value": "2026-03-07",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-uz-res-39-site-requirements",
      "version": "Uzbek-language text in the National Legislation Database (reg. No. 3785)",
      "document_date": "2026-02-16"
    },
    "legal_definitions": [
      {
        "term": "фаол ёриқ (active fault)",
        "section": "Item 1",
        "paraphrase": "A tectonic fault along which relative displacement of 0.5 metres or more between adjoining crustal blocks has been observed.",
        "source_id": "src-p2-uz-res-39-site-requirements",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-uz-law-zru-565-peaceful-atomic-energy",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "Read in the Uzbek original with an English gloss; no official Russian text was available. Chapters 2 to 5 were not read in full. The resolution names no site and grants no site permit.",
    "summary": "Uzbekistan's nuclear safety committee set binding site requirements for nuclear power plants in force from 7 March 2026: a plant may not be sited where there are active faults, high groundwater, seismicity above 8 points (MSK-64), sulfate or salt karst, or a nature-protection ban. The rules name no site and are not a site permit.",
    "sources": [
      "src-p2-uz-res-39-site-requirements"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-uz-pp-188-atomic-energy-agency-fund",
    "slug": "uzbekistan-atomic-energy-agency-and-fund-pp-188",
    "name": "Uzbekistan: Presidential Resolution PP-188 on the Atomic Energy Agency and its development fund (2024)",
    "short_label": "Uzbekistan PP-188 atomic energy fund",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "UZ",
    "issuing_authority": "President of the Republic of Uzbekistan",
    "citation": "Постановление Президента Республики Узбекистан от 24.05.2024 г. № ПП-188 «О мерах по эффективной организации деятельности Агентства по атомной энергии при Кабинете Министров»; in force 25 May 2024; amended by Decree UP-224 of 24 December 2024",
    "legal_scope": "Presidential resolution implementing Decree UP-79 of 24 May 2024. It approves the main activities and structure of the Atomic Energy Agency under the Cabinet of Ministers (including a state enterprise directorate for construction of the nuclear power plant), lets the Agency and its organisations make direct contracts, create companies and take part in financing projects in nuclear energy, and turns the earlier nuclear energy development fund into a Fund for Development of the Atomic Energy Use Sphere under the Agency. The fund draws on 4% of dividends of the state enterprise Navoiyuran (as amended in December 2024), grants and concessional loans of international financial institutions and other sources, and may be spent on Agency tasks connected with investment projects to build atomic energy facilities, including external infrastructure, on research and on the Agency's own operation.",
    "affects": [
      "project_funding",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2024-05-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-uz-pp-188-lex"
      },
      {
        "event": "effective",
        "date": {
          "value": "2024-05-25",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-uz-pp-188-lex"
      },
      {
        "event": "amended",
        "date": {
          "value": "2024-12-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-uz-pp-188-lex",
        "note": "Decree UP-224 reworded the fund's dividend source."
      }
    ],
    "effective_date": {
      "value": "2024-05-25",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-uz-pp-188-lex",
      "version": "LexUz Russian edition of 27 December 2024",
      "document_date": "2024-12-27"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "No amount, disbursement or allocation to a specific project is stated, and the Jizzakh small nuclear plant is not named. Decree UP-79 and the presidential acts on the Jizzakh plant were not opened.",
    "summary": "Uzbekistan's 2024 presidential resolution PP-188 organises the Atomic Energy Agency, including a directorate for building the nuclear power plant, and creates a Fund for Development of the Atomic Energy Use Sphere financed partly by 4% of Navoiyuran dividends that may be spent on tasks for building atomic energy facilities. It names no project and records no disbursement.",
    "sources": [
      "src-p2-uz-pp-188-lex"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-rw-law-59-2017-radiation-protection",
    "slug": "rwanda-law-59-2017-radiation-protection",
    "name": "Rwanda: Law N° 59/2017 governing radiation protection",
    "short_label": "Rwanda radiation protection law",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "RW",
    "issuing_authority": "Parliament of Rwanda; promulgated by the President of the Republic",
    "citation": "Law N° 59/2017 of 24/01/2018 governing radiation protection; Official Gazette n° Special of 25/01/2018; in force on publication (Article 37)",
    "legal_scope": "Statute governing the use, management and regulation of ionising-radiation activities, including the production, possession, use, import, export, transport and handling of radiation sources and the management of radioactive waste from civilian applications (Articles 1-2). The Regulatory Authority is the authority in charge of regulation of utilities or another authority established by law (Article 3(22)); it performs radiation-protection regulation independently and grants authorisations (Articles 4-6). The law contains no reactor-specific licensing sequence; the regulator's 2024 nuclear installation licensing regulation is made with this law as 'the Law'.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2018-01-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-rw-law-59-2017"
      },
      {
        "event": "published",
        "date": {
          "value": "2018-01-25",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-rw-law-59-2017",
        "note": "Official Gazette n° Special; in force on publication (Article 37)."
      }
    ],
    "effective_date": {
      "value": "2018-01-25",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-rw-law-59-2017",
      "version": "Official Gazette n° Special of 25/01/2018 (English column)",
      "document_date": "2018-01-25"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-rw-rura-regulation-013-2024-nuclear-installations",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "Rwanda had not completed a comprehensive nuclear law: a March 2026 IAEA review, as reported by NucNet, found drafting in progress and recommended completing the review of legislation. Later amendments to this law were not checked.",
    "summary": "Rwanda's 2018 radiation protection law gives the utilities regulator (RURA) independent authority to regulate and authorise ionising-radiation activities. It contains no reactor-specific licensing sequence; RURA's 2024 nuclear installation licensing regulation is made under it. A comprehensive nuclear law was still being drafted in March 2026.",
    "sources": [
      "src-p2-rw-law-59-2017",
      "src-p2-rw-nucnet-inir-2026"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-rw-rura-regulation-013-2024-nuclear-installations",
    "slug": "rwanda-rura-nuclear-installation-licensing-regulation-2024",
    "name": "Rwanda: RURA Regulation No 013/2024 governing licensing of nuclear installations",
    "short_label": "Rwanda nuclear installation licensing regulation",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "RW",
    "issuing_authority": "Rwanda Utilities Regulatory Authority (RURA), Regulatory Board",
    "citation": "Regulation No 013/R/RS-NRP/RURA/2024 of 30/07/2024 governing licensing of nuclear installations; signed at Kigali on 9 August 2024; in force on signature (Article 28)",
    "legal_scope": "Applies to nuclear installations and activities directly related to them (Article 3). Article 5 requires anyone intending to operate a nuclear installation to obtain, across its phases, a site licence, a construction licence, an authorisation for commissioning, an authorisation to introduce nuclear material, an operation licence, an authorisation to operate beyond design life, a decommissioning licence and release from regulatory control. Article 6 lists the site licence application documents (including site ownership or agreement, the site evaluation process, an initial safety analysis report and a radiological impact assessment) and says a site licence allows site preparation for construction; Article 7 makes it valid for ten years or as specified. Article 8 requires a preliminary safety analysis report for a construction licence. Annex I lists licence types and fees. Operators had six months from signature to comply (Article 26).",
    "affects": [
      "siting",
      "reactor_licensing",
      "licensing_fees"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2024-08-09",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-rw-rura-reg-013-2024",
        "note": "Regulation dated 30 July 2024; signed at Kigali on 9 August 2024 and in force on signature."
      }
    ],
    "effective_date": {
      "value": "2024-08-09",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-rw-rura-reg-013-2024",
      "version": "Signed regulation as posted by RURA",
      "document_date": "2024-08-09"
    },
    "legal_definitions": [
      {
        "term": "Site License",
        "section": "Article 2",
        "paraphrase": "An authorisation issued by the Regulatory Authority allowing an applicant to prepare a site for construction of a nuclear facility.",
        "source_id": "src-p2-rw-rura-reg-013-2024",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-rw-law-59-2017-radiation-protection",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "Siting criteria (for example seismic or population limits) are not set in this regulation and no separate siting regulation is listed by RURA. A later draft licensing regulation posted for consultation was not assessed. No site licence for any project is recorded here.",
    "summary": "Rwanda's utilities regulator adopted a licensing regulation for nuclear installations in force from 9 August 2024. It requires a site licence (valid ten years and allowing site preparation), then construction, commissioning, operation and decommissioning licences, and lists the documents each application needs. It is a licensing rule, not a permission for any project.",
    "sources": [
      "src-p2-rw-rura-reg-013-2024",
      "src-p2-rw-rura-nuclear-regulations"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-rw-presidential-order-127-01-raeb",
    "slug": "rwanda-presidential-order-establishing-raeb-2020",
    "name": "Rwanda: Presidential Order N° 127/01 establishing the Rwanda Atomic Energy Board (2020)",
    "short_label": "Rwanda RAEB establishment order",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "RW",
    "issuing_authority": "President of the Republic of Rwanda",
    "citation": "Presidential Order N° 127/01 of 03/12/2020 establishing Rwanda Atomic Energy Board; Official Gazette n° Special of 04/12/2020; in force on publication (Article 31)",
    "legal_scope": "Establishes the Rwanda Atomic Energy Board (RAEB) as a non-commercial public institution headquartered in Kigali. Its mission is to promote peaceful use of atomic energy for sustainable socio-economic development (Article 6). Its responsibilities include advising the Government on atomic energy, determining peaceful uses of nuclear power and other applications, building partnerships, promoting and supporting the construction and maintenance of nuclear energy installations for electricity production and other applications, supervising and managing the acquisition and use of nuclear fuel, and managing nuclear waste (Article 7).",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2020-12-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-rw-po-127-01-raeb"
      },
      {
        "event": "published",
        "date": {
          "value": "2020-12-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-p2-rw-po-127-01-raeb",
        "note": "Official Gazette n° Special; in force on publication (Article 31)."
      }
    ],
    "effective_date": {
      "value": "2020-12-04",
      "precision": "day",
      "basis": "actual"
    },
    "operative_source": {
      "source_id": "src-p2-rw-po-127-01-raeb",
      "version": "Official Gazette n° Special of 04/12/2020 (English column)",
      "document_date": "2020-12-04"
    },
    "legal_definitions": [
      {
        "term": "atomic energy",
        "section": "Article 3",
        "paraphrase": "Energy released by atoms in atomic reactions, also called nuclear energy because it is released during nuclear fission or fusion.",
        "source_id": "src-p2-rw-po-127-01-raeb",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "The order creates a promotion and implementation body; it provides no budget figure, names no project or site and grants no licence. RAEB's agreements with vendors are recorded separately as programmes. A government nuclear programme roadmap was not found as an official text.",
    "summary": "Rwanda's Presidential Order of 3 December 2020 established the Rwanda Atomic Energy Board to promote peaceful use of atomic energy, advise the Government and promote and support the construction of nuclear energy installations for electricity. It is an institutional measure; it names no project and grants no licence.",
    "sources": [
      "src-p2-rw-po-127-01-raeb"
    ],
    "confidence": "high",
    "jurisdiction_level": "national",
    "expiry": null,
    "last_checked": "2026-10-18",
    "next_review": "2027-04-18",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-gb-onr-relevant-good-practice-202609",
    "slug": "gb-onr-relevant-good-practice",
    "name": "ONR policy on using relevant good practice",
    "short_label": "Relevant good practice guidance",
    "category": "regulatory_guidance",
    "instrument_type": "regulatory_guidance",
    "jurisdiction": "GB",
    "jurisdiction_level": "national",
    "issuing_authority": "Office for Nuclear Regulation",
    "citation": "ONR-RGP-POL-001, issue 1.1",
    "legal_scope": "Inspector policy across ONR's regulatory purposes where goal-setting legal duties apply. Prescriptive requirements must still be met as written. The policy is not an enacted legal instrument and identifies no particular SMR project or design.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "published",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-09-30",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-onr-rgp-announcement-20260930",
        "note": "ONR's announcement date; the opened issue 1.1 gives only September 2026 as its publication date.",
        "reader": {
          "headline": "ONR explains how inspectors use relevant good practice",
          "what": "A new inspector policy explains how established practices can inform assessments against goal-setting legal duties.",
          "limit": "Guidance does not replace the legal test or grant project permission; the exact release day of issue 1.1 is not established.",
          "date_label": "Announcement dated"
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-onr-rgp-policy-202609",
      "version": "Issue 1.1; document control states September 2026, with no issue-specific day",
      "document_date": "2026-09"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "This guidance is not a new law, a design approval or site, construction or operating permission. It does not change the dutyholder's responsibility to comply with the law. No legal effective date or project-specific applicability is established. The policy's scheduled September 2031 review is not an expiry.",
    "summary": "ONR announced its relevant good practice policy on 30 September 2026. It explains how inspectors use established practices when assessing goal-setting legal duties. Relevant good practice is not prescribed in law: equivalent approaches may demonstrate compliance, and applying good practice does not replace the legal test. Dutyholders remain responsible for compliance and inspectors make independent judgements. The opened issue 1.1 gives publication as September 2026 and a scheduled review in September 2031; its exact release day is not stated.",
    "sources": [
      "src-onr-rgp-policy-202609",
      "src-onr-rgp-announcement-20260930"
    ],
    "confidence": "high",
    "last_checked": "2026-10-26",
    "next_review": "2027-04-26",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-prior-doe-dod-authorizations-20261026",
    "slug": "us-nrc-prior-doe-dod-authorizations",
    "name": "NRC reviews of reactor designs previously authorized by DOE or the Department of War",
    "short_label": "Prior DOE or defense authorization evidence",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 67195-67200, FR Doc. 2026-21801, docket NRC-2025-1503, RIN 3150-AL60",
    "legal_scope": "Amends 10 CFR 50.43 and 53.440 to allow relevant information from previously DOE- or Defense-authorized facilities that have been tested and demonstrated safe functioning to support commercial reactor applications under Parts 50, 52 and 53. Applicants must justify applicability and NRC compliance, including changes in design, hazards, siting and safety assumptions. The notice uses Department of War and Department of Defense interchangeably; the regulatory text retains Department of Defense.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "adopted_not_yet_effective",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-10-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-gpo-nrc-prior-authorizations-final-20261026",
        "reader": {
          "headline": "NRC publishes a pathway for using prior DOE or defense reactor evidence",
          "what": "The final rule permits relevant evidence from previously authorized facilities that have been tested and demonstrated safe functioning to support NRC commercial reactor licensing applications.",
          "limit": "Effective 25 November 2026. Applicants must demonstrate NRC compliance; the rule grants no project licence or construction or operating permission.",
          "date_label": "Published"
        }
      }
    ],
    "effective_date": {
      "value": "2026-11-25",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-gpo-nrc-prior-authorizations-final-20261026",
      "version": "Published final rule, Federal Register volume 91, pages 67195-67200",
      "document_date": "2026-10-26"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      }
    ],
    "applicability": [],
    "unapproved": "Published on 26 October but not effective until 25 November 2026. This rule grants no project licence or construction or operating authority, and does not automatically convert a DOE or defense authorization into an NRC licence. Applicants must substantiate the relevant authorization, testing and demonstrated safe functioning. No project-specific eligibility is established here.",
    "summary": "NRC published a final rule allowing applicants to use relevant evidence from previously DOE- or Defense-authorized reactors that have been tested and demonstrated safe functioning. It takes effect on 25 November 2026. Applicants must show how that evidence satisfies NRC requirements and address differences in the commercial application. NRC retains independent review and licensing authority. The rule is an evidentiary pathway, not an automatic project approval.",
    "sources": [
      "src-gpo-nrc-prior-authorizations-final-20261026"
    ],
    "confidence": "high",
    "last_checked": "2026-10-26",
    "next_review": "2026-11-25",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-pl-prawo-atomowe",
    "slug": "poland-atomic-law",
    "name": "Poland: Atomic Law (Ustawa z dnia 29 listopada 2000 r. – Prawo atomowe)",
    "short_label": "Poland Atomic Law",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "PL",
    "jurisdiction_level": "national",
    "issuing_authority": "Sejm Rzeczypospolitej Polskiej (Parliament of Poland)",
    "citation": "Ustawa z dnia 29 listopada 2000 r. – Prawo atomowe (Dz.U. 2001 nr 3 poz. 18); consolidated text Dz.U. 2026 poz. 1; amended by Dz.U. 2026 poz. 1097",
    "legal_scope": "Poland's framework statute on peaceful uses of atomic energy, nuclear safety and radiation protection. Art. 4 ust. 1 pkt 2 makes the construction, commissioning, operation or decommissioning of nuclear facilities subject to a licence (zezwolenie), and art. 3 pkt 17 defines a nuclear facility to include a nuclear power plant and a research reactor. Under art. 5 ust. 3 the President of the National Atomic Energy Agency (Prezes Państwowej Agencji Atomistyki, PAA) issues these licences, and art. 109 makes the President the central government authority for nuclear safety and radiation protection. Art. 35b requires the investor's site assessment and a site report that the President assesses in the construction licence procedure, art. 36 requires the President's positive opinion before a zoning decision for a nuclear facility, and art. 36a offers an advance opinion on a planned location. Art. 39a sets decision periods (24 months for a construction licence), art. 39 sets application fees for nuclear power plants (PLN 5,000,000 for construction) and art. 39b offers a general opinion on planned technical solutions before an application. The amending Act of 3 July 2026 (Dz.U. 2026 poz. 1097) adds art. 36l, a separate PAA licence for preliminary construction works at a nuclear power facility. The Act does not license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "licensing_fees"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2000-11-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-prawo-atomowe-tj2026",
        "note": "Ustawa z dnia 29 listopada 2000 r."
      },
      {
        "event": "effective",
        "date": {
          "value": "2002-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-prawo-atomowe-tj2026",
        "note": "Art. 139, with exceptions for chapter 13 and art. 136 (14 days after publication) and arts. 21 ust. 2 and 27 ust. 2 (24 months after publication)."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2026-09-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-dzu-2026-1097",
        "note": "Art. 2 of the Act of 3 July 2026 (new art. 36l) in force 14 days after publication on 18 August 2026 (Art. 9), recorded by the Sejm ELI service as 2 September 2026.",
        "reader": {
          "headline": "Poland's Atomic Law amendment adds a licence for preliminary nuclear construction works",
          "what": "Amendments of 3 July 2026, published on 18 August, took effect on 2 September 2026, adding a separate licence from the National Atomic Energy Agency for preliminary construction works at a nuclear power facility.",
          "limit": "The amendment licenses no site, design or project."
        }
      }
    ],
    "effective_date": {
      "value": "2002-01-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-pl-prawo-atomowe-tj2026",
      "version": "Consolidated text announced by the Marshal of the Sejm on 7 November 2025 (Dz.U. 2026 poz. 1, published 2 January 2026), read with the amending Act of 3 July 2026 (Dz.U. 2026 poz. 1097)",
      "document_date": "2026-01-02"
    },
    "legal_definitions": [
      {
        "term": "obiekt jądrowy (nuclear facility)",
        "section": "art. 3 pkt 17",
        "paraphrase": "A nuclear power plant, research reactor, isotope enrichment plant, nuclear fuel fabrication plant, spent fuel reprocessing plant or spent fuel storage facility, and a radioactive waste storage facility directly linked to and on the site of any of them.",
        "source_id": "src-pc-pl-prawo-atomowe-tj2026",
        "note": "Legal definition used by this statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      },
      {
        "term": "elektrownia jądrowa (nuclear power plant)",
        "section": "art. 3 pkt 6f",
        "paraphrase": "A facility producing electricity or heat from nuclear fuel for purposes other than research.",
        "source_id": "src-pc-pl-prawo-atomowe-tj2026",
        "note": "Legal definition used by this statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-pl-nuclear-investments-special-act-2011",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Grants no licence or opinion to any project or design. Council of Ministers implementing regulations (for example on site assessment under art. 35b ust. 4) were not opened. The consolidated text predates the 2026 amendment, which was read separately, and changes after it were not checked.",
    "summary": "Poland's Atomic Law requires a licence to build, commission, operate or decommission a nuclear power plant or research reactor. The President of the National Atomic Energy Agency (PAA) issues the licences, assesses the site report and can give advance opinions on a location or on planned technical solutions. A 2026 amendment adds a PAA licence for preliminary construction works. It approves no site, design or project.",
    "sources": [
      "src-pc-pl-prawo-atomowe-tj2026",
      "src-pc-pl-dzu-2026-1097"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-pl-nuclear-investments-special-act-2011",
    "slug": "poland-nuclear-investments-special-act",
    "name": "Poland: Act on preparing and carrying out investments in nuclear power facilities and accompanying investments (2011 special act)",
    "short_label": "Poland nuclear investments act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "PL",
    "jurisdiction_level": "national",
    "issuing_authority": "Sejm Rzeczypospolitej Polskiej (Parliament of Poland)",
    "citation": "Ustawa z dnia 29 czerwca 2011 r. o przygotowaniu i realizacji inwestycji w zakresie obiektów energetyki jądrowej oraz inwestycji towarzyszących (Dz.U. 2011 nr 135 poz. 789); consolidated text Dz.U. 2025 poz. 1156; amended by Dz.U. 2026 poz. 1097",
    "legal_scope": "Special act setting the rules, conditions and competent authorities for preparing and building nuclear power facilities and accompanying investments (art. 1), which are public-purpose investments (art. 3). As amended in 2026, a nuclear power facility is a nuclear power plant or a listed fuel-cycle, storage or waste facility serving nuclear power, with the infrastructure needed to run it (art. 2 pkt 2). An investor first needs a decision in principle (decyzja zasadnicza) from the minister responsible for energy raw materials, decided on public-interest grounds after opinions including that of the Internal Security Agency (arts. 3a-3d), and must apply within 10 years for a location decision, which the competent voivode issues (art. 4). The voivode also issues the building permit (art. 15), and the 2026 amendment adds an earlier building permit for preliminary construction works (art. 17a). Arts. 53a-53m designate the first nuclear power plant (EJ1, up to 3,750 MWe, in Choczewo or Gniewino and Krokowa) and provide State Treasury capital support to Polskie Elektrownie Jądrowe within annual budget limits for 2025 to 2030. The Act does not override Prawo atomowe (art. 1 ust. 2). Beyond the EJ1 provisions it sites no plant and approves no SMR project or design.",
    "affects": [
      "siting",
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2011-06-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-specact-tj2025",
        "note": "Ustawa z dnia 29 czerwca 2011 r."
      },
      {
        "event": "effective",
        "date": {
          "value": "2011-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-specact-tj2025",
        "note": "Art. 63."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2026-09-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-dzu-2026-1097",
        "note": "Art. 1 of the Act of 3 July 2026 (definition, decision in principle, arts. 17a-17c) in force 14 days after publication on 18 August 2026 (Art. 9), recorded by the Sejm ELI service as 2 September 2026.",
        "reader": {
          "headline": "Poland's nuclear investments act adds an early permit for preliminary construction works",
          "what": "Amendments of 3 July 2026 to Poland's 2011 special act took effect on 2 September 2026, adding an earlier building permit for preliminary construction works at a nuclear power facility.",
          "limit": "It approves no SMR project or design."
        }
      }
    ],
    "effective_date": {
      "value": "2011-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-pl-specact-tj2025",
      "version": "Consolidated text announced on 5 August 2025 (Dz.U. 2025 poz. 1156, published 22 August 2025), read with the amending Act of 3 July 2026 (Dz.U. 2026 poz. 1097)",
      "document_date": "2025-08-22"
    },
    "legal_definitions": [
      {
        "term": "obiekt energetyki jądrowej (nuclear power facility)",
        "section": "art. 2 pkt 2 (as replaced by Dz.U. 2026 poz. 1097)",
        "paraphrase": "A nuclear power plant, or, serving nuclear power, an isotope enrichment plant, nuclear fuel fabrication plant, spent fuel reprocessing plant, spent fuel storage facility, radioactive waste storage facility, uranium or thorium ore mining and initial processing plant or radioactive waste repository, together with the infrastructure needed to run it.",
        "source_id": "src-pc-pl-dzu-2026-1097",
        "note": "Legal definition used by this statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-pl-prawo-atomowe",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Decisions in principle, location decisions and permits issued to individual investors were not reviewed and none is recorded here. The EJ1 provisions name only the first large plant. Transitional provisions of the 2026 amendment were not analysed.",
    "summary": "Poland's 2011 special act sets the permit path for nuclear power facilities. An investor needs a decision in principle from the energy raw materials minister, then a location decision and a building permit from the regional voivode. A 2026 amendment adds an early permit for preliminary construction works. The act also funds the state company building the first large plant. It approves no SMR project or design.",
    "sources": [
      "src-pc-pl-specact-tj2025",
      "src-pc-pl-dzu-2026-1097"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-pl-ppej-2026",
    "slug": "poland-nuclear-power-programme-2026",
    "name": "Poland: Polish Nuclear Power Programme, 2026 update (Council of Ministers Resolution No. 198 of 29 September 2026)",
    "short_label": "Poland nuclear power programme 2026",
    "category": "enacted_binding",
    "instrument_type": "executive_order",
    "jurisdiction": "PL",
    "jurisdiction_level": "national",
    "issuing_authority": "Rada Ministrów (Council of Ministers)",
    "citation": "Uchwała nr 198 Rady Ministrów z dnia 29 września 2026 r. w sprawie aktualizacji programu wieloletniego pod nazwą „Program polskiej energetyki jądrowej” (M.P. 2026 poz. 977)",
    "legal_scope": "Council of Ministers resolution adopting the updated multi-year Polish Nuclear Power Programme (Program PEJ), made under the development policy act and art. As a Council of Ministers resolution it is a government programme act that directs the administration; it is not a statute and creates no rights or obligations for investors. 108d of Prawo atomowe (§ 1). It sets the implementation period at 2026 to 2038 with a perspective to 2046 (§ 2), entrusts coordination to the minister responsible for energy raw materials (§ 3), repeals the 2020 programme resolution no. 141 (§ 4) and took effect the day after its publication on 6 October 2026 (§ 5). The programme's goal is to build and commission nuclear power plants of about 6 to 9 GWe in total based on proven large-scale Generation III(+) water reactors. It describes the support model for the first plant (EJ1), including debt with 100% State Treasury guarantees and a two-way contract for difference. For nuclear projects outside the programme, including SMR projects, it says the government will support them as far as public finances allow, that decisions on optional support instruments follow a case-by-case assessment, that the government follows technology neutrality without preferential conditions for chosen investors or technologies, and that a roadmap for SMRs in Poland will be prepared. Annex 3 lists state budget spending by administration bodies for 2026 to 2038. The resolution funds, licenses or sites no SMR project.",
    "affects": [
      "programme_administration",
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2026-09-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-ppej-2026",
        "note": "Uchwała nr 198 Rady Ministrów z dnia 29 września 2026 r.",
        "reader": {
          "headline": "Poland adopts its 2026 nuclear power programme update",
          "what": "Poland's Council of Ministers adopted Resolution No. 198 updating the Polish Nuclear Power Programme, which centres on large reactors and promises an SMR roadmap with case-by-case, technology-neutral support decisions.",
          "limit": "A programme resolution directs the administration; it funds, licenses or sites no SMR project."
        }
      },
      {
        "event": "published",
        "date": {
          "value": "2026-10-06",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-ppej-2026",
        "note": "Monitor Polski, Warszawa, dnia 6 października 2026 r., poz. 977.",
        "reader": {
          "headline": "Poland publishes its 2026 nuclear power programme in Monitor Polski",
          "what": "The Council of Ministers resolution updating the Polish Nuclear Power Programme was published in Monitor Polski, 2026 item 977.",
          "limit": "A programme resolution directs the administration; it funds, licenses or sites no SMR project."
        }
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-10-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-pl-ppej-2026",
        "note": "§ 5: in force the day after publication.",
        "reader": {
          "headline": "Poland's 2026 nuclear power programme takes effect",
          "what": "The resolution updating the Polish Nuclear Power Programme took effect on 7 October 2026, the day after its publication.",
          "limit": "A programme resolution directs the administration; it funds, licenses or sites no SMR project."
        }
      }
    ],
    "effective_date": {
      "value": "2026-10-07",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": {
      "date": {
        "value": "2038",
        "precision": "year",
        "basis": "planned"
      },
      "condition": "§ 2 sets the programme's implementation period at 2026–2038, with a perspective to 2046. The resolution itself states no expiry."
    },
    "operative_source": {
      "source_id": "src-pc-pl-ppej-2026",
      "version": "Monitor Polski 2026 poz. 977 (resolution and annexed programme, published 6 October 2026)",
      "document_date": "2026-10-06"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-pl-prawo-atomowe",
        "relation": "related"
      },
      {
        "policy_id": "pol-pl-nuclear-investments-special-act-2011",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The SMR roadmap the programme announces was not found or read. The programme's account of the European Commission's state-aid decision for the first large plant was not checked against that decision. No project is recorded here as eligible for or receiving support.",
    "summary": "Poland's 2026 nuclear power programme aims for about 6 to 9 GWe of large Generation III(+) reactors over 2026 to 2038 and describes state support for the first plant. For SMR and other projects outside the programme it promises case-by-case, technology-neutral decisions on optional state support and a future SMR roadmap. It funds, licenses or sites no SMR project.",
    "sources": [
      "src-pc-pl-ppej-2026"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-cz-atomic-act-263-2016",
    "slug": "czechia-atomic-act",
    "name": "Czechia: Atomic Act (Act No. 263/2016 Coll., atomový zákon)",
    "short_label": "Czechia Atomic Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "CZ",
    "jurisdiction_level": "national",
    "issuing_authority": "Parlament České republiky (Parliament of the Czech Republic)",
    "citation": "Zákon č. 263/2016 Sb., atomový zákon, of 14 July 2016; in force 1 January 2017",
    "legal_scope": "Czech framework statute on the peaceful use of nuclear energy and ionising radiation, which replaced Act No. 18/1997 Coll. from 1 January 2017. Section 9(1) requires a licence from the State Office for Nuclear Safety (Státní úřad pro jadernou bezpečnost, SÚJB) for the siting, construction, first physical start-up and first power-generation start-up of a nuclear installation with a reactor, for its operation and decommissioning phases and for modifications affecting nuclear safety. A nuclear installation includes a facility or plant comprising a nuclear reactor using a fission or other nuclear chain reaction (s. 3(2)(e)). Under s. 19(2) the Office decides within 12 months on a siting licence and within 18 months on a construction licence, and s. 208 makes the Office responsible for issuing licences. The Act does not license, site or approve any reactor, design or project. This record rests on the regulator's working, unauthorised English translation, which reflects amendments up to Act No. 261/2021 Coll. only.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2016-07-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-cz-atomic-act-263-2016-en",
        "note": "Act No. 263/2016 of Coll. of 14th July 2016."
      },
      {
        "event": "effective",
        "date": {
          "value": "2017-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-cz-atomic-act-263-2016-en",
        "note": "Effect clause: in force on 1 January 2017."
      }
    ],
    "effective_date": {
      "value": "2017-01-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-cz-atomic-act-263-2016-en",
      "version": "SÚJB working, unauthorised English translation as amended by Acts 183/2017, 403/2020 and 261/2021 Coll. (file dated 11 March 2022), not the authentic Czech text",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "nuclear installation (jaderné zařízení)",
        "section": "s. 3(2)(e)",
        "paraphrase": "Includes a facility or plant comprising a nuclear reactor using a fission or other nuclear chain reaction, spent and fresh fuel storage facilities, enrichment, fuel fabrication and reprocessing plants, and listed radioactive waste facilities (as rendered in the regulator's translation).",
        "source_id": "src-pc-cz-atomic-act-263-2016-en",
        "note": "Legal definition used by this statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-cz-sujb-decree-378-2016-siting",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "Later amendments, including Act No. 284/2021 Coll. and Act No. 83/2025 Coll. (a government amendment of the Atomic Act listed by the Chamber of Deputies), are not reflected and were not read. The authentic consolidated Czech text on e-Sbírka could not be opened. SÚJB decrees other than the siting decree were not reviewed.",
    "summary": "Czechia's Atomic Act requires a licence from the State Office for Nuclear Safety (SÚJB) for each stage of a nuclear installation with a reactor, from siting and construction through start-up, operation and decommissioning. The Office decides siting licences within 12 months and construction licences within 18 months. It approves no site, design or project.",
    "sources": [
      "src-pc-cz-atomic-act-263-2016-en",
      "src-pc-cz-sujb-en-nuclear-law",
      "src-pc-cz-sujb-atomove-pravo",
      "src-pc-cz-psp-263-amendments"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-cz-sujb-decree-378-2016-siting",
    "slug": "czechia-nuclear-installation-siting-decree",
    "name": "Czechia: SÚJB Decree No. 378/2016 Coll. on siting of a nuclear installation",
    "short_label": "Czechia nuclear siting decree",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "CZ",
    "jurisdiction_level": "national",
    "issuing_authority": "Státní úřad pro jadernou bezpečnost (SÚJB, State Office for Nuclear Safety)",
    "citation": "Vyhláška č. 378/2016 Sb., o umístění jaderného zařízení, of 7 November 2016; in force 1 January 2017",
    "legal_scope": "Regulation of the State Office for Nuclear Safety issued under s. 236 of the Atomic Act to implement its ss. 24(7) and 47(4). It lists the site characteristics to be assessed for a nuclear installation (natural phenomena such as seismicity, faults, floods and groundwater, and phenomena originating in human activity such as aircraft crashes and explosions), sets the characteristics whose occurrence prohibits siting a nuclear installation, sets the scope and method of site evaluation, and sets the content of the documentation for a siting licence (s. 1). Exclusion criteria include a seismically capable fault or other crustal movement within 5 km that could cause a safety-reducing deformation of the installation, or an associated fault on the site area (s. 6(2)) and regular flooding of the site area from extreme meteorological situations with a probability of once in 100 years or more (s. 7(2)). The decree names no site and grants no siting licence. This record rests on the regulator's working English translation of the original text.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2016-11-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-cz-decree-378-2016-en",
        "note": "Decree No. 378/2016 Coll. of 7th November 2016."
      },
      {
        "event": "effective",
        "date": {
          "value": "2017-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-cz-decree-378-2016-en",
        "note": "s. 21."
      }
    ],
    "effective_date": {
      "value": "2017-01-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-cz-decree-378-2016-en",
      "version": "SÚJB working English translation of the original 2016 text (PDF created 19 March 2017), not the authentic Czech text",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-cz-atomic-act-263-2016",
        "relation": "implements"
      }
    ],
    "applicability": [],
    "unapproved": "Read in the regulator's working translation only, and the authentic Czech text on e-Sbírka could not be opened. Laws on accelerating energy infrastructure that may cover nuclear sources were not read. No site or siting licence is recorded here.",
    "summary": "Czechia's siting decree, issued by the State Office for Nuclear Safety, sets which site characteristics must be assessed for a nuclear installation, the conditions that rule a site out, such as a capable fault or regular flooding, and the documents needed for a siting licence. It names no site and approves no project.",
    "sources": [
      "src-pc-cz-decree-378-2016-en",
      "src-pc-cz-sujb-en-nuclear-law",
      "src-pc-cz-sujb-atomove-pravo"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nl-kernenergiewet",
    "slug": "netherlands-nuclear-energy-act",
    "name": "Netherlands: Nuclear Energy Act (Kernenergiewet)",
    "short_label": "Netherlands Nuclear Energy Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "NL",
    "jurisdiction_level": "national",
    "issuing_authority": "Staten-Generaal (Act of Parliament, Kingdom of the Netherlands)",
    "citation": "Kernenergiewet, Wet van 21 februari 1963 (BWBR0002402); consolidated version in force from 1 July 2024",
    "legal_scope": "Dutch framework act on releasing nuclear energy and using radioactive substances and radiation. Article 15(b) prohibits establishing, commissioning, operating, decommissioning or modifying an installation in which nuclear energy can be released without a licence from the Authority for Nuclear Safety and Radiation Protection (Autoriteit Nucleaire Veiligheid en Stralingsbescherming, ANVS), which Article 3 establishes and which performs its tasks independently. Article 15b allows a licence to be refused only in listed interests, such as the protection of people, animals, plants and goods, state security, the security of fissile materials and installations, liability cover and international obligations, and allows refusal of a licence to establish an installation whose technology would be outdated when it starts operating. Article 15a ends the 1973 Borssele plant's licence to release nuclear energy on 31 December 2033, a provision the portal marks as repealed by an amendment that has no in-force date yet. The Act does not license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "1963-02-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-nl-kernenergiewet",
        "note": "Wet van 21 februari 1963. Article 89 leaves the in-force dates of most provisions to royal decree."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-nl-kernenergiewet",
      "version": "Consolidated text on wetten.overheid.nl in force from 1 July 2024 (consulted 29 October 2026)",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Amendments the portal flags as having no in-force date were not assessed. The Decree on nuclear installations, fissile materials and ores (Bkse) and ANVS regulations were not opened. No licence is recorded here.",
    "summary": "The Netherlands' Nuclear Energy Act prohibits building, commissioning, operating or modifying a nuclear reactor installation without a licence from the independent Authority for Nuclear Safety and Radiation Protection (ANVS). A licence can be refused only for listed interests, such as protecting people and security, or because the technology would be outdated. It approves no site, design or project.",
    "sources": [
      "src-pc-nl-kernenergiewet"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-01-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nl-bkl-nuclear-plant-locations",
    "slug": "netherlands-nuclear-power-plant-locations",
    "name": "Netherlands: Environmental Quality Decree (Besluit kwaliteit leefomgeving), nuclear power plant locations",
    "short_label": "Netherlands nuclear plant locations",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "NL",
    "jurisdiction_level": "national",
    "issuing_authority": "Government of the Netherlands (royal decree on the proposal of the Minister of Infrastructure and the Environment)",
    "citation": "Besluit kwaliteit leefomgeving, Besluit van 3 juli 2018 (BWBR0041313), arts. 5.156 and 5.158 and Annex XV part B; consolidated version in force from 1 October 2026",
    "legal_scope": "National decree setting rules that municipal environment plans must follow. Article 5.156(2) designates the locations for a nuclear power plant (kernenergiecentrale) as those listed in Annex XV part B, Borssele/Vlissingen (municipalities of Borsele and Vlissingen) and Maasvlakte I (Rotterdam), with boundaries fixed by ministerial regulation, while Article 5.156(1) excludes nuclear power plants from the general large-scale generation locations. Article 5.158 bars an environment plan covering such a location and the area within 1 km of it from allowing housing that would raise the area's population above 5,000, or other vulnerable buildings or locations except the plant itself and those the competent authority finds necessary. The decree reserves space in local plans but grants no licence or permit. A February 2026 government notice says locations for two new large plants will be fixed in a project decision under the project procedure. The decree approves no reactor, design or project.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2018-07-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-nl-bkl",
        "note": "Besluit van 3 juli 2018. Article 13.1 leaves entry into force to royal decree."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-nl-bkl",
      "version": "Consolidated text on wetten.overheid.nl in force from 1 October 2026 (consulted 29 October 2026)",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-nl-kernenergiewet",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The ministerial regulation fixing the location boundaries was not opened. The project procedure for two new large plants had produced no location decision in the notices read. Future and undated amendments flagged by the portal were not assessed.",
    "summary": "The Netherlands' Environmental Quality Decree reserves two locations for a nuclear power plant, Borssele/Vlissingen and Maasvlakte I, in municipal environment plans. Within 1 km of them, plans may not allow housing that would push the population above 5,000 or other vulnerable buildings. It grants no permit and approves no reactor or project.",
    "sources": [
      "src-pc-nl-bkl",
      "src-pc-nl-stcrt-2026-3288"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-nl-mooi-nuclear-innovation-theme",
    "slug": "netherlands-mooi-nuclear-innovation-subsidy",
    "name": "Netherlands: MOOI subsidy module, nuclear energy innovation theme (Missiegedreven Onderzoek, Ontwikkeling en Innovatie)",
    "short_label": "Netherlands MOOI nuclear subsidy",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "NL",
    "jurisdiction_level": "national",
    "issuing_authority": "Minister van Klimaat en Groene Groei (Minister of Climate and Green Growth)",
    "citation": "Regeling van de Minister van Klimaat en Groene Groei van 30 juni 2025, nr. WJZ/98809940 (Stcrt. 2025, 22357), amended by Stcrt. 2025, 43110 and Stcrt. 2026, 19339",
    "legal_scope": "Ministerial regulation adding a nuclear energy theme to the MOOI module (mission-driven research, development and innovation) of the national subsidy regulation, under the Electricity mission (theme 4, renumbered theme 5 in December 2025). Subtheme a covers innovation projects developing Generation IV reactors or small modular reactors (SMRs) of at least Generation III+, including microreactors, and subtheme b covers geological disposal of radioactive waste. A collaboration must include at least two companies that are not in the same group. Applications were open from 5 January to 12 February 2026 under a EUR 10,000,000 ceiling, which the regulation of 27 May 2026 raised to EUR 12,600,000 with retroactive effect so that all good-quality projects could be funded. Aid is justified under Article 25 of the General Block Exemption Regulation (industrial research and experimental development). The explanatory note says EUR 65,000,000 from the Climate Fund is available to 2030 for the multi-year nuclear energy innovation programme. The module licenses or sites no reactor.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2025-06-30",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-nl-stcrt-2025-22357",
        "note": "Regeling van 30 juni 2025."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-nl-stcrt-2025-22357",
        "note": "Artikel III."
      },
      {
        "event": "amended",
        "date": {
          "value": "2025-12-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-nl-stcrt-2025-43110",
        "note": "Regulation of 15 December 2025 renumbering the theme as innovation theme 5."
      },
      {
        "event": "opened",
        "date": {
          "value": "2026-01-05",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-nl-stcrt-2025-22357",
        "note": "Application window 05-01-2026 t/m 12-02-2026."
      },
      {
        "event": "milestone",
        "date": {
          "value": "2026-02-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-nl-stcrt-2025-22357",
        "note": "Application window closed."
      },
      {
        "event": "amended",
        "date": {
          "value": "2026-05-27",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-nl-stcrt-2026-19339",
        "note": "Ceiling raised to EUR 12,600,000, retroactive to 5 January 2026."
      },
      {
        "event": "awarded",
        "date": {
          "value": "2026-07-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-rijksoverheid-mooi-awards-20260702",
        "note": "Announced 2 July 2026: four projects share EUR 12.6 million, using the whole available budget; RVO assessed five applications."
      }
    ],
    "effective_date": {
      "value": "2025-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-nl-stcrt-2025-22357",
      "version": "Amending regulation of 30 June 2025 (Stcrt. 2025, 22357) as amended by Stcrt. 2025, 43110 and Stcrt. 2026, 19339; the consolidated subsidy regulation was not opened",
      "document_date": "2025-06-30"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Individual award decisions, per-project amounts and the RVO decision documents were not opened; the four awards are recorded from the government's notice of 2 July 2026. The consolidated Regeling nationale EZ-, LVVN- en KGG-subsidies and any later opening were not opened.",
    "summary": "A Dutch subsidy module for mission-driven research and innovation added a nuclear energy theme in 2025 covering Generation IV reactors, small modular reactors of at least Generation III+ and microreactors, and geological waste disposal. Collaborations could apply from 5 January to 12 February 2026 for a budget later raised to EUR 12.6 million. It licenses or sites no reactor.",
    "sources": [
      "src-pc-nl-stcrt-2025-22357",
      "src-pc-nl-stcrt-2025-43110",
      "src-pc-nl-stcrt-2026-19339",
      "src-rijksoverheid-mooi-awards-20260702"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-01-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-no-atomic-energy-act-1972-28",
    "slug": "norway-atomic-energy-act",
    "name": "Norway: Act on Atomic Energy Activities (LOV-1972-05-12-28, atomenergiloven)",
    "short_label": "Norway Atomic Energy Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "NO",
    "jurisdiction_level": "national",
    "issuing_authority": "Stortinget",
    "citation": "Lov 12. mai 1972 nr. 28 om atomenergivirksomhet (atomenergiloven), LOV-1972-05-12-28; in force 1 July 1973 (ss. 40-41 from 4 December 1974); last amended by LOV-2018-06-22-76 (from 1 January 2026) and LOV-2022-06-17-59",
    "legal_scope": "Norway's framework statute for nuclear installations. Section 4 provides that no one may build, own or operate a nuclear installation (atomanlegg) without a licence (konsesjon) from the King, that the licence applies to a specific operating site, and that a licence to build a nuclear power plant should not be granted before the Storting has consented, with the case put to the Storting once a proposed site exists and ownership is clarified. Section 7 requires the applicant to give information on the site, purpose, type and scope and a safety assessment, and allows approval of a planned site to be promised before the licence is final. Section 1 defines a nuclear reactor and a nuclear installation, which includes a reactor installation. Under section 10 the Norwegian Radiation and Nuclear Safety Authority (Direktoratet for strålevern og atomsikkerhet, DSA) is the highest technical body on safety, prepares recommendations on all licence applications and supervises compliance, and section 11 requires DSA approval before an installation starts operating. Chapter III governs nuclear third-party liability. Lovdata names the Ministry of Health and Care Services as the responsible ministry. The Act sets no procedure specific to small modular reactors, and it does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "1972-05-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-no-atomic-energy-act",
        "note": "Lovdata identifier LOV-1972-05-12-28 (Act of 12 May 1972 no. 28)."
      },
      {
        "event": "effective",
        "date": {
          "value": "1973-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-no-atomic-energy-act",
        "note": "Note 1 to s. 58: in force from 1 July 1973 under royal resolution of 25 May 1973; ss. 40-41 from 4 December 1974."
      }
    ],
    "effective_date": {
      "value": "1973-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-no-atomic-energy-act",
      "version": "Consolidated text on Lovdata, last amended by LOV-2018-06-22-76 (from 1 January 2026) and LOV-2022-06-17-59",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "atomreaktor (nuclear reactor)",
        "section": "s. 1 d",
        "paraphrase": "A device containing nuclear fuel under conditions in which a self-sustaining fission chain reaction can occur without a neutron supply from another source.",
        "source_id": "src-pc-no-atomic-energy-act",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-no-impact-assessment-regulations-2017-854",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Grants no licence and approves no site, design or project. The regulations made under the Act and any delegation decisions were not reviewed in full. The Storting members' proposal of 19 March 2026 asking for amendments to this Act is not law.",
    "summary": "Norway's Atomic Energy Act requires a licence from the King to build, own or operate a nuclear installation, tied to a specific site. A licence to build a nuclear power plant should not be granted before the Storting has consented. The Norwegian Radiation and Nuclear Safety Authority prepares recommendations on all applications and must approve start of operation. It approves no site, design or project.",
    "sources": [
      "src-pc-no-atomic-energy-act",
      "src-pc-no-lovdata-regulations-under-act"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-no-impact-assessment-regulations-2017-854",
    "slug": "norway-impact-assessment-regulations-nuclear",
    "name": "Norway: Regulations on impact assessments (FOR-2017-06-21-854), Annex I item 2 b on nuclear reactors",
    "short_label": "Norway impact assessment regulations (nuclear)",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "NO",
    "jurisdiction_level": "national",
    "issuing_authority": "King in Council (Royal Decree), on the proposal of the Ministry of Local Government and Modernisation and the Ministry of Climate and Environment",
    "citation": "Forskrift 21. juni 2017 nr. 854 om konsekvensutredninger, FOR-2017-06-21-854; in force 1 July 2017; last amended by FOR-2026-03-06-353",
    "legal_scope": "Norwegian regulations on impact assessments, issued by Royal Decree under the Planning and Building Act. Section 6 requires the plans and projects listed in Annex I always to undergo an impact assessment with a planning programme or notification, including Annex I projects handled under laws other than the Planning and Building Act, and states that Annex I names the responsible authority. Annex I item 2 b covers nuclear power plants and other nuclear reactors, including their decommissioning, except research installations whose maximum power does not exceed 1 kW continuous load. For that item Annex I lists the Ministry of Energy for nuclear power plants under the Energy Act, and the Norwegian Radiation and Nuclear Safety Authority, the Ministry of Climate and Environment and the Ministry of Health and Care Services under the Atomic Energy Act and the Pollution Control Act. The regulations set the assessment procedure that precedes siting and licensing decisions. They do not decide where a reactor may be built, grant any licence or concession, or approve any assessment programme, design or project.",
    "affects": [
      "environmental_review",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2017-06-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-no-eia-regulation-2017-854",
        "note": "Fastsatt ved kgl.res. 21. juni 2017."
      },
      {
        "event": "effective",
        "date": {
          "value": "2017-07-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-no-eia-regulation-2017-854",
        "note": "Section 38: in force 1 July 2017."
      }
    ],
    "effective_date": {
      "value": "2017-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-no-eia-regulation-2017-854",
      "version": "Consolidated text on Lovdata, last amended by FOR-2026-03-06-353",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-no-atomic-energy-act-1972-28",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Sets no site and approves no assessment programme, licence or project. Impact assessment programmes set for individual Norwegian proposals were not reviewed, and the date on which Annex I item 2 b took its current wording was not checked.",
    "summary": "Norway's impact assessment regulations require every nuclear power plant or other nuclear reactor, except research installations of up to 1 kW, to undergo an impact assessment with a notification and assessment programme. Annex I names the Ministry of Energy as responsible authority for nuclear power plants under the Energy Act, alongside the radiation authority and two ministries under other laws. It sets no site and approves no project.",
    "sources": [
      "src-pc-no-eia-regulation-2017-854"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-fi-nuclear-energy-act-990-1987",
    "slug": "finland-nuclear-energy-act-1987",
    "name": "Finland: Nuclear Energy Act (ydinenergialaki 990/1987)",
    "short_label": "Finland Nuclear Energy Act 1987",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "FI",
    "jurisdiction_level": "national",
    "issuing_authority": "Eduskunta (Parliament of Finland)",
    "citation": "Ydinenergialaki 990/1987; issued 11 December 1987; in force 1 March 1988; consolidated to amendment 590/2026 of 26 June 2026; last day in force 31 December 2026",
    "legal_scope": "Finland's Nuclear Energy Act 990/1987 in its consolidated text to amendment 590/2026. Section 11 requires a Government decision-in-principle that construction is in line with the overall good of society for a nuclear facility of considerable general significance, which includes facilities producing nuclear energy with a thermal power above 50 MW. Under section 14 the Government may make that decision only after finding that the planned host municipality has stated it is in favour of construction. Section 15 sends a positive decision to Parliament, which may overturn it or let it stand, and section 18 allows a construction licence for such a facility only after Parliament has let the decision stand. Section 16 makes the Government (valtioneuvosto) the authority that grants licences to construct, operate and decommission nuclear facilities. Section 55 gives the Radiation and Nuclear Safety Authority (Säteilyturvakeskus, STUK) supervision of the safety of nuclear energy use. Finlex lists 31 December 2026 as the last day in force, and section 474 of Nuclear Energy Act 775/2026 repeals this Act from 1 January 2027. The Act does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "1987-12-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fi-nuclear-energy-act-990-1987",
        "note": "Finlex antopäivä 11.12.1987."
      },
      {
        "event": "effective",
        "date": {
          "value": "1988-03-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fi-nuclear-energy-act-990-1987",
        "note": "Finlex voimaantulo 1.3.1988."
      }
    ],
    "effective_date": {
      "value": "1988-03-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": {
      "date": {
        "value": "2026-12-31",
        "precision": "day",
        "basis": "planned"
      },
      "condition": "Finlex lists 31 December 2026 as the last day in force. Section 474 of Nuclear Energy Act 775/2026 repeals this Act and section 473 brings Act 775/2026 into force on 1 January 2027. The repeal has not yet taken effect."
    },
    "operative_source": {
      "source_id": "src-pc-fi-nuclear-energy-act-990-1987",
      "version": "Finlex consolidated text, ELI ajantasa/2026-06-26 (to amendment 590/2026)",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-fi-nuclear-energy-act-775-2026",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Approves no site, design or project and records no decision-in-principle. The Nuclear Energy Decree, STUK regulations and the content of amending Act 590/2026 were not reviewed separately.",
    "summary": "Finland's Nuclear Energy Act of 1987, in force until 31 December 2026, requires a Government decision-in-principle, backed by the host municipality and left standing by Parliament, before a construction licence for a nuclear energy facility above 50 MW thermal. The Government grants construction and operating licences and the Radiation and Nuclear Safety Authority (STUK) supervises safety. It approves no site, design or project.",
    "sources": [
      "src-pc-fi-nuclear-energy-act-990-1987",
      "src-pc-fi-nuclear-energy-act-775-2026"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-01-08",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-fi-nuclear-energy-act-775-2026",
    "slug": "finland-nuclear-energy-act-2026",
    "name": "Finland: Nuclear Energy Act (ydinenergialaki 775/2026)",
    "short_label": "Finland Nuclear Energy Act 2026",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "FI",
    "jurisdiction_level": "national",
    "issuing_authority": "Eduskunta (Parliament of Finland)",
    "citation": "Ydinenergialaki 775/2026; issued 4 September 2026; published 7 September 2026; in force 1 January 2027 (s. 473); government proposal HE 24/2026",
    "legal_scope": "Finland's new Nuclear Energy Act 775/2026, issued 4 September 2026, enters into force on 1 January 2027 (s. 473), when section 474 repeals Act 990/1987. Section 303 requires a licence under the Act to construct and operate a nuclear facility. Section 295 makes a decision-in-principle that the project is in line with the overall good of society a precondition for a nuclear power plant, which section 5 defines as a nuclear facility producing electricity or heat by fission in a nuclear reactor. Under section 296 the Government decides that matter, but the Ministry of Economic Affairs and Employment decides it where the project's plants have a total nominal thermal power of at most 50 MW. Under section 304 the Government decides licence matters for the construction, operation and decommissioning of nuclear power plants and nuclear fuel production plants, with the Ministry of Economic Affairs and Employment acting as the licensing authority that handles those cases, and the Radiation and Nuclear Safety Authority (STUK) decides licences for nuclear technical facilities. Under section 305 a construction licence application requires, among other things, the planned host municipality's statement in favour and STUK's site-suitability statement. Chapter 8 (ss. 64-71) sets site requirements, a protective zone and an emergency planning zone, and STUK supervises compliance (s. 15). The Act is not yet in force and does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "adopted_not_yet_effective",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2026-09-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fi-nuclear-energy-act-775-2026",
        "note": "Finlex antopäivä 4.9.2026.",
        "reader": {
          "headline": "Finland issues a new Nuclear Energy Act, in force from 1 January 2027",
          "what": "Finland's Nuclear Energy Act 775/2026 was issued on 4 September 2026. From 1 January 2027 it replaces the 1987 Act and sets decisions-in-principle, Government licensing of nuclear power plants, and site and protective-zone rules.",
          "limit": "The Act is not yet in effect and approves no project."
        }
      },
      {
        "event": "published",
        "date": {
          "value": "2026-09-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fi-nuclear-energy-act-775-2026",
        "note": "Finlex julkaisupäivä 7.9.2026.",
        "reader": {
          "headline": "Finland publishes its new Nuclear Energy Act",
          "what": "The Nuclear Energy Act 775/2026 was published on 7 September 2026. It takes effect on 1 January 2027.",
          "limit": "The Act is not yet in effect and approves no project."
        }
      },
      {
        "event": "effective",
        "date": {
          "value": "2027-01-01",
          "precision": "day",
          "basis": "planned"
        },
        "source": "src-pc-fi-nuclear-energy-act-775-2026",
        "note": "Section 473: in force 1 January 2027."
      }
    ],
    "effective_date": {
      "value": "2027-01-01",
      "precision": "day",
      "basis": "planned"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-fi-nuclear-energy-act-775-2026",
      "version": "Finlex text of 775/2026 as issued (ELI ajantasa/2026-09-04)",
      "document_date": "2026-09-04"
    },
    "legal_definitions": [
      {
        "term": "ydinvoimalaitos (nuclear power plant)",
        "section": "s. 5 point 32",
        "paraphrase": "A nuclear facility whose purpose is to produce electricity or heat by fission using a nuclear reactor.",
        "source_id": "src-pc-fi-nuclear-energy-act-775-2026",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-fi-nuclear-energy-act-990-1987",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Not yet in force. Approves no site, design or project. Implementing Government decrees and STUK regulations under the Act, its transitional provisions for pending cases (ss. 475-490) and the parliamentary documents were not reviewed.",
    "summary": "Finland's new Nuclear Energy Act takes effect on 1 January 2027 and replaces the 1987 Act. A nuclear power plant needs a decision-in-principle, made by the Government or, for projects of up to 50 MW thermal in total, by the Ministry of Economic Affairs and Employment. The Government licenses nuclear power plants, STUK licenses nuclear technical facilities, and the Act adds site and protective zone rules. It approves no project.",
    "sources": [
      "src-pc-fi-nuclear-energy-act-775-2026"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-01-08",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-eu-nuclear-safety-directive-2009-71",
    "slug": "eu-nuclear-safety-directive",
    "name": "EU: Council Directive 2009/71/Euratom on the nuclear safety of nuclear installations, as amended by Directive 2014/87/Euratom",
    "short_label": "EU Nuclear Safety Directive",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "EU",
    "jurisdiction_level": "supranational",
    "issuing_authority": "Council of the European Union",
    "citation": "Council Directive 2009/71/Euratom of 25 June 2009 (OJ L 172, 2.7.2009, p. 18), as amended by Council Directive 2014/87/Euratom of 8 July 2014 (OJ L 219, 25.7.2014, p. 42); consolidated version 02009L0071-20140814",
    "legal_scope": "Council Directive 2009/71/Euratom, as amended by Directive 2014/87/Euratom, binds EU Member States to establish and maintain a national framework for the nuclear safety of every civilian nuclear installation subject to a licence (Art. 2(1)). Nuclear installations include nuclear power plants and research reactor facilities (Art. 3(1)). The national framework must provide for a system of licensing and a prohibition on operating nuclear installations without a licence (Art. 4(1)(c)) and for a competent regulatory authority that is functionally separate from bodies promoting or using nuclear energy (Art. 5). Prime responsibility for safety rests with the licence holder (Art. 6(a)). Article 8a sets a safety objective that applies to installations first licensed for construction after 14 August 2014, and Article 8c requires any licence to construct or operate a nuclear installation to rest on an appropriate site- and installation-specific assessment. Member States designate their own regulators and decide licences. The Directive does not itself license, site or approve any reactor, design or project. The consolidated text read is a documentation tool without legal effect; the authentic texts are in the Official Journal.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2009-06-25",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-nuclear-safety-directive",
        "note": "Council Directive 2009/71/Euratom of 25 June 2009."
      },
      {
        "event": "published",
        "date": {
          "value": "2009-07-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-nuclear-safety-directive",
        "note": "OJ L 172, 2.7.2009, p. 18."
      },
      {
        "event": "effective",
        "date": {
          "value": "2009-07-22",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-nuclear-safety-directive",
        "note": "Art. 11: twentieth day after publication in OJ L 172 of 2 July 2009."
      },
      {
        "event": "milestone",
        "date": {
          "value": "2011-07-22",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-nuclear-safety-directive",
        "note": "Art. 10(1): transposition deadline for the original Directive."
      },
      {
        "event": "amended",
        "date": {
          "value": "2014-07-08",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-nuclear-safety-directive",
        "note": "Amended by Council Directive 2014/87/Euratom of 8 July 2014 (OJ L 219, 25.7.2014, p. 42)."
      }
    ],
    "effective_date": {
      "value": "2009-07-22",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-eu-nuclear-safety-directive",
      "version": "Consolidated text 02009L0071-20140814 (Publications Office; documentation only)",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "nuclear installation",
        "section": "Art. 3(1)",
        "paraphrase": "A nuclear power plant, enrichment plant, nuclear fuel fabrication plant, reprocessing plant, research reactor facility or spent fuel storage facility, and radioactive waste storage on the same site directly related to them.",
        "source_id": "src-pc-eu-nuclear-safety-directive",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-eu-euratom-treaty",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Addresses Member States and grants no licence. National transposing laws, the amending Directive's own transposition deadline and Commission implementation reports were not reviewed.",
    "summary": "The EU Nuclear Safety Directive requires each Member State to keep a national framework for the safety of licensed civilian nuclear installations, including power and research reactors, with licensing, a ban on unlicensed operation and an independent regulator. Licences must rest on a site- and installation-specific assessment. National authorities decide licences. It approves no site, design or project.",
    "sources": [
      "src-pc-eu-nuclear-safety-directive"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-eu-euratom-treaty",
    "slug": "eu-euratom-treaty",
    "name": "EU: Treaty establishing the European Atomic Energy Community (Euratom Treaty), consolidated version 2016",
    "short_label": "Euratom Treaty",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "EU",
    "jurisdiction_level": "supranational",
    "issuing_authority": "Member States of the European Atomic Energy Community",
    "citation": "Consolidated version of the Treaty establishing the European Atomic Energy Community, OJ C 203, 7.6.2016, p. 1 (2016/C 203/01)",
    "legal_scope": "The Treaty establishing the European Atomic Energy Community, in the consolidated version published in OJ C 203 of 7 June 2016. Article 2 gives the Community tasks that include establishing uniform safety standards to protect workers and the public and facilitating investment. Chapter 3 provides for basic radiation protection standards (Arts 30-31). Article 37 requires each Member State to give the Commission general data on any plan for the disposal of radioactive waste so that possible contamination of another Member State can be determined, with a Commission opinion within six months. Under Articles 41 to 43, persons and undertakings in the industrial activities listed in Annex II, which includes nuclear reactors of all types and for all purposes, must communicate investment projects for new installations that meet criteria set by the Council to the Commission and the Member State at least three months before the first supplier contracts, and the Commission communicates its views to the Member State. The Treaty does not license reactors, choose sites or approve any design or project; licensing remains with national authorities.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2016-06-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-euratom-treaty",
        "note": "Consolidated version published in OJ C 203 of 7 June 2016."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-eu-euratom-treaty",
      "version": "Consolidated version, OJ C 203, 7.6.2016 (2016/C 203/01)",
      "document_date": "2016-06-07"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-eu-nuclear-safety-directive-2009-71",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Licenses no reactor, chooses no site and approves no design or project. The Council criteria for Article 41 notifications, Commission opinions under Article 37 and any Treaty change after the 2016 consolidation were not reviewed.",
    "summary": "The Euratom Treaty sets EU nuclear tasks, including uniform safety standards. Member States must give the Commission general data on any plan to dispose of radioactive waste for an opinion on cross-border contamination, and undertakings must notify the Commission of investment projects for new installations, which include nuclear reactors of all types, before first supplier contracts. It licenses no reactor and approves no project.",
    "sources": [
      "src-pc-eu-euratom-treaty"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-eu-net-zero-industry-act-2024-1735",
    "slug": "eu-net-zero-industry-act",
    "name": "EU: Net-Zero Industry Act (Regulation (EU) 2024/1735)",
    "short_label": "EU Net-Zero Industry Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "EU",
    "jurisdiction_level": "supranational",
    "issuing_authority": "European Parliament and Council of the European Union",
    "citation": "Regulation (EU) 2024/1735 of the European Parliament and of the Council of 13 June 2024 (OJ L, 2024/1735, 28.6.2024); applies from 29 June 2024",
    "legal_scope": "Regulation (EU) 2024/1735, the Net-Zero Industry Act, sets a framework of measures to scale up EU manufacturing capacity for net-zero technologies and their supply chains (Art. 1). Article 4(1) lists the net-zero technologies within its scope, including nuclear fission energy technologies with nuclear fuel cycle technologies (point (i)) and nuclear technologies not covered under the other categories (point (s)). Article 4(2) states that the list is without prejudice to a Member State's right to determine its choice between energy sources and the general structure of its energy supply. Its measures, such as Member States' recognition of net-zero strategic projects (Art. 13), apply to net-zero technology manufacturing projects, defined as planned commercial facilities, or extensions or repurposing of existing facilities, to manufacture net-zero technologies, or energy-intensive industry decarbonisation projects (Art. 3(16)), not to the construction or licensing of power reactors. It applies from 29 June 2024 and is directly applicable in all Member States (Art. 49). This record does not assess its procurement, auction, skills or regulatory sandbox provisions. It does not license, site or approve any reactor, design, factory or project.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "2024-06-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-nzia-2024-1735",
        "note": "Done at Brussels, 13 June 2024."
      },
      {
        "event": "published",
        "date": {
          "value": "2024-06-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-nzia-2024-1735",
        "note": "OJ L series 2024/1735, 28.6.2024."
      },
      {
        "event": "effective",
        "date": {
          "value": "2024-06-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-nzia-2024-1735",
        "note": "Art. 49: in force the day after publication and applies from 29 June 2024."
      }
    ],
    "effective_date": {
      "value": "2024-06-29",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-eu-nzia-2024-1735",
      "version": "Original Official Journal text of 28.6.2024; later amendments not checked",
      "document_date": "2024-06-28"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Recognises no strategic project and approves no site, design, reactor or factory. Amendments after the original Official Journal text, implementing and delegated acts and Member State strategic-project decisions were not reviewed.",
    "summary": "The EU Net-Zero Industry Act lists nuclear fission energy technologies, including fuel cycle technologies, among the net-zero technologies it covers. Its measures, such as strategic project status, apply to factories that manufacture these technologies rather than to building reactors, and it leaves each Member State free to choose its energy mix. It approves no site, design or project.",
    "sources": [
      "src-pc-eu-nzia-2024-1735"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-eu-taxonomy-nuclear-delegated-regulation-2022-1214",
    "slug": "eu-taxonomy-nuclear-delegated-regulation",
    "name": "EU: Commission Delegated Regulation (EU) 2022/1214 adding nuclear energy activities to the EU taxonomy",
    "short_label": "EU taxonomy nuclear delegated act",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "EU",
    "jurisdiction_level": "supranational",
    "issuing_authority": "European Commission",
    "citation": "Commission Delegated Regulation (EU) 2022/1214 of 9 March 2022 (OJ L 188, 15.7.2022, p. 1), amending Delegated Regulations (EU) 2021/2139 and (EU) 2021/2178; applies from 1 January 2023",
    "legal_scope": "Commission Delegated Regulation (EU) 2022/1214, adopted under the Taxonomy Regulation (EU) 2020/852, amends Delegated Regulation (EU) 2021/2139 to add nuclear energy activities to the EU taxonomy of environmentally sustainable economic activities, and amends Delegated Regulation (EU) 2021/2178 on disclosures. New Section 4.26 covers research, development, demonstration and deployment of innovative facilities licensed by Member States' authorities that produce energy from nuclear processes with minimal fuel-cycle waste. Section 4.27 covers construction and safe operation of new nuclear installations for which the construction permit has been issued by 2045 by Member States' competent authorities, producing electricity or process heat. Section 4.28 covers modification of existing plants to extend their service time, authorised by 2040. Each section sets technical screening criteria. Article 2 requires undertakings to disclose the amount and proportion of taxonomy-aligned and taxonomy-eligible activities under these sections. Article 2a, inserted into Regulation 2021/2139, requires the Commission to review the dates. It applies from 1 January 2023 (Art. 3). It is a classification and disclosure rule: it provides no funding and does not license, site or approve any reactor, design or project.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2022-03-09",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-taxonomy-2022-1214",
        "note": "Commission Delegated Regulation of 9 March 2022."
      },
      {
        "event": "published",
        "date": {
          "value": "2022-07-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-taxonomy-2022-1214",
        "note": "OJ L 188, 15.7.2022."
      },
      {
        "event": "effective",
        "date": {
          "value": "2023-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-eu-taxonomy-2022-1214",
        "note": "Art. 3: applies from 1 January 2023."
      }
    ],
    "effective_date": {
      "value": "2023-01-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-eu-taxonomy-2022-1214",
      "version": "Original Official Journal text (OJ L 188, 15.7.2022); consolidated Delegated Regulation 2021/2139 not opened",
      "document_date": "2022-03-09"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Provides no funding and classifies no specific project as aligned. The consolidated text of Delegated Regulation 2021/2139 after later amendments, and any court rulings on this act, were not reviewed.",
    "summary": "This Commission delegated act adds nuclear activities to the EU taxonomy of sustainable economic activities, covering advanced pre-commercial technologies, new nuclear plants whose construction permit is issued by 2045 and life extensions authorised by 2040, each with technical screening criteria, and requires companies to disclose them. It applies from 1 January 2023. It provides no funding and approves no project.",
    "sources": [
      "src-pc-eu-taxonomy-2022-1214"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-shanti-act-2025",
    "slug": "india-shanti-act-2025",
    "name": "India: Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Act, 2025 (No. 39 of 2025)",
    "short_label": "India SHANTI Act 2025",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "IN",
    "jurisdiction_level": "national",
    "issuing_authority": "Parliament of India",
    "citation": "The Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India Act, 2025 (No. 39 of 2025); assented 20 December 2025; Gazette of India, Extraordinary, Part II Section 1, No. 63, 21 December 2025",
    "legal_scope": "Indian statute that, once brought into force, repeals the Atomic Energy Act, 1962 and the Civil Liability for Nuclear Damage Act, 2010 (s. 91(1)). Whether any commencement notification has been issued could not be verified from the sources read. Section 3(2)(a) makes a licence from the Central Government, defined as the Department of Atomic Energy (s. 2(6)), mandatory to build, own, operate or decommission a nuclear power plant or reactor. Government departments and bodies, Government companies, other companies (excluding companies incorporated outside India), joint ventures and persons the Government permits by notification may apply (ss. 2(9), 3(1)). Facilities and activities needing a licence also need a safety authorisation from the Atomic Energy Regulatory Board where they are likely to expose individuals to radiation (s. 3(3)), granted by the Board on terms set by its regulations (s. 7(2)). Section 17(1) deems the Board constituted under s. 27 of the 1962 Act to be constituted under this Act, and s. 24 lets it frame safety codes for design, siting, construction, commissioning, operation and decommissioning. Enrichment, spent fuel management and heavy water production stay with the Central Government (s. 3(5)). Section 1(2) brings the Act into force on dates the Central Government notifies in the Official Gazette. The Act does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "adopted_not_yet_effective",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025-12-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-in-shanti-act-2025",
        "note": "Presidential assent on 20 December 2025 (Bill No. 196-F of 2025)."
      },
      {
        "event": "published",
        "date": {
          "value": "2025-12-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-in-shanti-act-2025",
        "note": "Gazette of India, Extraordinary, Part II Section 1, No. 63."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-in-shanti-act-2025",
      "version": "As published in the Gazette of India, Extraordinary, No. 63 of 21 December 2025 (copy on the Department of Atomic Energy website, listed 5 June 2026)",
      "document_date": "2025-12-21"
    },
    "legal_definitions": [
      {
        "term": "nuclear facility",
        "section": "s. 2(23)",
        "paraphrase": "Any plant, with its premises, in which source or fissile material is produced, processed, used, handled, stored or disposed of, including a nuclear power plant, research reactor and listed fuel-cycle and waste facilities, or other facilities the Central Government notifies, but not mining and ore processing.",
        "source_id": "src-pc-in-shanti-act-2025",
        "note": "Legal definition used by this Indian statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-in-draft-shanti-rules-2026",
        "relation": "implemented_by"
      },
      {
        "policy_id": "pol-in-draft-shanti-regulations-2026",
        "relation": "implemented_by"
      }
    ],
    "applicability": [],
    "unapproved": "Grants no licence or safety authorisation to any project or design. No commencement notification under s. 1(2) was found on the Department of Atomic Energy's Acts and Rules page and the Gazette portal could not be read, so whether the Act or any provision is now in force is not verified. Until commencement the Atomic Energy Act, 1962 is not repealed. India Code and the regulator's website could not be read, so the 1962 Act was not opened.",
    "summary": "India's SHANTI Act, 2025 is to replace the Atomic Energy Act, 1962 and the 2010 nuclear liability law from dates the Government appoints by notification. No commencement notification was found, so whether it is yet in force is unverified. It requires a Department of Atomic Energy licence to build, own, operate or decommission a nuclear power plant or reactor, lets Indian companies apply, and adds a regulator safety authorisation. It approves no reactor or project.",
    "sources": [
      "src-pc-in-shanti-act-2025",
      "src-pc-in-dae-acts-rules"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2026-12-01",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-draft-shanti-rules-2026",
    "slug": "india-draft-shanti-rules-2026",
    "name": "India: Draft SHANTI Rules, 2026 (Department of Atomic Energy consultation)",
    "short_label": "India draft SHANTI Rules 2026",
    "category": "proposed",
    "instrument_type": "consultation",
    "jurisdiction": "IN",
    "jurisdiction_level": "national",
    "issuing_authority": "Department of Atomic Energy (Central Government)",
    "citation": "Draft Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Rules, 2026, draft dated 14 August 2026, under s. 84(1) of Act No. 39 of 2025",
    "legal_scope": "Draft rules the Central Government proposes under s. 84(1) of the SHANTI Act, 2025, superseding several Atomic Energy rules and the 2011 nuclear liability rules. Draft rule 9(1) would require a licensee, once licensed, to obtain design approval and safety authorisations from the Atomic Energy Regulatory Board for siting, construction, commissioning, operation and decommissioning of the plant or reactor. Draft rule 9(2) sets licensing hold points to be demonstrated before construction (including ownership or possessory rights of the site and Board design approval), before receipt of fuel, before first fuel loading and before licence renewal. Draft rule 9(3) would allow civil liability obligations to be exempted under s. 44 of the Act for research reactors and other low-power reactors whose integrated power at the site and exclusion zone do not exceed a value the Central Government notifies. The rules would come into force on publication in the Official Gazette. The Department invited comments until 4 September 2026. A draft has no legal effect and licenses, exempts or approves nothing.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-08-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-in-draft-shanti-rules-2026",
        "note": "Draft dated 14 August 2026 and placed on the Department's consultation page.",
        "reader": {
          "headline": "India's atomic energy department proposes draft SHANTI Rules",
          "what": "The Department of Atomic Energy put draft SHANTI Rules dated 14 August 2026 out for comment. They would require design approval and stage-by-stage safety authorisations from the regulator.",
          "limit": "A draft has no legal effect."
        }
      },
      {
        "event": "comment_period_closed",
        "date": {
          "value": "2026-09-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-in-dae-shanti-consultation",
        "note": "Deadline for submission: 8:00 PM on 4 September 2026.",
        "reader": {
          "headline": "Comments close on India's draft SHANTI Rules",
          "what": "The comment period on the Department of Atomic Energy's draft SHANTI Rules closed on 4 September 2026.",
          "limit": "The draft rules are not in effect."
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-in-draft-shanti-rules-2026",
      "version": "Consultation draft dated 14 August 2026 (G.S.R. number not yet assigned)",
      "document_date": "2026-08-14"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-in-shanti-act-2025",
        "relation": "implements"
      },
      {
        "policy_id": "pol-in-draft-shanti-regulations-2026",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "Not adopted. Whether final rules were notified after the 4 September 2026 deadline was not checked because the Gazette portal could not be read. Grants no licence or liability exemption to any reactor or project.",
    "summary": "India's Department of Atomic Energy published draft SHANTI Rules dated 14 August 2026 for comment until 4 September 2026. They would require licensees to obtain design approval and stage-by-stage safety authorisations from the Atomic Energy Regulatory Board and to meet licence hold points before construction and fuel loading. A draft has no legal effect.",
    "sources": [
      "src-pc-in-draft-shanti-rules-2026",
      "src-pc-in-dae-shanti-consultation"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-01-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-draft-shanti-regulations-2026",
    "slug": "india-draft-shanti-regulations-2026",
    "name": "India: Draft SHANTI Regulations, 2026 (Atomic Energy Regulatory Board consultation)",
    "short_label": "India draft SHANTI Regulations 2026",
    "category": "proposed",
    "instrument_type": "consultation",
    "jurisdiction": "IN",
    "jurisdiction_level": "national",
    "issuing_authority": "Atomic Energy Regulatory Board",
    "citation": "Draft Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Regulations, 2026, draft dated 14 August 2026, under s. 85(1) of Act No. 39 of 2025",
    "legal_scope": "Draft regulations the Atomic Energy Regulatory Board proposes under s. 85(1) of the SHANTI Act, 2025. Draft regulation 8 would require a safety authorisation for each stage of a nuclear power plant or reactor's lifetime, starting from siting and continuing through construction, commissioning, operation and decommissioning. Draft regulation 9 sets the safety authorisation for siting: the licensee must demonstrate safety with regard to the plant's impact on the region, the site's impact on plant safety and the feasibility of emergency response, and submit site information including evaluation against rejection and engineerability criteria, geological, seismological, meteorological and hydrological investigations, radiological impact assessment and the establishment of exclusion and emergency planning zones. A siting authorisation would not be granted until design approval has been obtained, and a reactor proposed at an existing site with a valid siting authorisation would need only updated site information. The regulations would come into force on publication in the Official Gazette, and comments were invited until 4 September 2026. A draft has no legal effect and sites or approves nothing.",
    "affects": [
      "siting",
      "reactor_licensing"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-08-14",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-in-draft-shanti-regulations-2026",
        "note": "Draft dated 14 August 2026 and placed on the Department of Atomic Energy's consultation page.",
        "reader": {
          "headline": "India publishes draft SHANTI Regulations on nuclear siting authorisation",
          "what": "Draft SHANTI Regulations of the Atomic Energy Regulatory Board, dated 14 August 2026, were put out for comment. They would require a separate safety authorisation for siting a nuclear power plant or reactor.",
          "limit": "A draft has no legal effect."
        }
      },
      {
        "event": "comment_period_closed",
        "date": {
          "value": "2026-09-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-in-dae-shanti-consultation",
        "note": "Deadline for submission: 8:00 PM on 4 September 2026.",
        "reader": {
          "headline": "Comments close on India's draft SHANTI Regulations",
          "what": "The comment period on the draft SHANTI Regulations closed on 4 September 2026.",
          "limit": "The draft regulations are not in effect."
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-in-draft-shanti-regulations-2026",
      "version": "Consultation draft dated 14 August 2026 (G.S.R. number not yet assigned)",
      "document_date": "2026-08-14"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-in-shanti-act-2025",
        "relation": "implements"
      },
      {
        "policy_id": "pol-in-draft-shanti-rules-2026",
        "relation": "companion"
      }
    ],
    "applicability": [],
    "unapproved": "Not adopted. Whether final regulations were notified was not checked. The Board's current site evaluation codes were not read because the regulator's website did not respond. Sites or approves no reactor or project.",
    "summary": "India's Atomic Energy Regulatory Board published draft SHANTI Regulations dated 14 August 2026 for comment until 4 September 2026. They would require a separate safety authorisation for siting a nuclear power plant or reactor, granted only after design approval and based on site hazard, radiological impact and emergency-response evaluation. A draft has no legal effect.",
    "sources": [
      "src-pc-in-draft-shanti-regulations-2026",
      "src-pc-in-dae-shanti-consultation"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-01-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-nuclear-energy-mission-smr",
    "slug": "india-nuclear-energy-mission-smr",
    "name": "India: Nuclear Energy Mission for small modular reactors (Union Budget 2025-26 announcement)",
    "short_label": "India Nuclear Energy Mission",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "IN",
    "jurisdiction_level": "national",
    "issuing_authority": "Government of India",
    "citation": "Nuclear Energy Mission announced in the Union Budget 2025-26 (Rs 20,000 crore for SMRs), as described by the Press Information Bureau on 19 December 2025 and 28 August 2026",
    "legal_scope": "Government of India mission announced in the Union Budget 2025-26 that, according to the Press Information Bureau, allocates Rs 20,000 crore to the research, design, development and deployment of indigenous small modular reactors, with an aim of at least five indigenously designed SMRs operational by 2033. A budget announcement is not a statute. No scheme guidelines, sanction order or Budget text was read, and the two PIB documents are government explanatory publications rather than the Budget itself. The PIB documents describe Bhabha Atomic Research Centre SMR designs alongside the mission, but this record links no design or project to the mission's funding. The mission does not license, site or approve any reactor or project.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "milestone",
        "date": {
          "value": "2033",
          "precision": "year",
          "basis": "target"
        },
        "source": "src-pc-in-pib-shanti-backgrounder-2025",
        "note": "Government aim stated by PIB: at least five indigenously designed SMRs operational by 2033."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-in-pib-nuclear-technology-2026",
      "version": "PIB explanatory document 'Nuclear Energy Technology in India', 28 August 2026",
      "document_date": "2026-08-28"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The Union Budget 2025-26 documents could not be read because the Budget portal refused automated access, so the allocation is taken from PIB publications. No scheme guidelines, year-wise release or sanction order was found, and no award to any company or project is recorded. Bharat Small Reactors announcements were not reviewed.",
    "summary": "India's Nuclear Energy Mission, announced in the Union Budget 2025-26, allocates Rs 20,000 crore to research, design, development and deployment of indigenous small modular reactors and aims for at least five operating by 2033, according to the Press Information Bureau. A budget announcement is not a law, and no scheme guidelines were found. It approves no project.",
    "sources": [
      "src-pc-in-pib-shanti-backgrounder-2025",
      "src-pc-in-pib-nuclear-technology-2026"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-kr-nuclear-safety-act",
    "slug": "south-korea-nuclear-safety-act",
    "name": "South Korea: Nuclear Safety Act (원자력안전법)",
    "short_label": "Korea Nuclear Safety Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "KR",
    "jurisdiction_level": "national",
    "issuing_authority": "National Assembly of the Republic of Korea",
    "citation": "원자력안전법 (Nuclear Safety Act), Act No. 10911 of 25 July 2011, as last amended by Act No. 21679 of 19 May 2026",
    "legal_scope": "Korean statute on safety management in the research, development, production and use of nuclear energy (art. 1). The Nuclear Safety and Security Commission, established under art. 3 of the Act on the Establishment and Operation of the Nuclear Safety and Security Commission, is the licensing authority. Anyone intending to construct a nuclear power reactor and related facilities must obtain the Commission's construction permit, applying with a radiological environmental impact assessment, preliminary safety analysis report, quality assurance plan and decommissioning plan (art. 10(1)-(2)). Before applying, an applicant may seek the Commission's prior approval of the site, supported by an environmental report and site investigation report, and may then carry out limited works (art. 10(3)-(5)). Operating a nuclear power reactor needs a separate operating licence from the Commission (art. 20). A standard design may be approved for repeated construction, valid for ten years (art. 12), and research or educational reactors need a construction permit by type (art. 30). The amendment approved by the Cabinet on 12 May 2026 and promulgated on 19 May 2026 as Act No. 21679 adds, according to the Commission's press release, a pre-review of reactor designs before licence applications (new art. 100-2) applying from 20 November 2026, according to the government's legislative entry for the enforcement rule, with other changes from 1 January 2027. The Act does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2011-07-25",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-nsa-elaw-bilingual",
        "note": "Enacted as Act No. 10911 (신규제정 2011. 7. 25)."
      },
      {
        "event": "amended",
        "date": {
          "value": "2026-05-19",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-nsa-lawgokr",
        "note": "Partial amendment, Act No. 21679 of 19 May 2026, shown as the current version on the national law portal."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2026-11-20",
          "precision": "day",
          "basis": "planned"
        },
        "source": "src-kr-moleg-nsa-enforcement-rule-20261104",
        "note": "The government's legislative entry for the enforcement rule gives 20 November as the start date for the pre-review amendment; the Commission's May press release said November."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2027-01-01",
          "precision": "day",
          "basis": "planned"
        },
        "source": "src-pc-kr-nssc-nsa-amendment-2026",
        "note": "NSSC: periodic inspection exemption and fine provisions apply from 1 January 2027."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-kr-nsa-elaw-bilingual",
      "version": "KLRI Korean-English parallel text current to Act No. 21065 of 1 October 2025. The national law portal lists Act No. 21679 of 19 May 2026 as current, but its article text was not readable.",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "원자로 (nuclear reactor)",
        "section": "art. 2 point 8",
        "paraphrase": "A device that uses nuclear fuel material as fuel, excluding devices prescribed by Presidential Decree.",
        "source_id": "src-pc-kr-nsa-elaw-bilingual",
        "note": "Legal definition used by this Korean statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Grants no permit, site approval or standard design approval to any project or design. The text of amending Act No. 21679 was not read because the national law portal shows article text only with scripts; its content is taken from the Commission's press release of 12 May 2026. The KLRI English translation is for reference only. The Enforcement Decree and Commission rules were not read.",
    "summary": "South Korea's Nuclear Safety Act requires a Nuclear Safety and Security Commission permit to build a nuclear power reactor and a separate licence to operate it, and allows prior approval of a site and approval of a standard design for repeated construction. A 2026 amendment adds a design pre-review before licensing, which the regulator says applies from November 2026. It approves no reactor or project.",
    "sources": [
      "src-pc-kr-nsa-elaw-bilingual",
      "src-pc-kr-nsa-lawgokr",
      "src-pc-kr-nssc-nsa-amendment-2026",
      "src-kr-moleg-nsa-enforcement-rule-20261104"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "next_review": "2026-11-23",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-kr-radiological-emergency-planning-zones",
    "slug": "south-korea-radiological-emergency-planning-zones",
    "name": "South Korea: Act on Physical Protection and Radiological Emergency (원자력시설 등의 방호 및 방사능 방재 대책법), emergency planning zones",
    "short_label": "Korea radiological emergency planning zones",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "KR",
    "jurisdiction_level": "national",
    "issuing_authority": "National Assembly of the Republic of Korea",
    "citation": "원자력시설 등의 방호 및 방사능 방재 대책법 (Act on Physical Protection and Radiological Emergency), Act No. 6873 of 15 May 2003, as last amended by Act No. 20720 of 21 January 2025 (in force 1 January 2026)",
    "legal_scope": "Korean statute on physical protection of nuclear facilities and radiological emergency preparedness. Article 20-2, added on 21 May 2014, requires the Nuclear Safety and Security Commission to determine and announce, for each nuclear facility, a base area for its radiological emergency planning zone. For an electricity-generating reactor and related facilities the base area is a precautionary action zone of a 3 to 5 kilometre radius and an urgent protective action planning zone of a 20 to 30 kilometre radius from where the reactor is installed. The licensee sets the actual zone after consulting the competent Mayor or Do Governor, taking account of population distribution, road networks, topography and the effectiveness of emergency measures. It must obtain the Commission's approval to set, alter or cancel the zone and must reflect it in its radiological emergency plan. The Act does not prohibit or approve any site and does not license any reactor or project.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2003-05-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-pprea-elaw-bilingual",
        "note": "Enacted as Act No. 6873 (신규제정 2003. 5. 15)."
      },
      {
        "event": "amended",
        "date": {
          "value": "2014-05-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-pprea-elaw-bilingual",
        "note": "Article 20-2 on radiological emergency planning zones added."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2026-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-pprea-lawgokr",
        "note": "Current version, Act No. 20720 of 21 January 2025, in force 1 January 2026."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-kr-pprea-elaw-bilingual",
      "version": "KLRI Korean-English parallel text current to Act No. 20720 of 21 January 2025, which the national law portal lists as the version in force from 1 January 2026",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-kr-nuclear-safety-act",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Sets no zone for any site and approves no facility. The Enforcement Decree, the Commission's announced base areas and any special treatment of small reactors were not reviewed. The general power plant siting law (Electric Power Source Development Promotion Act) was read but has no nuclear-specific provision and is not recorded.",
    "summary": "South Korea's radiological emergency law sets base emergency planning zones around each nuclear power reactor, 3 to 5 km for precautionary action and 20 to 30 km for urgent protective action planning, which the operator refines with the regional government and must have approved by the Nuclear Safety and Security Commission. It approves no site or project.",
    "sources": [
      "src-pc-kr-pprea-elaw-bilingual",
      "src-pc-kr-pprea-lawgokr"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-kr-smr-development-promotion-act",
    "slug": "south-korea-smr-development-promotion-act",
    "name": "South Korea: Special Act on the Promotion of and Support for Small Modular Reactor Development (소형모듈원자로 개발 촉진 및 지원에 관한 특별법)",
    "short_label": "Korea SMR Special Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "KR",
    "jurisdiction_level": "national",
    "issuing_authority": "National Assembly of the Republic of Korea",
    "citation": "소형모듈원자로 개발 촉진 및 지원에 관한 특별법, Act No. 21422 of 10 March 2026 (enactment), in force 11 September 2026",
    "legal_scope": "Korean statute to promote research, development and demonstration of small modular reactors and their commercialisation. According to the Ministry of Science and ICT's announcement of 11 September 2026, the Act and its Enforcement Decree took effect that day. The Ministry must set an SMR system development basic plan every five years and annual implementation plans, and an SMR system development promotion committee, including relevant ministries and at least ten private experts, deliberates on major matters. The Act provides a basis to support companies jointly invested by private firms and public institutions, which submit establishment, operation and business plans and may receive Government support for project costs within the budget. It also allows support for SMR research associations, designation of regions with concentrated university, research and industry capacity as SMR system research and development special zones, and designation of specialist training institutions. The article text was not read because the national law portal shows it only with scripts, so this description rests on the Ministry's announcement and article numbers are not given. The Act does not license, site or approve any reactor or project.",
    "affects": [
      "project_funding",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2026-03-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-smr-act-lawgokr",
        "note": "Enactment, Act No. 21422 of 10 March 2026 (promulgation date shown on the national law portal)."
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-09-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-smr-act-lawgokr",
        "note": "In force 11 September 2026, together with its Enforcement Decree per the Ministry of Science and ICT.",
        "reader": {
          "headline": "South Korea's SMR Special Act takes effect",
          "what": "South Korea's Special Act on the Promotion of and Support for SMR Development took effect on 11 September 2026, requiring a five-year SMR development plan and a promotion committee, according to the science ministry.",
          "limit": "The Act licenses or approves no reactor or project."
        }
      }
    ],
    "effective_date": {
      "value": "2026-09-11",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-kr-smr-act-lawgokr",
      "version": "National Law Information Center record of Act No. 21422 (enacted 10 March 2026, in force 11 September 2026); article text not readable without scripts",
      "document_date": "2026-03-10"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-kr-ismr-technology-development-programme",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "No basic plan, special zone designation, support decision or company under the Act was reviewed, and no project's eligibility is implied. The Act's article text and the Enforcement Decree were not read.",
    "summary": "South Korea's SMR Special Act, in force since 11 September 2026, requires a five-year SMR development basic plan, sets up an SMR development promotion committee that includes relevant ministries and at least ten private experts, and allows Government support for joint public-private SMR companies, research associations, research and development special zones and training institutions. It licenses or approves no reactor or project.",
    "sources": [
      "src-pc-kr-smr-act-lawgokr",
      "src-pc-kr-smr-act-msit-news-2026"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-kr-ismr-technology-development-programme",
    "slug": "south-korea-ismr-technology-development-programme",
    "name": "South Korea: Innovative SMR (i-SMR) Technology Development Programme (혁신형 소형모듈원자로 기술개발사업)",
    "short_label": "Korea i-SMR development programme",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "KR",
    "jurisdiction_level": "national",
    "issuing_authority": "Ministry of Science and ICT and Ministry of Trade, Industry and Energy",
    "citation": "혁신형 소형모듈원자로(i-SMR) 기술개발 사업 (preliminary feasibility study passed, announced 1 June 2022); 혁신형 소형모듈원자로 기술개발사업 공동운영관리규정 (MSIT Directive No. 227 and MOTIE Directive No. 246, 30 January 2023)",
    "legal_scope": "Joint research and development programme of the Ministry of Science and ICT and the Ministry of Trade, Industry and Energy for an innovative small modular reactor (i-SMR), which the ministries describe as a reactor of 300 MW or less with modular construction. The ministries announced on 1 June 2022 that the programme had passed the preliminary feasibility study, with a total budget of 399.2 billion won planned from the following year to 2028 for innovative technology development and standard design, and standard design approval expected in 2028. A joint operation and management directive for the programme (MSIT Directive No. 227 and MOTIE Directive No. 246) took effect on 30 January 2023. The programme funds technology development and design work. It does not license, site or approve any reactor or project, and standard design approval is a separate decision of the Nuclear Safety and Security Commission.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "milestone",
        "date": {
          "value": "2022-06-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-ismr-msit-motie-news-2022",
        "note": "MSIT and MOTIE announced that the programme passed the preliminary feasibility study."
      },
      {
        "event": "effective",
        "date": {
          "value": "2023-01-30",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-kr-ismr-joint-directive-lawgokr",
        "note": "Joint operation and management directive in force (MSIT Directive No. 227, MOTIE Directive No. 246)."
      }
    ],
    "effective_date": {
      "value": "2023-01-30",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": {
      "date": {
        "value": "2028",
        "precision": "year",
        "basis": "planned"
      },
      "condition": "The ministries said the budget runs to 2028. Whether the programme period or budget changed later was not checked."
    },
    "operative_source": {
      "source_id": "src-pc-kr-ismr-msit-motie-news-2022",
      "version": "Korea.kr policy news of 2 June 2022 on the joint MSIT and MOTIE announcement",
      "document_date": "2022-06-02"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-kr-smr-development-promotion-act",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "The directive's article text was not readable and the version shown is the original of 30 January 2023, so later amendments, yearly budgets and the programme's current status were not checked. No award to any company or project is recorded, and the Commission's design review is not an approval.",
    "summary": "South Korea's science and industry ministries run a joint programme to develop an innovative small modular reactor, the i-SMR, with 399.2 billion won planned from 2023 to 2028 for technology development and standard design, aiming for standard design approval in 2028. It funds development work and approves no reactor or project.",
    "sources": [
      "src-pc-kr-ismr-msit-motie-news-2022",
      "src-pc-kr-ismr-joint-directive-lawgokr"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-fr-environment-code-inb-regime",
    "slug": "france-environment-code-inb-regime",
    "name": "France: Basic nuclear installation (INB) regime, Code de l'environnement, livre V, titre IX",
    "short_label": "France INB licensing regime",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "FR",
    "jurisdiction_level": "national",
    "issuing_authority": "Parlement (legislative part) and Gouvernement (regulatory part), codified in the Code de l'environnement",
    "citation": "Code de l'environnement, livre V, titre IX, chapitres III, V et VI (articles L. 593-1 et suivants and the corresponding regulatory part), régime des installations nucléaires de base",
    "legal_scope": "French legislative and regulatory regime for basic nuclear installations (INB), which include nuclear reactors. According to the Autorité de sûreté nucléaire et de radioprotection (ASNR), chapters III, V and VI of title IX of book V of the Environment Code found the authorisation and control regime, renovated by Law 2006-686 of 13 June 2006 and codified in the Code. An intending operator may first ask the ASNR for an opinion on its safety options. The creation authorisation application is filed with the minister responsible for nuclear safety and examined by the ASNR, and under article L. 593-8 the authorisation can be granted only after a public inquiry. Creation is authorised by decree of the Prime Minister countersigned by the minister responsible for nuclear safety, after the ASNR's opinion, and the decree sets the installation's perimeter and characteristics. The ASNR then sets technical prescriptions and authorises commissioning after checking the installation against chapter III. A building permit from the prefect and, for some new sites, a public debate also apply. The ASNR, formed from the ASN and IRSN, started on 1 January 2025. The regime does not itself authorise any reactor, design or project.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2006-06-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fr-asnr-regime-inb",
        "note": "Law 2006-686 of 13 June 2006 on transparency and security in nuclear matters renovated the INB regime, later codified in the Environment Code."
      },
      {
        "event": "milestone",
        "date": {
          "value": "2025-01-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fr-asnr-regime-inb",
        "note": "The ASNR, created by the law of 21 May 2024 from the ASN and IRSN, started on 1 January 2025."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-fr-asnr-regime-inb",
      "version": "ASNR explanatory page 'Le régime juridique des installations nucléaires de base', last updated 16 December 2025 (the Code text itself was not read)",
      "document_date": "2025-12-16"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-fr-law-2023-491-new-reactors-existing-sites",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Authorises no installation. The Environment Code articles were not read in their own text because Legifrance refused automated access, so this record rests on the regulator's explanatory page. Amendments after 16 December 2025, including any made for small reactors, were not checked.",
    "summary": "France licenses nuclear reactors as basic nuclear installations under the Environment Code. Creation is authorised by a Prime Minister's decree after a public inquiry and examination by the nuclear safety and radiation protection authority (ASNR), which then sets technical prescriptions and authorises commissioning. It approves no reactor or project.",
    "sources": [
      "src-pc-fr-asnr-regime-inb"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-fr-law-2023-491-new-reactors-existing-sites",
    "slug": "france-law-2023-491-nuclear-acceleration",
    "name": "France: Loi n° 2023-491 du 22 juin 2023 (accélération des procédures nucléaires près des sites existants)",
    "short_label": "France nuclear acceleration law 2023",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "FR",
    "jurisdiction_level": "national",
    "issuing_authority": "Parlement",
    "citation": "Loi n° 2023-491 du 22 juin 2023 relative à l'accélération des procédures liées à la construction de nouvelles installations nucléaires à proximité de sites nucléaires existants et au fonctionnement des installations existantes (JO n° 144 du 23 juin 2023)",
    "legal_scope": "French statute whose title II speeds up procedures for building power reactors, including small modular reactors, sited in the immediate vicinity of or inside the perimeter of an existing basic nuclear installation, where the creation authorisation application is filed within twenty years of promulgation (art. 7 II). The Conseil d'État decree under art. 18 defines immediate vicinity, which cannot exceed the initial perimeter of the existing installation's off-site emergency plan (art. 7 VI). For such reactors, general-interest project status is decided by Conseil d'État decree after the public debate or consultation (art. 8), works are exempt from planning formalities with conformity checked during the environmental or creation authorisation (art. 9), and the environmental authorisation is granted by decree and allows other works before the creation authorisation, while buildings to receive nuclear fuel or house safeguard equipment wait for it (art. 11). Reactors meeting decree conditions are deemed of imperative overriding public interest (art. 12). Title I repeals Energy Code article L. 311-5-5 and point 5 of article L. 100-4 I and makes the creation authorisation stand in for the electricity operating authorisation (arts. 1-2). The Constitutional Council's decision 2023-851 DC of 21 June 2023 struck out several provisions before promulgation, including articles 3, 4 and 17, paragraph III of article 9 and provisions of articles 26, 27 and 29, which the Senate's table marks as declared non-conforming. The law sites, licenses or approves no reactor or project.",
    "affects": [
      "siting",
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2023-06-22",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fr-senat-loi-2023-491-promulguee",
        "note": "Loi n° 2023-491 du 22 juin 2023, after Constitutional Council decision 2023-851 DC of 21 June 2023."
      },
      {
        "event": "published",
        "date": {
          "value": "2023-06-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fr-senat-dossier-pjl22-100",
        "note": "Journal officiel n° 144 du 23 juin 2023."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-fr-senat-loi-2023-491-promulguee",
      "version": "Promulgated text ('Texte promulgué' column) in the Senate's historical comparative table for bill pjl22-100; not consolidated, later amendments not verified",
      "document_date": "2023-06-22"
    },
    "legal_definitions": [
      {
        "term": "réalisation d'un réacteur électronucléaire",
        "section": "art. 7 I",
        "paraphrase": "For title II, all constructions, developments, equipment, installations and works linked to a power reactor's creation or commissioning, its connection works to the transmission grid, and installations directly linked to preparing those works.",
        "source_id": "src-pc-fr-senat-loi-2023-491-promulguee",
        "note": "Legal definition used by this French statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-fr-environment-code-inb-regime",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Approves no project and fixes no immediate-vicinity perimeter for any site. The implementing Conseil d'État decree under art. 18, any order under art. 7 III, the decree conditions under art. 12 and amendments after promulgation were not read because Legifrance refused automated access. The content of the repealed Energy Code provisions was not read.",
    "summary": "France's 2023 nuclear acceleration law simplifies planning, environmental and land procedures for new power reactors, including small modular reactors, built next to or inside existing nuclear sites when the creation authorisation is sought within twenty years. Buildings that will hold nuclear fuel still wait for the creation authorisation. It approves no reactor or project.",
    "sources": [
      "src-pc-fr-senat-loi-2023-491-promulguee",
      "src-pc-fr-senat-dossier-pjl22-100"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-fr-france-2030-innovative-reactors-call",
    "slug": "france-2030-innovative-nuclear-reactors-call",
    "name": "France: France 2030 call for projects « Réacteurs nucléaires innovants » (first call)",
    "short_label": "France 2030 innovative reactors call",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "FR",
    "jurisdiction_level": "national",
    "issuing_authority": "Gouvernement (France 2030), operated by Bpifrance",
    "citation": "France 2030, appel à projets « Réacteurs nucléaires innovants », first call open until 28 June 2023 (communiqué of 9 March 2022; DGE announcements of 29 November 2023 and 21 March 2024)",
    "legal_scope": "France 2030 call-for-projects programme, endowed with 500 million euros according to the Government's communiqué of 9 March 2022, to support new complete concepts of innovative fission and fusion reactors, with several calls planned for projects at different maturity stages. The Directorate General for Enterprise says the first call was launched on 2 March 2022, operated by Bpifrance with support from the CEA, and closed on 28 June 2023, within the nuclear strand of France 2030 for which about 1 billion euros is planned. The first eight laureates were supported with 102.21 million euros of State funding, and three more announced on 21 March 2024 received 27.8 million euros and closed the examination of applications, for eleven laureates in all. The CEA provides technical support. The call text (cahier des charges) was not read. The programme funds development work and does not license, site or approve any reactor or project.",
    "affects": [
      "project_funding"
    ],
    "status": "completed",
    "lifecycle": [
      {
        "event": "opened",
        "date": {
          "value": "2022-03",
          "precision": "month",
          "basis": "actual"
        },
        "source": "src-pc-fr-dge-rni-laureats-2023",
        "note": "DGE gives 2 March 2022 as the launch; the Government communiqué dated 9 March 2022 says the first call is open that day."
      },
      {
        "event": "milestone",
        "date": {
          "value": "2023-06-28",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fr-dge-rni-laureats-2023",
        "note": "First call closed."
      },
      {
        "event": "completed",
        "date": {
          "value": "2024-03-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-fr-dge-rni-laureats-2024",
        "note": "Last three laureates announced, closing the examination of applications to the first call."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-fr-dge-rni-laureats-2024",
      "version": "DGE news page published 21 March 2024",
      "document_date": "2024-03-21"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The call terms on Bpifrance and any later call under the 500 million euro programme were not read (Bpifrance and economie.gouv.fr refused automated access on 18 October), so whether further calls opened is not verified. The DGE pages name eleven laureate companies; none is recorded here as an award, and none is linked to an SMRMap project.",
    "summary": "France 2030's first call for innovative nuclear reactor projects, part of a 500 million euro programme for new fission and fusion reactor concepts, ran from March 2022 to 28 June 2023 and ended in March 2024 with eleven laureates receiving State support. It funds development work and approves no reactor or project.",
    "sources": [
      "src-pc-fr-dge-rni-laureats-2024",
      "src-pc-fr-dge-rni-laureats-2023",
      "src-pc-fr-gouv-f2030-rni-2022"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-id-nuclear-energy-act-10-1997",
    "slug": "indonesia-nuclear-energy-law-10-1997",
    "name": "Indonesia: Law No. 10 of 1997 on Nuclear Energy (Undang-Undang Nomor 10 Tahun 1997 tentang Ketenaganukliran)",
    "short_label": "Indonesia Nuclear Energy Law 10/1997",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "ID",
    "jurisdiction_level": "national",
    "issuing_authority": "President of the Republic of Indonesia and Dewan Perwakilan Rakyat",
    "citation": "Undang-Undang Republik Indonesia Nomor 10 Tahun 1997 tentang Ketenaganukliran; signed and promulgated 10 April 1997 (Lembaran Negara 1997 No. 23); in force on promulgation; provisions including Articles 4 and 17 amended by Article 43 of Undang-Undang Nomor 11 Tahun 2020 tentang Cipta Kerja",
    "legal_scope": "Indonesia's framework statute on nuclear energy. Article 4 (restated in 2020) has the central government form a regulatory body (Badan Pengawas, BAPETEN) under and directly responsible to the President to supervise all uses of nuclear energy through regulation, licensing and inspection (also Article 14). Article 13 assigns construction, operation and decommissioning of non-commercial reactors to the implementing agency and of commercial reactors to state-owned enterprises, cooperatives and/or private companies, and provides that construction of a commercial reactor in the form of a nuclear power plant is determined by the Government after consulting the House of Representatives (DPR). Article 17, as amended by Article 43 of Law No. 11 of 2020 on Job Creation, requires business licensing (Perizinan Berusaha) from the central government for building and operating nuclear reactors and other nuclear installations and for reactor decommissioning, with conditions and procedures set by government regulation; inserted Article 2A gives the central government power to grant nuclear business licences. The BAPETEN portal marks the 2020 Law as amended; that later instrument was not opened. The statute does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "signed",
        "date": {
          "value": "1997-04-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-uu-10-1997",
        "note": "Disahkan di Jakarta pada tanggal 10 April 1997."
      },
      {
        "event": "effective",
        "date": {
          "value": "1997-04-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-uu-10-1997",
        "note": "Article 48: in force on promulgation; promulgated 10 April 1997."
      },
      {
        "event": "amended",
        "date": {
          "value": "2020-11-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-uu-11-2020",
        "note": "Article 43 of Law No. 11 of 2020 on Job Creation, signed and promulgated 2 November 2020, in force on promulgation (Article 186)."
      }
    ],
    "effective_date": {
      "value": "1997-04-10",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-id-uu-10-1997",
      "version": "Original 1997 text on the BAPETEN legal portal (JDIH), read with the 2020 amendments in Article 43 of Law No. 11 of 2020 on the same portal; the portal offers no consolidated text",
      "document_date": "1997-04-10"
    },
    "legal_definitions": [
      {
        "term": "reaktor nuklir (nuclear reactor)",
        "section": "Article 1 point 13",
        "paraphrase": "A device or installation run on nuclear fuel that can produce a controlled nuclear chain reaction and is used for power generation, research and/or radioisotope production.",
        "source_id": "src-pc-id-uu-10-1997",
        "note": "Legal definition used by this Indonesian statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Grants no licence and determines no nuclear power plant. The BAPETEN portal marks the 2020 Job Creation Law as amended without naming the amending instrument in the pages read; that instrument and Government Regulation No. 28 of 2025 on risk-based business licensing (listed on the portal) were not opened, so the wording of the amended articles is verified only as of the 2020 text.",
    "summary": "Indonesia's 1997 Nuclear Energy Law makes BAPETEN, under the President, the body that regulates, licenses and inspects nuclear energy use. Since 2020, building, operating or decommissioning a reactor needs a central government business licence. A commercial nuclear power plant is determined by the Government after consulting parliament. The 2020 amending law is itself marked as amended and no consolidated text was read. It approves no project.",
    "sources": [
      "src-pc-id-uu-10-1997",
      "src-pc-id-uu-11-2020"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-id-nuclear-installation-licensing-pp-2-2014",
    "slug": "indonesia-nuclear-installation-licensing-regulation-2-2014",
    "name": "Indonesia: Government Regulation No. 2 of 2014 on Licensing of Nuclear Installations and Use of Nuclear Material (Peraturan Pemerintah Nomor 2 Tahun 2014)",
    "short_label": "Indonesia nuclear installation licensing regulation (PP 2/2014)",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "ID",
    "jurisdiction_level": "national",
    "issuing_authority": "President of the Republic of Indonesia",
    "citation": "Peraturan Pemerintah Republik Indonesia Nomor 2 Tahun 2014 tentang Perizinan Instalasi Nuklir dan Pemanfaatan Bahan Nuklir; enacted and promulgated 16 January 2014 (Lembaran Negara 2014 No. 8); in force on promulgation",
    "legal_scope": "Government regulation implementing Law No. 10 of 1997 on licensing of nuclear installations. Article 3 divides nuclear reactors into power and non-power reactors, each commercial or non-commercial. Article 4 requires a licence for construction, operation and decommissioning of a nuclear reactor: the construction licence covers a site licence (izin Tapak) and a construction licence, and the operation licence covers a commissioning licence and an operating licence. Article 5 assigns non-commercial reactors to BATAN and commercial reactors to state-owned enterprises, cooperatives and/or incorporated companies, and provides that construction of a commercial power reactor as a nuclear power plant is determined by the minister responsible for electricity after consulting the House of Representatives. Applications go in writing to the Head of BAPETEN (Article 6). Site evaluation may begin only after the Head of BAPETEN approves it (Article 15), and the Head of BAPETEN issues the site licence when the technical assessment is met (Article 19). Article 133 revoked Government Regulation No. 43 of 2006 on reactor licensing. It does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2014-01-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-pp-2-2014",
        "note": "Ditetapkan di Jakarta pada tanggal 16 Januari 2014."
      },
      {
        "event": "effective",
        "date": {
          "value": "2014-01-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-pp-2-2014",
        "note": "Article 134: in force on promulgation; promulgated 16 January 2014."
      }
    ],
    "effective_date": {
      "value": "2014-01-16",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-id-pp-2-2014",
      "version": "Certified copy (salinan) of the 2014 text on the BAPETEN legal portal, status 'Baru'; no consolidated text offered",
      "document_date": "2014-01-16"
    },
    "legal_definitions": [
      {
        "term": "Reaktor Nuklir (nuclear reactor)",
        "section": "Article 1 point 2",
        "paraphrase": "A device or installation run on nuclear fuel that can produce a controlled nuclear chain reaction and is used for power generation, research and/or radioisotope production.",
        "source_id": "src-pc-id-pp-2-2014",
        "note": "Legal definition used by this Indonesian regulation only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Grants no licence. Whether Government Regulation No. 28 of 2025 on risk-based business licensing, listed on the BAPETEN portal, changes these procedures was not assessed. BAPETEN implementing regulations other than the 2018 site-evaluation regulation were not opened.",
    "summary": "Indonesia's 2014 Government Regulation on nuclear installation licensing sets the reactor licence sequence of site licence, construction licence, commissioning licence and operating licence, plus decommissioning. Applications go to the Head of BAPETEN, who issues each licence. A commercial nuclear power plant is determined by the electricity minister after consulting parliament. It approves no site, design or project.",
    "sources": [
      "src-pc-id-pp-2-2014"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-id-bapeten-site-evaluation-reg-4-2018",
    "slug": "indonesia-bapeten-site-evaluation-regulation-4-2018",
    "name": "Indonesia: BAPETEN Regulation No. 4 of 2018 on Safety Provisions for Site Evaluation of Nuclear Installations",
    "short_label": "Indonesia BAPETEN site evaluation regulation 4/2018",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "ID",
    "jurisdiction_level": "national",
    "issuing_authority": "Badan Pengawas Tenaga Nuklir (BAPETEN)",
    "citation": "Peraturan Badan Pengawas Tenaga Nuklir Nomor 4 Tahun 2018 tentang Ketentuan Keselamatan Evaluasi Tapak Instalasi Nuklir; enacted 23 July 2018; promulgated 8 August 2018; in force on promulgation",
    "legal_scope": "BAPETEN regulation setting the technical requirements for obtaining BAPETEN approval of a site evaluation, carrying out the site evaluation and monitoring the site of a nuclear installation (Article 2), applied through a graded approach depending on the installation's radiological hazard (Article 3). The site evaluation applicant may start only after the Head of BAPETEN approves the site evaluation, applying with a site evaluation programme and a management system (Article 4). It sets evaluation requirements for external hazards, including volcanic hazards: a site is declared unsuitable where the area within 5 km is a disaster-prone zone that does not meet the conditions set by the national geology authority (Article 20(5)), or where a required geotechnical engineering solution is not implemented or does not meet safety requirements (Article 28(2)). It revoked the 1999 reactor siting guideline decree and BAPETEN Head Regulation No. 5 of 2007 (Article 56). It does not itself approve any site, design or project.",
    "affects": [
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2018-07-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-perba-4-2018",
        "note": "Ditetapkan di Jakarta pada tanggal 23 Juli 2018."
      },
      {
        "event": "effective",
        "date": {
          "value": "2018-08-08",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-perba-4-2018",
        "note": "Article 57: in force on promulgation; promulgated 8 August 2018."
      }
    ],
    "effective_date": {
      "value": "2018-08-08",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-id-perba-4-2018",
      "version": "Certified copy (salinan) on the BAPETEN legal portal, status 'Baru'",
      "document_date": "2018-08-08"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Approves no site. BAPETEN's separate aspect-specific site evaluation regulations (seismic, volcanic, meteorology and hydrology, dispersion, human-induced external events) listed on the same portal were not opened.",
    "summary": "Indonesia's 2018 BAPETEN regulation on site evaluation sets the technical rules a nuclear installation developer must follow to get BAPETEN approval to evaluate a site, carry out the evaluation and monitor the site. It lists hazards to assess and cases where a site is declared unsuitable, such as an unacceptable volcanic hazard zone within 5 km. It approves no site, design or project.",
    "sources": [
      "src-pc-id-perba-4-2018"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-id-national-energy-policy-pp-40-2025",
    "slug": "indonesia-national-energy-policy-regulation-40-2025",
    "name": "Indonesia: Government Regulation No. 40 of 2025 on National Energy Policy (Peraturan Pemerintah Nomor 40 Tahun 2025 tentang Kebijakan Energi Nasional)",
    "short_label": "Indonesia National Energy Policy (PP 40/2025)",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "ID",
    "jurisdiction_level": "national",
    "issuing_authority": "President of the Republic of Indonesia",
    "citation": "Peraturan Pemerintah Republik Indonesia Nomor 40 Tahun 2025 tentang Kebijakan Energi Nasional; enacted and promulgated 15 September 2025; in force on promulgation",
    "legal_scope": "National energy policy regulation. Article 12 sets primary energy mix ranges and directs maximising the role of nuclear energy as long as its economics are met, from 0.4% to 0.5% of primary energy in 2032 to 11.7% to 12.1% in 2060. Article 55 directs nuclear development to electricity generation and/or heat for co-generation, requires nuclear power plants to meet safety, security, safeguards, fuel supply assurance and radioactive waste requirements, sets minimum siting considerations (safe from geological hazards, not densely populated, not a food-producing area), requires approval by the nuclear regulatory body for construction and operation, bases construction and operation on the recommendation of a nuclear energy programme implementing organisation, and leaves nuclear co-generation and that organisation to presidential regulations. Article 92 revokes the 2014 national energy policy (cited in the text as No. 79 of 2014). It provides no funding, licence, site or approval for any reactor, design or project.",
    "affects": [
      "programme_administration",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2025-09-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-pp-40-2025",
        "note": "Ditetapkan di Jakarta, pada tanggal 15 September 2025."
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-09-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-id-pp-40-2025",
        "note": "Article 93: in force on promulgation; promulgated 15 September 2025."
      }
    ],
    "effective_date": {
      "value": "2025-09-15",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-id-pp-40-2025",
      "version": "Certified copy (salinan) on the Ministry of Energy and Mineral Resources legal portal (JDIH ESDM)",
      "document_date": "2025-09-15"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Provides no funding and approves no project or site. The presidential regulations on nuclear co-generation and the nuclear energy programme implementing organisation (Article 55(9)-(10)) and the national electricity supply plan were not reviewed.",
    "summary": "Indonesia's 2025 National Energy Policy regulation aims to maximise nuclear energy where economic, from 0.4 to 0.5 percent of primary energy in 2032 to 11.7 to 12.1 percent in 2060. It sets minimum siting considerations for nuclear plants, requires regulator approval to build and operate them and calls for a nuclear programme implementing organisation. It funds and approves no project.",
    "sources": [
      "src-pc-id-pp-40-2025"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ar-national-nuclear-activity-law-24804",
    "slug": "argentina-national-nuclear-activity-law-24804",
    "name": "Argentina: Law 24.804, National Nuclear Activity Law (Ley Nacional de la Actividad Nuclear)",
    "short_label": "Argentina Nuclear Activity Law 24.804",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "AR",
    "jurisdiction_level": "national",
    "issuing_authority": "Honorable Congreso de la Nación Argentina",
    "citation": "Ley 24.804, Ley Nacional de la Actividad Nuclear; sanctioned 2 April 1997; partially promulgated by Decree 358/97 of 23 April 1997 (Article 40 and part of Article 2 observed); published in Boletín Oficial No. 28634 on 25 April 1997; Article 34 repealed by Article 61 of Law 26.784 (B.O. 5 November 2012); in force from publication (Article 41)",
    "legal_scope": "Argentina's framework statute on nuclear activity. The national state sets nuclear policy and carries out research and development, regulation and oversight through the National Atomic Energy Commission (CNEA) and the Nuclear Regulatory Authority (ARN) (Article 1). CNEA's functions include developing, building and operating experimental nuclear reactors (Article 2(i)). ARN, an autarkic entity under the Presidency (Article 14), regulates and oversees nuclear activity on radiological and nuclear safety, physical protection, licensing and oversight of nuclear installations and safeguards (Article 7), and grants, suspends and revokes construction, commissioning, operating and decommissioning licences for nuclear power plants and licences for research reactor safety (Article 16(b)-(c)). Anyone carrying out a nuclear activity must follow ARN regulations and obtain the licence, permit or authorisation (Article 9). Regulation and oversight are under national jurisdiction (Article 10), and any new site for a relevant nuclear installation needs an ARN construction licence authorising its location, with the approval of the province where it is to be installed (Article 11). It does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "1997-04-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ar-ley-24804-resumen",
        "note": "Sanción 02-04-1997."
      },
      {
        "event": "signed",
        "date": {
          "value": "1997-04-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ar-ley-24804-actualizado",
        "note": "Promulgated partially by Decree 358/97 of 23 April 1997, which observed Article 40 (domestic nuclear fuel requirement) and the words 'under the Presidency of the Nation' in Article 2."
      },
      {
        "event": "published",
        "date": {
          "value": "1997-04-25",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ar-ley-24804-resumen",
        "note": "Boletín Oficial No. 28634, page 1."
      },
      {
        "event": "effective",
        "date": {
          "value": "1997-04-25",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ar-ley-24804-actualizado",
        "note": "Article 41: in force from publication in the Boletín Oficial, 25 April 1997."
      }
    ],
    "effective_date": {
      "value": "1997-04-25",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-ar-ley-24804-actualizado",
      "version": "Texto actualizado on Argentina.gob.ar normativa (no revision date shown), showing Article 34 repealed by Law 26.784",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "instalación nuclear relevante (relevant nuclear installation)",
        "section": "Article 30(d)",
        "paraphrase": "Includes a nuclear reactor, a critical facility, a relevant radioactive facility and a relevant accelerator, under definitions set or to be set by the Nuclear Regulatory Authority.",
        "source_id": "src-pc-ar-ley-24804-actualizado",
        "note": "Legal definition used by this Argentine statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Grants no licence and approves no site. The implementing decree, ARN regulatory standards and the 417 later norms the portal links as modifying or complementing the Law (recent ones mostly ARN resolutions) were not reviewed individually.",
    "summary": "Argentina's 1997 National Nuclear Activity Law makes the Nuclear Regulatory Authority (ARN) the regulator that grants construction, commissioning, operating and decommissioning licences for nuclear power plants and safety licences for research reactors. Any new site for a relevant nuclear installation needs a construction licence authorising its location, granted by ARN with the approval of the province where it is to be installed. It approves no site, design or project.",
    "sources": [
      "src-pc-ar-ley-24804-actualizado",
      "src-pc-ar-ley-24804-resumen"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ar-science-technology-guidelines-2025-2027",
    "slug": "argentina-science-technology-guidelines-2025-2027",
    "name": "Argentina: Strategic Guidelines on Innovation, Science and Technology 2025-2027 (Resolución 282/2025)",
    "short_label": "Argentina science and technology guidelines 2025-2027",
    "category": "regulatory_guidance",
    "instrument_type": "regulatory_guidance",
    "jurisdiction": "AR",
    "jurisdiction_level": "national",
    "issuing_authority": "Jefatura de Gabinete de Ministros, Secretaría de Innovación, Ciencia y Tecnología",
    "citation": "Resolución 282/2025 (Jefatura de Gabinete de Ministros, Secretaría de Innovación, Ciencia y Tecnología), Lineamientos Estratégicos en Innovación, Ciencia y Tecnología 2025-2027; dated 30 October 2025; published in Boletín Oficial No. 35782 on 31 October 2025, page 81",
    "legal_scope": "Annex I sets the Strategic Guidelines on Innovation, Science and Technology for 2025-2027 to guide implementation of the National Science, Technology and Innovation Plan 2030 (Law 27.738), as a map of strategic priorities that guides the allocation of the human, financial and material resources of the national science and technology system. In the energy and mining sector it states that the Plan Nuclear Argentino, under way, foresees a phased process including development of a small modular reactor (SMR), a new nuclear power plant added to the existing complex, and uranium mining and processing, and it sets Mission 3, research, development and innovation in nuclear energy, covering technologies for medium and high power and experimental reactors. It creates no specific fund, award, licence or site and approves no reactor, design or project.",
    "affects": [
      "programme_administration"
    ],
    "status": "published",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2025-10-30",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ar-res-282-2025",
        "note": "Sanción 30-10-2025."
      },
      {
        "event": "published",
        "date": {
          "value": "2025-10-31",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ar-res-282-2025",
        "note": "Boletín Oficial No. 35782, page 81."
      }
    ],
    "effective_date": null,
    "expiry": {
      "date": {
        "value": "2027",
        "precision": "year",
        "basis": "planned"
      },
      "condition": "The guidelines cover the period 2025-2027. No end date is stated."
    },
    "operative_source": {
      "source_id": "src-pc-ar-res-282-2025",
      "version": "Texto original on Argentina.gob.ar normativa (Annex I in text; the resolution's articles only as images)",
      "document_date": "2025-10-30"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The resolution's operative articles appear on the portal only as images and were not read, so the approval wording is inferred from the portal's title for the norm. No official decree or resolution adopting the Plan Nuclear Argentino or selecting an SMR design was found. Press announcements of the plan were not used as evidence.",
    "summary": "Argentina's 2025-2027 science and technology guidelines, approved by a Secretariat resolution, are a non-binding orientation framework. They make nuclear energy research and innovation a priority mission and state that the Plan Nuclear Argentino foresees developing a small modular reactor and a new nuclear power plant. They guide the allocation of science system resources but create no fund and approve no project.",
    "sources": [
      "src-pc-ar-res-282-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-za-national-nuclear-regulator-act-47-1999",
    "slug": "south-africa-national-nuclear-regulator-act-1999",
    "name": "South Africa: National Nuclear Regulator Act, 1999 (Act No. 47 of 1999)",
    "short_label": "South Africa National Nuclear Regulator Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "ZA",
    "jurisdiction_level": "national",
    "issuing_authority": "Parliament of the Republic of South Africa",
    "citation": "National Nuclear Regulator Act, 1999 (Act No. 47 of 1999); presidential assent notified in Government Gazette No. 20760, Notice No. 1537 of 23 December 1999; takes effect on the commencement date of the Nuclear Energy Act, 1999 (s. 56(2))",
    "legal_scope": "Statute establishing the National Nuclear Regulator (NNR), a juristic person comprising a board, a chief executive officer and staff (s. 3). Section 20(1) prohibits anyone from siting, constructing, operating, decontaminating or decommissioning a nuclear installation except under a nuclear installation licence, and a nuclear installation includes a nuclear reactor (s. 1(xviii)). Under s. 21 an applicant applies to the NNR chief executive officer, the application is served on affected municipalities and published in the Gazette and local newspapers, directly affected persons may make representations to the board within 30 days and the board may hold hearings, and, subject to the board's approval, the chief executive officer grants the licence with conditions or refuses it. The Minister must make regulations on safety standards and regulatory practices on the board's recommendation (s. 36) and may, in consultation with affected municipalities, make regulations on development around a nuclear installation to ensure an emergency plan can be implemented (s. 38(4)). The Act takes effect on the commencement of the Nuclear Energy Act, 1999 (s. 56(2)). It does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "1999-12-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-za-nnr-act-1999-gazette",
        "note": "Government Gazette No. 20760, Office of the Presidency Notice No. 1537: the President has assented to the Act."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-za-nnr-act-1999",
      "version": "Act as enacted (text on the National Nuclear Regulator website); no consolidated text with later amendments was found",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "nuclear installation",
        "section": "s. 1(xviii)",
        "paraphrase": "A facility, installation, plant or structure for a nuclear fuel cycle process involving radioactive material, including a nuclear reactor (a nuclear fission reactor or a facility intended to create nuclear fusion), enrichment, fuel fabrication, reprocessing, spent fuel storage and waste facilities, or any facility declared a nuclear installation under s. 2(3).",
        "source_id": "src-pc-za-nnr-act-1999",
        "note": "Legal definition used by this South African statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Grants no licence. Amendments after 1999, if any, were not assessed because no consolidated official text was found. The NNR's other regulations and position papers, including its design authorisation framework, were not opened. The commencement date by presidential proclamation is not stated in the texts read.",
    "summary": "South Africa's National Nuclear Regulator Act establishes the National Nuclear Regulator and bars anyone from siting, building, operating or decommissioning a nuclear installation, including a reactor, without a nuclear installation licence. The regulator's chief executive officer grants or refuses licences with board approval after public notice and representations. It approves no site, design or project.",
    "sources": [
      "src-pc-za-nnr-act-1999",
      "src-pc-za-nnr-act-1999-gazette"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-za-nuclear-energy-act-46-1999",
    "slug": "south-africa-nuclear-energy-act-1999",
    "name": "South Africa: Nuclear Energy Act, 1999 (Act No. 46 of 1999)",
    "short_label": "South Africa Nuclear Energy Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "ZA",
    "jurisdiction_level": "national",
    "issuing_authority": "Parliament of the Republic of South Africa",
    "citation": "Nuclear Energy Act, 1999 (Act No. 46 of 1999); comes into operation, except s. 4, on a date specified by presidential proclamation (s. 61(2))",
    "legal_scope": "Statute establishing the South African Nuclear Energy Corporation Limited (Necsa), a public company wholly owned by the State, and defining its functions, powers and governance; providing for implementation of the Safeguards Agreement with the International Atomic Energy Agency; regulating the acquisition and possession of nuclear fuel and certain nuclear and related material and equipment and their import and export; and prescribing measures on radioactive waste and irradiated fuel storage (long title). Necsa's main functions include undertaking and promoting research and development in nuclear energy and radiation sciences and technology (s. 13(a)). Chapter IV (ss. 44-50) sets the Minister's responsibilities for source material, special nuclear material, restricted material, radioactive waste and irradiated fuel. Except for s. 4, the Act comes into operation on a date the President specifies by proclamation (s. 61(2)(a)). Licensing of nuclear installations is under the separate National Nuclear Regulator Act. It does not itself license, site or approve any reactor, design or project.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "1999",
          "precision": "year",
          "basis": "actual"
        },
        "source": "src-pc-za-nea-1999",
        "note": "The Act's title gives the year 1999; the copy read shows no assent or commencement date."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-za-nea-1999",
      "version": "Act as enacted (text on the National Nuclear Regulator website, undated copy); no consolidated text was found",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Grants no licence and funds no project. Chapter IV was read only at contents level. Amendments after 1999 and the proclamation fixing the commencement date were not found or assessed.",
    "summary": "South Africa's Nuclear Energy Act establishes the state-owned South African Nuclear Energy Corporation (Necsa), whose main functions include nuclear energy research and development, and sets ministerial responsibilities for nuclear material, radioactive waste and safeguards. Reactor licensing sits under the separate National Nuclear Regulator Act. It approves no site, design or project.",
    "sources": [
      "src-pc-za-nea-1999"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-za-site-licensing-regulations-r927",
    "slug": "south-africa-nuclear-site-licensing-regulations-r927",
    "name": "South Africa: Regulations on Licensing of Sites for New Nuclear Installations (GN R. 927 of 11 November 2011)",
    "short_label": "South Africa nuclear site licensing regulations",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "ZA",
    "jurisdiction_level": "national",
    "issuing_authority": "Minister of Energy, on the recommendation of the Board of the National Nuclear Regulator",
    "citation": "Regulations on Licensing of Sites for New Nuclear Installations, Government Notice No. R. 927, Government Gazette No. 34735 of 11 November 2011, made under s. 36 read with s. 47 of the National Nuclear Regulator Act, 1999",
    "legal_scope": "Regulations made by the Minister of Energy under s. 36 read with s. 47 of the National Nuclear Regulator Act on the recommendation of the NNR board. Their purpose is to establish requirements for applications for nuclear installation site licences (reg. 2). Anyone wishing to site a nuclear installation under s. 21(1) of the Act must lodge an application for a nuclear installation site licence with the NNR chief executive officer, supported by a Site Safety Report (reg. 3). Regulation 4 lists factors for evaluating sites, including all nuclear installations in the vicinity, the proposed design and site characteristics, acceptably low radiological doses and risks, natural and man-made hazards, emergency plans and security measures, and cumulative radiological impact. Regulation 5 sets the Site Safety Report contents. A site licence is valid for an indefinite period, but if five years have passed since it was granted the holder must supply updated information before construction and the Regulator decides whether to confirm or withdraw the licence, and a site licence is not a nuclear installation licence, which must be applied for separately (reg. 6). Regulation 7 names them the Regulations on Licencing of Sites for New Nuclear Installations, 2010. They do not themselves license or approve any site, design or project.",
    "affects": [
      "siting",
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2011-11-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-za-r927-2011",
        "note": "Government Notice No. R. 927, Government Gazette No. 34735."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-za-r927-2011",
      "version": "Government Gazette No. 34735 of 11 November 2011 (scanned copy reproduced by Sabinet, hosted by the NNR)",
      "document_date": "2011-11-11"
    },
    "legal_definitions": [
      {
        "term": "new nuclear installation",
        "section": "reg. 1",
        "paraphrase": "A nuclear installation constructed after the date on which these Regulations come into effect.",
        "source_id": "src-pc-za-r927-2011",
        "note": "Legal definition used by these South African regulations only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "Approves no site. The Gazette copy read is a scanned text with character recognition errors. The in-force date is not stated in the text read. The NNR's siting guidance RG-0011 was not opened.",
    "summary": "South Africa's 2011 site licensing regulations require anyone wishing to site a new nuclear installation to apply to the National Nuclear Regulator for a nuclear installation site licence supported by a Site Safety Report. They list the factors used to evaluate sites. A site licence is valid indefinitely, with updated information needed before construction after five years. They approve no site.",
    "sources": [
      "src-pc-za-r927-2011"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ua-snriu-regulation-cmu-363-2014",
    "slug": "ukraine-nuclear-regulatory-inspectorate-regulation",
    "name": "Ukraine: Regulation on the State Nuclear Regulatory Inspectorate (Cabinet of Ministers Resolution No. 363 of 20 August 2014, Положення про Державну інспекцію ядерного регулювання України)",
    "short_label": "Ukraine nuclear regulator regulation (CMU Resolution 363/2014)",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "UA",
    "jurisdiction_level": "national",
    "issuing_authority": "Кабінет Міністрів України (Cabinet of Ministers of Ukraine)",
    "citation": "Постанова Кабінету Міністрів України від 20 серпня 2014 р. № 363 «Про затвердження Положення про Державну інспекцію ядерного регулювання України» (Офіційний вісник України, 2014, № 69, ст. 1925); amended by Resolution No. 268 of 10 March 2023",
    "legal_scope": "Cabinet regulation setting the status and powers of Ukraine's nuclear regulator, the State Nuclear Regulatory Inspectorate (Держатомрегулювання, SNRIU). Point 1 makes it a central executive body, directed and coordinated by the Cabinet of Ministers, that forms and implements state policy on nuclear safety. Point 3 tasks it with state regulation of nuclear safety. Under point 4 it approves safety requirements and licence conditions (4.7), assesses the safety of nuclear installations (4.12) and conducts the state nuclear and radiation safety review (4.13). It licenses the operating organisation's activity at each separate stage of a nuclear installation's life cycle (4.14), issues separate permits for works or operations during construction, commissioning, operation and decommissioning (4.18) and supervises compliance with permits and safety rules (4.41). Its Head is appointed and dismissed by the Cabinet on the Prime Minister's proposal (point 11). Resolution No. 268 of 10 March 2023 added powers to recognise radiation protection experts and to organise, at least every 10 years, an evaluation of the regulatory framework and regulator with international experts. The regulation does not itself license, site or approve any reactor, design or project. The Law on the Use of Nuclear Energy and Radiation Safety, under which the licensing operates, is not yet recorded.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "issued",
        "date": {
          "value": "2014-08-20",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ua-cmu-res-363-2014",
        "note": "ПОСТАНОВА від 20 серпня 2014 р. № 363."
      },
      {
        "event": "amended",
        "date": {
          "value": "2023-03-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ua-cmu-res-268-2023",
        "note": "Resolution No. 268 of 10 March 2023 amends points 4 and 5. It is in force on publication, and the publication date is not shown on the page."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2023-12-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pc-ua-cmu-res-268-2023",
        "note": "Subpoints 1 and 3 of point 1 of the 2023 changes (radiation protection expert competence, training and knowledge checks) took effect on 11 December 2023 (Resolution No. 268, point 2)."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pc-ua-cmu-res-363-2014",
      "version": "As-adopted text of 20 August 2014 on the Cabinet's official portal (no consolidated version offered), read together with the changes approved by Resolution No. 268 of 10 March 2023. Any other amendments were not verified because the parliament's consolidated legislation portal did not respond.",
      "document_date": "2014-08-20"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Grants no licence or permit. The Law on the Use of Nuclear Energy and Radiation Safety (No. 39/95-ВР) and the other statutes on nuclear permits are not yet recorded because the parliament's legislation portal did not respond. Amendments to this regulation other than Resolution No. 268 of 2023, and the regulator's own orders on licensing procedure, were not checked.",
    "summary": "Ukraine's 2014 Cabinet regulation on the State Nuclear Regulatory Inspectorate (SNRIU) makes it the central executive body for nuclear safety regulation. SNRIU licenses the operating organisation for each life-cycle stage of a nuclear installation, issues separate permits for construction, commissioning, operation and decommissioning works, and supervises compliance. It approves no site, design or project.",
    "sources": [
      "src-pc-ua-cmu-res-363-2014",
      "src-pc-ua-cmu-res-268-2023",
      "src-pc-ua-cmu-res-268-2023-changes"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "next_review": "2027-04-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-fy2026-fee-rule",
    "slug": "us-nrc-fy2026-fee-rule",
    "name": "NRC final rule: Fee Schedules; Fee Recovery for Fiscal Year 2026 (with Executive Order 14300 fixed fee caps)",
    "short_label": "FY2026 NRC fee rule and fixed fee caps",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 36470 (final rule, 16 June 2026), FR Doc. 2026-12067, docket NRC-2023-0212, RIN 3150-AL12; correction 91 FR 65941 (19 October 2026)",
    "legal_scope": "NRC regulation amending 10 CFR parts 15, 170 and 171 to set fees for fiscal year 2026 under the Nuclear Energy Innovation and Modernization Act. It raises the professional hourly rate from $318 to $337 and the Reduced Hourly Rate for advanced nuclear reactor applicants and pre-applicants (ADVANCE Act section 201) from $148 to $154. New 10 CFR 170.33 implements section 5(a) of Executive Order 14300 with fixed caps on service fees for requested activities that involve a final safety evaluation. For complete applications accepted on or after 1 October 2026 the cap is the lesser of the Table 1 amount or a lower application-specific amount, for earlier applications it is an amount the Commission sets, and a cap may rise only for applicant failure (s. 170.33(a)-(e)). Table 1 lists, for example, $18,334,000 for a construction permit ($10,007,000 for advanced nuclear reactor applicants) and $30,145,000 for a combined licence with no prior approvals ($14,590,000). The NRC says it will address fixed deadlines for final decisions in a future rulemaking. The rule sets fees only. It licenses, sites or approves no reactor, design or project and does not decide whether any applicant qualifies for the reduced rate.",
    "affects": [
      "licensing_fees"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-06-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-fee-rule-fy2026-text"
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-08-17",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-fee-rule-fy2026-text",
        "reader": {
          "headline": "NRC's fiscal 2026 fee rule takes effect, with fixed review-fee caps",
          "what": "The NRC fee rule for fiscal year 2026 took effect, setting $337 an hour for full-cost reviews and $154 for eligible advanced reactor applicants, and adding fixed caps on review fees under Executive Order 14300.",
          "limit": "It licenses no reactor and decides no applicant's eligibility."
        }
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2026-10-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-fee-rule-fy2026-text",
        "note": "Table 1 fixed fee caps apply to complete applications accepted for review on or after this date (10 CFR 170.33(b)).",
        "reader": {
          "headline": "Fixed NRC review-fee caps start applying to new applications",
          "what": "The fixed fee caps in 10 CFR 170.33 apply to complete applications the NRC accepts for review on or after 1 October 2026.",
          "limit": "A fee cap decides no application; it licenses no reactor."
        }
      }
    ],
    "effective_date": {
      "value": "2026-08-17",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-us-fee-rule-fy2026-text",
      "version": "Federal Register final rule text (GovInfo HTML), 91 FR 36470-36509, read with the 19 October 2026 correction",
      "document_date": "2026-06-16"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      },
      {
        "policy_id": "pol-us-advance-act-2024",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Sets fees and caps only. Whether an applicant qualifies for the Reduced Hourly Rate, and the cap that applies to any application, are decided per application by the NRC and are not recorded here. The 19 October 2026 correction changed only a materials-licence annual fee table. No FY2027 fee rule appeared in the NRC final-rule listing checked on 30 October 2026.",
    "summary": "NRC fee rule for fiscal year 2026, in force since 17 August 2026. It sets the full-cost review rate at $337 an hour and the reduced rate for advanced reactor applicants at $154, and adds fixed caps on review fees under Executive Order 14300 for applications that end in a final safety evaluation. It licenses no reactor and decides no applicant's eligibility.",
    "sources": [
      "src-pr-us-fee-rule-fy2026-text",
      "src-pr-us-fee-rule-fy2026-correction",
      "src-pr-us-nrc-rules-listing-20261030"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-06-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-mandatory-hearing-flexibility-2026",
    "slug": "us-nrc-mandatory-hearing-flexibility-2026",
    "name": "NRC final rule: Increased Flexibility in the Mandatory Hearing Process",
    "short_label": "Mandatory hearing flexibility rule",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 20063 (final rule, 15 April 2026), FR Doc. 2026-07301, docket NRC-2025-1502",
    "legal_scope": "NRC regulation revising its rules of practice and procedure, in response to the ADVANCE Act and Executive Order 14300, to increase flexibility in conducting the mandatory (uncontested) hearings that section 189 of the Atomic Energy Act requires for construction permit applications. It removes 10 CFR 51.105 and 51.107, which specified environmental findings to be made by presiding officers, makes conforming changes, and revises provisions in 10 CFR parts 2, 50, 51, 52 and 53 to clarify that references to hearings in those parts apply only to contested hearings. It decides no licence and approves no reactor, design, site or project.",
    "affects": [
      "nrc_licensing",
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-04-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-mandatory-hearing-text"
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-05-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-mandatory-hearing-text"
      }
    ],
    "effective_date": {
      "value": "2026-05-15",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-us-mandatory-hearing-text",
      "version": "Federal Register final rule text (GovInfo HTML), 91 FR 20063",
      "document_date": "2026-04-15"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      },
      {
        "policy_id": "pol-us-advance-act-2024",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Procedural rule only. How the hearing on any particular application is run is decided by the Commission and is not recorded here. Commission orders on individual hearings were not reviewed.",
    "summary": "NRC rule in force since 15 May 2026 that makes the mandatory hearings held on reactor construction permit applications more flexible, in response to the ADVANCE Act and Executive Order 14300. It removes two environmental-finding provisions for presiding officers and clarifies that other references to hearings mean contested hearings. It licenses no reactor.",
    "sources": [
      "src-pr-us-mandatory-hearing-text"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-modernization-direct-final-2026",
    "slug": "us-nrc-modernization-direct-final-2026",
    "name": "NRC direct final rule: NRC Modernization: Rulemaking Procedure, Federal Advisory Committee Act Alignment, Access, and Security",
    "short_label": "NRC Modernization rule (procedure, FACA, access, security)",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 51555 (direct final rule, 11 August 2026), FR Doc. 2026-16374, docket NRC-2025-1139, RIN 3150-AL46; correction and confirmation of effective date FR Doc. 2026-19963 (30 September 2026)",
    "legal_scope": "Direct final rule, taken in response to Executive Order 14300, making targeted revisions to 10 CFR parts 2, 7 and 10. It changes the procedure for requests to withhold commercial, financial and proprietary information from public disclosure under 10 CFR 2.390, removing the requirement to include a statement of harm, makes the post-promulgation comment period in 10 CFR 2.804 voluntary, aligns the NRC's advisory committee rules in part 7 with the government-wide Federal Advisory Committee Act standards, and updates national security eligibility criteria. The NRC describes the amendments as primarily administrative and procedural and as establishing no new substantive obligations for licensees or other external stakeholders. On 30 September 2026 the NRC confirmed the 26 October 2026 effective date. It approves no reactor, design, site or project.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-08-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-nrc-modernization-text",
        "reader": {
          "headline": "NRC publishes an administrative modernization rule under Executive Order 14300",
          "what": "The NRC published a direct final rule simplifying requests to withhold proprietary information, making some post-rule comment periods optional, aligning advisory committee rules and updating security eligibility criteria.",
          "limit": "The NRC calls the changes administrative; the rule licenses no reactor."
        }
      },
      {
        "event": "comment_period_closed",
        "date": {
          "value": "2026-09-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-nrc-modernization-text",
        "reader": {
          "headline": "Comment period closes on the NRC modernization direct final rule",
          "what": "The public comment period on the NRC Modernization direct final rule closed.",
          "limit": "A closed comment period does not change what the rule does; it licenses no reactor."
        }
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-10-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-nrc-rules-listing-20261030",
        "note": "Effective date confirmed by FR Doc. 2026-19963, published 30 September 2026.",
        "reader": {
          "headline": "NRC modernization rule takes effect",
          "what": "The NRC Modernization direct final rule took effect on 26 October 2026, as confirmed in a Federal Register notice of 30 September 2026.",
          "limit": "The NRC calls the changes administrative; the rule licenses no reactor."
        }
      }
    ],
    "effective_date": {
      "value": "2026-10-26",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-us-nrc-modernization-text",
      "version": "Federal Register direct final rule text (GovInfo HTML), 91 FR 51555-51568",
      "document_date": "2026-08-11"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      }
    ],
    "applicability": [],
    "unapproved": "Administrative and procedural changes only. The companion proposed rule (FR Doc. 2026-16373) and the text of the 30 September correction were not opened separately. Whether the NRC withholds any applicant's information is decided per request and is not recorded here.",
    "summary": "NRC rule in force since 26 October 2026, taken in response to Executive Order 14300. It simplifies how applicants ask the NRC to withhold proprietary information, makes some post-rule comment periods optional, aligns advisory committee rules with government-wide standards and updates security eligibility criteria. The NRC calls the changes administrative. It licenses no reactor.",
    "sources": [
      "src-pr-us-nrc-modernization-text",
      "src-pr-us-nrc-rules-listing-20261030"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-design-certification-duration-2025",
    "slug": "us-nrc-design-certification-duration-2025",
    "name": "NRC direct final rule: Revising the Duration of Design Certifications",
    "short_label": "40-year design certification rule",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "90 FR 28869 (direct final rule, 2 July 2025), FR Doc. 2025-12396, docket NRC-2025-0018, RIN 3150-AL26; effective date confirmed at 90 FR 41503 (26 August 2025)",
    "legal_scope": "NRC regulation amending 10 CFR part 52 so that a design certification is generically valid for 40 years from its date of issuance instead of 15 (s. 52.55(a)), with a conforming change for renewal applications (s. 52.57) and a renewal duration of not more than 40 years (s. 52.61). It applies generically and to the five design certifications then in effect, appendices A (ABWR), D (AP1000), E (ESBWR), F (APR1400) and G (NuScale) to part 52, without changing their dates of issuance or renewal, and not to the two expired certifications. The Commission approved the change in a staff requirements memorandum of 14 November 2024, and the NRC states the rule is consistent with Executive Order 14300. It certifies no new design and approves no reactor, site or project.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2025-07-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-dc-duration-text"
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-09-15",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-dc-duration-confirmation",
        "note": "Effective date confirmed in the Federal Register on 26 August 2025 (90 FR 41503)."
      }
    ],
    "effective_date": {
      "value": "2025-09-15",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-us-dc-duration-text",
      "version": "Federal Register direct final rule text (GovInfo HTML), 90 FR 28869-28873, with the 26 August 2025 confirmation",
      "document_date": "2025-07-02"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Changes the duration of design certifications only. Whether a design is certified, or an application references a certification, is recorded among regulatory actions, not here.",
    "summary": "NRC rule in force since 15 September 2025 that makes US design certifications valid for 40 years instead of 15, both for the five certifications then in effect, including NuScale's, and for future ones. Issue dates are unchanged. It certifies no design and licenses no reactor.",
    "sources": [
      "src-pr-us-dc-duration-text",
      "src-pr-us-dc-duration-confirmation"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-categorical-exclusions-2026",
    "slug": "us-nrc-categorical-exclusions-2026",
    "name": "NRC final rule: Categorical Exclusions From Environmental Review",
    "short_label": "NRC categorical exclusions rule",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 15519 (final rule, 30 March 2026), FR Doc. 2026-06049, docket NRC-2018-0300, RIN 3150-AK54",
    "legal_scope": "NRC regulation amending the categorical exclusions in 10 CFR 51.22 for licensing, regulatory and administrative actions that do not significantly affect the quality of the human environment, so that no environmental assessment needs to be prepared for such actions unless the NRC finds special circumstances for a particular action (s. 51.22(b)). The NRC states that the rule does not change any requirements for applicants or licensees, that it is separate from the comprehensive review of NRC regulations under Executive Order 14300, and that a broader scope of new categorical exclusions for new reactors was outside the scope of the rule. It approves no reactor, design, site or project.",
    "affects": [
      "environmental_review"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-03-30",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-catex-text"
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-04-29",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-catex-text"
      }
    ],
    "effective_date": {
      "value": "2026-04-29",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-us-catex-text",
      "version": "Federal Register final rule text (GovInfo HTML), 91 FR 15519-15534",
      "document_date": "2026-03-30"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-nrc-new-reactor-geis-2026",
        "relation": "related"
      },
      {
        "policy_id": "pol-us-nrc-part-53-2026",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Whether an action falls within a categorical exclusion is decided by the NRC case by case and is not recorded here. The revised list of categories in s. 51.22 was not transcribed. A Part 53 correction of 13 April 2026 resolved conflicting amendatory instructions between the two rules published on 30 March 2026.",
    "summary": "NRC rule in force since 29 April 2026 that revises the list of NRC actions excluded from environmental assessment because they normally have no significant environmental effect. The NRC says it changes no requirements for applicants or licensees and left broader exclusions for new reactors outside its scope. It approves no reactor or site.",
    "sources": [
      "src-pr-us-catex-text",
      "src-pr-us-nrc-rules-listing-20261030"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-irc-45y-48e-clean-electricity-credits",
    "slug": "us-irc-45y-48e-clean-electricity-credits",
    "name": "Internal Revenue Code sections 45Y and 48E: clean electricity production and investment credits, as amended by Public Law 119-21",
    "short_label": "Clean electricity tax credits (45Y and 48E)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Congress",
    "citation": "26 U.S.C. 45Y and 48E (added by Pub. L. 117-169, secs. 13701-13702, 16 August 2022), as amended by Pub. L. 119-21, secs. 70512-70513 (approved 4 July 2025)",
    "legal_scope": "Federal tax credits for electricity generation facilities placed in service after 31 December 2024 whose greenhouse gas emissions rate is not greater than zero: a 10-year production credit (s. 45Y) or an investment credit (s. 48E). Both phase out by year of construction start: 100 percent in the first calendar year after the applicable year, 75 percent in the second, 50 percent in the third and 0 after that (ss. 45Y(d)(2), 48E(e)(2)). For facilities whose construction begins more than 12 months after enactment, Public Law 119-21 fixes the applicable year at calendar year 2032 and ends both credits for wind and solar facilities placed in service after 31 December 2027 (secs. 70512(a), (l)(4) and 70513(a), (g)(5)). It also adds prohibited-foreign-entity restrictions and, for an advanced nuclear facility under s. 45Y, a nuclear energy community test (s. 45(b)(11)(B)(iv) and (C)): a metropolitan statistical area with 0.17 percent or greater direct employment related to nuclear power. An advanced nuclear facility is one whose reactor design is approved as described in s. 45J(d)(2), or for which the NRC has issued a site-specific construction permit or combined licence. That test does not apply to the s. 48E credit. The statute names no project.",
    "affects": [
      "project_funding"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2022-08-16",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-usc-26-45y-2024",
        "note": "Sections added by Pub. L. 117-169, approved 16 August 2022."
      },
      {
        "event": "amended",
        "date": {
          "value": "2025-07-04",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-us-plaw-119-21",
        "note": "Pub. L. 119-21 secs. 70512-70513, approved 4 July 2025."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-us-usc-26-45y-2024",
      "version": "United States Code 2024 edition (GovInfo) read with the amendments enacted by Pub. L. 119-21 secs. 70512-70513, because the current consolidated text on uscode.house.gov could not be opened",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "advanced nuclear facility (for the nuclear energy community test)",
        "section": "26 U.S.C. 45(b)(11)(C), added by Pub. L. 119-21 sec. 70512(f)",
        "paraphrase": "A nuclear facility whose reactor design is approved in the manner described in s. 45J(d)(2), or one for which the NRC has authorized construction and issued a site-specific construction permit or combined licence.",
        "source_id": "src-pr-us-plaw-119-21",
        "note": "Legal definition used by this instrument only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [],
    "applicability": [],
    "unapproved": "No project's eligibility for either credit is recorded. Treasury guidance, the s. 45J definition referred to for advanced nuclear facilities, the s. 45U zero-emission nuclear credit and the prohibited-foreign-entity definitions were not reviewed. The current consolidated sections were not available from the Law Revision Counsel website when checked.",
    "summary": "Federal tax credits for zero-emission electricity generation placed in service from 2025. Public Law 119-21 of 4 July 2025 ended the credits for wind and solar facilities placed in service after 2027, tied the phase-down for other facilities to calendar year 2032, and added a nuclear energy community bonus test for advanced nuclear facilities under the production credit. It names no project.",
    "sources": [
      "src-pr-us-plaw-119-21",
      "src-pr-us-usc-26-45y-2024",
      "src-pr-us-usc-26-48e-2024"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-doe-haleu-availability-program",
    "slug": "us-doe-haleu-availability-program",
    "name": "DOE HALEU Availability Program and HALEU allocation process",
    "short_label": "DOE HALEU allocation",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of Energy, Office of Nuclear Energy",
    "citation": "DOE HALEU Availability Program (Energy Act of 2020, sec. 2001, 42 U.S.C. 16281) and its HALEU Allocation Process document",
    "legal_scope": "DOE programme, established under section 2001 of the Energy Act of 2020, to make high-assay low-enriched uranium available for civilian domestic research, development, demonstration and commercial use. Under the allocation process developers request HALEU from DOE sources, and DOE weighs whether the project is government-funded or cost-shared, its licensing schedule, the requester's capability to use the material and the material's availability. Section 3131(h) of the FY2024 National Defense Authorization Act requires priority for the two ARDP Pathway 1 demonstration reactors (X-energy and TerraPower Natrium). Before transfer the requester must, among other things, execute contracts with DOE and obtain an NRC licence for possession, and DOE may rescind allocations after significant delays. DOE announced first allocations to five companies in April 2025 and conditional commitments to three companies on 26 August 2025 and to NASA and Radiant on 23 July 2026, each followed by contracting. A conditional commitment is not a fuel delivery, and the programme licenses, sites or approves no reactor or project.",
    "affects": [
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "milestone",
        "date": {
          "value": "2025-04",
          "precision": "month",
          "basis": "actual"
        },
        "source": "src-doe-haleu-round3-20260723",
        "note": "First HALEU amounts announced for five companies."
      },
      {
        "event": "selected",
        "date": {
          "value": "2025-08-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-d2-doe-haleu-round2",
        "note": "Second round: conditional commitments to three companies."
      },
      {
        "event": "selected",
        "date": {
          "value": "2026-07-23",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-doe-haleu-round3-20260723",
        "note": "Third round: conditional commitments to NASA and Radiant."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-us-haleu-allocation-process",
      "version": "DOE HALEU Allocation Process PDF (no date in its text, file created 28 August 2025)",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-doe-ardp",
        "relation": "related"
      },
      {
        "policy_id": "pol-us-eo-14299",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Conditional commitments depend on contracts, NRC possession licences and fuel fabrication, and are not deliveries. The first-round announcement of April 2025 and the allocated quantities were not opened. No project's allocation is recorded here as an approval.",
    "summary": "DOE programme set up under the Energy Act of 2020 to supply high-assay low-enriched uranium from federal sources to advanced reactor developers while commercial supply is built. Developers apply under DOE's allocation process, and DOE has announced allocations or conditional commitments in three rounds from April 2025 to July 2026. A commitment is not a fuel delivery or a licence.",
    "sources": [
      "src-pr-us-haleu-allocation-process",
      "src-pr-us-haleu-availability-program",
      "src-d2-doe-haleu-round2",
      "src-doe-haleu-round3-20260723"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-30",
    "next_review": "2027-01-29",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-gb-nuclear-installations-act-1965",
    "slug": "gb-nuclear-installations-act-1965",
    "name": "United Kingdom: Nuclear Installations Act 1965 (c. 57), nuclear site licensing",
    "short_label": "UK Nuclear Installations Act 1965",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "GB",
    "jurisdiction_level": "national",
    "issuing_authority": "Parliament of the United Kingdom",
    "citation": "Nuclear Installations Act 1965 (c. 57), ss. 1, 3 and 26 as revised (s. 1 substituted by the Energy Act 2013, Sch. 12, from 1 April 2014)",
    "legal_scope": "UK statute that controls where nuclear reactors may be installed or operated. Section 1(1) prohibits using a site to install or operate a nuclear reactor (other than one in a means of transport) or another prescribed installation unless a nuclear site licence granted by the appropriate national authority is in force, and a contravention is an offence (s. 1(7)). Under section 26(1) that authority is the Office for Nuclear Regulation for England, Wales and Scotland and the Secretary of State for Northern Ireland, in each case including the adjacent territorial sea. A licence may be granted only to a body corporate and is not transferable (s. 3(1)), and the authority must consult the appropriate environment authority before granting one (s. 3(2)). Fusion energy facilities are excluded (s. 1(2A)). Section 26 defines a nuclear reactor as plant designed or adapted to produce atomic energy by a fission process with a controlled chain reaction. The Act itself grants no licence and approves no site, design or project.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "provision_effective",
        "date": {
          "value": "2014-04-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-nia-1965-s1",
        "note": "Section 1 substituted by the Energy Act 2013, s. 156(1) and Sch. 12 para. 17 (S.I. 2014/251, art. 4)."
      },
      {
        "event": "amended",
        "date": {
          "value": "2024-09-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-nia-1965-s1",
        "note": "Subsections 1(2A)-(2B) (fusion exclusion) and 1(12) (territorial sea) inserted by the Energy Act 2023."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-gb-nia-1965-s1",
      "version": "Latest available revised text on legislation.gov.uk, shown up to date with changes in force on or before 30 October 2026 (outstanding changes listed, not reviewed)",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "nuclear reactor",
        "section": "s. 26(1)",
        "paraphrase": "Any plant, including machinery, equipment or appliances, designed or adapted for the production of atomic energy by a fission process in which a controlled chain reaction can be maintained without an additional source of neutrons.",
        "source_id": "src-pr-gb-nia-1965-s26",
        "note": "Legal definition used by this UK statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-gb-energy-act-2013-part-3-onr",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Grants no licence. Only sections 1, 3 and 26 were read. Licence conditions, the nuclear liability provisions and changes not yet applied by the editors were not reviewed. Development consent under the Planning Act 2008 and environmental permits are separate permissions.",
    "summary": "The UK's core nuclear licensing law. No one may install or operate a nuclear reactor on a site without a nuclear site licence. In England, Wales and Scotland the Office for Nuclear Regulation grants licences, and in Northern Ireland the Secretary of State does. A licence goes only to a company and cannot be transferred. The Act approves no site, design or project.",
    "sources": [
      "src-pr-gb-nia-1965-s1",
      "src-pr-gb-nia-1965-s3",
      "src-pr-gb-nia-1965-s26"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-gb-energy-act-2013-part-3-onr",
    "slug": "gb-energy-act-2013-part-3-onr",
    "name": "United Kingdom: Energy Act 2013 (c. 32), Part 3, Office for Nuclear Regulation",
    "short_label": "UK Energy Act 2013 Part 3 (ONR)",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "GB",
    "jurisdiction_level": "national",
    "issuing_authority": "Parliament of the United Kingdom",
    "citation": "Energy Act 2013 (c. 32), Part 3, ss. 67, 68 and 77",
    "legal_scope": "UK statute establishing the nuclear regulator for Great Britain. Section 77 creates the Office for Nuclear Regulation as a body corporate (in force 10 March 2014). Section 67 sets the ONR's purposes: nuclear safety, nuclear site health and safety, nuclear security, nuclear safeguards and transport. Under section 68 the nuclear safety purposes are protecting people against risks of harm from ionising radiation from GB nuclear sites, including through the design and construction of relevant nuclear installations, arrangements for their operation and decommissioning, and the storage and use of nuclear matter. The prohibition on operating a reactor without a nuclear site licence sits in the Nuclear Installations Act 1965. Part 3 grants no licence and approves no site, design or project.",
    "affects": [
      "reactor_licensing"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "provision_effective",
        "date": {
          "value": "2014-03-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-energy-act-2013-s77",
        "note": "Section 77 (the ONR) in force under S.I. 2014/251, art. 3(b)."
      },
      {
        "event": "provision_effective",
        "date": {
          "value": "2014-04-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-energy-act-2013-s67",
        "note": "Section 67 (the ONR's purposes) in force under S.I. 2014/251, art. 4."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-gb-energy-act-2013-s77",
      "version": "Latest available revised text on legislation.gov.uk, sections 67, 68 and 77 read 30 October 2026",
      "document_date": null
    },
    "legal_definitions": [
      {
        "term": "relevant nuclear installation",
        "section": "s. 68(3)",
        "paraphrase": "A nuclear installation on a site in England, Wales or Scotland for which a nuclear site licence is required because of the installation, including a proposed or former installation for which such a licence would be or has been required.",
        "source_id": "src-pr-gb-energy-act-2013-s68",
        "note": "Legal definition used by this UK statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-gb-nuclear-installations-act-1965",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Only sections 67, 68 and 77 were read. Schedule 7, the ONR's enforcement powers and the reforms announced in the March 2026 government response were not reviewed.",
    "summary": "The 2013 Act set up the Office for Nuclear Regulation, the body that licenses and regulates nuclear sites in Great Britain, and defines its safety, site health and safety, security, safeguards and transport purposes. It approves no site, design or project.",
    "sources": [
      "src-pr-gb-energy-act-2013-s67",
      "src-pr-gb-energy-act-2013-s68",
      "src-pr-gb-energy-act-2013-s77"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-gb-en7-nps-nuclear-2025",
    "slug": "gb-en7-nps-nuclear-2025",
    "name": "United Kingdom: National Policy Statement for nuclear energy generation (EN-7)",
    "short_label": "EN-7 nuclear siting policy",
    "category": "regulatory_guidance",
    "instrument_type": "regulatory_guidance",
    "jurisdiction": "GB",
    "jurisdiction_level": "national",
    "issuing_authority": "Department for Energy Security and Net Zero (Secretary of State for Energy Security and Net Zero)",
    "citation": "National Policy Statement for nuclear energy generation (EN-7), presented to Parliament under s. 9(8) Planning Act 2008, ISBN 978-1-5286-6073-0; in force 18 December 2025",
    "legal_scope": "National Policy Statement under the Planning Act 2008 which, with the overarching energy statement EN-1, provides the primary policy for the Secretary of State's decisions on development consent applications for infrastructure using nuclear fission to generate energy in England and Wales (paras 1.1.5, 1.4.1). It covers projects that are nationally significant under the Act and projects directed into the development consent regime under sections 35 and 35ZA (para 1.6). It is designed to support development on a more diverse range of sites than the eight sites listed in the earlier EN-6, which keep their advantages (paras 1.7.1-1.7.3), and sets factors for site selection, including the Semi-Urban Population Density Criterion (paras 2.7.5-2.7.6). The Secretary of State does not examine applications for nuclear generating stations in Scotland or Northern Ireland (paras 1.4.2, 1.4.4). Development consent and the relevant regulatory permits, licences and authorisations must still be obtained (para 1.7.4). It grants no consent and approves no site, design or project.",
    "affects": [
      "siting"
    ],
    "status": "published",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2025-11-12",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-en7-page"
      },
      {
        "event": "effective",
        "date": {
          "value": "2025-12-18",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-en7-page"
      }
    ],
    "effective_date": {
      "value": "2025-12-18",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-gb-en7-text",
      "version": "Accessible webpage of the designated statement, updated 18 December 2025",
      "document_date": "2025-12-18"
    },
    "legal_definitions": [
      {
        "term": "nuclear infrastructure",
        "section": "para 1.6.1",
        "paraphrase": "Infrastructure using nuclear fission to generate energy, with ancillary infrastructure, that is a Nationally Significant Infrastructure Project under the Planning Act 2008 or is directed to require development consent under sections 35 and 35ZA.",
        "source_id": "src-pr-gb-en7-text",
        "note": "Definition used by this policy statement only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-gb-nuclear-regulatory-review-response-2026",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Grants no development consent. The supplementary information, the Welsh text and EN-1 were not reviewed. In its 13 March 2026 response to the Nuclear Regulatory Review the government said it would aim within 12 months to update EN-7 with a criterion supporting fleet rollout; no update was checked here.",
    "summary": "England and Wales planning policy for nuclear fission power projects, in force since 18 December 2025. Together with EN-1 it guides the Energy Secretary's decisions on development consent, and it opens siting to a wider range of locations than the eight sites named in the older EN-6. It grants no consent and approves no site.",
    "sources": [
      "src-pr-gb-en7-page",
      "src-pr-gb-en7-text",
      "src-pr-gb-nrr-response"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-03-13",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-gb-nuclear-regulatory-review-response-2026",
    "slug": "gb-nuclear-regulatory-review-response-2026",
    "name": "United Kingdom: Building our nuclear nation, government response to the Nuclear Regulatory Review 2025",
    "short_label": "UK nuclear regulatory reform response",
    "category": "regulatory_guidance",
    "instrument_type": "regulatory_guidance",
    "jurisdiction": "GB",
    "jurisdiction_level": "national",
    "issuing_authority": "Department for Energy Security and Net Zero (HM Government)",
    "citation": "Building our nuclear nation: government response to the Nuclear Regulatory Review 2025 (policy paper, 13 March 2026)",
    "legal_scope": "Government policy paper responding to the independent Nuclear Regulatory Taskforce, whose final report of November 2025 set out 47 recommendations on civil and defence nuclear regulation. The government accepts the principle of all the recommendations and commits to implement them, legislating where required as soon as practicable and before the end of 2027, subject to parliamentary timings. Commitments include a statutory objective for the Office for Nuclear Regulation to further growth, climate and national security goals, merging the Defence Nuclear Safety Regulator with the ONR, a lead regulator model from March 2026 under which the ONR is the single point of contact where several regulators are involved, a Nuclear Regulatory Implementation Panel first meeting in June 2026, a roadmap to Environmental Outcome Reports by December 2027 and an aim to update EN-7 within 12 months to support fleet rollout. Measures that need legislation take effect only when enacted. The paper grants no licence, consent or approval for any site, design or project.",
    "affects": [
      "reactor_licensing",
      "siting",
      "environmental_review"
    ],
    "status": "published",
    "lifecycle": [
      {
        "event": "milestone",
        "date": {
          "value": "2025-11-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-nrr-collection",
        "note": "Nuclear Regulatory Taskforce final report published."
      },
      {
        "event": "published",
        "date": {
          "value": "2026-03-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-nrr-response"
      },
      {
        "event": "milestone",
        "date": {
          "value": "2027-12",
          "precision": "month",
          "basis": "target"
        },
        "source": "src-pr-gb-nrr-response",
        "note": "Government commitment to implement the recommendations, including legislation, before the end of 2027, subject to parliamentary timings."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-gb-nrr-response",
      "version": "GOV.UK accessible webpage, published 13 March 2026",
      "document_date": "2026-03-13"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-gb-en7-nps-nuclear-2025",
        "relation": "related"
      },
      {
        "policy_id": "pol-gb-energy-act-2013-part-3-onr",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "A policy paper, not legislation. The Taskforce's 162-page final report and the annexed implementation plans were not read in full, and whether the lead regulator model and other interim measures have started was not checked.",
    "summary": "UK government response, published 13 March 2026, accepting the Nuclear Regulatory Taskforce's 47 recommendations. It commits to give the Office for Nuclear Regulation a growth objective, merge it with the defence nuclear regulator, make it the lead regulator for projects involving several regulators and put the reforms, with any legislation, in place by the end of 2027. It approves no project.",
    "sources": [
      "src-pr-gb-nrr-response",
      "src-pr-gb-nrr-collection"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-03-13",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-gb-gben-smr-programme",
    "slug": "gb-gben-smr-programme",
    "name": "United Kingdom: Great British Energy – Nuclear small modular reactor programme and technology selection",
    "short_label": "GBE-N SMR programme",
    "category": "funding_programme",
    "instrument_type": "funding_programme",
    "jurisdiction": "GB",
    "jurisdiction_level": "national",
    "issuing_authority": "Great British Energy – Nuclear (formerly Great British Nuclear), an arm's-length body of the Department for Energy Security and Net Zero",
    "citation": "GBE-N SMR technology selection process (contract notice July 2023, concluded April 2026); over £2.5 billion pledged for the SMR programme in the Spending Review period (10 June 2025)",
    "legal_scope": "Government-owned delivery programme for the UK's first small modular reactors. GBE-N ran a two-stage procurement for an SMR technology partner: a selection questionnaire in July 2023, six technologies down-selected in October 2023, four companies left after the initial tender phase in September 2024 (GE-Hitachi, Holtec Britain, Rolls-Royce SMR and Westinghouse), final tenders invited in February 2025, Rolls-Royce SMR selected as preferred bidder in June 2025 and a contract in April 2026 concluding the selection. The government pledged over £2.5 billion for the overall SMR programme in the Spending Review period, and GBE-N later said £2.6 billion was allocated in the 2025 Spending Review to enable the contract and wider programme delivery. The programme does not license, consent or site any reactor, and a final investment decision is still to come.",
    "affects": [
      "project_funding",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "opened",
        "date": {
          "value": "2023-07",
          "precision": "month",
          "basis": "actual"
        },
        "source": "src-pr-gb-smr-selection-process",
        "note": "Contract notice and selection questionnaire."
      },
      {
        "event": "milestone",
        "date": {
          "value": "2024-09",
          "precision": "month",
          "basis": "actual"
        },
        "source": "src-pr-gb-smr-selection-process",
        "note": "Initial tender phase concluded with four companies down-selected."
      },
      {
        "event": "selected",
        "date": {
          "value": "2025-06-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-rr-preferred-bidder",
        "note": "Rolls-Royce SMR selected as preferred bidder."
      },
      {
        "event": "milestone",
        "date": {
          "value": "2026-04",
          "precision": "month",
          "basis": "actual"
        },
        "source": "src-pr-gb-smr-selection-process",
        "note": "GBE-N and Rolls-Royce SMR entered into contract, concluding the technology selection process."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-gb-smr-selection-process",
      "version": "GOV.UK guidance page 'Small Modular Reactors: technology selection process', read 30 October 2026",
      "document_date": null
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The programme budget is a government pledge, not a disbursement. Site allocation, licensing by the Office for Nuclear Regulation, development consent and a final investment decision are separate steps and are not recorded as made here. SMRMap's Programmes section holds the separate Advanced Nuclear Framework (prg-gb-advanced-nuclear-framework).",
    "summary": "Great British Energy – Nuclear's programme to deliver the UK's first SMRs, backed by over £2.5 billion pledged in the 2025 Spending Review period. A competition launched in July 2023 ended with Rolls-Royce SMR chosen as preferred bidder in June 2025 and a contract in April 2026. It grants no licence, consent or site.",
    "sources": [
      "src-pr-gb-smr-selection-process",
      "src-pr-gb-rr-preferred-bidder",
      "src-next-wylfa-contract"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-gb-gben-rolls-royce-smr-award-2026",
    "slug": "gb-gben-rolls-royce-smr-award-2026",
    "name": "United Kingdom: GBE-N selection of, and contract with, Rolls-Royce SMR",
    "short_label": "GBE-N contract with Rolls-Royce SMR",
    "category": "funding_award",
    "instrument_type": "award",
    "jurisdiction": "GB",
    "jurisdiction_level": "national",
    "issuing_authority": "Great British Energy – Nuclear",
    "citation": "GBE-N preferred-bidder selection of Rolls-Royce SMR Ltd (10 June 2025) and contract (announced 13 April 2026)",
    "legal_scope": "Award under the GBE-N SMR programme. Rolls-Royce SMR Ltd was selected on 10 June 2025 as preferred bidder to partner with GBE-N to develop small modular reactors, subject to final government approvals and contract signature. On 13 April 2026 GBE-N announced that it had signed the contract, formally starting technology design activities. The contract requires Rolls-Royce SMR to deliver against key milestones as it begins site-specific design, regulatory engagement and planning processes ahead of a future final investment decision. GBE-N describes a three-unit project of at least 1.4 GWe. Separately, the National Wealth Fund committed up to £599 million to Rolls-Royce SMR. The award is not a licence, a development consent or an investment decision.",
    "affects": [
      "project_funding"
    ],
    "status": "awarded",
    "lifecycle": [
      {
        "event": "selected",
        "date": {
          "value": "2025-06-10",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-gb-rr-preferred-bidder"
      },
      {
        "event": "awarded",
        "date": {
          "value": "2026-04-13",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-next-wylfa-contract",
        "note": "Date GBE-N published the news that the contract had been signed; the selection-process page gives April 2026."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-next-wylfa-contract",
      "version": "GOV.UK news story from GBE-N, published 13 April 2026",
      "document_date": "2026-04-13"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-gb-gben-smr-programme",
        "relation": "award_under"
      }
    ],
    "applicability": [],
    "unapproved": "No site, licence or final investment decision follows from the award. The contract itself was not published in the documents opened, and they state no contract value. The documents opened do not name a site for the three units, so no project link is proposed.",
    "summary": "GBE-N chose Rolls-Royce SMR as preferred bidder on 10 June 2025 and announced a signed contract on 13 April 2026. The contract starts design, regulatory engagement and planning for a three-unit project of at least 1.4 GWe ahead of a future investment decision. It is not a licence, consent or investment decision.",
    "sources": [
      "src-pr-gb-rr-preferred-bidder",
      "src-next-wylfa-contract",
      "src-pr-gb-smr-selection-process"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ca-building-canada-act-2025",
    "slug": "canada-building-canada-act",
    "name": "Canada: Building Canada Act (S.C. 2025, c. 2, s. 4), national interest projects",
    "short_label": "Building Canada Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "CA",
    "jurisdiction_level": "national",
    "issuing_authority": "Parliament of Canada",
    "citation": "Building Canada Act, S.C. 2025, c. 2, s. 4 (assented to 26 June 2025)",
    "legal_scope": "Federal statute under which the Governor in Council may, by order, add a project it considers in the national interest to Schedule 1 (s. 5), after a 30-day Canada Gazette notice and consultation, and with the written consent of the province or territory where the project falls within its exclusive jurisdiction. For a listed project every determination, finding and opinion needed for an authorization under an Act or regulation listed in Schedule 2 is deemed favourable, although no authorization is granted solely on that basis (s. 6), and the Minister must issue a document deemed to be the specified authorizations, with conditions (s. 7). For a project to which the Nuclear Safety and Control Act applies, the Minister must consult the Canadian Nuclear Safety Commission and may issue or amend such a document only after the Commission confirms it will not compromise health or safety, national security or Canada's international obligations (ss. 11-14). In the consolidation current to 30 September 2026 Schedule 1 lists no project and Schedule 2 does not list the Nuclear Safety and Control Act. The Act designates no reactor project and grants no licence.",
    "affects": [
      "reactor_licensing",
      "programme_administration"
    ],
    "status": "in_effect",
    "lifecycle": [
      {
        "event": "enacted",
        "date": {
          "value": "2025-06-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-ca-building-canada-act",
        "note": "Assented to and in force on assent."
      },
      {
        "event": "amended",
        "date": {
          "value": "2026-03-26",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-pr-ca-building-canada-act",
        "note": "Last amendment shown in the consolidation; not reviewed separately."
      }
    ],
    "effective_date": {
      "value": "2025-06-26",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-pr-ca-building-canada-act",
      "version": "Consolidated Act current to 2026-09-30, last amended on 2026-03-26 (Justice Laws Website)",
      "document_date": "2026-09-30"
    },
    "legal_definitions": [
      {
        "term": "authorization",
        "section": "s. 2",
        "paraphrase": "For a national interest project, an approval, decision, permit, licence or other instrument required by an Act or regulation listed in Schedule 2 (or the listed portion of it) to permit the project to be carried out.",
        "source_id": "src-pr-ca-building-canada-act",
        "note": "Legal definition used by this statute only; SMRMap's inclusion rule for SMRs is separate and unchanged."
      }
    ],
    "related": [
      {
        "policy_id": "pol-ca-nuclear-safety-and-control-act",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "No project is listed in Schedule 1 of the consolidation read. The order defining the national interest under section 4.1 and the 26 March 2026 amendment were not reviewed. The power to add projects ends on the fifth anniversary of section 5 coming into force (s. 5(2)).",
    "summary": "Canadian law of June 2025 that lets the federal cabinet list national interest projects and then issue a single document standing in for listed federal approvals. For a project covered by the Nuclear Safety and Control Act, the Canadian Nuclear Safety Commission must be consulted and must confirm safety and security first. No project was listed in the version current to 30 September 2026, and it grants no licence.",
    "sources": [
      "src-pr-ca-building-canada-act"
    ],
    "confidence": "high",
    "last_checked": "2026-10-30",
    "next_review": "2027-04-30",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-materials-modernization-2026",
    "slug": "us-nrc-materials-modernization-2026",
    "name": "NRC proposal: modernizing materials licensing",
    "short_label": "NRC proposal: modernizing materials licensing",
    "category": "proposed",
    "instrument_type": "proposed_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 38124, 38135; FR Doc. 2026-12702; NRC-2025-1370; RIN 3150-AL56",
    "legal_scope": "NRC proposed changes to materials licensing on 24 June 2026. Its Part 72 discussion would clarify the spent-fuel definition and damaged-fuel description for advanced reactor fuels. These are proposed changes, not an adopted rule, fuel approval or reactor permission.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-06-24",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-2026-12702",
        "note": "Publication of the instrument described here. Later final disposition not established.",
        "reader": {
          "headline": "NRC proposes materials-licensing changes for advanced reactor fuels",
          "what": "The proposed rule includes changes to the Part 72 spent-fuel definition and damaged-fuel description.",
          "limit": "A proposed change, not an adopted rule, fuel approval or reactor authorization.",
          "date_label": "Proposal published"
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-2026-12702",
      "version": "As published; retained official notice PDF",
      "document_date": "2026-06-24"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The 24 June notice is a proposal, not an adopted amendment. Its stated 10 August 2026 comment deadline is past; that does not establish adoption. No fuel approval, materials licence or reactor authorization follows. No later final instrument or project-specific authorization was examined.",
    "summary": "NRC proposed changes to materials licensing on 24 June 2026. Its Part 72 discussion would clarify the spent-fuel definition and damaged-fuel description for advanced reactor fuels. These are proposed changes, not an adopted rule, fuel approval or reactor permission.",
    "sources": [
      "src-fr-2026-12702"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-marad-marine-smr-rfi-2026",
    "slug": "us-marad-marine-smr-rfi-2026",
    "name": "MARAD consultation: a marine SMR concept",
    "short_label": "MARAD consultation: a marine SMR concept",
    "category": "proposed",
    "instrument_type": "consultation",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Maritime Administration",
    "citation": "91 FR 24961; FR Doc. 2026-09070; MARAD-2026-0729",
    "legal_scope": "MARAD published a request for information on 7 May 2026 about a U.S.-built marine small modular reactor concept and its deployment framework. It sought public information, not bids for a completed reactor order. No vessel selection, licence or deployment is established.",
    "affects": [
      "programme_administration"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-05-07",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-2026-09070",
        "note": "Publication of the instrument described here. Later final disposition not established.",
        "reader": {
          "headline": "MARAD seeks information about a marine SMR concept",
          "what": "The agency requested public information on a U.S.-built marine SMR concept and its deployment framework.",
          "limit": "A request for information, not a vessel award, licence or deployment.",
          "date_label": "Notice published"
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-2026-09070",
      "version": "As published; retained official notice metadata and abstract only",
      "document_date": "2026-05-07"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "This is a request for information, not a vessel award, licence or deployment. Its stated 5 August 2026 comment deadline is past; no later selection is established. No later final instrument or project-specific authorization was examined.",
    "summary": "MARAD published a request for information on 7 May 2026 about a U.S.-built marine small modular reactor concept and its deployment framework. It sought public information, not bids for a completed reactor order. No vessel selection, licence or deployment is established.",
    "sources": [
      "src-fr-2026-09070"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-material-compatibility-draft-2026",
    "slug": "us-nrc-material-compatibility-draft-2026",
    "name": "NRC consultation: draft non-light-water reactor materials guidance",
    "short_label": "NRC consultation: draft non-light-water reactor materials guidance",
    "category": "proposed",
    "instrument_type": "consultation",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 59813; FR Doc. 2026-19217; NRC-2022-0215",
    "legal_scope": "NRC published a request for comment on 21 September 2026 on draft DANU-ISG-2023-01, Revision 1, covering material compatibility for non-light-water reactors. This record establishes the consultation notice, not the contents or adoption of the underlying guidance.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-09-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-2026-19217",
        "note": "Publication of the instrument described here. Later final disposition not established.",
        "reader": {
          "headline": "NRC seeks comments on draft reactor materials guidance",
          "what": "The notice concerns draft DANU-ISG-2023-01, Revision 1, for non-light-water reactors.",
          "limit": "The underlying draft guidance was not opened; the notice establishes no effective guidance or permission.",
          "date_label": "Notice published"
        }
      },
      {
        "event": "comment_period_closed",
        "date": {
          "value": "2026-11-05",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-gpo-nrc-material-compatibility-20260921",
        "reader": {
          "headline": "Comments close on NRC draft non-light-water reactor materials guidance",
          "what": "The comment period on draft DANU-ISG-2023-01, Revision 1, closed on 5 November 2026.",
          "limit": "The draft is not adopted guidance."
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-2026-19217",
      "version": "As published; full official notice text read",
      "document_date": "2026-09-21"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The underlying interim staff guidance was not opened. The notice's 5 November 2026 comment deadline has passed; that does not establish adoption. It does not establish an effective guidance document or reactor permission. The Federal Register showed no extension or final guidance through 10 November 2026.",
    "summary": "NRC published a request for comment on 21 September 2026 on draft DANU-ISG-2023-01, Revision 1, covering material compatibility for non-light-water reactors. This record establishes the consultation notice, not the contents or adoption of the underlying guidance.",
    "sources": [
      "src-fr-2026-19217",
      "src-gpo-nrc-material-compatibility-20260921"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-army-doe-advanced-reactor-catex-2026",
    "slug": "us-army-doe-advanced-reactor-catex-2026",
    "name": "Army adoption of DOE advanced-reactor categorical exclusion",
    "short_label": "Army adoption of DOE advanced-reactor categorical exclusion",
    "category": "regulatory_guidance",
    "instrument_type": "regulatory_guidance",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Department of the Army",
    "citation": "91 FR 56135–56136; FR Doc. 2026-17818",
    "legal_scope": "The Army published its adoption of DOE categorical exclusion B5.26 on 1 September 2026, effective and available for Army use that day. The notice refers to potential microreactor installations without naming a site. It is an administrative environmental-review procedure, not a reactor licence or project approval.",
    "affects": [
      "environmental_review"
    ],
    "status": "published",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-09-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-2026-17818",
        "note": "Publication of the instrument described here. Later final disposition not established.",
        "reader": {
          "headline": "Army publishes adoption of DOE advanced-reactor categorical exclusion",
          "what": "The Army adopted DOE categorical exclusion B5.26 as an available environmental-review procedure.",
          "limit": "No installation is named and no reactor site, construction or operation is approved.",
          "date_label": "Notice published"
        }
      },
      {
        "event": "effective",
        "date": {
          "value": "2026-09-01",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-2026-17818",
        "note": "Availability of the adopted exclusion for Army use, not approval of a particular project.",
        "reader": {
          "headline": "Army can use the adopted advanced-reactor categorical exclusion",
          "what": "The adoption notice states that DOE categorical exclusion B5.26 is available for Army use from 1 September 2026.",
          "limit": "No installation is named and no reactor site, construction or operation is approved.",
          "date_label": "Available for Army use"
        }
      }
    ],
    "effective_date": {
      "value": "2026-09-01",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-2026-17818",
      "version": "As published; retained official notice PDF",
      "document_date": "2026-09-01"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Effective means the exclusion is available for Army use. The notice names no installation and approves no reactor site, construction, operation or licence. Its administrative adoption does not eliminate the separate conditions for using an exclusion. No later final instrument or project-specific authorization was examined.",
    "summary": "The Army published its adoption of DOE categorical exclusion B5.26 on 1 September 2026, effective and available for Army use that day. The notice refers to potential microreactor installations without naming a site. It is an administrative environmental-review procedure, not a reactor licence or project approval.",
    "sources": [
      "src-fr-2026-17818"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-package-certification-proposal-2026",
    "slug": "us-nrc-package-certification-proposal-2026",
    "name": "NRC proposal: package certification and microreactor transport",
    "short_label": "NRC proposal: package certification and microreactor transport",
    "category": "proposed",
    "instrument_type": "proposed_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 46869, 46871; FR Doc. 2026-15117; NRC-2025-1667; RIN 3150-AL62",
    "legal_scope": "NRC proposed changes to package certification on 27 July 2026. Under stated conditions, the proposal would allow increased radiation-level limits for certain Type B packages, primarily to facilitate potential microreactor transport-package designs submitted for review. It certifies no package and authorizes no deployment.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "proposed",
        "date": {
          "value": "2026-07-27",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-2026-15117",
        "note": "Publication of the instrument described here. Later final disposition not established.",
        "reader": {
          "headline": "NRC proposes package-certification changes for microreactor transport",
          "what": "The proposed rule would allow increased radiation-level limits for some Type B packages under stated conditions.",
          "limit": "It certifies no package and authorizes no reactor deployment.",
          "date_label": "Proposal published"
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-2026-15117",
      "version": "As published; retained official notice PDF",
      "document_date": "2026-07-27"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The changes are proposed and conditional on any designs being submitted for review. No package is certified and no microreactor is licensed. Its stated 26 August 2026 comment deadline is past; that does not establish adoption. No later final instrument or project-specific authorization was examined.",
    "summary": "NRC proposed changes to package certification on 27 July 2026. Under stated conditions, the proposal would allow increased radiation-level limits for certain Type B packages, primarily to facilitate potential microreactor transport-package designs submitted for review. It certifies no package and authorizes no deployment.",
    "sources": [
      "src-fr-2026-15117"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-training-review-draft-2026",
    "slug": "us-nrc-training-review-draft-2026",
    "name": "NRC consultation: draft training-review guidance",
    "short_label": "NRC consultation: draft training-review guidance",
    "category": "proposed",
    "instrument_type": "consultation",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 46175 and 91 FR 54407 (comment-period extension); FR Docs. 2026-14702 and 2026-17132; NRC-2026-1849",
    "legal_scope": "NRC published a request for comment on draft NUREG-1220, Revision 2, on 22 July 2026. The notice describes training-review guidance covering stationary microreactors and small modular light-water reactors among other reactors. The underlying draft was not opened; no adopted guidance is established.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "proposed",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-07-22",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-2026-14702",
        "note": "Publication of the instrument described here. Later final disposition not established.",
        "reader": {
          "headline": "NRC seeks comments on draft training-review guidance",
          "what": "The notice describes draft NUREG-1220, Revision 2, including stationary microreactors and small modular LWRs.",
          "limit": "The underlying draft was not opened. This is not adopted guidance or a training-program approval.",
          "date_label": "Notice published"
        }
      },
      {
        "event": "comment_period_closed",
        "date": {
          "value": "2026-09-21",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-fr-2026-17132",
        "note": "Extended from 21 August 2026 by 91 FR 54407.",
        "reader": {
          "headline": "Comments close on NRC draft training-review guidance",
          "what": "After a one-month extension, the comment period on draft NUREG-1220, Revision 2, closed on 21 September 2026.",
          "limit": "This is not adopted guidance or a training-program approval."
        }
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-fr-2026-14702",
      "version": "As published; retained official notice PDF",
      "document_date": "2026-07-22"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "The underlying draft NUREG was not opened. The comment notice is not adopted guidance, a training-program approval or a reactor licence. No later final instrument or project-specific authorization was examined.",
    "summary": "NRC published a request for comment on draft NUREG-1220, Revision 2, on 22 July 2026. The notice describes training-review guidance covering stationary microreactors and small modular light-water reactors among other reactors. The underlying draft was not opened; no adopted guidance is established.",
    "sources": [
      "src-fr-2026-14702",
      "src-fr-2026-17132"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-02-09",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-in-dor-ib124-202506",
    "slug": "in-smr-manufacturing-credit-guidance",
    "name": "Indiana tax guidance on the SMR manufacturing expense credit",
    "short_label": "Indiana SMR manufacturing credit guidance",
    "category": "regulatory_guidance",
    "instrument_type": "regulatory_guidance",
    "jurisdiction": "US-IN",
    "jurisdiction_level": "state",
    "issuing_authority": "Indiana Department of Revenue",
    "citation": "Income Tax Information Bulletin 124 (June 2025), citing IC 6-3.1-45",
    "legal_scope": "Department of Revenue guidance for taxpayers making qualified investments to manufacture small modular nuclear reactors in Indiana. It describes a credit equal to 20 percent of qualified manufacturing investment and the department's claim process. This bulletin is not the statute and says material inconsistent with law is not binding.",
    "affects": [
      "project_funding"
    ],
    "status": "published",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2025-06",
          "precision": "month",
          "basis": "actual"
        },
        "source": "src-in-dor-ib124-202506",
        "note": "The bulletin states June 2025, with no publication day. Its \"Upon Publication\" effective label refers to the bulletin, not a separately verified commencement date of the statute."
      }
    ],
    "effective_date": null,
    "expiry": null,
    "operative_source": {
      "source_id": "src-in-dor-ib124-202506",
      "version": "Income Tax Information Bulletin 124, June 2025",
      "document_date": "2025-06"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "No tax credit, payment, eligibility decision or reactor permission is established for Breed or any other named project. The underlying enacted/current statutory text was not read in this pass. Manufacturing expenditure is distinct from buying, building or operating a reactor. This guidance is not an enacted law.",
    "summary": "Indiana Revenue's June 2025 bulletin explains a tax credit under IC 6-3.1-45 for qualified Indiana SMR manufacturing investment. It describes a 20 percent credit, carryforward of unused credit, no carryback or refund, and a submission followed by a department award letter. The cited source is nontechnical guidance, not the enacted statute. It does not establish that Breed, AEP, Amazon or X-energy received a credit, and it establishes no reactor permission.",
    "sources": [
      "src-in-dor-ib124-202506"
    ],
    "confidence": "high",
    "last_checked": "2026-11-03",
    "next_review": "2027-02-03",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-us-nrc-contested-adjudications-2026",
    "slug": "us-nrc-contested-adjudications-2026",
    "name": "NRC final rule: Streamlining Contested Adjudications in Licensing Proceedings",
    "short_label": "Contested hearing pathways",
    "category": "enacted_binding",
    "instrument_type": "final_rule",
    "jurisdiction": "US",
    "jurisdiction_level": "federal",
    "issuing_authority": "U.S. Nuclear Regulatory Commission",
    "citation": "91 FR 69446-69490, FR Doc. 2026-22443, docket NRC-2025-1501, RIN 3150-AL58",
    "legal_scope": "Revises the NRC rules of practice and procedure for contested adjudications in licensing proceedings, establishing Standard, Focused and Expedited hearing pathways. The rule describes 18-month and 12-month review schedules as pathway context, not universal hearing durations; some applications with an 18-month standard review schedule can use the Focused pathway. Applies to contested adjudicatory proceedings noticed on or after 3 December 2026.",
    "affects": [
      "nrc_licensing"
    ],
    "status": "adopted_not_yet_effective",
    "lifecycle": [
      {
        "event": "published",
        "date": {
          "value": "2026-11-03",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-gpo-nrc-contested-adjudications-final-20261103",
        "reader": {
          "headline": "NRC publishes new pathways for contested licensing hearings",
          "what": "The final rule sets Standard, Focused and Expedited pathways for contested adjudications in NRC licensing proceedings.",
          "limit": "Effective 3 December 2026 for proceedings noticed on or after that date; it decides no project application.",
          "date_label": "Published"
        }
      }
    ],
    "effective_date": {
      "value": "2026-12-03",
      "precision": "day",
      "basis": "actual"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-gpo-nrc-contested-adjudications-final-20261103",
      "version": "Published final rule, Federal Register volume 91, pages 69446-69490",
      "document_date": "2026-11-03"
    },
    "legal_definitions": [],
    "related": [
      {
        "policy_id": "pol-us-advance-act-2024",
        "relation": "responds_to"
      },
      {
        "policy_id": "pol-us-eo-14300",
        "relation": "responds_to"
      },
      {
        "policy_id": "pol-us-nrc-mandatory-hearing-flexibility-2026",
        "relation": "related"
      }
    ],
    "applicability": [],
    "unapproved": "Published on 3 November but not effective until 3 December 2026, and only for contested proceedings noticed on or after that date. It changes hearing procedure; it grants no licence or permit and does not resolve any pending contention.",
    "summary": "NRC published a final rule on 3 November 2026 to streamline contested adjudications in its licensing proceedings, in response to the ADVANCE Act and Executive Order 14300. It sets Standard, Focused and Expedited hearing pathways, which the Commission says are not rigid designations. It takes effect on 3 December 2026 for contested proceedings noticed on or after that date. It is separate from the mandatory (uncontested) hearing rule of April 2026.",
    "sources": [
      "src-gpo-nrc-contested-adjudications-final-20261103"
    ],
    "confidence": "high",
    "last_checked": "2026-11-10",
    "next_review": "2026-12-03",
    "review_state": "verified"
  },
  {
    "stable_id": "pol-ee-nuclear-energy-safety-act-2026",
    "slug": "estonia-nuclear-energy-safety-act-2026",
    "name": "Estonia: Nuclear Energy and Nuclear Safety Act (Tuumaenergia ja -ohutuse seadus)",
    "short_label": "Estonia Nuclear Energy and Safety Act",
    "category": "enacted_binding",
    "instrument_type": "statute",
    "jurisdiction": "EE",
    "jurisdiction_level": "national",
    "issuing_authority": "Riigikogu (Parliament of Estonia)",
    "citation": "Tuumaenergia ja -ohutuse seadus (TEnOS), adopted 17 June 2026, proclaimed by the President's resolution no. 772 of 2 July 2026, RT I, 11.07.2026, 1; to take effect 1 January 2027 (s. 134).",
    "legal_scope": "Regulates civil possession and handling of nuclear material, the nuclear fuel cycle, planning, construction, testing, operation and decommissioning of nuclear installations, local-benefit payments, emergency preparedness, nuclear security, nuclear waste and liability for nuclear damage (s. 1). Makes the Consumer Protection and Technical Regulatory Authority the competent authority (s. 13). A positive preliminary assessment is a precondition for applying for a construction permit (s. 20), and the Riigikogu decides whether to approve the Government's position on a draft preliminary assessment (s. 21).",
    "affects": [
      "reactor_licensing",
      "siting"
    ],
    "status": "adopted_not_yet_effective",
    "lifecycle": [
      {
        "event": "passed",
        "date": {
          "value": "2026-06-17",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-rt-ee-teos-2026",
        "note": "Vastu võetud 17.06.2026.",
        "reader": {
          "headline": "Estonia adopts a Nuclear Energy and Nuclear Safety Act, to take effect on 1 January 2027",
          "what": "The Riigikogu adopted the Act on 17 June 2026. It sets nuclear safety rules for each stage of an installation's life. The Ministry of Climate says it creates a nuclear regulator within the Consumer Protection and Technical Regulatory Authority.",
          "limit": "Not yet in force. The Act approves no site, design or project.",
          "date_label": "Adopted"
        }
      },
      {
        "event": "signed",
        "date": {
          "value": "2026-07-02",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-rt-ee-teos-2026",
        "note": "Proclaimed by the President of the Republic, resolution no. 772 of 2 July 2026."
      },
      {
        "event": "published",
        "date": {
          "value": "2026-07-11",
          "precision": "day",
          "basis": "actual"
        },
        "source": "src-rt-ee-teos-2026",
        "note": "RT I, 11.07.2026, 1."
      }
    ],
    "effective_date": {
      "value": "2027-01-01",
      "precision": "day",
      "basis": "planned"
    },
    "expiry": null,
    "operative_source": {
      "source_id": "src-rt-ee-teos-2026",
      "version": "Original text as published in Riigi Teataja, RT I, 11.07.2026, 1",
      "document_date": "2026-07-11"
    },
    "legal_definitions": [],
    "related": [],
    "applicability": [],
    "unapproved": "Not yet in force. Approves no site, design or project. Implementing regulations were not read.",
    "summary": "Estonia's parliament adopted a Nuclear Energy and Nuclear Safety Act on 17 June 2026, to take effect on 1 January 2027. It names the Consumer Protection and Technical Regulatory Authority as the competent authority for radiation and nuclear safety and requires a positive preliminary assessment, with a Riigikogu decision in that procedure, before an application for a construction permit. It licenses or sites no reactor.",
    "sources": [
      "src-rt-ee-teos-2026",
      "src-pc-ee-teos-2026",
      "src-pc-ee-kliim-nuclear-programme"
    ],
    "confidence": "high",
    "last_checked": "2026-11-11",
    "next_review": "2027-01-08",
    "review_state": "verified"
  }
]
