    "stable_id": "prg-se-blykalla-evroc-studsvik-feasibility",
    "slug": "se-blykalla-evroc-studsvik-feasibility",
    "name": "Blykalla–evroc–Studsvik nuclear-powered data-centre feasibility memorandum",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "SE"
    ],
    "participants": [
      {
        "organization_id": "org-blykalla",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "evroc",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-studsvik",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-sealer"
    ],
    "announced": {
      "value": "2025-10-06",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "October 2025 memorandum planned a steering committee and partnership talks. No later step was found. Studsvik's October 2026 results release names other new-nuclear partners and not this one.",
    "summary": "In October 2025 Blykalla, evroc and Studsvik signed a memorandum to assess commercial and technical co-location of data centres and SEALER reactors at Studsvik’s existing nuclear site in Nyköping. Work includes municipal and landowner engagement and considering a future PPA structure. The release planned a steering committee and later partnership negotiations. Their completion is not established. Studsvik’s existing site licence does not authorize a new Blykalla reactor. No unit count or capacity is committed.",
    "sources": [
      "src-blykalla-evroc-studsvik-20251006",
      "src-prgst-4f2ec745e0",
      "src-prgst-943cff28f0"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "October 2025 memorandum planned a steering committee and partnership talks. No later step was found. Studsvik's October 2026 results release names other new-nuclear partners and not this one. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Blykalla, evroc or Studsvik statement on the steering committee outcome or partnership negotiations.",
        "evidence": [
          {
            "source_id": "src-blykalla-evroc-studsvik-20251006",
            "locator": "Blykalla release 6 Oct 2025, penultimate paragraph: 'establish a joint steering committee'"
          },
          {
            "source_id": "src-prgst-4f2ec745e0",
            "locator": "Page 1, events of the quarter: Studsvik chose GE Vernova Hitachi, Samsung C&T and others 'som strategiska partners för ny kärnkraft'"
          },
          {
            "source_id": "src-prgst-943cff28f0",
            "locator": "Quarter events: May application for 'mellan 600 och 1 400 MW ny kärnkraft' at and near Nyköping"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-terrapower-nvision-natrium-framework",
    "slug": "us-terrapower-nvision-natrium-framework",
    "name": "TerraPower–nVision Natrium development framework",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "nVision Energy, LLC",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-natrium"
    ],
    "scale_text": "US development framework. No unit count, selected site or power sale committed",
    "announced": {
      "value": "2025-02-12",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Feb 2025 framework for a repeatable Natrium development model with nVision. No term is stated in the announcement and no project, site or later step under it was found.",
    "summary": "TerraPower and nVision Energy announced an agreement to develop a repeatable model for Natrium reactor and energy-storage projects across the United States, combining reactor technology with nVision's project-development and financing work. The announcement commits no units, customer purchase, selected site or licence application.",
    "sources": [
      "src-terrapower-nvision-20250212"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Feb 2025 framework for a repeatable Natrium development model with nVision. No term is stated in the announcement and no project, site or later step under it was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A TerraPower or nVision/NOVI Energy announcement of a Natrium project developed under the framework",
        "evidence": [
          {
            "source_id": "src-terrapower-nvision-20250212",
            "locator": "Release 12 Feb 2025, para 1: 'agreement to establish a framework for a repeatable deployment model'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-terrapower-sabey-natrium-mou",
    "slug": "us-terrapower-sabey-natrium-mou",
    "name": "TerraPower–Sabey Data Centers exploratory Natrium memorandum",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Sabey Data Centers",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-natrium"
    ],
    "scale_text": "Exploratory data-center power collaboration. No units or capacity committed",
    "announced": {
      "value": "2025-01-21",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "January 2025 memorandum to develop a collaboration agreement. No agreement, later step or end was found, and TerraPower's newsroom through August 2026 shows no Sabey follow-up.",
    "summary": "TerraPower and Sabey Data Centers announced an MOU to explore Natrium power for Sabey's current and future data-center operations. They identified the Rocky Mountain region and Texas as areas to explore and planned to consider several project structures. The MOU names no selected site, reactor count, purchase commitment or permit application.",
    "sources": [
      "src-terrapower-sabey-20250121"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "January 2025 memorandum to develop a collaboration agreement. No agreement, later step or end was found, and TerraPower's newsroom through August 2026 shows no Sabey follow-up. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A TerraPower or Sabey announcement of the strategic collaboration agreement, a site, or an end to the memorandum.",
        "evidence": [
          {
            "source_id": "src-terrapower-sabey-20250121",
            "locator": "TerraPower release 21 Jan 2025, first paragraph: 'memorandum of understanding to develop a strategic collaboration agreement'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-trisox-ornl-research-2026",
    "slug": "trisox-ornl-research-2026",
    "name": "TRISO-X–ORNL fuel-research agreement extension",
    "programme_type": "research_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-triso-x",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-aris-ornl",
        "role": "research"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "scale_text": "30-month research agreement. Continued pilot-facility work, no reactor order",
    "announced": {
      "value": "2026-08-11",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "The August 2026 release reports a research extension and continued ORNL pilot operations. No completed commercial fuel qualification or reactor permission is established.",
    "summary": "TRISO-X announced a 30-month extension of its ORNL cooperative research relationship, continuing its existing pilot facility and work on fuel-fabrication quality, yield and characterization. This research aims to develop manufacturing processes. It establishes no delivered commercial fuel, completed fuel qualification or reactor order.",
    "sources": [
      "src-xenergy-ornl-extension-20260811"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-17",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-xenergy-prometheus-research-2026",
    "slug": "xenergy-prometheus-research-2026",
    "name": "X-energy participation in Project Prometheus",
    "programme_type": "research_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-aris-idaho-national-laboratory",
        "role": "research"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "scale_text": "Three-year AI/nuclear research initiative. No reactor order or licensed AI control system",
    "announced": {
      "value": "2026-07-22",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "X-energy reports founding Tier 1 participation in an INL-led initiative. Prospective workflow improvements do not establish a licensing decision or approved reactor-control change.",
    "summary": "X-energy announced Tier 1 participation in the INL-led Project Prometheus research initiative, contributing Xe-100/TRISO-X design data and $10 million in private capital. The company reports a $60 million award to the wider three-year initiative, not to X-energy alone. Work targets engineering, licensing and manufacturing workflows. Its FAQ rules out present Xe-100 control-room AI integration. Neither reactor permission nor achieved deployment acceleration is established.",
    "sources": [
      "src-xenergy-prometheus-20260722"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-17",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-fanco-atkins-engineering-alliance-2026",
    "slug": "fanco-atkins-engineering-alliance-2026",
    "name": "FANCO–AtkinsRéalis EAGL-1 engineering alliance",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-fanco",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-atkinsrealis",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-eagl-1"
    ],
    "scale_text": "20-year North American engineering framework. No reactor order or plant capacity committed",
    "announced": {
      "value": "2026-05-13",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "20-year EPCM alliance signed in May 2026. AtkinsRéalis said work had already begun on the first task orders. No reactor order, site or permit is recorded.",
    "summary": "AtkinsRéalis announced a 20-year North American EPCM alliance for FANCO's EAGL-1 projects, with initial task orders covering design procedures, balance-of-plant conceptual design and nuclear steam supply system review. The framework supports US deployment aims, while its regional scope establishes no Canadian or Mexican deployment. It commits no reactor order, selected site, plant construction contract or permission.",
    "sources": [
      "src-atkins-fanco-alliance-20260513"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "20-year EPCM alliance signed in May 2026. AtkinsRéalis said work had already begun on the first task orders. No reactor order, site or permit is recorded.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Further task orders or an AtkinsRéalis or FANCO statement on the alliance, or an EAGL-1 site or construction-permit filing",
        "evidence": [
          {
            "source_id": "src-atkins-fanco-alliance-20260513",
            "locator": "Release 13 May 2026, para 1: 'Work has already begun on the task orders'"
          },
          {
            "source_id": "src-atkins-fanco-alliance-20260513",
            "locator": "Para 3: first task orders cover procedures, balance-of-plant conceptual design and NSSS design review"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-fanco-hyundai-framework-2026",
    "slug": "fanco-hyundai-framework-2026",
    "name": "FANCO–Hyundai E&C EAGL-1 cooperation framework",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-fanco",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-hyundai-ec",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-eagl-1"
    ],
    "scale_text": "Early engineering cooperation. No reactor count or nuclear capacity committed",
    "announced": {
      "value": "2026-07-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Framework signed 13 July 2026 and five-year master service agreement signed 30 October 2026, with no task order, site or reactor order stated.",
    "summary": "Hyundai E&C reported an EAGL-1 framework signed on 13 July 2026 (published 14 July) covering early balance-of-plant design, Bridge Power support, construction-feasibility reviews and modularization, then a five-year master service agreement signed on 30 October 2026 for constructability reviews, design and engineering advice and construction feedback. Scope, duration and value are set by later task orders, a future EPC role is exploratory and initial Bridge Power gas generation is not nuclear capacity. No site, reactor order, operator or configuration is named.",
    "sources": [
      "src-hyundai-fanco-framework-20260714",
      "src-hyundai-fanco-msa-20261102"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "Hyundai E&C's 2 November 2026 release reports a five-year master service agreement signed 30 October 2026, advancing the July framework. Work is set by later task orders; none is stated.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-11-11",
        "next_review": "2027-05-11",
        "next_trigger": "A Hyundai E&C or FANCO announcement of a task order, an EPC agreement or a selected Indiana site.",
        "evidence": [
          {
            "source_id": "src-hyundai-fanco-msa-20261102",
            "locator": "Hyundai E&C release 2 Nov 2026: 'signed a Master Service Agreement (MSA)'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-thorizon-tno-materials-2026",
    "slug": "thorizon-tno-materials-2026",
    "name": "Thorizon–TNO molten-salt reactor materials programme",
    "programme_type": "research_programme",
    "countries": [
      "NL"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-thorizon",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-tno",
        "role": "research"
      }
    ],
    "design_ids": [
      "dsn-catalogue-thorizon-one",
      "dsn-thorizon-pioneer"
    ],
    "related_project_ids": [
      "prj-thorizon-pioneer-petten"
    ],
    "scale_text": "Materials testing and modelling. No reactor order or output commitment",
    "announced": {
      "value": "2026-10-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Both partners report initial Amsterdam and Petten research while defining the testing plan, without establishing a reactor order, new site commitment or permission.",
    "summary": "Thorizon and TNO announced a TNO-led materials and corrosion programme to generate experimental data and predictive models for PIONEER licensing and later Thorizon One deployment. Initial work is under way in Amsterdam and Petten, with wider Dutch and international partners still prospective. This research agreement establishes no completed material qualification, reactor order, new site commitment or permission.",
    "sources": [
      "src-thorizon-tno-materials-20261014",
      "src-tno-thorizon-materials-20261014"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-17",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ae-enec-adnoc-smr-assessment",
    "slug": "ae-enec-adnoc-smr-assessment",
    "name": "ENEC and ADNOC agreement to assess SMRs and advanced reactors for ADNOC operations",
    "programme_type": "customer_agreement",
    "countries": [
      "AE"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Emirates Nuclear Energy Company (ENEC)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "ADNOC",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "no units, design or site",
    "announced": {
      "value": "2024-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Strategic collaboration agreement for technical and economic assessment, no plant.",
    "summary": "In November 2024 ENEC and ADNOC signed a strategic collaboration agreement to evaluate deploying advanced nuclear technology such as SMRs for ADNOC's operations, including a technical and economic assessment of best-fit reactor technologies and studies on using excess Barakah heat. No plant or site is named.",
    "sources": [
      "src-prg-7e32c12730",
      "src-prgsrc-2a0401b0b8"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "ENEC's own release states that ENEC and ADNOC signed a strategic collaboration agreement to assess SMRs and other advanced reactor technologies for ADNOC and to study use of Barakah excess heat.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-2a0401b0b8",
            "locator": "Opening paragraph under the headline: 'signed a Strategic Collaboration Agreement (SCA) with ADNOC'; second paragraph covers the technical and economic assessment and the Barakah excess-heat feasibility studies"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ae-enec-advance-programme",
    "slug": "ae-enec-advance-programme",
    "name": "ENEC ADVANCE programme for advanced reactors and its COP28 SMR memoranda",
    "programme_type": "government_programme",
    "countries": [
      "AE"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Emirates Nuclear Energy Company (ENEC)",
        "role": "government"
      },
      {
        "organization_id": "org-gevh",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-usnc",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-catalogue-moltexflex",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300",
      "dsn-catalogue-flex",
      "dsn-natrium",
      "dsn-xe-100"
    ],
    "scale_text": "technology evaluations, no units or sites",
    "announced": {
      "value": "2023-12",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Evaluation MoUs under ENEC's ADVANCE programme, no plant, site or order.",
    "summary": "Around COP28 in December 2023 ENEC launched a programme to evaluate advanced reactors, later named ADVANCE, and signed memoranda with MoltexFLEX, X-energy and USNC, after earlier MoUs with GE Hitachi (BWRX-300), TerraPower (Natrium) and Westinghouse. These are evaluation agreements, no plant, site or order is recorded.",
    "sources": [
      "src-prg-0493a9b4fe",
      "src-prg-f3901e1fee"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ae-nano-ehc-kronos-mou",
    "slug": "ae-nano-ehc-kronos-mou",
    "name": "NANO Nuclear Energy and EHC Investment memorandum on KRONOS MMR deployment in the UAE",
    "programme_type": "cooperation_mou",
    "countries": [
      "AE"
    ],
    "participants": [
      {
        "organization_id": "org-nano-nuclear",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "EHC Investment L.L.C.",
        "role": "investor"
      }
    ],
    "design_ids": [
      "dsn-kronos-mmr"
    ],
    "scale_text": "no units or sites",
    "announced": {
      "value": "2026-02-24",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU to explore a joint venture, to be formed only after a first commercial project or order.",
    "summary": "On 24 February 2026 NANO Nuclear Energy signed a memorandum with Abu Dhabi holding company EHC Investment to explore a joint venture for deploying micro modular reactors, notably KRONOS MMR, in the UAE and the wider Gulf. A formal joint venture is anticipated only after securing a first commercial project or order.",
    "sources": [
      "src-prg-b300582107"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-am-smr-replacement-unit",
    "slug": "am-smr-replacement-unit",
    "name": "Armenia's plan for an SMR as its next nuclear unit (US FIRST pre-feasibility study, US-Armenia nuclear agreement)",
    "programme_type": "national_plan",
    "countries": [
      "AM"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Armenia",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "US Department of State (FIRST programme)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Sargent & Lundy",
        "role": "other"
      }
    ],
    "scale_text": "four US SMR technologies short-listed by a pre-feasibility study, no selection",
    "announced": {
      "value": "2025-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Options under evaluation, no vendor selection, site decision or contract.",
    "summary": "Armenia's prime minister said in October 2025 that the next reactor would be an SMR. In February 2026 Armenia and the US completed negotiations on a civil nuclear cooperation agreement, which US Vice President Vance said means US SMR technology coming to Armenia, and in May 2026 a US-funded FIRST pre-feasibility study short-listed four US SMR technologies to replace the Armenian NPP unit. No vendor has been selected.",
    "sources": [
      "src-prg-846a442a1d",
      "src-prg-d45e552dec",
      "src-prg-398c3f6b7b"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The US Embassy Yerevan statement of about 22 May 2026 on the Sargent & Lundy FIRST pre-feasibility visit, a US State Department FIRST page for Armenia, or the 9 February 2026 Armenia-US joint statement on completing negotiations of the peaceful-use nuclear cooperation agreement (primeminister.am or state.gov).",
        "evidence": [
          {
            "source_id": "src-prg-846a442a1d",
            "locator": "Paragraphs 1 to 3 of the atomic-energy.ru item: the US Embassy in Armenia says Sargent & Lundy finished a preliminary feasibility study under the FIRST programme and four US SMR technologies were identified"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-bg-beh-fluor-nuscale-mou",
    "slug": "bg-beh-fluor-nuscale-mou",
    "name": "Bulgarian Energy Holding and Fluor memorandum on NuScale SMRs to replace coal units",
    "programme_type": "cooperation_mou",
    "countries": [
      "BG"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Bulgarian Energy Holding (BEH)",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Fluor",
        "role": "other"
      },
      {
        "organization_id": "org-nuscale",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-voygr"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2021-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Oct 2021 MoU to evaluate SMRs at coal sites. A 2026 USTDA tender cites it only as background for a separate study comparing U.S. SMR vendors. No later step under the MoU found.",
    "summary": "In October 2021 Bulgarian Energy Holding signed a memorandum with Fluor covering, among other things, evaluation of replacing coal boilers with NuScale SMRs, BEH described it more generally as information exchange and preliminary assistance. No site or order is recorded.",
    "sources": [
      "src-prg-a47c63d90f",
      "src-prgst-8eb180fb37",
      "src-prgst-9897f27fd4"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Oct 2021 MoU to evaluate SMRs at coal sites. A 2026 USTDA tender cites it only as background for a separate study comparing U.S. SMR vendors. No later step under the MoU found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Award of the USTDA-funded BEH SMR study contract and its vendor choice, or a BEH or Fluor/NuScale statement on the 2021 MoU",
        "evidence": [
          {
            "source_id": "src-prg-a47c63d90f",
            "locator": "WNN 29 Oct 2021, lead and Fluor quote: 'evaluating potential programme management services' and coal-fleet SMR re-purposement"
          },
          {
            "source_id": "src-prgst-9897f27fd4",
            "locator": "Project Background paragraph: 'signed a memorandum of understanding with Fluor and NuScale to evaluate'"
          },
          {
            "source_id": "src-prgst-8eb180fb37",
            "locator": "First paragraph, 13 Dec 2024: grant signed with BEH for 'U.S.-sourced SMR design options'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-bg-blue-bird-sge-bwrx300-jv-loi",
    "slug": "bg-blue-bird-sge-bwrx300-jv-loi",
    "name": "Blue Bird Energy and SGE letter of intent for a joint venture to build up to six BWRX-300s in Bulgaria",
    "programme_type": "fleet_agreement",
    "countries": [
      "BG"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Blue Bird Energy AD",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Synthos Green Energy (SGE)",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "scale_text": "up to six BWRX-300 units",
    "units_stated": 6,
    "announced": {
      "value": "2025-12-22",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Letter of intent for a joint venture, sites still to be selected, no order or licence.",
    "summary": "On 22 December 2025 Bulgarian company Blue Bird Energy and SGE announced a letter of intent to form a joint venture aimed at building a fleet of up to six BWRX-300 SMRs in Bulgaria, for industry, data centres and district heating. The joint venture would still have to select sites.",
    "sources": [
      "src-prg-7e58bd918c",
      "src-prg-76d1abd753",
      "src-prgsrc-aa8f58dc72"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "SGE's own release states that Blue Bird Energy AD and SGE S.A. signed a letter of intent to form a joint venture to build up to six BWRX-300 SMRs in Bulgaria.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-aa8f58dc72",
            "locator": "Opening paragraph: 'Blue Bird Energy AD and SGE S.A. announced the signing of a Letter of Intent (LOI) to establish a joint venture' for 'up to six BWRX-300' SMRs; bullet list of what the joint venture will do (select sites, licensing, construction, funding, operation)"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-bg-nuscale-kozloduy-mou",
    "slug": "bg-nuscale-kozloduy-mou",
    "name": "NuScale and Kozloduy NPP - New Build memorandum to evaluate NuScale SMRs at the Kozloduy site",
    "programme_type": "cooperation_mou",
    "countries": [
      "BG"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Kozloduy NPP - New Build Plc",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-nuscale",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-voygr"
    ],
    "scale_text": "no unit count",
    "announced": {
      "value": "2021-02-17",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "February 2021 evaluation memorandum. No study result, extension or end of the agreement was found in NuScale's 2021 release or trade press checked in October 2026.",
    "summary": "On 17 February 2021 NuScale and Kozloduy NPP - New Build signed a memorandum to evaluate the suitability of NuScale's SMR for the Kozloduy site, with studies and a timeline for a feasibility assessment. It is an evaluation agreement, not a plant proposal, no later step was found.",
    "sources": [
      "src-prg-d44c27e58c"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "February 2021 evaluation memorandum. No study result, extension or end of the agreement was found in NuScale's 2021 release or trade press checked in October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A KNPP-NB or NuScale statement reporting the feasibility study outcome, or a NuScale filing that lists the Bulgarian memorandum as current or ended.",
        "evidence": [
          {
            "source_id": "src-prg-d44c27e58c",
            "locator": "NuScale release dated 17 Feb 2021, third body paragraph: 'goal of the agreement is to evaluate'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-bg-ustda-beh-smr-prefeasibility-grant",
    "slug": "bg-ustda-beh-smr-prefeasibility-grant",
    "name": "USTDA grant to Bulgarian Energy Holding for SMR design-option and site evaluation",
    "programme_type": "selection_or_award",
    "countries": [
      "BG"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "US Trade and Development Agency (USTDA)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Bulgarian Energy Holding (BEH)",
        "role": "utility"
      }
    ],
    "scale_text": "one or more SMR plants (planned deployment, per WNN)",
    "announced": {
      "value": "2024-12",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Grant for a technical analysis and site examination, no site or vendor chosen.",
    "summary": "In December 2024 USTDA signed a grant with state-owned Bulgarian Energy Holding for a technical analysis of US SMR design options, an examination of potential plant sites and an implementation and financing roadmap. No site or vendor has been chosen.",
    "sources": [
      "src-prg-ab93c07639",
      "src-prgsrc-900a961d39"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "USTDA's own press release states that its Director signed a technical assistance grant with Bulgaria Energy Holding for a detailed analysis of US SMR design options, site examination and an implementation roadmap.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-900a961d39",
            "locator": "Opening paragraph (press release dated December 13, 2024): 'signed a technical assistance grant with state-owned Bulgaria Energy Holding EAD (BEH)'; third paragraph covers site examination and roadmap"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-bh-bapco-smr-study",
    "slug": "bh-bapco-smr-study",
    "name": "Bapco Energies study of a small modular nuclear plant for Bahrain",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "BH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Bapco Energies",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "no units, design or site",
    "announced": {
      "value": "2026-07",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Study reported by MEED via Semafor, no plant decision.",
    "summary": "Semafor reported in July 2026, citing MEED, that Bahrain is studying whether to build a small modular nuclear power plant, led by state-owned Bapco Energies through its venture capital arm. This follows a July 2025 US-Bahrain nuclear cooperation memorandum. No plant decision, design or site is recorded.",
    "sources": [
      "src-prg-bb4f82a7df",
      "src-wna-emerging-nuclear-countries"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Bapco Energies or BeVentures news release or a Bahrain government (energy ministry or NOGA) statement confirming the SMR study and the consultants.",
        "evidence": [
          {
            "source_id": "src-prg-bb4f82a7df",
            "locator": "Opening sentence of the Semafor item (21 Jul 2026): 'Bahrain is studying whether to build a small modular nuclear power plant ... with the state-owned Bapco Energies leading the effort through its venture capital arm'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-bo-aben-smr-implementation-study",
    "slug": "bo-aben-smr-implementation-study",
    "name": "Bolivia ABEN study on implementing small modular reactors (2025)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "BO"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Agencia Boliviana de Energía Nuclear (ABEN)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Ministerio de Hidrocarburos y Energías (Bolivia)",
        "role": "government"
      }
    ],
    "scale_text": "Study alternative: 600 MW of SMR capacity on the national grid by 2035 (300 MW in Santa Cruz in 2030, 300 MW in the…",
    "announced": {
      "value": "2025",
      "precision": "year",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Published study (first edition 2025), proposals are alternatives, not a government decision",
    "summary": "Bolivia's nuclear energy agency ABEN published a 2025 study on implementing small modular reactors in Bolivia, which reviews designs and proposes as one alternative adding 600 MW of SMR capacity to the national grid by 2035, with 300 MW in Santa Cruz department in 2030 and 300 MW in the west in 2035. It is a study, not a decision, it names regions, not sites, and no design or vendor is selected.",
    "sources": [
      "src-prg-b3e12b3efe"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-br-cdpnb-smr-technical-group",
    "slug": "br-cdpnb-smr-technical-group",
    "name": "Brazil federal technical group on land-based small and micro modular reactors (CDPNB Resolution 43, January 2026)",
    "programme_type": "government_programme",
    "countries": [
      "BR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministério de Minas e Energia (MME)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Comitê de Desenvolvimento do Programa Nuclear Brasileiro (CDPNB)",
        "role": "government"
      }
    ],
    "scale_text": "Study group, no capacity, units or sites",
    "announced": {
      "value": "2026-01-07",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Installed in April 2026. A third meeting in mid 2026 opened a technical and siting diagnostic phase. The member-designation act that starts its 180-day term was not found.",
    "summary": "Resolution CDPNB 43, dated 6 January 2026 and published on 7 January, established a technical group coordinated by Brazil's Ministry of Mines and Energy to assess infrastructure and challenges for land-based small and micro modular reactors. Its technical document is due within 180 days of publication of the member-designation act, extendable once by up to 90 days. An MME notice republished by IPEN in April 2026 reported the group's installation, but its weekday/date conflict leaves the meeting day unresolved. This is a study, not a decision to build.",
    "sources": [
      "src-prg-e4bf43e3a9",
      "src-prg-433bd6ab3d",
      "src-prg-804c7586da",
      "src-prg-primary-br-cdpnb43-20260107",
      "src-prg-primary-br-mme-ipen-gt19-20260423",
      "src-prgst-151cb64682"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "Installed in April 2026. A third meeting in mid 2026 opened a technical and siting diagnostic phase. The member-designation act that starts its 180-day term was not found.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "DOU publication of the member-designation act or of an extension, or an MME release that the GT-19 technical document was delivered to the CDPNB.",
        "evidence": [
          {
            "source_id": "src-prg-primary-br-cdpnb43-20260107",
            "locator": "Art. 1, paragraph 1: 'cento e oitenta dias, a contar da data de publicação do ato de designação'"
          },
          {
            "source_id": "src-prg-primary-br-mme-ipen-gt19-20260423",
            "locator": "Second paragraph: '1ª reunião ordinária do Grupo de Trabalho nº 19 (GT-19)'"
          },
          {
            "source_id": "src-prgst-151cb64682",
            "locator": "Standfirst and first paragraph: 'Terceira reunião do GT-19 inicia fase de diagnóstico técnico'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-br-diamante-jorge-lacerda-smr-evaluation",
    "slug": "br-diamante-jorge-lacerda-smr-evaluation",
    "name": "Diamante Energia evaluation of an SMR at the Jorge Lacerda coal complex (ANSN pre-licensing consultation, IAEA/ABDAN…",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "BR"
    ],
    "admin1": "Santa Catarina",
    "participants": [
      {
        "organization_id": "org-diamante-energia",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "Autoridade Nacional de Segurança Nuclear (ANSN)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "International Atomic Energy Agency (IAEA)",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "ABDAN (Associação Brasileira para Desenvolvimento de Atividades Nucleares)",
        "role": "other"
      },
      {
        "organization_id": "org-rosatom",
        "role": "other"
      }
    ],
    "scale_text": "One SMR under evaluation for one of the complex's units, design and capacity not selected",
    "announced": {
      "value": "2025-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Evaluation with a formal ANSN consultation on site-licence (LPL) requirements, no design selected, no licence application or investment decision",
    "summary": "Diamante Energia is evaluating a small modular reactor at its Jorge Lacerda coal-fired complex in Capivari de Baixo, Santa Catarina: the regulator ANSN visited in October 2025 and, on 26 May 2026, began a formal consultation requested by Diamante on the requirements for a preliminary site licence, and in September 2026 Diamante signed a letter of intent with the IAEA and ABDAN to assess the conversion of one unit. No reactor design or investment decision has been made, Rosatom says it has offered a RITM-family plant.",
    "sources": [
      "src-prg-cb0538cdd1",
      "src-prg-243273e472",
      "src-prg-101d61c516",
      "src-prg-3e9ef432f5",
      "src-prg-410e054e84"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-br-government-rosatom-smr-cooperation",
    "slug": "br-government-rosatom-smr-cooperation",
    "name": "Brazil Ministry of Mines and Energy and Rosatom (Tenex) cooperation on uranium and small modular reactors (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "BR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministério de Minas e Energia (MME)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Tenex (Rosatom subsidiary)",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "SMRs of 10-300 MW discussed in general, no unit count, design or site",
    "announced": {
      "value": "2025-05",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "May 2025 reports of a Tenex agreement and a planned Rosatom SMR partnership. No later signed instrument, working-group result or project was found through October 2026.",
    "summary": "During a May 2025 mission to Russia, Brazil's Ministry of Mines and Energy signed an agreement with Rosatom subsidiary Tenex to map Brazil's uranium potential and the development of small nuclear plants, and the minister said Brazil would form a partnership with Rosatom on small modular reactors. No design, site, order or follow-on agreement has been verified.",
    "sources": [
      "src-prg-8ae4efa9fb",
      "src-prg-ce9b50a12a",
      "src-prg-b03fa05768"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "May 2025 reports of a Tenex agreement and a planned Rosatom SMR partnership. No later signed instrument, working-group result or project was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An MME, Rosatom or Tenex statement of a signed SMR cooperation document, or a published result of the bilateral nuclear working group.",
        "evidence": [
          {
            "source_id": "src-prg-8ae4efa9fb",
            "locator": "Opening paragraph, MME 'firmou um acordo com a Tenex', later paragraph on SMR study"
          },
          {
            "source_id": "src-prg-ce9b50a12a",
            "locator": "Lead paragraph (12 May 2025), Brazil 'vai firmar parceria com a Rosatom' for SMRs"
          },
          {
            "source_id": "src-prg-b03fa05768",
            "locator": "Paragraphs 5-6, working group to set details by end of 2025, minister 'held talks with Rosatom subsidiary Tenex'"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The Ministry of Mines and Energy (gov.br/mme) news item on the May 2025 Moscow mission recording the Tenex agreement, or a Tenex or Rosatom release on the same agreement.",
        "evidence": [
          {
            "source_id": "src-prg-8ae4efa9fb",
            "locator": "Opening sentence of the Canal Solar item (12 May 2025): 'O MME (Ministério de Minas e Energia) firmou um acordo com a Tenex, subsidiária da estatal russa Rosatom'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-br-nuclep-rosatom-mou",
    "slug": "br-nuclep-rosatom-mou",
    "name": "Nuclep and Rosatom Energy Projects memorandum on large and smaller nuclear projects, including SMR manufacturing (2023)",
    "programme_type": "cooperation_mou",
    "countries": [
      "BR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Nuclep (Nuclebrás Equipamentos Pesados)",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "Rosatom Energy Projects",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "No unit count, capacity, design or site",
    "announced": {
      "value": "2023-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "September 2023 memorandum for Rosatom to develop large and smaller projects with Nuclep. No step under it was found in sources read.",
    "summary": "At the IAEA General Conference in Vienna in September 2023, Brazilian state equipment maker Nuclep and Rosatom Energy Projects signed a memorandum of understanding for the Russian side to develop large and smaller nuclear projects with Nuclep, Nuclep's commercial director said it could let Nuclep lead SMR production in Brazil. It is a memorandum only, with no design, site or order.",
    "sources": [
      "src-prg-7004a79f9e"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "September 2023 memorandum for Rosatom to develop large and smaller projects with Nuclep. No step under it was found in sources read. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Nuclep or Rosatom statement on work under the 2023 memorandum.",
        "evidence": [
          {
            "source_id": "src-prg-7004a79f9e",
            "locator": "Petronotícias, 26 Sep 2023, first paragraph: 'projetos nucleares de grande e menor portes'"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Nuclep (nuclep.gov.br) or Rosatom news item on the memorandum signed at the IAEA General Conference in Vienna in September 2023.",
        "evidence": [
          {
            "source_id": "src-prg-7004a79f9e",
            "locator": "First paragraph of the Petronoticias article: 'assinatura de um memorando de entendimentos entre o diretor-geral da Rosatom ... e o presidente da NUCLEP' at the IAEA General Conference in Vienna"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ca-capital-power-opg-alberta-smr",
    "slug": "ca-capital-power-opg-alberta-smr",
    "name": "Capital Power and Ontario Power Generation assessment of grid-scale SMRs for Alberta",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "CA"
    ],
    "admin1": "Alberta",
    "participants": [
      {
        "organization_id": null,
        "name": "Capital Power",
        "role": "utility"
      },
      {
        "organization_id": "org-opg",
        "role": "utility"
      }
    ],
    "announced": {
      "value": "2024-01-15",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Pre-feasibility work, first funded phase completed and commitment extended two more years (AIF dated 4 March 2026). No site, design or unit count.",
    "summary": "Capital Power and Ontario Power Generation agreed in January 2024 to jointly assess developing and deploying grid-scale small modular reactors in Alberta, including ownership and operating structures. Capital Power's 2025 annual information form says the first funded pre-feasibility phase is complete and the partners extended their collaboration for two more years, no site, reactor design or order is recorded.",
    "sources": [
      "src-prg-76292550fc"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ca-dnd-aecl-northern-microreactor-feasibility",
    "slug": "ca-dnd-aecl-northern-microreactor-feasibility",
    "name": "Canada's National Defence and AECL joint feasibility programme on Canadian-controlled microreactors for the North (2026)",
    "programme_type": "government_programme",
    "countries": [
      "CA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Department of National Defence",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Atomic Energy of Canada Limited",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Natural Resources Canada",
        "role": "government"
      }
    ],
    "scale_text": "DND investing over CAD40 million in the 2026-27 fiscal year (as stated: \"this fiscal year\")",
    "announced": {
      "value": "2026-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Feasibility assessment, no design, vendor, site or reactor selected.",
    "summary": "In April 2026 Canada's energy minister announced a joint feasibility programme with the Department of National Defence and Atomic Energy of Canada Limited to assess Canadian-controlled microreactor technology for the North, with DND investing over CAD40 million that fiscal year. The June 2026 national strategy sets an objective to demonstrate a Canadian-controlled Generation IV microreactor by 2035 to support defence facilities. No design, vendor or site has been named.",
    "sources": [
      "src-prg-74b83892eb",
      "src-prg-90e09625cd"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ca-kaeri-aecl-smart-mou",
    "slug": "ca-kaeri-aecl-smart-mou",
    "name": "KAERI and AECL memorandum seeking a SMART demonstration at an AECL-owned site in Canada",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-kaeri",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Atomic Energy of Canada Limited (AECL)",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "Canadian Nuclear Laboratories (CNL)",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-aris-smart"
    ],
    "announced": {
      "value": "2023-09-08",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Sept 2023 R&D MoU seeking a SMART demonstration at an AECL site. No term is stated in the announcement, and no later step, site or agreement was found.",
    "summary": "KAERI and Atomic Energy of Canada Limited signed a memorandum of understanding in September 2023 on civilian nuclear R&D, KAERI said the partnership seeks a demonstration of its SMART reactor at an AECL-owned, CNL-managed site, building on Hyundai Engineering and KAERI's effort to bring SMART to Canada. No site, agreement to build or licence application has been published.",
    "sources": [
      "src-prg-cc85510400",
      "src-prg-dde703fc6a",
      "src-prgsrc-9bc201d80a"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Sept 2023 R&D MoU seeking a SMART demonstration at an AECL site. No term is stated in the announcement, and no later step, site or agreement was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An AECL or CNL announcement on a SMART demonstration (site agreement or invitation stage), or a KAERI report on the MoU",
        "evidence": [
          {
            "source_id": "src-prg-cc85510400",
            "locator": "KAERI news 2023.09.08, para 2: 'seeks demonstration of SMART in the AECL-owned and CNL-managed site'"
          },
          {
            "source_id": "src-prg-dde703fc6a",
            "locator": "WNN 11 Dec 2023, para on Canada: KAERI and Hyundai to 'strengthen the local business base in Canada'"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "KAERI's own news page states that KAERI and AECL signed an MOU on 8 September 2023 with a focus on demonstrating the SMART reactor at an AECL-owned, CNL-managed site.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-9bc201d80a",
            "locator": "Opening paragraph: 'agreed on an innovative nuclear R&D partnership, signing a Memorandum of Understanding (MOU) on September 8th'; second paragraph: 'AECL and CNL ... demonstration of SMART in the AECL-owned and CNL-managed site'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ca-kr-us-khnp-arc-nb-power-arc100-fleet",
    "slug": "ca-kr-us-khnp-arc-nb-power-arc100-fleet",
    "name": "KHNP, ARC Clean Technology and NB Power collaboration on global ARC-100 fleet deployment (2023-2024)",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA"
    ],
    "participants": [
      {
        "organization_id": "org-khnp",
        "role": "investor"
      },
      {
        "organization_id": "org-arc",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-nbpower",
        "role": "utility"
      }
    ],
    "design_ids": [
      "dsn-arc-100"
    ],
    "scale_text": "global fleet deployment, starting with the New Brunswick demonstration unit (unit count not stated)",
    "announced": {
      "value": "2023-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "ARC said in December 2025 that new funding would support its KHNP fleet-deployment agreement. The last reported step was an April 2025 meeting. No deliverable under it was found.",
    "summary": "After a November 2023 memorandum, KHNP, ARC Clean Technology and NB Power signed a collaboration agreement in May 2024 aimed at teaming agreements for global ARC-100 fleet deployment, starting with the demonstration unit planned at Point Lepreau, New Brunswick. It sets deliverables for discussions on participation and possible investment, it is not an order.",
    "related_project_ids": [
      "prj-arc100-lepreau"
    ],
    "sources": [
      "src-prg-f2002eb71f",
      "src-arc-khnp-meeting-20250507",
      "src-fr-canadian-nuclear-safety-79c4fa82",
      "src-prgst-107c2af442"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "ARC said in December 2025 that new funding would support its KHNP fleet-deployment agreement. The last reported step was an April 2025 meeting. No deliverable under it was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An ARC, KHNP or NB Power announcement of a teaming agreement, investment or other deliverable under the May 2024 agreement, or a statement that it ended.",
        "evidence": [
          {
            "source_id": "src-prg-f2002eb71f",
            "locator": "WNN 2 May 2024, third paragraph: 'firm commitments to deliverables, processes and timelines'"
          },
          {
            "source_id": "src-arc-khnp-meeting-20250507",
            "locator": "ARC release 7 May 2025, first paragraph: meeting held 'on April 29 at the Lotte Hotel in Seoul'"
          },
          {
            "source_id": "src-prgst-107c2af442",
            "locator": "Second paragraph: funding will support 'its collaboration agreement with Korea Hydro & Nuclear Power (KHNP) for global aSMR fleet deployment'"
          },
          {
            "source_id": "src-fr-canadian-nuclear-safety-79c4fa82",
            "locator": "Status line: licence to prepare site application of 30 June 2023 '(awaiting additional submissions from NB Power)'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ca-mcmaster-usnc-mmr-feasibility",
    "slug": "ca-mcmaster-usnc-mmr-feasibility",
    "name": "McMaster University, USNC and Global First Power Micro Modular Reactor deployment feasibility study (Ontario)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "CA"
    ],
    "admin1": "Ontario",
    "participants": [
      {
        "organization_id": null,
        "name": "McMaster University",
        "role": "research"
      },
      {
        "organization_id": "org-usnc",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-global-first-power",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-gfp-mmr"
    ],
    "announced": {
      "value": "2022",
      "precision": "year",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "The study was described in 2022 as an estimated 18-month effort leading to a McMaster decision. No findings, decision or end of the study have been found.",
    "summary": "McMaster University, Ultra Safe Nuclear Corporation and Global First Power announced in spring 2022 a feasibility study of deploying USNC's Micro-Modular Reactor at McMaster or an affiliated site as a training and demonstration resource. It is a study only, with no site decision or licence application in the sources read.",
    "sources": [
      "src-prg-083050695d",
      "src-prgst-4465117e89"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "The study was described in 2022 as an estimated 18-month effort leading to a McMaster decision. No findings, decision or end of the study have been found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "McMaster publication of the feasibility study findings or of its deployment decision.",
        "evidence": [
          {
            "source_id": "src-prg-083050695d",
            "locator": "Closing paragraph: 'Over the next few months, McMaster, USNC and GFP will complete the feasibility study'"
          },
          {
            "source_id": "src-prgst-4465117e89",
            "locator": "Tucker quote paragraph: 'an estimated 18-month initiative'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ca-nova-scotia-ontario-smr-mou",
    "slug": "ca-nova-scotia-ontario-smr-mou",
    "name": "Nova Scotia and Ontario memorandum of understanding on small modular reactors (2025)",
    "programme_type": "intergovernmental_agreement",
    "countries": [
      "CA"
    ],
    "admin1": "Nova Scotia, Ontario",
    "participants": [
      {
        "organization_id": null,
        "name": "Province of Nova Scotia",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Province of Ontario",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2025-10-23",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Interprovincial knowledge-sharing MoU, Nova Scotia said SMRs would not be established in the province soon. No site.",
    "summary": "Nova Scotia and Ontario signed a memorandum effective 23 October 2025 under which Nova Scotia will draw on Ontario's experience to explore SMRs as a clean-energy option. The provinces will share knowledge on SMR technology, regulation, supply chain, economics, waste and engagement, and advocate for federal support. Nova Scotia said SMRs would not be established in the province soon, no site or project is named.",
    "sources": [
      "src-prg-ad2b937a14",
      "src-prg-40d694febf"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ca-nuclear-energy-strategy-2026",
    "slug": "ca-nuclear-energy-strategy-2026",
    "name": "Nuclear Energy Strategy for Canada (2026): SMR and microreactor objectives",
    "programme_type": "national_plan",
    "countries": [
      "CA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Natural Resources Canada",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2026-06-22",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Federal strategy with 2035 objectives (targets), not a project, site or funding decision for a specific reactor.",
    "summary": "Natural Resources Canada published Canada's first national nuclear strategy on 22 June 2026, after announcing it in April. Its objectives include at least one nuclear deployment, including SMRs, operational or under construction outside Ontario by 2035, and a Canadian microreactor demonstrated by 2035 for later deployment to remote communities. These are policy targets, not approved projects.",
    "sources": [
      "src-prg-90e09625cd",
      "src-prg-af56c77ad1",
      "src-prg-74b83892eb"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ca-nucleon-arc-nuarc-alberta",
    "slug": "ca-nucleon-arc-nuarc-alberta",
    "name": "Nucleon Energy and ARC Clean Technology NuARC partnership to deploy ARC-100 SMRs, starting in Alberta",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA"
    ],
    "admin1": "Alberta",
    "participants": [
      {
        "organization_id": null,
        "name": "Nucleon Energy Inc.",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-arc",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-arc-100"
    ],
    "announced": {
      "value": "2025-09-25",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Partnership entity formed, no site, unit count or licence application named.",
    "summary": "Calgary-based Nucleon Energy and ARC Clean Technology formed a partnership entity, NuARC, in September 2025 to develop and deploy generation facilities using ARC's ARC-100 sodium-cooled SMR, with an initial focus on Alberta. No site, unit count, order or licence application is named.",
    "sources": [
      "src-prg-ca8e5211a7"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ca-opg-xenergy-xe100-industrial-framework",
    "slug": "ca-opg-xenergy-xe100-industrial-framework",
    "name": "OPG and X-energy framework agreement to deploy Xe-100 SMRs at industrial sites in Canada",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA"
    ],
    "participants": [
      {
        "organization_id": "org-opg",
        "role": "utility"
      },
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "announced": {
      "value": "2022-07-12",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "July 2022 framework to pursue Xe-100 deployments at industrial sites. No site, project or later step under it was found in sources checked through October 2026.",
    "summary": "Ontario Power Generation and X-energy signed a framework agreement in July 2022 to pursue opportunities to deploy Xe-100 SMRs at industrial sites in Ontario and to identify further end users and sites across Canada, for applications such as oil sands and mining. No site, order or licence application is recorded.",
    "sources": [
      "src-prg-bcf8e92f2c",
      "src-prg-0081c38419"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "July 2022 framework to pursue Xe-100 deployments at industrial sites. No site, project or later step under it was found in sources checked through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An OPG or X-energy statement naming an industrial site or project under the framework, or X-energy's prospectus text on the OPG framework.",
        "evidence": [
          {
            "source_id": "src-prg-bcf8e92f2c",
            "locator": "Paragraphs 1-2, framework 'to pursue opportunities to deploy Xe-100' at industrial sites"
          },
          {
            "source_id": "src-prg-0081c38419",
            "locator": "Paragraph 2, parties will 'identify further potential end users and sites'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ca-prodigy-des-nedhe-tnpp-mou",
    "slug": "ca-prodigy-des-nedhe-tnpp-mou",
    "name": "Prodigy Clean Energy and Des Nëdhé Group memorandum on transportable microreactor plants for remote Canada",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA"
    ],
    "participants": [
      {
        "organization_id": "org-prodigy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Des Nëdhé Group",
        "role": "other"
      }
    ],
    "design_names": [
      "Prodigy Microreactor Power Station (transportable nuclear power plant)"
    ],
    "announced": {
      "value": "2024-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "March 2024 MoU to explore transportable microreactor projects and Indigenous ownership. No term is stated in the announcement and no project under it was found. Belledune is a separate pilot.",
    "summary": "Prodigy Clean Energy and the Indigenous economic development corporation Des Nëdhé Group signed a memorandum of understanding to explore using Prodigy's transportable microreactor plants to power remote mines and communities in Canada and to pursue Indigenous ownership and workforce roles. It names no site, order or licence application, Prodigy's separate Belledune commercial pilot is recorded as its own project.",
    "related_project_ids": [
      "prj-prodigy-belledune"
    ],
    "sources": [
      "src-wnn-prodigy-desnedhe-2024",
      "src-prg-328d1c53c6"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "March 2024 MoU to explore transportable microreactor projects and Indigenous ownership. No term is stated in the announcement and no project under it was found. Belledune is a separate pilot. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Prodigy or Des Nëdhé announcement of a project, site or ownership agreement under this MoU",
        "evidence": [
          {
            "source_id": "src-wnn-prodigy-desnedhe-2024",
            "locator": "WNN 20 Mar 2024, para 2: 'will explore potential Transportable Nuclear Power Plant (TNPPs) projects'"
          },
          {
            "source_id": "src-prg-328d1c53c6",
            "locator": "Prodigy pilot page: Belledune, New Brunswick commercial pilot 'In service early 2030s'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ca-src-microreactor-demonstration",
    "slug": "ca-src-microreactor-demonstration",
    "name": "Saskatchewan Research Council microreactor demonstration programme (installation paused)",
    "programme_type": "government_programme",
    "countries": [
      "CA"
    ],
    "admin1": "Saskatchewan",
    "participants": [
      {
        "organization_id": null,
        "name": "Saskatchewan Research Council (SRC)",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Government of Saskatchewan",
        "role": "government"
      },
      {
        "organization_id": "org-westinghouse",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-evinci"
    ],
    "scale_text": "one initial microreactor (eVinci, described as capable of five megawatts of electricity), $80 million provincial funding",
    "units_stated": 1,
    "announced": {
      "value": "2023-11-27",
      "precision": "day",
      "basis": "actual"
    },
    "status": "paused",
    "status_note": "SRC reported cancellation of its eVinci project and paused reactor installation on 15 April 2026. This does not establish global design cancellation or a later SRC restart.",
    "related_project_ids": [
      "prj-src-initial-evinci"
    ],
    "summary": "In November 2023 the Government of Saskatchewan announced $80 million for the Saskatchewan Research Council to pursue licensing and demonstration of a first Westinghouse eVinci microreactor, with the location to be determined during regulatory processes. In April 2026 SRC told the Legislative Assembly's Economy Committee that Westinghouse had cancelled the eVinci project and that SRC had put the reactor installation on pause while it continues to follow other microreactor technologies. No site, licence application or construction was recorded.",
    "sources": [
      "src-prg-2789f8b2c0",
      "src-prg-52dfdb44eb",
      "src-prg-2561992fde",
      "src-prg-717c4dae3d"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ca-us-opg-nypa-advanced-nuclear-mou",
    "slug": "ca-us-opg-nypa-advanced-nuclear-mou",
    "name": "Ontario Power Generation and New York Power Authority memorandum on advanced nuclear, including SMRs (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA",
      "US"
    ],
    "admin1": "Ontario, New York",
    "participants": [
      {
        "organization_id": "org-opg",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "New York Power Authority",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Governor of New York and Premier of Ontario",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2025-12-19",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Knowledge-sharing framework, selects no technology, site or project.",
    "summary": "On 19 December 2025 NYPA and OPG signed a memorandum establishing a framework for collaboration on advanced nuclear technologies, including large reactors and SMRs, covering information sharing, financing and economics, and workforce development. Governor Hochul and Premier Ford separately signed a declaration of intent on cooperation. The memorandum selects no technology, site or project.",
    "sources": [
      "src-prg-39db4426c0",
      "src-prg-39f32af0cc"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ca-xenergy-alberta-xe100-feasibility",
    "slug": "ca-xenergy-alberta-xe100-feasibility",
    "name": "X-energy Canada study of repurposing an Alberta thermal power site with Xe-100 reactors (2025)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "CA"
    ],
    "admin1": "Alberta",
    "participants": [
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "TransAlta",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Emissions Reduction Alberta",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Hatch",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "PCL",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "Kinectrics",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "announced": {
      "value": "2025-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Study reported complete in September 2025, site not named, no project or licence application.",
    "summary": "A study by X-energy Canada, funded by Emissions Reduction Alberta and carried out with TransAlta, Hatch, PCL and Kinectrics, reported in September 2025 that repurposing an existing thermal generation site in Alberta with Xe-100 reactors is feasible. The site is not named. It is a completed feasibility study, not a project, site selection or licence application.",
    "sources": [
      "src-prg-b53e925812",
      "src-prgsrc-46e0edede2"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "X-energy's own release states that its Canadian subsidiary completed the study with TransAlta, Hatch, PCL and Kinectrics, funded by Emissions Reduction Alberta.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-46e0edede2",
            "locator": "Opening paragraph (EDMONTON, September 25, 2025): 'announced the successful completion of a study confirming the feasibility and benefits of repurposing an existing TransAlta thermal generation site in Alberta with Xe-100'; second paragraph names Emissions Reduction Alberta, TransAlta, Hatch, PCL and Kinectrics"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-cn-cgn-tsinghua-nhr200ii-heating-demonstration",
    "slug": "cn-cgn-tsinghua-nhr200ii-heating-demonstration",
    "name": "CGN and Tsinghua NHR200-II nuclear district-heating demonstration: NEA-approved preliminary work (2018)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "CN"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-cgn",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-aris-inet-tsinghua-university",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "National Energy Administration (NEA)",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-catalogue-nhr200-ii"
    ],
    "scale_text": "one demonstration heating project (unit count not stated)",
    "announced": {
      "value": "2018-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "NEA agreed preliminary work in 2018 for a North China heating demonstration. No site, approval or end is reported. INET's 2025 focus is the separate Huapeng One industrial project.",
    "summary": "In January 2018 China's National Energy Administration agreed that CGN and Tsinghua University should carry out preliminary work, including planning and site selection, for China's first nuclear district-heating demonstration using the NHR200-II low-temperature heating reactor in North China. No site was named. By 2025 INET described promoting the 'Huapeng One' industrial-coupling demonstration with CGN.",
    "related_project_ids": [
      "prj-huizhou-huapeng-one"
    ],
    "sources": [
      "src-prg-bcdc1932de",
      "src-prg-f5fc36e8d4",
      "src-prg-5adf903c71",
      "src-prg-900b6eaacb"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "NEA agreed preliminary work in 2018 for a North China heating demonstration. No site, approval or end is reported. INET's 2025 focus is the separate Huapeng One industrial project. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A CGN, INET or NEA document naming a site or approval for the North China heating demonstration, or stating that Huapeng One replaced it.",
        "evidence": [
          {
            "source_id": "src-prg-bcdc1932de",
            "locator": "Third paragraph: 'agreed that CGN and Tsinghua University should conduct preliminary work'"
          },
          {
            "source_id": "src-prg-f5fc36e8d4",
            "locator": "Institute history paragraph: '国家能源局已于2018年1月同意NHR200-II核能供暖示范项目开展前期工作'"
          },
          {
            "source_id": "src-prg-900b6eaacb",
            "locator": "Second paragraph end: '低温供热堆与工业耦合商业示范项目（“华鹏一号”）的推广'"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "Tsinghua University's nuclear institute (INET) records that the National Energy Administration agreed in January 2018 to preliminary work on the NHR200-II nuclear heating demonstration. The page does not name CGN or a region.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A CGN or National Energy Administration document naming CGN's role in the NHR200-II heating demonstration.",
        "evidence": [
          {
            "source_id": "src-prg-f5fc36e8d4",
            "locator": "Paragraph on the NHR200-II (early in the page): '国家能源局已于2018年1月同意NHR200-II核能供暖示范项目开展前期工作'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-cn-cnnc-acp100s-floating-demonstration",
    "slug": "cn-cnnc-acp100s-floating-demonstration",
    "name": "CNNC ACP100S floating nuclear power plant demonstration programme (2016 plan inclusion)",
    "programme_type": "government_programme",
    "countries": [
      "CN"
    ],
    "participants": [
      {
        "organization_id": "org-cnnc",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-aris-cnnc-npic",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "National Development and Reform Commission (NDRC)",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-aris-acp100s"
    ],
    "scale_text": "one demonstration floating reactor (unit count and rating not stated in the sources read)",
    "announced": {
      "value": "2016-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "NDRC included ACP100S in the 13th Five-Year energy innovation plan in January 2016. No later document on the floating demonstration was found through October 2026.",
    "related_project_ids": [
      "prj-cnnc-floating-demo-2016"
    ],
    "summary": "In January 2016 China's NDRC agreed to include CNNC's ACP100S floating nuclear power plant, the marine version of the ACP100, in the 13th Five-Year energy innovation plan. CNNC's Nuclear Power Institute said it planned to start building a demonstration reactor at the end of 2016 and operate it in 2019. These were planned dates, no host site, construction or licence is recorded in the sources read.",
    "sources": [
      "src-prg-0225737634"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "NDRC included ACP100S in the 13th Five-Year energy innovation plan in January 2016. No later document on the floating demonstration was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A CNNC, NPIC or NDRC document on the ACP100S floating demonstration, or its inclusion or omission in later Five-Year energy plans.",
        "evidence": [
          {
            "source_id": "src-prg-0225737634",
            "locator": "Paragraph 2, NDRC formal reply including ACP100S in the 能源创新十三五 plan"
          },
          {
            "source_id": "src-prg-0225737634",
            "locator": "Paragraph 4, plan to start the demonstration reactor at end of 2016 and operate it in 2019"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-cn-guizhou-small-reactor-demonstration",
    "slug": "cn-guizhou-small-reactor-demonstration",
    "name": "Guizhou provincial plan for a CGN small-reactor nuclear demonstration (4 x 100 MW, 13th Five-Year Plan draft)",
    "programme_type": "government_programme",
    "countries": [
      "CN"
    ],
    "admin1": "Guizhou",
    "participants": [
      {
        "organization_id": null,
        "name": "Guizhou Provincial Development and Reform Commission / Energy Administration",
        "role": "government"
      },
      {
        "organization_id": "org-catalogue-cgn",
        "role": "developer_or_vendor"
      }
    ],
    "design_names": [
      "small reactor (design not named)"
    ],
    "scale_text": "4 small reactors of 100 MW each (400 MW), with siting among Xingyi, Zhenning and Yuping",
    "units_stated": 4,
    "announced": {
      "value": "2016-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "The 2016 draft plan expected construction to start during 2016-2020. No approval, site or carry-over into a later plan was found. Whether the target lapsed is not stated.",
    "summary": "Guizhou's draft 13th Five-Year energy plan (reported April 2016) listed a nuclear small-reactor demonstration in which CGN proposed four 100 MW small reactors, with site selection in Xingyi, Zhenning, Yuping and other places. In 2013 a provincial site-survey report and a small-reactor site resource analysis had passed expert review. This is a provincial planning target, not a selected site, approval or construction.",
    "sources": [
      "src-prg-4399fe1075",
      "src-prg-d97cd2aa23"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "The 2016 draft plan expected construction to start during 2016-2020. No approval, site or carry-over into a later plan was found. Whether the target lapsed is not stated. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Text of Guizhou's 14th or 15th Five-Year energy plan on small reactors, or a CGN or NDRC statement on the Guizhou project",
        "evidence": [
          {
            "source_id": "src-prg-4399fe1075",
            "locator": "Nuclear project package item: '预计“十三五”期间开工，预计投资140亿元'"
          },
          {
            "source_id": "src-prg-d97cd2aa23",
            "locator": "2013-11-26 item: experts urge to '尽快开展核电小堆厂址普选'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-cn-htgr-industrial-chain-alliance",
    "slug": "cn-htgr-industrial-chain-alliance",
    "name": "China's HTGR Modern Industrial Chain Alliance led by CNNC's Chinergy (2025)",
    "programme_type": "research_programme",
    "countries": [
      "CN"
    ],
    "participants": [
      {
        "organization_id": "org-chinergy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-cnnc",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "more than 60 member organisations",
    "announced": {
      "value": "2025-12-11",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Industrial alliance, not a deployment project.",
    "summary": "CNNC subsidiary Chinergy launched the High-Temperature Gas-Cooled Reactor Modern Industrial Chain Alliance in Beijing on 11 December 2025, bringing together more than 60 organisations. It covers research and design, fuel and equipment manufacturing, construction, operation and overseas markets, aiming to extend HTGR use to heating and hydrogen. It is an industrial alliance, not a deployment project.",
    "sources": [
      "src-prg-ff7ab78eed",
      "src-prgsrc-6678afc07f"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "CNNC's own news page states that the HTGR alliance, initiated by CNNC subsidiary Chinergy, was established in Beijing on 11 December with more than 60 organisations.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-6678afc07f",
            "locator": "Opening paragraph: 'the High-Temperature Gas-Cooled Reactor (HTGR) Modern Industrial Chain Alliance, initiated by Chinergy, a subsidiary of CNNC, was established in Beijing'; second-to-third paragraphs: 'more than 60 core organizations'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-cn-sinap-thorium-msr-prototype",
    "slug": "cn-sinap-thorium-msr-prototype",
    "name": "SINAP thorium molten-salt reactor programme: 100 MWt prototype targeted by 2035",
    "programme_type": "research_programme",
    "countries": [
      "CN"
    ],
    "participants": [
      {
        "organization_id": "org-sinap",
        "role": "research"
      },
      {
        "organization_id": "org-catalogue-spic",
        "role": "other"
      }
    ],
    "design_names": [
      "100 MWt thorium molten-salt prototype (unnamed)"
    ],
    "scale_text": "one 100 MWt prototype",
    "units_stated": 1,
    "announced": {
      "value": "2025-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Stated goal only, the source read names no site, approval or construction for the 100 MWt prototype.",
    "summary": "After the Wuwei experimental thorium molten-salt reactor achieved thorium-to-uranium conversion, SINAP said in November 2025 that it aims to complete construction and demonstration of a 100 MWt prototype by 2035 and work with SPIC and others on an industrial supply chain. No site, approval or construction is recorded for the prototype.",
    "related_project_ids": [
      "prj-sinap-minqin-smtmsr",
      "prj-tmsr-lf1-wuwei"
    ],
    "sources": [
      "src-prg-a790a2984e"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A SINAP or Chinese Academy of Sciences own news release (not a Xinhua or China Science Daily repost) stating the 2035 100 MWt prototype goal and the SPIC supply-chain cooperation, or an SPIC statement on the same.",
        "evidence": [
          {
            "source_id": "src-prg-a790a2984e",
            "locator": "Final quoted paragraphs of the China Daily article: 'Our goal is to complete the construction and demonstration of a 100-MWt prototype by 2035'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-co-eje-cafetero-smr-viability-study",
    "slug": "co-eje-cafetero-smr-viability-study",
    "name": "Universidad Nacional-led study of SMR viability in Colombia's Eje Cafetero (coffee region)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "CO"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Universidad Nacional de Colombia",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Universidad de Caldas",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Universidad del Quindío",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Gobernación del Quindío",
        "role": "government"
      }
    ],
    "scale_text": "SMRs of 10-200 MW discussed generically, no units, site or municipality",
    "announced": {
      "value": "2026-09-15",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Research project awaiting royalties-system (SGR) funding, target of 2035 is aspirational, no site",
    "summary": "Researchers led by the Universidad Nacional de Colombia, with the Universities of Caldas and Quindío, the Quindío departmental government and other partners, are studying whether small modular reactors could be viable in Colombia's Eje Cafetero region, using computer simulations of technical, economic and social factors. The project was in final evaluation for national royalties funding in September 2026, it names no site and is not a plan to build.",
    "sources": [
      "src-prg-9960b9426e"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The Universidad Nacional de Colombia communique (Agencia de Noticias UNAL) on the Eje Cafetero SMR viability study, September 2026, or a release from the Universidad de Caldas, Universidad del Quindio or the Gobernacion del Quindio.",
        "evidence": [
          {
            "source_id": "src-prg-9960b9426e",
            "locator": "Third paragraph of the El Colombiano article (15 Sep 2026): 'Estas instituciones están evaluando si es viable el uso de pequeños reactores nucleares modulares (SMR) en esta región'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-co-minenergia-iaea-mou",
    "slug": "co-minenergia-iaea-mou",
    "name": "Colombia Ministry of Mines and Energy and IAEA memorandum covering nuclear planning and small modular reactors…",
    "programme_type": "cooperation_mou",
    "countries": [
      "CO"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministerio de Minas y Energía (Colombia)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "International Atomic Energy Agency (IAEA)",
        "role": "other"
      }
    ],
    "scale_text": "No units, capacity, design or site",
    "announced": {
      "value": "2026-02-24",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Non-binding memorandum, no financial obligations, no project",
    "summary": "On 24 February 2026 in Cartagena, Colombia's Ministry of Mines and Energy and the IAEA signed a non-binding memorandum of understanding establishing technical cooperation on energy planning, nuclear infrastructure development and small modular reactors, to evaluate nuclear power as an option. It creates no financial obligations and names no project.",
    "sources": [
      "src-prg-6a0ae63031"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-cz-mpo-cez-rolls-royce-additional-sites-mou",
    "slug": "cz-mpo-cez-rolls-royce-additional-sites-mou",
    "name": "Czech Industry Ministry, ČEZ and Rolls-Royce SMR memorandum to prepare additional SMR sites",
    "programme_type": "cooperation_mou",
    "countries": [
      "CZ"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Industry and Trade of the Czech Republic",
        "role": "government"
      },
      {
        "organization_id": "org-cez",
        "role": "utility"
      },
      {
        "organization_id": "org-rolls-royce-smr",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-rr-smr"
    ],
    "scale_text": "up to six Rolls-Royce SMR units across three Czech sites (Rolls-Royce SMR statement)",
    "units_stated": 6,
    "announced": {
      "value": "2026-07-21",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Memorandum opening preparation of new sites (mainly Dětmarovice and Tušimice), no new permit. Prunéřov is only an area ČEZ analyses.",
    "summary": "On 21 July 2026 the Czech Ministry of Industry and Trade, ČEZ and Rolls-Royce SMR signed a memorandum opening the way to prepare further SMR sites, chiefly Dětmarovice and Tušimice, after the first unit planned at Temelín. Rolls-Royce SMR spoke of three Czech sites allowing up to six units. ČEZ also analyses other areas, including Prunéřov, Ledvice, Mělník and Dukovany, without proposals there.",
    "related_project_ids": [
      "prj-rr-detmarovice",
      "prj-rr-temelin",
      "prj-rr-tusimice"
    ],
    "sources": [
      "src-mpo-cz-smr-sites-2026",
      "src-prg-42e31f10c5",
      "src-parent-cez-additional"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-dk-smr-analysis",
    "slug": "dk-smr-analysis",
    "name": "Danish government analysis of serially produced SMRs and the 1985 nuclear ban",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "DK"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Climate, Energy and Utilities of Denmark",
        "role": "government"
      }
    ],
    "scale_text": "no capacity or site",
    "announced": {
      "value": "2026-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Three-track analysis under way, the 1985 ban remains, no project or site.",
    "summary": "In January 2026 Denmark's climate ministry set the terms for a three-track analysis of the possible role of serially produced SMRs in the Danish energy system, regulatory and authority requirements, and business potential, following a 2025 parliamentary decision. The 1985 ban on nuclear power remains in force, there is no project or site.",
    "sources": [
      "src-prg-4eeadd18e8"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-dz-iaea-joint-statement-smr",
    "slug": "dz-iaea-joint-statement-smr",
    "name": "Algeria and IAEA joint statement prioritising SMRs for electricity and desalination (December 2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "DZ"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Algeria (Ministry of Foreign Affairs, Ministry of Energy and Renewable Energies)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "International Atomic Energy Agency (IAEA)",
        "role": "other"
      }
    ],
    "scale_text": "No units, capacity, design or site, IAEA expert mission on SMR feasibility offered",
    "announced": {
      "value": "2025-12-08",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Joint statement, feasibility mission offered, no project",
    "summary": "On 8 December 2025 the IAEA and Algeria signed a joint statement under which the IAEA will support Algeria in exploring nuclear energy options, including small modular reactors for electricity and seawater desalination, and offered an expert mission on SMR feasibility. In September 2026 Algeria's energy minister and the IAEA Director General reviewed progress under the agreement. No site, design or project has been named.",
    "sources": [
      "src-prg-2c5d7a2da4",
      "src-prg-2fc5e07d63",
      "src-prg-ea046b58f9"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ec-nuclear-plan-modular-reactor",
    "slug": "ec-nuclear-plan-modular-reactor",
    "name": "Ecuador nuclear power plan: first-stage 300 MW modular reactor (Ministry of Energy)",
    "programme_type": "national_plan",
    "countries": [
      "EC"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministerio de Energía y Minas / Ministerio de Ambiente y Energía (Ecuador)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Organismo de Implementación del Programa Nuclear (NEPIU)",
        "role": "government"
      }
    ],
    "scale_text": "First stage: 300 MW of nuclear through a modular reactor, later a 1 GW plant (as stated in February 2025)",
    "units_stated": 1,
    "announced": {
      "value": "2025-02-21",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Plan, tender was scheduled for 2026 but not verified as issued, 2029 first-power target superseded by a ~10-year horizon (Dec 2025)",
    "summary": "In February 2025 Ecuador's electricity vice-minister said the government's roadmap would first provide 300 MW of nuclear power through a modular reactor, later followed by a 1 GW plant, with a tender to select a builder planned for 2026. In December 2025 the ministry created a nuclear programme implementing organisation and set a horizon of about ten years for the first reactor (RNE1). No design, vendor, site or tender award has been announced.",
    "sources": [
      "src-prg-11936d86fc",
      "src-prg-fdae16b73f",
      "src-wna-emerging-nuclear-countries",
      "src-prgsrc-2ee56f02ed"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The ministry's December 2025 bulletin announces the body that will run the nuclear programme (NEPIU), to be constituted in early 2026, and a horizon of about ten years for the first reactor. It does not mention the February 2025 plan for a 300 MW modular reactor.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A ministry document on the February 2025 plan for a first-stage 300 MW modular reactor and its tender.",
        "evidence": [
          {
            "source_id": "src-prgsrc-2ee56f02ed",
            "locator": "Paragraphs 1-2 of the bulletin dated 27 de diciembre de 2025: 'Organismo de Implementación del Programa Nuclear (NEPIU)' and 'primer reactor nuclear ecuatoriano, RNE1, en un horizonte aproximado de diez años'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-eu-sge-gev-hitachi-samsung-bwrx300-europe",
    "slug": "eu-sge-gev-hitachi-samsung-bwrx300-europe",
    "name": "SGE, GE Vernova, Hitachi and Samsung C&T cooperation on BWRX-300 fleet deployment in Central and Eastern Europe and…",
    "programme_type": "cooperation_mou",
    "countries": [
      "GB",
      "PL"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "SGE (Synthos Green Energy)",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "GE Vernova",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Hitachi",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Samsung C&T",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "announced": {
      "value": "2026-09-22",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Two memoranda (Dec 2025 bilateral, Sep 2026 four-party framework), no new site or order.",
    "summary": "Synthos Green Energy (SGE) and Samsung C&T signed a memorandum in December 2025 to explore partnership on BWRX-300 fleet deployment in Central and Eastern Europe, including studies for SGE's Polish project and a possible Samsung C&T investment. On 22 September 2026 SGE, GE Vernova, Hitachi and Samsung C&T signed a broader framework memorandum on BWRX-300 market development in Central and Eastern Europe and the UK, linked to the July 2026 US-Japan-Korea memorandum. Neither names a new site or order.",
    "sources": [
      "src-prg-ed506bea19",
      "src-prg-c5ea5f15b7",
      "src-prg-c93c53c3a6"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-fi-alva-steady-energy-jyvaskyla-prestudy",
    "slug": "fi-alva-steady-energy-jyvaskyla-prestudy",
    "name": "Alva and Steady Energy one-year pre-study of nuclear district heating for Jyväskylä",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "FI"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Alva-yhtiöt Oy",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-catalogue-steady-energy",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-ldr-50"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2026-05-19",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Letter of intent for a one-year pre-study, Alva says no investment decision is being made.",
    "summary": "On 19 May 2026 Alva, Jyväskylä's municipal energy utility, and Steady Energy signed a letter of intent for a year-long pre-study of SMR district heating, covering regulation, locations, zoning, technology and costs. Alva states that it is not making an investment decision at this stage.",
    "sources": [
      "src-steady-fourth-city-2026",
      "src-prg-dbd6fd95c0"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-fi-se-fortum-gevh-bwrx300-early-works",
    "slug": "fi-se-fortum-gevh-bwrx300-early-works",
    "name": "Fortum and GE Vernova Hitachi early works agreement for BWRX-300 SMRs in Finland and Sweden (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "FI",
      "SE"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Fortum",
        "role": "utility"
      },
      {
        "organization_id": "org-gevh",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "scale_text": "not stated (deployment aimed for the 2030s)",
    "announced": {
      "value": "2025-07",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Early-works agreement, no order or licence. NuCore Energi’s 2026 state-aid application for Oskarshamn is technology-open and is not a BWRX-300 selection.",
    "summary": "In mid-2025 Fortum and GE Vernova Hitachi agreed to carry out pre-licensing and site-adaptation engineering aimed at deploying BWRX-300 SMRs in Finland and Sweden in the 2030s. In August 2026 Fortum's project company NuCore Energi applied for Swedish state aid for a 1,200 to 3,400 MW new nuclear project in Oskarshamn municipality. Its options include SMRs and large reactors, and no technology has been selected.",
    "sources": [
      "src-prg-e315470d0d",
      "src-n1-fortum-nucore-20260827",
      "src-n1-wnn-nucore-20260827"
    ],
    "confidence": "low",
    "last_checked": "2026-10-18",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-fi-tem-afry-nuclear-promotion-study",
    "slug": "fi-tem-afry-nuclear-promotion-study",
    "name": "Finnish government-commissioned AFRY study on promoting nuclear energy, including SMR electricity and heat options…",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "FI"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Economic Affairs and Employment of Finland",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "AFRY Management Consulting",
        "role": "other"
      }
    ],
    "announced": {
      "value": "2025-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Report submitted March 2026, the ministry said it is prepared to start legislative work for SMR market entry.",
    "summary": "Finland's Ministry of Economic Affairs and Employment commissioned AFRY in November 2025 to study options, costs and market effects of promoting nuclear energy, covering large reactors, SMR electricity and heat solutions, and life extensions. The report, submitted in March 2026, found heat-producing SMRs may be better placed for market-based implementation than new large plants. It is a study, not a programme decision.",
    "sources": [
      "src-prg-b631b99877",
      "src-prg-7f1ded80db"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-fr-ppe3-first-smr-target",
    "slug": "fr-ppe3-first-smr-target",
    "name": "France's third Multiannual Energy Programme (PPE3): first small reactor targeted around the early 2030s (2026)",
    "programme_type": "national_plan",
    "countries": [
      "FR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of France",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2026-02",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Policy trajectory (not legislation), names no SMR design or site.",
    "summary": "France's government published its third Multiannual Energy Programme (PPE3) for 2026-2035 in February 2026. Alongside six EPR2 reactors and reactor life extensions, it backs small modular reactors with the objective of a first reactor at the start of the 2030s. The PPE is a policy trajectory, not legislation, and names no SMR design or site.",
    "sources": [
      "src-prg-3b8bde5dfe",
      "src-prgsrc-9c84eda8ec"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The government's press kit for the third PPE (12 February 2026) backs small modular reactors with the objective of a first reactor at the start of the 2030s. Trade press described this as a construction start. The decree text was not available when checked.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "The PPE3 decree or strategy text stating the small-reactor objective.",
        "evidence": [
          {
            "source_id": "src-prgsrc-9c84eda8ec",
            "locator": "PDF page 10, section 'Relance du nucléaire': 'Elle propose de soutenir les petits réacteurs modulaires (« SMR ») ... avec l'objectif d'un premier réacteur au début de la décennie 2030'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-fr-stellaria-equinix-preorder",
    "slug": "fr-stellaria-equinix-preorder",
    "name": "Stellaria and Equinix pre-order agreement for power from Stellarium reactors (2025)",
    "programme_type": "customer_agreement",
    "countries": [
      "FR"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-stellaria",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Equinix",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-catalogue-stellarium"
    ],
    "announced": {
      "value": "2025-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Capacity reservation (pre-order), up to 500 MWe per Stellaria's release, no site or unit count stated.",
    "summary": "French molten-salt reactor developer Stellaria signed a pre-order agreement in November 2025 under which data-centre operator Equinix secured the first power-capacity reservation on the Stellarium, which Stellaria plans to deploy from 2035. Stellaria's release heads it as a pre-order of up to 500 MWe. No site or number of units is stated. It is a capacity reservation, not a construction order or permit.",
    "sources": [
      "src-prg-f02573412a",
      "src-prg-e485a37df7",
      "src-prgsrc-39d5cc39cc"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Stellaria's release (26 November 2025) records the pre-order agreement with Equinix for power from the first Stellarium reactor and heads it as a pre-order of up to 500 MWe.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-39d5cc39cc",
            "locator": "Opening paragraph (novembre 26, 2025): 'annonce un accord de précommande avec Equinix, Inc.'; section 'Un accord de précommande à hauteur de 500 Mwe de puissance'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-gb-advanced-nuclear-framework",
    "slug": "gb-advanced-nuclear-framework",
    "name": "UK Advanced Nuclear Framework and pipeline for private advanced, small and micro modular reactor projects (2026)",
    "programme_type": "government_programme",
    "countries": [
      "GB"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Department for Energy Security and Net Zero",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Great British Energy-Nuclear",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2026-02-04",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Pipeline applications from March 2026, in-principle endorsement only, not a consent, licence or funding award.",
    "summary": "The UK Department for Energy Security and Net Zero published the Advanced Nuclear Framework on 4 February 2026 to support private advanced, small and micro modular reactor projects, opening a pipeline that developers could apply to join from March 2026. Successful projects receive in-principle government endorsement after assessment by government and GBE-N and are expected to be privately financed. Endorsement is not a planning consent, licence or funding award.",
    "sources": [
      "src-prg-b5d73dc243",
      "src-prg-f7482694f4"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-gb-gbe-n-scotland-siting-study",
    "slug": "gb-gbe-n-scotland-siting-study",
    "name": "GBE-N desktop study of land in Scotland technically suitable for new nuclear, including SMRs and microreactors",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "GB"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Great British Energy - Nuclear (GBE-N)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Department for Energy Security and Net Zero",
        "role": "government"
      }
    ],
    "scale_text": "technology-agnostic, covers microreactors (1-20 MWe), SMRs/AMRs and GW-scale reactors",
    "announced": {
      "value": "2026-06-30",
      "precision": "day",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Desktop technical study published, no project, host, technology or site decision. Scottish Government policy is not to consent new nuclear.",
    "summary": "GBE-N, advising DESNZ, published on 30 June 2026 a high-level desktop study identifying land areas in Scotland that may be technically suitable for future nuclear deployment, considering microreactors, SMRs/AMRs and GW-scale reactors. The report notes the Scottish Government's policy of not granting planning consent to new nuclear, it creates no project or site decision.",
    "sources": [
      "src-prg-67cfeef27f",
      "src-prg-10ed96ec6a"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-gb-sge-bwrx300-fleet",
    "slug": "gb-sge-bwrx300-fleet",
    "name": "SGE plan for a 14-unit BWRX-300 fleet at three UK sites",
    "programme_type": "fleet_agreement",
    "countries": [
      "GB"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "SGE S.A. (SGE SMR UK Limited)",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-gevh",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "scale_text": "14 BWRX-300 units on three sites, first site to host six units, 4.2GW combined (as stated)",
    "units_stated": 14,
    "announced": {
      "value": "2026-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Application submitted under the UK Advanced Nuclear Framework, no site named by SGE, no licence, no government support agreed.",
    "summary": "SGE's 1 July 2026 plan proposes 14 BWRX-300s at three unnamed UK sites under the Advanced Nuclear Framework. Earlier sources record expected site selection in H1 2027 and disputed Oldbury press reports, with GBE-N saying it held no record of SGE interest in the land. WNN reported on 22 October that SGE SMR UK and OPG subsidiary Origin Nuclear signed an LOI for a proposed UK operating company. It describes intended future fleet roles, not a named site's licensed operator appointment, reactor permission or site selection.",
    "sources": [
      "src-prg-69b750da51",
      "src-prg-62f9b8534d",
      "src-prg-2fcd3fb141",
      "src-wnn-sge-origin-loi-20261022"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-25",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-gb-terrapower-kbr-natrium-uk-siting",
    "slug": "gb-terrapower-kbr-natrium-uk-siting",
    "name": "TerraPower and KBR studies of potential UK sites for Natrium reactors (2025)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "GB"
    ],
    "participants": [
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "KBR",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-natrium"
    ],
    "announced": {
      "value": "2025-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Site studies, UK government described the work as continuing in Feb 2026. No site named.",
    "summary": "In September 2025 TerraPower and KBR announced that they would jointly conduct studies and evaluate potential UK sites for TerraPower's Natrium reactor. The UK government's February 2026 Advanced Nuclear Framework announcement described the work as continuing. No site has been named, Natrium's UK Generic Design Assessment is a separate, design-level process.",
    "sources": [
      "src-prg-a99fbf28dc",
      "src-prg-f7482694f4",
      "src-prgsrc-33ac029286"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "TerraPower's own release states that TerraPower and KBR will jointly conduct studies and evaluate potential UK sites for Natrium.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-33ac029286",
            "locator": "Second paragraph (release dated September 15, 2025): 'TerraPower and KBR will jointly conduct studies and evaluate potential sites for deployment of the Natrium technology'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-gb-ulc-energy-chiltern-vital-smr-clusters",
    "slug": "gb-ulc-energy-chiltern-vital-smr-clusters",
    "name": "ULC-Energy and Chiltern Vital Group letter of intent on SMR-powered clean-energy clusters at UK business parks",
    "programme_type": "customer_agreement",
    "countries": [
      "GB"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "ULC-Energy BV",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Chiltern Vital Group",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-rr-smr"
    ],
    "scale_text": "no plant, unit count or capacity stated",
    "announced": {
      "value": "2025-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Jan 2025 letter of intent to collaborate on SMR-powered clusters at CVG business parks. No term is stated in the announcement and no later step under it was found.",
    "summary": "In January 2025 ULC-Energy and Chiltern Vital Group signed a letter of intent to collaborate on clean-energy solutions for CVG business parks, initially the Berkeley Science and Technology Park and the Yorkshire Energy Park. CVG says it intends to encourage the roll-out of Rolls-Royce SMRs at a Berkeley campus. No plant, unit count or licence application is recorded.",
    "sources": [
      "src-prg-c692981bfb"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Jan 2025 letter of intent to collaborate on SMR-powered clusters at CVG business parks. No term is stated in the announcement and no later step under it was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A ULC-Energy or CVG announcement of a cluster project, an SMR siting application or a planning decision naming ULC",
        "evidence": [
          {
            "source_id": "src-prg-c692981bfb",
            "locator": "WNN 15 Jan 2025, para 1-2: Letter of Intent to 'collaborate on delivering innovative clean energy solutions'"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A ULC-Energy or Chiltern Vital Group news release (or company social post) on the January 2025 letter of intent.",
        "evidence": [
          {
            "source_id": "src-prg-c692981bfb",
            "locator": "Opening paragraph of the WNN article (15 Jan 2025): ULC-Energy BV 'has signed a Letter of Intent with UK-based zero emissions energy and technology developer Chiltern Vital Group'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-gn-rosatom-floating-npp-mou",
    "slug": "gn-rosatom-floating-npp-mou",
    "name": "Rosatom and Guinea memorandum to study floating nuclear power plants with RITM-200 reactors",
    "programme_type": "cooperation_mou",
    "countries": [
      "GN"
    ],
    "participants": [
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Republic of Guinea (signatory body not visible in the text read)",
        "role": "government"
      }
    ],
    "design_names": [
      "RITM-200 floating power unit (variant not specified in article text)"
    ],
    "scale_text": "No unit count, capacity or site stated",
    "announced": {
      "value": "2024-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "June 2024 exploratory memorandum on floating units with RITM-200 reactors. No study result, contract, extension or end was found in sources checked in October 2026.",
    "summary": "Rosatom signed a memorandum of understanding with Guinea at the St Petersburg International Economic Forum in June 2024 to explore the possible deployment of floating power plants equipped with RITM-200 reactors. It is an exploratory memorandum, no site, number of units or contract was reported.",
    "sources": [
      "src-prg-fac0bfc833",
      "src-prg-36a80dc847"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "June 2024 exploratory memorandum on floating units with RITM-200 reactors. No study result, contract, extension or end was found in sources checked in October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Rosatom or Guinean government announcement of a study result, intergovernmental agreement or contract for floating units.",
        "evidence": [
          {
            "source_id": "src-prg-36a80dc847",
            "locator": "WNN 7 Jun 2024, second paragraph: 'exploring how the implementation of the sea-based units would work'"
          },
          {
            "source_id": "src-prg-fac0bfc833",
            "locator": "NucNet lede: memorandum 'to explore the possible deployment of floating power plants'"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Rosatom news item of June 2024 on the memorandum with Guinea on floating nuclear power units.",
        "evidence": [
          {
            "source_id": "src-prg-36a80dc847",
            "locator": "Opening paragraph of the WNN article (7 Jun 2024): 'The Republic of Guinea and Rosatom have signed a memorandum of understanding to cooperate on the development of floating power units'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-gr-fnpp-joint-development-program-study",
    "slug": "gr-fnpp-joint-development-program-study",
    "name": "ABS, Core Power and Athlos Energy assessment of floating nuclear power plants for Greece (Deon Policy Institute…",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "GR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "American Bureau of Shipping",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "CORE POWER (UK)",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Athlos Energy",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "Deon Policy Institute",
        "role": "research"
      }
    ],
    "announced": {
      "value": "2025-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Workshop Oct 2025, report May 2026 found no fundamental barriers. No plant, site or design selected.",
    "summary": "As part of a Joint Development Program, the American Bureau of Shipping, CORE POWER UK and Greek company Athlos Energy held a workshop in Athens on 30-31 October 2025 on deploying floating nuclear power plants in Greece. The resulting Deon Policy Institute report, published in May 2026, found no fundamental barriers but open policy, regulatory, financial and social-acceptance issues. No plant, site or design is selected.",
    "sources": [
      "src-prg-5ee481f387",
      "src-prg-6c86d24104",
      "src-prgsrc-10ccc61e85"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The study report, published under the Joint Development Program of ABS, CORE POWER and Athlos Energy with authors from CORE POWER and ABS, records the programme and the Athens workshop of 30-31 October 2025.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-10ccc61e85",
            "locator": "PDF page 5, executive summary: 'a two-day workshop was organized in Athens on October 30-31, 2025, by the American Bureau of Shipping, Athlos Energy, and Core Power'; page 3 'The Joint Development Program' lists CORE POWER, ABS and Athlos Energy"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-gr-inter-ministerial-committee-smr",
    "slug": "gr-inter-ministerial-committee-smr",
    "name": "Greece's Inter-Ministerial Committee to examine small modular reactors (2026)",
    "programme_type": "government_programme",
    "countries": [
      "GR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Greece (Council of Ministers)",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2026-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Study committee, the Prime Minister said its brief is not construction of nuclear plants. No site, design or decision.",
    "summary": "Greek Prime Minister Kyriakos Mitsotakis announced in March 2026 that Greece would examine the potential role of SMRs, and by August 2026 the Council of Ministers had set up an Inter-Ministerial Committee to do so. He said its brief is scientific investigation and a defined framework, not the construction of nuclear plants. No site, design or decision to build exists.",
    "sources": [
      "src-wnn-greece-smr-committee-20260804",
      "src-prg-cf397b7934"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The Greek government spokesman's announcement or the Prime Minister's remarks of 30 July 2026 on the nuclear energy committee, on the government's websites.",
        "evidence": [
          {
            "source_id": "src-wnn-greece-smr-committee-20260804",
            "locator": "Opening sentence of the WNN article (4 Aug 2026): 'The Greek Council of Ministers has set up an Inter-Ministerial Committee to explore the potential for small modular reactors'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-hr-nuclear-working-group-smr-siting",
    "slug": "hr-nuclear-working-group-smr-siting",
    "name": "Croatia's Working Group for Nuclear Energy: siting studies and SMR-versus-large comparison",
    "programme_type": "government_programme",
    "countries": [
      "HR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of the Economy of Croatia",
        "role": "government"
      }
    ],
    "scale_text": "no capacity or unit target",
    "announced": {
      "value": "2025-02",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Working group preparing location studies and comparing SMRs with large plants, no site or decision.",
    "summary": "In February 2025 Croatia's Ministry of the Economy set up a Working Group for Nuclear Energy to prepare studies on potential locations, compare the financial and economic aspects of SMRs with large plants, and draft a legislative framework including an independent regulator. No site or technology decision is recorded.",
    "sources": [
      "src-prg-9d86fc3ebe",
      "src-prgsrc-afca87c13c"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The ministry's own news item states that the Working Group for Nuclear Energy was established that day, with tasks including a legislative framework, an independent regulator, location studies for large plants or SMRs and an SMR versus large-plant cost comparison.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-afca87c13c",
            "locator": "Opening paragraph (Objavljeno: 11.02.2025.): 'U Ministarstvu gospodarstva danas je osnovana Radna skupina za nuklearnu energiju'; fourth paragraph: studies of potential locations 'bilo u obliku klasičnih nuklearnih elektrana ili malih modularnih reaktora (SMR)' and analysis of SMR versus large plants"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-hu-hunatom-rolls-royce-smr-mou",
    "slug": "hu-hunatom-rolls-royce-smr-mou",
    "name": "Hunatom and Rolls-Royce SMR memorandum on potential use of Rolls-Royce SMRs in Hungary",
    "programme_type": "cooperation_mou",
    "countries": [
      "HU"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Hunatom",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-rolls-royce-smr",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-rr-smr"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2025-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Non-binding MoU (Hunatom: \"does not yet mean a binding commitment\"), no site.",
    "summary": "Hunatom and Rolls-Royce SMR signed a memorandum on the potential use of Rolls-Royce SMR technology in Hungary, Hunatom stresses it is not yet a binding commitment. World Nuclear Association dates it to June 2025. It follows a January 2025 UK-Hungary strategic cooperation focused on SMRs.",
    "sources": [
      "src-prg-f576b7d5f5",
      "src-prg-93ececa7ac",
      "src-prg-41202aa101"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-hu-hunatom-sge-bwrx300-loi",
    "slug": "hu-hunatom-sge-bwrx300-loi",
    "name": "Hunatom and Synthos Green Energy letter of intent on up to 10 BWRX-300 SMRs in Hungary",
    "programme_type": "fleet_agreement",
    "countries": [
      "HU"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Hunatom",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "Synthos Green Energy (SGE)",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "scale_text": "up to 10 BWRX-300 units",
    "units_stated": 10,
    "announced": {
      "value": "2025-07",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Letter of intent establishing a pre-framework, no site, order or licence.",
    "summary": "In July 2025 Hungarian nuclear development firm Hunatom and Synthos Green Energy signed a letter of intent establishing a pre-framework for joint project development for up to ten BWRX-300 SMRs, in the presence of Hungary's foreign minister. It names no site and is not an order.",
    "sources": [
      "src-prg-105c30909d",
      "src-prgsrc-dba906d5c6"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "SGE's own news item records that SGE S.A. and Hunatom signed a letter of intent establishing a pre-framework for joint project development of BWRX-300 SMRs in Hungary, with the Hungarian foreign minister present.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-dba906d5c6",
            "locator": "News item, first two paragraphs: \"SGE S.A. and Hunatom have signed a Letter of Intent (LOI) to assess the deployment of BWRX-300\" SMRs in Hungary; the LoI \"establishes a pre-framework for joint activities\"; last paragraph lists the Hungarian foreign minister as present at the signing."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-hu-mvm-holtec-smr300-mou",
    "slug": "hu-mvm-holtec-smr300-mou",
    "name": "MVM and Holtec memorandum to explore SMR-300 deployment in Hungary",
    "programme_type": "cooperation_mou",
    "countries": [
      "HU"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "MVM",
        "role": "utility"
      },
      {
        "organization_id": "org-holtec",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-smr-300"
    ],
    "scale_text": "number of units not stated by Holtec (WNA reports up to ten)",
    "announced": {
      "value": "2025-12",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU to explore deployment, no site, order or licence.",
    "summary": "In December 2025 Holtec announced a memorandum with Hungarian state energy group MVM to explore deploying SMR-300 units in Hungary, building on the November 2025 US-Hungary nuclear energy MoU. No site, order or licence is recorded.",
    "sources": [
      "src-prg-7a02d5e8e4",
      "src-prg-b65cc545d7"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Holtec International or MVM Group news release (or the Holtec social-media post WNN cites) announcing the December 2025 SMR-300 memorandum of understanding.",
        "evidence": [
          {
            "source_id": "src-prg-7a02d5e8e4",
            "locator": "Opening paragraph: \"Holtec International has announced a memorandum of understanding with Hungary's energy giant MVM\" to explore SMR-300 deployment; third paragraph says the MoU was signed by MVM's CEO and a Holtec division president, and that Holtec posted it on social media."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-hu-us-funded-smr-feed-study",
    "slug": "hu-us-funded-smr-feed-study",
    "name": "US-funded phase-one FEED study for SMR pre-construction activities in Hungary",
    "programme_type": "selection_or_award",
    "countries": [
      "HU"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "US Government (US Embassy Budapest)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Government of Hungary",
        "role": "government"
      }
    ],
    "scale_text": "no site, owner, design or unit count",
    "announced": {
      "value": "2026-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Selection for a US-funded FEED study, no site, owner or design named.",
    "summary": "The US Chargé d'Affaires in Budapest said Hungary was selected for a US-funded phase-one front-end engineering and design (FEED) study for SMR pre-construction activities, World Nuclear Association dates the US announcement to April 2026. No site, owner or design is named.",
    "sources": [
      "src-prg-529e4d4adb",
      "src-prg-93ececa7ac"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-hu-us-hungary-nuclear-mou-2025",
    "slug": "hu-us-hungary-nuclear-mou-2025",
    "name": "US-Hungary nuclear energy memorandum covering SMRs (November 2025)",
    "programme_type": "intergovernmental_agreement",
    "countries": [
      "HU"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Hungary",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "US Department of State",
        "role": "government"
      }
    ],
    "scale_text": "Hungary signalled intent to support up to 10 SMRs (US State Department)",
    "units_stated": 10,
    "announced": {
      "value": "2025-11-07",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Intergovernmental MoU signalling intent to negotiate, not an order or a plant.",
    "summary": "On 7 November 2025 the US and Hungarian governments signed a nuclear energy memorandum that, per the US State Department, signals intent to negotiate cooperation including SMRs, it said Hungary signalled support for up to ten SMRs worth up to USD 20 billion. It is a statement of intent, not an order.",
    "sources": [
      "src-prg-7a02d5e8e4"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The US State Department's release on the 7 November 2025 US-Hungary nuclear energy memorandum, or the Hungarian government's own statement.",
        "evidence": [
          {
            "source_id": "src-prg-7a02d5e8e4",
            "locator": "Fourth paragraph: governments \"signed an MoU on nuclear energy\" in November that the US State Department said \"signals our intent to start negotiations\" including SMRs; fifth paragraph quotes 'up to 10 SMRs ... up to USD20 billion'."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-id-brin-peluit40-pln-nusantara",
    "slug": "id-brin-peluit40-pln-nusantara",
    "name": "BRIN PeLUIt-40 HTGR development with PLN Nusantara Power (de-dieselisation target)",
    "programme_type": "research_programme",
    "countries": [
      "ID"
    ],
    "participants": [
      {
        "organization_id": "org-aris-national-research-and-innovation-agency-brin-bandung-institute-of-technology-itb",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "PT PLN Nusantara Power (Technology Development Division)",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Kakiatna Engineering",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "Universitas Pertamina",
        "role": "research"
      }
    ],
    "design_ids": [
      "dsn-aris-peluit-40"
    ],
    "scale_text": "cogeneration reactor (design stage)",
    "announced": {
      "value": null,
      "precision": "unknown",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "The IAEA ARIS record of October 2024 lists PLN Nusantara Power supporting PeLUIt-40 design work. No later document on that collaboration was found.",
    "summary": "BRIN's IAEA ARIS record for PeLUIt-40, a pebble-bed HTGR classed as an SMR, says one target application is PLN's de-dieselisation programme and that PLN subsidiary PLN Nusantara Power joined the effort. The design is still under development, with design approval by BAPETEN yet to come. No site or construction decision exists.",
    "related_project_ids": [
      "prj-rde-serpong"
    ],
    "sources": [
      "src-aris-peluit40-2024"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "The IAEA ARIS record of October 2024 lists PLN Nusantara Power supporting PeLUIt-40 design work. No later document on that collaboration was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A BRIN or PLN Nusantara Power statement on the collaboration, or a BAPETEN record of a PeLUIt-40 design approval application.",
        "evidence": [
          {
            "source_id": "src-aris-peluit40-2024",
            "locator": "Design-stage section: 'supported by Technology Development Division of PT. PLN Nusantara Power'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-id-national-nuclear-programme-ruptl",
    "slug": "id-national-nuclear-programme-ruptl",
    "name": "Indonesia's first nuclear power programme: 2 x 250 MWe in the RUPTL 2025-2034, with SMR technology planned",
    "programme_type": "national_plan",
    "countries": [
      "ID"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "BAPETEN (nuclear regulator)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "PT PLN (Persero)",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "National Energy Council (DEN)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Ministry of Energy and Mineral Resources (ESDM)",
        "role": "government"
      }
    ],
    "scale_text": "500 MWe (2 x 250 MWe), one each in the Sumatra (Bangka Belitung) and Kalimantan (West Kalimantan) systems, commercial…",
    "units_stated": 2,
    "announced": {
      "value": "2025",
      "precision": "year",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Planning target. Site determination expected in 2026 or by 2027 and PLN tender from 2027 (officials, reported), BAPETEN reports pre-licensing engagement with three unnamed vendors (two foreign, one…",
    "summary": "Indonesia's national electricity plans (RUKN and PLN's RUPTL 2025-2034) target a 250 MWe nuclear plant each in the Sumatra and Kalimantan systems with commercial operation in 2034, and ANTARA reports that Indonesia plans to use SMR technology at both locations. BAPETEN is preparing a strategic environmental assessment for the programme and reports pre-licensing talks with three unnamed vendors. No site, vendor, licence or construction has been decided.",
    "related_project_ids": [
      "prj-thorcon-kelasa",
      "prj-west-kalimantan-land-smr",
      "prj-west-kalimantan-ritm-floating"
    ],
    "sources": [
      "src-prg-4dfa5c26d2",
      "src-prg-8baa579c1f",
      "src-prg-711551fe75",
      "src-prg-9fb0c320d8",
      "src-prg-300ccd18eb"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-id-pertamina-nre-saltfoss-cmsr",
    "slug": "id-pertamina-nre-saltfoss-cmsr",
    "name": "Pertamina NRE and Seaborg (now Saltfoss) memorandum on a CMSR Power Barge in Indonesia (2023)",
    "programme_type": "cooperation_mou",
    "countries": [
      "ID"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Pertamina New & Renewable Energy (Pertamina NRE)",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-catalogue-saltfoss",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-cmsr"
    ],
    "scale_text": "CMSR Power Barge of 200-800 MWe to be considered after studies",
    "announced": {
      "value": "2023-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "September 2023 MoU to assess a CMSR Power Barge in Indonesia and scope a first project. No later step under it was found through October 2026.",
    "summary": "In September 2023 Pertamina NRE signed a memorandum with Denmark's Seaborg (now Saltfoss Energy) to assess deployment of the CMSR Power Barge in Indonesia and scope an initial project. A barge of 200-800 MWe would be considered only after the studies. No site, order or licence followed in the sources read.",
    "sources": [
      "src-prg-8189e4f184",
      "src-prg-primary-seaborg-pertamina-archive-2023"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "September 2023 MoU to assess a CMSR Power Barge in Indonesia and scope a first project. No later step under it was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Pertamina NRE or Saltfoss statement on the assessment's progress or result, or a Pertamina NRE nuclear study that names Saltfoss.",
        "evidence": [
          {
            "source_id": "src-prg-8189e4f184",
            "locator": "Paragraph 2, the parties will use the assessment 'to scope an initial project'"
          },
          {
            "source_id": "src-prg-primary-seaborg-pertamina-archive-2023",
            "locator": "Release body, parties 'intend to explore and assess' CMSR use in Indonesia"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-id-west-kalimantan-smr-feasibility-study",
    "slug": "id-west-kalimantan-smr-feasibility-study",
    "name": "West Kalimantan SMR feasibility and FEED study with the United States and Japan",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "ID"
    ],
    "admin1": "West Kalimantan",
    "participants": [
      {
        "name": "PLN",
        "organization_id": null,
        "role": "utility"
      },
      {
        "organization_id": "org-nuscale",
        "role": "developer_or_vendor"
      }
    ],
    "announced": {
      "value": "2025",
      "precision": "year",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "A study, not a selected project: no host site, design selection or deployment decision followed in the sources read.",
    "summary": "Indonesian reporting describes PLN cooperation with NuScale in West Kalimantan and front-end engineering study work with the United States and Japan. In September 2025 the coordinating minister said the small-reactor feasibility study had been completed. It is separate from Rosatom's floating and land-based proposals for the same province.",
    "legacy_project_ids": [
      "prj-kalimantan-nuscale-feed"
    ],
    "related_project_ids": [
      "prj-west-kalimantan-land-smr",
      "prj-west-kalimantan-ritm-floating"
    ],
    "sources": [
      "src-bloomberg-kalimantan-nuscale-feed",
      "src-antara-kalimantan-study-complete-2025"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The White House / USTR text of the 19 February 2026 US-Indonesia reciprocal trade agreement (West Kalimantan SMR engineering and design clause), or an ekon.go.id / ESDM release on the Coordinating Minister's September 2025 statement that the feasibility study with the US and Japan was complete.",
        "evidence": [
          {
            "source_id": "src-antara-kalimantan-study-complete-2025",
            "locator": "Lead paragraph: the Coordinating Minister for the Economy says the government has completed the feasibility study ('menyelesaikan studi kelayakan') with Japan and the United States on small modular reactors for a nuclear plant; later paragraph names PLN Indonesia Power, NuScale Power and JGC."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-in-ru-rosatom-india-fnpp-working-group",
    "slug": "in-ru-rosatom-india-fnpp-working-group",
    "name": "Rosatom and India's Ministry of Ports, Shipping and Waterways working group on floating nuclear power plants (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "IN"
    ],
    "participants": [
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Ministry of Ports, Shipping and Waterways (India)",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2025-12",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Working group (reported via Tass), no design, site or agreement to build.",
    "summary": "Rosatom's director general said in December 2025, as reported by Tass and WNN, that Rosatom and India's Ministry of Ports, Shipping and Waterways had set up a working group to examine floating nuclear power plants in India. At the same summit President Putin said SMRs and floating plants could be relevant to cooperation. No design, site or agreement to build is recorded.",
    "sources": [
      "src-prg-35d2d129bc"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Rosatom news release or an Indian Ministry of Ports, Shipping and Waterways statement on the working group on floating nuclear power plants (December 2025, around the Putin-Modi summit).",
        "evidence": [
          {
            "source_id": "src-prg-35d2d129bc",
            "locator": "Near the end of the body text: Rosatom's director general said, 'according to the official Russian Tass news agency', that Rosatom and India's Ministry of Ports, Shipping and Waterways \"had established a working group\" on floating nuclear power plants."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-iq-smr-consideration-russia-talks",
    "slug": "iq-smr-consideration-russia-talks",
    "name": "Iraq's consideration of SMRs and small-reactor cooperation talks with Russia",
    "programme_type": "government_programme",
    "countries": [
      "IQ"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Iraq / Iraqi atomic energy commission",
        "role": "government"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "no units, design or site",
    "announced": {
      "value": "2024-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "In May 2025 Iraq's cabinet authorised its atomic energy chief to negotiate and sign a nuclear cooperation agreement with Russia, which he linked to small reactors. No signed agreement was found.",
    "summary": "During an IAEA visit in March 2024 Iraq said it was looking at options such as SMRs for energy security and desalination. World Nuclear Association reports that in 2025 the head of Iraq's atomic energy commission announced cooperation being developed with Russia on small reactors for electricity, though no agreements had been signed.",
    "sources": [
      "src-prg-477f3a5d6a",
      "src-wna-emerging-nuclear-countries",
      "src-prgst-0ecdd0e5a8",
      "src-prgst-6e2ca17f42"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "In May 2025 Iraq's cabinet authorised its atomic energy chief to negotiate and sign a nuclear cooperation agreement with Russia, which he linked to small reactors. No signed agreement was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Signature of the Iraq-Russia nuclear cooperation agreement, or a Rosatom or Iraqi Atomic Energy Commission statement on small-reactor talks after mid-2025",
        "evidence": [
          {
            "source_id": "src-prgst-6e2ca17f42",
            "locator": "Para 1: Council of Ministers 'authorised the Chairman of the Iraqi Atomic Energy Commission to negotiate and sign'"
          },
          {
            "source_id": "src-prgst-0ecdd0e5a8",
            "locator": "Para 1: on May 27 'a deal that Baghdad has been building with Russia since early 2024' to co-develop small reactors"
          },
          {
            "source_id": "src-wna-emerging-nuclear-countries",
            "locator": "Iraq section: 2025 cooperation 'being developed with Russia on small reactors' with no agreements signed"
          },
          {
            "source_id": "src-prg-477f3a5d6a",
            "locator": "WNN 19 Mar 2024, para 4: 'looking at options such as small modular reactors'"
          }
        ]
      },
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The IAEA's March 2024 news item on the Director General's visit to Baghdad, and the Iraqi cabinet's May 2025 decision authorising nuclear cooperation talks with Russia.",
        "evidence": [
          {
            "source_id": "src-prg-477f3a5d6a",
            "locator": "Fourth paragraph: \"Iraq is looking at options such as small modular reactors for energy security and water desalinisation projects\", reported from the IAEA Director General's March 2024 visit to Baghdad."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ir-aeoi-rosatom-small-npp-mou",
    "slug": "ir-aeoi-rosatom-small-npp-mou",
    "name": "Iran (AEOI) and Rosatom memorandum on building small nuclear power plants in Iran",
    "programme_type": "cooperation_mou",
    "countries": [
      "IR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Atomic Energy Organization of Iran (AEOI)",
        "role": "government"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "no units, design or site",
    "announced": {
      "value": "2025-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "September 2025 memorandum. Talks in October 2025 and a 5 October 2026 political statement keep small plants on the agenda but report no contract, site or other step under it.",
    "summary": "In September 2025 Russia and Iran signed a memorandum on cooperation in building small nuclear power plants in Iran, following a meeting of Rosatom's head and Iranian Vice President Eslami. Rosatom said it envisages specific implementation steps. A report published on 5 October 2026 quotes the deputy chair of Russia's Security Council as saying another nuclear plant and small nuclear plants remain on the agenda. That political statement names no site, design or contract and does not establish a new project or programme instrument.",
    "sources": [
      "src-prg-b266e8e432",
      "src-atomic-energy-iran-small-npp-20261005",
      "src-prgst-a7bf411175",
      "src-prgsrc-c85fe080f6"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "September 2025 memorandum. Talks in October 2025 and a 5 October 2026 political statement keep small plants on the agenda but report no contract, site or other step under it. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An AEOI or Rosatom announcement of a design or construction contract for small plants under the 2025 memorandum.",
        "evidence": [
          {
            "source_id": "src-prg-b266e8e432",
            "locator": "Interfax 24 Sep 2025, second paragraph: memorandum 'envisages specific steps aimed at implementing'"
          },
          {
            "source_id": "src-atomic-energy-iran-small-npp-20261005",
            "locator": "Article dated 5 Oct 2026, lede: small plants remain 'на повестке дня'"
          },
          {
            "source_id": "src-prgst-a7bf411175",
            "locator": "First two paragraphs: Eslami and Rosatom's Spassky 'discussed nuclear energy cooperation' in Tehran"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "Rosatom's own press release records that Rosatom and the Atomic Energy Organization of Iran signed, on 24 September 2025 in Moscow, a memorandum on construction of small modular reactor nuclear power plants in Iran.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-c85fe080f6",
            "locator": "Body, second paragraph: the chief delegates \"signed a memorandum of understanding and cooperation for construction of small modular reactor nuclear power plants in the Islamic Republic of Iran\"; the document \"specifies particular steps\" for implementation."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-it-edf-nuward-edison-italy",
    "slug": "it-edf-nuward-edison-italy",
    "name": "EDF, Nuward and Edison NUWARD SMR partnership for Italy (second-of-series plant targeted by 2035)",
    "programme_type": "cooperation_mou",
    "countries": [
      "IT"
    ],
    "participants": [
      {
        "organization_id": "org-edf",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-catalogue-nuward",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Edison",
        "role": "utility"
      }
    ],
    "design_ids": [
      "dsn-catalogue-nuward-smr"
    ],
    "scale_text": "first European series of 10 NUWARD SMRs in five countries, Italian second plant targeted for operation by 2035",
    "announced": {
      "value": "2026-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Declaration of interest (June 2026) and partnership proposal, no Italian site, company or order.",
    "summary": "EDF plans a first series of ten NUWARD SMRs in France, Italy, Poland, Belgium and Finland, with construction from 2030. In September 2026 EDF, Nuward and Edison presented the design with Italian industry, which had signed a declaration of interest in June 2026, and set an objective of a second plant in Italy operating by 2035. No Italian site or order is recorded.",
    "sources": [
      "src-prg-6a4c6c1beb",
      "src-prg-b97c62faa7",
      "src-prgsrc-2c3148476d"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Edison's release of 25 June 2026 records the declaration of intent signed with EDF, Nuward and Italian nuclear industry companies for a European plant based on Nuward SMR technology, with first plants operating in 2035. The September 2026 presentation details rest on press reports.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "An EDF, Nuward or Edison document on the September 2026 presentation and the Italian plant objective.",
        "evidence": [
          {
            "source_id": "src-prgsrc-2c3148476d",
            "locator": "Page 1, first paragraph (dateline Antibes-Milano, 25 giugno 2026): \"Edison ha sottoscritto insieme a EDF, Nuward e agli operatori dell'industria e della filiera nucleare italiana una Dichiarazione di Intenti\" for a European third-generation plant based on Nuward SMR technology, \"con l'obiettivo di avere i primi impianti operativi nel 2035\"."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-jm-nuclear-smr-assessment",
    "slug": "jm-nuclear-smr-assessment",
    "name": "Jamaica nuclear energy assessment focused on SMRs (Nuclear Energy Working Committee, CNL/AECL memorandum)",
    "programme_type": "government_programme",
    "countries": [
      "JM"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Jamaica (Ministry of Science, Technology and Special Projects)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Nuclear Energy Working Committee",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Canadian Nuclear Laboratories",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Atomic Energy of Canada Limited",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "ICENS, University of the West Indies Mona",
        "role": "research"
      }
    ],
    "scale_text": "Assessment only, SMRs of up to about 100 MW cited as typical of those under consideration, no units or site",
    "announced": {
      "value": "2024-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Assessment and readiness work, minister says Jamaica is not about to build a plant",
    "summary": "Jamaica's government is assessing nuclear power through a reconstituted Nuclear Energy Working Committee, building on an October 2024 memorandum with Canadian Nuclear Laboratories and Atomic Energy of Canada Limited that covers SMRs. In June 2026 the science minister said the programme's documents converge on SMRs under a build-own-operate-transfer model, but that Jamaica is not about to build a plant, next steps are public consultation, a nuclear cooperation agreement with Canada, IAEA notification and a regulatory framework.",
    "sources": [
      "src-prg-04f8737942",
      "src-prg-1a913b3e87"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-jo-jaec-khnp-ismr-feasibility-mou",
    "slug": "jo-jaec-khnp-ismr-feasibility-mou",
    "name": "JAEC and KHNP memorandum for a feasibility study of an i-SMR in Jordan",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "JO"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Jordan Atomic Energy Commission (JAEC)",
        "role": "government"
      },
      {
        "organization_id": "org-khnp",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-i-smr"
    ],
    "scale_text": "no units or site",
    "announced": {
      "value": "2023-12-05",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "KHNP said in April 2025 that the joint pre-feasibility study was under way. Nothing later shows it continuing, finished or ended.",
    "summary": "The 5 December 2023 JAEC–KHNP memorandum was reported as covering a comprehensive technical and economic feasibility study for KHNP's i-SMR in Jordan. In a release datelined 9 April 2025, KHNP described a joint pre-feasibility study as under way under that agreement. The terminology differs, and the update establishes neither study completion nor current activity. No site or order is recorded.",
    "sources": [
      "src-prg-b06468849c",
      "src-prg-primary-khnp-jaec-prefeasibility-20250409"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "KHNP said in April 2025 that the joint pre-feasibility study was under way. Nothing later shows it continuing, finished or ended. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A KHNP or JAEC report that the study was completed, extended or moved to a further phase.",
        "evidence": [
          {
            "source_id": "src-prg-primary-khnp-jaec-prefeasibility-20250409",
            "locator": "Second paragraph: 'both parties are conducting a joint pre-feasibility study'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-jo-jaec-smr-programme",
    "slug": "jo-jaec-smr-programme",
    "name": "Jordan Atomic Energy Commission SMR programme (vendor studies, floating plant at Aqaba considered)",
    "programme_type": "national_plan",
    "countries": [
      "JO"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Jordan Atomic Energy Commission (JAEC)",
        "role": "government"
      },
      {
        "organization_id": "org-rolls-royce-smr",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-cnnc",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-nuscale",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "JAEC describes a 100–300 MWe small-reactor class. Unit count and site are not specified on this page.",
    "announced": {
      "value": "2018-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "National shift to SMRs after the 2018 cancellation of the large-plant project, technology comparison and studies, no site or vendor decision.",
    "summary": "After cancelling its two-unit large plant in 2018, JAEC pursued SMR cooperation with Rolls-Royce, X-energy, Rosatom, CNNC and others. Its chairman said in April 2023 that small reactors were chosen for desalination and power, with a floating plant at Aqaba under consideration. JAEC's own undated project page describes a 100–300 MWe small-reactor class for electricity or seawater desalination, alongside technology evaluation, infrastructure work and vendor agreements. It names no selected site, vendor or unit count.",
    "sources": [
      "src-prg-33efcd1199",
      "src-prg-62b38a667b",
      "src-jaec-npp-project-page-2026"
    ],
    "confidence": "low",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-jo-jaec-xenergy-xe100-mou",
    "slug": "jo-jaec-xenergy-xe100-mou",
    "name": "JAEC and X-energy memorandum to assess Xe-100 deployment in Jordan",
    "programme_type": "cooperation_mou",
    "countries": [
      "JO"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Jordan Atomic Energy Commission (JAEC)",
        "role": "government"
      },
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "scale_text": "no units or site",
    "announced": {
      "value": "2017-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "superseded",
    "status_note": "Followed in November 2019 by a JAEC and X-energy letter of intent, described as the second stage, for four Xe-100 units by 2030. The letter of intent's later status is unknown.",
    "summary": "In November 2017 JAEC signed a memorandum with X-energy to assess the potential deployment of the Xe-100 high-temperature gas-cooled reactor in Jordan, for electricity, desalination and industrial uses. No site, order or later step is recorded.",
    "sources": [
      "src-prg-d038d9b9b6",
      "src-prgst-c5d97f810e"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "Followed in November 2019 by a JAEC and X-energy letter of intent, described as the second stage, for four Xe-100 units by 2030. The letter of intent's later status is unknown.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A JAEC or X-energy document on the 2019 LOI, a site decision, or a definitive agreement.",
        "evidence": [
          {
            "source_id": "src-prg-d038d9b9b6",
            "locator": "Lead paragraph, MoU signed 'to assess' the Xe-100 for potential deployment in Jordan"
          },
          {
            "source_id": "src-prgst-c5d97f810e",
            "locator": "Lead and paragraph 3, parties 'advanced to the second stage' by an LOI signed on 11 November"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "X-energy's November 2017 news release on the JAEC memorandum, or a JAEC news item of 28-29 November 2017 (Arabic or English) on the Xe-100 memorandum.",
        "evidence": [
          {
            "source_id": "src-prg-d038d9b9b6",
            "locator": "Opening paragraph: \"The Jordan Atomic Energy Commission has signed a memorandum of understanding with X-energy to assess\" the Xe-100 small modular reactor for potential deployment in Jordan; article dated 29 November 2017."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-jp-htgr-demonstration-reactor",
    "slug": "jp-htgr-demonstration-reactor",
    "name": "Japan's HTGR demonstration reactor programme (METI/ANRE, MHI core company, site not selected)",
    "programme_type": "government_programme",
    "countries": [
      "JP"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Agency for Natural Resources and Energy (ANRE), METI",
        "role": "government"
      },
      {
        "organization_id": "org-mitsubishi-heavy-industries",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-catalogue-jaea",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Ibaraki Prefecture",
        "role": "other"
      }
    ],
    "design_names": [
      "HTGR demonstration reactor (MHI basic design)"
    ],
    "scale_text": "one demonstration reactor, reactor thermal output 150-250 MW (conceptual specification about 200 MWt)",
    "units_stated": 1,
    "announced": {
      "value": "2023-07",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Operation targeted in the 2030s, site selection and implementing structure still listed as open tasks (2026 roadmap). Ibaraki Prefecture asked the national government in June 2025 and June 2026 to…",
    "summary": "Japan's government plans a high-temperature gas-cooled demonstration reactor for hydrogen production, targeted to operate in the 2030s, METI's ANRE selected MHI in July 2023 as core company for its design and construction. The conceptual specification is about 200 MWt. Site selection and the implementing body have not been decided, although Ibaraki Prefecture has asked to host it.",
    "related_project_ids": [
      "prj-httr-oarai"
    ],
    "sources": [
      "src-wnn-httr-mhi-2023",
      "src-jaea-httr-hydrogen-2025",
      "src-jaea-ard-symposium-2026"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-jp-meti-small-lwr-development",
    "slug": "jp-meti-small-lwr-development",
    "name": "METI next-generation reactor support: MHI domestic small light-water reactor (SMR) development (2026)",
    "programme_type": "selection_or_award",
    "countries": [
      "JP"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Economy, Trade and Industry (METI)",
        "role": "government"
      },
      {
        "organization_id": "org-mitsubishi-heavy-industries",
        "role": "developer_or_vendor"
      }
    ],
    "design_names": [
      "MHI domestic small light-water reactor (unnamed)"
    ],
    "scale_text": "development subsidy (no units)",
    "announced": {
      "value": "2026-08-05",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Subsidy award for reactor-type and element-technology development, no site, plant or licence application.",
    "summary": "In August 2026 MHI said METI selected three of its proposals under a supplementary-budget programme supporting next-generation reactors, including development of a small light-water reactor using domestic technology. MHI noted that Japan's 31 July 2026 nuclear policy guideline placed small light-water reactors (SMRs) at the social-implementation stage. This is development funding, not a plant, site or licence.",
    "sources": [
      "src-prg-0cc9c55196"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ke-nupea-first-npp-programme",
    "slug": "ke-nupea-first-npp-programme",
    "name": "Kenya first nuclear power plant programme (NuPEA, SMR option under evaluation, Siaya County preferred area)",
    "programme_type": "national_plan",
    "countries": [
      "KE"
    ],
    "admin1": "Siaya County",
    "participants": [
      {
        "organization_id": null,
        "name": "Nuclear Power and Energy Agency (NuPEA)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "KenGen",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Kenya Nuclear Regulatory Authority (KNRA)",
        "role": "government"
      }
    ],
    "scale_text": "Initial 1,000 MWe target via multi-module SMRs (NEI), other sources cite about 2,000 MWe (WNA) or 3,000 MW (The Star)…",
    "announced": {
      "value": "2026-05-02",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Technology and vendor not selected, preferred site (Lenya Village) identified but subject to characterisation, no licence or contract",
    "summary": "Kenya's Nuclear Power and Energy Agency is preparing the country's first nuclear power plant in Siaya County, with KenGen designated owner-operator and a groundbreaking targeted for 2027. Nuclear Engineering International reports that NuPEA has shifted its focus toward multi-module SMRs and received proposals including a Rolls-Royce two-unit offer, but no technology, vendor or contract has been selected and reported capacities differ between sources.",
    "sources": [
      "src-prg-fe83998423",
      "src-prg-85a3541f98",
      "src-prg-71fa405a5f",
      "src-wna-emerging-nuclear-countries"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-kg-rosatom-small-npp",
    "slug": "kg-rosatom-small-npp",
    "name": "Kyrgyzstan and Rosatom small nuclear power plant memorandum and RITM-200N pre-feasibility work",
    "programme_type": "cooperation_mou",
    "countries": [
      "KG"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Energy of the Kyrgyz Republic",
        "role": "government"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-ritm-200n"
    ],
    "scale_text": "initially one or two plants with one or two 55 MW RITM-200N units (press)",
    "announced": {
      "value": "2022",
      "precision": "year",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Memorandum (2022), terms of reference for a pre-study (Nov 2022) and pre-feasibility study handed over (2025), talks continuing, no site or decision.",
    "summary": "Kyrgyzstan and Rosatom signed a memorandum on a small nuclear plant in early 2022 and terms of reference for a preliminary study of a RITM-200N plant in November 2022, Rosatom later handed over a pre-feasibility study. In March 2026 Rosatom's head said talks on small and medium plants were proceeding slowly. No site or decision is recorded.",
    "sources": [
      "src-prg-bca731ad2f",
      "src-prg-ae82cd542c"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Rosatom Energy Projects / Rosatom release on the 22 November 2022 terms of reference (ATOMEXPO-2022), the January 2022 Expo 2020 Dubai memorandum, or a Kyrgyz Ministry of Energy statement on the pre-feasibility study handed over in 2025.",
        "evidence": [
          {
            "source_id": "src-prg-bca731ad2f",
            "locator": "Opening and second paragraphs: the Kyrgyz Ministry of Energy and Rosatom Energy Projects signed \"the terms of reference for a preliminary study\"; \"the parties are interested in developing a RITM-200N\" small modular reactor plant; later paragraph notes the January 2022 memorandum of cooperation."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-kr-busan-smr-special-zone",
    "slug": "kr-busan-smr-special-zone",
    "name": "Busan Metropolitan City plan for an SMR special zone and marine SMR industry (2026)",
    "programme_type": "government_programme",
    "countries": [
      "KR"
    ],
    "admin1": "Busan",
    "participants": [
      {
        "organization_id": null,
        "name": "Busan Metropolitan City",
        "role": "government"
      }
    ],
    "scale_text": "zone and industry plan (no units)",
    "announced": {
      "value": "2026-09-27",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Feasibility research on special-zone designation under the SMR Special Act, with a zone-planning study planned for 2027, marine (floating) SMRs promoted as a growth industry. No reactor site, design…",
    "summary": "Busan is studying the feasibility of an SMR special zone under the SMR Special Act that took effect in September 2026, aiming at a demonstration-and-export hub, and plans a zone-planning study in 2027. It also promotes marine SMRs for floating plants and ships. The plan names no reactor site, design or developer.",
    "related_project_ids": [
      "prj-gijang-smr"
    ],
    "sources": [
      "src-prg-962ebe5b47"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Busan Metropolitan City's press release (busan.go.kr 보도자료) of about 27 September 2026 on the SMR special-zone feasibility study and marine SMR industry plan.",
        "evidence": [
          {
            "source_id": "src-prg-962ebe5b47",
            "locator": "Fourth paragraph: \"27일 부산시에 따르면 시는 올해 3월 제정돼 이달 11일 시행된 'SMR 특별법'에 맞춰 'SMR 특구 지정 타당성 및 추진전략 연구'를 진행하고 있다\" (per Busan City, as reported 27 Sept 2026); next sentence adds a 2027 zone-planning study."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-kr-kaeri-kocia-htgr-mou",
    "slug": "kr-kaeri-kocia-htgr-mou",
    "name": "KAERI and Korea Chemical Industry Association memorandum on HTGRs for petrochemicals (2026)",
    "programme_type": "cooperation_mou",
    "countries": [
      "KR"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-kaeri",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Korea Chemical Industry Association",
        "role": "host_or_customer"
      }
    ],
    "design_names": [
      "high-temperature gas-cooled reactor (KAERI, design not named)"
    ],
    "scale_text": "not stated",
    "announced": {
      "value": "2026-03-06",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU on technology cooperation and commercialisation opportunities, no design, site or plant.",
    "summary": "In March 2026 KAERI and the Korea Chemical Industry Association agreed to cooperate on studying high-temperature gas-cooled reactors as a carbon-free heat source for the petrochemical industry. The memorandum covers technology cooperation and commercialisation opportunities only. No design, site or plant is named.",
    "sources": [
      "src-prg-acd3bad889",
      "src-prgsrc-e17e16956d"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "KAERI's own press release records that KAERI and the Korea Chemical Industry Association signed, on 6 March 2026, a technology-cooperation memorandum on using high-temperature gas-cooled reactors for petrochemical process heat.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-e17e16956d",
            "locator": "Press release body, first paragraph: the association and KAERI signed on 6 March 2026 the '고온가스로 활용 기술협력 업무협약' (agreement on technology cooperation for using HTGRs)"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-kr-nano-ds-danseok-mmr-mou",
    "slug": "kr-nano-ds-danseok-mmr-mou",
    "name": "NANO Nuclear Energy and DS Danseok memorandum on introducing micro modular reactors in South Korea (2026)",
    "programme_type": "cooperation_mou",
    "countries": [
      "KR"
    ],
    "participants": [
      {
        "organization_id": "org-nano-nuclear",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "DS Danseok",
        "role": "host_or_customer"
      }
    ],
    "announced": {
      "value": "2026-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Cooperation memorandum on technology review, regulation and business models, no site or order.",
    "summary": "DS Danseok, a South Korean resource-recycling energy company, announced in January 2026 a memorandum with NANO Nuclear Energy on introducing micro modular reactors in Korea, covering technology review, regulatory response, supply chain and business models for industrial sites, with a possible phased introduction. The specific NANO design is not named. No site or order exists.",
    "sources": [
      "src-prg-c17c11cc14",
      "src-prgsrc-d431e21d7e"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "DS Danseok's newsroom item of 12 January 2026 records its memorandum with NANO Nuclear Energy on introducing micro modular reactors in Korea, covering technology review, licensing, supply chain and phased introduction.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-d431e21d7e",
            "locator": "News list page 2, item headed \"DS단석, 美 나노 뉴클리어 에너지와 MMR 업무협약 체결\" (item date 2026-01-12): DS Danseok and NANO Nuclear Energy signed an MoU on domestic introduction of micro modular reactors, announced \"12일\"; cooperation on 기술 검토, 인허가 대응, 공급망 연계 and phased introduction."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-kr-nssc-smr-pre-review",
    "slug": "kr-nssc-smr-pre-review",
    "name": "Korea's NSSC SMR regulatory roadmap and pre-review system (companies signal intent, 2026)",
    "programme_type": "government_programme",
    "countries": [
      "KR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Nuclear Safety and Security Commission (NSSC)",
        "role": "government"
      },
      {
        "organization_id": "org-terrapower",
        "role": "other"
      },
      {
        "organization_id": "org-catalogue-saltfoss",
        "role": "other"
      }
    ],
    "scale_text": "regulatory programme (no units)",
    "announced": {
      "value": "2026-02",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Pre-review system starts November 2026, about three companies have signalled intent but no formal application, law revisions planned from 2028. No project or site.",
    "summary": "South Korea's nuclear regulator announced an SMR regulatory roadmap in February 2026 and a pre-review system starting in November 2026 that examines parts of a design before formal licensing. In July 2026 it said about three domestic and foreign companies had signalled intent to apply, reportedly including TerraPower and Saltfoss Energy. No application, project or site exists yet.",
    "sources": [
      "src-prg-6e054a78d2"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2026-12-04",
        "next_trigger": "NSSC press releases (보도자료) of February 2026 (SMR regulatory roadmap) and mid-July 2026 (pre-review system from 20 November 2026, three companies signalling intent), on nssc.go.kr.",
        "evidence": [
          {
            "source_id": "src-prg-6e054a78d2",
            "locator": "Quote of the NSSC SMR safety division head at a 15 July 2026 press briefing: \"신청 의향을 표명한 기업이 3곳 정도 있다\" (about three companies have signalled intent to apply for the SMR pre-review)."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-kr-terrapower-sk-innovation-natrium-term-sheet",
    "slug": "kr-terrapower-sk-innovation-natrium-term-sheet",
    "name": "TerraPower and SK Innovation term sheet to develop Korea's first commercial Natrium plant (2026)",
    "programme_type": "cooperation_mou",
    "countries": [
      "KR"
    ],
    "participants": [
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "SK Innovation",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-natrium"
    ],
    "announced": {
      "value": "2026-08",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Term sheet of intent, no site, capacity, schedule or licence application in Korea.",
    "summary": "TerraPower and SK Innovation announced a term sheet in August 2026 to advance their intent to develop Korea's first commercial Natrium plant and expand internationally. The agreement also expands SK Innovation's participation in TerraPower's US demonstration and later commercial projects. No site, capacity, schedule or licence application in Korea is named.",
    "sources": [
      "src-prg-c17f11f7b4",
      "src-prgsrc-3818dabebf"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "TerraPower's release of 14 August 2026 records the term sheet with SK Innovation to advance their intent to develop Korea's first commercial Natrium plant. It does not mention SK Innovation's role in the US demonstration.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "An SK Innovation release on the August 2026 term sheet.",
        "evidence": [
          {
            "source_id": "src-prgsrc-3818dabebf",
            "locator": "Fifth paragraph (dateline Bellevue, August 14, 2026): \"Separately, TerraPower and SK Innovation announced a term sheet agreement to advance their intent to develop Korea's first commercial Natrium plant along with plans to expand internationally.\""
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-kw-kisr-smr-assessment",
    "slug": "kw-kisr-smr-assessment",
    "name": "KISR preliminary assessment of SMRs for non-electric applications in Kuwait",
    "programme_type": "research_programme",
    "countries": [
      "KW"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Kuwait Institute for Scientific Research (KISR)",
        "role": "research"
      }
    ],
    "scale_text": "technology assessment, no units or site",
    "announced": {
      "value": "2024-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Research assessment presented at the IAEA SMR conference (Oct 2024), no government decision or project.",
    "summary": "KISR researchers presented at the IAEA SMR conference in October 2024 a preliminary assessment of SMRs for non-electric uses in Kuwait, concluding that pressurised-water SMRs suit desalination. Kuwait has no nuclear power infrastructure, this is research, not a government decision or project.",
    "sources": [
      "src-prg-5a91cedcfe"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-lk-national-nuclear-programme",
    "slug": "lk-national-nuclear-programme",
    "name": "Sri Lanka nuclear power programme roadmap and siting (SMR capability considered)",
    "programme_type": "national_plan",
    "countries": [
      "LK"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Sri Lanka Atomic Energy Board (SLAEB)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Ministry of Energy",
        "role": "government"
      }
    ],
    "scale_text": "first nuclear power plant targeted for 2034 (technology and size not selected)",
    "announced": {
      "value": "2024-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Roadmap: site selection and characterisation, bid invitation by 2027, construction and operation by 2034, six candidate sites under evaluation, technology-neutral, with SMR capability among roadmap…",
    "summary": "Sri Lanka's Cabinet committed in March 2024 to a nuclear power planning programme, and the Atomic Energy Board's roadmap aims for a bid invitation by 2027 and plant operation by 2034. The roadmap took account of the ability to build SMRs, and six candidate sites from three regions have been identified for evaluation. No technology, vendor or site has been selected.",
    "sources": [
      "src-prg-fd539c4854",
      "src-prg-c44cdb7986"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-lt-inpp-newcleo-feasibility-mou",
    "slug": "lt-inpp-newcleo-feasibility-mou",
    "name": "Ignalina NPP and newcleo memorandum to study LFR deployment feasibility in Lithuania",
    "programme_type": "cooperation_mou",
    "countries": [
      "LT"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ignalina Nuclear Power Plant (INPP)",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-catalogue-newcleo",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-lfr-as-200"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2025-07",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Feasibility-study MoU, no host site or plant named.",
    "summary": "In July 2025 the state-owned Ignalina Nuclear Power Plant and newcleo signed a memorandum of understanding to study the feasibility of deploying newcleo's lead-cooled LFR-AS-200 technology in Lithuania, in the presence of the energy minister. No site or plant has been named.",
    "sources": [
      "src-prg-8bff66c3ff"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The Lithuanian energy ministry's July 2025 news item on the memorandum, or a newcleo or Ignalina nuclear power plant (Altra) release of 9-10 July 2025.",
        "evidence": [
          {
            "source_id": "src-prg-8bff66c3ff",
            "locator": "Opening paragraph: Ignalina NPP and Newcleo \"have signed a memorandum of understanding to study the feasibility of deploying Newcleo's advanced fast reactor technology in the Baltic nation\"."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-lt-sge-altra-gvh-bwrx300-mou",
    "slug": "lt-sge-altra-gvh-bwrx300-mou",
    "name": "SGE, Altra and GE Vernova Hitachi memorandum to assess BWRX-300 deployment in Lithuania",
    "programme_type": "cooperation_mou",
    "countries": [
      "LT"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "SGE S.A.",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Altra",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-gevh",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2026-02",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU framing a technical and economic assessment, no site, order or licence.",
    "summary": "SGE, Lithuania's Altra and GE Vernova Hitachi signed a memorandum (reported 27 February 2026) setting a framework for a technical and economic assessment of possible BWRX-300 deployment in Lithuania. It is an assessment agreement, with no site or order.",
    "sources": [
      "src-prg-e660cd42e9",
      "src-prgsrc-ffb3537928"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "SGE's own news item records that SGE, Altra (Ignalina NPP) and GE Vernova Hitachi signed a trilateral MoU on 25 February 2026 in Washington framing a technical and economic feasibility assessment of the BWRX-300 in Lithuania.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-ffb3537928",
            "locator": "First paragraph: 'the Ignalina Nuclear Power Plant, operating under the name Altra' with GE Vernova Hitachi and SGE 'signed a trilateral Memorandum of Understanding' in Washington on 25 February"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-lv-nuclear-informative-report",
    "slug": "lv-nuclear-informative-report",
    "name": "Latvia Ministry of Climate and Energy informative report on nuclear energy and SMRs",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "LV"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Climate and Energy of Latvia (KEM)",
        "role": "government"
      }
    ],
    "scale_text": "300 MW SMR used only as a costing example",
    "announced": {
      "value": "2025-05-06",
      "precision": "day",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Government informative report at an early planning stage, no project, site, developer or design.",
    "summary": "On 6 May 2025 Latvia's Ministry of Climate and Energy presented the government with an informative report on nuclear energy focused on SMRs, saying Latvia is at an early planning stage and should start with research and capacity building. A 300 MW SMR appears only as a cost example, there is no project or site.",
    "sources": [
      "src-prg-a7aff99617"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-mn-small-npp-rosatom-talks",
    "slug": "mn-small-npp-rosatom-talks",
    "name": "Mongolia's small nuclear power plant plans and talks with Rosatom (RITM-200 offered)",
    "programme_type": "government_programme",
    "countries": [
      "MN"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Mongolia / Nuclear Energy Commission",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Ministry of Energy of Mongolia",
        "role": "government"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Mon-Atom LLC",
        "role": "other"
      }
    ],
    "design_names": [
      "RITM-200 (offered by Rosatom)"
    ],
    "scale_text": "not stated",
    "announced": {
      "value": "2023",
      "precision": "year",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Basic research and talks, New Kharkhorin area and the Mardai uranium deposit discussed as potential locations, no agreement to build, site or design selection. Mongolia's 2025 timeline puts a site…",
    "summary": "Mongolia is studying nuclear power and says an SMR is being considered because of its sparse population and low demand. Rosatom presented an SMR concept in 2023 and offers RITM-200 reactors, the New Kharkhorin area is described as one potential location and a parliamentary vice-speaker cited talks about the Mardai uranium deposit, and in June 2026 the energy minister expressed interest in cooperating on a basic study. No agreement to build, site or design has been decided.",
    "sources": [
      "src-prg-257936015c",
      "src-prg-415525e359",
      "src-prg-7cd141ec63",
      "src-prg-2891160414"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-mx-inin-smr-studies-2026-2030",
    "slug": "mx-inin-smr-studies-2026-2030",
    "name": "Mexico ININ institutional programme 2026-2030: SMR and microreactor studies (no CFE decision)",
    "programme_type": "research_programme",
    "countries": [
      "MX"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Instituto Nacional de Investigaciones Nucleares (ININ)",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Secretaría de Energía (SENER)",
        "role": "government"
      }
    ],
    "scale_text": "Studies only, no units, capacity or sites",
    "announced": {
      "value": "2026",
      "precision": "year",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Institutional research programme, SENER's PLADESE 2025-2039 includes no new nuclear capacity",
    "summary": "The National Institute of Nuclear Research's Institutional Programme 2026-2030 commits ININ to studies of small modular reactors and microreactors, including SMR cogeneration and seawater desalination for water-stressed regions such as Baja California, to support future decisions by CFE and the federal government. It is a research programme, not a plan to build, Mexico's electricity sector plan to 2039 includes no new nuclear capacity.",
    "sources": [
      "src-prg-eedb8bb544",
      "src-prg-82d32a82d4",
      "src-prg-8f81334446"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ng-national-nuclear-programme-smr",
    "slug": "ng-national-nuclear-programme-smr",
    "name": "Nigeria national nuclear power programme evaluating SMRs and large reactors (NAEC, Geregu and Itu candidate sites)",
    "programme_type": "national_plan",
    "countries": [
      "NG"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Nigeria Atomic Energy Commission (NAEC)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Nigerian Nuclear Regulatory Authority (NNRA)",
        "role": "government"
      },
      {
        "organization_id": "org-khnp",
        "role": "other"
      }
    ],
    "scale_text": "No SMR unit count or capacity, the report's demand scenarios cite two (or four) 1.2 GW units for large-reactor planning",
    "announced": {
      "value": "2025-04-24",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Programme in IAEA Milestones Phase 2 per the report, no SMR vendor, site assignment or licence",
    "summary": "Nigeria's September 2025 national report to the Convention on Nuclear Safety says the country is evaluating both large reactors and small modular reactors, participates in the US FIRST SMR programme, and has Geregu (Kogi State) and Itu (Akwa Ibom) as top candidate sites for nuclear power plants. No SMR technology, vendor or site assignment has been decided.",
    "sources": [
      "src-prg-de756b5f43",
      "src-prg-889a1f557f",
      "src-wna-emerging-nuclear-countries"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-nl-gelderland-smr-location-study",
    "slug": "nl-gelderland-smr-location-study",
    "name": "Province of Gelderland SMR action plan and location studies (Dodewaard, Wijchen)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "NL"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Province of Gelderland",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Gemeente Neder-Betuwe",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "goal: two possible SMR locations identified before 2027",
    "announced": {
      "value": "2024",
      "precision": "year",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Location and feasibility studies, the province says no decision on locations or construction is being taken.",
    "summary": "Gelderland adopted an SMR action plan in 2024 and aims to have two possible SMR locations in view before 2027, it says it will not build itself. A Haskoning study (reported June 2026) points to Dodewaard and Wijchen, and feasibility studies have started with interested municipalities such as Neder-Betuwe. No location or technology has been chosen.",
    "sources": [
      "src-prg-200134b6ed",
      "src-prg-e6f17b3119"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-nl-hexana-atoomcooperatie-mou",
    "slug": "nl-hexana-atoomcooperatie-mou",
    "name": "Hexana and Atoomcoöperatie memorandum on Hexana SMR deployment in the Netherlands (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "NL"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-hexana",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Atoomcoöperatie",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-catalogue-hexana"
    ],
    "scale_text": "not stated",
    "announced": {
      "value": "2025-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU to explore cooperation and stakeholder engagement, no site or project.",
    "summary": "In November 2025 French SMR developer Hexana and the Dutch citizen energy cooperative Atoomcoöperatie signed a memorandum to explore developing Hexana's sodium-cooled SMR platform in the Netherlands, with the cooperative coordinating stakeholder engagement. No site or project is named.",
    "sources": [
      "src-prg-2b0acce075",
      "src-prgsrc-300d34ea14"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Hexana's page records the memorandum with Atoomcoöperatie to explore developing Hexana's nuclear platform in the Netherlands, with the cooperative facilitating stakeholder engagement. The page date is later than the signing.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-300d34ea14",
            "locator": "Opening paragraph: HEXANA and Atoomcoöperatie \"have signed a Memorandum of Understanding (MoU) to explore cooperation on the potential development HEXANA's nuclear platform in the Netherlands\"; the cooperative \"will facilitate stakeholder engagement\"."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-nl-opmeer-smr-feasibility",
    "slug": "nl-opmeer-smr-feasibility",
    "name": "Opmeer municipality SMR feasibility programme (Allseas explored as initiator)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "NL"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Gemeente Opmeer",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-allseas",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-allseas-htgr"
    ],
    "scale_text": "no unit count, Allseas reactor described as needing under one hectare (press)",
    "announced": {
      "value": "2025-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Feasibility study (Sept 2025) and follow-up, intention agreement with Allseas explored but not recorded as signed, council chose a broader regional approach on 23 Sept 2026.",
    "summary": "Opmeer municipality, on its council's instruction, is investigating whether an SMR could be built locally, a feasibility study reported in September 2025 and a follow-up explored an intention agreement with Allseas. On 23 September 2026 the executive chose a broader regional approach. No developer agreement, site decision or permit is recorded.",
    "sources": [
      "src-prg-adf5223a65",
      "src-prg-4d761b080f"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-nl-overijssel-smr-siting-study",
    "slug": "nl-overijssel-smr-siting-study",
    "name": "Province of Overijssel SMR siting study (Tractebel)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "NL"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Province of Overijssel",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Tractebel",
        "role": "other"
      }
    ],
    "scale_text": "up to 100 MW sites widely, 100-500 MW sites few (study findings)",
    "announced": {
      "value": "2026-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Spatial study only, the province states no decision on SMR deployment and no designated locations.",
    "summary": "A spatial study commissioned by the Province of Overijssel and carried out by Tractebel identified areas potentially suitable for SMRs, finding many possible locations for SMRs up to 100 MW and few for 100-500 MW units. The province stresses that no decision has been taken and no location designated.",
    "sources": [
      "src-prg-dbde00d931",
      "src-prgsrc-ab89662bbc"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The Province of Overijssel's own news item records that the province commissioned Tractebel to do a first technical-spatial exploration for SMRs, found potentially suitable areas (few for 100-500 MW, near the IJssel), and has taken no decision and designated no locations.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-ab89662bbc",
            "locator": "News item (\"Gepubliceerd op 10 juni 2026\"), first paragraph: \"De provincie Overijssel heeft een ruimtelijke verkenning laten uitvoeren naar de mogelijke inpassing van Small Modular Reactors\" by \"het onafhankelijke bureau Tractebel\"; section 'Geen besluit over kernenergie of locaties': no decision and no locations designated."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-nl-ulc-energy-rolls-royce-smr",
    "slug": "nl-ulc-energy-rolls-royce-smr",
    "name": "ULC-Energy exclusive agreement with Rolls-Royce SMR for deployment in the Netherlands",
    "programme_type": "cooperation_mou",
    "countries": [
      "NL"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "ULC-Energy BV",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-rolls-royce-smr",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-rr-smr"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2022-08",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Exclusive collaboration agreement, ANVS lists ULC-Energy in orientation talks, no site, order or licence application.",
    "summary": "In August 2022 Rolls-Royce SMR signed an exclusive agreement with ULC-Energy to collaborate on deploying Rolls-Royce SMR plants in the Netherlands, with ULC-Energy selecting it as its technology. The Dutch regulator ANVS lists ULC-Energy (Rolls-Royce SMR, 1,500 MWth / 500 MWe) among four parties in orientation talks. No site or licence application is recorded.",
    "sources": [
      "src-prg-db8e9487ab",
      "src-anvs-smr-20261005"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-no-aecon-norsk-kjernekraft-bwrx300",
    "slug": "no-aecon-norsk-kjernekraft-bwrx300",
    "name": "Aecon and Norsk Kjernekraft strategic cooperation on BWRX-300 SMRs in Norway (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "NO"
    ],
    "participants": [
      {
        "organization_id": "org-norsk-kjernekraft",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "Aecon",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "announced": {
      "value": "2025-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Cooperation agreement, does not assign the design to any specific Norwegian site.",
    "summary": "Aecon, a contractor on Canada's first BWRX-300 at Darlington, and Norwegian developer Norsk Kjernekraft signed a strategic cooperation agreement in November 2025 focused on the GE Vernova Hitachi BWRX-300. It aims at a roadmap for feasibility studies, licensing, stakeholder management and site identification. It does not assign the design to any of Norsk Kjernekraft's specific project sites.",
    "sources": [
      "src-prg-f4c2c95234"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An Aecon or Norsk Kjernekraft news release (or LinkedIn announcement) on the November 2025 strategic cooperation agreement.",
        "evidence": [
          {
            "source_id": "src-prg-f4c2c95234",
            "locator": "Opening paragraph: \"The strategic cooperation agreement between Aecon ... and Norwegian private nuclear developer Norsk Kjernekraft, will focus on the GE Vernova Hitachi BWRX-300\"; second paragraph: roadmap for feasibility studies, licensing, stakeholder management and site identification."
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-no-norsk-kjernekraft-hexana-mou",
    "slug": "no-norsk-kjernekraft-hexana-mou",
    "name": "Norsk Kjernekraft and Hexana memorandum on advanced reactor deployment in Norway (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "NO"
    ],
    "participants": [
      {
        "organization_id": "org-norsk-kjernekraft",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-catalogue-hexana",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-hexana"
    ],
    "scale_text": "not stated",
    "announced": {
      "value": "2025-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU to explore joint deployment, no site or project.",
    "summary": "In June 2025 Norwegian developer Norsk Kjernekraft signed a memorandum with France's Hexana to explore joint deployment of Hexana's sodium-cooled SMR with heat storage in Norway, aimed at industrial decarbonisation. No site or project is named.",
    "sources": [
      "src-prg-3bfb2a9f0e",
      "src-prgsrc-6f02caa484"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Norsk Kjernekraft's own press release records the MoU with HEXANA on 24 June 2025 to explore joint deployment of advanced nuclear technology in Norway, with Norsk Kjernekraft helping to identify sites and industrial partners.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-6f02caa484",
            "locator": "Press release dated 24 June 2025 (dateline Aix-en-Provence), first paragraph: \"HEXANA og Norsk Kjernekraft har signert en intensjonsavtale (MoU) for å utforske felles muligheter for utplassering av avansert kjernekraftteknologi i Norge.\""
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-no-norsk-kjernekraft-saltfoss-loi",
    "slug": "no-norsk-kjernekraft-saltfoss-loi",
    "name": "Norsk Kjernekraft and Seaborg (now Saltfoss) letter of intent on CMSR deployment in Norway (2023)",
    "programme_type": "cooperation_mou",
    "countries": [
      "NO"
    ],
    "participants": [
      {
        "organization_id": "org-norsk-kjernekraft",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-catalogue-saltfoss",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-cmsr"
    ],
    "scale_text": "not stated",
    "announced": {
      "value": "2023-07",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "July 2023 letter of intent to investigate deploying the CMSR in Norway as a longer-term option. No term is stated in the announcement and no later step was found.",
    "summary": "In July 2023 Norsk Kjernekraft and Seaborg (now Saltfoss Energy) signed a letter of intent to investigate deploying Seaborg's compact molten salt reactor in Norway, as a longer-term option after conventional SMRs. No site or project is named.",
    "sources": [
      "src-prg-be3a1af7ef",
      "src-prgsrc-697edb6589"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "July 2023 letter of intent to investigate deploying the CMSR in Norway as a longer-term option. No term is stated in the announcement and no later step was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Norsk Kjernekraft or Saltfoss statement on the CMSR in Norway, or a Norwegian licensing step naming the design",
        "evidence": [
          {
            "source_id": "src-prg-be3a1af7ef",
            "locator": "WNN 18 Jul 2023, lead: 'letter of intent to investigate the deployment of Seaborg's compact molten salt reactor'"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "Norsk Kjernekraft's own release says it and Seaborg ApS entered a letter of intent to investigate establishing Seaborg's molten salt reactor in Norway, after initially building conventional SMRs.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-697edb6589",
            "locator": "Press release body, first paragraph: Norsk Kjernekraft AS and Seaborg ApS \"inngår intensjonsavtale om å undersøke mulighetene for å etablere Seaborg sin saltsmeltereaktor\" in Norway"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-no-nuclear-commission-nou-2026-4",
    "slug": "no-nuclear-commission-nou-2026-4",
    "name": "Norwegian Nuclear Commission report (NOU 2026:4): prepare for possible future nuclear power but start no process now…",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "NO"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Norwegian Nuclear Commission",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Ministry of Energy of Norway",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2026-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Report submitted April 2026, consultation to 8 October 2026, government to decide further process. Ten nuclear-plant notifications pending.",
    "summary": "The Norwegian Nuclear Commission, appointed in June 2024, submitted its report (NOU 2026:4) in April 2026 recommending that the government not start a nuclear power development process now but prepare for possible future use, including a national competence project. Ten notifications of proposed plants have been filed, apart from the Taftøy plan of several SMRs, which already has an assessment programme, the government awaited the commission before acting on them. The report went to consultation until 8 October 2026.",
    "related_project_ids": [
      "prj-fensfjorden-smr",
      "prj-taftoy-smr"
    ],
    "sources": [
      "src-prg-3a52388c13"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The NOU 2026:4 report or the energy ministry's release on it on the Norwegian government's website.",
        "evidence": [
          {
            "source_id": "src-prg-3a52388c13",
            "locator": "Opening paragraph: the commission recommends the government not start a nuclear power development process now but prepare for possible future use; report sent for consultation"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ph-doe-khnp-smart-prefeasibility-ceza",
    "slug": "ph-doe-khnp-smart-prefeasibility-ceza",
    "name": "Philippine DOE and KHNP SMART pre-feasibility study at CEZA, Santa Ana, Cagayan (2018-2019)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "PH"
    ],
    "admin1": "Cagayan",
    "participants": [
      {
        "organization_id": null,
        "name": "Department of Energy (Philippines)",
        "role": "government"
      },
      {
        "organization_id": "org-khnp",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Cagayan Economic Zone Authority (CEZA)",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-aris-smart"
    ],
    "scale_text": "100 MWe SMART (as reported by WNA)",
    "announced": {
      "value": "2018-07-27",
      "precision": "day",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Final pre-feasibility study turned over December 2019, evaluation only, no project decision.",
    "summary": "Under a July 2018 memorandum on nuclear infrastructure cooperation, the Philippine Department of Energy and KHNP carried out a pre-feasibility study of building a SMART reactor in the Cagayan Economic Zone Authority at Santa Ana, Cagayan. The final study was handed over in December 2019. It was an evaluation, no project decision followed in the sources read.",
    "sources": [
      "src-prg-401eead3de",
      "src-prg-bd457f143a"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ph-doe-rosatom-smr-cooperation",
    "slug": "ph-doe-rosatom-smr-cooperation",
    "name": "Philippine DOE and Rosatom cooperation on small modular reactor feasibility (2017 memorandum, 2019 agreement)",
    "programme_type": "cooperation_mou",
    "countries": [
      "PH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Department of Energy (Philippines)",
        "role": "government"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "not stated",
    "announced": {
      "value": "2017-11-13",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "A 2017 memorandum ran five years. A 2019 memorandum of intent and a January 2022 action plan followed with no stated term. No later step was found through October 2026.",
    "summary": "In November 2017 the Philippine Department of Energy and Rosatom signed a memorandum of cooperation under which Russia would help with feasibility studies on onshore or offshore small modular reactors, among other nuclear infrastructure work. In October 2019 the DOE signed a further agreement with Rosatom to assess a small nuclear plant, floating or on land. No site or project is recorded.",
    "sources": [
      "src-prg-db14cd7ffc",
      "src-prg-bd457f143a",
      "src-prgst-8cb1665907"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "A 2017 memorandum ran five years. A 2019 memorandum of intent and a January 2022 action plan followed with no stated term. No later step was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A DOE or Rosatom statement that the 2017 memorandum was extended, or a reported result of the pre-feasibility study under the 2019 memorandum of intent.",
        "evidence": [
          {
            "source_id": "src-prg-db14cd7ffc",
            "locator": "WNN 15 Nov 2017, last paragraph: 'The MoC will run for five years, but can be extended'"
          },
          {
            "source_id": "src-prg-bd457f143a",
            "locator": "WNA Philippines profile (updated 23 Oct 2026), nuclear plans section: 'further agreement with Rosatom in October 2019'"
          },
          {
            "source_id": "src-prgst-8cb1665907",
            "locator": "First two paragraphs: Rosatom and DOE 'agreed on an action plan' that 'follows a memorandum of intent signed ... in 2019'"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Philippine DOE or Rosatom news release on the 13 November 2017 memorandum of cooperation signed in Manila, or on the 2019 memorandum of intent",
        "evidence": [
          {
            "source_id": "src-prg-db14cd7ffc",
            "locator": "Paragraph beginning 'Russia will also assist the Philippines in carrying out feasibility studies on the construction of small modular reactors, either onshore or offshore'; memorandum of cooperation signed 13 November by Cusi and Spassky"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ph-meralco-usnc-mmr-prefeasibility",
    "slug": "ph-meralco-usnc-mmr-prefeasibility",
    "name": "Meralco and Ultra Safe Nuclear micro-modular reactor pre-feasibility study (2023, ended)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "PH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Manila Electric Company (Meralco)",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-usnc",
        "role": "developer_or_vendor"
      }
    ],
    "design_names": [
      "USNC Micro-Modular Reactor (MMR)"
    ],
    "scale_text": "one or more MMR energy systems (study)",
    "announced": {
      "value": "2023-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "ended",
    "status_note": "Four-month pre-feasibility study agreement, WNA (updated 5 Oct 2026) says the cooperation ended after USNC filed for bankruptcy in October 2024.",
    "summary": "In November 2023 Meralco signed a cooperation agreement with Ultra Safe Nuclear Corporation for a four-month pre-feasibility study of deploying one or more Micro-Modular Reactor systems in the Philippines. The World Nuclear Association reports that the cooperation ended after USNC's October 2024 bankruptcy filing. No project followed.",
    "sources": [
      "src-prg-307e18b339",
      "src-prg-bd457f143a"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Meralco news release (meralco.com.ph) or the USNC release of 15-16 November 2023 on the cooperation agreement signed at APEC",
        "evidence": [
          {
            "source_id": "src-prg-307e18b339",
            "locator": "Third paragraph: USNC will conduct a pre-feasibility study running four months to familiarise Meralco with MMR systems; agreement signed at APEC in San Francisco"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ph-mgen-ustda-smr-feasibility-study",
    "slug": "ph-mgen-ustda-smr-feasibility-study",
    "name": "Meralco PowerGen SMR feasibility study funded by USTDA (Meralco NEST programme)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "PH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Manila Electric Company (Meralco)",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "Meralco PowerGen Corporation (MGEN)",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "US Trade and Development Agency (USTDA)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Sargent & Lundy",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "AMH Philippines, Inc.",
        "role": "other"
      }
    ],
    "scale_text": "study and implementation roadmap for a first SMR plant (USTDA grant of USD 2.7-2.8 million as variously reported)",
    "announced": {
      "value": "2026-02-16",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Study due by Q4 2027 to decide whether, when and how SMRs fit, Sargent & Lundy and AMH selected 1 September 2026. No design, site or deployment decision. Candidate proof-of-concept sites reported in…",
    "summary": "In February 2026 USTDA funded Meralco PowerGen to evaluate US SMR designs, identify preferred technology and sites, and develop an implementation roadmap for the Philippines' first SMR plant, under Meralco's Nuclear Energy Strategic Transition (NEST) programme. Meralco and MGEN chose Sargent & Lundy with AMH Philippines in September 2026 to run the study, due by late 2027. No design, site or decision to build exists, three possible proof-of-concept sites were reported in 2024.",
    "sources": [
      "src-prg-232524f8aa",
      "src-prg-45f18c94be",
      "src-prg-c288ebeb8b",
      "src-prg-64e3562065"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ph-national-nuclear-programme",
    "slug": "ph-national-nuclear-programme",
    "name": "Philippine national nuclear energy programme (first plant targeted for 2032, SMRs among options)",
    "programme_type": "national_plan",
    "countries": [
      "PH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Department of Energy (Philippines)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Nuclear Energy Program Inter-Agency Committee (NEP-IAC)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Philippine Atomic Energy Regulatory Authority (PhilATOM)",
        "role": "government"
      }
    ],
    "scale_text": "draft tendering targets of 1,200 MWe by 2032, 2,400 MWe by 2035 and 4,800 MWe by 2050 (technology-neutral)",
    "announced": {
      "value": "2022-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Technology-neutral programme measures: February 2026 licensing flowchart, June and September 2026 draft tendering circulars, PhilATOM law (commissioners not yet appointed as of October 2026)…",
    "summary": "The Philippines aims to have its first nuclear plant operating by 2032 and is considering either reviving Bataan or building a small modular reactor. In 2026 the government finalised a whole-of-government licensing flowchart and consulted on draft rules for competitive tendering of nuclear capacity. The programme is technology-neutral and has not selected any SMR plant or site.",
    "sources": [
      "src-prg-bd457f143a",
      "src-prg-315a436f4f"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A DOE press release on the 11 February 2026 licensing-flowchart discussion, or the text of the 2022 executive order adopting the national nuclear position on the Official Gazette or Presidential Communications Office site",
        "evidence": [
          {
            "source_id": "src-prg-315a436f4f",
            "locator": "Opening paragraph: the government completed a 'harmonised, whole-of-government licensing and permitting flowchart' for nuclear plant projects, toward operation by 2032"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ph-stgr20-letter-of-intent",
    "slug": "ph-stgr20-letter-of-intent",
    "name": "Southern Infrastructure and Kaizen ANZ letter of intent for a 40 MW thorium STGR20 reactor in the Philippines (2023)",
    "programme_type": "cooperation_mou",
    "countries": [
      "PH"
    ],
    "participants": [
      {
        "organization_id": "org-southern-infrastructure",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Kaizen ANZ Pty Ltd",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Department of Trade and Industry (Philippines)",
        "role": "government"
      }
    ],
    "design_names": [
      "STGR20 (Simple Thorium Gas-cooled Reactor)"
    ],
    "scale_text": "initial 40 MW thorium-fuelled STGR20",
    "announced": {
      "value": "2023-10-09",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Letter of intent witnessed in October 2023, with a stated plan to start by mid 2024 and finish by 2027. No later step, PPP filing or end is documented.",
    "summary": "On 9 October 2023 in Adelaide, the Philippine Trade Secretary witnessed a letter of intent by Australia's Southern Infrastructure, with Kaizen ANZ, to develop an initial 40 MW thorium-fuelled STGR20 gas-cooled reactor in the Philippines. The developer describes STGR20 as a scalable SMR. No host, site or licence application is recorded.",
    "sources": [
      "src-prg-1e55531b65",
      "src-prg-39e2544ead",
      "src-prg-141fe11284",
      "src-prgst-62abdb7c57"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Letter of intent witnessed in October 2023, with a stated plan to start by mid 2024 and finish by 2027. No later step, PPP filing or end is documented. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A PPP Center, DTI or Philippine Department of Energy record of a proposal or agreement, or a company statement on the project.",
        "evidence": [
          {
            "source_id": "src-prg-1e55531b65",
            "locator": "Photo caption paragraph: 'witnessed a Letter of Intent by Southern Infrastructure Pty Ltd'"
          },
          {
            "source_id": "src-prg-141fe11284",
            "locator": "Projects list: 'exclusive agreement with TEN Energy of the Netherlands to commercialise'"
          },
          {
            "source_id": "src-prgst-62abdb7c57",
            "locator": "Fifth paragraph: 'slated to begin by mid-2024 and to finish construction by 2027'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-pl-enea-last-energy-loi",
    "slug": "pl-enea-last-energy-loi",
    "name": "Enea and Last Energy letter of intent to cooperate on SMRs in Poland",
    "programme_type": "cooperation_mou",
    "countries": [
      "PL"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Enea SA",
        "role": "utility"
      },
      {
        "organization_id": "org-last-energy",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-pwr-20"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2022-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Enea said in October 2023 that the cooperation ended when the letter of intent expired. Last Energy said it still worked closely with Enea. No later document settles it.",
    "summary": "In June 2022 state-owned utility Enea signed a letter of intent with Last Energy to cooperate on the development, construction and distribution of SMRs, possibly through a Polish joint company. Further steps depended on confirming viability and obtaining certificates, no site or plant is recorded.",
    "sources": [
      "src-prg-5a6c05a350",
      "src-prgst-2daf493651"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "conflicting",
        "note": "Enea said in October 2023 that the cooperation ended when the letter of intent expired. Last Energy said it still worked closely with Enea. No later document settles it. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An Enea or Last Energy statement after October 2023 on the 2022 LOI, or any new Enea-Last Energy agreement.",
        "evidence": [
          {
            "source_id": "src-prg-5a6c05a350",
            "locator": "Paragraph beginning 'Under the letter of intent', scope decided 'after confirming the economic and technological viability'"
          },
          {
            "source_id": "src-prgst-2daf493651",
            "locator": "Paragraph 2, Enea: cooperation 'została zakończona' with the LOI's expiry"
          },
          {
            "source_id": "src-prgst-2daf493651",
            "locator": "Paragraph 3, Last Energy says it still cooperates 'ściśle' with Enea"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An Enea (Polish) news release on the June 2022 letter of intent signed at Congress 590, or a Last Energy news release on it",
        "evidence": [
          {
            "source_id": "src-prg-5a6c05a350",
            "locator": "Paragraphs on the Enea and Last Energy letter of intent: joint Polish company possible; signed at the Congress 590 conference in Nadarzyn"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-pl-kghm-smr-programme",
    "slug": "pl-kghm-smr-programme",
    "name": "KGHM Polska Miedź SMR programme (suspended)",
    "programme_type": "fleet_agreement",
    "countries": [
      "PL"
    ],
    "participants": [
      {
        "organization_id": "org-kghm",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300",
      "dsn-catalogue-nuward-smr",
      "dsn-holtec-smr-160",
      "dsn-rr-smr",
      "dsn-voygr"
    ],
    "announced": {
      "value": "2023",
      "precision": "year",
      "basis": "actual"
    },
    "status": "paused",
    "status_note": "The 13 July 2023 decision covered five light-water designs. The programme text says the project is currently suspended. July 2026 press remarks are not a company withdrawal document.",
    "summary": "KGHM applied on 13 April 2023 for a decision in principle covering Rolls-Royce SMR, NUWARD, SMR-160, BWRX-300 and VOYGR. NuScale was preferred only for processing that application. The 14 February 2022 early-works agreement was not exclusive. A 10 August 2026 article reports a representative told a July subcommittee the company had given up its own project and would consider offtake. It is not a company document. The programme text says the project is currently suspended. The 30 September 2026 notice records adoption and does not name KGHM. No site, module count or plant output is stored.",
    "legacy_project_ids": [
      "prj-kghm-nuscale"
    ],
    "sources": [
      "src-kghm-nuscale-2023",
      "src-gramwzielone-smr-pl-2026",
      "src-govpl-ppej-2026",
      "src-govpl-ppej-adoption-20260930"
    ],
    "confidence": "low",
    "last_checked": "2026-10-19",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-pl-last-energy-ksse",
    "slug": "pl-last-energy-ksse",
    "name": "Last Energy power purchase agreement for ten 20 MWe plants in the Katowice Special Economic Zone",
    "programme_type": "customer_agreement",
    "countries": [
      "PL"
    ],
    "participants": [
      {
        "organization_id": "org-last-energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Katowicka Specjalna Strefa Ekonomiczna S.A. (KSSE)",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [],
    "scale_text": "ten 20 MWe plants, exact model designation not established by the reviewed agreement sources",
    "units_stated": 10,
    "announced": {
      "value": "2023-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "2023 agreement for ten 20 MWe plants in KSSE. Last Energy's undated page still shows a 2027 target, but no dated later step, site or permit was found.",
    "related_project_ids": [
      "prj-last-energy-ksse-first"
    ],
    "summary": "Last Energy agreed with the Katowice Special Economic Zone to develop ten of its 20 MWe micro nuclear plants, selling power under PPAs to zone investors, World Nuclear News reported the deal in March 2023. No specific plant site, decision in principle or licence application is recorded.",
    "sources": [
      "src-prg-d7316d3d33",
      "src-prg-3aef39f981"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "2023 agreement for ten 20 MWe plants in KSSE. Last Energy's undated page still shows a 2027 target, but no dated later step, site or permit was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A dated Last Energy or KSSE announcement of a KSSE site, decision in principle or PAA filing, or a statement ending the PPA",
        "evidence": [
          {
            "source_id": "src-prg-d7316d3d33",
            "locator": "Last Energy solution section: 'ten 20 MWe power plants with a targeted commissioning date of 2027'"
          },
          {
            "source_id": "src-prg-3aef39f981",
            "locator": "WNN 23 Mar 2023, Poland para: first of 10 plants at KSSE targeted 'in 2026'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-pl-respect-energy-edf-nuward",
    "slug": "pl-respect-energy-edf-nuward",
    "name": "Respect Energy and EDF agreement to develop NUWARD SMR projects in Poland",
    "programme_type": "cooperation_mou",
    "countries": [
      "PL"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Respect Energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-edf",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-nuward-smr"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2023-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "January 2023 exclusive cooperation agreement to evaluate greenfield sites. No site, later step or end was found. EDF replaced the original NUWARD design in 2024 and 2025.",
    "summary": "In January 2023 Polish energy trader Respect Energy and EDF agreed to cooperate on NUWARD SMR projects in Poland and to start evaluating greenfield sites. EDF later redesigned NUWARD (2024-25). No decision in principle, site or order is recorded.",
    "sources": [
      "src-prg-00ed8e0350",
      "src-prg-ded3ed7f89",
      "src-prgsrc-f64a52ec4c"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "January 2023 exclusive cooperation agreement to evaluate greenfield sites. No site, later step or end was found. EDF replaced the original NUWARD design in 2024 and 2025. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Respect Energy or EDF statement on site selection, or on whether the agreement covers the redesigned NUWARD.",
        "evidence": [
          {
            "source_id": "src-prg-00ed8e0350",
            "locator": "WNN 16 Jan 2023, joint statement paragraph: 'jointly start the evaluation process of specific new greenfield sites'"
          },
          {
            "source_id": "src-prg-ded3ed7f89",
            "locator": "WNA Poland profile (updated 27 Oct 2026), SMR section: 'EDF abandoned the original Nuward design in mid-2024'"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "EDF's own release records the January 2023 agreement with Respect Energy and the plan to start evaluating specific greenfield sites.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-f64a52ec4c",
            "locator": "Press release, first paragraph (dated 13 January 2023, Paris): EDF and Respect Energy \"announced the signature of a Cooperation Agreement to jointly develop nuclear power projects in Poland\" based on NUWARD SMR technology"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-pl-unimot-getka-nuscale",
    "slug": "pl-unimot-getka-nuscale",
    "name": "Unimot and Getka agreement with NuScale to explore coal-repurposing SMRs in Poland",
    "programme_type": "cooperation_mou",
    "countries": [
      "PL"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Unimot",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "Getka",
        "role": "other"
      },
      {
        "organization_id": "org-nuscale",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-voygr"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2021-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Exploratory MOU signed in September 2021 with no stated term. No later step, renewal or end has been found.",
    "summary": "In September 2021 Polish fuels and power trader Unimot and US firm Getka signed an agreement with NuScale to explore deploying NuScale Power Modules as a coal-repurposing solution at Polish coal plants. No site, decision in principle or order is recorded.",
    "sources": [
      "src-prg-85a0e400b0",
      "src-prgst-0e2adb313b"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Exploratory MOU signed in September 2021 with no stated term. No later step, renewal or end has been found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Unimot, Getka or NuScale statement on the MOU's outcome, renewal or end.",
        "evidence": [
          {
            "source_id": "src-prg-85a0e400b0",
            "locator": "Fourth paragraph: 'signed an agreement with NuScale to explore whether its 77 MWe NuScale Power Module could be deployed'"
          },
          {
            "source_id": "src-prgst-0e2adb313b",
            "locator": "Second paragraph: 'NuScale will support Getka and UNIMOT's examination'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-pr-nuclear-alternative-project-smr-siting-study",
    "slug": "pr-nuclear-alternative-project-smr-siting-study",
    "name": "Nuclear Alternative Project study of SMR and microreactor site suitability in Puerto Rico (DOE-funded)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "PR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Nuclear Alternative Project",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "U.S. Department of Energy, Office of Nuclear Energy",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2021-11-23",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "DOE-funded siting study awarded in November 2021. Two possible sites were reported by February 2024, but no final siting report or completion was found through October 2026.",
    "summary": "DOE's Office of Nuclear Energy published an abstract in November 2021 for a Nuclear Alternative Project award to evaluate the general site suitability for small modular reactors and microreactors in Puerto Rico. The non-profit says it is studying the feasibility of advanced reactors for the island, no site, project or licence application exists.",
    "sources": [
      "src-prg-52d9f3b3b5",
      "src-prg-cb1b2050f2",
      "src-prgst-6608a422cb"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "DOE-funded siting study awarded in November 2021. Two possible sites were reported by February 2024, but no final siting report or completion was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Publication of the NAP Phase 2 siting final report with site rankings, or a DOE project close-out record.",
        "evidence": [
          {
            "source_id": "src-prg-52d9f3b3b5",
            "locator": "Abstract text, awardee will 'evaluate the general site suitability'"
          },
          {
            "source_id": "src-prg-cb1b2050f2",
            "locator": "Home page banner, 'We are Studying the Feasibility'"
          },
          {
            "source_id": "src-prgst-6608a422cb",
            "locator": "Paragraph 2, DOE 'awarded $1.6m' and 'Two possible sites have been identified'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-py-us-ncmou-smr-microreactor-plans",
    "slug": "py-us-ncmou-smr-microreactor-plans",
    "name": "Paraguay SMR and microreactor plans under the US-Paraguay strategic civil nuclear memorandum (August 2026)",
    "programme_type": "intergovernmental_agreement",
    "countries": [
      "PY"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Paraguay (Ministry of Foreign Affairs)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Autoridad Reguladora Radiológica y Nuclear (ARRN)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "United States (Department of State)",
        "role": "government"
      }
    ],
    "scale_text": "Microreactors up to 30 MW (projected ~2030) and SMRs up to 300 MW (~10 years), as described by the regulator, no units…",
    "announced": {
      "value": "2026-08-04",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Non-binding memorandum, a binding Section 123 agreement still to be negotiated, no project",
    "summary": "On 4 August 2026 Paraguay and the United States signed a non-binding Memorandum of Understanding on Strategic Civil Nuclear Cooperation. Paraguay's nuclear regulator head told ABC Color that microreactors could be operating around 2030 and SMRs in about ten years, but described the memorandum as a political step toward a binding Section 123 agreement, no project, site or vendor exists.",
    "sources": [
      "src-prg-9ef81ee1bd"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A US State Department statement or a Paraguayan Foreign Ministry (MRE) or ARRN release, ideally with the text of the 4 August 2026 memorandum",
        "evidence": [
          {
            "source_id": "src-prg-9ef81ee1bd",
            "locator": "Opening: on 4 August 2026 Paraguay and the US signed the Strategic Civil Nuclear Cooperation memorandum (NCMOU); the ARRN head says it is a political step toward a binding Section 123 agreement"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ro-dp-world-constanta-smr-study",
    "slug": "ro-dp-world-constanta-smr-study",
    "name": "DP World, CEA and TerraWater Institute SMR feasibility study for the Port of Constanța",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "RO"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "DP World",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-cea",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "TerraWater Institute",
        "role": "other"
      }
    ],
    "scale_text": "technology-agnostic, models port demand 2030-2050",
    "announced": {
      "value": "2026-06-04",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Feasibility study, DP World says any development would need further assessment and regulatory review.",
    "summary": "On 4 June 2026 DP World signed an agreement with France's CEA and TerraWater Institute for a feasibility study on whether SMRs could meet the Port of Constanța's long-term energy needs, modelling demand from 2030 to 2050. Any development would be subject to further technical assessment, regulatory review and stakeholder engagement.",
    "sources": [
      "src-prg-eecde04e1f"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ro-last-energy-cncan-licensing",
    "slug": "ro-last-energy-cncan-licensing",
    "name": "Last Energy PWR-20 licensing engagement with Romania's regulator CNCAN",
    "programme_type": "regulatory_engagement",
    "countries": [
      "RO"
    ],
    "participants": [
      {
        "organization_id": "org-last-energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "CNCAN",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-pwr-20"
    ],
    "scale_text": "no site named in the licensing release",
    "announced": {
      "value": "2024-10-07",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "ENSREG's March 2026 regulator dashboard lists Last Energy's Quantum in preparatory review in Romania as an active project. An EU SMR alliance said in Nov 2025 it had suspended its working group.",
    "summary": "In October 2024 Last Energy said CNCAN confirmed it had completed the pre-authorization phase and could enter the authorization phase for its PWR-20. The ENSREG dashboard of March 2026 lists Last Energy's Quantum (60 MWth) in preparatory review in Romania, while the European SMR Industrial Alliance suspended the Quantum project working group in November 2025 pending clarification. No site is named in these sources.",
    "related_project_ids": [
      "prj-last-energy-mioveni"
    ],
    "sources": [
      "src-last-energy-cncan-2024",
      "src-ensreg-smr-dashboard-2026-03",
      "src-prg-ab6bf0aa20"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "ENSREG's March 2026 regulator dashboard lists Last Energy's Quantum in preparatory review in Romania as an active project. An EU SMR alliance said in Nov 2025 it had suspended its working group.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The next ENSREG SMR dashboard edition or a CNCAN statement on Last Energy's authorization phase",
        "evidence": [
          {
            "source_id": "src-ensreg-smr-dashboard-2026-03",
            "locator": "Dashboard March 2026 table, row 'Quantum Last Energy PWR 60 MWth ... Romania Preparatory review'"
          },
          {
            "source_id": "src-last-energy-cncan-2024",
            "locator": "Release 7 Oct 2024, para 1-2: CNCAN confirmed pre-authorization phase complete"
          },
          {
            "source_id": "src-prg-ab6bf0aa20",
            "locator": "Alliance PWG reassessment dated 13-11-2025: Project Quantum 'decided not to participate', PWG suspended"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-rs-smr-1200mw-target",
    "slug": "rs-smr-1200mw-target",
    "name": "Serbia's goal of 1,200 MW from small modular reactors (four SMRs)",
    "programme_type": "national_plan",
    "countries": [
      "RS"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Serbia",
        "role": "government"
      }
    ],
    "scale_text": "1,200 MW from SMRs, four SMRs (WNN headline)",
    "units_stated": 4,
    "announced": {
      "value": "2024-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Presidential goal, the 1989 ban on nuclear plants was lifted in December 2024, no site, vendor or project.",
    "summary": "In March 2024 President Vučić said Serbia was seeking international support to reach 1,200 MW of capacity from small modular reactors. In December 2024 the National Assembly ended the 35-year prohibition on building nuclear plants. No site, vendor or project is recorded.",
    "sources": [
      "src-prg-fc610463db",
      "src-prg-da1022f05a"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Serbian Presidency (predsednik.rs) or government release, or the IAEA/NES 2024 record, of President Vucic's 21 March 2024 statement about four SMRs and 1,200 MW",
        "evidence": [
          {
            "source_id": "src-prg-fc610463db",
            "locator": "Vucic quoted at the Brussels summit: 'very much interested in getting at least four SMRs (small modular reactors) that can replace 1200 megawatts'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ru-gazprom-tambey-fpu-study",
    "slug": "ru-gazprom-tambey-fpu-study",
    "name": "Gazprom study of four floating nuclear power units for the Tambey field cluster (Yamal)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "RU"
    ],
    "participants": [
      {
        "organization_id": "org-gazprom",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "four floating units, about 400 MW in total (press)",
    "units_stated": 4,
    "announced": {
      "value": "2023-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Kommersant reported in 2023 that Gazprom was studying four floating units for the Tambey fields. No decision, contract or end of the study was found in sources checked.",
    "summary": "Kommersant reported in June and October 2023 that Gazprom was studying four floating nuclear power units, about 400 MW in total, to supply the Tambey cluster of fields on Yamal. It is an option under study, no decision, order or berth has been recorded.",
    "related_project_ids": [
      "prj-gazprom-kirinskoye-floating"
    ],
    "sources": [
      "src-kommersant-gazprom-fpu-2023"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Kommersant reported in 2023 that Gazprom was studying four floating units for the Tambey fields. No decision, contract or end of the study was found in sources checked. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Gazprom or Rosatom announcement of a decision, contract or berth for floating units at Tambey.",
        "evidence": [
          {
            "source_id": "src-kommersant-gazprom-fpu-2023",
            "locator": "Kommersant 2 Oct 2023, paragraph citing the 16 June report: 'изучает установку четырех плавучих АЭС'"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Gazprom or Rosatom statement, or a Yamal-Nenets regional planning document, naming a floating nuclear unit study for the Tambey field cluster",
        "evidence": [
          {
            "source_id": "src-kommersant-gazprom-fpu-2023",
            "locator": "Paragraph beginning 'Как писал Ъ 16 июня': Gazprom also studies four floating nuclear plants of 400 MW in total for the Tambey cluster fields on Yamal"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ru-pevek-additional-fpu-study",
    "slug": "ru-pevek-additional-fpu-study",
    "name": "Rosatom early study of an additional modernised floating power unit for Pevek (Chukotka request)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "RU"
    ],
    "participants": [
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Chukotka Autonomous Okrug administration",
        "role": "government"
      }
    ],
    "scale_text": "one additional modernised floating power unit (design not named)",
    "units_stated": 1,
    "announced": {
      "value": "2023-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Rosatom said in October 2023 the study was at a very early stage and no decision had been taken. No later document on it was found.",
    "summary": "In October 2023 Rosatom told Kommersant it was studying, at the Chukotka administration's request, the supply of an additional modernised floating power unit to Pevek, and that the work was at a very early stage. No decision has been recorded, the four 106 MW units cited by officials in 2026 are the existing Baimsky project.",
    "related_project_ids": [
      "prj-baimsky-floating",
      "prj-lomonosov"
    ],
    "sources": [
      "src-prg-bfbd9172d5"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Rosatom said in October 2023 the study was at a very early stage and no decision had been taken. No later document on it was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Rosatom or Chukotka government decision, or a regional power development scheme listing an additional floating unit at Pevek.",
        "evidence": [
          {
            "source_id": "src-prg-bfbd9172d5",
            "locator": "Second paragraph Rosatom quote: 'решение об осуществлении проекта не принято'"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Rosatom or Chukotka government release on the September 2023 Eastern Economic Forum memorandum (Chukotatomenergo and the Chukotka government), or a Rosatom statement on the additional Pevek unit",
        "evidence": [
          {
            "source_id": "src-prg-bfbd9172d5",
            "locator": "Second paragraph: Rosatom says it is working on supplying an additional modernised floating unit to Pevek at the Chukotka administration's request, at a 'very early stage'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ru-primorsky-floating-units-study",
    "slug": "ru-primorsky-floating-units-study",
    "name": "Primorsky Krai floating nuclear power units study (Rosatom)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "RU"
    ],
    "admin1": "Primorsky Krai",
    "participants": [
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      },
      {
        "name": "Government of Primorsky Krai",
        "organization_id": null,
        "role": "government"
      }
    ],
    "announced": {
      "value": "2024",
      "precision": "year",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "March 2024 memorandum to prepare future binding deals on floating units. Talks were reported in September 2024. No contract or later step was found.",
    "summary": "Rosatom's machine-building division signed a memorandum at ATOMEXPO-2024 with the Investment Agency of Primorsky Krai to prepare for future binding deals on floating power units. The regional energy minister presented candidate locations near Fokino and Slavyanka. In September 2024 Rosatom said talks with the territory's government continued, including supply for a planned Lake Khasan resort. Trade press links the concept to RITM-200-class reactors. No binding contract or site decision was found through October 2026.",
    "legacy_project_ids": [
      "prj-primorsky-floating-ritm"
    ],
    "sources": [
      "src-atommedia-atomekspo-2024-primorsky",
      "src-powertech-primorsky-fnpp",
      "src-seetaoe-primorsky-fnpp",
      "src-rosatom-primorsky-memorandum-2024-ru",
      "src-kommersant-primorsky-floating-units-2024",
      "src-rosatom-eef-2024-primorsky-floating-units"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "March 2024 memorandum to prepare future binding deals on floating units. Talks were reported in September 2024. No contract or later step was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Rosatom or Primorsky Krai announcement of a binding floating-unit contract, a site decision, or termination.",
        "evidence": [
          {
            "source_id": "src-rosatom-primorsky-memorandum-2024-ru",
            "locator": "Paragraph 3, preparation for future 'юридически обязывающих сделок'"
          },
          {
            "source_id": "src-kommersant-primorsky-floating-units-2024",
            "locator": "Paragraph 5, Nikipelov: settle capacity and 'обязывающими документами' by year end"
          },
          {
            "source_id": "src-rosatom-eef-2024-primorsky-floating-units",
            "locator": "Paragraph 2, division and regional government 'обсуждают' floating units for Lake Khasan"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ru-rosatom-small-npp-programme",
    "slug": "ru-rosatom-small-npp-programme",
    "name": "Rosatom small nuclear power plant programme (62 small reactors by 2039, four more floating plants)",
    "programme_type": "national_plan",
    "countries": [
      "RU"
    ],
    "participants": [
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      }
    ],
    "design_names": [
      "RITM-200 family (floating units)"
    ],
    "scale_text": "about 62 small-NPP reactors by 2039, about 18 for floating plants, four more floating plants planned",
    "units_stated": 62,
    "announced": {
      "value": "2024-12",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Corporate programme statements without named sites, individual projects are published separately.",
    "summary": "Rosatom's corporate newspaper reported in December 2024 that Rosatom plans to build 62 small-NPP reactors by 2039, about 18 of them for floating plants, and in August 2026 a Rosatom director said four more floating plants are planned. These are unsited programme statements, sited projects are recorded separately.",
    "related_project_ids": [
      "prj-baimsky-floating",
      "prj-kaliningrad-floating-smr-proposal",
      "prj-lomonosov",
      "prj-yakutia-ritm"
    ],
    "sources": [
      "src-prg-d9b2660a4f",
      "src-interfax-baimsky-units"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ru-shelf-m-prospective-arctic-sites",
    "slug": "ru-shelf-m-prospective-arctic-sites",
    "name": "Rosatom list of prospective Arctic sites for SHELF-M microreactor plants (Yakutia, Krasnoyarsk, Chukotka)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "RU"
    ],
    "participants": [
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-aris-nikiet",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Krasnoyarsk Krai government",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-aris-shelf-m"
    ],
    "scale_text": "five prospective sites, 10 MW per module (Rosatom statement)",
    "announced": {
      "value": "2023-08",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Aug 2023 list of five candidate sites. Only Sovinoe advanced as its own project. No Krasnoyarsk agreement or later step for the other four sites was found.",
    "summary": "In August 2023 Rosatom named five prospective sites for SHELF-M small nuclear plants: the Sovinoe deposit (Chukotka), the Agylki deposit and Batagay (Yakutia), and Baikit and Bolshevik Island (Krasnoyarsk). Krasnoyarsk officials said they intended to sign an agreement for a first plant at Baikit by 2035. Only Sovinoe has advanced to a project record.",
    "related_project_ids": [
      "prj-chukotka-sovinoe-shelf-m"
    ],
    "sources": [
      "src-atomic-energy-sovinoe-2023",
      "src-prg-827016a831"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Aug 2023 list of five candidate sites. Only Sovinoe advanced as its own project. No Krasnoyarsk agreement or later step for the other four sites was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A signed Rosatom-Krasnoyarsk or Rosatom-Yakutia agreement for a SHELF-M plant, or inclusion of these sites in Russia's general scheme for power facilities",
        "evidence": [
          {
            "source_id": "src-atomic-energy-sovinoe-2023",
            "locator": "28 Aug 2023 item: Sovinoe, Agylki, Batagay, Baikit and Bolshevik Island named as prospective sites"
          },
          {
            "source_id": "src-prg-827016a831",
            "locator": "Kommersant 24 Aug 2023, para 1-3: region 'намерены подписать соглашение' with Rosatom at the EEF"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Rosatom or NIKIET release or the Technoprom-2023 presentation listing the five sites, or the Krasnoyarsk Krai-Rosatom agreement release from the September 2023 Eastern Economic Forum",
        "evidence": [
          {
            "source_id": "src-atomic-energy-sovinoe-2023",
            "locator": "Opening paragraphs: Rosatom selected five prospective SHELF-M sites in Chukotka, Yakutia and Krasnoyarsk Krai (Sovinoe, Agylkinskoe, Batagay, Baikit, Bolshevik Island), per a TASS interview at Technoprom"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ru-vk300-arkhangelsk-feasibility",
    "slug": "ru-vk300-arkhangelsk-feasibility",
    "name": "Feasibility study for a four-unit VK-300 nuclear cogeneration plant in the Arkhangelsk region",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "RU"
    ],
    "participants": [
      {
        "organization_id": "org-aris-nikiet",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-rosatom",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-vk-300"
    ],
    "scale_text": "four VK-300 units, Ne = 1000 MW installed electric capacity, Q = 1600 Gcal/h heat",
    "units_stated": 4,
    "announced": {
      "value": "2007-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "An April 2007 IAEA conference paper says the feasibility study for a four-unit VK-300 cogeneration plant in Arkhangelsk was produced and approved by a Rosatom board.",
    "summary": "A paper at an April 2007 IAEA conference (proceedings 2009) reports a feasibility study for a four-unit VK-300 nuclear cogeneration plant in the Arkhangelsk region with 1000 MW electric and 1600 Gcal/h heat capacity, reviewed and approved by a Rosatom scientific and technical board. No later project step is recorded.",
    "sources": [
      "src-prg-a70c51c8d9"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "An April 2007 IAEA conference paper says the feasibility study for a four-unit VK-300 cogeneration plant in Arkhangelsk was produced and approved by a Rosatom board.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "None needed for the study. Any later plant decision would belong to a separate project record.",
        "evidence": [
          {
            "source_id": "src-prg-a70c51c8d9",
            "locator": "Proceedings page 114, VK-300 paper: 'A Feasibility Study has been produced by now' and 'approved by Rosatom Scientific and Technical Board No. 10'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-rw-holtec-raeb-smr300",
    "slug": "rw-holtec-raeb-smr300",
    "name": "Holtec International and Rwanda Atomic Energy Board development agreement for SMR-300 units (up to about 5 GW)",
    "programme_type": "fleet_agreement",
    "countries": [
      "RW"
    ],
    "participants": [
      {
        "organization_id": "org-holtec",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Rwanda Atomic Energy Board (RAEB)",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-smr-300"
    ],
    "scale_text": "SMR-300 units with a potential total capacity of up to approximately 5 GW (unit count not stated)",
    "announced": {
      "value": "2026-05-19",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Development agreement, no site, first plant, order or licence application named",
    "summary": "On 19 May 2026, at the Nuclear Energy Innovation Summit for Africa in Kigali, Holtec International and the Rwanda Atomic Energy Board signed a development agreement to work together to deploy SMR-300 units in Rwanda, with a potential total capacity of up to about 5 GW. No site, first unit, order or licence application has been announced, the same occasion saw a separate US-Rwanda civil nuclear cooperation memorandum.",
    "sources": [
      "src-prg-3738b6929f",
      "src-prg-f636db2bbe",
      "src-prg-86ca23c879",
      "src-wna-emerging-nuclear-countries"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-rw-nano-raeb-mou",
    "slug": "rw-nano-raeb-mou",
    "name": "NANO Nuclear Energy and Rwanda Atomic Energy Board memorandum on SMRs and microreactors (ZEUS, ODIN)",
    "programme_type": "cooperation_mou",
    "countries": [
      "RW"
    ],
    "participants": [
      {
        "organization_id": "org-nano-nuclear",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Rwanda Atomic Energy Board (RAEB)",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-catalogue-odin"
    ],
    "design_names": [
      "ZEUS"
    ],
    "scale_text": "No unit count, capacity or site stated",
    "announced": {
      "value": "2024-08",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Framework MOU signed in August 2024 with no stated term. No later step under it, renewal or end has been found.",
    "summary": "NANO Nuclear Energy signed a memorandum of understanding with the Rwanda Atomic Energy Board establishing a framework to facilitate the introduction of small modular reactors and microreactors such as NANO's ZEUS and ODIN designs in Rwanda, plus training and education support. It is a framework memorandum, not an order, no site or schedule is committed in the WNN report.",
    "sources": [
      "src-prg-36b50621ce",
      "src-wna-emerging-nuclear-countries",
      "src-prgst-2912804658"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Framework MOU signed in August 2024 with no stated term. No later step under it, renewal or end has been found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A NANO Nuclear or RAEB announcement of a step under the MOU (training programme, site study, licensing) or of its end.",
        "evidence": [
          {
            "source_id": "src-prg-36b50621ce",
            "locator": "Third paragraph: 'the MoU establishes a framework under which it will work alongside the RAEB'"
          },
          {
            "source_id": "src-wna-emerging-nuclear-countries",
            "locator": "Rwanda section: 'NANO Nuclear Energy signed a memorandum of understanding with the Rwanda Atomic Energy Board'"
          },
          {
            "source_id": "src-prgst-2912804658",
            "locator": "Second paragraph: 'The MOU establishes a framework under which NANO Nuclear work alongside the RAEB'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-rw-rosatom-smr-roadmap",
    "slug": "rw-rosatom-smr-roadmap",
    "name": "Rwanda Atomic Energy Board and Rosatom roadmap on small modular reactors (first Joint Coordinating Committee, 2026)",
    "programme_type": "cooperation_mou",
    "countries": [
      "RW"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Rwanda Atomic Energy Board (RAEB)",
        "role": "government"
      },
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "No design, unit count, capacity or site stated",
    "announced": {
      "value": "2026-06-29",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Cooperation roadmap, no design, site, order or plant commitment",
    "summary": "At the first meeting of the Rwanda-Russia Joint Coordinating Committee on nuclear energy in Moscow, the Rwanda Atomic Energy Board and Rosatom signed a roadmap on small modular reactors, alongside work on a nuclear science centre, personnel training and infrastructure. The roadmap names no design, site or plant and is not an order.",
    "sources": [
      "src-prg-143e324a7d",
      "src-prg-7302005896",
      "src-prg-db043f5e15",
      "src-prg-eccc66dff9"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-sa-dl-ec-swcc-smr-desalination-mou",
    "slug": "sa-dl-ec-swcc-smr-desalination-mou",
    "name": "DL E&C and Saline Water Conversion Corporation memorandum on SMRs for desalination",
    "programme_type": "cooperation_mou",
    "countries": [
      "SA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "DL E&C",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Saline Water Conversion Corporation (SWCC)",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "no unit count, design or site",
    "announced": {
      "value": "2023-10-22",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "October 2023 MoU to explore SMRs for desalination and SMR-based hydrogen and ammonia research. No later step under it was found through October 2026.",
    "summary": "On 22 October 2023 South Korea's DL E&C and Saudi Arabia's Saline Water Conversion Corporation signed a memorandum, reported by the Korea Economic Daily, to explore using SMRs in desalination plants and to research SMR-based hydrogen and ammonia production. No design, plant or site is named.",
    "sources": [
      "src-prg-49b05555d8",
      "src-prgst-83cf02867a",
      "src-prgsrc-3d026daf8c"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "October 2023 MoU to explore SMRs for desalination and SMR-based hydrogen and ammonia research. No later step under it was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A DL E&C or SWCC announcement of a feasibility study, contract or pilot for SMR-based desalination.",
        "evidence": [
          {
            "source_id": "src-prgst-83cf02867a",
            "locator": "Paragraphs 2-4, 'SMR 적용을 위한 상호 협력 MOU' signed 22 October in Riyadh"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "DL E&C's own release records the 22 October 2023 MoU with SWCC to find SMR solutions for desalination plants and to research SMR-based clean hydrogen and ammonia.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-3d026daf8c",
            "locator": "English press release, second paragraph: DL E&C entered \"an MOU with SWCC on mutual cooperation for the application of SMR (Small Modular Reactor) to desalination plants\" on the 22nd (local time) in Riyadh"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-sa-kacare-cnec-htr",
    "slug": "sa-kacare-cnec-htr",
    "name": "K.A.CARE and CNEC memorandum and feasibility study for a high-temperature gas-cooled reactor in Saudi Arabia",
    "programme_type": "cooperation_mou",
    "countries": [
      "SA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "King Abdullah City for Atomic and Renewable Energy (K.A.CARE)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "China Nuclear Engineering Corporation (CNEC)",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-htr-pm"
    ],
    "scale_text": "no size disclosed",
    "announced": {
      "value": "2016-01-19",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Feasibility study begun in 2017. K.A.CARE said in Dec 2017 it would be concluded that month, but no report that it was finished or of any later step was found.",
    "summary": "On 19 January 2016 K.A.CARE and CNEC signed a memorandum on building a high-temperature gas-cooled reactor in Saudi Arabia, without size or timeline. A joint working group began a feasibility study in May 2017, aiming to finish that year. No later step is recorded.",
    "sources": [
      "src-prg-4b5e166651",
      "src-prg-668a1e7dde",
      "src-prgst-07e9e78a14",
      "src-prgst-a255625356"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Feasibility study begun in 2017. K.A.CARE said in Dec 2017 it would be concluded that month, but no report that it was finished or of any later step was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A K.A.CARE or CNEC statement that the HTGR feasibility study was delivered, or a Saudi cabinet decision on an HTGR project",
        "evidence": [
          {
            "source_id": "src-prg-4b5e166651",
            "locator": "WNN 20 Jan 2016, para 2: MoU 'for cooperation in building the high-temperature gas-cooled reactor'"
          },
          {
            "source_id": "src-prg-668a1e7dde",
            "locator": "WNN 17 May 2017, lead: working group 'aims to complete the feasibility study report later this year'"
          },
          {
            "source_id": "src-prgst-07e9e78a14",
            "locator": "Slide 11, HTGR column: 'study in its final stages and will be concluded in December 2017'"
          },
          {
            "source_id": "src-prgst-a255625356",
            "locator": "WNN 17 Mar 2017, para 1-3: 'cooperation agreement for a joint study on the feasibility'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-sa-kacare-kaeri-smart",
    "slug": "sa-kacare-kaeri-smart",
    "name": "K.A.CARE and KAERI cooperation on SMART/SMART100 SMRs for Saudi Arabia",
    "programme_type": "cooperation_mou",
    "countries": [
      "SA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "King Abdullah City for Atomic and Renewable Energy (K.A.CARE)",
        "role": "government"
      },
      {
        "organization_id": "org-catalogue-kaeri",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-khnp",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-aris-smart",
      "dsn-catalogue-smart100"
    ],
    "scale_text": "at least two SMART units envisaged in the 2015 agreement (WNA), no site",
    "announced": {
      "value": "2015-03",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Design cooperation and joint design approval in Korea (Sept 2024), design approval is not a Saudi site licence, no Saudi site or construction commitment.",
    "summary": "K.A.CARE and KAERI agreed in March 2015 to assess building at least two SMART reactors in Saudi Arabia and carried out pre-project engineering, in 2019 the two countries agreed to cooperate on commercialising SMART, including a reactor in Saudi Arabia. KAERI, KHNP and K.A.CARE jointly obtained Korean standard design approval for SMART100 in September 2024. No Saudi site or construction commitment is recorded.",
    "sources": [
      "src-prg-5b7b21bf57",
      "src-prg-8b7061fd9c",
      "src-prgsrc-1e2eeaab92"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "KAERI's release of 27 September 2024 records the SMART100 standard design approval obtained jointly by KAERI, K.A.CARE and KHNP. It does not describe the 2015 or 2019 agreements.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A K.A.CARE or KAERI document on the 2015 agreement to assess SMART units in Saudi Arabia, or on the 2019 commercialisation agreement.",
        "evidence": [
          {
            "source_id": "src-prgsrc-1e2eeaab92",
            "locator": "KAERI News, first paragraph: KAERI, \"King Abdullah City for Atomic and Renewable Energy (K.A.CARE) and Korea Hydro & Nuclear Power (KHNP)\" announced receiving standard design approval for SMART100 on 26 September 2024"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-se-copenhagen-atomics-regulatory-dialogue",
    "slug": "se-copenhagen-atomics-regulatory-dialogue",
    "name": "Copenhagen Atomics thorium molten-salt reactor early regulatory dialogue with Sweden (ENSREG SMR dashboard)",
    "programme_type": "regulatory_engagement",
    "countries": [
      "SE"
    ],
    "participants": [
      {
        "organization_id": "org-aris-copenhagen-atomics",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-aris-copenhagen-atomics-waste-burner"
    ],
    "scale_text": "no host, unit count or site",
    "announced": {
      "value": "2026-03-03",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Early regulatory dialogue only, no host, site or application.",
    "summary": "The ENSREG SMR Task Force dashboard of 3 March 2026 lists Copenhagen Atomics' 100 MWth thorium molten-salt reactor, aimed at industrial customers such as aluminium, ammonia or hydrogen plants, in early dialogue with the Swedish regulator. No host or site is named.",
    "related_project_ids": [
      "prj-psi-copenhagen-atomics"
    ],
    "sources": [
      "src-ensreg-smr-dashboard-2026-03"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-se-holtec-smr300-regulatory-dialogue",
    "slug": "se-holtec-smr300-regulatory-dialogue",
    "name": "Holtec SMR-300 early regulatory dialogue with Sweden (ENSREG SMR dashboard)",
    "programme_type": "regulatory_engagement",
    "countries": [
      "SE"
    ],
    "participants": [
      {
        "organization_id": "org-holtec",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-smr-300"
    ],
    "scale_text": "no host, unit count or site",
    "announced": {
      "value": "2026-03-03",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Early regulatory dialogue only (dashboard status at 3 March 2026), no host, licensee, site or application.",
    "summary": "The ENSREG SMR Task Force dashboard dated 3 March 2026 lists Holtec's SMR-300 in early dialogue with the Swedish regulator, with electricity production as the target market. No Swedish host, utility or site is named.",
    "sources": [
      "src-ensreg-smr-dashboard-2026-03"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-se-knxt-refirm-south",
    "slug": "se-knxt-refirm-south",
    "name": "Kärnfull Next Re:Firm South programme: candidate SMR sites in Karlshamn, Motala and Västervik",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "SE"
    ],
    "participants": [
      {
        "organization_id": "org-karnfull-next",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-studsvik",
        "role": "investor"
      },
      {
        "organization_id": null,
        "name": "Motala municipality",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "SMR parks of at least two light-water reactors per site (company programme statement), up to four SMRs discussed for…",
    "announced": {
      "value": "2025-02-21",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Pre-studies and a conceptual study only at these candidate sites, no application or agreement to build. Valdemarsvik and Nyköping are published separately.",
    "summary": "Kärnfull Next (acquired by Studsvik in March 2026) runs a south-Swedish SMR siting programme, Re:Firm South. Beyond its published Valdemarsvik and Nyköping records, it signed landowner agreements for pre-studies at Elleholm and Guö-Köpegårda (Karlshamn) and Stora Askö (Västervik), and a conceptual-study agreement with Motala municipality. Motala says no decision to build has been taken.",
    "related_project_ids": [
      "prj-knxt-valdemarsvik",
      "prj-studsvik-nykoping"
    ],
    "sources": [
      "src-knxt-news",
      "src-prg-d93d6647b0",
      "src-prg-79997a5907",
      "src-prg-36bf9e2013"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-se-steady-energy-sweden-entry",
    "slug": "se-steady-energy-sweden-entry",
    "name": "Steady Energy LDR-50 district-heating market entry in Sweden (with Kärnfull Next partnership)",
    "programme_type": "cooperation_mou",
    "countries": [
      "SE"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-steady-energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-karnfull-next",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-ldr-50"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2024-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Strategic partnership (2024) and Swedish country manager (2026), no Swedish host, site or order.",
    "summary": "In June 2024 Kärnfull Next and Steady Energy formed a strategic partnership to introduce SMRs for district heating in Sweden, and in March 2026 Steady Energy said it was establishing a Swedish presence with a country manager. No Swedish customer, site or order is recorded.",
    "sources": [
      "src-prg-4cee2f2182",
      "src-prg-3849eb3fe0"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-sg-ema-khnp-smr-study-mou",
    "slug": "sg-ema-khnp-smr-study-mou",
    "name": "Singapore EMA and KHNP memorandum on joint SMR studies (2026)",
    "programme_type": "cooperation_mou",
    "countries": [
      "SG"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Energy Market Authority (EMA)",
        "role": "government"
      },
      {
        "organization_id": "org-khnp",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "joint studies (no units)",
    "announced": {
      "value": "2026-03-01",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU for joint SMR studies, training and information sharing, Singapore has made no decision to deploy nuclear energy.",
    "summary": "On 1 March 2026 Singapore's Energy Market Authority and KHNP signed a memorandum on civil nuclear cooperation focused on joint studies of SMRs for potential use in Singapore, plus training and information sharing. It is a study framework, Singapore has not decided to deploy nuclear energy.",
    "sources": [
      "src-prg-06e7077b9c",
      "src-prgsrc-a69c9ee72a"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "KHNP's own release records the MoU with EMA for joint SMR studies for potential use in Singapore, human-resource training and information sharing.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-a69c9ee72a",
            "locator": "KHNP News, first paragraph: KHNP \"signed a Memorandum of Understanding (MOU) with Singapore's Energy Market Authority (EMA) in Singapore on the 1st\", on the sidelines of the Korea-Singapore Summit"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-sg-government-nuclear-smr-study",
    "slug": "sg-government-nuclear-smr-study",
    "name": "Singapore government study of nuclear energy and SMRs (no deployment decision, IAEA INIR planned)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "SG"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Trade and Industry (now Ministry of Energy, Trade and Industry)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Energy Market Authority (EMA)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Mott MacDonald",
        "role": "other"
      }
    ],
    "scale_text": "study (no units)",
    "announced": {
      "value": "2025-02",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Study only. The ministry said on 4 August 2026 that no decision to deploy has been made, that planning parameters and siting options are premature, and that the first phase of an IAEA INIR is…",
    "summary": "Singapore is studying whether nuclear energy, including SMRs, could suit it in the longer term, EMA commissioned Mott MacDonald to assess the safety and technical feasibility of advanced nuclear technologies. In August 2026 the ministry said no deployment decision has been made, buffer-zone and siting parameters are premature, and an IAEA infrastructure review is planned for the next year.",
    "sources": [
      "src-prg-6098227c87",
      "src-prg-06e7077b9c"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-si-smr-option-studies",
    "slug": "si-smr-option-studies",
    "name": "Slovenia SMR option studies: US Project Phoenix pre-feasibility support and GEN energija SMR assessment",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "SI"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "GEN energija",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "US Department of State (Project Phoenix)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Sargent & Lundy",
        "role": "other"
      }
    ],
    "scale_text": "no unit count or site, Šoštanj mentioned as a potential location (2026 event)",
    "announced": {
      "value": "2024-02",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Pre-feasibility support and company studies, no site, design or decision. JEK2 large-plant project is separate.",
    "summary": "In February 2024 Slovenia was selected for US Project Phoenix support to complete a pre-feasibility study for potential future SMR deployment. In November 2024 GEN energija said it would intensify study of SMRs alongside the large JEK2 project. At a May 2026 event the Šoštanj thermal plant site was mentioned as a potential SMR location, no decision has been taken.",
    "sources": [
      "src-prg-d076e28008",
      "src-prg-1b8b145b0d",
      "src-prg-ba0bc70c90"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A US Embassy in Ljubljana release on Slovenia's selection for Project Phoenix (February 2024), or a GEN energija statement on its SMR studies.",
        "evidence": [
          {
            "source_id": "src-prg-d076e28008",
            "locator": "Opening and third paragraphs: Slovenia selected for Project Phoenix advisory services; State Department letter says it supports completion of a pre-feasibility study for potential SMR deployment"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-sk-javys-westinghouse-ap300-mou",
    "slug": "sk-javys-westinghouse-ap300-mou",
    "name": "JAVYS and Westinghouse memoranda on AP300 SMR (and AP1000) deployment in Slovakia",
    "programme_type": "cooperation_mou",
    "countries": [
      "SK"
    ],
    "participants": [
      {
        "organization_id": "org-javys",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-westinghouse",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-ap300"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2023-07-17",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Non-exclusive framework memoranda signed in July 2023 with no stated term. No later AP300 step, renewal or end has been found.",
    "summary": "On 17 July 2023 JAVYS and Westinghouse announced non-exclusive memoranda on potential AP1000 and AP300 deployment, providing a framework for technical and development plans. The announcements establish no AP300 site or order. The AP1000 part is outside SMR scope, and generic AP300 timelines are not Slovak deployment milestones.",
    "sources": [
      "src-prg-bfddb9d14f",
      "src-prg-primary-javys-westinghouse-mou-20230717",
      "src-prg-primary-westinghouse-javys-mou-20230717"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Non-exclusive framework memoranda signed in July 2023 with no stated term. No later AP300 step, renewal or end has been found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A JAVYS, Slovak government or Westinghouse statement on AP300 work in Slovakia under the memoranda.",
        "evidence": [
          {
            "source_id": "src-prg-primary-javys-westinghouse-mou-20230717",
            "locator": "JAVYS statement: 'The signing of memorandums does not establish any exclusivity'"
          },
          {
            "source_id": "src-prg-primary-westinghouse-javys-mou-20230717",
            "locator": "Second paragraph: 'create a framework for the two parties to collaborate on detailed technical and developmental plans'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-sk-project-phoenix-smr-feasibility",
    "slug": "sk-project-phoenix-smr-feasibility",
    "name": "US Project Phoenix coal-to-SMR feasibility study for Slovakia (four sites found suitable)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "SK"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Slovenské elektrárne",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Ministry of Economy of the Slovak Republic",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Sargent & Lundy",
        "role": "other"
      },
      {
        "organization_id": null,
        "name": "US Department of State (Project Phoenix)",
        "role": "government"
      }
    ],
    "scale_text": "four candidate sites: Bohunice, Mochovce, Vojany, US Steel Košice",
    "announced": {
      "value": "2023-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Feasibility study completed (reported January 2026), next steps are regulatory framework and detailed site investigations, no project.",
    "summary": "Slovakia was selected in September 2023 for US Project Phoenix support for a coal-to-SMR feasibility study, carried out by Sargent & Lundy with the Ministry of Economy and Slovenské elektrárne. The study, reported in January 2026, found Bohunice, Mochovce, Vojany and the US Steel Košice site all meet baseline SMR criteria. It selects no technology and creates no project.",
    "related_project_ids": [
      "prj-newcleo-bohunice"
    ],
    "sources": [
      "src-prg-2cdb2d0f8d",
      "src-prg-e42037b958",
      "src-prgsrc-3121aa43ec"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The utility's own release records the Project Phoenix SMR feasibility study, its parties and its finding that all four assessed sites met baseline SMR criteria.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-3121aa43ec",
            "locator": "Press release, second paragraph: the study was developed with \"Sargent & Lundy, the Ministry of Economy of the Slovak Republic, and Slovenské elektrárne\" with US State Department support; 'Key Findings' section names Bohunice, Mochovce, Vojany and U. S. Steel Košice"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-sk-sge-slovenske-elektrarne-mou",
    "slug": "sk-sge-slovenske-elektrarne-mou",
    "name": "SGE and Slovenské elektrárne MoU to explore BWRX-300 opportunities in Slovakia, Czech Republic and the UK",
    "programme_type": "cooperation_mou",
    "countries": [
      "CZ",
      "GB",
      "SK"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "SGE S.A.",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Slovenské elektrárne",
        "role": "utility"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2025-08",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU to explore cooperation (joint ventures, financing, data-centre links), no site, order or project.",
    "summary": "SGE and Slovenské elektrárne signed a memorandum to explore cooperation on BWRX-300 projects. The original names opportunities in Slovakia, the Czech Republic and the United Kingdom through local partnerships, special-purpose vehicles and other agreed business models, plus links to digital infrastructure. This is programme scope, with no committed plant, site, order or permission established. World Nuclear Association dates the memorandum to August 2025.",
    "sources": [
      "src-prg-a71a1b3fcf",
      "src-prg-17a9fbc188"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-sn-nuclear-power-programme-smr",
    "slug": "sn-nuclear-power-programme-smr",
    "name": "Senegal nuclear power programme focused on small modular reactors (launched September 2026)",
    "programme_type": "national_plan",
    "countries": [
      "SN"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministère de l'Énergie et du Pétrole (Senegal)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Autorité sénégalaise de radioprotection, de sûreté et de sécurité nucléaires (ARSN)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "International Atomic Energy Agency (IAEA)",
        "role": "other"
      }
    ],
    "scale_text": "Ministry presentation: three 300 MW SMRs could cover about 20% of national needs in 2050 (illustrative), no units…",
    "announced": {
      "value": "2026-09-07",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Programme launch under the IAEA Milestones Approach, no design, vendor, site or financing",
    "summary": "At a national workshop opened on 7 September 2026, Senegal's energy minister declared that the political decision for nuclear power had been taken and that implementation would follow the IAEA's phased approach under the Sénégal 2050 agenda, with small modular reactors as the chosen route. A ministry presentation said three 300 MW SMRs could cover about 20% of national needs in 2050, no design, vendor, site or financing has been decided.",
    "sources": [
      "src-prg-6a7bd17768",
      "src-prg-e4ff466a48",
      "src-wna-emerging-nuclear-countries",
      "src-prgsrc-980c29f96c"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The national regulator records the 7 September 2026 opening, by the energy minister, of the workshop on the governance of Senegal's nuclear power programme. It does not mention small modular reactors.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A Ministry of Energy and Petroleum or IAEA document stating the programme's choice of small modular reactors.",
        "evidence": [
          {
            "source_id": "src-prgsrc-980c29f96c",
            "locator": "First paragraph: the energy minister \"a présidé, ce lundi 7 septembre 2026, la cérémonie d’ouverture de l’atelier de haut niveau\" on setting up the Strategic Committee and the management organisation of Senegal's electronuclear programme"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-sv-nuclear-programme",
    "slug": "sv-nuclear-programme",
    "name": "El Salvador nuclear power programme with early SMR evaluation (OIPEN, US DOE memorandum, 2026)",
    "programme_type": "national_plan",
    "countries": [
      "SV"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Organismo para la Implementación del Programa de Energía Nuclear (OIPEN)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "US Department of Energy, Office of Nuclear Energy",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Thorium Energy Alliance",
        "role": "other"
      }
    ],
    "scale_text": "Nuclear about 15% of electricity by 2050, potentially through SMRs, no units, design or site",
    "announced": {
      "value": "2026-03-10",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "IAEA Milestones Phase 1 (INIR May 2026), candidate sites reviewed (SEED 2025) but not confirmed, no design or vendor",
    "summary": "El Salvador's long-term energy planning envisages nuclear power supplying about 15% of electricity by 2050, potentially through small modular reactors, and an IAEA INIR mission in 2026 noted the country's early evaluation of SMR technologies. The programme, run by OIPEN, began with a 2023 memorandum with the Thorium Energy Alliance, in March 2026 El Salvador signed a memorandum with the US Department of Energy's Office of Nuclear Energy. No design, vendor or site has been selected.",
    "sources": [
      "src-prg-4413861546",
      "src-prg-b37d966f77",
      "src-wna-emerging-nuclear-countries"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The IAEA's 19 May 2026 press release on its review of El Salvador's nuclear power infrastructure, or a US Department of Energy or OIPEN release on the March 2026 memorandum.",
        "evidence": [
          {
            "source_id": "src-prg-4413861546",
            "locator": "Opening paragraphs: IAEA INIR mission hosted by OIPEN reports progress; nuclear envisioned at around 15% of electricity by 2050, potentially through SMRs; early evaluation of SMR technologies noted"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-th-cn-egat-cnos-smr-mou",
    "slug": "th-cn-egat-cnos-smr-mou",
    "name": "EGAT and CNNC Overseas memorandum on SMR knowledge exchange (2024)",
    "programme_type": "cooperation_mou",
    "countries": [
      "TH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Electricity Generating Authority of Thailand (EGAT)",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "China National Nuclear Corporation Overseas Ltd (CNOS), a CNNC subsidiary",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "not stated",
    "announced": {
      "value": "2024-08-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU for knowledge and technology exchange and a study of SMR use, no design, site or order.",
    "summary": "On 14 August 2024 EGAT and CNNC Overseas signed a memorandum to exchange knowledge and technology on nuclear plants and study the possibility of using SMRs in Thailand, with CNOS supporting EGAT's SMR preparation. It selects no design or site.",
    "sources": [
      "src-prg-ebe9340892"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-th-draft-pdp-smr-plan",
    "slug": "th-draft-pdp-smr-plan",
    "name": "Thailand's draft Power Development Plan: two SMR plants (600 MW) prepared by EGAT",
    "programme_type": "national_plan",
    "countries": [
      "TH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Electricity Generating Authority of Thailand (EGAT)",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Government of Thailand",
        "role": "government"
      }
    ],
    "scale_text": "two SMR plants with combined capacity of 600 MW, possible commercial operation around 2037 (EGAT planning documents…",
    "units_stated": 2,
    "announced": {
      "value": "2024",
      "precision": "year",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Draft plan, no reactor design, site or supplier selected and no construction approval (September 2026). Regulatory, workforce and waste frameworks in preparation.",
    "summary": "Thailand's draft Power Development Plan includes two SMR plants with a combined 600 MW toward the end of the plan period, and EGAT says it is advancing feasibility studies, site searches and technology selection. As of September 2026 the government had not selected a reactor, supplier or site, nor approved construction.",
    "sources": [
      "src-prg-7b8e9661d4",
      "src-prg-86583fe285"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-th-egat-ustda-smr-feasibility-study",
    "slug": "th-egat-ustda-smr-feasibility-study",
    "name": "EGAT SMR feasibility study funded by the US Trade and Development Agency (about 600 MWe)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "TH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Electricity Generating Authority of Thailand (EGAT)",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "US Trade and Development Agency (USTDA)",
        "role": "government"
      }
    ],
    "scale_text": "study of SMR deployment generating about 600 MWe (vendor-neutral, seven US designers considered)",
    "announced": {
      "value": "2026-09-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Grant agreement signed, USTDA to issue an RFP for the study contractor. No site or design selected.",
    "summary": "On 14 September 2026 EGAT and USTDA signed an agreement for a US-funded feasibility study on deploying US SMR technologies in Thailand, assessing locations, costs and regulatory steps for about 600 MWe. The vendor-neutral study is to consider designs from seven US companies. It is a study, not a site or technology selection.",
    "sources": [
      "src-prg-dfc02b557c",
      "src-prgsrc-6a84065da2"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "USTDA's own release records the EGAT grant agreement, the vendor-neutral study of seven US designs, and the plan to issue a request for proposals.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-6a84065da2",
            "locator": "Press release dated 14 September 2026, Bangkok, first paragraph: \"USTDA signed an agreement with the Electricity Generating Authority of Thailand (EGAT) for a feasibility study\" of US SMR technologies of about 600 megawatts"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-th-gpsc-saltfoss-cmsr",
    "slug": "th-gpsc-saltfoss-cmsr",
    "name": "GPSC and Seaborg (now Saltfoss) memorandum on a CMSR Power Barge study in Thailand (2024)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "TH"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Global Power Synergy Public Company (GPSC), PTT Group",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-catalogue-saltfoss",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-cmsr"
    ],
    "scale_text": "CMSR Power Barge of 200-800 MWe to be considered after studies",
    "announced": {
      "value": "2024-04-24",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "April 2024 MoU for a study expected to take about four years. GPSC said in March 2025 that its 2024-2027 study plan with Seaborg was under way. No later report was found.",
    "summary": "In April 2024 Thailand's GPSC and Denmark's Seaborg (now Saltfoss Energy) signed a memorandum to assess how a CMSR Power Barge could be used in Thailand and to scope an initial project, in a study expected to take about four years. A 200-800 MWe barge would be considered only after the studies.",
    "sources": [
      "src-prg-e92def17fb",
      "src-prgst-658c160249",
      "src-prgsrc-95567bf40b"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "April 2024 MoU for a study expected to take about four years. GPSC said in March 2025 that its 2024-2027 study plan with Seaborg was under way. No later report was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A GPSC or Saltfoss report of the study's result, extension or termination, or the SMR section of GPSC's 2025 or 2026 annual report (Form 56-1).",
        "evidence": [
          {
            "source_id": "src-prg-e92def17fb",
            "locator": "Paragraph 4, the study is 'expected to take about four years to complete'"
          },
          {
            "source_id": "src-prgst-658c160249",
            "locator": "Paragraph 2, COO: GPSC is collaborating with Seaborg on 'the 4-year study plan (2024-2027)'"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "Saltfoss's own release records the GPSC-Seaborg MoU to assess and scope an initial CMSR Power Barge project, with a 200-800 MWe barge considered after the studies.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-95567bf40b",
            "locator": "Press release, first paragraph: \"Global Power Synergy Public Company Limited (GPSC) and Seaborg ApS have entered a Memorandum of Understanding\" to explore deployment of the CMSR Power Barge in Thailand"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-th-kr-khnp-egat-smr-mou",
    "slug": "th-kr-khnp-egat-smr-mou",
    "name": "KHNP and EGAT memorandum on SMR cooperation in Thailand (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "TH"
    ],
    "participants": [
      {
        "organization_id": "org-khnp",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Electricity Generating Authority of Thailand (EGAT)",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "not stated",
    "announced": {
      "value": "2025-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MoU for information exchange, a joint review of SMR options and training, no design, site or order.",
    "summary": "In June 2025 KHNP and EGAT signed a memorandum to exchange SMR technical information, jointly review options for introducing an SMR in Thailand and cooperate on staff training. It does not select a design or site.",
    "sources": [
      "src-prg-31ef0e9a17",
      "src-prgsrc-65799ef5fd"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "EGAT's own release records the KHNP-EGAT MoU to study and exchange SMR technology and develop training guidelines, with no design or site selected.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-65799ef5fd",
            "locator": "News release, second paragraph: on 10 June 2025 KHNP and EGAT \"signed a Memorandum of Understanding (MOU) on nuclear power plant technology\" at EGAT headquarters"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-tr-smr-5000mwe-2050-target",
    "slug": "tr-smr-5000mwe-2050-target",
    "name": "Türkiye national target of 5,000 MWe of SMR capacity by 2050",
    "programme_type": "national_plan",
    "countries": [
      "TR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Energy and Natural Resources of Türkiye",
        "role": "government"
      }
    ],
    "scale_text": "5,000 MWe of SMR capacity by 2050, alongside 12 large reactors",
    "announced": {
      "value": "2025-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Ministerial target, no SMR site, vendor or project.",
    "summary": "In November 2025 Türkiye's energy minister set a target of 5,000 MWe of SMR capacity by 2050, in addition to 12 large reactors. It is a national target, no SMR site, vendor or project has been chosen.",
    "sources": [
      "src-prg-cab9da8280",
      "src-prgsrc-016736f64b"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The energy minister, speaking to the Istanbul Chamber of Industry assembly, states the 2050 aim of 12 large conventional reactors plus an additional 5 thousand megawatts of small modular reactors.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-016736f64b",
            "locator": "News item dated 26.11.2025, body paragraph 'At Least 10-15 Percent of Production': 'small modular reactors of 5 thousand megawatts' in addition to 12 large conventional reactors"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-tr-ustda-tunas-smr-roadmap",
    "slug": "tr-ustda-tunas-smr-roadmap",
    "name": "USTDA-funded SMR deployment roadmap study for TÜNAŞ",
    "programme_type": "selection_or_award",
    "countries": [
      "TR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "US Trade and Development Agency (USTDA)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "TÜNAŞ (Türkiye Nükleer Enerji A.Ş.)",
        "role": "utility"
      }
    ],
    "scale_text": "study of four US SMR designs and five US Gen-IV designs",
    "announced": {
      "value": "2026-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Grant-funded, year-long study (about USD 2 million), no site or plant.",
    "summary": "In September 2026 USTDA signed an agreement with state-owned TÜNAŞ to fund technical assistance for a regulatory, institutional and financial roadmap for SMR deployment by Turkish private companies, including a year-long review of US SMR and advanced designs. No site or plant is involved.",
    "sources": [
      "src-prg-cab9da8280",
      "src-prgsrc-6e8879a0d8"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "USTDA signed an agreement with TÜNAŞ to fund technical assistance for a regulatory, institutional and financial roadmap for private-sector SMR deployment, including a review of US reactor designs.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-6e8879a0d8",
            "locator": "Press release dateline NEW YORK, first body paragraph: 'USTDA signed an agreement with Türkiye Nükleer Enerji Anonim Şirketi (TÜNAŞ)'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ua-chornobyl-zone-smr-siting",
    "slug": "ua-chornobyl-zone-smr-siting",
    "name": "Energoatom and the exclusion-zone agency: SMR siting in the Chornobyl exclusion zone (Kopachi, Leliv)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "UA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "State Agency of Ukraine on Exclusion Zone Management",
        "role": "government"
      },
      {
        "organization_id": "org-energoatom",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Chornobyl NPP",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "no design or unit count",
    "announced": {
      "value": "2024-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Candidate areas proposed (Kopachi, Leliv), land allocation discussed, no signed allocation, design or plant recorded.",
    "summary": "Since October 2024 Energoatom, Chornobyl NPP and Ukraine's exclusion-zone agency have reviewed areas in the Chornobyl exclusion zone for future SMRs, in May 2025 the agency said it was ready to allocate land and expected an agreement. Its 2025 report says potential sites were proposed near the abandoned villages of Kopachi and Leliv. No design, signed allocation or plant is recorded.",
    "related_project_ids": [
      "prj-teplator-slavutych"
    ],
    "sources": [
      "src-prg-00031478f1",
      "src-prg-3eaf208fc9",
      "src-prg-bb1a65804f"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The State Agency of Ukraine on Exclusion Zone Management's 2025 activity report (reported 27 Feb 2026) or its news item on SMR siting with Energoatom, or the Chornobyl NPP news post of October-November 2024 on the second on-site meeting reviewing SMR locations.",
        "evidence": [
          {
            "source_id": "src-prg-00031478f1",
            "locator": "Second paragraph: 'Representatives of the State Agency of Ukraine on Exclusion Zone Management and specialists from ... Energoatom' joined Chernobyl NPP officials to visit several areas, per 'CNPP reported'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ua-energoatom-edf-nuward",
    "slug": "ua-energoatom-edf-nuward",
    "name": "Energoatom and EDF cooperation agreement covering study of NUWARD SMR technology",
    "programme_type": "cooperation_mou",
    "countries": [
      "UA"
    ],
    "participants": [
      {
        "organization_id": "org-energoatom",
        "role": "utility"
      },
      {
        "organization_id": "org-edf",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-catalogue-nuward-smr"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2024-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "June 2024 cooperation agreement to study EDF's EPR and NUWARD designs. No term is stated in the announcement, and no later step under it was found in sources checked.",
    "summary": "In June 2024 Energoatom and EDF signed a cooperation agreement covering study of EDF's EPR and NUWARD SMR technologies and operating-experience exchange. It is a study agreement, no NUWARD site or order is recorded.",
    "sources": [
      "src-prg-2d698d2396"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "June 2024 cooperation agreement to study EDF's EPR and NUWARD designs. No term is stated in the announcement, and no later step under it was found in sources checked. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An Energoatom or EDF statement on work under the 2024 agreement.",
        "evidence": [
          {
            "source_id": "src-prg-2d698d2396",
            "locator": "WNN 10 Jun 2024, para 2: 'covers the study of EDF's gigawatt-scale EPR and Nuward' designs"
          }
        ]
      },
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An EDF press release or an Energoatom news item of June 2024 on the cooperation agreement signed during the Ukrainian president's visit to France.",
        "evidence": [
          {
            "source_id": "src-prg-2d698d2396",
            "locator": "Second paragraph: 'Thursday's agreement between the two state-owned nuclear power giants covers the study of EDF's gigawatt-scale EPR and Nuward small modular reactor technologies'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ua-energoatom-holtec-smr160",
    "slug": "ua-energoatom-holtec-smr160",
    "name": "Energoatom and Holtec cooperation agreement for up to 20 SMR-160 plants in Ukraine",
    "programme_type": "fleet_agreement",
    "countries": [
      "UA"
    ],
    "participants": [
      {
        "organization_id": "org-energoatom",
        "role": "utility"
      },
      {
        "organization_id": "org-holtec",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-holtec-smr-160",
      "dsn-smr-300"
    ],
    "scale_text": "up to 20 SMR-160 plants (plus a pilot), per the April 2023 agreement",
    "units_stated": 20,
    "announced": {
      "value": "2023-04-21",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Cooperation agreement, pilot target of grid connection by March 2029 is a plan, no licence or construction recorded.",
    "summary": "On 21 April 2023 Energoatom and Holtec signed a cooperation agreement envisaging an SMR-160 pilot and an execution plan for up to 20 more SMR-160 plants in Ukraine, focusing on former coal sites, plus local manufacturing. A December 2024 Energoatom statement describes plans for an SMR-300 component plant. No licence or construction is recorded.",
    "related_project_ids": [
      "prj-rivne-smr160"
    ],
    "sources": [
      "src-prg-421634ff69",
      "src-energoatom-trypilska-2024"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ua-energoatom-nuscale-mou",
    "slug": "ua-energoatom-nuscale-mou",
    "name": "Energoatom and NuScale memorandum to explore NuScale SMRs replacing fossil plants in Ukraine",
    "programme_type": "cooperation_mou",
    "countries": [
      "UA"
    ],
    "participants": [
      {
        "organization_id": "org-energoatom",
        "role": "utility"
      },
      {
        "organization_id": "org-nuscale",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-voygr"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2021-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "September 2021 memorandum for a feasibility study with proposed sites. No study result, extension or end was found in English or Ukrainian sources checked in October 2026.",
    "summary": "In September 2021 Energoatom and NuScale signed a memorandum to explore deploying NuScale SMRs to replace fossil-fuel plants, with NuScale supporting a feasibility study including proposed sites. No site or order is recorded.",
    "sources": [
      "src-prg-b3475d560a",
      "src-prgsrc-826956f501"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "September 2021 memorandum for a feasibility study with proposed sites. No study result, extension or end was found in English or Ukrainian sources checked in October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An Energoatom or NuScale statement on the feasibility study or the memorandum's status.",
        "evidence": [
          {
            "source_id": "src-prg-b3475d560a",
            "locator": "WNN 2 Sep 2021, fourth paragraph: NuScale 'would support Energoatom to draw up a feasibility study'"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "NuScale and Energoatom signed an MOU to explore NuScale plants in Ukraine, with NuScale supporting a feasibility study that includes proposed project sites, cost studies and licensing work.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-826956f501",
            "locator": "First paragraph of the release (PORTLAND, Ore.--(BUSINESS WIRE)--): 'signed a Memorandum of Understanding (MOU) to explore the deployment of NuScale Power plants in Ukraine'; second body paragraph lists the feasibility study for proposed project sites"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ua-energoatom-rolls-royce-smr-mou",
    "slug": "ua-energoatom-rolls-royce-smr-mou",
    "name": "Energoatom and Rolls-Royce SMR memorandum on SMR deployment for Ukraine's recovery",
    "programme_type": "cooperation_mou",
    "countries": [
      "UA"
    ],
    "participants": [
      {
        "organization_id": "org-energoatom",
        "role": "utility"
      },
      {
        "organization_id": "org-rolls-royce-smr",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-rr-smr"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2023-03-20",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "MOU to explore deployment signed in March 2023 with no stated term. No later step, renewal or end has been found.",
    "summary": "On 20 March 2023 Energoatom and Rolls-Royce SMR signed a memorandum to explore deploying Rolls-Royce SMRs in Ukraine as it rebuilds. No site or order is recorded.",
    "sources": [
      "src-prg-7ad978930b"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "MOU to explore deployment signed in March 2023 with no stated term. No later step, renewal or end has been found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An Energoatom or Rolls-Royce SMR statement on the memorandum's progress or end.",
        "evidence": [
          {
            "source_id": "src-prg-7ad978930b",
            "locator": "Ukraine paragraph: 'work together to explore future opportunities to deploy Rolls-Royce SMR reactors in Ukraine'"
          }
        ]
      },
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The Rolls-Royce SMR release of March 2023 on its agreement to support Ukraine's rebuilding, or Energoatom's 21 March 2023 announcement of the memorandum.",
        "evidence": [
          {
            "source_id": "src-prg-7ad978930b",
            "locator": "Third paragraph: 'The MoU was signed on 20 March by Energoatom President Petro Kotin and Sophie Macfarlane-Smith, head of customer engagement at Rolls-Royce SMR'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ua-energoatom-westinghouse-ap300-mou",
    "slug": "ua-energoatom-westinghouse-ap300-mou",
    "name": "Energoatom and Westinghouse memorandum on AP300 SMR deployment in Ukraine",
    "programme_type": "cooperation_mou",
    "countries": [
      "UA"
    ],
    "participants": [
      {
        "organization_id": "org-energoatom",
        "role": "utility"
      },
      {
        "organization_id": "org-westinghouse",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-ap300"
    ],
    "scale_text": "no unit count or site",
    "announced": {
      "value": "2023-09",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "September 2023 MoU on developing and deploying AP300 SMRs in Ukraine. No site, order or later step under it was found through October 2026.",
    "summary": "In September 2023 Energoatom and Westinghouse signed a memorandum on developing and deploying AP300 SMRs in Ukraine, alongside a separate AP1000 agreement. No AP300 site or order is recorded.",
    "sources": [
      "src-prg-b06b644bd9",
      "src-prgsrc-614ed301d0"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "September 2023 MoU on developing and deploying AP300 SMRs in Ukraine. No site, order or later step under it was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An Energoatom or Westinghouse announcement of an AP300 site, contract or joint working-group result in Ukraine.",
        "evidence": [
          {
            "source_id": "src-prg-b06b644bd9",
            "locator": "Lead paragraph, MoU 'relating to the development and deployment of AP300' in Ukraine"
          },
          {
            "source_id": "src-prg-b06b644bd9",
            "locator": "Paragraph 5, minister: first SMR 'may appear within the next 10 years'"
          }
        ]
      },
      "programme_source": {
        "state": "supported",
        "note": "Westinghouse and Energoatom signed an MoU for developing and deploying the AP300 SMR, establishing a joint working group on contracting, licensing and the local supply chain.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-614ed301d0",
            "locator": "Dateline paragraph (Cranberry Township, PA, Sept. 12, 2023): 'signed a Memorandum of Understanding for the development and deployment of the AP300™ Small Modular Reactor (SMR)'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ua-smr-roadmap-and-draft-law",
    "slug": "ua-smr-roadmap-and-draft-law",
    "name": "Ukraine's draft SMR implementation roadmap and draft law on small modular reactors (2025)",
    "programme_type": "government_programme",
    "countries": [
      "UA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Ministry of Energy of Ukraine",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Verkhovna Rada Committee on Energy and Housing and Communal Services",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2025-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Draft law and draft action plan as of Oct 2025, adoption not confirmed in the sources read.",
    "summary": "In October 2025 Ukraine's Ministry of Energy convened a working group on a draft action plan (roadmap) for introducing SMRs, and a draft law on SMR implementation was presented to parliament's energy committee. The bill would let private owners of SMRs choose their operators and drop the requirement to submit three alternative sites. Registered as bill No. 14164 on 29 October 2025, it was recommended for adoption at first reading by the lead committee on 22 April 2026, and parliament's bill card showed it awaiting that reading in October 2026. No site or design is named.",
    "sources": [
      "src-prg-4ae53d64a6",
      "src-prgsrc-47686354b5",
      "src-prgsrc-54c87bdd05",
      "src-prgsrc-d7355d2e94"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Parliament's energy committee records its 9 October 2025 presentation of the draft law on introducing small modular reactors, its slides propose a free market of operators, and the bill card records bill No. 14164 awaiting first reading. None mentions the energy ministry's roadmap working group.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "An energy ministry document on the SMR roadmap working group, or the text of bill No. 14164 or its first-reading vote.",
        "evidence": [
          {
            "source_id": "src-prgsrc-47686354b5",
            "locator": "News item (published 10 Oct 2025, 11:46), headline and body: 'провів презентацію законопроекту щодо впровадження малих модульних реакторів'"
          },
          {
            "source_id": "src-prgsrc-54c87bdd05",
            "locator": "Slide 14: 'Створити оновлену модель оператора ядерної установки з вільним ринком експлуатуючих організацій' (an operator model with a free market of operating organisations)"
          },
          {
            "source_id": "src-prgsrc-d7355d2e94",
            "locator": "Card header: '14164 від 29.10.2025'; lead committee conclusion of 22.04.2026: 'прийняти в першому читанні за основу'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-arkansas-nuclear-feasibility-study",
    "slug": "us-arkansas-nuclear-feasibility-study",
    "name": "Arkansas legislative feasibility study on new nuclear generation, including small modular and micro reactors (2025-2026)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Arkansas",
    "participants": [
      {
        "organization_id": null,
        "name": "State of Arkansas (legislature Joint Energy Committee)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "EXCEL Services Corporation",
        "role": "other"
      }
    ],
    "announced": {
      "value": "2025",
      "precision": "year",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Final report presented to the Joint Energy Committee on 6 August 2026, candidate areas only, no project.",
    "summary": "Arkansas engaged consultancy EXCEL Services Corporation in 2025 to study new nuclear generation, covering siting and technology options including large, small modular and micro reactors. The final report, presented to the legislature's Joint Committee on Energy on 6 August 2026, called new reactors feasible and advisable but said state support may be needed, and identified candidate areas. It selects no technology, developer or site.",
    "sources": [
      "src-prg-65e5ce09cc",
      "src-prg-8c9b18537a",
      "src-prgsrc-664d3ae658"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The Joint Committee on Energy directed the EXCEL study under Act 707 of 2025, and the final report concluded new nuclear is feasible and advisable and screened six candidate areas.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-664d3ae658",
            "locator": "PDF page 1 transmittal letter dated July 24, 2026 ('Final Report and Presentation Slides'); Executive Summary page ES-1: 'new nuclear is feasible and advisable in Arkansas'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-army-janus-program",
    "slug": "us-army-janus-program",
    "name": "U.S. Army Janus Program for commercial microreactors on Army installations",
    "programme_type": "government_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-us-army",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Defense Innovation Unit",
        "role": "government"
      }
    ],
    "scale_text": "first five installations paired with vendors (Aug 2026), nine installations shortlisted (Nov 2025), Army goal of more…",
    "announced": {
      "value": "2025-10-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Five installations selected with vendors (recorded as separate projects), four shortlisted installations (Fort Wainwright, Holston AAP, JBLM, Redstone Arsenal) not selected so far.",
    "summary": "The Janus Program is the Army's next-generation nuclear power programme to build commercial microreactors on installations through Defense Innovation Unit milestone-based contracting. The Army shortlisted nine installations in November 2025 and in August 2026 named the first five, each paired with a vendor, Fort Wainwright, Holston Army Ammunition Plant, Joint Base Lewis-McChord and Redstone Arsenal were shortlisted but not selected.",
    "related_project_ids": [
      "prj-janus-fort-benning-kaleidos",
      "prj-janus-fort-bragg-antares",
      "prj-janus-fort-campbell-banr",
      "prj-janus-fort-drum-evinci",
      "prj-janus-fort-hood-ga-tes"
    ],
    "sources": [
      "src-prg-ceb5cc5c58",
      "src-prg-ccd0d032a9"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-bwxt-wyoming-energy-authority-banr-study",
    "slug": "us-bwxt-wyoming-energy-authority-banr-study",
    "name": "BWXT and Wyoming Energy Authority contract to assess BANR microreactor deployment in Wyoming",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Wyoming",
    "participants": [
      {
        "organization_id": "org-bwxt",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Wyoming Energy Authority",
        "role": "government"
      },
      {
        "organization_id": "org-aris-idaho-national-laboratory",
        "role": "research"
      }
    ],
    "design_ids": [
      "dsn-banr"
    ],
    "scale_text": "two-phase, two-year contract",
    "announced": {
      "value": "2023-09-12",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Two-phase, two-year contract of September 2023. Phase one was reported complete in June 2024. INL's April 2025 tracker listed the study as pending. No completion report was found.",
    "summary": "BWXT announced a two-phase Wyoming Energy Authority microreactor viability contract in September 2023. Its 17 June 2024 phase-two award covers conceptual design, regulatory planning, a fleet model and supply-chain demonstrations. Approximately $20 million is the total cost-share programme value, not phase-two cash received. This is a study contract, not a selected site, reactor order or licence.",
    "sources": [
      "src-prg-425fec9734",
      "src-archive19-82a809dd39",
      "src-prgst-5827699f48"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Two-phase, two-year contract of September 2023. Phase one was reported complete in June 2024. INL's April 2025 tracker listed the study as pending. No completion report was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A BWXT or Wyoming Energy Authority statement that phase two was delivered, extended or ended, or a WEA board record on the contract.",
        "evidence": [
          {
            "source_id": "src-prg-425fec9734",
            "locator": "Lead paragraph, 'two-phase, two-year contract' with the Wyoming Energy Authority"
          },
          {
            "source_id": "src-archive19-82a809dd39",
            "locator": "Creager quote, 'The completion of phase one'"
          },
          {
            "source_id": "src-archive19-82a809dd39",
            "locator": "Paragraph before the forward-looking statement, phase two 'expected to be complete by the third quarter of 2025'"
          },
          {
            "source_id": "src-prgst-5827699f48",
            "locator": "Wyoming row of the state feasibility-study table: 'Pending', '2023', 'TBD'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-constellation-clinton-smr-evaluation",
    "slug": "us-constellation-clinton-smr-evaluation",
    "name": "Constellation evaluation of an advanced reactor or SMR at the Clinton Clean Energy Center (Illinois)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Illinois",
    "participants": [
      {
        "organization_id": "org-constellation",
        "role": "utility"
      }
    ],
    "announced": {
      "value": "2025-06-03",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "In Aug 2025 Constellation said it was assessing extending Clinton's early site permit, which expires 15 Mar 2027, or a new construction permit. No filing or technology choice was found.",
    "summary": "Announcing its 20-year power deal with Meta for the Clinton plant in June 2025, Constellation said it is evaluating whether to extend Clinton's existing early site permit or seek a new construction permit to pursue an advanced nuclear reactor or SMR at the site. No filing, technology choice or order is recorded.",
    "sources": [
      "src-prg-1b76f43955",
      "src-prgst-7cf5298a17"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "In Aug 2025 Constellation said it was assessing extending Clinton's early site permit, which expires 15 Mar 2027, or a new construction permit. No filing or technology choice was found.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-02-05",
        "next_trigger": "A Clinton ESP renewal application (due by about 29 Jan 2027, 45 days before 15 Mar 2027 expiry), a construction-permit filing, or ESP expiry without renewal",
        "evidence": [
          {
            "source_id": "src-prg-1b76f43955",
            "locator": "Release 3 Jun 2025, para 2: 'evaluating strategies to extend the plant's existing early site permit'"
          },
          {
            "source_id": "src-prgst-7cf5298a17",
            "locator": "Paras 2 and 4: Constellation 'disclosed on Tuesday that it is assessing'. ESP-001 'expires March 15, 2027'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-cvea-usnc-mmr-feasibility",
    "slug": "us-cvea-usnc-mmr-feasibility",
    "name": "Copper Valley Electric Association and Ultra Safe Nuclear Corporation Micro Modular Reactor feasibility study (Alaska)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Alaska",
    "participants": [
      {
        "organization_id": null,
        "name": "Copper Valley Electric Association",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-usnc",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-gfp-mmr"
    ],
    "scale_text": "projected 10 MWe micro facility",
    "announced": {
      "value": "2022-02",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "CVEA's 2023 presentation says the study was delivered in October 2022 and reviewed by its board. It found suitable sites but high ownership risk. No site or licence decision is reported.",
    "summary": "Copper Valley Electric Association and Ultra Safe Nuclear Corporation agreed in 2022 to study the feasibility of building a first commercial Micro Modular Reactor installation in Alaska, projected at 10 MWe, for the cooperative that serves the Valdez-Glennallen region. The study was to determine location, cost and social acceptance, no site, licence application or later decision appears in the sources read.",
    "sources": [
      "src-prg-b62b5afd1e",
      "src-prgst-fdb404d3e7"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "CVEA's 2023 presentation says the study was delivered in October 2022 and reviewed by its board. It found suitable sites but high ownership risk. No site or licence decision is reported.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "None needed for the study itself. A CVEA board decision on a reactor project would be a separate record.",
        "evidence": [
          {
            "source_id": "src-prg-b62b5afd1e",
            "locator": "WNN 8 Feb 2022, second paragraph: study 'expected to take 4-6 months to complete'"
          },
          {
            "source_id": "src-prgst-fdb404d3e7",
            "locator": "Pre-feasibility study process slide: 'Study delivered to CVEA October 2022', and Conclusions slide: 'High risk for CVEA members to own'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-doe-nric-nuclear-energy-launch-pad",
    "slug": "us-doe-nric-nuclear-energy-launch-pad",
    "name": "DOE / NRIC Nuclear Energy Launch Pad (reactor and fuel-cycle developer selections)",
    "programme_type": "government_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "U.S. Department of Energy, Office of Nuclear Energy",
        "role": "government"
      },
      {
        "organization_id": "org-aris-idaho-national-laboratory",
        "role": "research"
      },
      {
        "organization_id": "org-deployable-energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "General Matter",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-nucube",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-radiant",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-antares",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-oklo",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-valar",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-forge-atomics",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-scaled-atomics",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "round 1 (Apr 2026): 4 companies, round 2 (Aug 2026): 13 projects from 12 companies",
    "announced": {
      "value": "2026-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Selections give access to NRIC technical, regulatory and deployment support, selections are not commitments to build specific plants.",
    "summary": "The Nuclear Energy Launch Pad, run by DOE's Office of Nuclear Energy and the National Reactor Innovation Center, emerged from the Reactor Pilot and Fuel Line Pilot programmes and offers selected developers a prioritised path to DOE authorisation, testing and deployment support. First selections in April 2026 named Deployable Energy, General Matter, NuCube Energy and Radiant, a second round in August 2026 selected 13 projects from 12 companies including Antares, Oklo, Valar Atomics, Forge Atomics and Scaled Atomics. Selections do not identify new plants or sites.",
    "sources": [
      "src-prg-a087c33274",
      "src-open56-inl-launchpad20260824",
      "src-prg-d5317c2088",
      "src-prg-ca90067384"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-energysolutions-ipa-intermountain-nuclear",
    "slug": "us-energysolutions-ipa-intermountain-nuclear",
    "name": "EnergySolutions, Intermountain Power Agency and Utah initiative to explore advanced nuclear, including SMRs, at the…",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Utah",
    "participants": [
      {
        "organization_id": null,
        "name": "EnergySolutions",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Intermountain Power Agency",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "Utah Office of Energy Development",
        "role": "government"
      }
    ],
    "announced": {
      "value": "2025-04-23",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "April 2025 MoU to share information and discuss nuclear generation at the IPP site. No technology choice, filing or later step was found through October 2026.",
    "summary": "EnergySolutions announced in April 2025 an initiative with the Intermountain Power Agency and the State of Utah to explore developing advanced nuclear generation, including potential advanced SMRs, at the Intermountain Power Project site near Delta, Utah. It names no technology, site plan, order or licence application.",
    "sources": [
      "src-prg-8c012cecba",
      "src-prgst-bec6c1849c"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "April 2025 MoU to share information and discuss nuclear generation at the IPP site. No technology choice, filing or later step was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An EnergySolutions, IPA or Utah Office of Energy Development announcement of a technology selection, site study result or NRC pre-application for the IPP site.",
        "evidence": [
          {
            "source_id": "src-prg-8c012cecba",
            "locator": "Lead paragraph, initiative 'to explore the development of advanced nuclear power generation'"
          },
          {
            "source_id": "src-prgst-bec6c1849c",
            "locator": "Paragraph 2, MoU signed 23 April 'confirms the intention of the Parties to share information'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-fpl-smr-early-site-permit-plan",
    "slug": "us-fpl-smr-early-site-permit-plan",
    "name": "FPL plan to begin early site permitting for a potential SMR next to an existing nuclear plant (Florida)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Florida",
    "participants": [
      {
        "organization_id": null,
        "name": "Florida Power & Light Company (FPL)",
        "role": "utility"
      }
    ],
    "announced": {
      "value": "2026-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Utility ten-year site plan states a plan to begin initial early site permitting stages in 2026-2027, no site, technology or filing named, SMR in-service beyond the ten-year horizon.",
    "summary": "FPL's 2026-2035 Ten Year Site Plan says the utility plans to begin the initial stages of NRC early site permitting in 2026-2027 for a potential SMR at a site adjacent to one of its existing nuclear plants, taking a stepwise approach. No site, technology, application or in-service date within the plan period is stated.",
    "sources": [
      "src-prg-dca6b6be63"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-great-plains-new-nuclear-consortium",
    "slug": "us-great-plains-new-nuclear-consortium",
    "name": "Great Plains New Nuclear Consortium study of 1,000-2,000 MW of new nuclear, including SMRs, in Nebraska (2025)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Nebraska",
    "participants": [
      {
        "organization_id": null,
        "name": "Nebraska Public Power District",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Omaha Public Power District",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Lincoln Electric System",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Grand River Dam Authority",
        "role": "utility"
      }
    ],
    "scale_text": "between 1,000 and 2,000 MW of new nuclear capacity, including SMRs, within Nebraska",
    "announced": {
      "value": "2025-12-01",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Feasibility, site and technology studies, no construction or investment decision, no site named.",
    "summary": "Four public-power utilities - Nebraska Public Power District, Omaha Public Power District, Lincoln Electric System and Oklahoma's Grand River Dam Authority - formed the Great Plains New Nuclear Consortium by memorandum on 1 December 2025. It will study the feasibility, sites and technologies for 1,000-2,000 MW of new nuclear capacity, including SMRs, in Nebraska. No construction or investment decision has been made.",
    "sources": [
      "src-prg-ac94c7b5ca",
      "src-prg-5da3f5aeeb"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-holtec-entergy-hyundai-smr300",
    "slug": "us-holtec-entergy-hyundai-smr300",
    "name": "Holtec, Entergy and Hyundai E&C agreement to evaluate SMR-300 projects across Entergy's territory (2026)",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-holtec",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Entergy",
        "role": "utility"
      },
      {
        "organization_id": "org-hyundai-ec",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-smr-300"
    ],
    "scale_text": "potential dual-unit SMR-300 projects (number not stated)",
    "announced": {
      "value": "2026-08",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Non-binding memorandum of agreement to evaluate customer demand, candidate sites and commercial structures, no site named.",
    "summary": "In August 2026 Holtec, Entergy and Hyundai E&C signed a non-binding memorandum of agreement to evaluate potential dual-unit SMR-300 projects for large-load customers in Entergy's service territory in Mississippi, Louisiana, Texas and Arkansas. It covers demand, candidate sites and commercial structures, no site or order is recorded.",
    "sources": [
      "src-prg-660c97f2cf",
      "src-prgsrc-619f948b80"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Holtec, Entergy and Hyundai E&C signed a non-binding memorandum of agreement to evaluate customer demand, candidate sites and commercial structures for potential dual-unit SMR-300 projects across Entergy's service territory.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-619f948b80",
            "locator": "Opening paragraph: 'Holtec International, Entergy Services, LLC, and Hyundai Engineering & Construction Co., Ltd. (HDEC) today announced a strategic collaboration'; second paragraph: 'non-binding Memorandum of Agreement (MOA)'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-holtec-smr300-decommissioning-sites",
    "slug": "us-holtec-smr300-decommissioning-sites",
    "name": "Holtec plan to use its retired nuclear plant sites (Pilgrim, Indian Point, Big Rock Point) for future SMR-300 units",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-holtec",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Holtec Nuclear Corp. (IPO registrant)",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-smr-300"
    ],
    "scale_text": "S-1 deployment portfolio of 22 SMR-300 units totalling 7,480 MWe across Palisades, Oyster Creek, Indian Point and…",
    "announced": {
      "value": "2026-07-10",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Company-identified prospective sites in an IPO filing, Indian Point and Pilgrim projects 'remain pending', no licence application for Pilgrim, Indian Point or Big Rock Point.",
    "summary": "In its July 2026 Form S-1, Holtec Nuclear Corp. described an affiliate-owned SMR-300 deployment portfolio and identified its retired Pilgrim, Indian Point and Big Rock Point sites as potential locations for future SMR-300 units, alongside the existing Palisades and Oyster Creek projects. Beyond Palisades and Oyster Creek these are prospective sites only, with no licence applications or construction decisions.",
    "related_project_ids": [
      "prj-holtec-oyster-creek",
      "prj-holtec-palisades"
    ],
    "sources": [
      "src-prg-77d6523011"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Holtec's July 2026 registration statement (Form S-1) describing its SMR-300 plans at the Pilgrim, Indian Point and Big Rock Point sites.",
        "evidence": [
          {
            "source_id": "src-prg-77d6523011",
            "locator": "Section 'The Larger 47-GW Pipeline': 'Beyond Palisades and Oyster Creek, Holtec identifies the retired Pilgrim, Indian Point, and Big Rock Point nuclear sites as potential locations for future SMR-300 deployment'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-idaho-strategic-radiant-kaleidos",
    "slug": "us-idaho-strategic-radiant-kaleidos",
    "name": "Idaho Strategic Resources and Radiant memorandum on Kaleidos microreactors at a mine site (2024)",
    "programme_type": "customer_agreement",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Idaho Strategic Resources",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-radiant",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-kaleidos"
    ],
    "scale_text": "one or more of the first five Frontier Kaleidos units",
    "announced": {
      "value": "2024-05-08",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Non-binding May 2024 MOU to join Radiant's Frontier program and study licensing at an Idaho Strategic site. No term is stated in the announcement and no later step under it was found.",
    "summary": "In May 2024 Idaho Strategic Resources signed a non-binding memorandum with Radiant to join the Kaleidos Frontier Pilot Program, creating a pathway to operate one or more of the first five Kaleidos microreactors at a viable Idaho Strategic site. The two companies agreed to study licensing and operations, no site is named.",
    "related_project_ids": [
      "prj-radiant-kaleidos-inl"
    ],
    "sources": [
      "src-prg-3358e09dd3"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Non-binding May 2024 MOU to join Radiant's Frontier program and study licensing at an Idaho Strategic site. No term is stated in the announcement and no later step under it was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Idaho Strategic's annual report or a release naming a Kaleidos host site, or Radiant naming Idaho Strategic among Frontier customers",
        "evidence": [
          {
            "source_id": "src-prg-3358e09dd3",
            "locator": "Release 8 May 2024, para 1: 'non-binding memorandum of understanding' and 'jointly study the licensing process'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-indiana-oed-eli-lilly-nuclear-loi",
    "slug": "us-indiana-oed-eli-lilly-nuclear-loi",
    "name": "Indiana Office of Energy Development and Eli Lilly letter of intent on SMR and advanced nuclear projects",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "admin1": "Indiana",
    "participants": [
      {
        "organization_id": null,
        "name": "Indiana Office of Energy Development",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Eli Lilly and Company",
        "role": "host_or_customer"
      }
    ],
    "announced": {
      "value": "2026-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Nonbinding letter of intent, no vendor, site or capacity, on-site screening discussions for the LEAP District or other Lilly locations.",
    "summary": "Indiana Governor Mike Braun signed a nonbinding letter of intent under which the state's Office of Energy Development and Eli Lilly will collaborate to explore small modular reactor and other advanced nuclear projects for industrial, research and community power, including screening of the LEAP Research and Innovation District. It names no vendor, site or capacity and is not an order or permit.",
    "sources": [
      "src-prg-dc3f5692bb",
      "src-prgsrc-e1c9edf492"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The letter of intent, dated 24 March 2026, sets out the nonbinding intent of Indiana's Office of Energy Development and Eli Lilly to explore SMRs and other advanced nuclear. It runs two years from the last signature.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-e1c9edf492",
            "locator": "Page 1, opening paragraph: 'nonbinding intent of the Indiana Office of Energy Development (\"OED\") and Eli Lilly and Company (\"Lilly\") to collaborate'; section 5.2 item 4 names the LEAP Research and Innovation District"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-japan-gvh-bwrx300-tennessee-alabama",
    "slug": "us-japan-gvh-bwrx300-tennessee-alabama",
    "name": "US–Japan strategic investment in GE Vernova Hitachi BWRX-300 SMRs in Tennessee and Alabama (up to $40 billion)",
    "programme_type": "intergovernmental_agreement",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "U.S. Department of Commerce",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Government of Japan",
        "role": "government"
      },
      {
        "organization_id": "org-gevh",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-tva",
        "role": "utility"
      }
    ],
    "design_ids": [
      "dsn-bwrx-300"
    ],
    "scale_text": "BWRX-300 SMRs in Tennessee and Alabama, capacity 3 GW (basis not stated), cost up to $40 billion",
    "announced": {
      "value": "2026-03-20",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Investment announcement under the US-Japan trade deal, no site named by the Commerce fact sheet. TVA said in August 2026 it is in discussions with GVH about multiple BWRX-300 units at Bellefonte but…",
    "summary": "The US Department of Commerce announced in March 2026, under the US–Japan strategic investment initiative, a deal of up to $40 billion for GE Vernova Hitachi BWRX-300 SMRs totalling 3 GW in Tennessee and Alabama. No sites were identified, in August 2026 TVA said it was in discussions with GE Vernova Hitachi about placing multiple BWRX-300 units at its Bellefonte site but had made no decision. It is not an order, site selection or licence application.",
    "sources": [
      "src-prg-2a8ac58d05",
      "src-prg-9c60f6ff40",
      "src-prg-2286268bb4",
      "src-prg-90d40b7d8d",
      "src-prg-8217bce8ae"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-kr-terrapower-hdec-natrium-epc",
    "slug": "us-kr-terrapower-hdec-natrium-epc",
    "name": "TerraPower and Hyundai E&C framework agreement: EPC for up to eight Natrium reactors (2026)",
    "programme_type": "fleet_agreement",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-hyundai-ec",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-natrium"
    ],
    "scale_text": "EPC contractor for up to eight future Natrium reactors",
    "units_stated": 8,
    "announced": {
      "value": "2026-08",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Framework agreement, no specific plant, site or order for the up-to-eight units.",
    "summary": "In August 2026 TerraPower signed a strategic framework agreement selecting Hyundai Engineering & Construction as its engineering, procurement and construction contractor for up to eight future Natrium reactors, with completion, price and performance guarantees. It follows a May 2026 TerraPower, HD Hyundai and HDEC memorandum. No specific plant, site or order for those units is named.",
    "sources": [
      "src-prg-c17f11f7b4",
      "src-prg-8a46d20e79"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-lgeku-xenergy-xe100-kentucky",
    "slug": "us-lgeku-xenergy-xe100-kentucky",
    "name": "LG&E and KU (PPL) and X-energy collaboration to explore Xe-100 SMR deployment in Kentucky",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Kentucky",
    "participants": [
      {
        "organization_id": null,
        "name": "Louisville Gas and Electric Company (LG&E)",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Kentucky Utilities Company (KU)",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "PPL Corporation",
        "role": "other"
      },
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "announced": {
      "value": "2026-04-30",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Early project feasibility activities, no site, unit count or licence application. Builds on a 2024 GAIN/X-energy feasibility phase after an earlier Ghent site study.",
    "summary": "PPL's utilities LG&E and KU and X-energy announced in April 2026 that they are collaborating to explore deploying Xe-100 SMRs in Kentucky and have begun early project feasibility activities. This follows PPL's 2024 GAIN-funded feasibility work with X-energy, after an earlier study found the Ghent site suitable for an SMR plant. No site has been chosen and no order or licence application is recorded.",
    "sources": [
      "src-prg-bdf3db4833",
      "src-prg-4fba03c642"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-maryland-mea-xenergy-coal-to-nuclear-study",
    "slug": "us-maryland-mea-xenergy-coal-to-nuclear-study",
    "name": "Maryland Energy Administration grant study of repurposing a Maryland coal plant with X-energy's Xe-100",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Maryland",
    "participants": [
      {
        "organization_id": null,
        "name": "Maryland Energy Administration",
        "role": "government"
      },
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Frostburg State University",
        "role": "research"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "announced": {
      "value": "2022-06-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "An INL GAIN tracker of April 2025 lists the study as completed on 1 December 2022 with a named report. The coal plant and the findings were not found in sources read.",
    "summary": "The Maryland Energy Administration awarded grants in June 2022 to X-energy and Frostburg State University to evaluate repurposing a specific Maryland coal-fired plant with X-energy's Xe-100 SMR, with findings due later that year. The coal plant was not named and no proposal, order or licence application followed in the sources read.",
    "sources": [
      "src-prg-f7ec850ddc",
      "src-prg-8928ac213b",
      "src-prgst-5827699f48",
      "src-prgst-6357cfc0c1"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "An INL GAIN tracker of April 2025 lists the study as completed on 1 December 2022 with a named report. The coal plant and the findings were not found in sources read.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "MEA or X-energy publication of the study report, or an MEA statement on its outcome.",
        "evidence": [
          {
            "source_id": "src-prg-f7ec850ddc",
            "locator": "First paragraph: 'A joint analysis of the findings will be delivered to MEA later this year'"
          },
          {
            "source_id": "src-prgst-5827699f48",
            "locator": "Maryland row: 'Completed', '12/1/2022', 'Feasibility Assessment and Economic Evaluation: Repurposing a Coal Power Plant Site'"
          },
          {
            "source_id": "src-prgst-6357cfc0c1",
            "locator": "Second paragraph: 'This is only the first step in a robust feasibility process'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-nano-afwerx-kronos-jbab-study",
    "slug": "us-nano-afwerx-kronos-jbab-study",
    "name": "NANO Nuclear AFWERX research contract to explore a KRONOS MMR at Joint Base Anacostia-Bolling",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "District of Columbia",
    "participants": [
      {
        "organization_id": "org-nano-nuclear",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-us-air-force",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-kronos-mmr"
    ],
    "scale_text": "Direct-to-Phase II SBIR contract of approximately $1.25 million",
    "announced": {
      "value": "2025-09-02",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "NANO's 12 August 2026 results say it continued advancing the Direct to Phase II award at Joint Base Anacostia-Bolling. This is a research contract, not a deployment decision.",
    "summary": "AFWERX awarded NANO Nuclear a Direct-to-Phase II Small Business Innovation Research contract of about $1.25 million in September 2025 to explore the feasibility of deploying its KRONOS MMR at Joint Base Anacostia-Bolling, examining energy demand, siting options and regulatory pathways. It is a research contract only, there is no deployment decision or licence application.",
    "sources": [
      "src-prg-8ccdace042",
      "src-nano-jbab-2025",
      "src-prg-3525240f07",
      "src-nano-ir-2026"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "NANO's 12 August 2026 results say it continued advancing the Direct to Phase II award at Joint Base Anacostia-Bolling. This is a research contract, not a deployment decision.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A NANO quarterly update reporting delivery of the JBAB study deliverables or contract close-out.",
        "evidence": [
          {
            "source_id": "src-prg-8ccdace042",
            "locator": "Paragraph 3, contract 'will examine JBAB's current and future energy demands'"
          },
          {
            "source_id": "src-nano-ir-2026",
            "locator": "Q3 2026 Key Highlights, 'continued advancing Direct to Phase II Award' at Joint Base Anacostia Bolling"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-nano-ameresco-microreactor-mou",
    "slug": "us-nano-ameresco-microreactor-mou",
    "name": "NANO Nuclear Energy and Ameresco memorandum on deploying NANO microreactors at US federal and commercial sites (2026)",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-nano-nuclear",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Ameresco",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-catalogue-loki-mmr",
      "dsn-kronos-mmr"
    ],
    "design_names": [
      "ZEUS"
    ],
    "announced": {
      "value": "2026-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Exploratory memorandum, site-specific agreements expected later, no site named.",
    "summary": "Ameresco signed a memorandum with NANO Nuclear Energy, reported in January 2026, to explore deploying NANO's microreactors - including KRONOS MMR, ZEUS and LOKI MMR - at US federal and commercial sites, with Ameresco expected to lead EPC under later site-specific agreements. No site, order or licence application is named.",
    "sources": [
      "src-prg-c17c11cc14",
      "src-prgsrc-5f33e9f99e"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "NANO Nuclear and Ameresco signed an MOU to explore deploying NANO's KRONOS MMR, ZEUS and LOKI MMR microreactors on federal and commercial sites, with Ameresco expected to lead EPC under later site-specific agreements.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-5f33e9f99e",
            "locator": "Opening paragraph (New York, NY and Framingham, MA, Jan. 12, 2026): 'signed a Memorandum of Understanding (MOU) with Ameresco, Inc.'; third paragraph on later 'specific agreements' with Ameresco leading EPC"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-nano-doe-id-zeus-odin-siting-mou",
    "slug": "us-nano-doe-id-zeus-odin-siting-mou",
    "name": "NANO Nuclear and DOE Idaho Operations Office memorandum to evaluate siting ZEUS and ODIN prototypes at INL",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "admin1": "Idaho",
    "participants": [
      {
        "organization_id": "org-nano-nuclear",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "U.S. Department of Energy Idaho Operations Office",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Battelle Energy Alliance (INL operator)",
        "role": "research"
      }
    ],
    "design_ids": [
      "dsn-catalogue-odin"
    ],
    "design_names": [
      "ZEUS"
    ],
    "announced": {
      "value": "2024-12-04",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "The Dec 2024 MOU runs for five years (to about Dec 2029) with an option to renew, so its term has not expired. No later siting step, land-use deal or filing was found.",
    "summary": "NANO Nuclear and the DOE Idaho Operations Office signed a five-year memorandum of understanding in December 2024 to evaluate the feasibility of siting, building, operating and decommissioning NANO's ZEUS and ODIN experimental microreactors at Idaho National Laboratory. It is an evaluation framework, not a siting decision or licence.",
    "sources": [
      "src-prg-ac93157471"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "The Dec 2024 MOU runs for five years (to about Dec 2029) with an option to renew, so its term has not expired. No later siting step, land-use deal or filing was found.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A DOE-ID or INL land-use agreement or site selection for ZEUS or ODIN, or a NANO statement ending or renewing the MOU",
        "evidence": [
          {
            "source_id": "src-prg-ac93157471",
            "locator": "Release 4 Dec 2024, near end: 'The MOU will remain in effect for five years, with an option for renewal'"
          },
          {
            "source_id": "src-prg-ac93157471",
            "locator": "Para 1 and 3: framework 'to evaluate the feasibility of siting' with site evaluations and land-use agreements"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-natura-ngl-permian-produced-water",
    "slug": "us-natura-ngl-permian-produced-water",
    "name": "Natura Resources and NGL Water Solutions Permian agreement on MSR-100 power and produced-water treatment (Texas)",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "admin1": "Texas",
    "participants": [
      {
        "organization_id": "org-natura",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "NGL Water Solutions Permian LLC (NGL Energy Partners LP)",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-natura-msr-100"
    ],
    "scale_text": "Natura's 100-megawatt molten salt reactor (MW basis not specified), no unit count",
    "announced": {
      "value": "2026-02-03",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Agreement to collaborate in seeking opportunities, no site, unit count, order or licence application.",
    "summary": "Natura Resources signed an agreement with NGL Water Solutions Permian, a subsidiary of NGL Energy Partners, to pursue opportunities to combine Natura's 100-megawatt molten salt reactor with thermal desalination for power production and oil and gas produced-water treatment in the Permian Basin. It is an agreement to seek and evaluate opportunities, not an order, site selection or permit.",
    "sources": [
      "src-coverage-natura-ngl-20261013",
      "src-prg-10d5d7c35f"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-nextera-smr-colocation-evaluation",
    "slug": "us-nextera-smr-colocation-evaluation",
    "name": "NextEra Energy evaluation of 6 GW of SMR capacity at its nuclear sites and new sites (2026)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "NextEra Energy",
        "role": "utility"
      }
    ],
    "scale_text": "6 GWe of SMR co-location opportunities at existing nuclear sites, plus potential greenfield sites",
    "announced": {
      "value": "2026-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Corporate evaluation of SMR vendors and sites, no vendor, site or project selected.",
    "summary": "NextEra Energy's chief executive told investors in January 2026 that the company is evaluating SMR vendors and sees 6 GW of SMR co-location opportunities at its nuclear sites, mainly to serve data centres, while also developing greenfield sites. Any new build would depend on commercial terms and risk-sharing. No vendor, site or project has been selected.",
    "sources": [
      "src-prg-b3f7af5b29",
      "src-prgsrc-f1360d577b"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "NextEra's prepared remarks for its January 2026 results call say it is evaluating various SMR vendors and has 6 GW of SMR co-location opportunities at its nuclear sites, while developing greenfield sites.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-f1360d577b",
            "locator": "CEO remarks on nuclear, printed pages 9-10: 'closely evaluating the capabilities of various SMR OEMs' and '6 gigawatts of SMR' co-location opportunities at its nuclear sites"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-nppd-gen3-smr-early-site-permit",
    "slug": "us-nppd-gen3-smr-early-site-permit",
    "name": "Nebraska Public Power District Gen III+ SMR early site permit programme (DOE cost-shared)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Nebraska",
    "participants": [
      {
        "organization_id": null,
        "name": "Nebraska Public Power District (NPPD)",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "U.S. Department of Energy",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Omaha Public Power District",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Lincoln Electric System",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Grand River Dam Authority",
        "role": "utility"
      }
    ],
    "scale_text": "DOE award $27,864,860 for an ESP, four finalist communities (Beatrice, Sutherland, Norfolk, Brownville), consortium…",
    "announced": {
      "value": "2026-05-08",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Pursuing an NRC early site permit for Gen III+ SMRs, no application filed or site chosen in the sources read, NPPD's CEO said a larger reactor could also be considered.",
    "summary": "DOE awarded the Nebraska Public Power District about $27.9 million under its Gen III+ SMR programme to obtain an NRC early site permit for a Nebraska location to support future Gen III+ SMR deployment. NPPD has narrowed 16 candidate communities to four finalists and formed a consortium with other public power utilities, no site, technology or application has been fixed, and NPPD says a larger reactor remains possible.",
    "sources": [
      "src-doe-gen3-tier2-selections-2026",
      "src-prg-f10b0286b1"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-nucube-alaska-fund-nualaska",
    "slug": "us-nucube-alaska-fund-nualaska",
    "name": "NuCube Energy and Alaska Fund NuAlaska initiative for NuSun-1 projects in Alaska",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "admin1": "Alaska",
    "participants": [
      {
        "organization_id": "org-nucube",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Alaska Fund",
        "role": "investor"
      }
    ],
    "design_ids": [
      "dsn-nusun-1"
    ],
    "announced": {
      "value": "2026-07-30",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "MOU creating a joint initiative, no site, unit count or licence application named.",
    "summary": "NuCube Energy and Alaska Fund announced a memorandum of understanding in July 2026 creating NuAlaska, a joint initiative pairing NuCube's NuSun-1 reactor with Alaska Fund's financing to advance nuclear energy projects in Alaska. No site, unit count, order or licence application is named.",
    "sources": [
      "src-prg-90c7fcc0a9"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-nypa-upstate-advanced-nuclear",
    "slug": "us-nypa-upstate-advanced-nuclear",
    "name": "New York Power Authority programme for at least 1 GW of new nuclear in upstate New York (large reactors and/or SMRs)",
    "programme_type": "government_programme",
    "countries": [
      "US"
    ],
    "admin1": "New York",
    "participants": [
      {
        "organization_id": null,
        "name": "New York Power Authority (NYPA)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Governor of New York",
        "role": "government"
      }
    ],
    "scale_text": "at least 1 GW of new capacity in upstate New York",
    "announced": {
      "value": "2025-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Request for qualifications (29 May 2026) to prequalify developers of large reactors and/or SMRs, no technology, developer or host community selected in the sources read, first-of-a-kind reactors and…",
    "summary": "Following Governor Hochul's June 2025 directive, the New York Power Authority is developing at least 1 GW of new nuclear capacity in upstate New York, its May 2026 request for qualifications admits large reactors such as the AP1000 and/or SMRs such as the BWRX-300. Eight upstate communities and 23 developers responded to earlier requests for information. No technology, developer or host community has been selected.",
    "sources": [
      "src-prg-26ae73079c",
      "src-prg-cb84c78c81",
      "src-prgsrc-8dc41c6fd7"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "The governor's directive of 23 June 2025 tells NYPA to develop and build at least one gigawatt of new nuclear capacity in upstate New York. It does not name reactor types, which come from the May 2026 request for qualifications.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "NYPA's May 2026 request for qualifications naming the reactor types it considers.",
        "evidence": [
          {
            "source_id": "src-prgsrc-8dc41c6fd7",
            "locator": "Opening paragraph: 'directed the New York Power Authority (NYPA) to develop and construct a zero-emission advanced nuclear power plant in Upstate New York'; third paragraph: 'no less than one gigawatt'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-oklo-wyoming-hyperscale-loi",
    "slug": "us-oklo-wyoming-hyperscale-loi",
    "name": "Oklo and Wyoming Hyperscale non-binding letter of intent for 100 MW of Aurora power to a data-centre campus",
    "programme_type": "customer_agreement",
    "countries": [
      "US"
    ],
    "admin1": "Wyoming",
    "participants": [
      {
        "organization_id": "org-oklo",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Wyoming Hyperscale",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-aurora"
    ],
    "scale_text": "100 megawatts of clean power (basis not stated)",
    "announced": {
      "value": "2024-05-23",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "May 2024 non-binding LOI toward a 20-year PPA. No binding PPA or later step under it was found in Oklo releases checked.",
    "summary": "Oklo and Wyoming Hyperscale signed a non-binding letter of intent in May 2024 outlining their intent to enter a 20-year power purchase agreement for Oklo to supply 100 megawatts from Aurora powerhouses to a Wyoming Hyperscale data-centre campus. It is not a binding contract and names no powerhouse site.",
    "sources": [
      "src-prg-3805d246c2"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "May 2024 non-binding LOI toward a 20-year PPA. No binding PPA or later step under it was found in Oklo releases checked. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Oklo's next 10-Q or a release announcing a binding PPA or termination.",
        "evidence": [
          {
            "source_id": "src-prg-3805d246c2",
            "locator": "Oklo release 23 May 2024, body: 'signed a non-binding letter of intent outlining their intent to enter into a 20-year Power Purchase Agreement'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-pacificorp-terrapower-natrium-study",
    "slug": "us-pacificorp-terrapower-natrium-study",
    "name": "PacifiCorp and TerraPower joint study of up to five additional Natrium reactors by 2035",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "PacifiCorp",
        "role": "utility"
      },
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-natrium"
    ],
    "scale_text": "up to five additional Natrium reactor and integrated energy storage systems by 2035",
    "units_stated": 5,
    "announced": {
      "value": "2022-10-27",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Joint study announced in 2022. Plans moved from two extra Utah units in 2023 to none in the 2025 IRP. No document says the study finished or ended.",
    "summary": "TerraPower and PacifiCorp announced in October 2022 a joint feasibility study of up to five additional Natrium reactor and storage systems by 2035. TerraPower’s 31 March 2023 release says PacifiCorp’s resource plan forecast two additional Utah systems before final site selection. PacifiCorp’s 2025 IRP preferred portfolio includes the Natrium demonstration and does not select additional nuclear units. These are successive planning positions, not two committed Utah projects, site permissions or evidence that the wider study was cancelled.",
    "related_project_ids": [
      "prj-natrium-kemmerer"
    ],
    "sources": [
      "src-prg-7fd3dd7915",
      "src-terrapower-pacificorp-forecast-20230331",
      "src-pacificorp-irp-2025-nuclear",
      "src-prgst-2dedfd19d4"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Joint study announced in 2022. Plans moved from two extra Utah units in 2023 to none in the 2025 IRP. No document says the study finished or ended. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A PacifiCorp or TerraPower statement on the study's result, or an IRP that explains the status of the additional-units study.",
        "evidence": [
          {
            "source_id": "src-prg-7fd3dd7915",
            "locator": "First paragraph: 'joint study to evaluate the feasibility of deploying up to five additional Natrium'"
          },
          {
            "source_id": "src-pacificorp-irp-2025-nuclear",
            "locator": "Executive summary, New Nuclear Resources (Figure 1.7): 'includes advanced nuclear as part of its least-cost, least-risk preferred portfolio'"
          },
          {
            "source_id": "src-prgst-2dedfd19d4",
            "locator": "Lede: 'walked back plans to build additional Natrium reactors beyond the demonstration plant'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-srns-geh-prism-srs-2010",
    "slug": "us-srns-geh-prism-srs-2010",
    "name": "SRNS and GE Hitachi agreement to explore a PRISM prototype at the Savannah River Site (2010)",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "admin1": "South Carolina",
    "participants": [
      {
        "organization_id": null,
        "name": "Savannah River Nuclear Solutions (SRNS)",
        "role": "other"
      },
      {
        "organization_id": "org-gevh",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-aris-prism"
    ],
    "announced": {
      "value": "2010-10-27",
      "precision": "day",
      "basis": "actual"
    },
    "status": "ended",
    "status_note": "The 2010 MoU says it stays in effect for one year from signing unless superseded or terminated. No renewal or later agreement was found, so its term ended around late 2011.",
    "summary": "In October 2010 Savannah River Nuclear Solutions, DOE's management contractor at the Savannah River Site, signed an agreement with GE Hitachi to explore deploying a prototype of GEH's PRISM reactor as part of a proposed demonstration of small modular reactor technologies at the site. It was exploratory only, with no deployment commitment, licence application or construction.",
    "sources": [
      "src-prg-bafa07b8f9",
      "src-prgst-fc42ae4051"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "The 2010 MoU says it stays in effect for one year from signing unless superseded or terminated. No renewal or later agreement was found, so its term ended around late 2011.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Only a document showing a renewal or a follow-on SRNS-GEH PRISM agreement would change this.",
        "evidence": [
          {
            "source_id": "src-prg-bafa07b8f9",
            "locator": "October 27, 2010 entry, SRNS agreement with GEH 'to explore the potential' of a PRISM prototype"
          },
          {
            "source_id": "src-prgst-fc42ae4051",
            "locator": "Terms, item 2, 'shall remain in effect for one year from the Effective Date'"
          },
          {
            "source_id": "src-prgst-fc42ae4051",
            "locator": "Terms, items 4-5, future work only under 'a subsequent written agreement'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-terra-innovatum-ameresco-solo-mou",
    "slug": "us-terra-innovatum-ameresco-solo-mou",
    "name": "Terra Innovatum and Ameresco memorandum on siting and deploying SOLO micro-modular reactors (2025)",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-terra-innovatum",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Ameresco",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-solo"
    ],
    "announced": {
      "value": "2025-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Framework memorandum, no site, order or licence application. Latest mention found Nov 2025.",
    "summary": "Terra Innovatum announced in October 2025 a memorandum with US energy-solutions company Ameresco setting a framework for siting, development, construction, integration, operation and decommissioning planning of its SOLO micro-modular reactor, with Ameresco helping to identify and secure sites. No site, order or licence application is named.",
    "sources": [
      "src-prg-731e8169d2",
      "src-prg-ecf4622cdd"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Terra Innovatum's release of about 1 October 2025 on its partnership with Ameresco.",
        "evidence": [
          {
            "source_id": "src-prg-731e8169d2",
            "locator": "Second paragraph: 'The Italy-based company has this week announced it has signed memorandums of understanding with US-based energy solutions provider Ameresco'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-terra-innovatum-uvation-solo-loi",
    "slug": "us-terra-innovatum-uvation-solo-loi",
    "name": "Terra Innovatum and Uvation letter of intent for a SOLO microreactor pilot for data centres (2025)",
    "programme_type": "customer_agreement",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-terra-innovatum",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Uvation",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-solo"
    ],
    "scale_text": "1 MWe pilot programme with a strategic option to scale up to 100 MWe",
    "announced": {
      "value": "2025-11",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Letter of intent, no site, order or licence application.",
    "summary": "Terra Innovatum signed a letter of intent with US technology company Uvation in November 2025 for a 1 MWe SOLO pilot programme, with a strategic option to scale to 100 MWe for Uvation's AI and data-centre infrastructure. Uvation called the pilot a first step that could extend across multiple sites. No site, order or licence application is named.",
    "sources": [
      "src-prg-ecf4622cdd"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "source_unavailable",
        "note": "The record rests on press reports. The first-hand page identified for it was not available to SMRMap when checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Terra Innovatum's release of 20 November 2025 on its 1 MWe pilot deployment agreement with Uvation.",
        "evidence": [
          {
            "source_id": "src-prg-ecf4622cdd",
            "locator": "Opening standfirst: 'Terra Innovatum ... has signed a Letter of Intent with US technology firm Uvation to launch a 1 MWe pilot programme with a strategic option to scale up to 100 MWe'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-terrapower-evergy-kansas-natrium-mou",
    "slug": "us-terrapower-evergy-kansas-natrium-mou",
    "name": "TerraPower, Evergy and Kansas Department of Commerce memorandum to explore siting a Natrium plant in Kansas",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "admin1": "Kansas",
    "participants": [
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Evergy",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Kansas Department of Commerce",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-natrium"
    ],
    "announced": {
      "value": "2025-09-23",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Memorandum to evaluate sites in Evergy's Kansas service territory, communities (e.g. Greenwood County/Eureka) submitted letters of interest, no site selected in the sources read.",
    "summary": "TerraPower, Evergy and the Kansas Department of Commerce signed a memorandum of understanding in September 2025 to explore siting a Natrium reactor and energy storage system in Evergy's Kansas service territory. Greenwood County invited community support for a bid and said TerraPower was expected to narrow the field to two or three communities, no site has been selected and no licence application filed.",
    "sources": [
      "src-prg-30ddb1e9fd",
      "src-prg-a0ff3f0f85",
      "src-prg-6e134b13f0"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-terrestrial-energysolutions-imsr-siting-mou",
    "slug": "us-terrestrial-energysolutions-imsr-siting-mou",
    "name": "Terrestrial Energy and EnergySolutions memorandum to site IMSR plants at EnergySolutions-owned sites",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-terrestrial",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "EnergySolutions",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-imsr"
    ],
    "announced": {
      "value": "2024-12",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "MOU of December 2024 to evaluate EnergySolutions sites and pick one. No IMSR site choice, renewal or end has been found.",
    "summary": "Terrestrial Energy and EnergySolutions signed a memorandum of understanding in December 2024 to collaborate on siting and deploying Integral Molten Salt Reactor plants at EnergySolutions-owned sites, such as the former Kewaunee plant in Wisconsin, and to select the most suitable site. No IMSR site has been selected, EnergySolutions' later Kewaunee licensing notice with WEC Energy Group names no technology.",
    "sources": [
      "src-prg-4723286f5e",
      "src-prg-5c450467a0"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "MOU of December 2024 to evaluate EnergySolutions sites and pick one. No IMSR site choice, renewal or end has been found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Terrestrial Energy or EnergySolutions announcement selecting an IMSR site under the MOU, or ending it.",
        "evidence": [
          {
            "source_id": "src-prg-4723286f5e",
            "locator": "Fifth paragraph: 'Under the terms of the MOU, the companies will now evaluate these sites and select the most suitable'"
          },
          {
            "source_id": "src-prg-5c450467a0",
            "locator": "Second paragraph: 'The company is working with WEC Energy Group on the project'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-terrestrial-riot-imsr-data-centres",
    "slug": "us-terrestrial-riot-imsr-data-centres",
    "name": "Terrestrial Energy and Riot Platforms memorandum on IMSR plants for data centres (up to 4 GW, 2026)",
    "programme_type": "customer_agreement",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-terrestrial",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Riot Platforms",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-imsr"
    ],
    "scale_text": "multiple 390 MW IMSR Plants, up to 4 GW, at sites to be assessed (including Riot facilities in Texas and Kentucky)",
    "announced": {
      "value": "2026-05-06",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Memorandum of understanding, sites to be evaluated, no site, order or licence.",
    "summary": "On 6 May 2026 Terrestrial Energy and Riot Platforms announced a memorandum to pair future Riot data centres with multiple 390 MW IMSR plants totalling up to 4 GW, assessing sites including Riot's existing Texas and Kentucky facilities. It is a framework to evaluate sites, no site, order or licence is recorded.",
    "sources": [
      "src-prg-db3724234f"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-texas-tech-acu-natura-produced-water-msr",
    "slug": "us-texas-tech-acu-natura-produced-water-msr",
    "name": "Texas Tech, Abilene Christian University, Natura Resources and Texas Produced Water Consortium molten-salt-reactor…",
    "programme_type": "research_programme",
    "countries": [
      "US"
    ],
    "admin1": "Texas",
    "participants": [
      {
        "organization_id": null,
        "name": "Texas Tech University",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Abilene Christian University",
        "role": "research"
      },
      {
        "organization_id": "org-natura",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Texas Produced Water Consortium (TxPWC)",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Texas Legislature",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-msr-1"
    ],
    "announced": {
      "value": "2025-01",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "A 2025 Texas appropriation to Texas Tech, with a subaward to ACU, backs the partnership set up by the January 2025 memorandum. Reported in July 2025, with no later report found.",
    "summary": "Texas Tech, ACU, Natura and the Texas Produced Water Consortium announced a research memorandum in January 2025, backed by a state appropriation to Texas Tech and subaward to ACU. An earlier Natura release of 24 July 2024 described collaboration to examine reactor deployment for produced-water treatment. It was not the later memorandum or a deployment decision. The existing ACU MSR-1 is a separate project.",
    "related_project_ids": [
      "prj-natura-msr-1-acu"
    ],
    "sources": [
      "src-prg-46019de179",
      "src-archive19-167a9ca3d7",
      "src-prgst-c531fa3ce7"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "A 2025 Texas appropriation to Texas Tech, with a subaward to ACU, backs the partnership set up by the January 2025 memorandum. Reported in July 2025, with no later report found.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Texas Tech, ACU or TxPWC report of produced-water research results under the appropriation, or MSR-1 operation.",
        "evidence": [
          {
            "source_id": "src-prg-46019de179",
            "locator": "Paragraphs 1-2, 'A recent appropriation from the Texas Legislature' with a subaward to ACU"
          },
          {
            "source_id": "src-archive19-167a9ca3d7",
            "locator": "Paragraph 1, July 2024 partnership 'to look at the deployment' of Natura's LF-MSR"
          },
          {
            "source_id": "src-prgst-c531fa3ce7",
            "locator": "Paragraph 2, appropriation 'directs research funding to Texas Tech', later paragraph 'The ongoing partnership'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-tva-entra1-nuscale-6gw",
    "slug": "us-tva-entra1-nuscale-6gw",
    "name": "ENTRA1 Energy and Tennessee Valley Authority agreement for up to 6 GW of NuScale SMR capacity",
    "programme_type": "fleet_agreement",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "ENTRA1 Energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-tva",
        "role": "host_or_customer"
      },
      {
        "organization_id": "org-nuscale",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-voygr"
    ],
    "scale_text": "up to six gigawatts of NuScale SMR capacity",
    "announced": {
      "value": "2025",
      "precision": "year",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Framework agreement, as of 5 August 2026 ENTRA1 was still in discussions with TVA toward a definitive power purchase agreement. No site named.",
    "summary": "NuScale's strategic partner ENTRA1 Energy signed an agreement with the Tennessee Valley Authority in the third quarter of 2025 to deploy up to six gigawatts of NuScale SMR capacity. By August 2026 the parties were still advancing discussions toward a definitive power purchase agreement, no site, order or licence application is recorded.",
    "sources": [
      "src-prg-738870f50a",
      "src-prg-5bfcafee7b"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-utah-terrapower-flagship-natrium-mou",
    "slug": "us-utah-terrapower-flagship-natrium-mou",
    "name": "Utah Office of Energy Development, TerraPower and Flagship Companies memorandum to explore siting a Natrium plant in…",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "admin1": "Utah",
    "participants": [
      {
        "organization_id": null,
        "name": "Utah Office of Energy Development",
        "role": "government"
      },
      {
        "organization_id": "org-terrapower",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Flagship Companies",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-natrium"
    ],
    "announced": {
      "value": "2025-08-25",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Non-binding Aug 2025 MOU aiming for preliminary site recommendations by end-2025. No published recommendation or later step was found.",
    "summary": "The Utah Office of Energy Development, TerraPower and land developer Flagship Companies signed a non-binding memorandum in August 2025, under Governor Cox's Operation Gigawatt, to identify and assess sites for a potential Natrium reactor and storage plant in Utah, aiming for preliminary site recommendations by the end of 2025. No site, order or licence application is recorded.",
    "sources": [
      "src-prg-31b2df39df",
      "src-prg-c4553a2ee8",
      "src-prg-c4d596468a"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Non-binding Aug 2025 MOU aiming for preliminary site recommendations by end-2025. No published recommendation or later step was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "Publication of the preliminary Utah site recommendations by OED or TerraPower, or a named Utah Natrium site",
        "evidence": [
          {
            "source_id": "src-prg-31b2df39df",
            "locator": "OED release 25 Aug 2025: 'non-binding framework' with goal of 'preliminary site recommendations by the end of 2025'"
          },
          {
            "source_id": "src-prg-c4d596468a",
            "locator": "TerraPower release 25 Aug 2025, para 1: MOU 'to explore the potential siting of a Natrium'"
          },
          {
            "source_id": "src-prg-c4553a2ee8",
            "locator": "POWER 29 Aug 2025: MOU 'establishes a non-binding framework to identify and assess candidate sites'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-wisconsin-psc-uw-nuclear-siting-study",
    "slug": "us-wisconsin-psc-uw-nuclear-siting-study",
    "name": "Wisconsin PSC and UW-Madison nuclear power siting study (2025 Wisconsin Act 12)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Wisconsin",
    "participants": [
      {
        "organization_id": null,
        "name": "Public Service Commission of Wisconsin",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "University of Wisconsin-Madison, Department of Nuclear Engineering and Engineering Physics",
        "role": "research"
      }
    ],
    "scale_text": "$2 million state funding, study due by the start of 2027",
    "announced": {
      "value": "2026-02",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "State siting study covering traditional nuclear, SMRs and advanced technologies including fusion, no site or project.",
    "summary": "Under 2025 Wisconsin Act 12, the Public Service Commission of Wisconsin and UW-Madison's nuclear engineering department are carrying out a state nuclear power siting study, announced in February 2026 and due by the start of 2027. Its scope covers traditional nuclear, small modular reactors and advanced technologies including fusion, it identifies siting opportunities but proposes no plant.",
    "sources": [
      "src-prg-f45e28d478"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-xenergy-talen-xe100-loi",
    "slug": "us-xenergy-talen-xe100-loi",
    "name": "X-energy and Talen Energy letter of intent to assess three or more four-unit Xe-100 plants (Pennsylvania and PJM)",
    "programme_type": "fleet_agreement",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Talen Energy Corporation",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "scale_text": "three or more four-unit Xe-100 plants",
    "announced": {
      "value": "2026-03-19",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Letter of intent for feasibility studies, site evaluations and a project execution framework, siting parameters not finalised, no order or licence application.",
    "summary": "X-energy and independent power producer Talen Energy signed a letter of intent in March 2026 to assess deploying three or more four-unit Xe-100 SMR plants in Pennsylvania and across the PJM market, including possible conversion of fossil-fired sites. Planned work is early-stage (feasibility studies and site evaluations), no site, order or licence application exists.",
    "sources": [
      "src-prg-4151326f3d",
      "src-prg-0f0ab87f90"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-vn-decision-438-atomic-energy-strategy",
    "slug": "vn-decision-438-atomic-energy-strategy",
    "name": "Vietnam atomic energy strategy (Decision 438/QD-TTg, 2026): at least one SMR project by 2035, 10-15 SMRs by 2050",
    "programme_type": "national_plan",
    "countries": [
      "VN"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of Viet Nam (Prime Minister)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Vietnam Electricity (EVN)",
        "role": "utility"
      }
    ],
    "scale_text": "at least one SMR plant project by 2035, about 10-15 small modular reactors by 2050",
    "announced": {
      "value": "2026-03-16",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Strategy targets, no SMR site, developer or design named. Full decision text not read (summaries only).",
    "summary": "On 16 March 2026 Vietnam approved its atomic energy strategy to 2035 with a vision to 2050, aiming to complete Ninh Thuan 1 and 2 and to deploy at least one SMR power plant project by 2035, and about 10-15 small modular reactors by 2050. The strategy names no SMR site, developer or design.",
    "sources": [
      "src-prg-3332c9d3e6",
      "src-prg-d84c361983"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-14",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-vn-dong-nai-pilot-smr-plan",
    "slug": "vn-dong-nai-pilot-smr-plan",
    "name": "Dong Nai city plan seeking selection to pilot an SMR power plant by 2035",
    "programme_type": "government_programme",
    "countries": [
      "VN"
    ],
    "admin1": "Đồng Nai",
    "participants": [
      {
        "organization_id": null,
        "name": "Dong Nai City People's Committee",
        "role": "government"
      }
    ],
    "scale_text": "pilot SMR plant (no size stated)",
    "announced": {
      "value": "2026-07-01",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "City implementation plan under Decision 438 aims to be chosen by the central government to pilot an SMR plant by 2035, no developer, design, site or central decision. The city plan document itself…",
    "summary": "Dong Nai's People's Committee issued a plan implementing Vietnam's atomic energy strategy that aims for the city to be chosen by the central government to pilot an SMR power plant by 2035, and envisages a hybrid SMR-renewables system for data centres. It is an aspiration, no developer, design, site or central decision exists.",
    "sources": [
      "src-prg-a85e7d11a9"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "not_disclosed",
        "note": "The record rests on press reports. No release or official document from a party or an official body was found in sources checked in October 2026.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "The Dong Nai City People's Committee plan (KH-UBND, issued around June 2026) implementing the national atomic energy strategy under Decision 438/QĐ-TTg, on dongnai.gov.vn or in the city's official gazette.",
        "evidence": [
          {
            "source_id": "src-prg-a85e7d11a9",
            "locator": "Paragraph 2: 'Thực hiện Quyết định số 438/QĐ-TTg ... UBND thành phố Đồng Nai mới đây đã ban hành Kế hoạch triển khai'; later 'Phấn đấu đưa thành phố Đồng Nai trở thành địa phương tiên phong được Trung ương lựa chọn triển khai thí điểm dự án' (SMR)"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-vn-pecc2-saltfoss-siemens-floating-study",
    "slug": "vn-pecc2-saltfoss-siemens-floating-study",
    "name": "PECC2, Seaborg (now Saltfoss) and Siemens Energy joint study on floating CMSR power plants in Vietnam (2022)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "VN"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Power Engineering Consulting JSC 2 (PECC2)",
        "role": "other"
      },
      {
        "organization_id": "org-catalogue-saltfoss",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Siemens Energy",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-catalogue-cmsr"
    ],
    "scale_text": "first modular floating power plant (size not stated)",
    "announced": {
      "value": "2022-06",
      "precision": "month",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "Preliminary joint study report, recommends a modular nuclear power programme and strategic environmental assessment before any government decision. No project.",
    "summary": "A 2022 joint study by Vietnamese consultancy PECC2, Seaborg (now Saltfoss Energy) and Siemens Energy examined floating CMSR power plants for electricity, hydrogen and ammonia in Vietnam. Its preliminary report set out milestones toward a first modular floating plant, starting with a national modular nuclear power programme and environmental assessment. No government decision or project followed in the sources read.",
    "sources": [
      "src-prg-50077dad4d",
      "src-prgsrc-0eab7d6d23"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Seaborg's news item records the preliminary study by PECC2, Siemens Energy and Seaborg on CMSR power barges for electricity, hydrogen and ammonia in Vietnam. It does not describe the report's milestones.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "The preliminary study report by PECC2, Seaborg and Siemens Energy, or a PECC2 release on it.",
        "evidence": [
          {
            "source_id": "src-prgsrc-0eab7d6d23",
            "locator": "Body paragraph beginning 'Prior to the conference': 'PECC2 has been conducting a preliminary study together with Siemens Energy and Seaborg'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-za-irp2025-nuclear-necsa-smr",
    "slug": "za-irp2025-nuclear-necsa-smr",
    "name": "South Africa IRP 2025 new-nuclear plan and Necsa SMR partner selection",
    "programme_type": "national_plan",
    "countries": [
      "ZA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Government of South Africa (IRP 2025)",
        "role": "government"
      },
      {
        "organization_id": "org-necsa",
        "role": "research"
      }
    ],
    "scale_text": "IRP 2025: 5,200 MWe of new nuclear by 2039 (first 1,200 MWe by 2036), technology not specified in the text read, Necsa…",
    "announced": {
      "value": "2025-10",
      "precision": "month",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "National plan plus an SMR partner expression-of-interest process, no SMR technology selected, no site or licence",
    "summary": "South Africa's Integrated Resource Plan 2025, approved in October 2025, calls for 5,200 MWe of new nuclear capacity by 2039. In line with Decision 4 of IRP 2025, Necsa launched an expression of interest on 31 March 2026 to find partners to develop, demonstrate and deploy SMRs, and in June 2026 said it hoped to select a development partner within a year. No SMR technology, partner or site has been selected, the earlier 2,500 MWe procurement was paused in 2024.",
    "sources": [
      "src-prg-3396496922",
      "src-engnews-necsa-partner-2026",
      "src-prg-9dec8ce756",
      "src-prgsrc-a5f007cd18"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Necsa's statement of 31 March 2026 launches the call for SMR development partners in line with Decision 4 of IRP 2025. It does not give the plan's nuclear capacity, which rests on press reports.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "The Integrated Resource Plan 2025 text or its Cabinet approval notice giving the plan's nuclear capacity.",
        "evidence": [
          {
            "source_id": "src-prgsrc-a5f007cd18",
            "locator": "Statement summary dated 31 March 2026: 'is today launching an Expression of Interest (EOI) process' ... 'in line with Decision 4 in the Integrated Resources Plan (IRP, 2025)'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-fanco-floral-power-evaluation-2026",
    "slug": "fanco-floral-power-evaluation-2026",
    "name": "FANCO–Floral Energy integrated-power opportunity evaluation",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "GB",
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-fanco",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Floral Energy",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-eagl-1"
    ],
    "scale_text": "No nuclear capacity or reactor count committed",
    "announced": {
      "value": "2026-10-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Announced partnership for evaluation and planning. Individual projects remain conditional.",
    "summary": "FANCO announced a strategic partnership with Floral Energy to evaluate UK opportunities and potential US projects combining near-term generation with a future EAGL-1 pathway. Work covers site evaluation, technical integration and development planning. Oldbury is a potential site subject to access, feasibility and approvals. Floral’s initial Power Blocks are gas-fired. Their capacity is not a nuclear commitment. Individual projects still require commercial arrangements, financing and approvals. The announcement does not specify which US projects may participate.",
    "sources": [
      "src-fanco-floral-20261014"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-15",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-tr-arc-icn-arc100-term-sheet",
    "slug": "tr-arc-icn-arc100-term-sheet",
    "name": "ARC Clean Technology and IC Nuclear & Industry term sheet for ARC-100 deployment in Türkiye",
    "programme_type": "cooperation_mou",
    "countries": [
      "TR"
    ],
    "participants": [
      {
        "organization_id": "org-arc",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "IC Nuclear & Industry (IC Holding)",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-arc-100"
    ],
    "announced": {
      "value": "2026-04-07",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Term sheet with definitive agreements still to be negotiated. No site, unit count, schedule or licence application named.",
    "summary": "On 7 April 2026 ARC Clean Technology announced a term sheet with IC Nuclear & Industry, part of Türkiye's IC Holding, setting a commercial framework for deploying and developing the ARC-100 in Türkiye and the region. It covers joint technical, economic and regulatory feasibility studies, and the parties intend to negotiate definitive agreements on technology licensing, engineering and project implementation. No site, number of units, schedule or licence application is named.",
    "sources": [
      "src-l1-arc-icn-turkiye-20260407"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-18",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-gb-amr-rdd-htgr-demonstration",
    "slug": "gb-amr-rdd-htgr-demonstration",
    "name": "UK Advanced Modular Reactor RD&D programme HTGR demonstrator (Hartlepool proposed as host by EDF)",
    "programme_type": "government_programme",
    "countries": [
      "GB"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Department for Energy Security and Net Zero (DESNZ)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "EDF Energy Nuclear Generation Limited",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "National Nuclear Laboratory (NNL)",
        "role": "research"
      },
      {
        "organization_id": "org-catalogue-jaea",
        "role": "research"
      }
    ],
    "scale_text": "one high temperature gas reactor demonstrator (2030s)",
    "announced": {
      "value": "2022-04",
      "precision": "month",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Phase A ended in March 2023 and Phase B funding ran to March 2025. No government decision on Phase C, the demonstrator build, has been found.",
    "summary": "The UK government's Advanced Modular Reactor research, development and demonstration programme is working towards a high temperature gas reactor demonstrator. In Phase A (2022-2023) EDF proposed its Hartlepool Heat Hub as host site and found Hartlepool could be an appropriate HTGR site, while a NNL, JAEA and Jacobs team adapting Japan's HTGR design won a Phase B bid. Construction depends on a later government decision. A JAEA presentation of August 2026 still shows Hartlepool as a candidate site.",
    "sources": [
      "src-n1-govuk-amr-phasea-orgs",
      "src-n1-govuk-amr-phasea-closure",
      "src-jaea-ard-symposium-2026",
      "src-prgst-1b4ea91756"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Phase A ended in March 2023 and Phase B funding ran to March 2025. No government decision on Phase C, the demonstrator build, has been found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A DESNZ Phase B post-closure summary or a Spending Review decision on Phase C of the HTGR demonstration.",
        "evidence": [
          {
            "source_id": "src-n1-govuk-amr-phasea-closure",
            "locator": "Programme phases list, item 3: 'Phase C is subject to HMG decision making under the next spending review'"
          },
          {
            "source_id": "src-prgst-1b4ea91756",
            "locator": "Opening paragraph: 'FEED+ (Front End Engineering Design and supporting activities) studies until March 2025'"
          },
          {
            "source_id": "src-jaea-ard-symposium-2026",
            "locator": "Slide 16 caption: '英国高温ガス炉実証炉の建設候補地' with Hartlepool marked"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-natura-nov-shepherd-commercialisation-2025",
    "slug": "us-natura-nov-shepherd-commercialisation-2025",
    "name": "Natura acquisition of Shepherd Power and commercialization agreement with NOV",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-natura",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "role": "other",
        "name": "NOV Inc."
      },
      {
        "organization_id": null,
        "role": "other",
        "name": "Shepherd Power"
      }
    ],
    "design_ids": [
      "dsn-natura-msr-100"
    ],
    "announced": {
      "value": "2025-12-10",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "December 2025 Shepherd Power purchase and NOV commercialization agreement. A July 2026 article restates the partnership but no later step under the agreement was found.",
    "summary": "On 10 December 2025 Natura reported acquiring Shepherd Power from NOV and signing a commercialization agreement with NOV. The intended market includes data centres and industrial applications. NOV becoming an investor is prospective. Neither delivered funds nor a named customer, reactor site or reactor order is established.",
    "sources": [
      "src-archive19-ad4905829c",
      "src-fortune-natura-20260704"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "December 2025 Shepherd Power purchase and NOV commercialization agreement. A July 2026 article restates the partnership but no later step under the agreement was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Natura or NOV announcement of a definitive supply-chain agreement, the NOV investment closing, or manufacturing work under the agreement.",
        "evidence": [
          {
            "source_id": "src-archive19-ad4905829c",
            "locator": "Lead paragraph, Natura 'signed an agreement with NOV to advance commercialization'"
          },
          {
            "source_id": "src-archive19-ad4905829c",
            "locator": "Paragraph 6, NOV 'will become an investor in Natura'"
          },
          {
            "source_id": "src-fortune-natura-20260704",
            "locator": "Paragraph on Shepherd Power, 'partnering with NOV in the process'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-natura-3m-lithium7-cooperation-2025",
    "slug": "us-natura-3m-lithium7-cooperation-2025",
    "name": "Natura and 3M lithium-7 development and qualification agreement",
    "programme_type": "research_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-natura",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "role": "developer_or_vendor",
        "name": "3M"
      }
    ],
    "design_ids": [
      "dsn-natura-msr-100"
    ],
    "announced": {
      "value": "2025-11-04",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "November 2025 agreement for 3M to begin developing and qualifying lithium-7. Natura's press releases through October 2026 report no later step with 3M.",
    "summary": "Natura and 3M signed a cooperative work agreement on 4 November 2025. 3M agreed to begin developing and qualifying lithium-7 for molten-salt reactor technology. No supply quantity, delivered material, reactor deployment or completed qualification is established. This is distinct from the later DOE FLiBe allocation.",
    "sources": [
      "src-archive19-b869fe8f68"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "November 2025 agreement for 3M to begin developing and qualifying lithium-7. Natura's press releases through October 2026 report no later step with 3M. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Natura or 3M announcement of qualified lithium-7 or a supply agreement.",
        "evidence": [
          {
            "source_id": "src-archive19-b869fe8f68",
            "locator": "Natura release dated 4 Nov 2025, lede: 3M 'agrees to begin the process of developing and qualifying Lithium-7'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-bwxt-nfs-haleu-deconversion-2024",
    "slug": "us-bwxt-nfs-haleu-deconversion-2024",
    "name": "Nuclear Fuel Services selection for DOE HALEU deconversion IDIQ",
    "programme_type": "selection_or_award",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-bwxt",
        "role": "other"
      },
      {
        "organization_id": null,
        "role": "developer_or_vendor",
        "name": "Nuclear Fuel Services"
      },
      {
        "organization_id": null,
        "role": "government",
        "name": "U.S. Department of Energy"
      }
    ],
    "design_ids": [],
    "announced": {
      "value": "2024-10-08",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "DOE's awardee page (last modified June 2026) lists Nuclear Fuel Services among six deconversion awardees with contracts of up to 10 years. No task order to NFS is documented.",
    "summary": "On 8 October 2024 BWXT reported that Nuclear Fuel Services was selected for DOE HALEU deconversion services under an indefinite-delivery, indefinite-quantity contract. The $2 million minimum ordering guarantee is not a funded task order or proof of cash received. Future orders are competed among awardees. Deconversion is not enrichment or an operating fuel plant.",
    "sources": [
      "src-archive19-6356c78e8e",
      "src-prgst-51a94cad92"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "DOE's awardee page (last modified June 2026) lists Nuclear Fuel Services among six deconversion awardees with contracts of up to 10 years. No task order to NFS is documented.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A DOE deconversion task order or contract modification naming NFS, or a DOE notice ending the deconversion IDIQ.",
        "evidence": [
          {
            "source_id": "src-archive19-6356c78e8e",
            "locator": "Second paragraph: 'indefinite-delivery, indefinite-quantity contract where future orders will be solicited'"
          },
          {
            "source_id": "src-prgst-51a94cad92",
            "locator": "Awardee list and terms: 'Nuclear Fuel Services Inc.' and 'Contracts will last for up to 10 years'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ca-bwxt-westinghouse-ap300-components-mou-2024",
    "slug": "ca-bwxt-westinghouse-ap300-components-mou-2024",
    "name": "BWXT Canada and Westinghouse AP300/AP1000 component-manufacturing memorandum",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA"
    ],
    "participants": [
      {
        "organization_id": "org-bwxt",
        "role": "other"
      },
      {
        "organization_id": null,
        "role": "developer_or_vendor",
        "name": "BWXT Canada Ltd."
      },
      {
        "organization_id": "org-westinghouse",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-ap300"
    ],
    "announced": {
      "value": "2024-12-12",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "December 2024 MoU on possible AP300 and AP1000 component manufacture. No definitive manufacturing agreement or later step under it was found through October 2026.",
    "summary": "BWXT Canada and Westinghouse signed a memorandum on 12 December 2024 covering potential AP300 and AP1000 component manufacture in Canada and globally. Prospective work includes vessels, steam generators and heat exchangers. Definitive manufacturing agreements remain necessary. No component order, selected reactor site or construction is established. AP1000 is large-reactor context.",
    "sources": [
      "src-archive19-f289487a5e"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "December 2024 MoU on possible AP300 and AP1000 component manufacture. No definitive manufacturing agreement or later step under it was found through October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A BWXT or Westinghouse announcement of a definitive AP300 or AP1000 component supply contract, or a BWXT 10-K or 10-Q reference to this MoU.",
        "evidence": [
          {
            "source_id": "src-archive19-f289487a5e",
            "locator": "Lead paragraph, BWXT 'has the potential to manufacture' AP1000 and AP300 components"
          },
          {
            "source_id": "src-archive19-f289487a5e",
            "locator": "Forward-looking statement, risk of 'execution of definitive agreements'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-gb-terrestrial-springfields-imsr-fuel-pilot-2025",
    "slug": "gb-terrestrial-springfields-imsr-fuel-pilot-2025",
    "name": "Terrestrial Energy and Springfields IMSR fuel-pilot manufacturing contract",
    "programme_type": "customer_agreement",
    "countries": [
      "GB"
    ],
    "participants": [
      {
        "organization_id": "org-terrestrial",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "role": "developer_or_vendor",
        "name": "Springfields Fuels Limited"
      },
      {
        "organization_id": "org-westinghouse",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-imsr"
    ],
    "announced": {
      "value": "2025-11-05",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "November 2025 contract for a Springfields IMSR fuel pilot plant with construction targeted for 2026. No 2026 document names the plant or confirms construction began.",
    "summary": "On 5 November 2025 Terrestrial reported a manufacturing and supply contract with Springfields Fuels Limited, a Westinghouse subsidiary, for an IMSR fuel pilot plant at Springfields in Preston. It expands an August 2023 planning/design contract. Design and construction were contracted. A 2026 construction start was a target. This establishes neither completed construction, enrichment services, delivered fuel nor a reactor deployment.",
    "sources": [
      "src-archive19-a3163e8452",
      "src-prgst-ffed3f2d78"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "November 2025 contract for a Springfields IMSR fuel pilot plant with construction targeted for 2026. No 2026 document names the plant or confirms construction began. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Terrestrial or Westinghouse statement on the Springfields pilot plant's construction start, or a Terrestrial 10-Q or 10-K passage naming the Springfields contract.",
        "evidence": [
          {
            "source_id": "src-archive19-a3163e8452",
            "locator": "Lead paragraph, contract for the pilot plant 'with construction set to begin in 2026'"
          },
          {
            "source_id": "src-prgst-ffed3f2d78",
            "locator": "Supply Chain Developments, 'Continued Westinghouse engagement for the supply of uranium tetrafluoride'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-br-mnb-technology-development",
    "slug": "br-mnb-technology-development",
    "name": "Brazilian Microreactor (MNB) technology-development programme",
    "programme_type": "research_programme",
    "countries": [
      "BR"
    ],
    "participants": [
      {
        "organization_id": "org-terminus-rd-energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "role": "developer_or_vendor",
        "name": "Diamante Energia"
      },
      {
        "organization_id": null,
        "role": "developer_or_vendor",
        "name": "Indústrias Nucleares do Brasil (INB)"
      },
      {
        "organization_id": null,
        "role": "research",
        "name": "Instituto de Engenharia Nuclear (IEN/CNEN)"
      },
      {
        "organization_id": null,
        "role": "research",
        "name": "Instituto de Pesquisas Energéticas e Nucleares (IPEN/CNEN)"
      }
    ],
    "design_ids": [],
    "scale_text": "Conflicting accounts: Diamante states 5 MWe and IEN about 5 MWth.",
    "announced": {
      "value": "2025-03-18",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Finep-funded in March 2025 with a 36-month schedule. In November 2025 IEN said the project was starting, with its critical unit being installed in the Argonauta building.",
    "summary": "Diamante, Terminus and INB describe a Brazilian microreactor technology-development programme involving IEN, IPEN and other research partners. Diamante's project page describes 5 MWe in a 40-foot container. IEN's November 2025 account describes about 5 MWth. These specifications remain unreconciled, and the programme's relationship to the HARPIA design is unresolved. This programme record does not establish an operating commercial reactor or an authorized deployment.",
    "related_project_ids": [
      "prj-ucri-ien"
    ],
    "sources": [
      "src-coverage-cnen-march-20261013",
      "src-diamante-mnb-project",
      "src-ien-mnb-20251111"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "Finep-funded in March 2025 with a 36-month schedule. In November 2025 IEN said the project was starting, with its critical unit being installed in the Argonauta building.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "IEN, CNEN or ANSN report on the critical unit's commissioning or first authorization, or a Finep progress report",
        "evidence": [
          {
            "source_id": "src-ien-mnb-20251111",
            "locator": "IEN news 11/11/2025, opening paragraphs: 'o projeto do microrreator nuclear brasileiro dá os seus primeiros passos'"
          },
          {
            "source_id": "src-ien-mnb-20251111",
            "locator": "Closing section: 'O cronograma total do projeto nacional é de 36 meses'"
          },
          {
            "source_id": "src-coverage-cnen-march-20261013",
            "locator": "CNEN 18 Mar 2025, para 3-5: Finep Mais Inovação award, R$ 50 milhões, 'terá duração de três anos'"
          },
          {
            "source_id": "src-diamante-mnb-project",
            "locator": "Project header: 'Projeto em Execução', Prazo de Execução 36 meses"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-kairos-bwxt-triso-collaboration-2025",
    "slug": "us-kairos-bwxt-triso-collaboration-2025",
    "name": "Kairos Power and BWXT commercial TRISO fuel development collaboration",
    "programme_type": "research_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-kairos",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-bwxt",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-hermes",
      "dsn-kp-fhr"
    ],
    "related_project_ids": [
      "prj-hermes-2"
    ],
    "announced": {
      "value": "2025-09-03",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "September 2025 agreement to explore commercial TRISO production and a possible joint plant. No later step under it was found in BWXT or other sources checked in October 2026.",
    "summary": "On 3 September 2025 Kairos Power and BWXT announced cooperation to explore commercial TRISO manufacture, possible fuel supply for Hermes 2 and subsequent Kairos reactors, and a possible jointly developed fuel-fabrication facility. Existing US laboratories and BWXT production capabilities are inputs to the study, not a selected new factory. No firm fuel order, funded new facility, delivered fuel or reactor permission is established. The US scope follows the named Hermes 2 target, not every potential customer.",
    "sources": [
      "src-bwxt-kairos-triso-20250903",
      "src-nrc-kairos-hermes"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "September 2025 agreement to explore commercial TRISO production and a possible joint plant. No later step under it was found in BWXT or other sources checked in October 2026. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Kairos or BWXT announcement of a fuel supply contract for Hermes 2 or a decision on a joint fabrication facility.",
        "evidence": [
          {
            "source_id": "src-bwxt-kairos-triso-20250903",
            "locator": "BWXT release 3 Sep 2025, first paragraph: 'agreement to collaboratively explore technical and process opportunities'"
          },
          {
            "source_id": "src-nrc-kairos-hermes",
            "locator": "NRC Hermes page (last updated 15 Sep 2026): construction permit issued 'December 14, 2023'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-natura-quadrant-haleu-framework-2026",
    "slug": "us-natura-quadrant-haleu-framework-2026",
    "name": "Natura and Quadrant prospective commercial-reactor HALEU framework",
    "programme_type": "cooperation_mou",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-natura",
        "role": "host_or_customer"
      },
      {
        "organization_id": null,
        "name": "Quadrant Nuclear Industries, Inc.",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [],
    "announced": {
      "value": "2026-06-11",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Agreement announced 11 June 2026, with the parties intending to set up a long-term offtake framework. Signing alone does not show it active, and no later step was found.",
    "summary": "Natura reported an agreement naming it as a prospective HALEU recipient from Quadrant for its commercial reactor systems. The companies intended to establish a long-term offtake framework. The release does not disclose a Natura allocation, delivery, firm long-term offtake order or MSR-1 fuel assignment. QNI's stated annual production capacity belongs to its planned facility, not to Natura.",
    "sources": [
      "src-d2-natura-quadrant"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Agreement announced 11 June 2026, with the parties intending to set up a long-term offtake framework. Signing alone does not show it active, and no later step was found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A signed long-term offtake contract between Natura and QNI, or a QNI facility milestone naming Natura",
        "evidence": [
          {
            "source_id": "src-d2-natura-quadrant",
            "locator": "Release 11 Jun 2026, QNI quote: 'we intend to establish a framework for a long-term offtake arrangement'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-natura-hifunda-sensor-development-2026",
    "slug": "us-natura-hifunda-sensor-development-2026",
    "name": "Natura and HiFunda molten-salt chemistry sensor development",
    "programme_type": "research_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-natura",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "HiFunda LLC",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [],
    "announced": {
      "value": "2026-04-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Development agreement announced in April 2026. No later progress report, delivered sensor or end of the work has been found.",
    "summary": "Natura announced an agreement with HiFunda to develop an electrochemical molten-salt chemistry sensor. The release describes development work, not evidence that a complete nuclear-grade sensor had been qualified or installed in an operating reactor. HiFunda's reported prior component work does not establish completion of the whole instrument.",
    "sources": [
      "src-natura-hifunda-20260414"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Development agreement announced in April 2026. No later progress report, delivered sensor or end of the work has been found. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Natura or HiFunda report of sensor testing, qualification or delivery.",
        "evidence": [
          {
            "source_id": "src-natura-hifunda-20260414",
            "locator": "Third paragraph: 'Natura will work with HiFunda to engineer an electrochemical sensor'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-aep-amazon-xenergy-breed-exploration",
    "slug": "us-aep-amazon-xenergy-breed-exploration",
    "name": "AEP, Amazon and X-energy exploration agreement for the former Breed station in Indiana",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Indiana",
    "participants": [
      {
        "organization_id": "org-aep",
        "role": "utility"
      },
      {
        "organization_id": "org-xenergy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-amazon",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-xe-100"
    ],
    "scale_text": "Exploration target of 12 Xe-100 reactors, up to 960 MW combined as stated, not a committed plant.",
    "announced": {
      "value": "2026-10-19",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Exploration agreement for the former Breed site, with targeted units and prospective power purchases, not a construction or operating permission.",
    "summary": "Amazon's 19 October 2026 announcement describes an agreement with AEP and X-energy to explore Xe-100 deployment at the former Breed station in Sullivan County, Indiana, targeting 12 reactors and up to 960 MW as stated. Amazon is a prospective first power customer and development funder. X-energy describes an AEP/X-energy JDA for feasibility work and milestone-based Amazon capital. No amount, disbursement, formal operator appointment, construction permission or final investment decision is established.",
    "sources": [
      "src-amazon-breed-exploration-20261019",
      "src-xenergy-breed-jda-20261019"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-25",
    "review_state": "verified",
    "related_project_ids": [
      "prj-aep-amazon-xenergy-breed"
    ]
  },
  {
    "stable_id": "prg-nl-rotterdam-smr-supply-chain-study",
    "slug": "nl-rotterdam-smr-supply-chain-study",
    "name": "Port of Rotterdam preliminary SMR supply-chain study",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "NL"
    ],
    "admin1": "South Holland",
    "participants": [
      {
        "name": "SmartPort",
        "role": "other"
      },
      {
        "name": "Deltalinqs",
        "role": "other"
      },
      {
        "name": "Port of Rotterdam Authority",
        "role": "other"
      },
      {
        "name": "Municipality of Rotterdam",
        "role": "government"
      },
      {
        "name": "Province of South Holland",
        "role": "government"
      },
      {
        "name": "Tractebel",
        "role": "research"
      },
      {
        "name": "Technopolis Group",
        "role": "research"
      }
    ],
    "announced": {
      "value": "2026-10-12",
      "precision": "day",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "A completed preliminary supply-chain study is reported, not a selected reactor deployment or permission.",
    "summary": "On 12 October 2026 Tractebel announced an exploratory study by Tractebel and Technopolis Group, commissioned by SmartPort, Deltalinqs, the Port of Rotterdam Authority, the Municipality of Rotterdam and the Province of South Holland. It assesses the port's potential role in a future SMR supply chain. It identifies no selected reactor, deployment site, design or developer. This records a study, not a deployment.",
    "sources": [
      "src-wnn-rotterdam-study-20261022",
      "src-prgsrc-a79e29fa31"
    ],
    "confidence": "low",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_source": {
        "state": "supported",
        "note": "Tractebel's own news item records the exploratory study by Tractebel and Technopolis Group, commissioned by SmartPort, Deltalinqs, the Port of Rotterdam Authority, the Municipality of Rotterdam and the Province of South Holland, on the port's role in the SMR supply chain.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-10-29",
        "next_trigger": "A later document from a party or the responsible body that changes this record's parties, scope or dates.",
        "evidence": [
          {
            "source_id": "src-prgsrc-a79e29fa31",
            "locator": "News item (\"Published on 12 October 2026\"), second paragraph: \"Commissioned by SmartPort, Deltalinqs, the Port of Rotterdam Authority, the Municipality of Rotterdam and the Province of South Holland, the study was carried out jointly by Tractebel and Technopolis Group.\""
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-id-rosatom-halmahera-floating-power-agreement",
    "slug": "id-rosatom-halmahera-floating-power-agreement",
    "name": "Rosatom and PT Pembangkit Listrik Nuklir floating power agreement for northern Halmahera",
    "programme_type": "fleet_agreement",
    "countries": [
      "ID"
    ],
    "admin1": "North Maluku",
    "participants": [
      {
        "organization_id": "org-rosatom",
        "role": "developer_or_vendor"
      },
      {
        "name": "PT Pembangkit Listrik Nuklir",
        "role": "other"
      }
    ],
    "design_names": [
      "FPU-100"
    ],
    "scale_text": "Two FPU-100 floating power units, 200 MW combined as stated, not a reactor-module count or qualified rating.",
    "announced": {
      "value": "2026-10-20",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Company-reported electricity-supply agreement with no precise berth, operator, reactor permission or fixed delivery year established.",
    "summary": "Rosatom's 20 October newsletter reports an agreement with PT Pembangkit Listrik Nuklir to supply northern Halmahera using two FPU-100 units, 200 MW combined as stated. First electricity is expected as early as five years after key electricity-supply contract terms take effect, without a fixed year. The signing date, precise berth and operator are unestablished, and this is not a permission or a construction start.",
    "sources": [
      "src-rosatom-newsletter-halmahera-20261020"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-25",
    "review_state": "verified",
    "related_project_ids": [
      "prj-rosatom-north-halmahera-floating"
    ]
  },
  {
    "stable_id": "prg-us-deep-fission-gpda-commercial-power-agreement",
    "slug": "us-deep-fission-gpda-commercial-power-agreement",
    "name": "Deep Fission and GPDA commercial power agreement at Great Plains Industrial Park",
    "programme_type": "customer_agreement",
    "countries": [
      "US"
    ],
    "admin1": "Kansas",
    "participants": [
      {
        "organization_id": "org-deep-fission",
        "role": "developer_or_vendor"
      },
      {
        "name": "Great Plains Development Authority",
        "role": "host_or_customer"
      }
    ],
    "design_ids": [
      "dsn-gravity"
    ],
    "scale_text": "Initial phase anticipated at 150 MW as stated, with later phases up to 2,000 MW subject to demand.",
    "announced": {
      "value": "2026-10-20",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Company-reported commercial agreement for a project distinct from the pilot, subject to licensing and demand with no minimum purchase.",
    "summary": "Deep Fission announced a definitive master energy purchase agreement with GPDA for a commercial Gravity project at its Parsons pilot site, distinct from the pilot itself. The company anticipates 150 MW initially and commercial operation on 30 September 2028, with later phases to 2,000 MW depending on demand. Under the agreement, GPDA would purchase available electricity for park tenants with no minimum obligation or disclosed price, and licensing, Kansas approvals and delivery arrangements remain conditions.",
    "sources": [
      "src-deep-fission-gpda-agreement-20261020"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-25",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-valar-nrc-preapplication-engagement",
    "slug": "us-valar-nrc-preapplication-engagement",
    "name": "Valar Atomics NRC pre-application engagement",
    "programme_type": "regulatory_engagement",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-valar",
        "role": "developer_or_vendor"
      },
      {
        "name": "U.S. Nuclear Regulatory Commission",
        "role": "government"
      }
    ],
    "design_names": [
      "NumenorOne"
    ],
    "announced": {
      "value": null,
      "precision": "unknown",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Company-level NRC pre-application engagement does not establish a site-specific application, permission or Carbon County link.",
    "summary": "The NRC overview describes pre-application engagement with Valar Atomics and lists docket 99902185. It identifies NumenorOne as an HTGR for which Valar submitted a DOE authorization application and separately discusses Ward250, without identifying the Carbon County campus. The page's 22 October review date does not date an application or approval, and its activity-table entries referring to other companies are not used as Valar evidence.",
    "sources": [
      "src-nrc-valar-preapplication-20261022"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-25",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-ca-us-nucleon-arc-mou-20250513",
    "slug": "ca-us-nucleon-arc-mou-20250513",
    "name": "Nucleon and ARC memorandum to explore ARC-100 deployment in Alberta and Texas",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA",
      "US"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "ARC Clean Technology Inc.",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Nucleon Energy Inc.",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-arc-100"
    ],
    "announced": {
      "value": "2025-05-13",
      "precision": "day",
      "basis": "actual"
    },
    "status": "superseded",
    "status_note": "Superseded by NuARC, the partnership entity ARC and Nucleon announced on 25 September 2025 to deploy ARC-100 units, starting in Alberta. Texas is not named in the later release.",
    "summary": "ARC Clean Technology Inc. and Nucleon Energy announced a memorandum to explore ARC-100 deployment at combined-heat-and-power and electricity-only sites under development by Nucleon in Alberta and Texas. The framework covers siting evaluation and progressing toward licensing. It names no site, committed unit count, order or filed application. The partnership it pointed toward was announced in September 2025 as NuARC, a separate record whose initial focus is Alberta.",
    "sources": [
      "src-arc-nucleon-mou-20250513",
      "src-prg-ca8e5211a7",
      "src-prgst-107c2af442",
      "src-prgst-b51ecc3800"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "Superseded by NuARC, the partnership entity ARC and Nucleon announced on 25 September 2025 to deploy ARC-100 units, starting in Alberta. Texas is not named in the later release.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A NuARC site announcement or licence filing, or a statement on whether the Texas scope of the May 2025 MOU continues.",
        "evidence": [
          {
            "source_id": "src-arc-nucleon-mou-20250513",
            "locator": "ARC release 13 May 2025, closing MOU paragraph: 'move toward a long-term commercial partnership'"
          },
          {
            "source_id": "src-prg-ca8e5211a7",
            "locator": "First paragraph: 'announced today the formation of a partnership entity named NuARC', and ARC quote: 'culmination of a shared vision'"
          },
          {
            "source_id": "src-prgst-b51ecc3800",
            "locator": "Fourth paragraph: 'In May, ARC and Nucleon signed a memorandum of understanding'"
          },
          {
            "source_id": "src-prgst-107c2af442",
            "locator": "NuARC paragraph: Alberta deployment 'with evaluation of potential sites in progress'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-ca-arc-invest-alberta-mou-20230324",
    "slug": "ca-arc-invest-alberta-mou-20230324",
    "name": "ARC and Invest Alberta commercialization memorandum",
    "programme_type": "cooperation_mou",
    "countries": [
      "CA"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "ARC Clean Technology Canada, Inc.",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Invest Alberta Corporation",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-arc-100"
    ],
    "announced": {
      "value": "2023-03-24",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "Memorandum signed in March 2023 with no stated term. No later document reports a step under it, a renewal or an end.",
    "summary": "ARC Clean Technology Canada and Invest Alberta announced a memorandum to support commercialization of the ARC-100 in Alberta, including operations expansion and supply-chain development toward a possible fleet. This is a commercialization objective, with no site, unit count, reactor order or licence identified in the announcement.",
    "sources": [
      "src-arc-invest-alberta-20230324",
      "src-prg-ca8e5211a7"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "not_disclosed",
        "note": "Memorandum signed in March 2023 with no stated term. No later document reports a step under it, a renewal or an end. Searched in late October 2026 for later documents from the parties and trade press.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "An Invest Alberta or ARC statement on the MOU (a step under it, renewal or expiry), or a NuARC document naming Invest Alberta support under the 2023 memorandum.",
        "evidence": [
          {
            "source_id": "src-arc-invest-alberta-20230324",
            "locator": "Fourth paragraph: 'Under the terms of the MOU, ARC will begin the process to expand its operations in Alberta'"
          },
          {
            "source_id": "src-prg-ca8e5211a7",
            "locator": "Dateline paragraph: 'announced today the formation of a partnership entity named NuARC'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-us-darpa-fat-cat-autonomous-reactor-research",
    "slug": "us-darpa-fat-cat-autonomous-reactor-research",
    "name": "DARPA Fast Capacitance (Fat Cat) autonomous fast-reactor research",
    "programme_type": "research_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "Defense Advanced Research Projects Agency (DARPA)",
        "role": "government"
      },
      {
        "organization_id": "org-los-alamos-national-laboratory",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "Space Nuclear Power Corporation (SpaceNukes)",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [],
    "scale_text": "Autonomous fast-reactor control research and a planned Device Assembly Facility demonstration. Capacity is not stated.",
    "announced": {
      "value": null,
      "precision": "unknown",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "SpaceNukes reported on 21 October 2026 a DARPA Fat Cat agreement for phased design and a planned Kilopower ground test with Los Alamos. No test has been completed.",
    "summary": "DARPA describes Fat Cat as autonomous fast-reactor control research with a planned Los Alamos demonstration at the Device Assembly Facility. On 21 October 2026 SpaceNukes announced that DARPA had awarded it an Other Transaction Agreement for phased development and a planned follow-on Kilopower ground test with Los Alamos. The company announcement gives no award value or completed-test date. It does not establish an achieved test, operating permission or deployment project, and does not date the programme's creation.",
    "sources": [
      "src-darpa-fat-cat-programme-20261027",
      "src-spacenukes-fat-cat-award-20261021"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "SpaceNukes reported on 21 October 2026 a DARPA Fat Cat agreement for phased design and a planned Kilopower ground test with Los Alamos. No test has been completed.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A DARPA announcement of further Fat Cat awards, or completion of the Los Alamos ground test.",
        "evidence": [
          {
            "source_id": "src-spacenukes-fat-cat-award-20261021",
            "locator": "Dateline paragraph: 'has awarded the company an Other Transaction Agreement (OTA) under the Fast Capacitance (Fat Cat) program'"
          },
          {
            "source_id": "src-darpa-fat-cat-programme-20261027",
            "locator": "Programme description: 'Fat Cat plans to make history by demonstrating autonomous nuclear control'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-fr-newcleo-mox-pilot-safety-options-2026",
    "slug": "fr-newcleo-mox-pilot-safety-options-2026",
    "name": "Newcleo MOX fuel-fabrication pilot safety-options review",
    "programme_type": "regulatory_engagement",
    "countries": [
      "FR"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-newcleo",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "ASNR",
        "role": "government"
      }
    ],
    "design_ids": [],
    "announced": {
      "value": null,
      "precision": "unknown",
      "basis": "actual"
    },
    "status": "completed",
    "status_note": "ASNR issued its opinion on Newcleo's MOX pilot-plant safety-options file on 2 July 2026, closing this review stage. Any creation-authorization application would be a separate step.",
    "summary": "ASNR's 2 July 2026 opinion, publicized on 13 July, found Newcleo's MOX pilot-line safety approach satisfactory at the options stage, with further substantiation required before any eventual creation-authorization application. It excludes future extensions. Requirements include isotopic assumptions, confinement, fire and aircraft risks, and prospective waste inventories, disposal routes and storage without assuming third-party facilities are available.",
    "sources": [
      "src-asnr-newcleo-mox-opinion-2026-av030",
      "src-asnr-newcleo-mox-news-20260713"
    ],
    "confidence": "high",
    "last_checked": "2026-10-29",
    "review_state": "verified",
    "detail_reviews": {
      "programme_status": {
        "state": "supported",
        "note": "ASNR issued its opinion on Newcleo's MOX pilot-plant safety-options file on 2 July 2026, closing this review stage. Any creation-authorization application would be a separate step.",
        "owner": "smrmap-editor",
        "reviewed_at": "2026-10-29",
        "next_review": "2027-04-27",
        "next_trigger": "A Newcleo creation-authorization application for the fuel plant, which would be a new regulatory step and a separate record.",
        "evidence": [
          {
            "source_id": "src-asnr-newcleo-mox-opinion-2026-av030",
            "locator": "Opinion 2026-AV-030, page 1: recitals of Newcleo's file of 13 December 2024 and staff review of 3 December 2025, then 'Rend l'avis suivant'"
          },
          {
            "source_id": "src-asnr-newcleo-mox-news-20260713",
            "locator": "ASNR news item dated 13/07/2026, first paragraph: 'a rendu, le 2 juillet 2026, son avis'"
          }
        ]
      }
    }
  },
  {
    "stable_id": "prg-se-blykalla-neext-sealer-engineering-2026",
    "slug": "se-blykalla-neext-sealer-engineering-2026",
    "name": "Blykalla and NEEXT SEALER basic-design engineering cooperation",
    "programme_type": "cooperation_mou",
    "countries": [
      "SE"
    ],
    "participants": [
      {
        "organization_id": "org-blykalla",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "NEEXT Engineering",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-sealer"
    ],
    "announced": {
      "value": "2026-10-26",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Company-reported design-engineering cooperation. It is not a site construction award, power purchase, disclosed funding amount or licence.",
    "summary": "Blykalla announced on 26 October 2026 an agreement signed on 2 October expanding NEEXT's engineering support for SEALER conventional-island basic design. NEEXT's design and digital-modelling engineers are being integrated into Blykalla's engineering organization. References to Swedish reactor parks provide context and do not establish a separate construction contract for each site.",
    "sources": [
      "src-blykalla-neext-sealer-20261026"
    ],
    "confidence": "medium",
    "last_checked": "2026-10-27",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-doe-reactor-pilot-program",
    "slug": "us-doe-reactor-pilot-program",
    "name": "DOE Reactor Pilot Program (DOE-authorized advanced test reactors)",
    "programme_type": "government_programme",
    "countries": [
      "US"
    ],
    "participants": [
      {
        "organization_id": "org-us-doe",
        "role": "government"
      },
      {
        "organization_id": "org-aalo",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-antares",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Atomic Alchemy Inc.",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-deep-fission",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-last-energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-oklo",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-natura",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-radiant",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-terrestrial",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-valar",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-aalo-x",
      "dsn-aurora",
      "dsn-gravity",
      "dsn-kaleidos",
      "dsn-mark-0",
      "dsn-msr-1",
      "dsn-pwr-5",
      "dsn-ward-250"
    ],
    "design_names": [
      "Pluto",
      "TETRA",
      "Versatile Isotope Production Reactor (VIPR)"
    ],
    "scale_text": "11 projects from 10 companies selected in August 2025",
    "announced": {
      "value": "2025-06-18",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "DOE's page, read 28 October 2026, still lists rolling applications, and DOE reported a criticality in August 2026. Selection is a DOE test-reactor authorization path, not an NRC licence.",
    "summary": "DOE announced the Reactor Pilot Program on 18 June 2025 to test advanced reactors under DOE authorization, aiming for at least three to reach criticality by 4 July 2026, and selected 11 projects from ten companies on 12 August 2025. DOE reports criticality for Antares's Mark-0 (4 June 2026), Valar's Ward 250 (18 June), Aalo-X (4 July) and Oklo's Groves isotope test reactor, reported on 6 August as critical the night before. DOE also counted Deployable Energy's Unity, critical on 30 June under the Nuclear Energy Launch Pad (which DOE calls the programme's next evolution), toward the goal.",
    "related_project_ids": [
      "prj-aalo-x-inl",
      "prj-antares-mark0-inl",
      "prj-aurora-inl",
      "prj-deep-fission-parsons",
      "prj-last-energy-rellis",
      "prj-natura-msr-1-acu",
      "prj-radiant-kaleidos-inl",
      "prj-ward-250"
    ],
    "sources": [
      "src-doe-rpp-launch-20250618",
      "src-doe-rpp-selections-20250812",
      "src-doe-reactor-pilot-program",
      "src-doe-rpp-update-202607",
      "src-doe-mark0-2026",
      "src-doe-ward250-2026",
      "src-doe-aalo-x-2026",
      "src-doe-unity-third-criticality-20260701",
      "src-doe-groves-fifth-criticality-20260806"
    ],
    "confidence": "high",
    "last_checked": "2026-10-28",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-in-advanced-nuclear-ready-communities",
    "slug": "us-in-advanced-nuclear-ready-communities",
    "name": "Indiana Advanced Nuclear Ready Communities programme",
    "programme_type": "government_programme",
    "countries": [
      "US"
    ],
    "admin1": "Indiana",
    "participants": [
      {
        "organization_id": null,
        "name": "Indiana Office of Energy Development",
        "role": "government"
      }
    ],
    "design_ids": [],
    "scale_text": "Community-readiness designations, no reactor units or capacity stated.",
    "announced": {
      "value": null,
      "precision": "unknown",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Official OED overview and application link available at review. This is a readiness programme, not a site or reactor approval.",
    "summary": "Indiana's Office of Energy Development administers a community-readiness designation programme with three tiers: Nuclear Aware, Nuclear Prepared and Nuclear Ready. The official overview describes criteria including stakeholder organization, site readiness, workforce development and formal developer agreements, and provides an application link. Its announcement date is not established by the undated overview. The cited page does not establish that Sullivan County or the Breed proposal has received a designation, secured funding or obtained reactor permission.",
    "sources": [
      "src-in-oed-ready-communities-20261103"
    ],
    "confidence": "high",
    "last_checked": "2026-11-03",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-us-dairyland-applied-atomics-genoa-loi",
    "slug": "us-dairyland-applied-atomics-genoa-loi",
    "name": "Dairyland Power and Applied Atomics letter of intent to evaluate SMRs at the Genoa site (Wisconsin)",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "US"
    ],
    "admin1": "Wisconsin",
    "participants": [
      {
        "organization_id": null,
        "name": "Dairyland Power Cooperative",
        "role": "utility"
      },
      {
        "organization_id": null,
        "name": "Applied Atomics, Inc.",
        "role": "developer_or_vendor"
      }
    ],
    "design_ids": [
      "dsn-mpower"
    ],
    "scale_text": "One or more Applied Atomics SMRs to be evaluated. No unit count or committed capacity",
    "announced": {
      "value": "2026-10-22",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "Letter of intent to evaluate feasibility and a possible power purchase agreement, with no order, licence application or site permission.",
    "summary": "Dairyland Power Cooperative and Applied Atomics announced on 22 October 2026 a letter of intent to evaluate deploying one or more Applied Atomics small modular reactors at Dairyland's Genoa site in southwest Wisconsin, with Dairyland to explore buying the power through a power purchase agreement. Applied Atomics says it holds the exclusive land-based licence to BWXT's mPower design and describes its units as 100 MWe each. The site formerly hosted a 50 MW nuclear plant and a coal plant retired in 2021, and no unit count, order or licence application is stated.",
    "sources": [
      "src-dairyland-applied-atomics-genoa-loi-20261022"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-tr-ustda-tupras-smr-roadmap",
    "slug": "tr-ustda-tupras-smr-roadmap",
    "name": "USTDA-funded SMR assessment and roadmap for TÜPRAŞ refining operations",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "TR"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "US Trade and Development Agency (USTDA)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "Türkiye Petrol Rafinerileri A.Ş. (TÜPRAŞ)",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "study of a range of US SMR technologies for refinery electricity, heat and steam, with no plant size stated",
    "announced": {
      "value": "2026-10-26",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "USTDA announced on 26 October 2026 a signed agreement to fund technical assistance, and its release says a request for proposals will be posted, with no refinery, site, reactor or plant named.",
    "summary": "USTDA said on 26 October 2026 that it signed an agreement with TÜPRAŞ to fund technical assistance assessing SMRs to supply electricity, heat and steam for its refining processes, and a roadmap for evaluating whether and how SMRs could be deployed. No refinery, site or reactor is named.",
    "sources": [
      "src-ustda-tupras-20261026"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-no-copenhagen-atomics-ocean-power-mou",
    "slug": "no-copenhagen-atomics-ocean-power-mou",
    "name": "Ocean-Power and Copenhagen Atomics MoU to study thorium molten-salt reactors in Norway",
    "programme_type": "cooperation_mou",
    "countries": [
      "NO"
    ],
    "participants": [
      {
        "organization_id": "org-aris-copenhagen-atomics",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Ocean-Power AS",
        "role": "developer_or_vendor"
      }
    ],
    "scale_text": "No site, unit count or order named",
    "announced": {
      "value": "2025-07-23",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "The July 2025 release reports a joint study only. No later report was read, and no site, order or licence application is named.",
    "summary": "Ocean-Power AS and Copenhagen Atomics signed a memorandum of understanding, announced in July 2025, to jointly study producing electricity and heat in Norway with thorium-based molten-salt reactors. The study is to cover technical and regulatory conditions, power and heat demand, site selection and a conceptual plant design. No site, unit count, order or licence application is named.",
    "sources": [
      "src-copenhagen-atomics-ocean-power-20250723"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-kr-steady-energy-kdhc-cooperation",
    "slug": "kr-steady-energy-kdhc-cooperation",
    "name": "Steady Energy and Korea District Heating Corp. cooperation on heat-only SMRs",
    "programme_type": "cooperation_mou",
    "countries": [
      "KR"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-steady-energy",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "Korea District Heating Corp.",
        "role": "utility"
      }
    ],
    "scale_text": "No site, unit count or order named",
    "announced": {
      "value": "2025-12-05",
      "precision": "day",
      "basis": "actual"
    },
    "status": "unknown",
    "status_note": "The December 2025 release reports a cooperation agreement without stating its terms. No later report was read, and no Korean site or order is named.",
    "summary": "Steady Energy and Korea District Heating Corp. announced an agreement in December 2025 to foster cooperation on heat-only small modular reactors. The release does not state the agreement's terms and names no Korean site, unit count, order or licence application.",
    "sources": [
      "src-steady-energy-kdhc-20251205"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-tw-nthu-nucube-mmr-assessment",
    "slug": "tw-nthu-nucube-mmr-assessment",
    "name": "National Tsing Hua University and NuCube Energy assessment of a microreactor on the NTHU campus",
    "programme_type": "feasibility_or_siting_study",
    "countries": [
      "TW"
    ],
    "participants": [
      {
        "organization_id": "org-nucube",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": null,
        "name": "National Tsing Hua University",
        "role": "host_or_customer"
      }
    ],
    "scale_text": "No unit count, order or licence application named",
    "announced": {
      "value": "2026-10-19",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "An agreement to exchange information and assess feasibility. NTHU states a hope, not a schedule, and no order or licence application is established.",
    "summary": "National Tsing Hua University and NuCube Energy signed an agreement on 19 October 2026 to exchange information on and assess micro modular reactor development, research uses and deployment feasibility, including the possibility of a unit on the NTHU campus. NTHU's THOR research reactor is due to be decommissioned in 2040. NTHU hopes for installation within two years after NuCube's reactor reaches commercial operation in the US. No order, site decision or licence application is established.",
    "sources": [
      "src-nthu-nucube-agreement-20261020"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-nl-thorizon-pronto-mooi-2026",
    "slug": "nl-thorizon-pronto-mooi-2026",
    "name": "Thorizon-led Project Pronto under the Dutch MOOI Kernenergie scheme",
    "programme_type": "research_programme",
    "countries": [
      "NL"
    ],
    "participants": [
      {
        "organization_id": "org-catalogue-thorizon",
        "role": "developer_or_vendor"
      },
      {
        "organization_id": "org-nrg-pallas",
        "role": "research"
      },
      {
        "organization_id": "org-tno",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "TU Delft",
        "role": "research"
      },
      {
        "organization_id": null,
        "name": "VDL Groep",
        "role": "other"
      }
    ],
    "design_ids": [
      "dsn-catalogue-thorizon-one",
      "dsn-thorizon-pioneer"
    ],
    "related_project_ids": [
      "prj-thorizon-pioneer-petten"
    ],
    "scale_text": "EUR 4 million grant for a non-nuclear prototype and corrosion tests. No reactor order",
    "announced": {
      "value": "2026-07-02",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "The government said selected projects start by autumn 2026. No start, completed test, construction funding or reactor permission is established.",
    "summary": "The Dutch government announced on 2 July 2026 that four projects would share EUR 12.6 million under MOOI Kernenergie, including Project Pronto, led by Thorizon. Thorizon's release reports a EUR 4 million grant to it, VDL Groep, NRG PALLAS, TU Delft and TNO for a full-scale non-nuclear prototype and corrosion tests in molten salt up to 650°C, supporting its PIONEER and Thorizon One plans. It does not name Pronto, and the match rests on Thorizon leading only that project. No reactor construction funding, order or permission is established.",
    "sources": [
      "src-thorizon-mooi-grant-20260716",
      "src-rijksoverheid-mooi-awards-20260702"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "review_state": "verified"
  },
  {
    "stable_id": "prg-cz-se-sujb-ssm-rolls-royce-smr-mou",
    "slug": "cz-se-sujb-ssm-rolls-royce-smr-mou",
    "name": "SÚJB and SSM memorandum on regulatory cooperation for the Rolls-Royce SMR",
    "programme_type": "cooperation_mou",
    "countries": [
      "CZ",
      "SE"
    ],
    "participants": [
      {
        "organization_id": null,
        "name": "SSM (Swedish regulator)",
        "role": "government"
      },
      {
        "organization_id": null,
        "name": "SÚJB (Czech State Office for Nuclear Safety)",
        "role": "government"
      }
    ],
    "design_ids": [
      "dsn-rr-smr"
    ],
    "scale_text": "Regulator cooperation. No licence, site or project named",
    "announced": {
      "value": "2026-10-14",
      "precision": "day",
      "basis": "actual"
    },
    "status": "active",
    "status_note": "A regulator cooperation memorandum. It is not a licensing decision, and SÚJB's notice names no Czech or Swedish project.",
    "summary": "The Czech regulator SÚJB signed a memorandum of understanding with the Swedish regulator SSM on 14 October 2026, mainly on cooperation for future deployment of the Rolls-Royce small modular reactor. SÚJB says both regulators have similar agreements with the UK's ONR, making the cooperation trilateral. The memorandum is not a licensing decision, and SÚJB's notice names no Czech or Swedish project or site.",
    "sources": [
      "src-sujb-ssm-memorandum-20261020"
    ],
    "confidence": "medium",
    "last_checked": "2026-11-11",
    "review_state": "verified"
  }
]