{
 "schema": 2,
 "about": "Release days (UTC) on which a public SMRMap build first carried, changed, removed or restored a record or an Updates entry. A release day is not the date of the development itself. History starts with the first committed public dataset; re-checks that change only review dates, owners or next triggers are not counted as changes. A change only to the evidence references inside a record's reviews (the sources and locators cited) is listed separately, under evidence_only for that day, and is not counted as a changed record; evidence_state holds the fingerprints they are compared by. Release days recorded before this file's schema 2 counted such changes as changed records.",
 "history_starts": "2026-10-01",
 "days": [
  {
   "date": "2026-10-01",
   "baseline": true,
   "counts": {
    "projects": 19,
    "designs": 15,
    "organizations": 18,
    "programmes": 0,
    "policies": 0,
    "regulatory_actions": 0,
    "events": 0
   },
   "new_updates": []
  },
  {
   "date": "2026-10-01",
   "added": {
    "projects": [
     "prj-aalo-rellis",
     "prj-aalo-x-inl",
     "prj-aep-joshua-falls",
     "prj-aep-rockport",
     "prj-antares-mark0-inl",
     "prj-ap300-teesside",
     "prj-atucha-new-smr",
     "prj-baimsky-floating",
     "prj-barc-vizag-htgcr",
     "prj-belews-creek",
     "prj-bwxt-green-river",
     "prj-cascade-enw",
     "prj-chalk-river-mmr",
     "prj-dalane-smr",
     "prj-elementl-letart",
     "prj-fermi-estonia",
     "prj-holtec-blue-castle",
     "prj-holtec-oyster-creek",
     "prj-imsr-rellis",
     "prj-jimmy-bazancourt",
     "prj-kairos-rellis",
     "prj-last-energy-haskell",
     "prj-last-energy-llynfi",
     "prj-last-energy-london-gateway",
     "prj-last-energy-rellis",
     "prj-natura-msr-1-acu",
     "prj-natura-rellis",
     "prj-north-anna-smr",
     "prj-oklo-eielson",
     "prj-oklo-ohio",
     "prj-osge-dabrowa-gornicza",
     "prj-osge-nowa-huta",
     "prj-osge-ostroleka",
     "prj-osge-stalowa-wola",
     "prj-osge-stawy-monowskie",
     "prj-osge-wloclawek",
     "prj-oygarden-smr",
     "prj-pele-inl",
     "prj-penn-state-frontier",
     "prj-prodigy-belledune",
     "prj-radiant-buckley",
     "prj-radiant-kaleidos-inl",
     "prj-rr-detmarovice",
     "prj-rr-temelin",
     "prj-rr-tusimice",
     "prj-sask-rafferty",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-taftoy-smr",
     "prj-tarapur-bsmr-200",
     "prj-tarapur-smr-55",
     "prj-thorcon-kelasa",
     "prj-unity-inl",
     "prj-ward-250",
     "prj-yakutia-ritm"
    ],
    "designs": [
     "dsn-aalo-pod",
     "dsn-aalo-x",
     "dsn-ap300",
     "dsn-banr",
     "dsn-barc-htgcr",
     "dsn-bsmr-200",
     "dsn-evinci",
     "dsn-gfp-mmr",
     "dsn-imsr",
     "dsn-jimmy-heat",
     "dsn-kaleidos",
     "dsn-kp-fhr",
     "dsn-mark-0",
     "dsn-msr-1",
     "dsn-natura-msr-100",
     "dsn-pele",
     "dsn-pwr-20",
     "dsn-pwr-5",
     "dsn-ritm-200s",
     "dsn-sealer",
     "dsn-smr-55",
     "dsn-thorcon-500",
     "dsn-unity",
     "dsn-ward-250"
    ],
    "organizations": [
     "org-aalo",
     "org-aep",
     "org-antares",
     "org-barc",
     "org-blykalla",
     "org-bwxt",
     "org-cez",
     "org-deployable-energy",
     "org-dod-sco",
     "org-dominion-energy",
     "org-duke-energy",
     "org-elementl",
     "org-energy-northwest",
     "org-fermi-energia",
     "org-global-first-power",
     "org-jimmy",
     "org-kghm",
     "org-last-energy",
     "org-nano-nuclear",
     "org-natura",
     "org-norsk-kjernekraft",
     "org-osge",
     "org-penn-state",
     "org-prodigy",
     "org-radiant",
     "org-saskpower",
     "org-tata-chemicals-na",
     "org-terrestrial",
     "org-thorcon",
     "org-trondheimsleia",
     "org-valar",
     "org-westinghouse"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-brest-od-300",
     "prj-clinch-river-bwrx",
     "prj-holtec-palisades",
     "prj-long-mott",
     "prj-natrium-kemmerer",
     "prj-nuscale-romania",
     "prj-ritm-jizzakh",
     "prj-rr-wylfa",
     "prj-uamps-cfpp"
    ],
    "organizations": [
     "org-arc",
     "org-cnea",
     "org-cnnc",
     "org-dow",
     "org-gevh",
     "org-holtec",
     "org-huaneng",
     "org-kairos",
     "org-nbpower",
     "org-nuscale",
     "org-oklo",
     "org-opg",
     "org-rolls-royce-smr",
     "org-rosatom",
     "org-terrapower",
     "org-tva",
     "org-uamps",
     "org-xenergy"
    ]
   },
   "removed": {
    "projects": [
     {
      "id": "prj-rr-pipeline-undisclosed",
      "name": "Rolls-Royce SMR multi-site programme (non-deployment aggregate)",
      "stage": "announced"
     }
    ]
   },
   "stage_changes": [
    {
     "id": "prj-holtec-palisades",
     "from": "announced",
     "to": "licensing"
    }
   ],
   "new_updates": []
  },
  {
   "date": "2026-10-02",
   "added": {
    "projects": [
     "prj-aalo-idaho-falls-erp",
     "prj-alfred-mioveni",
     "prj-ameren-callaway-wsmr",
     "prj-anpi-jbsa-antares",
     "prj-anpi-malmstrom-evinci",
     "prj-antares-mark1-inl",
     "prj-baishan-happy200",
     "prj-belledune-arc100",
     "prj-blue-energy-victoria",
     "prj-bluecore-long-beach",
     "prj-blykalla-horby",
     "prj-bontang-pkt-msr",
     "prj-calogena-cadarache",
     "prj-cgn-bohai-acpr50s",
     "prj-chukotka-sovinoe-shelf-m",
     "prj-cottam-smr300",
     "prj-daegu-gunwi-ismr",
     "prj-daqing-nhr200",
     "prj-darlington-bwrx-units-2-4",
     "prj-deep-atomic-mk60-inl",
     "prj-deep-fission-parsons",
     "prj-dimitrovgrad-svbr100",
     "prj-dual-fluid-rwanda",
     "prj-evinci-dome",
     "prj-galena-4s",
     "prj-gazprom-kirinskoye-floating",
     "prj-gijang-smr",
     "prj-halden-smr",
     "prj-hartlepool-xe100",
     "prj-helen-helsinki-smr",
     "prj-hexana-gard-rhodanien",
     "prj-holtec-brigham-city",
     "prj-holtec-smr160-srs-2012",
     "prj-htgr-pola-ncbj",
     "prj-htr10-inet",
     "prj-httr-oarai",
     "prj-hyperion-srs-2012",
     "prj-industria-rr-smr",
     "prj-inl-marvel",
     "prj-isu-nucube-art",
     "prj-janus-fort-benning-kaleidos",
     "prj-janus-fort-bragg-antares",
     "prj-janus-fort-campbell-banr",
     "prj-janus-fort-drum-evinci",
     "prj-janus-fort-hood-ga-tes",
     "prj-kerava-ldr50",
     "prj-knxt-karlshamn",
     "prj-knxt-valdemarsvik",
     "prj-kuopio-smr-heat",
     "prj-last-energy-legnica",
     "prj-last-energy-mioveni",
     "prj-leandrea-mol",
     "prj-lister-smr",
     "prj-loki-mmr-dome-inl",
     "prj-maoming-green-energy-htgr",
     "prj-midpoint-smr",
     "prj-moltex-ssrw-lepreau",
     "prj-nano-barupon-liberty",
     "prj-nano-kronos-jbab",
     "prj-narvik-fornes",
     "prj-navy-crane-microreactor",
     "prj-necsa-pelindaba-smr-demo",
     "prj-newcleo-bohunice",
     "prj-newcleo-veron-lfr-as-30",
     "prj-nine-mile-point-advanced-smr",
     "prj-ningdu-modular-plan",
     "prj-nuclea-morpheus-usrel",
     "prj-nucube-usrel",
     "prj-nuscale-srs-2012",
     "prj-oklo-diamondback",
     "prj-osge-warszawa",
     "prj-otrera-marcoule",
     "prj-patnow-zepak-smr",
     "prj-pbmr-koeberg",
     "prj-psi-copenhagen-atomics",
     "prj-purdue-duke-smr",
     "prj-rde-serpong",
     "prj-rivne-smr160",
     "prj-ruijin-htr",
     "prj-sanmen-htgr",
     "prj-sellafield-prism",
     "prj-solo-valmeyer",
     "prj-standard-power-ohio",
     "prj-standard-power-pennsylvania",
     "prj-starcore-pinawa",
     "prj-stellaria-alvin-cadarache",
     "prj-stratek-zilkaats",
     "prj-studsvik-nykoping",
     "prj-surry-gec",
     "prj-svalbard-sealer",
     "prj-teplator-slavutych",
     "prj-tetra-1-rellis",
     "prj-thorizon-pioneer-petten",
     "prj-thorizon-zeeland",
     "prj-tmsr-lf1-wuwei",
     "prj-trawsfynydd-egino",
     "prj-trypilska-smr",
     "prj-uiuc-kronos",
     "prj-unity-dome-2027",
     "prj-usnc-inl-mmr-proposal",
     "prj-vardo-smr",
     "prj-videberg-varo-rr-smr",
     "prj-west-kalimantan-land-smr",
     "prj-west-kalimantan-ritm-floating",
     "prj-wylfa-nuscale-shearwater",
     "prj-xiapu-htgr",
     "prj-xuwei-htgr-unit3",
     "prj-zettajoule-tees-zj0"
    ],
    "designs": [
     "dsn-acr-300",
     "dsn-allseas-htgr",
     "dsn-archeos",
     "dsn-aris-abv-6e",
     "dsn-aris-acp100s",
     "dsn-aris-amr",
     "dsn-aris-bandi",
     "dsn-aris-copenhagen-atomics-waste-burner",
     "dsn-aris-elena",
     "dsn-aris-fbnr",
     "dsn-aris-fuji",
     "dsn-aris-g4m",
     "dsn-aris-gt-mhr",
     "dsn-aris-holos-mono",
     "dsn-aris-holos-quad",
     "dsn-aris-htr-10",
     "dsn-aris-marvel",
     "dsn-aris-mhr-100",
     "dsn-aris-mhr-t",
     "dsn-aris-otrera-300",
     "dsn-aris-peluit-40",
     "dsn-aris-prism",
     "dsn-aris-prismatic-htr",
     "dsn-aris-shelf-m",
     "dsn-aris-smahtr",
     "dsn-aris-smart",
     "dsn-aris-star",
     "dsn-aris-svbr-100",
     "dsn-aris-unitherm",
     "dsn-aris-vber-300",
     "dsn-aris-w-lfr",
     "dsn-bluecore-bc-15",
     "dsn-catalogue-4s",
     "dsn-catalogue-a-htr-100",
     "dsn-catalogue-acpr50s",
     "dsn-catalogue-blossom-energy-smr",
     "dsn-catalogue-blue-capsule",
     "dsn-catalogue-cal-30",
     "dsn-catalogue-cmsr",
     "dsn-catalogue-df300",
     "dsn-catalogue-dfbr-1",
     "dsn-catalogue-em2",
     "dsn-catalogue-energy-well",
     "dsn-catalogue-flex",
     "dsn-catalogue-fmr",
     "dsn-catalogue-gthtr300",
     "dsn-catalogue-happy200",
     "dsn-catalogue-hectar",
     "dsn-catalogue-hexana",
     "dsn-catalogue-htgr-pola",
     "dsn-catalogue-htmr-100",
     "dsn-catalogue-htr50s",
     "dsn-catalogue-httr",
     "dsn-catalogue-i-smr",
     "dsn-catalogue-ldr-50",
     "dsn-catalogue-leunr",
     "dsn-catalogue-lfr-as-200",
     "dsn-catalogue-lfr-as-30",
     "dsn-catalogue-lftr",
     "dsn-catalogue-loki-mmr",
     "dsn-catalogue-mn-1",
     "dsn-catalogue-movelux",
     "dsn-catalogue-nhr200-ii",
     "dsn-catalogue-nuclearis-n1",
     "dsn-catalogue-nuward-smr",
     "dsn-catalogue-odin",
     "dsn-catalogue-otrera-2x300",
     "dsn-catalogue-r1",
     "dsn-catalogue-ritm-200m",
     "dsn-catalogue-salus-100",
     "dsn-catalogue-sealer-one",
     "dsn-catalogue-smart100",
     "dsn-catalogue-ssr-w",
     "dsn-catalogue-start",
     "dsn-catalogue-stellarium",
     "dsn-catalogue-teplator",
     "dsn-catalogue-thorizon-one",
     "dsn-catalogue-xamr",
     "dsn-deep-atomic-mk60",
     "dsn-eagl-1",
     "dsn-eagles-300",
     "dsn-ga-tes",
     "dsn-gravity",
     "dsn-halo-mmr",
     "dsn-hefasto",
     "dsn-holtec-smr-160",
     "dsn-htr-pm600",
     "dsn-jay-1",
     "dsn-jh-100",
     "dsn-kronos-mmr",
     "dsn-marina",
     "dsn-mn-350",
     "dsn-morpheus",
     "dsn-nusun-1",
     "dsn-pbmr",
     "dsn-polar-1",
     "dsn-solo",
     "dsn-svbr-100",
     "dsn-tredic-htgr"
    ],
    "organizations": [
     "org-allseas",
     "org-ameren",
     "org-archeos-sas",
     "org-aris-akme-engineering-jsc",
     "org-aris-cnnc-npic",
     "org-aris-copenhagen-atomics",
     "org-aris-furgs",
     "org-aris-gen4-energy-inc",
     "org-aris-holosgen-llc",
     "org-aris-idaho-national-laboratory",
     "org-aris-inet-tsinghua-university",
     "org-aris-international-thorium-molten-salt-forum-itmsf",
     "org-aris-kepco-e-c",
     "org-aris-national-research-and-innovation-agency-brin-bandung-institute-of-technology-itb",
     "org-aris-nikiet",
     "org-aris-nrc-kurchatov-institute",
     "org-aris-ornl",
     "org-aris-star-energy-sa",
     "org-aris-stl-nuclear-pty-ltd",
     "org-blue-energy",
     "org-bluecore-energy",
     "org-catalogue-afrikantov-okbm",
     "org-catalogue-blossom-energy",
     "org-catalogue-blue-capsule-technology",
     "org-catalogue-calogena",
     "org-catalogue-cgn",
     "org-catalogue-csmc",
     "org-catalogue-cv",
     "org-catalogue-dual-fluid-energy",
     "org-catalogue-eskom",
     "org-catalogue-flibe-energy",
     "org-catalogue-general-atomics",
     "org-catalogue-hexana",
     "org-catalogue-inet-and-cgn",
     "org-catalogue-jaea",
     "org-catalogue-kaeri",
     "org-catalogue-khnp-and-kaeri",
     "org-catalogue-mobilenuclear-energy",
     "org-catalogue-moltex-energy",
     "org-catalogue-moltexflex",
     "org-catalogue-naarea",
     "org-catalogue-ncbj",
     "org-catalogue-newcleo",
     "org-catalogue-nuclearis-energy",
     "org-catalogue-nuward",
     "org-catalogue-otrera",
     "org-catalogue-saltfoss",
     "org-catalogue-spic",
     "org-catalogue-steady-energy",
     "org-catalogue-stellaria",
     "org-catalogue-stratek-global",
     "org-catalogue-thorizon",
     "org-catalogue-toshiba",
     "org-catalogue-transmutex",
     "org-catalogue-uwb-and-ciirc-ctu",
     "org-cea",
     "org-centrica",
     "org-chinergy",
     "org-city-of-galena",
     "org-constellation",
     "org-constellation-smr-dev",
     "org-cwmni-egino",
     "org-deep-atomic",
     "org-deep-fission",
     "org-eagles-consortium",
     "org-edf",
     "org-energoatom",
     "org-energy-alberta",
     "org-epz",
     "org-fanco",
     "org-gazprom",
     "org-hadron-energy",
     "org-helen",
     "org-idaho-state-university",
     "org-industria",
     "org-invap",
     "org-javys",
     "org-jhatom",
     "org-karnfull-next",
     "org-keravan-energia",
     "org-khnp",
     "org-kuopion-energia",
     "org-meitner-energy",
     "org-necsa",
     "org-nrg-pallas",
     "org-nuclea-energy",
     "org-nucube",
     "org-pbmr",
     "org-psi",
     "org-pupuk-kaltim",
     "org-purdue",
     "org-raten",
     "org-sawtooth-sedc",
     "org-scaled-atomics",
     "org-sck-cen",
     "org-shearwater",
     "org-sinap",
     "org-southern-infrastructure",
     "org-spic",
     "org-standard-power",
     "org-starcore",
     "org-studsvik",
     "org-tees",
     "org-terra-innovatum",
     "org-tredic",
     "org-uiuc",
     "org-ujv-rez",
     "org-us-air-force",
     "org-us-army",
     "org-us-navy",
     "org-usnc",
     "org-videberg-kraft",
     "org-world-thermoexport",
     "org-zepak"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aep-joshua-falls",
     "prj-aep-rockport",
     "prj-antares-mark0-inl",
     "prj-arc100-lepreau",
     "prj-atucha-new-smr",
     "prj-baimsky-floating",
     "prj-barc-vizag-htgcr",
     "prj-belews-creek",
     "prj-bwxt-green-river",
     "prj-cascade-enw",
     "prj-chalk-river-mmr",
     "prj-clinch-river-bwrx",
     "prj-elementl-letart",
     "prj-fermi-estonia",
     "prj-holtec-blue-castle",
     "prj-holtec-oyster-creek",
     "prj-jimmy-bazancourt",
     "prj-last-energy-haskell",
     "prj-last-energy-llynfi",
     "prj-last-energy-london-gateway",
     "prj-natura-msr-1-acu",
     "prj-north-anna-smr",
     "prj-nuscale-romania",
     "prj-osge-nowa-huta",
     "prj-osge-ostroleka",
     "prj-osge-stalowa-wola",
     "prj-osge-wloclawek",
     "prj-penn-state-frontier",
     "prj-radiant-buckley",
     "prj-radiant-kaleidos-inl",
     "prj-ritm-jizzakh",
     "prj-rr-detmarovice",
     "prj-rr-temelin",
     "prj-rr-tusimice",
     "prj-rr-wylfa",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-taftoy-smr",
     "prj-tarapur-bsmr-200",
     "prj-tarapur-smr-55",
     "prj-ward-250",
     "prj-yakutia-ritm"
    ],
    "designs": [
     "dsn-kaleidos",
     "dsn-unity"
    ],
    "organizations": [
     "org-gevh",
     "org-nano-nuclear"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-arc100-lepreau",
     "from": "siting",
     "to": "licensing"
    },
    {
     "id": "prj-cascade-enw",
     "from": "licensing",
     "to": "siting"
    },
    {
     "id": "prj-nuscale-romania",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-osge-stalowa-wola",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-radiant-buckley",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-rr-wylfa",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-yakutia-ritm",
     "from": "siting",
     "to": "licensing"
    }
   ],
   "new_updates": []
  },
  {
   "date": "2026-10-03",
   "added": {
    "projects": [
     "prj-antares-r1-inl-cfa",
     "prj-arc100-inl",
     "prj-fensfjorden-smr",
     "prj-grenland-smr",
     "prj-jiamusi-nuclear-heating",
     "prj-mpower-clinch-river",
     "prj-nano-digihost-north-tonawanda",
     "prj-ngnp-inl",
     "prj-norilsk-asmm-ritm400",
     "prj-odin-berkeley-green",
     "prj-ornl-tcr",
     "prj-ruta70-ippe-obninsk",
     "prj-stellaria-fos-sur-mer",
     "prj-ubattery-chalk-river",
     "prj-vber300-aktau"
    ],
    "designs": [
     "dsn-abv-6m",
     "dsn-acpr100",
     "dsn-cap150",
     "dsn-cap200",
     "dsn-enhs",
     "dsn-flexblue",
     "dsn-karat-100",
     "dsn-karat-45",
     "dsn-leadir-ps100",
     "dsn-lfr-tl-30",
     "dsn-lspr",
     "dsn-mcsfr",
     "dsn-microuranus",
     "dsn-mk1-pb-fhr",
     "dsn-mpower",
     "dsn-nuscale-microreactor",
     "dsn-rapid",
     "dsn-ritm-400",
     "dsn-ruta-70",
     "dsn-sc-htgr",
     "dsn-ssr-thermal-spectrum",
     "dsn-sstar",
     "dsn-star-h2",
     "dsn-star-lm",
     "dsn-starcore",
     "dsn-u-battery",
     "dsn-vk-300",
     "dsn-xenith"
    ],
    "organizations": [
     "org-anl",
     "org-cambridge-atomworks",
     "org-criepi",
     "org-elysium-industries",
     "org-framatome-inc",
     "org-generation-mpower",
     "org-llnl",
     "org-naval-group",
     "org-northern-nuclear-industries",
     "org-snerdi",
     "org-tokyo-tech",
     "org-uc-berkeley",
     "org-unist",
     "org-urenco"
    ],
    "policies": [
     "pol-in-sea423-2025",
     "pol-in-sea424-2025",
     "pol-in-smr-certificate-statute",
     "pol-tx-hb14-2025",
     "pol-tx-tandf",
     "pol-tx-taneo-grant-rules-2026",
     "pol-us-advance-act-2024",
     "pol-us-ardp-award-terrapower-2020",
     "pol-us-ardp-award-xenergy-2020",
     "pol-us-doe-ardp",
     "pol-us-doe-gen3-smr-program",
     "pol-us-doe-reactor-pilot-program",
     "pol-us-eo-14299",
     "pol-us-eo-14300",
     "pol-us-eo-14301",
     "pol-us-eo-14302",
     "pol-us-gen3-selection-holtec-2025",
     "pol-us-gen3-selection-tva-2025",
     "pol-us-gen3-tier2-selections-2026",
     "pol-us-nrc-licensing-siting-proposed-2026",
     "pol-us-nrc-microreactor-proposed-2026",
     "pol-us-nrc-new-reactor-geis-2026",
     "pol-us-nrc-part-53-2026",
     "pol-us-nrc-smr-emergency-preparedness-2023"
    ],
    "regulatory_actions": [
     "reg-acu-msrr-cp-2024",
     "reg-bapeten-kelasa-2025",
     "reg-clinch-cp-20260929",
     "reg-hermes1-cp",
     "reg-hermes2-cp",
     "reg-longmott-cp",
     "reg-natrium-cp",
     "reg-nb-ltps",
     "reg-opg-ltc-2025",
     "reg-opg-lto-2026",
     "reg-pioneer-cp-lwa-application-2026",
     "reg-rr-gda"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-x-inl",
     "prj-fermi-estonia",
     "prj-holtec-palisades",
     "prj-nano-barupon-liberty",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu",
     "prj-ward-250"
    ],
    "designs": [
     "dsn-aris-fuji"
    ]
   },
   "removed": {
    "projects": [
     {
      "id": "prj-knxt-karlshamn",
      "name": "Kärnfull Next SMR candidate sites in Karlshamn",
      "stage": "announced"
     },
     {
      "id": "prj-nano-kronos-jbab",
      "name": "NANO Nuclear KRONOS MMR study for Joint Base Anacostia-Bolling",
      "stage": "announced"
     },
     {
      "id": "prj-standard-power-ohio",
      "name": "Standard Power NuScale Ohio proposal (combined two-site programme)",
      "stage": "announced"
     },
     {
      "id": "prj-standard-power-pennsylvania",
      "name": "Standard Power NuScale Pennsylvania proposal (combined two-site programme)",
      "stage": "announced"
     }
    ]
   },
   "stage_changes": [],
   "new_updates": [
    "update-pol-in-sea423-2025-1",
    "update-pol-in-sea424-2025-1",
    "update-pol-in-smr-certificate-statute-1",
    "update-pol-tx-hb14-2025-1",
    "update-pol-tx-hb14-2025-2",
    "update-pol-tx-tandf-1",
    "update-pol-tx-taneo-grant-rules-2026-1",
    "update-pol-tx-taneo-grant-rules-2026-2",
    "update-pol-tx-taneo-grant-rules-2026-3",
    "update-pol-us-advance-act-2024-1",
    "update-pol-us-advance-act-2024-2",
    "update-pol-us-ardp-award-terrapower-2020-1",
    "update-pol-us-ardp-award-xenergy-2020-1",
    "update-pol-us-doe-ardp-1",
    "update-pol-us-doe-gen3-smr-program-1",
    "update-pol-us-doe-gen3-smr-program-2",
    "update-pol-us-doe-gen3-smr-program-3",
    "update-pol-us-doe-gen3-smr-program-4",
    "update-pol-us-doe-reactor-pilot-program-1",
    "update-pol-us-doe-reactor-pilot-program-2",
    "update-pol-us-doe-reactor-pilot-program-3",
    "update-pol-us-eo-14299-1",
    "update-pol-us-eo-14299-2",
    "update-pol-us-eo-14300-1",
    "update-pol-us-eo-14300-2",
    "update-pol-us-eo-14301-1",
    "update-pol-us-eo-14301-2",
    "update-pol-us-eo-14302-1",
    "update-pol-us-eo-14302-2",
    "update-pol-us-gen3-selection-holtec-2025-1",
    "update-pol-us-gen3-selection-tva-2025-1",
    "update-pol-us-gen3-tier2-selections-2026-1",
    "update-pol-us-nrc-licensing-siting-proposed-2026-1",
    "update-pol-us-nrc-licensing-siting-proposed-2026-2",
    "update-pol-us-nrc-microreactor-proposed-2026-1",
    "update-pol-us-nrc-microreactor-proposed-2026-2",
    "update-pol-us-nrc-new-reactor-geis-2026-1",
    "update-pol-us-nrc-new-reactor-geis-2026-2",
    "update-pol-us-nrc-new-reactor-geis-2026-3",
    "update-pol-us-nrc-part-53-2026-1",
    "update-pol-us-nrc-part-53-2026-2",
    "update-pol-us-nrc-part-53-2026-3",
    "update-pol-us-nrc-smr-emergency-preparedness-2023-1",
    "update-pol-us-nrc-smr-emergency-preparedness-2023-2",
    "update-reg-acu-msrr-cp-2024-decision",
    "update-reg-bapeten-kelasa-2025-decision",
    "update-reg-clinch-cp-20260929-decision",
    "update-reg-hermes1-cp-decision",
    "update-reg-hermes2-cp-decision",
    "update-reg-longmott-cp-application",
    "update-reg-natrium-cp-decision",
    "update-reg-nb-ltps-application",
    "update-reg-opg-ltc-2025-decision",
    "update-reg-opg-lto-2026-application",
    "update-reg-pioneer-cp-lwa-application-2026-application"
   ]
  },
  {
   "date": "2026-10-04",
   "added": {
    "policies": [
     "pol-ak-ch4-sla-2022",
     "pol-ca-prc-25524-1",
     "pol-ca-prc-25524-2",
     "pol-fl-366-93",
     "pol-id-39-3027",
     "pol-id-eo-2021-02",
     "pol-id-eo-2025-06",
     "pol-ky-164-2805",
     "pol-ky-278-615",
     "pol-me-35a-4302",
     "pol-mi-hb4128-2025",
     "pol-mn-216b243-3b",
     "pol-nc-gs-166a-29",
     "pol-nc-gs-62-133-8",
     "pol-nj-pl2026-c9",
     "pol-oh-4164",
     "pol-sc-58-33-196",
     "pol-sc-blra-2007",
     "pol-va-56-585-1-14",
     "pol-va-56-585-1-15",
     "pol-wa-rcw-80-50",
     "pol-wi-act-2015-344",
     "pol-wi-act-2025-12",
     "pol-wv-sb4-2022",
     "pol-wy-ch103-2022"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-clinch-river-bwrx",
     "prj-darlington-bwrx",
     "prj-holtec-palisades",
     "prj-long-mott",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu"
    ],
    "policies": [
     "pol-in-sea423-2025",
     "pol-in-sea424-2025",
     "pol-in-smr-certificate-statute"
    ],
    "regulatory_actions": [
     "reg-longmott-cp"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-pol-ak-ch4-sla-2022-1",
    "update-pol-ak-ch4-sla-2022-2",
    "update-pol-ca-prc-25524-1-1",
    "update-pol-ca-prc-25524-2-1",
    "update-pol-fl-366-93-1",
    "update-pol-id-39-3027-1",
    "update-pol-id-eo-2021-02-1",
    "update-pol-id-eo-2025-06-1",
    "update-pol-in-sea423-2025-2",
    "update-pol-in-sea424-2025-2",
    "update-pol-in-smr-certificate-statute-2",
    "update-pol-ky-164-2805-1",
    "update-pol-ky-278-615-1",
    "update-pol-me-35a-4302-1",
    "update-pol-me-35a-4302-2",
    "update-pol-mi-hb4128-2025-1",
    "update-pol-mi-hb4128-2025-2",
    "update-pol-mn-216b243-3b-1",
    "update-pol-mn-216b243-3b-2",
    "update-pol-mn-216b243-3b-3",
    "update-pol-nc-gs-166a-29-1",
    "update-pol-nc-gs-62-133-8-1",
    "update-pol-nj-pl2026-c9-1",
    "update-pol-nj-pl2026-c9-2",
    "update-pol-oh-4164-1",
    "update-pol-sc-58-33-196-1",
    "update-pol-sc-blra-2007-1",
    "update-pol-va-56-585-1-14-1",
    "update-pol-va-56-585-1-15-1",
    "update-pol-wa-rcw-80-50-1",
    "update-pol-wi-act-2015-344-1",
    "update-pol-wi-act-2015-344-2",
    "update-pol-wi-act-2015-344-3",
    "update-pol-wi-act-2025-12-1",
    "update-pol-wi-act-2025-12-2",
    "update-pol-wi-act-2025-12-3",
    "update-pol-wv-sb4-2022-1",
    "update-pol-wv-sb4-2022-2",
    "update-pol-wy-ch103-2022-1",
    "update-pol-wy-ch103-2022-2",
    "update-pol-wy-ch103-2022-3"
   ]
  },
  {
   "date": "2026-10-05",
   "added": {
    "projects": [
     "prj-fanco-eagl1-indiana",
     "prj-ghana-voygr12",
     "prj-myanmar-ritm-smr"
    ],
    "designs": [
     "dsn-otrera-one"
    ],
    "organizations": [
     "org-nuclear-power-ghana",
     "org-regnum"
    ],
    "policies": [
     "pol-ar-act373-2025",
     "pol-ar-act707-2025",
     "pol-az-ch56-2025",
     "pol-az-eo-2025-13",
     "pol-az-sb1418-2026",
     "pol-co-ch45-2025",
     "pol-hi-xi-8",
     "pol-ia-eo17-2026",
     "pol-ia-hf2757-2026",
     "pol-id-39-3020",
     "pol-id-ipuc-37049",
     "pol-il-eo-2026-01",
     "pol-in-eo-25-48",
     "pol-ks-79-266",
     "pol-ks-nuclear-siting",
     "pol-ky-164-2803",
     "pol-ky-ch51-2025",
     "pol-la-act111-2025",
     "pol-la-act462-2025",
     "pol-la-eo-jml-25-074",
     "pol-mi-pa121-2024",
     "pol-mi-pa218-2022",
     "pol-mi-pa235-2023",
     "pol-mn-rule-7855",
     "pol-mo-393-1400",
     "pol-mo-psc-eo-2024-0056",
     "pol-mp-2-cmc-1326",
     "pol-mt-75-20-206",
     "pol-nd-hb1025-2025",
     "pol-ne-71-3505",
     "pol-nh-162-f-1",
     "pol-nj-eo-2-2026",
     "pol-nm-17-9-592",
     "pol-nv-459-910",
     "pol-ny-psc-26-e-0335",
     "pol-oh-4906-01",
     "pol-oh-4906-04",
     "pol-ok-osl491-2025",
     "pol-or-469-595",
     "pol-pa-rpa-402-1",
     "pol-pr-pc1092-2026",
     "pol-ri-39-31-5",
     "pol-ri-42-98-4",
     "pol-ri-445-ricr-1",
     "pol-sc-act41-nuclear-advisory-council",
     "pol-sd-49-41b-4",
     "pol-tn-pc530-2025",
     "pol-va-pur-2025-00085",
     "pol-vt-act52-2021",
     "pol-wy-35-11-2101"
    ],
    "regulatory_actions": [
     "reg-asnr-calogena-options-2024",
     "reg-asnr-jimmy-dac-2024",
     "reg-asnr-lfr-as-30-options-2025",
     "reg-asnr-otrera-one-options-2026",
     "reg-asnr-stellaria-alpha-2025",
     "reg-dod-pele-rod-2022",
     "reg-doe-cx-035340-mark0",
     "reg-doe-cx-271002-aalo",
     "reg-doe-cx-271007-unity",
     "reg-doe-cx-271015-ward",
     "reg-doe-marvel-fonsi-2021",
     "reg-nrc-aurora-col-2020-denied",
     "reg-nrc-belews-creek-esp-2025",
     "reg-nrc-uiuc-kronos-cp-2026"
    ]
   },
   "restored": {
    "projects": [
     "prj-standard-power-ohio",
     "prj-standard-power-pennsylvania"
    ]
   },
   "changed": {
    "projects": [
     "prj-aalo-x-inl",
     "prj-aep-joshua-falls",
     "prj-antares-mark0-inl",
     "prj-aurora-inl",
     "prj-belews-creek",
     "prj-blue-energy-victoria",
     "prj-calogena-cadarache",
     "prj-clinch-river-bwrx",
     "prj-hexana-gard-rhodanien",
     "prj-inl-marvel",
     "prj-jimmy-bazancourt",
     "prj-kerava-ldr50",
     "prj-knxt-valdemarsvik",
     "prj-last-energy-llynfi",
     "prj-last-energy-rellis",
     "prj-natura-msr-1-acu",
     "prj-pele-inl",
     "prj-radiant-kaleidos-inl",
     "prj-stellaria-alvin-cadarache",
     "prj-thorizon-zeeland",
     "prj-uiuc-kronos",
     "prj-unity-inl",
     "prj-ward-250"
    ],
    "designs": [
     "dsn-aalo-x",
     "dsn-allseas-htgr",
     "dsn-bwrx-300",
     "dsn-mark-0",
     "dsn-pwr-5",
     "dsn-smr-300",
     "dsn-unity",
     "dsn-ward-250"
    ],
    "organizations": [
     "org-deployable-energy",
     "org-standard-power",
     "org-valar"
    ],
    "policies": [
     "pol-ak-ch4-sla-2022",
     "pol-id-39-3027",
     "pol-ky-164-2805",
     "pol-ky-278-615",
     "pol-oh-4164",
     "pol-wy-ch103-2022"
    ],
    "regulatory_actions": [
     "reg-clinch-cp-20260929",
     "reg-rr-gda"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-pol-ar-act373-2025-1",
    "update-pol-ar-act373-2025-2",
    "update-pol-ar-act707-2025-1",
    "update-pol-ar-act707-2025-2",
    "update-pol-az-ch56-2025-1",
    "update-pol-az-eo-2025-13-1",
    "update-pol-az-sb1418-2026-1",
    "update-pol-co-ch45-2025-1",
    "update-pol-co-ch45-2025-2",
    "update-pol-hi-xi-8-1",
    "update-pol-ia-eo17-2026-1",
    "update-pol-ia-hf2757-2026-1",
    "update-pol-id-39-3020-1",
    "update-pol-id-ipuc-37049-1",
    "update-pol-il-eo-2026-01-1",
    "update-pol-in-eo-25-48-1",
    "update-pol-ks-79-266-1",
    "update-pol-ks-nuclear-siting-1",
    "update-pol-ky-164-2803-1",
    "update-pol-ky-164-2805-2",
    "update-pol-ky-278-615-2",
    "update-pol-ky-ch51-2025-1",
    "update-pol-la-act111-2025-1",
    "update-pol-la-act462-2025-1",
    "update-pol-la-eo-jml-25-074-1",
    "update-pol-mi-pa121-2024-1",
    "update-pol-mi-pa121-2024-2",
    "update-pol-mi-pa218-2022-1",
    "update-pol-mi-pa235-2023-1",
    "update-pol-mi-pa235-2023-2",
    "update-pol-mn-rule-7855-1",
    "update-pol-mo-393-1400-1",
    "update-pol-mo-psc-eo-2024-0056-1",
    "update-pol-mo-psc-eo-2024-0056-2",
    "update-pol-mp-2-cmc-1326-1",
    "update-pol-mt-75-20-206-1",
    "update-pol-nd-hb1025-2025-1",
    "update-pol-ne-71-3505-1",
    "update-pol-nh-162-f-1-1",
    "update-pol-nj-eo-2-2026-1",
    "update-pol-nm-17-9-592-1",
    "update-pol-nv-459-910-1",
    "update-pol-ny-psc-26-e-0335-1",
    "update-pol-oh-4906-01-1",
    "update-pol-oh-4906-04-1",
    "update-pol-ok-osl491-2025-1",
    "update-pol-or-469-595-1",
    "update-pol-pa-rpa-402-1-1",
    "update-pol-pr-pc1092-2026-1",
    "update-pol-pr-pc1092-2026-2",
    "update-pol-ri-39-31-5-1",
    "update-pol-ri-42-98-4-1",
    "update-pol-ri-445-ricr-1-1",
    "update-pol-sc-act41-nuclear-advisory-council-1",
    "update-pol-sc-act41-nuclear-advisory-council-2",
    "update-pol-sd-49-41b-4-1",
    "update-pol-tn-pc530-2025-1",
    "update-pol-tn-pc530-2025-2",
    "update-pol-va-pur-2025-00085-1",
    "update-pol-vt-act52-2021-1",
    "update-pol-vt-act52-2021-2",
    "update-pol-wy-35-11-2101-1",
    "update-reg-asnr-calogena-options-2024-application",
    "update-reg-asnr-jimmy-dac-2024-application",
    "update-reg-asnr-lfr-as-30-options-2025-application",
    "update-reg-asnr-otrera-one-options-2026-application",
    "update-reg-asnr-stellaria-alpha-2025-application",
    "update-reg-dod-pele-rod-2022-decision",
    "update-reg-doe-cx-035340-mark0-decision",
    "update-reg-doe-cx-271002-aalo-decision",
    "update-reg-doe-cx-271007-unity-decision",
    "update-reg-doe-cx-271015-ward-decision",
    "update-reg-doe-marvel-fonsi-2021-decision",
    "update-reg-nrc-aurora-col-2020-denied-application",
    "update-reg-nrc-aurora-col-2020-denied-decision",
    "update-reg-nrc-belews-creek-esp-2025-application",
    "update-reg-nrc-uiuc-kronos-cp-2026-application"
   ]
  },
  {
   "date": "2026-10-06",
   "added": {
    "projects": [
     "prj-haiyang-integrated-small-reactor",
     "prj-huakun-one-taipingling",
     "prj-shenyang-nhr200-2001",
     "prj-sinap-minqin-smtmsr",
     "prj-yantai-nhr200-desalination-2003"
    ],
    "designs": [
     "dsn-arc-generator",
     "dsn-harpia",
     "dsn-huakun-one",
     "dsn-nugen-engine",
     "dsn-sinap-smtmsr-10mwe"
    ],
    "organizations": [
     "org-alpha-tech-research",
     "org-cgn-ocean-energy",
     "org-nugen-llc",
     "org-rosenergoatom",
     "org-shandong-nuclear-power",
     "org-spic-nuclear-energy",
     "org-terminus-rd-energy"
    ],
    "regulatory_actions": [
     "reg-haiyang-small-reactor-siting-opinion-2024"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-atucha-new-smr",
     "prj-baimsky-floating",
     "prj-barc-vizag-htgcr",
     "prj-carem25",
     "prj-chukotka-sovinoe-shelf-m",
     "prj-daegu-gunwi-ismr",
     "prj-daqing-nhr200",
     "prj-fermi-estonia",
     "prj-gijang-smr",
     "prj-holtec-palisades",
     "prj-httr-oarai",
     "prj-knxt-valdemarsvik",
     "prj-linglong-one",
     "prj-myanmar-ritm-smr",
     "prj-necsa-pelindaba-smr-demo",
     "prj-newcleo-veron-lfr-as-30",
     "prj-nuscale-romania",
     "prj-prodigy-belledune",
     "prj-psi-copenhagen-atomics",
     "prj-ritm-jizzakh",
     "prj-rr-wylfa",
     "prj-studsvik-nykoping",
     "prj-tarapur-bsmr-200",
     "prj-tarapur-smr-55",
     "prj-thorcon-kelasa",
     "prj-ward-250",
     "prj-west-kalimantan-land-smr",
     "prj-west-kalimantan-ritm-floating",
     "prj-yakutia-ritm"
    ],
    "designs": [
     "dsn-banr",
     "dsn-bsmr-200",
     "dsn-catalogue-flex",
     "dsn-catalogue-thorizon-one",
     "dsn-evinci"
    ],
    "regulatory_actions": [
     "reg-pioneer-cp-lwa-application-2026"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-barc-vizag-htgcr",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-daegu-gunwi-ismr",
     "from": "announced",
     "to": "deferred"
    },
    {
     "id": "prj-tarapur-bsmr-200",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-tarapur-smr-55",
     "from": "announced",
     "to": "siting"
    }
   ],
   "new_updates": [
    "update-evt-aalo-x-criticality",
    "update-evt-aalo-x-dsa-2026",
    "update-evt-army-pele-fuel-report-20251203",
    "update-evt-aurora-nrc-feedback-20260605",
    "update-evt-aurora-pdsa",
    "update-evt-belews-esp-docketed-2026",
    "update-evt-belews-esp-eis-scoping-2026",
    "update-evt-belews-esp-hearing-2026",
    "update-evt-blue-energy-cpa-letter-20260915",
    "update-evt-blue-energy-cpa-statement-2026",
    "update-evt-cfpp-cancel",
    "update-evt-clinch-cp-20260929",
    "update-evt-fanco-indiana-park-2025",
    "update-evt-ghana-voygr12-agreement",
    "update-evt-ghana-voygr12-npg-2025",
    "update-evt-hermes2-groundbreak",
    "update-evt-htrpm-cod",
    "update-evt-imsr-rellis-lease",
    "update-evt-jimmy-dac-update-20260723",
    "update-evt-last-energy-pdsa-statement-2026",
    "update-evt-longmott-fonsi",
    "update-evt-mark0-criticality",
    "update-evt-mark0-dsa-2026",
    "update-evt-marvel-assembly-target-2026",
    "update-evt-marvel-criticality-target-2027",
    "update-evt-marvel-full-power-target-2028",
    "update-evt-marvel-process-heat-estimate-2029",
    "update-evt-next-doicesti-conditions",
    "update-evt-next-doicesti-fid",
    "update-evt-next-letart",
    "update-evt-next-wylfa-contract",
    "update-evt-oklo-sodi-option",
    "update-evt-parent-aep-joshua-falls",
    "update-evt-parent-aep-rockport",
    "update-evt-parent-ap300-teesside",
    "update-evt-parent-barc-vizag-htgcr",
    "update-evt-parent-holtec-blue-castle",
    "update-evt-parent-holtec-oyster-creek",
    "update-evt-parent-last-energy-haskell",
    "update-evt-parent-last-energy-llynfi",
    "update-evt-parent-last-energy-london-gateway",
    "update-evt-parent-osge-dabrowa-gornicza",
    "update-evt-parent-osge-nowa-huta",
    "update-evt-parent-osge-ostroleka",
    "update-evt-parent-prodigy-belledune",
    "update-evt-parent-radiant-buckley",
    "update-evt-parent-rr-detmarovice",
    "update-evt-parent-rr-tusimice",
    "update-evt-parent-sealer-norrsundet",
    "update-evt-parent-sealer-untra",
    "update-evt-parent-taftoy-smr",
    "update-evt-parent-tarapur-bsmr-200",
    "update-evt-parent-tarapur-smr-55",
    "update-evt-pele-fuel-delivery-2025",
    "update-evt-radiant-dome-campaign-2026",
    "update-evt-radiant-dome-selection-2025",
    "update-evt-rellis-2025-02-04",
    "update-evt-ssm-malma-opinion-20260603",
    "update-evt-standard-power-ohio-2023",
    "update-evt-standard-power-pennsylvania-2023",
    "update-evt-stellaria-alpha-seized-20251222",
    "update-evt-uiuc-kronos-acceptance-2026",
    "update-evt-uiuc-kronos-draft-ea-target",
    "update-evt-uiuc-kronos-draft-se-target",
    "update-evt-uiuc-kronos-final-ea-target",
    "update-evt-uiuc-kronos-final-se-target",
    "update-evt-uiuc-kronos-schedule-2026",
    "update-evt-unity-criticality",
    "update-evt-unity-dsa-2026",
    "update-evt-ward250-criticality",
    "update-evt-ward250-dsa-2026",
    "update-evt-ward250-full-power-2026",
    "update-evt-wc-atucha-tender-authorised-2026",
    "update-evt-wc-belledune-banr-selected-2026",
    "update-evt-wc-daegu-bid-lapsed-2026",
    "update-evt-wc-doicesti-gms-2026",
    "update-evt-wc-haiyang-siting-opinion-2024",
    "update-evt-wc-huakun-eia-accepted-2025",
    "update-evt-wc-myanmar-implementation-2026",
    "update-evt-wc-pioneer-psar-2026",
    "update-evt-wc-shenyang-nhr200-approval-2001",
    "update-evt-wc-sinap-smtmsr-eia-2026",
    "update-evt-wc-studsvik-partners-2026",
    "update-evt-wc-tarapur-aec-site-2026",
    "update-evt-wc-veron-debate-report-2026",
    "update-evt-wc-vizag-siting-consent-2026",
    "update-evt-wc-yantai-nhr200-approval-2003",
    "update-reg-haiyang-small-reactor-siting-opinion-2024-decision"
   ]
  },
  {
   "date": "2026-10-07",
   "added": {
    "policies": [
     "pol-hr-nuclear-development-law-2026"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aurora-inl",
     "prj-oklo-eielson",
     "prj-ward-250"
    ],
    "designs": [
     "dsn-aurora",
     "dsn-ward-250"
    ],
    "organizations": [
     "org-oklo"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-pol-hr-nuclear-development-law-2026-1",
    "update-pol-hr-nuclear-development-law-2026-2",
    "update-pol-hr-nuclear-development-law-2026-3",
    "update-pol-hr-nuclear-development-law-2026-4"
   ]
  },
  {
   "date": "2026-10-08",
   "added": {
    "projects": [
     "prj-gs-energy-uljin"
    ],
    "designs": [
     "dsn-atgor",
     "dsn-deer",
     "dsn-grem",
     "dsn-jereh-micro-reactor",
     "dsn-rapid-l",
     "dsn-vityaz"
    ],
    "organizations": [
     "org-appalachian-power"
    ],
    "regulatory_actions": [
     "reg-cncan-doicesti-siting-application",
     "reg-doe-aurora-nepa-20260720",
     "reg-doe-pwr5-phase1-nepa-20260930",
     "reg-longmott-ea-fonsi-2026"
    ],
    "events": [
     "evt-aalo-x-criticality",
     "evt-aalo-x-dsa-2026",
     "evt-army-pele-fuel-report-20251203",
     "evt-aurora-nepa-20260720",
     "evt-aurora-nrc-feedback-20260605",
     "evt-aurora-pdsa",
     "evt-bapeten-kelasa",
     "evt-belews-esp-docketed-2026",
     "evt-belews-esp-eis-scoping-2026",
     "evt-belews-esp-hearing-2026",
     "evt-blue-energy-cpa-letter-20260915",
     "evt-blue-energy-cpa-statement-2026",
     "evt-cfpp-cancel",
     "evt-clinch-cp-20260929",
     "evt-darlington-ltc",
     "evt-darlington-lto-app",
     "evt-fanco-indiana-park-2025",
     "evt-ghana-voygr12-agreement",
     "evt-ghana-voygr12-npg-2025",
     "evt-hermes2-groundbreak",
     "evt-htrpm-cod",
     "evt-imsr-rellis-lease",
     "evt-jimmy-dac-update-20260723",
     "evt-last-energy-pdsa-statement-2026",
     "evt-longmott-fonsi",
     "evt-mark0-criticality",
     "evt-mark0-dsa-2026",
     "evt-marvel-assembly-target-2026",
     "evt-marvel-criticality-target-2027",
     "evt-marvel-full-power-target-2028",
     "evt-marvel-process-heat-estimate-2029",
     "evt-natrium-cp",
     "evt-next-doicesti-conditions",
     "evt-next-doicesti-fid",
     "evt-next-letart",
     "evt-next-wylfa-contract",
     "evt-oklo-sodi-option",
     "evt-parent-aep-joshua-falls",
     "evt-parent-aep-rockport",
     "evt-parent-ap300-teesside",
     "evt-parent-barc-vizag-htgcr",
     "evt-parent-belews-creek",
     "evt-parent-holtec-blue-castle",
     "evt-parent-holtec-oyster-creek",
     "evt-parent-last-energy-haskell",
     "evt-parent-last-energy-llynfi",
     "evt-parent-last-energy-london-gateway",
     "evt-parent-osge-dabrowa-gornicza",
     "evt-parent-osge-nowa-huta",
     "evt-parent-osge-ostroleka",
     "evt-parent-prodigy-belledune",
     "evt-parent-radiant-buckley",
     "evt-parent-rr-detmarovice",
     "evt-parent-rr-tusimice",
     "evt-parent-sealer-norrsundet",
     "evt-parent-sealer-untra",
     "evt-parent-taftoy-smr",
     "evt-parent-tarapur-bsmr-200",
     "evt-parent-tarapur-smr-55",
     "evt-pele-fuel-delivery-2025",
     "evt-pwr5-dsa-announcement-20261007",
     "evt-pwr5-nepa-20260930",
     "evt-radiant-dome-campaign-2026",
     "evt-radiant-dome-selection-2025",
     "evt-rellis-2025-02-04",
     "evt-ssm-malma-opinion-20260603",
     "evt-standard-power-ohio-2023",
     "evt-standard-power-pennsylvania-2023",
     "evt-stellaria-alpha-seized-20251222",
     "evt-uiuc-kronos-acceptance-2026",
     "evt-uiuc-kronos-draft-ea-target",
     "evt-uiuc-kronos-draft-se-target",
     "evt-uiuc-kronos-final-ea-target",
     "evt-uiuc-kronos-final-se-target",
     "evt-uiuc-kronos-schedule-2026",
     "evt-unity-criticality",
     "evt-unity-dsa-2026",
     "evt-ward250-criticality",
     "evt-ward250-dsa-2026",
     "evt-ward250-full-power-2026",
     "evt-wc-atucha-tender-authorised-2026",
     "evt-wc-belledune-banr-selected-2026",
     "evt-wc-daegu-bid-lapsed-2026",
     "evt-wc-doicesti-gms-2026",
     "evt-wc-haiyang-siting-opinion-2024",
     "evt-wc-huakun-eia-accepted-2025",
     "evt-wc-myanmar-implementation-2026",
     "evt-wc-pioneer-psar-2026",
     "evt-wc-shenyang-nhr200-approval-2001",
     "evt-wc-sinap-smtmsr-eia-2026",
     "evt-wc-studsvik-partners-2026",
     "evt-wc-tarapur-aec-site-2026",
     "evt-wc-veron-debate-report-2026",
     "evt-wc-vizag-siting-consent-2026",
     "evt-wc-yantai-nhr200-approval-2003"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-idaho-falls-erp",
     "prj-aep-joshua-falls",
     "prj-aurora-inl",
     "prj-last-energy-llynfi",
     "prj-last-energy-rellis",
     "prj-long-mott",
     "prj-nuscale-romania",
     "prj-uiuc-kronos",
     "prj-ward-250"
    ],
    "designs": [
     "dsn-ap300",
     "dsn-aris-amr",
     "dsn-aris-htr-10",
     "dsn-aris-marvel",
     "dsn-aris-prismatic-htr",
     "dsn-cap200",
     "dsn-catalogue-httr",
     "dsn-catalogue-ldr-50",
     "dsn-evinci",
     "dsn-kronos-mmr",
     "dsn-msr-1",
     "dsn-pwr-5",
     "dsn-rapid",
     "dsn-sinap-smtmsr-10mwe"
    ],
    "regulatory_actions": [
     "reg-longmott-cp"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-last-energy-llynfi",
     "from": "licensing",
     "to": "siting"
    },
    {
     "id": "prj-last-energy-rellis",
     "from": "licensing",
     "to": "construction"
    },
    {
     "id": "prj-nuscale-romania",
     "from": "siting",
     "to": "licensing"
    },
    {
     "id": "prj-ward-250",
     "from": "commissioning",
     "to": "operating"
    }
   ],
   "new_updates": [
    "update-evt-aurora-nepa-20260720",
    "update-evt-bapeten-kelasa",
    "update-evt-darlington-ltc",
    "update-evt-darlington-lto-app",
    "update-evt-natrium-cp",
    "update-evt-parent-belews-creek",
    "update-evt-pwr5-dsa-announcement-20261007",
    "update-evt-pwr5-nepa-20260930",
    "update-reg-doe-aurora-nepa-20260720-decision",
    "update-reg-doe-pwr5-phase1-nepa-20260930-decision",
    "update-reg-longmott-ea-fonsi-2026-decision"
   ]
  },
  {
   "date": "2026-10-09",
   "added": {
    "designs": [
     "dsn-aalo-1",
     "dsn-apollo-a-10",
     "dsn-elyon-5",
     "dsn-reploy-sps"
    ],
    "organizations": [
     "org-apollo-atomics",
     "org-ee-capital",
     "org-holtec-palisades",
     "org-holtec-smr-llc",
     "org-hyundai-ec",
     "org-palisades-energy",
     "org-palisades-smr",
     "org-reploy"
    ],
    "policies": [
     "pol-ca-ita-127-45-small-nuclear-itc",
     "pol-ca-physical-activities-regs-item-27"
    ],
    "regulatory_actions": [
     "reg-nrc-blue-energy-cp-lwa-part1-2026",
     "reg-pioneer-excavation-ea-fonsi-2026",
     "reg-pioneer-excavation-walls-exemption-2026"
    ],
    "events": [
     "evt-darlington-physical-start-20260422",
     "evt-egino-wind-down-statement-20251203",
     "evt-marvel-fdsa-approval-20261006",
     "evt-marvel-pdsa-approval-20260311",
     "evt-pioneer-advanced-ser-target-20270131",
     "evt-pioneer-draft-eis-target-20261031",
     "evt-pioneer-excavation-walls-exemption-2026",
     "evt-pioneer-final-eis-target-20270331",
     "evt-pioneer-final-ser-target-20270331",
     "evt-radiant-kaleidos-dark-statement-20260209"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-idaho-falls-erp",
     "prj-aalo-rellis",
     "prj-aep-joshua-falls",
     "prj-blue-energy-victoria",
     "prj-bluecore-long-beach",
     "prj-darlington-bwrx",
     "prj-elementl-letart",
     "prj-fanco-eagl1-indiana",
     "prj-holtec-palisades",
     "prj-imsr-rellis",
     "prj-inl-marvel",
     "prj-jimmy-bazancourt",
     "prj-kairos-rellis",
     "prj-last-energy-haskell",
     "prj-natura-rellis",
     "prj-radiant-kaleidos-inl",
     "prj-trawsfynydd-egino"
    ],
    "designs": [
     "dsn-aris-marvel",
     "dsn-catalogue-flex",
     "dsn-jimmy-heat",
     "dsn-kaleidos"
    ],
    "organizations": [
     "org-aalo",
     "org-blue-energy",
     "org-bwxt",
     "org-cwmni-egino",
     "org-holtec",
     "org-nano-nuclear",
     "org-xenergy"
    ],
    "regulatory_actions": [
     "reg-asnr-jimmy-dac-2024"
    ],
    "events": [
     "evt-marvel-criticality-target-2027",
     "evt-parent-last-energy-haskell",
     "evt-wc-pioneer-psar-2026"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-aalo-rellis",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-aep-joshua-falls",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-bluecore-long-beach",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-elementl-letart",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-kairos-rellis",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-last-energy-haskell",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-natura-rellis",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-trawsfynydd-egino",
     "from": "announced",
     "to": "deferred"
    }
   ],
   "new_updates": [
    "update-evt-darlington-physical-start-20260422",
    "update-evt-egino-wind-down-statement-20251203",
    "update-evt-marvel-fdsa-approval-20261006",
    "update-evt-marvel-pdsa-approval-20260311",
    "update-evt-pioneer-advanced-ser-target-20270131",
    "update-evt-pioneer-draft-eis-target-20261031",
    "update-evt-pioneer-excavation-walls-exemption-2026",
    "update-evt-pioneer-final-eis-target-20270331",
    "update-evt-pioneer-final-ser-target-20270331",
    "update-evt-radiant-kaleidos-dark-statement-20260209",
    "update-pol-ca-ita-127-45-small-nuclear-itc-1",
    "update-pol-ca-ita-127-45-small-nuclear-itc-2",
    "update-pol-ca-physical-activities-regs-item-27-1",
    "update-pol-ca-physical-activities-regs-item-27-2",
    "update-reg-nrc-blue-energy-cp-lwa-part1-2026-application",
    "update-reg-pioneer-excavation-ea-fonsi-2026-decision",
    "update-reg-pioneer-excavation-walls-exemption-2026-decision"
   ]
  },
  {
   "date": "2026-10-10",
   "added": {
    "organizations": [
     "org-hainan-nuclear-power",
     "org-indiana-michigan-power",
     "org-long-mott-energy",
     "org-meta-platforms",
     "org-skhk",
     "org-us-sfr-owner"
    ],
    "regulatory_actions": [
     "reg-nnsa-xuwei-htgr-design-criteria-2026",
     "reg-nnsa-xuwei-u3-cl-review-2025",
     "reg-nrc-us460-sda-2025",
     "reg-se-gov-approval-malma-2026",
     "reg-se-gov-approval-norrsundet-2026",
     "reg-se-gov-approval-studsvik-2026",
     "reg-se-gov-approval-untra-2026"
    ],
    "events": [
     "evt-se-videberg-state-aid-application-2025",
     "evt-se-videberg-state-stake-2026"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aep-rockport",
     "prj-anpi-jbsa-antares",
     "prj-anpi-malmstrom-evinci",
     "prj-arc100-lepreau",
     "prj-brest-od-300",
     "prj-carem25",
     "prj-darlington-bwrx",
     "prj-elementl-letart",
     "prj-hermes-2",
     "prj-htr-pm-shidaowan",
     "prj-janus-fort-benning-kaleidos",
     "prj-janus-fort-bragg-antares",
     "prj-janus-fort-campbell-banr",
     "prj-janus-fort-drum-evinci",
     "prj-janus-fort-hood-ga-tes",
     "prj-knxt-valdemarsvik",
     "prj-linglong-one",
     "prj-lomonosov",
     "prj-long-mott",
     "prj-natrium-kemmerer",
     "prj-navy-crane-microreactor",
     "prj-oklo-ohio",
     "prj-pele-inl",
     "prj-radiant-buckley",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-studsvik-nykoping",
     "prj-uiuc-kronos",
     "prj-videberg-varo-rr-smr",
     "prj-xuwei-htgr-unit3"
    ],
    "designs": [
     "dsn-acp100",
     "dsn-brest-od-300",
     "dsn-carem25",
     "dsn-hermes",
     "dsn-htr-pm",
     "dsn-klt40s",
     "dsn-voygr"
    ],
    "organizations": [
     "org-appalachian-power",
     "org-rosenergoatom",
     "org-terrapower",
     "org-uiuc"
    ],
    "regulatory_actions": [
     "reg-nrc-uiuc-kronos-cp-2026",
     "reg-opg-ltc-2025"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-se-videberg-state-aid-application-2025",
    "update-evt-se-videberg-state-stake-2026",
    "update-reg-nnsa-xuwei-htgr-design-criteria-2026-decision",
    "update-reg-nrc-us460-sda-2025-decision",
    "update-reg-se-gov-approval-malma-2026-application",
    "update-reg-se-gov-approval-norrsundet-2026-application",
    "update-reg-se-gov-approval-studsvik-2026-application",
    "update-reg-se-gov-approval-untra-2026-application"
   ]
  },
  {
   "date": "2026-10-11",
   "added": {
    "events": [
     "evt-letart-unit1-construction-target",
     "evt-longmott-cli-26-10",
     "evt-longmott-final-se-target"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-elementl-letart",
     "prj-fanco-eagl1-indiana",
     "prj-long-mott"
    ],
    "designs": [
     "dsn-eagl-1"
    ],
    "organizations": [
     "org-fanco"
    ],
    "regulatory_actions": [
     "reg-longmott-cp"
    ],
    "events": [
     "evt-fanco-indiana-park-2025"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-letart-unit1-construction-target",
    "update-evt-longmott-cli-26-10",
    "update-evt-longmott-final-se-target"
   ]
  },
  {
   "date": "2026-10-13",
   "added": {
    "projects": [
     "prj-elena-am-pilot",
     "prj-formosa-carem-commercial",
     "prj-huizhou-huapeng-one",
     "prj-kaliningrad-floating-smr-proposal",
     "prj-liaoyuan-dhr400",
     "prj-meta-terrapower-initial",
     "prj-ucri-ien",
     "prj-unity-hornbeck-maritime",
     "prj-valar-carbon-county-campus"
    ],
    "designs": [
     "dsn-ahwr-300",
     "dsn-alfred",
     "dsn-allegro",
     "dsn-alvin",
     "dsn-balder",
     "dsn-barc-chtr",
     "dsn-clear-m10",
     "dsn-cr-100",
     "dsn-daratha-microreactor",
     "dsn-david-smr",
     "dsn-df-cde",
     "dsn-dhr400",
     "dsn-electra-forte",
     "dsn-elena-am",
     "dsn-forge-ember",
     "dsn-huapeng-one",
     "dsn-kaist-atom",
     "dsn-kaist-mmr",
     "dsn-mhi-multipurpose-microreactor",
     "dsn-myrrha-battery-smr-2014",
     "dsn-pascar",
     "dsn-pearl",
     "dsn-pgsfr",
     "dsn-thorizon-pioneer",
     "dsn-tmsr-lf1",
     "dsn-uranus-40",
     "dsn-vber-150",
     "dsn-vver-300-v478",
     "dsn-vver-i",
     "dsn-zap-zmr",
     "dsn-ziacore"
    ],
    "organizations": [
     "org-bam-energy",
     "org-cnnc-sueneng-nuclear-power",
     "org-daratha-atomics",
     "org-diamante-energia",
     "org-forge-atomics",
     "org-ien",
     "org-inest-fds",
     "org-kaist",
     "org-los-alamos-national-laboratory",
     "org-mitsubishi-heavy-industries",
     "org-okb-gidropress",
     "org-snu-nutreck",
     "org-witkowitz-atomica",
     "org-zap-energy"
    ],
    "regulatory_actions": [
     "reg-ansn-ucri-request-2025",
     "reg-nnsa-tmsr-lf1-operating-2023"
    ],
    "events": [
     "evt-alfred-roadmap-2031",
     "evt-alfred-roadmap-2032",
     "evt-alfred-roadmap-2036",
     "evt-alfred-roadmap-2037",
     "evt-alvin-criticality-target-2030",
     "evt-balder-earliest-tests-2028",
     "evt-deep-fission-parsons-target-2027",
     "evt-isu-art-site-20260916",
     "evt-radiant-dome-completion-report-20260930",
     "evt-starcore-first-power-target-2030",
     "evt-unity-dome-selection-20260930",
     "evt-unity-dome-target-2027",
     "evt-xuwei-preconstruction-inspection-20261009",
     "evt-yakutia-environment-announcement-2024",
     "evt-yakutia-hearings-reported-2026",
     "evt-yakutia-operation-target-2031"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-alfred-mioveni",
     "prj-deep-fission-parsons",
     "prj-dual-fluid-rwanda",
     "prj-isu-nucube-art",
     "prj-nano-digihost-north-tonawanda",
     "prj-prodigy-belledune",
     "prj-psi-copenhagen-atomics",
     "prj-radiant-kaleidos-inl",
     "prj-starcore-pinawa",
     "prj-stellaria-alvin-cadarache",
     "prj-thorizon-pioneer-petten",
     "prj-thorizon-zeeland",
     "prj-tmsr-lf1-wuwei",
     "prj-unity-dome-2027",
     "prj-xuwei-htgr-unit3",
     "prj-yakutia-ritm"
    ],
    "designs": [
     "dsn-catalogue-energy-well",
     "dsn-catalogue-salus-100",
     "dsn-catalogue-thorizon-one",
     "dsn-smr-300",
     "dsn-starcore",
     "dsn-unity"
    ],
    "organizations": [
     "org-catalogue-csmc",
     "org-psi",
     "org-raten",
     "org-sinap"
    ],
    "regulatory_actions": [
     "reg-nnsa-xuwei-htgr-design-criteria-2026",
     "reg-nnsa-xuwei-u3-cl-review-2025"
    ],
    "events": [
     "evt-wc-belledune-banr-selected-2026"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-psi-copenhagen-atomics",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-unity-dome-2027",
     "from": "announced",
     "to": "siting"
    }
   ],
   "new_updates": [
    "update-evt-alfred-roadmap-2031",
    "update-evt-alfred-roadmap-2032",
    "update-evt-alfred-roadmap-2036",
    "update-evt-alfred-roadmap-2037",
    "update-evt-alvin-criticality-target-2030",
    "update-evt-balder-earliest-tests-2028",
    "update-evt-deep-fission-parsons-target-2027",
    "update-evt-isu-art-site-20260916",
    "update-evt-radiant-dome-completion-report-20260930",
    "update-evt-starcore-first-power-target-2030",
    "update-evt-unity-dome-selection-20260930",
    "update-evt-unity-dome-target-2027",
    "update-evt-xuwei-preconstruction-inspection-20261009",
    "update-evt-yakutia-environment-announcement-2024",
    "update-evt-yakutia-hearings-reported-2026",
    "update-evt-yakutia-operation-target-2031",
    "update-reg-ansn-ucri-request-2025-application",
    "update-reg-nnsa-tmsr-lf1-operating-2023-decision"
   ]
  },
  {
   "date": "2026-10-14",
   "added": {
    "projects": [
     "prj-cnnc-floating-demo-2016",
     "prj-last-energy-ksse-first",
     "prj-src-initial-evinci"
    ],
    "designs": [
     "dsn-megalvin",
     "dsn-rolls-royce-amr"
    ],
    "organizations": [
     "org-rolls-royce-plc"
    ],
    "programmes": [
     "prg-ae-enec-adnoc-smr-assessment",
     "prg-ae-enec-advance-programme",
     "prg-ae-nano-ehc-kronos-mou",
     "prg-am-smr-replacement-unit",
     "prg-bg-beh-fluor-nuscale-mou",
     "prg-bg-blue-bird-sge-bwrx300-jv-loi",
     "prg-bg-nuscale-kozloduy-mou",
     "prg-bg-ustda-beh-smr-prefeasibility-grant",
     "prg-bh-bapco-smr-study",
     "prg-bo-aben-smr-implementation-study",
     "prg-br-cdpnb-smr-technical-group",
     "prg-br-diamante-jorge-lacerda-smr-evaluation",
     "prg-br-government-rosatom-smr-cooperation",
     "prg-br-nuclep-rosatom-mou",
     "prg-ca-capital-power-opg-alberta-smr",
     "prg-ca-dnd-aecl-northern-microreactor-feasibility",
     "prg-ca-kaeri-aecl-smart-mou",
     "prg-ca-kr-us-khnp-arc-nb-power-arc100-fleet",
     "prg-ca-mcmaster-usnc-mmr-feasibility",
     "prg-ca-nova-scotia-ontario-smr-mou",
     "prg-ca-nuclear-energy-strategy-2026",
     "prg-ca-nucleon-arc-nuarc-alberta",
     "prg-ca-opg-xenergy-xe100-industrial-framework",
     "prg-ca-prodigy-des-nedhe-tnpp-mou",
     "prg-ca-src-microreactor-demonstration",
     "prg-ca-us-opg-nypa-advanced-nuclear-mou",
     "prg-ca-xenergy-alberta-xe100-feasibility",
     "prg-cn-cgn-tsinghua-nhr200ii-heating-demonstration",
     "prg-cn-cnnc-acp100s-floating-demonstration",
     "prg-cn-guizhou-small-reactor-demonstration",
     "prg-cn-htgr-industrial-chain-alliance",
     "prg-cn-sinap-thorium-msr-prototype",
     "prg-co-eje-cafetero-smr-viability-study",
     "prg-co-minenergia-iaea-mou",
     "prg-cz-mpo-cez-rolls-royce-additional-sites-mou",
     "prg-dk-smr-analysis",
     "prg-dz-iaea-joint-statement-smr",
     "prg-ec-nuclear-plan-modular-reactor",
     "prg-eu-sge-gev-hitachi-samsung-bwrx300-europe",
     "prg-fi-alva-steady-energy-jyvaskyla-prestudy",
     "prg-fi-se-fortum-gevh-bwrx300-early-works",
     "prg-fi-tem-afry-nuclear-promotion-study",
     "prg-fr-ppe3-first-smr-target",
     "prg-fr-stellaria-equinix-preorder",
     "prg-gb-advanced-nuclear-framework",
     "prg-gb-gbe-n-scotland-siting-study",
     "prg-gb-sge-bwrx300-fleet",
     "prg-gb-terrapower-kbr-natrium-uk-siting",
     "prg-gb-ulc-energy-chiltern-vital-smr-clusters",
     "prg-gn-rosatom-floating-npp-mou",
     "prg-gr-fnpp-joint-development-program-study",
     "prg-gr-inter-ministerial-committee-smr",
     "prg-hr-nuclear-working-group-smr-siting",
     "prg-hu-hunatom-rolls-royce-smr-mou",
     "prg-hu-hunatom-sge-bwrx300-loi",
     "prg-hu-mvm-holtec-smr300-mou",
     "prg-hu-us-funded-smr-feed-study",
     "prg-hu-us-hungary-nuclear-mou-2025",
     "prg-id-brin-peluit40-pln-nusantara",
     "prg-id-national-nuclear-programme-ruptl",
     "prg-id-pertamina-nre-saltfoss-cmsr",
     "prg-id-west-kalimantan-smr-feasibility-study",
     "prg-in-ru-rosatom-india-fnpp-working-group",
     "prg-iq-smr-consideration-russia-talks",
     "prg-ir-aeoi-rosatom-small-npp-mou",
     "prg-it-edf-nuward-edison-italy",
     "prg-jm-nuclear-smr-assessment",
     "prg-jo-jaec-khnp-ismr-feasibility-mou",
     "prg-jo-jaec-smr-programme",
     "prg-jo-jaec-xenergy-xe100-mou",
     "prg-jp-htgr-demonstration-reactor",
     "prg-jp-meti-small-lwr-development",
     "prg-ke-nupea-first-npp-programme",
     "prg-kg-rosatom-small-npp",
     "prg-kr-busan-smr-special-zone",
     "prg-kr-kaeri-kocia-htgr-mou",
     "prg-kr-nano-ds-danseok-mmr-mou",
     "prg-kr-nssc-smr-pre-review",
     "prg-kr-terrapower-sk-innovation-natrium-term-sheet",
     "prg-kw-kisr-smr-assessment",
     "prg-lk-national-nuclear-programme",
     "prg-lt-inpp-newcleo-feasibility-mou",
     "prg-lt-sge-altra-gvh-bwrx300-mou",
     "prg-lv-nuclear-informative-report",
     "prg-mn-small-npp-rosatom-talks",
     "prg-mx-inin-smr-studies-2026-2030",
     "prg-ng-national-nuclear-programme-smr",
     "prg-nl-gelderland-smr-location-study",
     "prg-nl-hexana-atoomcooperatie-mou",
     "prg-nl-opmeer-smr-feasibility",
     "prg-nl-overijssel-smr-siting-study",
     "prg-nl-ulc-energy-rolls-royce-smr",
     "prg-no-aecon-norsk-kjernekraft-bwrx300",
     "prg-no-norsk-kjernekraft-hexana-mou",
     "prg-no-norsk-kjernekraft-saltfoss-loi",
     "prg-no-nuclear-commission-nou-2026-4",
     "prg-ph-doe-khnp-smart-prefeasibility-ceza",
     "prg-ph-doe-rosatom-smr-cooperation",
     "prg-ph-meralco-usnc-mmr-prefeasibility",
     "prg-ph-mgen-ustda-smr-feasibility-study",
     "prg-ph-national-nuclear-programme",
     "prg-ph-stgr20-letter-of-intent",
     "prg-pl-enea-last-energy-loi",
     "prg-pl-kghm-smr-programme",
     "prg-pl-last-energy-ksse",
     "prg-pl-respect-energy-edf-nuward",
     "prg-pl-unimot-getka-nuscale",
     "prg-pr-nuclear-alternative-project-smr-siting-study",
     "prg-py-us-ncmou-smr-microreactor-plans",
     "prg-ro-dp-world-constanta-smr-study",
     "prg-ro-last-energy-cncan-licensing",
     "prg-rs-smr-1200mw-target",
     "prg-ru-gazprom-tambey-fpu-study",
     "prg-ru-pevek-additional-fpu-study",
     "prg-ru-primorsky-floating-units-study",
     "prg-ru-rosatom-small-npp-programme",
     "prg-ru-shelf-m-prospective-arctic-sites",
     "prg-ru-vk300-arkhangelsk-feasibility",
     "prg-rw-holtec-raeb-smr300",
     "prg-rw-nano-raeb-mou",
     "prg-rw-rosatom-smr-roadmap",
     "prg-sa-dl-ec-swcc-smr-desalination-mou",
     "prg-sa-kacare-cnec-htr",
     "prg-sa-kacare-kaeri-smart",
     "prg-se-copenhagen-atomics-regulatory-dialogue",
     "prg-se-holtec-smr300-regulatory-dialogue",
     "prg-se-knxt-refirm-south",
     "prg-se-steady-energy-sweden-entry",
     "prg-sg-ema-khnp-smr-study-mou",
     "prg-sg-government-nuclear-smr-study",
     "prg-si-smr-option-studies",
     "prg-sk-javys-westinghouse-ap300-mou",
     "prg-sk-project-phoenix-smr-feasibility",
     "prg-sk-sge-slovenske-elektrarne-mou",
     "prg-sn-nuclear-power-programme-smr",
     "prg-sv-nuclear-programme",
     "prg-th-cn-egat-cnos-smr-mou",
     "prg-th-draft-pdp-smr-plan",
     "prg-th-egat-ustda-smr-feasibility-study",
     "prg-th-gpsc-saltfoss-cmsr",
     "prg-th-kr-khnp-egat-smr-mou",
     "prg-tr-smr-5000mwe-2050-target",
     "prg-tr-ustda-tunas-smr-roadmap",
     "prg-ua-chornobyl-zone-smr-siting",
     "prg-ua-energoatom-edf-nuward",
     "prg-ua-energoatom-holtec-smr160",
     "prg-ua-energoatom-nuscale-mou",
     "prg-ua-energoatom-rolls-royce-smr-mou",
     "prg-ua-energoatom-westinghouse-ap300-mou",
     "prg-ua-smr-roadmap-and-draft-law",
     "prg-us-arkansas-nuclear-feasibility-study",
     "prg-us-army-janus-program",
     "prg-us-bwxt-wyoming-energy-authority-banr-study",
     "prg-us-constellation-clinton-smr-evaluation",
     "prg-us-cvea-usnc-mmr-feasibility",
     "prg-us-doe-nric-nuclear-energy-launch-pad",
     "prg-us-energysolutions-ipa-intermountain-nuclear",
     "prg-us-fpl-smr-early-site-permit-plan",
     "prg-us-great-plains-new-nuclear-consortium",
     "prg-us-holtec-entergy-hyundai-smr300",
     "prg-us-holtec-smr300-decommissioning-sites",
     "prg-us-idaho-strategic-radiant-kaleidos",
     "prg-us-indiana-oed-eli-lilly-nuclear-loi",
     "prg-us-japan-gvh-bwrx300-tennessee-alabama",
     "prg-us-kr-terrapower-hdec-natrium-epc",
     "prg-us-lgeku-xenergy-xe100-kentucky",
     "prg-us-maryland-mea-xenergy-coal-to-nuclear-study",
     "prg-us-nano-afwerx-kronos-jbab-study",
     "prg-us-nano-ameresco-microreactor-mou",
     "prg-us-nano-doe-id-zeus-odin-siting-mou",
     "prg-us-natura-ngl-permian-produced-water",
     "prg-us-nextera-smr-colocation-evaluation",
     "prg-us-nppd-gen3-smr-early-site-permit",
     "prg-us-nucube-alaska-fund-nualaska",
     "prg-us-nypa-upstate-advanced-nuclear",
     "prg-us-oklo-wyoming-hyperscale-loi",
     "prg-us-pacificorp-terrapower-natrium-study",
     "prg-us-srns-geh-prism-srs-2010",
     "prg-us-terra-innovatum-ameresco-solo-mou",
     "prg-us-terra-innovatum-uvation-solo-loi",
     "prg-us-terrapower-evergy-kansas-natrium-mou",
     "prg-us-terrestrial-energysolutions-imsr-siting-mou",
     "prg-us-terrestrial-riot-imsr-data-centres",
     "prg-us-texas-tech-acu-natura-produced-water-msr",
     "prg-us-tva-entra1-nuscale-6gw",
     "prg-us-utah-terrapower-flagship-natrium-mou",
     "prg-us-wisconsin-psc-uw-nuclear-siting-study",
     "prg-us-xenergy-talen-xe100-loi",
     "prg-vn-decision-438-atomic-energy-strategy",
     "prg-vn-dong-nai-pilot-smr-plan",
     "prg-vn-pecc2-saltfoss-siemens-floating-study",
     "prg-za-irp2025-nuclear-necsa-smr"
    ],
    "regulatory_actions": [
     "reg-clinch-river-bwrx-clinch-river-nuclear-site-early-site-permi",
     "reg-darlington-bwrx-cnsc-consent-to-remove-regulatory-hold-point",
     "reg-darlington-bwrx-original-darlington-new-nuclear-project-site",
     "reg-darlington-bwrx-renewal-of-darlington-new-nuclear-project-si",
     "reg-htr10-inet-nnsa-first-fuel-loading-licence-for-htr-10",
     "reg-ritm-jizzakh-licence-for-construction-of-an-npp-power-unit-w",
     "reg-ritm-jizzakh-permit-to-use-the-site-for-nuclear-installation"
    ],
    "events": [
     "evt-aalo-x-inl-other-2026-03-03",
     "evt-aalo-x-inl-other-2027",
     "evt-antares-mark0-inl-other-2026-01",
     "evt-aurora-inl-commercial-operation-2028",
     "evt-aurora-inl-construction-start-2025",
     "evt-baimsky-floating-commercial-operation-2028",
     "evt-baimsky-floating-commercial-operation-2031",
     "evt-baimsky-floating-other-2026-05",
     "evt-baimsky-floating-other-2026-09-24",
     "evt-belews-creek-commercial-operation-2036",
     "evt-belews-creek-other-2026-07",
     "evt-belews-creek-other-2026-09-29",
     "evt-belews-creek-other-2026-10-01",
     "evt-belews-creek-other-2026-12",
     "evt-belews-creek-other-2027-02",
     "evt-belews-creek-other-2027-03",
     "evt-blue-energy-victoria-commercial-operation-2032",
     "evt-blue-energy-victoria-regulatory-step-2027",
     "evt-brest-od-300-construction-start-2021-06-08",
     "evt-brest-od-300-other-2026-09-14",
     "evt-brest-od-300-other-2027",
     "evt-brest-od-300-regulatory-step-2021-02-10",
     "evt-clinch-river-bwrx-other-2026-08-13",
     "evt-clinch-river-bwrx-regulatory-step-2025-05-20",
     "evt-clinch-river-bwrx-regulatory-step-2025-07-09",
     "evt-daqing-nhr200-construction-start-1997",
     "evt-daqing-nhr200-other-1991",
     "evt-daqing-nhr200-other-1993",
     "evt-deep-fission-parsons-groundbreaking-2025-12",
     "evt-deep-fission-parsons-regulatory-step-2026-08-06",
     "evt-dual-fluid-rwanda-construction-start-2026",
     "evt-dual-fluid-rwanda-other-2023-09",
     "evt-dual-fluid-rwanda-other-2024-03-25",
     "evt-dual-fluid-rwanda-other-2024-04",
     "evt-dual-fluid-rwanda-other-2025-02",
     "evt-dual-fluid-rwanda-other-2028",
     "evt-hermes-1-construction-start-2025-05-01",
     "evt-hermes-1-first-concrete-2025-05",
     "evt-hermes-1-groundbreaking-2024-07",
     "evt-hermes-1-regulatory-step-2021-11-29",
     "evt-hermes-2-regulatory-step-2023-09-11",
     "evt-holtec-palisades-construction-start-2028-4",
     "evt-holtec-palisades-other-2026-08-31",
     "evt-holtec-palisades-other-2026-12-31",
     "evt-holtec-palisades-other-2031",
     "evt-holtec-palisades-regulatory-step-2026-02-13",
     "evt-htr-pm-shidaowan-construction-start-2012-12-09",
     "evt-htr-pm-shidaowan-first-criticality-2021-09-12",
     "evt-htr-pm-shidaowan-grid-connection-2021-12-14",
     "evt-htr10-inet-construction-start-1995-06",
     "evt-htr10-inet-first-criticality-2000-12-01",
     "evt-htr10-inet-fuel-load-2000-11-20",
     "evt-htr10-inet-other-2000-04",
     "evt-htr10-inet-other-2003-01-26",
     "evt-httr-oarai-first-criticality-1998-11",
     "evt-httr-oarai-other-2001",
     "evt-httr-oarai-other-2010-03",
     "evt-httr-oarai-other-2021-07",
     "evt-httr-oarai-other-2025-09-26",
     "evt-httr-oarai-other-2030",
     "evt-httr-oarai-regulatory-step-2025-03-27",
     "evt-knxt-valdemarsvik-other-2025-02-18",
     "evt-knxt-valdemarsvik-other-2026-05-08",
     "evt-knxt-valdemarsvik-other-2026-05-11",
     "evt-knxt-valdemarsvik-other-2026-06-12",
     "evt-knxt-valdemarsvik-other-2026-09-03",
     "evt-knxt-valdemarsvik-other-2026-12-31",
     "evt-last-energy-rellis-construction-start-2026",
     "evt-last-energy-rellis-other-2025-08",
     "evt-linglong-one-construction-start-2021-07-13",
     "evt-lomonosov-commercial-operation-2020-05-22",
     "evt-lomonosov-construction-start-2007-04-15",
     "evt-lomonosov-first-criticality-2018-11-02",
     "evt-lomonosov-first-criticality-2018-11-08",
     "evt-lomonosov-grid-connection-2019-12-19",
     "evt-long-mott-regulatory-step-2025-05-12",
     "evt-natrium-kemmerer-other-2026-03-04",
     "evt-natrium-kemmerer-regulatory-step-2024-05-21",
     "evt-natura-msr-1-acu-announcement-2026-07-21",
     "evt-natura-msr-1-acu-other-2024-03-14",
     "evt-natura-msr-1-acu-other-2025",
     "evt-natura-msr-1-acu-other-2026-09-18",
     "evt-natura-msr-1-acu-regulatory-step-2022-08-12",
     "evt-natura-msr-1-acu-regulatory-step-2022-11-28",
     "evt-pele-inl-other-2025-07",
     "evt-pele-inl-other-2025-11-05",
     "evt-pele-inl-other-2026-06",
     "evt-pele-inl-other-2027",
     "evt-pele-inl-other-2028",
     "evt-radiant-kaleidos-inl-other-2026-07-01",
     "evt-radiant-kaleidos-inl-other-2026-08",
     "evt-radiant-kaleidos-inl-other-2026-3",
     "evt-ritm-jizzakh-first-concrete-2026",
     "evt-ritm-jizzakh-first-criticality-2029",
     "evt-ritm-jizzakh-other-2026-03-24",
     "evt-ritm-jizzakh-other-2026-06",
     "evt-rr-temelin-other-2027",
     "evt-rr-temelin-regulatory-step-2026-10",
     "evt-sealer-norrsundet-other-2026-05-28",
     "evt-sealer-norrsundet-other-2026-06-05",
     "evt-sealer-norrsundet-other-2026-12-31",
     "evt-sealer-untra-other-2026-08-28",
     "evt-sealer-untra-other-2026-08-31",
     "evt-sealer-untra-other-2027-04-30",
     "evt-stellaria-alvin-cadarache-other-2026-04-23",
     "evt-stellaria-alvin-cadarache-other-2032",
     "evt-tmsr-lf1-wuwei-construction-start-2018-09",
     "evt-tmsr-lf1-wuwei-first-criticality-2023-10-11",
     "evt-tmsr-lf1-wuwei-other-2022-08",
     "evt-tmsr-lf1-wuwei-other-2024-10",
     "evt-tmsr-lf1-wuwei-other-2025-11-01",
     "evt-ucri-ien-other-2025-03",
     "evt-ucri-ien-other-2025-10-06",
     "evt-ucri-ien-other-2025-12-09",
     "evt-uiuc-kronos-construction-start-2027",
     "evt-uiuc-kronos-other-2026-06-23",
     "evt-uiuc-kronos-other-2029",
     "evt-unity-inl-other-2026",
     "evt-unity-inl-other-2026-05-22",
     "evt-ward-250-other-2025-11-17",
     "evt-ward-250-other-2026-02",
     "evt-ward-250-other-2026-02-15",
     "evt-ward-250-other-2026-06-26",
     "evt-ward-250-other-2026-07-01",
     "evt-xuwei-htgr-unit3-commercial-operation-2031",
     "evt-xuwei-htgr-unit3-first-concrete-2026",
     "evt-yakutia-ritm-regulatory-step-2023-04-21"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-idaho-falls-erp",
     "prj-aalo-rellis",
     "prj-aalo-x-inl",
     "prj-aep-joshua-falls",
     "prj-aep-rockport",
     "prj-alfred-mioveni",
     "prj-ameren-callaway-wsmr",
     "prj-anpi-jbsa-antares",
     "prj-anpi-malmstrom-evinci",
     "prj-antares-mark0-inl",
     "prj-antares-mark1-inl",
     "prj-antares-r1-inl-cfa",
     "prj-ap300-teesside",
     "prj-arc100-inl",
     "prj-arc100-lepreau",
     "prj-atucha-new-smr",
     "prj-aurora-inl",
     "prj-baimsky-floating",
     "prj-baishan-happy200",
     "prj-barc-vizag-htgcr",
     "prj-belews-creek",
     "prj-belledune-arc100",
     "prj-blue-energy-victoria",
     "prj-bluecore-long-beach",
     "prj-blykalla-horby",
     "prj-bontang-pkt-msr",
     "prj-brest-od-300",
     "prj-bwxt-green-river",
     "prj-calogena-cadarache",
     "prj-carem25",
     "prj-cascade-enw",
     "prj-cgn-bohai-acpr50s",
     "prj-chalk-river-mmr",
     "prj-chukotka-sovinoe-shelf-m",
     "prj-clinch-river-bwrx",
     "prj-cottam-smr300",
     "prj-daegu-gunwi-ismr",
     "prj-dalane-smr",
     "prj-daqing-nhr200",
     "prj-darlington-bwrx",
     "prj-darlington-bwrx-units-2-4",
     "prj-deep-atomic-mk60-inl",
     "prj-deep-fission-parsons",
     "prj-dimitrovgrad-svbr100",
     "prj-dual-fluid-rwanda",
     "prj-elementl-letart",
     "prj-elena-am-pilot",
     "prj-evinci-dome",
     "prj-fanco-eagl1-indiana",
     "prj-fensfjorden-smr",
     "prj-fermi-estonia",
     "prj-formosa-carem-commercial",
     "prj-galena-4s",
     "prj-gazprom-kirinskoye-floating",
     "prj-ghana-voygr12",
     "prj-gijang-smr",
     "prj-grenland-smr",
     "prj-gs-energy-uljin",
     "prj-haiyang-integrated-small-reactor",
     "prj-halden-smr",
     "prj-hartlepool-xe100",
     "prj-helen-helsinki-smr",
     "prj-hermes-1",
     "prj-hermes-2",
     "prj-hexana-gard-rhodanien",
     "prj-holtec-blue-castle",
     "prj-holtec-brigham-city",
     "prj-holtec-oyster-creek",
     "prj-holtec-palisades",
     "prj-holtec-smr160-srs-2012",
     "prj-htgr-pola-ncbj",
     "prj-htr-pm-shidaowan",
     "prj-htr10-inet",
     "prj-httr-oarai",
     "prj-huakun-one-taipingling",
     "prj-huizhou-huapeng-one",
     "prj-hyperion-srs-2012",
     "prj-imsr-rellis",
     "prj-industria-rr-smr",
     "prj-inl-marvel",
     "prj-isu-nucube-art",
     "prj-janus-fort-benning-kaleidos",
     "prj-janus-fort-bragg-antares",
     "prj-janus-fort-campbell-banr",
     "prj-janus-fort-drum-evinci",
     "prj-janus-fort-hood-ga-tes",
     "prj-jiamusi-nuclear-heating",
     "prj-jimmy-bazancourt",
     "prj-kairos-rellis",
     "prj-kaliningrad-floating-smr-proposal",
     "prj-kerava-ldr50",
     "prj-knxt-valdemarsvik",
     "prj-kuopio-smr-heat",
     "prj-last-energy-haskell",
     "prj-last-energy-legnica",
     "prj-last-energy-llynfi",
     "prj-last-energy-london-gateway",
     "prj-last-energy-mioveni",
     "prj-last-energy-rellis",
     "prj-leandrea-mol",
     "prj-liaoyuan-dhr400",
     "prj-linglong-one",
     "prj-lister-smr",
     "prj-loki-mmr-dome-inl",
     "prj-lomonosov",
     "prj-long-mott",
     "prj-maoming-green-energy-htgr",
     "prj-meta-terrapower-initial",
     "prj-midpoint-smr",
     "prj-moltex-ssrw-lepreau",
     "prj-mpower-clinch-river",
     "prj-myanmar-ritm-smr",
     "prj-nano-barupon-liberty",
     "prj-nano-digihost-north-tonawanda",
     "prj-narvik-fornes",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu",
     "prj-natura-rellis",
     "prj-navy-crane-microreactor",
     "prj-necsa-pelindaba-smr-demo",
     "prj-newcleo-bohunice",
     "prj-newcleo-veron-lfr-as-30",
     "prj-ngnp-inl",
     "prj-nine-mile-point-advanced-smr",
     "prj-ningdu-modular-plan",
     "prj-norilsk-asmm-ritm400",
     "prj-north-anna-smr",
     "prj-nuclea-morpheus-usrel",
     "prj-nucube-usrel",
     "prj-nuscale-romania",
     "prj-nuscale-srs-2012",
     "prj-odin-berkeley-green",
     "prj-oklo-diamondback",
     "prj-oklo-eielson",
     "prj-oklo-ohio",
     "prj-ornl-tcr",
     "prj-osge-dabrowa-gornicza",
     "prj-osge-nowa-huta",
     "prj-osge-ostroleka",
     "prj-osge-stalowa-wola",
     "prj-osge-stawy-monowskie",
     "prj-osge-warszawa",
     "prj-osge-wloclawek",
     "prj-otrera-marcoule",
     "prj-oygarden-smr",
     "prj-patnow-zepak-smr",
     "prj-pbmr-koeberg",
     "prj-pele-inl",
     "prj-penn-state-frontier",
     "prj-prodigy-belledune",
     "prj-psi-copenhagen-atomics",
     "prj-purdue-duke-smr",
     "prj-radiant-buckley",
     "prj-radiant-kaleidos-inl",
     "prj-rde-serpong",
     "prj-ritm-jizzakh",
     "prj-rivne-smr160",
     "prj-rr-detmarovice",
     "prj-rr-temelin",
     "prj-rr-tusimice",
     "prj-rr-wylfa",
     "prj-ruijin-htr",
     "prj-ruta70-ippe-obninsk",
     "prj-sanmen-htgr",
     "prj-sask-rafferty",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-sellafield-prism",
     "prj-shenyang-nhr200-2001",
     "prj-sinap-minqin-smtmsr",
     "prj-solo-valmeyer",
     "prj-standard-power-ohio",
     "prj-standard-power-pennsylvania",
     "prj-starcore-pinawa",
     "prj-stellaria-alvin-cadarache",
     "prj-stellaria-fos-sur-mer",
     "prj-stratek-zilkaats",
     "prj-studsvik-nykoping",
     "prj-surry-gec",
     "prj-svalbard-sealer",
     "prj-taftoy-smr",
     "prj-tarapur-bsmr-200",
     "prj-tarapur-smr-55",
     "prj-teplator-slavutych",
     "prj-tetra-1-rellis",
     "prj-thorcon-kelasa",
     "prj-thorizon-pioneer-petten",
     "prj-thorizon-zeeland",
     "prj-tmsr-lf1-wuwei",
     "prj-trawsfynydd-egino",
     "prj-trypilska-smr",
     "prj-uamps-cfpp",
     "prj-ubattery-chalk-river",
     "prj-ucri-ien",
     "prj-uiuc-kronos",
     "prj-unity-dome-2027",
     "prj-unity-hornbeck-maritime",
     "prj-unity-inl",
     "prj-usnc-inl-mmr-proposal",
     "prj-valar-carbon-county-campus",
     "prj-vardo-smr",
     "prj-vber300-aktau",
     "prj-videberg-varo-rr-smr",
     "prj-ward-250",
     "prj-west-kalimantan-land-smr",
     "prj-west-kalimantan-ritm-floating",
     "prj-wylfa-nuscale-shearwater",
     "prj-xiapu-htgr",
     "prj-xuwei-htgr-unit3",
     "prj-yakutia-ritm",
     "prj-yantai-nhr200-desalination-2003",
     "prj-zettajoule-tees-zj0"
    ],
    "designs": [
     "dsn-aalo-1",
     "dsn-aalo-pod",
     "dsn-acpr100",
     "dsn-alfred",
     "dsn-alvin",
     "dsn-ap300",
     "dsn-arc-100",
     "dsn-arc-generator",
     "dsn-aris-abv-6e",
     "dsn-aris-acp100s",
     "dsn-aris-amr",
     "dsn-aris-bandi",
     "dsn-aris-copenhagen-atomics-waste-burner",
     "dsn-aris-elena",
     "dsn-aris-fbnr",
     "dsn-aris-fuji",
     "dsn-aris-g4m",
     "dsn-aris-gt-mhr",
     "dsn-aris-holos-mono",
     "dsn-aris-holos-quad",
     "dsn-aris-htr-10",
     "dsn-aris-mhr-100",
     "dsn-aris-mhr-t",
     "dsn-aris-otrera-300",
     "dsn-aris-peluit-40",
     "dsn-aris-prism",
     "dsn-aris-prismatic-htr",
     "dsn-aris-shelf-m",
     "dsn-aris-smahtr",
     "dsn-aris-smart",
     "dsn-aris-star",
     "dsn-aris-unitherm",
     "dsn-aris-vber-300",
     "dsn-aris-w-lfr",
     "dsn-atgor",
     "dsn-aurora",
     "dsn-banr",
     "dsn-barc-chtr",
     "dsn-bsmr-200",
     "dsn-catalogue-4s",
     "dsn-catalogue-a-htr-100",
     "dsn-catalogue-acpr50s",
     "dsn-catalogue-blue-capsule",
     "dsn-catalogue-cal-30",
     "dsn-catalogue-cmsr",
     "dsn-catalogue-dfbr-1",
     "dsn-catalogue-em2",
     "dsn-catalogue-energy-well",
     "dsn-catalogue-flex",
     "dsn-catalogue-fmr",
     "dsn-catalogue-gthtr300",
     "dsn-catalogue-happy200",
     "dsn-catalogue-hexana",
     "dsn-catalogue-htgr-pola",
     "dsn-catalogue-htmr-100",
     "dsn-catalogue-htr50s",
     "dsn-catalogue-httr",
     "dsn-catalogue-i-smr",
     "dsn-catalogue-lfr-as-200",
     "dsn-catalogue-lftr",
     "dsn-catalogue-loki-mmr",
     "dsn-catalogue-movelux",
     "dsn-catalogue-odin",
     "dsn-catalogue-r1",
     "dsn-catalogue-ritm-200m",
     "dsn-catalogue-smart100",
     "dsn-catalogue-ssr-w",
     "dsn-catalogue-stellarium",
     "dsn-catalogue-teplator",
     "dsn-catalogue-xamr",
     "dsn-clear-m10",
     "dsn-df-cde",
     "dsn-dhr400",
     "dsn-evinci",
     "dsn-ga-tes",
     "dsn-gravity",
     "dsn-halo-mmr",
     "dsn-hermes",
     "dsn-holtec-smr-160",
     "dsn-imsr",
     "dsn-jimmy-heat",
     "dsn-kaist-mmr",
     "dsn-kaleidos",
     "dsn-kp-fhr",
     "dsn-kronos-mmr",
     "dsn-mark-0",
     "dsn-morpheus",
     "dsn-msr-1",
     "dsn-natrium",
     "dsn-natura-msr-100",
     "dsn-nuscale-microreactor",
     "dsn-nusun-1",
     "dsn-otrera-one",
     "dsn-pbmr",
     "dsn-pele",
     "dsn-pwr-20",
     "dsn-ritm-200n",
     "dsn-ritm-400",
     "dsn-rr-smr",
     "dsn-sealer",
     "dsn-smr-300",
     "dsn-solo",
     "dsn-svbr-100",
     "dsn-thorcon-500",
     "dsn-tmsr-lf1",
     "dsn-unity",
     "dsn-vityaz",
     "dsn-ward-250",
     "dsn-xe-100",
     "dsn-zap-zmr",
     "dsn-ziacore"
    ],
    "organizations": [
     "org-aris-inet-tsinghua-university",
     "org-jimmy",
     "org-nuscale"
    ],
    "regulatory_actions": [
     "reg-clinch-cp-20260929",
     "reg-hermes1-cp",
     "reg-hermes2-cp",
     "reg-natrium-cp",
     "reg-opg-ltc-2025"
    ],
    "events": [
     "evt-darlington-physical-start-20260422",
     "evt-hermes2-groundbreak",
     "evt-htrpm-cod",
     "evt-natrium-cp"
    ]
   },
   "removed": {
    "designs": [
     {
      "id": "dsn-aris-svbr-100",
      "name": "SVBR-100"
     }
    ]
   },
   "stage_changes": [
    {
     "id": "prj-ritm-jizzakh",
     "from": "construction",
     "to": "licensing"
    }
   ],
   "new_updates": [
    "update-evt-aalo-x-inl-other-2026-03-03",
    "update-evt-aalo-x-inl-other-2027",
    "update-evt-antares-mark0-inl-other-2026-01",
    "update-evt-aurora-inl-commercial-operation-2028",
    "update-evt-aurora-inl-construction-start-2025",
    "update-evt-baimsky-floating-commercial-operation-2028",
    "update-evt-baimsky-floating-commercial-operation-2031",
    "update-evt-baimsky-floating-other-2026-05",
    "update-evt-baimsky-floating-other-2026-09-24",
    "update-evt-belews-creek-commercial-operation-2036",
    "update-evt-belews-creek-other-2026-07",
    "update-evt-belews-creek-other-2026-09-29",
    "update-evt-belews-creek-other-2026-10-01",
    "update-evt-belews-creek-other-2026-12",
    "update-evt-belews-creek-other-2027-02",
    "update-evt-belews-creek-other-2027-03",
    "update-evt-blue-energy-victoria-commercial-operation-2032",
    "update-evt-blue-energy-victoria-regulatory-step-2027",
    "update-evt-brest-od-300-construction-start-2021-06-08",
    "update-evt-brest-od-300-other-2026-09-14",
    "update-evt-brest-od-300-other-2027",
    "update-evt-brest-od-300-regulatory-step-2021-02-10",
    "update-evt-clinch-river-bwrx-other-2026-08-13",
    "update-evt-clinch-river-bwrx-regulatory-step-2025-05-20",
    "update-evt-clinch-river-bwrx-regulatory-step-2025-07-09",
    "update-evt-daqing-nhr200-construction-start-1997",
    "update-evt-daqing-nhr200-other-1991",
    "update-evt-daqing-nhr200-other-1993",
    "update-evt-deep-fission-parsons-groundbreaking-2025-12",
    "update-evt-deep-fission-parsons-regulatory-step-2026-08-06",
    "update-evt-dual-fluid-rwanda-construction-start-2026",
    "update-evt-dual-fluid-rwanda-other-2023-09",
    "update-evt-dual-fluid-rwanda-other-2024-03-25",
    "update-evt-dual-fluid-rwanda-other-2024-04",
    "update-evt-dual-fluid-rwanda-other-2025-02",
    "update-evt-dual-fluid-rwanda-other-2028",
    "update-evt-hermes-1-construction-start-2025-05-01",
    "update-evt-hermes-1-first-concrete-2025-05",
    "update-evt-hermes-1-groundbreaking-2024-07",
    "update-evt-hermes-1-regulatory-step-2021-11-29",
    "update-evt-hermes-2-regulatory-step-2023-09-11",
    "update-evt-holtec-palisades-construction-start-2028-4",
    "update-evt-holtec-palisades-other-2026-08-31",
    "update-evt-holtec-palisades-other-2026-12-31",
    "update-evt-holtec-palisades-other-2031",
    "update-evt-holtec-palisades-regulatory-step-2026-02-13",
    "update-evt-htr-pm-shidaowan-construction-start-2012-12-09",
    "update-evt-htr-pm-shidaowan-first-criticality-2021-09-12",
    "update-evt-htr-pm-shidaowan-grid-connection-2021-12-14",
    "update-evt-htr10-inet-construction-start-1995-06",
    "update-evt-htr10-inet-first-criticality-2000-12-01",
    "update-evt-htr10-inet-fuel-load-2000-11-20",
    "update-evt-htr10-inet-other-2000-04",
    "update-evt-htr10-inet-other-2003-01-26",
    "update-evt-httr-oarai-first-criticality-1998-11",
    "update-evt-httr-oarai-other-2001",
    "update-evt-httr-oarai-other-2010-03",
    "update-evt-httr-oarai-other-2021-07",
    "update-evt-httr-oarai-other-2025-09-26",
    "update-evt-httr-oarai-other-2030",
    "update-evt-httr-oarai-regulatory-step-2025-03-27",
    "update-evt-knxt-valdemarsvik-other-2025-02-18",
    "update-evt-knxt-valdemarsvik-other-2026-05-08",
    "update-evt-knxt-valdemarsvik-other-2026-05-11",
    "update-evt-knxt-valdemarsvik-other-2026-06-12",
    "update-evt-knxt-valdemarsvik-other-2026-09-03",
    "update-evt-knxt-valdemarsvik-other-2026-12-31",
    "update-evt-last-energy-rellis-construction-start-2026",
    "update-evt-last-energy-rellis-other-2025-08",
    "update-evt-linglong-one-construction-start-2021-07-13",
    "update-evt-lomonosov-commercial-operation-2020-05-22",
    "update-evt-lomonosov-construction-start-2007-04-15",
    "update-evt-lomonosov-first-criticality-2018-11-02",
    "update-evt-lomonosov-first-criticality-2018-11-08",
    "update-evt-lomonosov-grid-connection-2019-12-19",
    "update-evt-long-mott-regulatory-step-2025-05-12",
    "update-evt-natrium-kemmerer-other-2026-03-04",
    "update-evt-natrium-kemmerer-regulatory-step-2024-05-21",
    "update-evt-natura-msr-1-acu-announcement-2026-07-21",
    "update-evt-natura-msr-1-acu-other-2024-03-14",
    "update-evt-natura-msr-1-acu-other-2025",
    "update-evt-natura-msr-1-acu-other-2026-09-18",
    "update-evt-natura-msr-1-acu-regulatory-step-2022-08-12",
    "update-evt-natura-msr-1-acu-regulatory-step-2022-11-28",
    "update-evt-pele-inl-other-2025-07",
    "update-evt-pele-inl-other-2025-11-05",
    "update-evt-pele-inl-other-2026-06",
    "update-evt-pele-inl-other-2027",
    "update-evt-pele-inl-other-2028",
    "update-evt-radiant-kaleidos-inl-other-2026-07-01",
    "update-evt-radiant-kaleidos-inl-other-2026-08",
    "update-evt-radiant-kaleidos-inl-other-2026-3",
    "update-evt-ritm-jizzakh-first-concrete-2026",
    "update-evt-ritm-jizzakh-first-criticality-2029",
    "update-evt-ritm-jizzakh-other-2026-03-24",
    "update-evt-ritm-jizzakh-other-2026-06",
    "update-evt-rr-temelin-other-2027",
    "update-evt-rr-temelin-regulatory-step-2026-10",
    "update-evt-sealer-norrsundet-other-2026-05-28",
    "update-evt-sealer-norrsundet-other-2026-06-05",
    "update-evt-sealer-norrsundet-other-2026-12-31",
    "update-evt-sealer-untra-other-2026-08-28",
    "update-evt-sealer-untra-other-2026-08-31",
    "update-evt-sealer-untra-other-2027-04-30",
    "update-evt-stellaria-alvin-cadarache-other-2026-04-23",
    "update-evt-stellaria-alvin-cadarache-other-2032",
    "update-evt-tmsr-lf1-wuwei-construction-start-2018-09",
    "update-evt-tmsr-lf1-wuwei-first-criticality-2023-10-11",
    "update-evt-tmsr-lf1-wuwei-other-2022-08",
    "update-evt-tmsr-lf1-wuwei-other-2024-10",
    "update-evt-tmsr-lf1-wuwei-other-2025-11-01",
    "update-evt-ucri-ien-other-2025-03",
    "update-evt-ucri-ien-other-2025-10-06",
    "update-evt-ucri-ien-other-2025-12-09",
    "update-evt-uiuc-kronos-construction-start-2027",
    "update-evt-uiuc-kronos-other-2026-06-23",
    "update-evt-uiuc-kronos-other-2029",
    "update-evt-unity-inl-other-2026",
    "update-evt-unity-inl-other-2026-05-22",
    "update-evt-ward-250-other-2025-11-17",
    "update-evt-ward-250-other-2026-02",
    "update-evt-ward-250-other-2026-02-15",
    "update-evt-ward-250-other-2026-06-26",
    "update-evt-ward-250-other-2026-07-01",
    "update-evt-xuwei-htgr-unit3-commercial-operation-2031",
    "update-evt-xuwei-htgr-unit3-first-concrete-2026",
    "update-evt-yakutia-ritm-regulatory-step-2023-04-21",
    "update-reg-clinch-cp-20260929-application",
    "update-reg-clinch-river-bwrx-clinch-river-nuclear-site-early-site-permi-application",
    "update-reg-clinch-river-bwrx-clinch-river-nuclear-site-early-site-permi-decision",
    "update-reg-darlington-bwrx-cnsc-consent-to-remove-regulatory-hold-point-application",
    "update-reg-darlington-bwrx-cnsc-consent-to-remove-regulatory-hold-point-decision",
    "update-reg-darlington-bwrx-original-darlington-new-nuclear-project-site-decision",
    "update-reg-darlington-bwrx-renewal-of-darlington-new-nuclear-project-si-application",
    "update-reg-darlington-bwrx-renewal-of-darlington-new-nuclear-project-si-decision",
    "update-reg-hermes1-cp-application",
    "update-reg-hermes2-cp-application",
    "update-reg-htr10-inet-nnsa-first-fuel-loading-licence-for-htr-10-decision",
    "update-reg-natrium-cp-application",
    "update-reg-opg-ltc-2025-application",
    "update-reg-ritm-jizzakh-licence-for-construction-of-an-npp-power-unit-w-decision",
    "update-reg-ritm-jizzakh-permit-to-use-the-site-for-nuclear-installation-decision"
   ]
  },
  {
   "date": "2026-10-15",
   "added": {
    "projects": [
     "prj-aalo-ascension-inl"
    ],
    "organizations": [
     "org-huaneng-shidaowan"
    ],
    "programmes": [
     "prg-fanco-floral-power-evaluation-2026"
    ],
    "regulatory_actions": [
     "reg-asnr-hexana-options-2026",
     "reg-nnsa-htr10-ol-1405",
     "reg-nnsa-htrpm-ol-2119",
     "reg-nra-httr-installation-change-2020-06-03"
    ],
    "events": [
     "evt-aalo-ascension-announcement-20260704",
     "evt-aalo-ascension-datacenter-target-2027"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-x-inl",
     "prj-baimsky-floating",
     "prj-hermes-2",
     "prj-htr-pm-shidaowan",
     "prj-htr10-inet",
     "prj-httr-oarai",
     "prj-linglong-one",
     "prj-oklo-ohio",
     "prj-ward-250"
    ],
    "designs": [
     "dsn-brest-od-300",
     "dsn-xe-100"
    ],
    "organizations": [
     "org-huaneng"
    ],
    "regulatory_actions": [
     "reg-asnr-calogena-options-2024",
     "reg-asnr-stellaria-alpha-2025"
    ],
    "events": [
     "evt-htr10-inet-other-2003-01-26",
     "evt-ward-250-other-2026-07-01"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-aalo-ascension-announcement-20260704",
    "update-evt-aalo-ascension-datacenter-target-2027",
    "update-reg-asnr-hexana-options-2026-application",
    "update-reg-nnsa-htr10-ol-1405-decision",
    "update-reg-nnsa-htrpm-ol-2119-decision",
    "update-reg-nra-httr-installation-change-2020-06-03-application",
    "update-reg-nra-httr-installation-change-2020-06-03-decision"
   ]
  },
  {
   "date": "2026-10-16",
   "added": {
    "designs": [
     "dsn-smart-c"
    ],
    "organizations": [
     "org-ropower-nuclear",
     "org-sge"
    ],
    "policies": [
     "pol-us-nrc-enhancements-proposed-20260924"
    ],
    "regulatory_actions": [
     "reg-kr-smart100-sda-2024",
     "reg-mee-xuwei-phase1-siting-eia-2024-04-17"
    ],
    "events": [
     "evt-doicesti-snn-egms-20261029",
     "evt-httr-oarai-full-power-2021-09-19",
     "evt-httr-oarai-full-power-safety-test-2024-03",
     "evt-lomonosov-operating-licence-2019-06",
     "evt-myanmar-survey-plans-reported-2026-08-24",
     "evt-radiant-buckley-haleu-commitment-2026-07-23",
     "evt-vardo-assessment-programme-held-2024-11-22"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-bluecore-long-beach",
     "prj-chalk-river-mmr",
     "prj-clinch-river-bwrx",
     "prj-dual-fluid-rwanda",
     "prj-hermes-1",
     "prj-htr10-inet",
     "prj-httr-oarai",
     "prj-lomonosov",
     "prj-long-mott",
     "prj-myanmar-ritm-smr",
     "prj-natura-msr-1-acu",
     "prj-nuscale-romania",
     "prj-patnow-zepak-smr",
     "prj-radiant-buckley",
     "prj-radiant-kaleidos-inl",
     "prj-tmsr-lf1-wuwei",
     "prj-vardo-smr",
     "prj-xuwei-htgr-unit3"
    ],
    "designs": [
     "dsn-aris-smart",
     "dsn-catalogue-flex",
     "dsn-catalogue-smart100",
     "dsn-evinci",
     "dsn-gfp-mmr",
     "dsn-halo-mmr",
     "dsn-sinap-smtmsr-10mwe"
    ],
    "organizations": [
     "org-catalogue-newcleo",
     "org-hadron-energy",
     "org-kairos",
     "org-xenergy",
     "org-zepak"
    ],
    "programmes": [
     "prg-ir-aeoi-rosatom-small-npp-mou",
     "prg-jo-jaec-smr-programme",
     "prg-us-pacificorp-terrapower-natrium-study"
    ],
    "regulatory_actions": [
     "reg-clinch-cp-20260929"
    ],
    "events": [
     "evt-hermes-1-construction-start-2025-05-01",
     "evt-httr-oarai-other-2021-07",
     "evt-natura-msr-1-acu-other-2026-09-18"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-doicesti-snn-egms-20261029",
    "update-evt-httr-oarai-full-power-2021-09-19",
    "update-evt-httr-oarai-full-power-safety-test-2024-03",
    "update-evt-lomonosov-operating-licence-2019-06",
    "update-evt-myanmar-survey-plans-reported-2026-08-24",
    "update-evt-radiant-buckley-haleu-commitment-2026-07-23",
    "update-evt-vardo-assessment-programme-held-2024-11-22",
    "update-pol-us-nrc-enhancements-proposed-20260924-1",
    "update-reg-kr-smart100-sda-2024-application",
    "update-reg-kr-smart100-sda-2024-decision",
    "update-reg-mee-xuwei-phase1-siting-eia-2024-04-17-decision"
   ]
  },
  {
   "date": "2026-10-17",
   "added": {
    "organizations": [
     "org-atkinsrealis",
     "org-bwxt-advanced-technologies",
     "org-general-atomics-electromagnetic-systems",
     "org-tno",
     "org-triso-x",
     "org-westinghouse-government-services"
    ],
    "programmes": [
     "prg-fanco-atkins-engineering-alliance-2026",
     "prg-fanco-hyundai-framework-2026",
     "prg-se-blykalla-evroc-studsvik-feasibility",
     "prg-thorizon-tno-materials-2026",
     "prg-trisox-ornl-research-2026",
     "prg-us-terrapower-nvision-natrium-framework",
     "prg-us-terrapower-sabey-natrium-mou",
     "prg-xenergy-prometheus-research-2026"
    ],
    "policies": [
     "pol-us-nrc-nepa-proposed-20260707",
     "pol-us-nrc-radiation-proposed-20260715"
    ],
    "regulatory_actions": [
     "reg-nnsa-linglong-construction-licence-2117-2021"
    ],
    "events": [
     "evt-natrium-official-construction-start-2026-04-23"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-deep-fission-parsons",
     "prj-janus-fort-campbell-banr",
     "prj-janus-fort-drum-evinci",
     "prj-janus-fort-hood-ga-tes",
     "prj-jimmy-bazancourt",
     "prj-linglong-one",
     "prj-nuscale-srs-2012",
     "prj-rr-wylfa",
     "prj-sealer-norrsundet",
     "prj-sellafield-prism",
     "prj-stellaria-alvin-cadarache",
     "prj-tarapur-smr-55",
     "prj-ward-250",
     "prj-xuwei-htgr-unit3"
    ],
    "designs": [
     "dsn-catalogue-dfbr-1",
     "dsn-catalogue-htmr-100",
     "dsn-catalogue-lfr-as-200",
     "dsn-evinci",
     "dsn-gravity",
     "dsn-tredic-htgr"
    ],
    "organizations": [
     "org-antares",
     "org-blykalla",
     "org-catalogue-thorizon",
     "org-deployable-energy",
     "org-fanco",
     "org-gevh",
     "org-hyundai-ec",
     "org-nano-nuclear",
     "org-sge",
     "org-terrapower",
     "org-usnc",
     "org-xenergy"
    ],
    "programmes": [
     "prg-br-cdpnb-smr-technical-group",
     "prg-id-pertamina-nre-saltfoss-cmsr",
     "prg-jo-jaec-khnp-ismr-feasibility-mou",
     "prg-sk-javys-westinghouse-ap300-mou"
    ],
    "events": [
     "evt-deep-fission-parsons-regulatory-step-2026-08-06"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-linglong-pris-reported-construction-licence-2019-07-15",
    "update-evt-natrium-official-construction-start-2026-04-23",
    "update-pol-us-nrc-nepa-proposed-20260707-1",
    "update-pol-us-nrc-radiation-proposed-20260715-1",
    "update-reg-nnsa-linglong-construction-licence-2117-2021-decision"
   ]
  },
  {
   "date": "2026-10-18",
   "added": {
    "projects": [
     "prj-ameresco-imsr-aberdeen"
    ],
    "organizations": [
     "org-abilene-christian-university",
     "org-amazon",
     "org-ameresco",
     "org-atomflot",
     "org-barnard-construction",
     "org-cristanol",
     "org-energy-northwest-new-nuclear",
     "org-latona-group",
     "org-refirm-malma",
     "org-rosatom-engineering-division",
     "org-rusatom-overseas",
     "org-sister-1-llc",
     "org-texas-am-university-system",
     "org-uz-npp-construction-directorate"
    ],
    "programmes": [
     "prg-gb-amr-rdd-htgr-demonstration",
     "prg-tr-arc-icn-arc100-term-sheet"
    ],
    "policies": [
     "pol-br-constitution-art-225-6-nuclear-plant-location",
     "pol-br-law-14222-2021-ansn",
     "pol-ca-class-i-nuclear-facilities-regulations",
     "pol-ca-nrcan-enabling-smr-program",
     "pol-ca-nuclear-safety-and-control-act",
     "pol-cn-atomic-energy-law-2025",
     "pol-cn-mee-order-8-licensing-procedure-2019",
     "pol-cn-nuclear-safety-law-2017",
     "pol-jp-long-term-decarbonization-power-auction",
     "pol-jp-nra-rule-5-power-reactor-siting-standards",
     "pol-jp-reactor-regulation-act",
     "pol-ro-cncan-nsn-01-npp-siting",
     "pol-ro-law-111-1996-nuclear-activities",
     "pol-ru-federal-law-170-fz-atomic-energy",
     "pol-ru-general-scheme-power-facilities-2042",
     "pol-ru-np-032-19-npp-site-safety-requirements",
     "pol-rw-law-59-2017-radiation-protection",
     "pol-rw-presidential-order-127-01-raeb",
     "pol-rw-rura-regulation-013-2024-nuclear-installations",
     "pol-se-act-on-nuclear-activities-1984-3",
     "pol-se-government-approval-nuclear-facilities-2026-585",
     "pol-se-state-support-new-nuclear-2025-587",
     "pol-uz-committee-resolution-39-npp-site-requirements",
     "pol-uz-law-zru-565-peaceful-atomic-energy",
     "pol-uz-pp-188-atomic-energy-agency-fund"
    ],
    "regulatory_actions": [
     "reg-natrium-kemmerer-energy-island-exemption-20250507"
    ],
    "events": [
     "evt-aalo-x-inl-groundbreaking-2025-08",
     "evt-ameresco-imsr-aberdeen-selection-2026-09-21",
     "evt-antares-mark0-doe-agreement-2025-09",
     "evt-antares-mark0-haleu-commitment-2025-08-26",
     "evt-arc100-lepreau-iaa-no-designation-2022-12-22",
     "evt-baimsky-floating-keel-laying-2022-08",
     "evt-belews-creek-draft-eis-2026-12",
     "evt-brest-od-300-fuel-module-pilot-2024-12-25",
     "evt-brest-od-300-turbine-hall-separators-2026-10-07",
     "evt-cascade-enw-amazon-agreement-2024-10-16",
     "evt-cascade-enw-design-build-negotiations-2025-10-23",
     "evt-cascade-enw-engagement-plan-rev3-2026-03-26",
     "evt-cascade-enw-nrc-preapplication-2024-08",
     "evt-clinch-river-doe-gen3-selection-2025-12-02",
     "evt-darlington-basemat-lift-2026-04",
     "evt-darlington-bwxt-rpv-contract-2025-01-27",
     "evt-darlington-cgf-bof-equity-2025-10",
     "evt-darlington-cnsc-12-2-request-2025-07-25",
     "evt-darlington-first-nations-investment-2026-06-23",
     "evt-darlington-ontario-fid-2025-05-08",
     "evt-doicesti-control-body-response-2026-07-28",
     "evt-doicesti-exim-pre-project-loan-2024",
     "evt-doicesti-fluor-feed2-contract-2024-07",
     "evt-doicesti-us-finance-letters-2026-05",
     "evt-hermes-1-construction-completion-target-2028",
     "evt-holtec-palisades-doe-gen3-selection-2025-12-02",
     "evt-httr-oarai-construction-start-1991",
     "evt-httr-oarai-installation-permit-1990-11",
     "evt-httr-oarai-permit-application-1989-02",
     "evt-jimmy-bazancourt-complements-2025-02-13",
     "evt-last-energy-llynfi-exim-letter-2024-12-13",
     "evt-last-energy-llynfi-grid-offer-2025-01-16",
     "evt-last-energy-rellis-announced-2025-10-15",
     "evt-last-energy-rellis-criticality-target-2026",
     "evt-natrium-kemmerer-bechtel-exit-2026-09",
     "evt-natrium-kemmerer-construction-completion-target-2030",
     "evt-natrium-kemmerer-wyoming-permit-2025-01-14",
     "evt-natura-msr-1-doe-ota-2025-12",
     "evt-natura-msr-1-haleu-commitment-2025-08-26",
     "evt-pele-inl-bwxt-contract-2022-06",
     "evt-pele-inl-core-barrel-2026-09",
     "evt-pele-inl-groundbreaking-2024-09",
     "evt-sealer-norrsundet-plan-consultation-2026-10-09",
     "evt-stellaria-alvin-cadarache-complements-2026-06-16",
     "evt-tmsr-lf1-wuwei-full-power-2024-06",
     "evt-ward-250-groundbreaking-2025-09-17",
     "evt-yakutia-ritm-rusatom-overseas-licence-report-2021-08-06"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-x-inl",
     "prj-ameren-callaway-wsmr",
     "prj-antares-mark0-inl",
     "prj-arc100-lepreau",
     "prj-aurora-inl",
     "prj-baimsky-floating",
     "prj-baishan-happy200",
     "prj-belews-creek",
     "prj-blue-energy-victoria",
     "prj-brest-od-300",
     "prj-cascade-enw",
     "prj-clinch-river-bwrx",
     "prj-daqing-nhr200",
     "prj-darlington-bwrx",
     "prj-dual-fluid-rwanda",
     "prj-galena-4s",
     "prj-hermes-1",
     "prj-hermes-2",
     "prj-holtec-palisades",
     "prj-httr-oarai",
     "prj-inl-marvel",
     "prj-jiamusi-nuclear-heating",
     "prj-jimmy-bazancourt",
     "prj-knxt-valdemarsvik",
     "prj-last-energy-llynfi",
     "prj-last-energy-rellis",
     "prj-lomonosov",
     "prj-long-mott",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu",
     "prj-nuscale-romania",
     "prj-pele-inl",
     "prj-radiant-kaleidos-inl",
     "prj-ritm-jizzakh",
     "prj-sask-rafferty",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-stellaria-alvin-cadarache",
     "prj-studsvik-nykoping",
     "prj-tarapur-smr-55",
     "prj-tmsr-lf1-wuwei",
     "prj-ucri-ien",
     "prj-unity-inl",
     "prj-ward-250",
     "prj-xuwei-htgr-unit3",
     "prj-yakutia-ritm"
    ],
    "designs": [
     "dsn-aalo-x",
     "dsn-aris-marvel",
     "dsn-natrium",
     "dsn-xe-100"
    ],
    "organizations": [
     "org-antares",
     "org-blykalla",
     "org-catalogue-newcleo",
     "org-catalogue-steady-energy",
     "org-deep-fission",
     "org-deployable-energy",
     "org-energy-northwest",
     "org-last-energy",
     "org-osge",
     "org-terrapower",
     "org-valar"
    ],
    "programmes": [
     "prg-fi-se-fortum-gevh-bwrx300-early-works"
    ],
    "policies": [
     "pol-ca-physical-activities-regs-item-27",
     "pol-hr-nuclear-development-law-2026",
     "pol-ny-psc-26-e-0335",
     "pol-pa-rpa-402-1",
     "pol-us-nrc-enhancements-proposed-20260924",
     "pol-us-nrc-licensing-siting-proposed-2026"
    ],
    "regulatory_actions": [
     "reg-asnr-hexana-options-2026",
     "reg-asnr-jimmy-dac-2024",
     "reg-clinch-cp-20260929",
     "reg-clinch-river-bwrx-clinch-river-nuclear-site-early-site-permi",
     "reg-darlington-bwrx-cnsc-consent-to-remove-regulatory-hold-point",
     "reg-darlington-bwrx-renewal-of-darlington-new-nuclear-project-si",
     "reg-doe-pwr5-phase1-nepa-20260930",
     "reg-hermes1-cp",
     "reg-hermes2-cp",
     "reg-kr-smart100-sda-2024",
     "reg-natrium-cp",
     "reg-nnsa-xuwei-htgr-design-criteria-2026",
     "reg-nnsa-xuwei-u3-cl-review-2025",
     "reg-nra-httr-installation-change-2020-06-03",
     "reg-nrc-aurora-col-2020-denied",
     "reg-nrc-belews-creek-esp-2025",
     "reg-nrc-blue-energy-cp-lwa-part1-2026",
     "reg-opg-ltc-2025",
     "reg-pioneer-excavation-ea-fonsi-2026",
     "reg-pioneer-excavation-walls-exemption-2026",
     "reg-ritm-jizzakh-licence-for-construction-of-an-npp-power-unit-w",
     "reg-se-gov-approval-untra-2026"
    ],
    "events": [
     "evt-baimsky-floating-other-2026-09-24",
     "evt-belews-creek-other-2026-09-29",
     "evt-belews-creek-other-2026-10-01",
     "evt-belews-creek-other-2026-12",
     "evt-belews-creek-other-2027-02",
     "evt-belews-creek-other-2027-03",
     "evt-belews-esp-hearing-2026",
     "evt-blue-energy-cpa-statement-2026",
     "evt-brest-od-300-other-2026-09-14",
     "evt-clinch-cp-20260929",
     "evt-clinch-river-bwrx-other-2026-08-13",
     "evt-deep-fission-parsons-regulatory-step-2026-08-06",
     "evt-holtec-palisades-other-2026-08-31",
     "evt-httr-oarai-first-criticality-1998-11",
     "evt-isu-art-site-20260916",
     "evt-knxt-valdemarsvik-other-2026-05-08",
     "evt-knxt-valdemarsvik-other-2026-09-03",
     "evt-longmott-cli-26-10",
     "evt-marvel-fdsa-approval-20261006",
     "evt-myanmar-survey-plans-reported-2026-08-24",
     "evt-natura-msr-1-acu-other-2026-09-18",
     "evt-parent-prodigy-belledune",
     "evt-parent-sealer-untra",
     "evt-parent-tarapur-smr-55",
     "evt-pwr5-dsa-announcement-20261007",
     "evt-radiant-dome-completion-report-20260930",
     "evt-radiant-kaleidos-inl-other-2026-08",
     "evt-ritm-jizzakh-other-2026-06",
     "evt-rr-temelin-regulatory-step-2026-10",
     "evt-sealer-untra-other-2026-08-28",
     "evt-sealer-untra-other-2026-08-31",
     "evt-unity-dome-selection-20260930",
     "evt-wc-atucha-tender-authorised-2026",
     "evt-wc-belledune-banr-selected-2026",
     "evt-wc-myanmar-implementation-2026",
     "evt-wc-pioneer-psar-2026",
     "evt-wc-studsvik-partners-2026",
     "evt-wc-tarapur-aec-site-2026",
     "evt-wc-veron-debate-report-2026",
     "evt-xuwei-htgr-unit3-commercial-operation-2031",
     "evt-xuwei-preconstruction-inspection-20261009"
    ]
   },
   "removed": {
    "events": [
     {
      "id": "evt-ritm-jizzakh-first-concrete-2026",
      "name": "First concrete for first RITM-200N unit (expected)"
     }
    ]
   },
   "stage_changes": [
    {
     "id": "prj-ritm-jizzakh",
     "from": "licensing",
     "to": "construction"
    }
   ],
   "new_updates": [
    "update-evt-aalo-x-inl-groundbreaking-2025-08",
    "update-evt-ameresco-imsr-aberdeen-selection-2026-09-21",
    "update-evt-antares-mark0-doe-agreement-2025-09",
    "update-evt-antares-mark0-haleu-commitment-2025-08-26",
    "update-evt-arc100-lepreau-iaa-no-designation-2022-12-22",
    "update-evt-baimsky-floating-keel-laying-2022-08",
    "update-evt-belews-creek-draft-eis-2026-12",
    "update-evt-brest-od-300-fuel-module-pilot-2024-12-25",
    "update-evt-brest-od-300-turbine-hall-separators-2026-10-07",
    "update-evt-cascade-enw-amazon-agreement-2024-10-16",
    "update-evt-cascade-enw-design-build-negotiations-2025-10-23",
    "update-evt-cascade-enw-engagement-plan-rev3-2026-03-26",
    "update-evt-cascade-enw-nrc-preapplication-2024-08",
    "update-evt-clinch-river-doe-gen3-selection-2025-12-02",
    "update-evt-darlington-basemat-lift-2026-04",
    "update-evt-darlington-bwxt-rpv-contract-2025-01-27",
    "update-evt-darlington-cgf-bof-equity-2025-10",
    "update-evt-darlington-cnsc-12-2-request-2025-07-25",
    "update-evt-darlington-first-nations-investment-2026-06-23",
    "update-evt-darlington-ontario-fid-2025-05-08",
    "update-evt-doicesti-control-body-response-2026-07-28",
    "update-evt-doicesti-exim-pre-project-loan-2024",
    "update-evt-doicesti-fluor-feed2-contract-2024-07",
    "update-evt-doicesti-us-finance-letters-2026-05",
    "update-evt-hermes-1-construction-completion-target-2028",
    "update-evt-holtec-palisades-doe-gen3-selection-2025-12-02",
    "update-evt-httr-oarai-construction-start-1991",
    "update-evt-httr-oarai-installation-permit-1990-11",
    "update-evt-httr-oarai-permit-application-1989-02",
    "update-evt-jimmy-bazancourt-complements-2025-02-13",
    "update-evt-last-energy-llynfi-exim-letter-2024-12-13",
    "update-evt-last-energy-llynfi-grid-offer-2025-01-16",
    "update-evt-last-energy-rellis-announced-2025-10-15",
    "update-evt-last-energy-rellis-criticality-target-2026",
    "update-evt-natrium-kemmerer-bechtel-exit-2026-09",
    "update-evt-natrium-kemmerer-construction-completion-target-2030",
    "update-evt-natrium-kemmerer-wyoming-permit-2025-01-14",
    "update-evt-natura-msr-1-doe-ota-2025-12",
    "update-evt-natura-msr-1-haleu-commitment-2025-08-26",
    "update-evt-pele-inl-bwxt-contract-2022-06",
    "update-evt-pele-inl-core-barrel-2026-09",
    "update-evt-pele-inl-groundbreaking-2024-09",
    "update-evt-sealer-norrsundet-plan-consultation-2026-10-09",
    "update-evt-stellaria-alvin-cadarache-complements-2026-06-16",
    "update-evt-tmsr-lf1-wuwei-full-power-2024-06",
    "update-evt-ward-250-groundbreaking-2025-09-17",
    "update-evt-yakutia-ritm-rusatom-overseas-licence-report-2021-08-06",
    "update-pol-br-constitution-art-225-6-nuclear-plant-location-1",
    "update-pol-br-law-14222-2021-ansn-1",
    "update-pol-br-law-14222-2021-ansn-2",
    "update-pol-br-law-14222-2021-ansn-3",
    "update-pol-br-law-14222-2021-ansn-4",
    "update-pol-ca-class-i-nuclear-facilities-regulations-1",
    "update-pol-ca-class-i-nuclear-facilities-regulations-2",
    "update-pol-ca-nrcan-enabling-smr-program-1",
    "update-pol-ca-nuclear-safety-and-control-act-1",
    "update-pol-ca-nuclear-safety-and-control-act-2",
    "update-pol-cn-atomic-energy-law-2025-1",
    "update-pol-cn-atomic-energy-law-2025-2",
    "update-pol-cn-mee-order-8-licensing-procedure-2019-1",
    "update-pol-cn-mee-order-8-licensing-procedure-2019-2",
    "update-pol-cn-nuclear-safety-law-2017-1",
    "update-pol-cn-nuclear-safety-law-2017-2",
    "update-pol-jp-long-term-decarbonization-power-auction-1",
    "update-pol-jp-nra-rule-5-power-reactor-siting-standards-1",
    "update-pol-jp-nra-rule-5-power-reactor-siting-standards-2",
    "update-pol-jp-nra-rule-5-power-reactor-siting-standards-3",
    "update-pol-jp-reactor-regulation-act-1",
    "update-pol-jp-reactor-regulation-act-2",
    "update-pol-jp-reactor-regulation-act-3",
    "update-pol-ro-cncan-nsn-01-npp-siting-1",
    "update-pol-ro-cncan-nsn-01-npp-siting-2",
    "update-pol-ro-law-111-1996-nuclear-activities-1",
    "update-pol-ro-law-111-1996-nuclear-activities-2",
    "update-pol-ro-law-111-1996-nuclear-activities-3",
    "update-pol-ro-law-111-1996-nuclear-activities-4",
    "update-pol-ru-federal-law-170-fz-atomic-energy-1",
    "update-pol-ru-federal-law-170-fz-atomic-energy-2",
    "update-pol-ru-federal-law-170-fz-atomic-energy-3",
    "update-pol-ru-general-scheme-power-facilities-2042-1",
    "update-pol-ru-np-032-19-npp-site-safety-requirements-1",
    "update-pol-ru-np-032-19-npp-site-safety-requirements-2",
    "update-pol-rw-law-59-2017-radiation-protection-1",
    "update-pol-rw-law-59-2017-radiation-protection-2",
    "update-pol-rw-presidential-order-127-01-raeb-1",
    "update-pol-rw-presidential-order-127-01-raeb-2",
    "update-pol-rw-rura-regulation-013-2024-nuclear-installations-1",
    "update-pol-se-act-on-nuclear-activities-1984-3-1",
    "update-pol-se-act-on-nuclear-activities-1984-3-2",
    "update-pol-se-act-on-nuclear-activities-1984-3-3",
    "update-pol-se-government-approval-nuclear-facilities-2026-585-1",
    "update-pol-se-government-approval-nuclear-facilities-2026-585-2",
    "update-pol-se-government-approval-nuclear-facilities-2026-585-3",
    "update-pol-se-state-support-new-nuclear-2025-587-1",
    "update-pol-se-state-support-new-nuclear-2025-587-2",
    "update-pol-se-state-support-new-nuclear-2025-587-3",
    "update-pol-uz-committee-resolution-39-npp-site-requirements-1",
    "update-pol-uz-committee-resolution-39-npp-site-requirements-2",
    "update-pol-uz-law-zru-565-peaceful-atomic-energy-1",
    "update-pol-uz-law-zru-565-peaceful-atomic-energy-2",
    "update-pol-uz-law-zru-565-peaceful-atomic-energy-3",
    "update-pol-uz-pp-188-atomic-energy-agency-fund-1",
    "update-pol-uz-pp-188-atomic-energy-agency-fund-2",
    "update-pol-uz-pp-188-atomic-energy-agency-fund-3",
    "update-reg-natrium-kemmerer-energy-island-exemption-20250507-application",
    "update-reg-natrium-kemmerer-energy-island-exemption-20250507-decision"
   ]
  },
  {
   "date": "2026-10-19",
   "added": {
    "programmes": [
     "prg-br-mnb-technology-development",
     "prg-ca-bwxt-westinghouse-ap300-components-mou-2024",
     "prg-gb-terrestrial-springfields-imsr-fuel-pilot-2025",
     "prg-us-bwxt-nfs-haleu-deconversion-2024",
     "prg-us-kairos-bwxt-triso-collaboration-2025",
     "prg-us-natura-3m-lithium7-cooperation-2025",
     "prg-us-natura-hifunda-sensor-development-2026",
     "prg-us-natura-nov-shepherd-commercialisation-2025",
     "prg-us-natura-quadrant-haleu-framework-2026"
    ],
    "events": [
     "evt-htr10-inet-electricity-generation-2004-10"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-ascension-inl",
     "prj-aalo-idaho-falls-erp",
     "prj-aalo-rellis",
     "prj-aalo-x-inl",
     "prj-aep-joshua-falls",
     "prj-aep-rockport",
     "prj-alfred-mioveni",
     "prj-ameren-callaway-wsmr",
     "prj-ameresco-imsr-aberdeen",
     "prj-anpi-jbsa-antares",
     "prj-anpi-malmstrom-evinci",
     "prj-antares-mark0-inl",
     "prj-antares-mark1-inl",
     "prj-antares-r1-inl-cfa",
     "prj-ap300-teesside",
     "prj-arc100-inl",
     "prj-arc100-lepreau",
     "prj-atucha-new-smr",
     "prj-aurora-inl",
     "prj-baimsky-floating",
     "prj-baishan-happy200",
     "prj-barc-vizag-htgcr",
     "prj-belews-creek",
     "prj-belledune-arc100",
     "prj-blue-energy-victoria",
     "prj-bluecore-long-beach",
     "prj-blykalla-horby",
     "prj-bontang-pkt-msr",
     "prj-brest-od-300",
     "prj-bwxt-green-river",
     "prj-calogena-cadarache",
     "prj-carem25",
     "prj-cascade-enw",
     "prj-cgn-bohai-acpr50s",
     "prj-chalk-river-mmr",
     "prj-chukotka-sovinoe-shelf-m",
     "prj-clinch-river-bwrx",
     "prj-cnnc-floating-demo-2016",
     "prj-cottam-smr300",
     "prj-daegu-gunwi-ismr",
     "prj-dalane-smr",
     "prj-daqing-nhr200",
     "prj-darlington-bwrx",
     "prj-darlington-bwrx-units-2-4",
     "prj-deep-atomic-mk60-inl",
     "prj-deep-fission-parsons",
     "prj-dimitrovgrad-svbr100",
     "prj-dual-fluid-rwanda",
     "prj-elementl-letart",
     "prj-elena-am-pilot",
     "prj-evinci-dome",
     "prj-fanco-eagl1-indiana",
     "prj-fensfjorden-smr",
     "prj-fermi-estonia",
     "prj-formosa-carem-commercial",
     "prj-galena-4s",
     "prj-gazprom-kirinskoye-floating",
     "prj-ghana-voygr12",
     "prj-gijang-smr",
     "prj-grenland-smr",
     "prj-gs-energy-uljin",
     "prj-haiyang-integrated-small-reactor",
     "prj-halden-smr",
     "prj-hartlepool-xe100",
     "prj-helen-helsinki-smr",
     "prj-hermes-1",
     "prj-hermes-2",
     "prj-hexana-gard-rhodanien",
     "prj-holtec-blue-castle",
     "prj-holtec-brigham-city",
     "prj-holtec-oyster-creek",
     "prj-holtec-palisades",
     "prj-holtec-smr160-srs-2012",
     "prj-htgr-pola-ncbj",
     "prj-htr-pm-shidaowan",
     "prj-htr10-inet",
     "prj-httr-oarai",
     "prj-huakun-one-taipingling",
     "prj-huizhou-huapeng-one",
     "prj-hyperion-srs-2012",
     "prj-imsr-rellis",
     "prj-industria-rr-smr",
     "prj-inl-marvel",
     "prj-isu-nucube-art",
     "prj-janus-fort-benning-kaleidos",
     "prj-janus-fort-bragg-antares",
     "prj-jiamusi-nuclear-heating",
     "prj-jimmy-bazancourt",
     "prj-kairos-rellis",
     "prj-knxt-valdemarsvik",
     "prj-kuopio-smr-heat",
     "prj-last-energy-haskell",
     "prj-last-energy-llynfi",
     "prj-last-energy-rellis",
     "prj-linglong-one",
     "prj-lister-smr",
     "prj-lomonosov",
     "prj-long-mott",
     "prj-mpower-clinch-river",
     "prj-narvik-fornes",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu",
     "prj-natura-rellis",
     "prj-newcleo-bohunice",
     "prj-newcleo-veron-lfr-as-30",
     "prj-ngnp-inl",
     "prj-nuscale-romania",
     "prj-oklo-eielson",
     "prj-oklo-ohio",
     "prj-osge-dabrowa-gornicza",
     "prj-osge-nowa-huta",
     "prj-osge-ostroleka",
     "prj-osge-stalowa-wola",
     "prj-osge-stawy-monowskie",
     "prj-osge-wloclawek",
     "prj-oygarden-smr",
     "prj-pbmr-koeberg",
     "prj-pele-inl",
     "prj-psi-copenhagen-atomics",
     "prj-radiant-buckley",
     "prj-radiant-kaleidos-inl",
     "prj-rde-serpong",
     "prj-ritm-jizzakh",
     "prj-rr-temelin",
     "prj-rr-wylfa",
     "prj-sanmen-htgr",
     "prj-sask-rafferty",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-sellafield-prism",
     "prj-sinap-minqin-smtmsr",
     "prj-solo-valmeyer",
     "prj-src-initial-evinci",
     "prj-stellaria-alvin-cadarache",
     "prj-studsvik-nykoping",
     "prj-svalbard-sealer",
     "prj-taftoy-smr",
     "prj-tarapur-bsmr-200",
     "prj-tarapur-smr-55",
     "prj-thorcon-kelasa",
     "prj-tmsr-lf1-wuwei",
     "prj-trawsfynydd-egino",
     "prj-uamps-cfpp",
     "prj-ubattery-chalk-river",
     "prj-ucri-ien",
     "prj-uiuc-kronos",
     "prj-unity-dome-2027",
     "prj-unity-inl",
     "prj-valar-carbon-county-campus",
     "prj-vardo-smr",
     "prj-vber300-aktau",
     "prj-videberg-varo-rr-smr",
     "prj-ward-250",
     "prj-xuwei-htgr-unit3",
     "prj-yakutia-ritm"
    ],
    "designs": [
     "dsn-aalo-1",
     "dsn-aalo-pod",
     "dsn-aalo-x",
     "dsn-abv-6m",
     "dsn-acp100",
     "dsn-acpr100",
     "dsn-acr-300",
     "dsn-ahwr-300",
     "dsn-alfred",
     "dsn-allegro",
     "dsn-allseas-htgr",
     "dsn-alvin",
     "dsn-ap300",
     "dsn-apollo-a-10",
     "dsn-arc-100",
     "dsn-arc-generator",
     "dsn-archeos",
     "dsn-aris-abv-6e",
     "dsn-aris-acp100s",
     "dsn-aris-amr",
     "dsn-aris-bandi",
     "dsn-aris-copenhagen-atomics-waste-burner",
     "dsn-aris-elena",
     "dsn-aris-fbnr",
     "dsn-aris-fuji",
     "dsn-aris-g4m",
     "dsn-aris-gt-mhr",
     "dsn-aris-holos-mono",
     "dsn-aris-holos-quad",
     "dsn-aris-htr-10",
     "dsn-aris-marvel",
     "dsn-aris-mhr-100",
     "dsn-aris-mhr-t",
     "dsn-aris-otrera-300",
     "dsn-aris-peluit-40",
     "dsn-aris-prism",
     "dsn-aris-prismatic-htr",
     "dsn-aris-shelf-m",
     "dsn-aris-smahtr",
     "dsn-aris-smart",
     "dsn-aris-star",
     "dsn-aris-unitherm",
     "dsn-aris-vber-300",
     "dsn-aris-w-lfr",
     "dsn-atgor",
     "dsn-aurora",
     "dsn-balder",
     "dsn-banr",
     "dsn-barc-chtr",
     "dsn-barc-htgcr",
     "dsn-bluecore-bc-15",
     "dsn-brest-od-300",
     "dsn-bsmr-200",
     "dsn-bwrx-300",
     "dsn-cap150",
     "dsn-cap200",
     "dsn-carem25",
     "dsn-catalogue-4s",
     "dsn-catalogue-cal-30",
     "dsn-catalogue-happy200",
     "dsn-catalogue-hexana",
     "dsn-catalogue-htgr-pola",
     "dsn-catalogue-htmr-100",
     "dsn-catalogue-httr",
     "dsn-catalogue-i-smr",
     "dsn-catalogue-ldr-50",
     "dsn-catalogue-lfr-as-200",
     "dsn-catalogue-lfr-as-30",
     "dsn-catalogue-loki-mmr",
     "dsn-catalogue-odin",
     "dsn-catalogue-r1",
     "dsn-catalogue-ssr-w",
     "dsn-catalogue-stellarium",
     "dsn-catalogue-teplator",
     "dsn-catalogue-thorizon-one",
     "dsn-deep-atomic-mk60",
     "dsn-df-cde",
     "dsn-dhr400",
     "dsn-eagl-1",
     "dsn-elena-am",
     "dsn-evinci",
     "dsn-ga-tes",
     "dsn-gfp-mmr",
     "dsn-gravity",
     "dsn-hermes",
     "dsn-holtec-smr-160",
     "dsn-htr-pm",
     "dsn-htr-pm600",
     "dsn-huakun-one",
     "dsn-huapeng-one",
     "dsn-imsr",
     "dsn-jimmy-heat",
     "dsn-kaleidos",
     "dsn-klt40s",
     "dsn-kp-fhr",
     "dsn-kronos-mmr",
     "dsn-mark-0",
     "dsn-morpheus",
     "dsn-mpower",
     "dsn-msr-1",
     "dsn-natrium",
     "dsn-natura-msr-100",
     "dsn-nusun-1",
     "dsn-pbmr",
     "dsn-pele",
     "dsn-pwr-20",
     "dsn-pwr-5",
     "dsn-ritm-200n",
     "dsn-ritm-200s",
     "dsn-ritm-400",
     "dsn-rr-smr",
     "dsn-ruta-70",
     "dsn-sealer",
     "dsn-sinap-smtmsr-10mwe",
     "dsn-smr-300",
     "dsn-smr-55",
     "dsn-solo",
     "dsn-svbr-100",
     "dsn-thorcon-500",
     "dsn-thorizon-pioneer",
     "dsn-tmsr-lf1",
     "dsn-u-battery",
     "dsn-unity",
     "dsn-voygr",
     "dsn-ward-250",
     "dsn-xe-100"
    ],
    "organizations": [
     "org-bwxt",
     "org-cnnc",
     "org-kghm",
     "org-natura",
     "org-terrestrial",
     "org-uamps"
    ],
    "programmes": [
     "prg-pl-kghm-smr-programme",
     "prg-us-bwxt-wyoming-energy-authority-banr-study",
     "prg-us-texas-tech-acu-natura-produced-water-msr"
    ],
    "events": [
     "evt-cfpp-cancel",
     "evt-marvel-full-power-target-2028",
     "evt-pele-inl-other-2028",
     "evt-ward-250-other-2026-07-01",
     "evt-ward250-full-power-2026"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-htr10-inet-electricity-generation-2004-10"
   ]
  },
  {
   "date": "2026-10-20",
   "added": {
    "organizations": [
     "org-dalane-kjernekraft",
     "org-diamondback-ep",
     "org-eel-river-bar-first-nation",
     "org-government-new-brunswick",
     "org-huaneng-xiapu-nuclear",
     "org-narvik-kjernekraft",
     "org-pabineau-first-nation"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-blykalla-horby",
     "prj-bontang-pkt-msr",
     "prj-carem25",
     "prj-cgn-bohai-acpr50s",
     "prj-chalk-river-mmr",
     "prj-daegu-gunwi-ismr",
     "prj-dalane-smr",
     "prj-dimitrovgrad-svbr100",
     "prj-evinci-dome",
     "prj-fensfjorden-smr",
     "prj-fermi-estonia",
     "prj-grenland-smr",
     "prj-halden-smr",
     "prj-holtec-brigham-city",
     "prj-industria-rr-smr",
     "prj-janus-fort-campbell-banr",
     "prj-janus-fort-drum-evinci",
     "prj-janus-fort-hood-ga-tes",
     "prj-kaliningrad-floating-smr-proposal",
     "prj-kerava-ldr50",
     "prj-last-energy-haskell",
     "prj-last-energy-ksse-first",
     "prj-last-energy-legnica",
     "prj-last-energy-london-gateway",
     "prj-last-energy-mioveni",
     "prj-leandrea-mol",
     "prj-liaoyuan-dhr400",
     "prj-lister-smr",
     "prj-loki-mmr-dome-inl",
     "prj-maoming-green-energy-htgr",
     "prj-meta-terrapower-initial",
     "prj-midpoint-smr",
     "prj-moltex-ssrw-lepreau",
     "prj-mpower-clinch-river",
     "prj-myanmar-ritm-smr",
     "prj-nano-barupon-liberty",
     "prj-nano-digihost-north-tonawanda",
     "prj-narvik-fornes",
     "prj-natura-msr-1-acu",
     "prj-navy-crane-microreactor",
     "prj-necsa-pelindaba-smr-demo",
     "prj-ngnp-inl",
     "prj-nine-mile-point-advanced-smr",
     "prj-ningdu-modular-plan",
     "prj-norilsk-asmm-ritm400",
     "prj-north-anna-smr",
     "prj-nuclea-morpheus-usrel",
     "prj-nucube-usrel",
     "prj-nuscale-romania",
     "prj-nuscale-srs-2012",
     "prj-odin-berkeley-green",
     "prj-oklo-diamondback",
     "prj-ornl-tcr",
     "prj-osge-dabrowa-gornicza",
     "prj-osge-nowa-huta",
     "prj-osge-ostroleka",
     "prj-osge-stalowa-wola",
     "prj-osge-stawy-monowskie",
     "prj-osge-warszawa",
     "prj-osge-wloclawek",
     "prj-otrera-marcoule",
     "prj-oygarden-smr",
     "prj-patnow-zepak-smr",
     "prj-pbmr-koeberg",
     "prj-pele-inl",
     "prj-penn-state-frontier",
     "prj-prodigy-belledune",
     "prj-purdue-duke-smr",
     "prj-radiant-buckley",
     "prj-rde-serpong",
     "prj-ritm-jizzakh",
     "prj-rivne-smr160",
     "prj-rr-detmarovice",
     "prj-rr-tusimice",
     "prj-rr-wylfa",
     "prj-ruijin-htr",
     "prj-ruta70-ippe-obninsk",
     "prj-sask-rafferty",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-sellafield-prism",
     "prj-shenyang-nhr200-2001",
     "prj-src-initial-evinci",
     "prj-standard-power-ohio",
     "prj-standard-power-pennsylvania",
     "prj-starcore-pinawa",
     "prj-stellaria-alvin-cadarache",
     "prj-stellaria-fos-sur-mer",
     "prj-stratek-zilkaats",
     "prj-studsvik-nykoping",
     "prj-surry-gec",
     "prj-svalbard-sealer",
     "prj-teplator-slavutych",
     "prj-tetra-1-rellis",
     "prj-thorcon-kelasa",
     "prj-thorizon-pioneer-petten",
     "prj-thorizon-zeeland",
     "prj-trawsfynydd-egino",
     "prj-trypilska-smr",
     "prj-uamps-cfpp",
     "prj-ucri-ien",
     "prj-uiuc-kronos",
     "prj-unity-hornbeck-maritime",
     "prj-usnc-inl-mmr-proposal",
     "prj-vber300-aktau",
     "prj-videberg-varo-rr-smr",
     "prj-west-kalimantan-land-smr",
     "prj-west-kalimantan-ritm-floating",
     "prj-wylfa-nuscale-shearwater",
     "prj-xiapu-htgr",
     "prj-xuwei-htgr-unit3",
     "prj-yakutia-ritm",
     "prj-yantai-nhr200-desalination-2003",
     "prj-zettajoule-tees-zj0"
    ],
    "designs": [
     "dsn-catalogue-a-htr-100",
     "dsn-catalogue-acpr50s",
     "dsn-catalogue-blossom-energy-smr",
     "dsn-catalogue-blue-capsule",
     "dsn-catalogue-cmsr",
     "dsn-catalogue-df300",
     "dsn-catalogue-dfbr-1",
     "dsn-catalogue-em2",
     "dsn-catalogue-energy-well",
     "dsn-catalogue-flex",
     "dsn-catalogue-fmr",
     "dsn-catalogue-gthtr300",
     "dsn-catalogue-hectar",
     "dsn-catalogue-htr50s",
     "dsn-catalogue-leunr",
     "dsn-catalogue-lftr",
     "dsn-catalogue-mn-1",
     "dsn-catalogue-movelux",
     "dsn-catalogue-nhr200-ii",
     "dsn-catalogue-nuclearis-n1",
     "dsn-catalogue-nuward-smr",
     "dsn-catalogue-otrera-2x300",
     "dsn-catalogue-ritm-200m",
     "dsn-catalogue-salus-100",
     "dsn-catalogue-sealer-one",
     "dsn-catalogue-smart100",
     "dsn-catalogue-start",
     "dsn-catalogue-xamr",
     "dsn-clear-m10",
     "dsn-cr-100",
     "dsn-daratha-microreactor",
     "dsn-david-smr",
     "dsn-deer",
     "dsn-eagles-300",
     "dsn-electra-forte",
     "dsn-elyon-5",
     "dsn-enhs",
     "dsn-flexblue",
     "dsn-forge-ember",
     "dsn-grem",
     "dsn-halo-mmr",
     "dsn-harpia",
     "dsn-hefasto",
     "dsn-jay-1",
     "dsn-jereh-micro-reactor",
     "dsn-jh-100",
     "dsn-kaist-atom",
     "dsn-kaist-mmr",
     "dsn-karat-100",
     "dsn-karat-45",
     "dsn-leadir-ps100",
     "dsn-lfr-tl-30",
     "dsn-lspr",
     "dsn-marina",
     "dsn-mcsfr",
     "dsn-megalvin",
     "dsn-mhi-multipurpose-microreactor",
     "dsn-microuranus",
     "dsn-mk1-pb-fhr",
     "dsn-mn-350",
     "dsn-myrrha-battery-smr-2014",
     "dsn-nugen-engine",
     "dsn-nuscale-microreactor",
     "dsn-otrera-one",
     "dsn-pascar",
     "dsn-pearl",
     "dsn-pgsfr",
     "dsn-polar-1",
     "dsn-rapid",
     "dsn-rapid-l",
     "dsn-reploy-sps",
     "dsn-rolls-royce-amr",
     "dsn-sc-htgr",
     "dsn-smart-c",
     "dsn-ssr-thermal-spectrum",
     "dsn-sstar",
     "dsn-star-h2",
     "dsn-star-lm",
     "dsn-starcore",
     "dsn-tredic-htgr",
     "dsn-uranus-40",
     "dsn-vber-150",
     "dsn-vityaz",
     "dsn-vk-300",
     "dsn-vver-300-v478",
     "dsn-vver-i",
     "dsn-xenith",
     "dsn-zap-zmr",
     "dsn-ziacore"
    ],
    "organizations": [
     "org-aris-ornl",
     "org-huaneng"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": []
  },
  {
   "date": "2026-10-21",
   "added": {
    "organizations": [
     "org-aecon-kiewit-nuclear-partners",
     "org-asp-isotopes",
     "org-atomenergomash",
     "org-atomstroyexport",
     "org-baltic-shipyard",
     "org-building-ontario-fund",
     "org-cameco",
     "org-canada-growth-fund",
     "org-canada-indigenous-loan-guarantee",
     "org-canada-infrastructure-bank",
     "org-cascade-nuclear-partners",
     "org-cnec",
     "org-cnnc-huachen",
     "org-cnnc-north-fuel",
     "org-cnnp",
     "org-crusoe",
     "org-dp-world",
     "org-finep",
     "org-framatome",
     "org-gdk-baimskaya",
     "org-gnf-a",
     "org-google",
     "org-jiangsu-guoxin",
     "org-jiangsu-power-construction-no3",
     "org-kiewit-nuclear-solutions",
     "org-legnica-special-economic-zone",
     "org-lianyungang-jinlian",
     "org-meti-anre",
     "org-nova-power-gas",
     "org-nuclearelectrica",
     "org-orano",
     "org-pacificorp",
     "org-samsung-ct",
     "org-seligdar",
     "org-standard-nuclear",
     "org-tata-chemicals-soda-ash-partners",
     "org-titan-2",
     "org-triga-international",
     "org-tvel",
     "org-uk-government",
     "org-us-doe",
     "org-us-exim",
     "org-williams-treaties-first-nations"
    ],
    "events": [
     "evt-alvin-criticality-target-2029-stated-20250312",
     "evt-baimsky-first-unit-target-2027-stated-20220831",
     "evt-belews-creek-afser-target-20260208",
     "evt-belews-creek-draft-eis-target-20260208",
     "evt-belews-creek-final-eis-target-20260208",
     "evt-belews-creek-final-se-target-20260208",
     "evt-clinch-final-se-target-202606-stated-20260618",
     "evt-clinch-final-se-target-202611-stated-20250725",
     "evt-clinch-final-ser-issued-20260625",
     "evt-darlington-grid-target-2029-stated-20231130",
     "evt-darlington-grid-target-2030-stated-20251024",
     "evt-natrium-cod-target-2028-stated-20211116",
     "evt-natrium-online-target-2031-stated-20260123"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-x-inl",
     "prj-antares-mark0-inl",
     "prj-aurora-inl",
     "prj-baimsky-floating",
     "prj-blue-energy-victoria",
     "prj-brest-od-300",
     "prj-bwxt-green-river",
     "prj-calogena-cadarache",
     "prj-cascade-enw",
     "prj-darlington-bwrx",
     "prj-fensfjorden-smr",
     "prj-fermi-estonia",
     "prj-gazprom-kirinskoye-floating",
     "prj-halden-smr",
     "prj-hermes-1",
     "prj-hermes-2",
     "prj-holtec-palisades",
     "prj-htr-pm-shidaowan",
     "prj-htr10-inet",
     "prj-httr-oarai",
     "prj-inl-marvel",
     "prj-jimmy-bazancourt",
     "prj-knxt-valdemarsvik",
     "prj-last-energy-legnica",
     "prj-last-energy-london-gateway",
     "prj-lomonosov",
     "prj-long-mott",
     "prj-meta-terrapower-initial",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu",
     "prj-nuscale-romania",
     "prj-oklo-eielson",
     "prj-oklo-ohio",
     "prj-osge-stalowa-wola",
     "prj-pele-inl",
     "prj-radiant-buckley",
     "prj-radiant-kaleidos-inl",
     "prj-ritm-jizzakh",
     "prj-rr-wylfa",
     "prj-sealer-untra",
     "prj-studsvik-nykoping",
     "prj-svalbard-sealer",
     "prj-taftoy-smr",
     "prj-uamps-cfpp",
     "prj-ucri-ien",
     "prj-ward-250",
     "prj-xuwei-htgr-unit3",
     "prj-yakutia-ritm"
    ],
    "events": [
     "evt-alvin-criticality-target-2030",
     "evt-baimsky-floating-commercial-operation-2028",
     "evt-belews-creek-draft-eis-2026-12",
     "evt-belews-creek-other-2026-12",
     "evt-belews-creek-other-2027-02",
     "evt-belews-creek-other-2027-03",
     "evt-yakutia-operation-target-2031"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-alvin-criticality-target-2029-stated-20250312",
    "update-evt-baimsky-first-unit-target-2027-stated-20220831",
    "update-evt-belews-creek-afser-target-20260208",
    "update-evt-belews-creek-draft-eis-target-20260208",
    "update-evt-belews-creek-final-eis-target-20260208",
    "update-evt-belews-creek-final-se-target-20260208",
    "update-evt-clinch-final-se-target-202606-stated-20260618",
    "update-evt-clinch-final-se-target-202611-stated-20250725",
    "update-evt-clinch-final-ser-issued-20260625",
    "update-evt-darlington-grid-target-2029-stated-20231130",
    "update-evt-darlington-grid-target-2030-stated-20251024",
    "update-evt-natrium-cod-target-2028-stated-20211116",
    "update-evt-natrium-online-target-2031-stated-20260123"
   ]
  },
  {
   "date": "2026-10-23",
   "added": {},
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-ascension-inl",
     "prj-aalo-idaho-falls-erp",
     "prj-aalo-rellis",
     "prj-aalo-x-inl",
     "prj-aep-joshua-falls",
     "prj-aep-rockport",
     "prj-alfred-mioveni",
     "prj-ameren-callaway-wsmr",
     "prj-ameresco-imsr-aberdeen",
     "prj-anpi-jbsa-antares",
     "prj-anpi-malmstrom-evinci",
     "prj-antares-mark0-inl",
     "prj-antares-mark1-inl",
     "prj-antares-r1-inl-cfa",
     "prj-ap300-teesside",
     "prj-arc100-inl",
     "prj-arc100-lepreau",
     "prj-atucha-new-smr",
     "prj-aurora-inl",
     "prj-baimsky-floating",
     "prj-baishan-happy200",
     "prj-barc-vizag-htgcr",
     "prj-belews-creek",
     "prj-belledune-arc100",
     "prj-blue-energy-victoria",
     "prj-bluecore-long-beach",
     "prj-blykalla-horby",
     "prj-bontang-pkt-msr",
     "prj-brest-od-300",
     "prj-bwxt-green-river",
     "prj-calogena-cadarache",
     "prj-carem25",
     "prj-cascade-enw",
     "prj-cgn-bohai-acpr50s",
     "prj-chalk-river-mmr",
     "prj-chukotka-sovinoe-shelf-m",
     "prj-clinch-river-bwrx",
     "prj-cnnc-floating-demo-2016",
     "prj-cottam-smr300",
     "prj-daegu-gunwi-ismr",
     "prj-dalane-smr",
     "prj-daqing-nhr200",
     "prj-darlington-bwrx",
     "prj-darlington-bwrx-units-2-4",
     "prj-deep-atomic-mk60-inl",
     "prj-deep-fission-parsons",
     "prj-dimitrovgrad-svbr100",
     "prj-dual-fluid-rwanda",
     "prj-elementl-letart",
     "prj-elena-am-pilot",
     "prj-evinci-dome",
     "prj-fanco-eagl1-indiana",
     "prj-fensfjorden-smr",
     "prj-fermi-estonia",
     "prj-formosa-carem-commercial",
     "prj-galena-4s",
     "prj-gazprom-kirinskoye-floating",
     "prj-ghana-voygr12",
     "prj-gijang-smr",
     "prj-grenland-smr",
     "prj-gs-energy-uljin",
     "prj-haiyang-integrated-small-reactor",
     "prj-halden-smr",
     "prj-hartlepool-xe100",
     "prj-helen-helsinki-smr",
     "prj-hermes-1",
     "prj-hermes-2",
     "prj-hexana-gard-rhodanien",
     "prj-holtec-blue-castle",
     "prj-holtec-brigham-city",
     "prj-holtec-oyster-creek",
     "prj-holtec-palisades",
     "prj-holtec-smr160-srs-2012",
     "prj-htgr-pola-ncbj",
     "prj-htr-pm-shidaowan",
     "prj-htr10-inet",
     "prj-httr-oarai",
     "prj-huakun-one-taipingling",
     "prj-huizhou-huapeng-one",
     "prj-hyperion-srs-2012",
     "prj-imsr-rellis",
     "prj-industria-rr-smr",
     "prj-inl-marvel",
     "prj-isu-nucube-art",
     "prj-janus-fort-benning-kaleidos",
     "prj-janus-fort-bragg-antares",
     "prj-janus-fort-campbell-banr",
     "prj-janus-fort-drum-evinci",
     "prj-janus-fort-hood-ga-tes",
     "prj-jiamusi-nuclear-heating",
     "prj-jimmy-bazancourt",
     "prj-kairos-rellis",
     "prj-kaliningrad-floating-smr-proposal",
     "prj-kerava-ldr50",
     "prj-knxt-valdemarsvik",
     "prj-kuopio-smr-heat",
     "prj-last-energy-haskell",
     "prj-last-energy-ksse-first",
     "prj-last-energy-legnica",
     "prj-last-energy-llynfi",
     "prj-last-energy-london-gateway",
     "prj-last-energy-mioveni",
     "prj-last-energy-rellis",
     "prj-leandrea-mol",
     "prj-liaoyuan-dhr400",
     "prj-linglong-one",
     "prj-lister-smr",
     "prj-loki-mmr-dome-inl",
     "prj-lomonosov",
     "prj-long-mott",
     "prj-maoming-green-energy-htgr",
     "prj-meta-terrapower-initial",
     "prj-midpoint-smr",
     "prj-moltex-ssrw-lepreau",
     "prj-mpower-clinch-river",
     "prj-myanmar-ritm-smr",
     "prj-nano-barupon-liberty",
     "prj-nano-digihost-north-tonawanda",
     "prj-narvik-fornes",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu",
     "prj-natura-rellis",
     "prj-navy-crane-microreactor",
     "prj-necsa-pelindaba-smr-demo",
     "prj-newcleo-bohunice",
     "prj-newcleo-veron-lfr-as-30",
     "prj-ngnp-inl",
     "prj-nine-mile-point-advanced-smr",
     "prj-ningdu-modular-plan",
     "prj-norilsk-asmm-ritm400",
     "prj-north-anna-smr",
     "prj-nuclea-morpheus-usrel",
     "prj-nucube-usrel",
     "prj-nuscale-romania",
     "prj-nuscale-srs-2012",
     "prj-odin-berkeley-green",
     "prj-oklo-diamondback",
     "prj-oklo-eielson",
     "prj-oklo-ohio",
     "prj-ornl-tcr",
     "prj-osge-dabrowa-gornicza",
     "prj-osge-nowa-huta",
     "prj-osge-ostroleka",
     "prj-osge-stalowa-wola",
     "prj-osge-stawy-monowskie",
     "prj-osge-warszawa",
     "prj-osge-wloclawek",
     "prj-otrera-marcoule",
     "prj-oygarden-smr",
     "prj-patnow-zepak-smr",
     "prj-pbmr-koeberg",
     "prj-pele-inl",
     "prj-penn-state-frontier",
     "prj-prodigy-belledune",
     "prj-psi-copenhagen-atomics",
     "prj-purdue-duke-smr",
     "prj-radiant-buckley",
     "prj-radiant-kaleidos-inl",
     "prj-rde-serpong",
     "prj-ritm-jizzakh",
     "prj-rivne-smr160",
     "prj-rr-detmarovice",
     "prj-rr-temelin",
     "prj-rr-tusimice",
     "prj-rr-wylfa",
     "prj-ruijin-htr",
     "prj-ruta70-ippe-obninsk",
     "prj-sanmen-htgr",
     "prj-sask-rafferty",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-sellafield-prism",
     "prj-shenyang-nhr200-2001",
     "prj-sinap-minqin-smtmsr",
     "prj-solo-valmeyer",
     "prj-src-initial-evinci",
     "prj-standard-power-ohio",
     "prj-standard-power-pennsylvania",
     "prj-starcore-pinawa",
     "prj-stellaria-alvin-cadarache",
     "prj-stellaria-fos-sur-mer",
     "prj-stratek-zilkaats",
     "prj-studsvik-nykoping",
     "prj-surry-gec",
     "prj-svalbard-sealer",
     "prj-taftoy-smr",
     "prj-tarapur-bsmr-200",
     "prj-tarapur-smr-55",
     "prj-teplator-slavutych",
     "prj-tetra-1-rellis",
     "prj-thorcon-kelasa",
     "prj-thorizon-pioneer-petten",
     "prj-thorizon-zeeland",
     "prj-tmsr-lf1-wuwei",
     "prj-trawsfynydd-egino",
     "prj-trypilska-smr",
     "prj-uamps-cfpp",
     "prj-ubattery-chalk-river",
     "prj-ucri-ien",
     "prj-uiuc-kronos",
     "prj-unity-dome-2027",
     "prj-unity-hornbeck-maritime",
     "prj-unity-inl",
     "prj-usnc-inl-mmr-proposal",
     "prj-valar-carbon-county-campus",
     "prj-vardo-smr",
     "prj-vber300-aktau",
     "prj-videberg-varo-rr-smr",
     "prj-ward-250",
     "prj-west-kalimantan-land-smr",
     "prj-west-kalimantan-ritm-floating",
     "prj-wylfa-nuscale-shearwater",
     "prj-xiapu-htgr",
     "prj-xuwei-htgr-unit3",
     "prj-yakutia-ritm",
     "prj-yantai-nhr200-desalination-2003",
     "prj-zettajoule-tees-zj0"
    ],
    "events": [
     "evt-baimsky-floating-commercial-operation-2028",
     "evt-natrium-cod-target-2028-stated-20211116",
     "evt-natrium-online-target-2031-stated-20260123"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-galena-4s",
     "from": "announced",
     "to": "cancelled"
    },
    {
     "id": "prj-shenyang-nhr200-2001",
     "from": "announced",
     "to": "cancelled"
    }
   ],
   "new_updates": []
  },
  {
   "date": "2026-10-24",
   "added": {
    "events": [
     "evt-antares-mark0-nsda-reported-202510",
     "evt-antares-mark1-nsda-announcement-20261023"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-antares-mark0-inl",
     "prj-antares-mark1-inl",
     "prj-carem25",
     "prj-clinch-river-bwrx",
     "prj-darlington-bwrx",
     "prj-hermes-1",
     "prj-htr10-inet",
     "prj-inl-marvel",
     "prj-lomonosov",
     "prj-natrium-kemmerer",
     "prj-nuscale-romania",
     "prj-uiuc-kronos"
    ],
    "designs": [
     "dsn-natrium"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-antares-mark0-nsda-reported-202510",
    "update-evt-antares-mark1-nsda-announcement-20261023"
   ]
  },
  {
   "date": "2026-10-25",
   "added": {
    "programmes": [
     "prg-id-rosatom-halmahera-floating-power-agreement",
     "prg-nl-rotterdam-smr-supply-chain-study",
     "prg-us-aep-amazon-xenergy-breed-exploration",
     "prg-us-deep-fission-gpda-commercial-power-agreement",
     "prg-us-valar-nrc-preapplication-engagement"
    ],
    "events": [
     "evt-radiant-crane-selection-announced-20261020"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-navy-crane-microreactor"
    ],
    "organizations": [
     "org-antares",
     "org-asp-isotopes",
     "org-nano-nuclear",
     "org-necsa",
     "org-westinghouse"
    ],
    "programmes": [
     "prg-gb-sge-bwrx300-fleet"
    ],
    "policies": [
     "pol-ky-164-2805"
    ],
    "regulatory_actions": [
     "reg-pioneer-cp-lwa-application-2026"
    ],
    "events": [
     "evt-antares-mark0-nsda-reported-202510"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-radiant-crane-selection-announced-20261020"
   ]
  },
  {
   "date": "2026-10-26",
   "added": {
    "programmes": [
     "prg-ca-arc-invest-alberta-mou-20230324",
     "prg-ca-us-nucleon-arc-mou-20250513"
    ],
    "policies": [
     "pol-gb-onr-relevant-good-practice-202609",
     "pol-us-nrc-prior-doe-dod-authorizations-20261026"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-arc100-lepreau",
     "prj-belews-creek",
     "prj-carem25",
     "prj-clinch-river-bwrx",
     "prj-fensfjorden-smr",
     "prj-grenland-smr",
     "prj-hermes-1",
     "prj-hermes-2",
     "prj-last-energy-legnica",
     "prj-lomonosov",
     "prj-myanmar-ritm-smr",
     "prj-osge-wloclawek",
     "prj-ritm-jizzakh",
     "prj-shenyang-nhr200-2001",
     "prj-yakutia-ritm"
    ],
    "designs": [
     "dsn-arc-100",
     "dsn-deer"
    ],
    "organizations": [
     "org-arc"
    ],
    "programmes": [
     "prg-ca-kr-us-khnp-arc-nb-power-arc100-fleet"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-pol-gb-onr-relevant-good-practice-202609-1",
    "update-pol-us-nrc-prior-doe-dod-authorizations-20261026-1"
   ]
  },
  {
   "date": "2026-10-27",
   "added": {
    "programmes": [
     "prg-fr-newcleo-mox-pilot-safety-options-2026",
     "prg-se-blykalla-neext-sealer-engineering-2026",
     "prg-us-darpa-fat-cat-autonomous-reactor-research"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-arc100-lepreau",
     "prj-baimsky-floating",
     "prj-dual-fluid-rwanda",
     "prj-htr10-inet",
     "prj-last-energy-mioveni"
    ],
    "regulatory_actions": [
     "reg-asnr-calogena-options-2024",
     "reg-asnr-jimmy-dac-2024"
    ],
    "events": [
     "evt-dual-fluid-rwanda-construction-start-2026",
     "evt-dual-fluid-rwanda-other-2028"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": []
  },
  {
   "date": "2026-10-28",
   "added": {
    "projects": [
     "prj-last-energy-caldwell"
    ],
    "designs": [
     "dsn-nuscale-us600"
    ],
    "programmes": [
     "prg-us-doe-reactor-pilot-program"
    ],
    "regulatory_actions": [
     "reg-cnsc-vdr-arc100-2025",
     "reg-cnsc-vdr-bwrx300-2023",
     "reg-cnsc-vdr-evinci-2023",
     "reg-cnsc-vdr-imsr-2023",
     "reg-cnsc-vdr-mmr-2019",
     "reg-cnsc-vdr-smr160-2020",
     "reg-cnsc-vdr-ssrw-2021",
     "reg-cnsc-vdr-xe100-2023",
     "reg-kr-smart-sda-2012",
     "reg-nrc-us600-dc-2023",
     "reg-nrc-us600-sda-2020",
     "reg-uk-gda-bwrx300-2025",
     "reg-uk-gda-natrium-2026",
     "reg-uk-gda-rr-smr-step2-2024",
     "reg-uk-gda-smr300-2026",
     "reg-uk-gda-xe100-2026"
    ],
    "events": [
     "evt-last-energy-caldwell-rep-202607",
     "evt-linglong-cold-functional-202510",
     "evt-linglong-hot-functional-20261001",
     "evt-linglong-nnsa-commissioning-20260818",
     "evt-linglong-nnsa-key-issues-20260316",
     "evt-linglong-nnsa-workgroup-20260605",
     "evt-linglong-operator-licences-202503",
     "evt-natrium-kemmerer-supplier-awards-20260831",
     "evt-rr-detmarovice-preferred-site-20230227",
     "evt-rr-tusimice-eia-notification-20250506",
     "evt-rr-tusimice-eia-screening-20251222",
     "evt-rr-tusimice-preferred-site-20230227"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-ascension-inl",
     "prj-aalo-rellis",
     "prj-aalo-x-inl",
     "prj-ameren-callaway-wsmr",
     "prj-ameresco-imsr-aberdeen",
     "prj-antares-mark0-inl",
     "prj-antares-mark1-inl",
     "prj-antares-r1-inl-cfa",
     "prj-arc100-inl",
     "prj-aurora-inl",
     "prj-baimsky-floating",
     "prj-baishan-happy200",
     "prj-belews-creek",
     "prj-belledune-arc100",
     "prj-blue-energy-victoria",
     "prj-bluecore-long-beach",
     "prj-brest-od-300",
     "prj-carem25",
     "prj-chukotka-sovinoe-shelf-m",
     "prj-cnnc-floating-demo-2016",
     "prj-daegu-gunwi-ismr",
     "prj-daqing-nhr200",
     "prj-darlington-bwrx",
     "prj-deep-atomic-mk60-inl",
     "prj-fensfjorden-smr",
     "prj-galena-4s",
     "prj-gazprom-kirinskoye-floating",
     "prj-ghana-voygr12",
     "prj-grenland-smr",
     "prj-haiyang-integrated-small-reactor",
     "prj-hartlepool-xe100",
     "prj-hermes-1",
     "prj-hermes-2",
     "prj-holtec-blue-castle",
     "prj-holtec-smr160-srs-2012",
     "prj-htr-pm-shidaowan",
     "prj-htr10-inet",
     "prj-httr-oarai",
     "prj-huakun-one-taipingling",
     "prj-hyperion-srs-2012",
     "prj-industria-rr-smr",
     "prj-inl-marvel",
     "prj-janus-fort-benning-kaleidos",
     "prj-janus-fort-campbell-banr",
     "prj-janus-fort-drum-evinci",
     "prj-jiamusi-nuclear-heating",
     "prj-kerava-ldr50",
     "prj-knxt-valdemarsvik",
     "prj-kuopio-smr-heat",
     "prj-last-energy-haskell",
     "prj-last-energy-legnica",
     "prj-last-energy-london-gateway",
     "prj-last-energy-mioveni",
     "prj-last-energy-rellis",
     "prj-linglong-one",
     "prj-loki-mmr-dome-inl",
     "prj-lomonosov",
     "prj-midpoint-smr",
     "prj-mpower-clinch-river",
     "prj-myanmar-ritm-smr",
     "prj-nano-barupon-liberty",
     "prj-nano-digihost-north-tonawanda",
     "prj-narvik-fornes",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu",
     "prj-necsa-pelindaba-smr-demo",
     "prj-ngnp-inl",
     "prj-nuclea-morpheus-usrel",
     "prj-nucube-usrel",
     "prj-nuscale-srs-2012",
     "prj-odin-berkeley-green",
     "prj-ornl-tcr",
     "prj-otrera-marcoule",
     "prj-pele-inl",
     "prj-purdue-duke-smr",
     "prj-radiant-kaleidos-inl",
     "prj-rde-serpong",
     "prj-ritm-jizzakh",
     "prj-rr-detmarovice",
     "prj-rr-tusimice",
     "prj-rr-wylfa",
     "prj-ruta70-ippe-obninsk",
     "prj-sanmen-htgr",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-shenyang-nhr200-2001",
     "prj-sinap-minqin-smtmsr",
     "prj-solo-valmeyer",
     "prj-src-initial-evinci",
     "prj-standard-power-ohio",
     "prj-standard-power-pennsylvania",
     "prj-stellaria-alvin-cadarache",
     "prj-stellaria-fos-sur-mer",
     "prj-studsvik-nykoping",
     "prj-surry-gec",
     "prj-teplator-slavutych",
     "prj-thorizon-pioneer-petten",
     "prj-thorizon-zeeland",
     "prj-tmsr-lf1-wuwei",
     "prj-trawsfynydd-egino",
     "prj-ubattery-chalk-river",
     "prj-uiuc-kronos",
     "prj-unity-inl",
     "prj-usnc-inl-mmr-proposal",
     "prj-vber300-aktau",
     "prj-ward-250",
     "prj-west-kalimantan-land-smr",
     "prj-west-kalimantan-ritm-floating",
     "prj-yakutia-ritm",
     "prj-yantai-nhr200-desalination-2003",
     "prj-zettajoule-tees-zj0"
    ],
    "programmes": [
     "prg-ru-primorsky-floating-units-study"
    ],
    "regulatory_actions": [
     "reg-asnr-stellaria-alpha-2025",
     "reg-nnsa-tmsr-lf1-operating-2023",
     "reg-rr-gda"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-rr-detmarovice",
     "from": "announced",
     "to": "siting"
    },
    {
     "id": "prj-rr-tusimice",
     "from": "announced",
     "to": "siting"
    }
   ],
   "new_updates": [
    "update-evt-last-energy-caldwell-rep-202607",
    "update-evt-linglong-cold-functional-202510",
    "update-evt-linglong-hot-functional-20261001",
    "update-evt-linglong-nnsa-commissioning-20260818",
    "update-evt-linglong-nnsa-key-issues-20260316",
    "update-evt-linglong-nnsa-workgroup-20260605",
    "update-evt-linglong-operator-licences-202503",
    "update-evt-natrium-kemmerer-supplier-awards-20260831",
    "update-evt-rr-detmarovice-preferred-site-20230227",
    "update-evt-rr-tusimice-eia-notification-20250506",
    "update-evt-rr-tusimice-eia-screening-20251222",
    "update-evt-rr-tusimice-preferred-site-20230227",
    "update-reg-cnsc-vdr-arc100-2025-decision",
    "update-reg-cnsc-vdr-bwrx300-2023-decision",
    "update-reg-cnsc-vdr-imsr-2023-decision",
    "update-reg-cnsc-vdr-mmr-2019-decision",
    "update-reg-cnsc-vdr-smr160-2020-decision",
    "update-reg-cnsc-vdr-ssrw-2021-decision",
    "update-reg-cnsc-vdr-xe100-2023-decision",
    "update-reg-kr-smart-sda-2012-decision",
    "update-reg-nrc-us600-dc-2023-decision",
    "update-reg-nrc-us600-sda-2020-decision",
    "update-reg-uk-gda-bwrx300-2025-decision",
    "update-reg-uk-gda-rr-smr-step2-2024-decision",
    "update-reg-uk-gda-smr300-2026-decision"
   ]
  },
  {
   "date": "2026-10-29",
   "added": {
    "policies": [
     "pol-ar-national-nuclear-activity-law-24804",
     "pol-ar-science-technology-guidelines-2025-2027",
     "pol-cz-atomic-act-263-2016",
     "pol-cz-sujb-decree-378-2016-siting",
     "pol-eu-euratom-treaty",
     "pol-eu-net-zero-industry-act-2024-1735",
     "pol-eu-nuclear-safety-directive-2009-71",
     "pol-eu-taxonomy-nuclear-delegated-regulation-2022-1214",
     "pol-fi-nuclear-energy-act-775-2026",
     "pol-fi-nuclear-energy-act-990-1987",
     "pol-fr-environment-code-inb-regime",
     "pol-fr-france-2030-innovative-reactors-call",
     "pol-fr-law-2023-491-new-reactors-existing-sites",
     "pol-id-bapeten-site-evaluation-reg-4-2018",
     "pol-id-national-energy-policy-pp-40-2025",
     "pol-id-nuclear-energy-act-10-1997",
     "pol-id-nuclear-installation-licensing-pp-2-2014",
     "pol-in-draft-shanti-regulations-2026",
     "pol-in-draft-shanti-rules-2026",
     "pol-in-nuclear-energy-mission-smr",
     "pol-in-shanti-act-2025",
     "pol-kr-ismr-technology-development-programme",
     "pol-kr-nuclear-safety-act",
     "pol-kr-radiological-emergency-planning-zones",
     "pol-kr-smr-development-promotion-act",
     "pol-nl-bkl-nuclear-plant-locations",
     "pol-nl-kernenergiewet",
     "pol-nl-mooi-nuclear-innovation-theme",
     "pol-no-atomic-energy-act-1972-28",
     "pol-no-impact-assessment-regulations-2017-854",
     "pol-pl-nuclear-investments-special-act-2011",
     "pol-pl-ppej-2026",
     "pol-pl-prawo-atomowe",
     "pol-za-national-nuclear-regulator-act-47-1999",
     "pol-za-nuclear-energy-act-46-1999",
     "pol-za-site-licensing-regulations-r927"
    ]
   },
   "restored": {},
   "changed": {
    "programmes": [
     "prg-bg-beh-fluor-nuscale-mou",
     "prg-bg-nuscale-kozloduy-mou",
     "prg-br-cdpnb-smr-technical-group",
     "prg-br-government-rosatom-smr-cooperation",
     "prg-br-mnb-technology-development",
     "prg-br-nuclep-rosatom-mou",
     "prg-ca-arc-invest-alberta-mou-20230324",
     "prg-ca-bwxt-westinghouse-ap300-components-mou-2024",
     "prg-ca-kaeri-aecl-smart-mou",
     "prg-ca-kr-us-khnp-arc-nb-power-arc100-fleet",
     "prg-ca-mcmaster-usnc-mmr-feasibility",
     "prg-ca-opg-xenergy-xe100-industrial-framework",
     "prg-ca-prodigy-des-nedhe-tnpp-mou",
     "prg-ca-us-nucleon-arc-mou-20250513",
     "prg-cn-cgn-tsinghua-nhr200ii-heating-demonstration",
     "prg-cn-cnnc-acp100s-floating-demonstration",
     "prg-cn-guizhou-small-reactor-demonstration",
     "prg-fanco-atkins-engineering-alliance-2026",
     "prg-fanco-hyundai-framework-2026",
     "prg-fr-newcleo-mox-pilot-safety-options-2026",
     "prg-gb-amr-rdd-htgr-demonstration",
     "prg-gb-terrestrial-springfields-imsr-fuel-pilot-2025",
     "prg-gb-ulc-energy-chiltern-vital-smr-clusters",
     "prg-gn-rosatom-floating-npp-mou",
     "prg-id-brin-peluit40-pln-nusantara",
     "prg-id-pertamina-nre-saltfoss-cmsr",
     "prg-iq-smr-consideration-russia-talks",
     "prg-ir-aeoi-rosatom-small-npp-mou",
     "prg-jo-jaec-khnp-ismr-feasibility-mou",
     "prg-jo-jaec-xenergy-xe100-mou",
     "prg-no-norsk-kjernekraft-saltfoss-loi",
     "prg-ph-doe-rosatom-smr-cooperation",
     "prg-ph-stgr20-letter-of-intent",
     "prg-pl-enea-last-energy-loi",
     "prg-pl-last-energy-ksse",
     "prg-pl-respect-energy-edf-nuward",
     "prg-pl-unimot-getka-nuscale",
     "prg-pr-nuclear-alternative-project-smr-siting-study",
     "prg-ro-last-energy-cncan-licensing",
     "prg-ru-gazprom-tambey-fpu-study",
     "prg-ru-pevek-additional-fpu-study",
     "prg-ru-primorsky-floating-units-study",
     "prg-ru-shelf-m-prospective-arctic-sites",
     "prg-ru-vk300-arkhangelsk-feasibility",
     "prg-rw-nano-raeb-mou",
     "prg-sa-dl-ec-swcc-smr-desalination-mou",
     "prg-sa-kacare-cnec-htr",
     "prg-se-blykalla-evroc-studsvik-feasibility",
     "prg-sk-javys-westinghouse-ap300-mou",
     "prg-th-gpsc-saltfoss-cmsr",
     "prg-ua-energoatom-edf-nuward",
     "prg-ua-energoatom-nuscale-mou",
     "prg-ua-energoatom-rolls-royce-smr-mou",
     "prg-ua-energoatom-westinghouse-ap300-mou",
     "prg-us-bwxt-nfs-haleu-deconversion-2024",
     "prg-us-bwxt-wyoming-energy-authority-banr-study",
     "prg-us-constellation-clinton-smr-evaluation",
     "prg-us-cvea-usnc-mmr-feasibility",
     "prg-us-darpa-fat-cat-autonomous-reactor-research",
     "prg-us-energysolutions-ipa-intermountain-nuclear",
     "prg-us-idaho-strategic-radiant-kaleidos",
     "prg-us-kairos-bwxt-triso-collaboration-2025",
     "prg-us-maryland-mea-xenergy-coal-to-nuclear-study",
     "prg-us-nano-afwerx-kronos-jbab-study",
     "prg-us-nano-doe-id-zeus-odin-siting-mou",
     "prg-us-natura-3m-lithium7-cooperation-2025",
     "prg-us-natura-hifunda-sensor-development-2026",
     "prg-us-natura-nov-shepherd-commercialisation-2025",
     "prg-us-natura-quadrant-haleu-framework-2026",
     "prg-us-oklo-wyoming-hyperscale-loi",
     "prg-us-pacificorp-terrapower-natrium-study",
     "prg-us-srns-geh-prism-srs-2010",
     "prg-us-terrapower-nvision-natrium-framework",
     "prg-us-terrapower-sabey-natrium-mou",
     "prg-us-terrestrial-energysolutions-imsr-siting-mou",
     "prg-us-texas-tech-acu-natura-produced-water-msr",
     "prg-us-utah-terrapower-flagship-natrium-mou"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-pol-ar-national-nuclear-activity-law-24804-1",
    "update-pol-ar-national-nuclear-activity-law-24804-2",
    "update-pol-ar-national-nuclear-activity-law-24804-3",
    "update-pol-ar-national-nuclear-activity-law-24804-4",
    "update-pol-ar-science-technology-guidelines-2025-2027-1",
    "update-pol-ar-science-technology-guidelines-2025-2027-2",
    "update-pol-cz-atomic-act-263-2016-1",
    "update-pol-cz-atomic-act-263-2016-2",
    "update-pol-cz-sujb-decree-378-2016-siting-1",
    "update-pol-cz-sujb-decree-378-2016-siting-2",
    "update-pol-eu-euratom-treaty-1",
    "update-pol-eu-net-zero-industry-act-2024-1735-1",
    "update-pol-eu-net-zero-industry-act-2024-1735-2",
    "update-pol-eu-net-zero-industry-act-2024-1735-3",
    "update-pol-eu-nuclear-safety-directive-2009-71-1",
    "update-pol-eu-nuclear-safety-directive-2009-71-2",
    "update-pol-eu-nuclear-safety-directive-2009-71-3",
    "update-pol-eu-nuclear-safety-directive-2009-71-4",
    "update-pol-eu-nuclear-safety-directive-2009-71-5",
    "update-pol-eu-taxonomy-nuclear-delegated-regulation-2022-1214-1",
    "update-pol-eu-taxonomy-nuclear-delegated-regulation-2022-1214-2",
    "update-pol-eu-taxonomy-nuclear-delegated-regulation-2022-1214-3",
    "update-pol-fi-nuclear-energy-act-775-2026-1",
    "update-pol-fi-nuclear-energy-act-775-2026-2",
    "update-pol-fi-nuclear-energy-act-775-2026-3",
    "update-pol-fi-nuclear-energy-act-990-1987-1",
    "update-pol-fi-nuclear-energy-act-990-1987-2",
    "update-pol-fr-environment-code-inb-regime-1",
    "update-pol-fr-environment-code-inb-regime-2",
    "update-pol-fr-france-2030-innovative-reactors-call-1",
    "update-pol-fr-france-2030-innovative-reactors-call-2",
    "update-pol-fr-france-2030-innovative-reactors-call-3",
    "update-pol-fr-law-2023-491-new-reactors-existing-sites-1",
    "update-pol-fr-law-2023-491-new-reactors-existing-sites-2",
    "update-pol-id-bapeten-site-evaluation-reg-4-2018-1",
    "update-pol-id-bapeten-site-evaluation-reg-4-2018-2",
    "update-pol-id-national-energy-policy-pp-40-2025-1",
    "update-pol-id-national-energy-policy-pp-40-2025-2",
    "update-pol-id-nuclear-energy-act-10-1997-1",
    "update-pol-id-nuclear-energy-act-10-1997-2",
    "update-pol-id-nuclear-energy-act-10-1997-3",
    "update-pol-id-nuclear-installation-licensing-pp-2-2014-1",
    "update-pol-id-nuclear-installation-licensing-pp-2-2014-2",
    "update-pol-in-draft-shanti-regulations-2026-1",
    "update-pol-in-draft-shanti-regulations-2026-2",
    "update-pol-in-draft-shanti-rules-2026-1",
    "update-pol-in-draft-shanti-rules-2026-2",
    "update-pol-in-nuclear-energy-mission-smr-1",
    "update-pol-in-shanti-act-2025-1",
    "update-pol-in-shanti-act-2025-2",
    "update-pol-kr-ismr-technology-development-programme-1",
    "update-pol-kr-ismr-technology-development-programme-2",
    "update-pol-kr-nuclear-safety-act-1",
    "update-pol-kr-nuclear-safety-act-2",
    "update-pol-kr-nuclear-safety-act-3",
    "update-pol-kr-nuclear-safety-act-4",
    "update-pol-kr-radiological-emergency-planning-zones-1",
    "update-pol-kr-radiological-emergency-planning-zones-2",
    "update-pol-kr-radiological-emergency-planning-zones-3",
    "update-pol-kr-smr-development-promotion-act-1",
    "update-pol-kr-smr-development-promotion-act-2",
    "update-pol-nl-bkl-nuclear-plant-locations-1",
    "update-pol-nl-kernenergiewet-1",
    "update-pol-nl-mooi-nuclear-innovation-theme-1",
    "update-pol-nl-mooi-nuclear-innovation-theme-2",
    "update-pol-nl-mooi-nuclear-innovation-theme-3",
    "update-pol-nl-mooi-nuclear-innovation-theme-4",
    "update-pol-nl-mooi-nuclear-innovation-theme-5",
    "update-pol-nl-mooi-nuclear-innovation-theme-6",
    "update-pol-no-atomic-energy-act-1972-28-1",
    "update-pol-no-atomic-energy-act-1972-28-2",
    "update-pol-no-impact-assessment-regulations-2017-854-1",
    "update-pol-no-impact-assessment-regulations-2017-854-2",
    "update-pol-pl-nuclear-investments-special-act-2011-1",
    "update-pol-pl-nuclear-investments-special-act-2011-2",
    "update-pol-pl-nuclear-investments-special-act-2011-3",
    "update-pol-pl-ppej-2026-1",
    "update-pol-pl-ppej-2026-2",
    "update-pol-pl-ppej-2026-3",
    "update-pol-pl-prawo-atomowe-1",
    "update-pol-pl-prawo-atomowe-2",
    "update-pol-pl-prawo-atomowe-3",
    "update-pol-za-national-nuclear-regulator-act-47-1999-1",
    "update-pol-za-nuclear-energy-act-46-1999-1",
    "update-pol-za-site-licensing-regulations-r927-1"
   ]
  },
  {
   "date": "2026-10-30",
   "added": {
    "projects": [
     "prj-aep-amazon-xenergy-breed",
     "prj-geenex-beck-creek",
     "prj-rosatom-north-halmahera-floating"
    ],
    "organizations": [
     "org-geenex-power"
    ],
    "policies": [
     "pol-ca-building-canada-act-2025",
     "pol-gb-en7-nps-nuclear-2025",
     "pol-gb-energy-act-2013-part-3-onr",
     "pol-gb-gben-rolls-royce-smr-award-2026",
     "pol-gb-gben-smr-programme",
     "pol-gb-nuclear-installations-act-1965",
     "pol-gb-nuclear-regulatory-review-response-2026",
     "pol-ua-snriu-regulation-cmu-363-2014",
     "pol-us-doe-haleu-availability-program",
     "pol-us-irc-45y-48e-clean-electricity-credits",
     "pol-us-nrc-categorical-exclusions-2026",
     "pol-us-nrc-design-certification-duration-2025",
     "pol-us-nrc-fy2026-fee-rule",
     "pol-us-nrc-mandatory-hearing-flexibility-2026",
     "pol-us-nrc-modernization-direct-final-2026"
    ],
    "events": [
     "evt-antares-mark1-electricity-target-2027"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aalo-ascension-inl",
     "prj-aalo-idaho-falls-erp",
     "prj-alfred-mioveni",
     "prj-ameren-callaway-wsmr",
     "prj-ameresco-imsr-aberdeen",
     "prj-anpi-jbsa-antares",
     "prj-anpi-malmstrom-evinci",
     "prj-antares-mark1-inl",
     "prj-antares-r1-inl-cfa",
     "prj-ap300-teesside",
     "prj-arc100-inl",
     "prj-belledune-arc100",
     "prj-blykalla-horby",
     "prj-bontang-pkt-msr",
     "prj-chukotka-sovinoe-shelf-m",
     "prj-clinch-river-bwrx",
     "prj-daegu-gunwi-ismr",
     "prj-deep-atomic-mk60-inl",
     "prj-deep-fission-parsons",
     "prj-gazprom-kirinskoye-floating",
     "prj-halden-smr",
     "prj-holtec-smr160-srs-2012",
     "prj-hyperion-srs-2012",
     "prj-inl-marvel",
     "prj-isu-nucube-art",
     "prj-janus-fort-benning-kaleidos",
     "prj-janus-fort-bragg-antares",
     "prj-janus-fort-campbell-banr",
     "prj-janus-fort-drum-evinci",
     "prj-janus-fort-hood-ga-tes",
     "prj-jiamusi-nuclear-heating",
     "prj-jimmy-bazancourt",
     "prj-last-energy-haskell",
     "prj-last-energy-mioveni",
     "prj-leandrea-mol",
     "prj-mpower-clinch-river",
     "prj-nano-barupon-liberty",
     "prj-natrium-kemmerer",
     "prj-navy-crane-microreactor",
     "prj-newcleo-veron-lfr-as-30",
     "prj-ngnp-inl",
     "prj-nuscale-srs-2012",
     "prj-odin-berkeley-green",
     "prj-ornl-tcr",
     "prj-osge-dabrowa-gornicza",
     "prj-otrera-marcoule",
     "prj-purdue-duke-smr",
     "prj-rde-serpong",
     "prj-ruijin-htr",
     "prj-ruta70-ippe-obninsk",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-shenyang-nhr200-2001",
     "prj-solo-valmeyer",
     "prj-standard-power-ohio",
     "prj-standard-power-pennsylvania",
     "prj-starcore-pinawa",
     "prj-stellaria-alvin-cadarache",
     "prj-stellaria-fos-sur-mer",
     "prj-taftoy-smr",
     "prj-teplator-slavutych",
     "prj-thorizon-pioneer-petten",
     "prj-thorizon-zeeland",
     "prj-tmsr-lf1-wuwei",
     "prj-trypilska-smr",
     "prj-ubattery-chalk-river",
     "prj-valar-carbon-county-campus",
     "prj-vardo-smr",
     "prj-vber300-aktau",
     "prj-west-kalimantan-land-smr",
     "prj-xiapu-htgr",
     "prj-xuwei-htgr-unit3",
     "prj-yantai-nhr200-desalination-2003",
     "prj-zettajoule-tees-zj0"
    ],
    "designs": [
     "dsn-allegro",
     "dsn-aris-prismatic-htr",
     "dsn-aris-w-lfr",
     "dsn-bwrx-300",
     "dsn-catalogue-df300",
     "dsn-catalogue-em2",
     "dsn-catalogue-fmr",
     "dsn-catalogue-start",
     "dsn-cr-100",
     "dsn-david-smr",
     "dsn-deer",
     "dsn-forge-ember",
     "dsn-gravity",
     "dsn-hefasto",
     "dsn-huakun-one",
     "dsn-kaist-atom",
     "dsn-otrera-one",
     "dsn-reploy-sps",
     "dsn-ritm-400",
     "dsn-svbr-100",
     "dsn-vver-300-v478"
    ],
    "organizations": [
     "org-epz"
    ],
    "programmes": [
     "prg-ae-enec-adnoc-smr-assessment",
     "prg-am-smr-replacement-unit",
     "prg-bg-blue-bird-sge-bwrx300-jv-loi",
     "prg-bg-ustda-beh-smr-prefeasibility-grant",
     "prg-bh-bapco-smr-study",
     "prg-br-government-rosatom-smr-cooperation",
     "prg-br-nuclep-rosatom-mou",
     "prg-ca-kaeri-aecl-smart-mou",
     "prg-ca-xenergy-alberta-xe100-feasibility",
     "prg-cn-cgn-tsinghua-nhr200ii-heating-demonstration",
     "prg-cn-htgr-industrial-chain-alliance",
     "prg-cn-sinap-thorium-msr-prototype",
     "prg-co-eje-cafetero-smr-viability-study",
     "prg-ec-nuclear-plan-modular-reactor",
     "prg-fr-ppe3-first-smr-target",
     "prg-fr-stellaria-equinix-preorder",
     "prg-gb-terrapower-kbr-natrium-uk-siting",
     "prg-gb-ulc-energy-chiltern-vital-smr-clusters",
     "prg-gn-rosatom-floating-npp-mou",
     "prg-gr-fnpp-joint-development-program-study",
     "prg-gr-inter-ministerial-committee-smr",
     "prg-hr-nuclear-working-group-smr-siting",
     "prg-hu-hunatom-sge-bwrx300-loi",
     "prg-hu-mvm-holtec-smr300-mou",
     "prg-hu-us-hungary-nuclear-mou-2025",
     "prg-id-rosatom-halmahera-floating-power-agreement",
     "prg-id-west-kalimantan-smr-feasibility-study",
     "prg-in-ru-rosatom-india-fnpp-working-group",
     "prg-iq-smr-consideration-russia-talks",
     "prg-ir-aeoi-rosatom-small-npp-mou",
     "prg-it-edf-nuward-edison-italy",
     "prg-jo-jaec-xenergy-xe100-mou",
     "prg-kg-rosatom-small-npp",
     "prg-kr-busan-smr-special-zone",
     "prg-kr-kaeri-kocia-htgr-mou",
     "prg-kr-nano-ds-danseok-mmr-mou",
     "prg-kr-nssc-smr-pre-review",
     "prg-kr-terrapower-sk-innovation-natrium-term-sheet",
     "prg-lt-inpp-newcleo-feasibility-mou",
     "prg-lt-sge-altra-gvh-bwrx300-mou",
     "prg-nl-hexana-atoomcooperatie-mou",
     "prg-nl-overijssel-smr-siting-study",
     "prg-nl-rotterdam-smr-supply-chain-study",
     "prg-no-aecon-norsk-kjernekraft-bwrx300",
     "prg-no-norsk-kjernekraft-hexana-mou",
     "prg-no-norsk-kjernekraft-saltfoss-loi",
     "prg-no-nuclear-commission-nou-2026-4",
     "prg-ph-doe-rosatom-smr-cooperation",
     "prg-ph-meralco-usnc-mmr-prefeasibility",
     "prg-ph-national-nuclear-programme",
     "prg-pl-enea-last-energy-loi",
     "prg-pl-respect-energy-edf-nuward",
     "prg-py-us-ncmou-smr-microreactor-plans",
     "prg-rs-smr-1200mw-target",
     "prg-ru-gazprom-tambey-fpu-study",
     "prg-ru-pevek-additional-fpu-study",
     "prg-ru-shelf-m-prospective-arctic-sites",
     "prg-sa-dl-ec-swcc-smr-desalination-mou",
     "prg-sa-kacare-kaeri-smart",
     "prg-sg-ema-khnp-smr-study-mou",
     "prg-si-smr-option-studies",
     "prg-sk-project-phoenix-smr-feasibility",
     "prg-sn-nuclear-power-programme-smr",
     "prg-sv-nuclear-programme",
     "prg-th-egat-ustda-smr-feasibility-study",
     "prg-th-gpsc-saltfoss-cmsr",
     "prg-th-kr-khnp-egat-smr-mou",
     "prg-tr-smr-5000mwe-2050-target",
     "prg-tr-ustda-tunas-smr-roadmap",
     "prg-ua-chornobyl-zone-smr-siting",
     "prg-ua-energoatom-edf-nuward",
     "prg-ua-energoatom-nuscale-mou",
     "prg-ua-energoatom-rolls-royce-smr-mou",
     "prg-ua-energoatom-westinghouse-ap300-mou",
     "prg-ua-smr-roadmap-and-draft-law",
     "prg-us-aep-amazon-xenergy-breed-exploration",
     "prg-us-arkansas-nuclear-feasibility-study",
     "prg-us-holtec-entergy-hyundai-smr300",
     "prg-us-holtec-smr300-decommissioning-sites",
     "prg-us-indiana-oed-eli-lilly-nuclear-loi",
     "prg-us-nano-ameresco-microreactor-mou",
     "prg-us-nextera-smr-colocation-evaluation",
     "prg-us-nypa-upstate-advanced-nuclear",
     "prg-us-terra-innovatum-ameresco-solo-mou",
     "prg-us-terra-innovatum-uvation-solo-loi",
     "prg-vn-dong-nai-pilot-smr-plan",
     "prg-vn-pecc2-saltfoss-siemens-floating-study",
     "prg-za-irp2025-nuclear-necsa-smr"
    ],
    "policies": [
     "pol-tx-tandf",
     "pol-us-advance-act-2024",
     "pol-us-doe-reactor-pilot-program",
     "pol-us-eo-14300",
     "pol-us-nrc-licensing-siting-proposed-2026",
     "pol-us-nrc-microreactor-proposed-2026",
     "pol-us-nrc-part-53-2026",
     "pol-wi-act-2025-12"
    ],
    "regulatory_actions": [
     "reg-asnr-jimmy-dac-2024",
     "reg-asnr-stellaria-alpha-2025"
    ],
    "events": [
     "evt-clinch-final-se-target-202606-stated-20260618",
     "evt-clinch-final-ser-issued-20260625",
     "evt-jimmy-bazancourt-complements-2025-02-13",
     "evt-jimmy-dac-update-20260723",
     "evt-stellaria-alpha-seized-20251222",
     "evt-stellaria-alvin-cadarache-complements-2026-06-16"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-antares-mark1-electricity-target-2027",
    "update-pol-ca-building-canada-act-2025-1",
    "update-pol-ca-building-canada-act-2025-2",
    "update-pol-gb-en7-nps-nuclear-2025-1",
    "update-pol-gb-en7-nps-nuclear-2025-2",
    "update-pol-gb-energy-act-2013-part-3-onr-1",
    "update-pol-gb-energy-act-2013-part-3-onr-2",
    "update-pol-gb-gben-rolls-royce-smr-award-2026-1",
    "update-pol-gb-gben-rolls-royce-smr-award-2026-2",
    "update-pol-gb-gben-smr-programme-1",
    "update-pol-gb-gben-smr-programme-2",
    "update-pol-gb-gben-smr-programme-3",
    "update-pol-gb-gben-smr-programme-4",
    "update-pol-gb-nuclear-installations-act-1965-1",
    "update-pol-gb-nuclear-installations-act-1965-2",
    "update-pol-gb-nuclear-regulatory-review-response-2026-1",
    "update-pol-gb-nuclear-regulatory-review-response-2026-2",
    "update-pol-gb-nuclear-regulatory-review-response-2026-3",
    "update-pol-ua-snriu-regulation-cmu-363-2014-1",
    "update-pol-ua-snriu-regulation-cmu-363-2014-2",
    "update-pol-ua-snriu-regulation-cmu-363-2014-3",
    "update-pol-us-doe-haleu-availability-program-1",
    "update-pol-us-doe-haleu-availability-program-2",
    "update-pol-us-doe-haleu-availability-program-3",
    "update-pol-us-irc-45y-48e-clean-electricity-credits-1",
    "update-pol-us-irc-45y-48e-clean-electricity-credits-2",
    "update-pol-us-nrc-categorical-exclusions-2026-1",
    "update-pol-us-nrc-categorical-exclusions-2026-2",
    "update-pol-us-nrc-design-certification-duration-2025-1",
    "update-pol-us-nrc-design-certification-duration-2025-2",
    "update-pol-us-nrc-fy2026-fee-rule-1",
    "update-pol-us-nrc-fy2026-fee-rule-2",
    "update-pol-us-nrc-fy2026-fee-rule-3",
    "update-pol-us-nrc-mandatory-hearing-flexibility-2026-1",
    "update-pol-us-nrc-mandatory-hearing-flexibility-2026-2",
    "update-pol-us-nrc-modernization-direct-final-2026-1",
    "update-pol-us-nrc-modernization-direct-final-2026-2",
    "update-pol-us-nrc-modernization-direct-final-2026-3",
    "update-prg-ae-enec-adnoc-smr-assessment-announced",
    "update-prg-ae-enec-advance-programme-announced",
    "update-prg-ae-nano-ehc-kronos-mou-announced",
    "update-prg-am-smr-replacement-unit-announced",
    "update-prg-bg-beh-fluor-nuscale-mou-announced",
    "update-prg-bg-blue-bird-sge-bwrx300-jv-loi-announced",
    "update-prg-bg-nuscale-kozloduy-mou-announced",
    "update-prg-bg-ustda-beh-smr-prefeasibility-grant-announced",
    "update-prg-bh-bapco-smr-study-announced",
    "update-prg-br-cdpnb-smr-technical-group-announced",
    "update-prg-br-diamante-jorge-lacerda-smr-evaluation-announced",
    "update-prg-br-government-rosatom-smr-cooperation-announced",
    "update-prg-br-mnb-technology-development-announced",
    "update-prg-br-nuclep-rosatom-mou-announced",
    "update-prg-ca-arc-invest-alberta-mou-20230324-announced",
    "update-prg-ca-bwxt-westinghouse-ap300-components-mou-2024-announced",
    "update-prg-ca-capital-power-opg-alberta-smr-announced",
    "update-prg-ca-dnd-aecl-northern-microreactor-feasibility-announced",
    "update-prg-ca-kaeri-aecl-smart-mou-announced",
    "update-prg-ca-kr-us-khnp-arc-nb-power-arc100-fleet-announced",
    "update-prg-ca-nova-scotia-ontario-smr-mou-announced",
    "update-prg-ca-nuclear-energy-strategy-2026-announced",
    "update-prg-ca-nucleon-arc-nuarc-alberta-announced",
    "update-prg-ca-opg-xenergy-xe100-industrial-framework-announced",
    "update-prg-ca-prodigy-des-nedhe-tnpp-mou-announced",
    "update-prg-ca-src-microreactor-demonstration-announced",
    "update-prg-ca-us-nucleon-arc-mou-20250513-announced",
    "update-prg-ca-us-opg-nypa-advanced-nuclear-mou-announced",
    "update-prg-ca-xenergy-alberta-xe100-feasibility-announced",
    "update-prg-cn-cgn-tsinghua-nhr200ii-heating-demonstration-announced",
    "update-prg-cn-cnnc-acp100s-floating-demonstration-announced",
    "update-prg-cn-guizhou-small-reactor-demonstration-announced",
    "update-prg-cn-htgr-industrial-chain-alliance-announced",
    "update-prg-cn-sinap-thorium-msr-prototype-announced",
    "update-prg-co-eje-cafetero-smr-viability-study-announced",
    "update-prg-co-minenergia-iaea-mou-announced",
    "update-prg-cz-mpo-cez-rolls-royce-additional-sites-mou-announced",
    "update-prg-dk-smr-analysis-announced",
    "update-prg-dz-iaea-joint-statement-smr-announced",
    "update-prg-ec-nuclear-plan-modular-reactor-announced",
    "update-prg-eu-sge-gev-hitachi-samsung-bwrx300-europe-announced",
    "update-prg-fanco-atkins-engineering-alliance-2026-announced",
    "update-prg-fanco-floral-power-evaluation-2026-announced",
    "update-prg-fanco-hyundai-framework-2026-announced",
    "update-prg-fi-alva-steady-energy-jyvaskyla-prestudy-announced",
    "update-prg-fi-se-fortum-gevh-bwrx300-early-works-announced",
    "update-prg-fi-tem-afry-nuclear-promotion-study-announced",
    "update-prg-fr-ppe3-first-smr-target-announced",
    "update-prg-fr-stellaria-equinix-preorder-announced",
    "update-prg-gb-advanced-nuclear-framework-announced",
    "update-prg-gb-amr-rdd-htgr-demonstration-announced",
    "update-prg-gb-gbe-n-scotland-siting-study-announced",
    "update-prg-gb-sge-bwrx300-fleet-announced",
    "update-prg-gb-terrapower-kbr-natrium-uk-siting-announced",
    "update-prg-gb-terrestrial-springfields-imsr-fuel-pilot-2025-announced",
    "update-prg-gb-ulc-energy-chiltern-vital-smr-clusters-announced",
    "update-prg-gn-rosatom-floating-npp-mou-announced",
    "update-prg-gr-fnpp-joint-development-program-study-announced",
    "update-prg-gr-inter-ministerial-committee-smr-announced",
    "update-prg-hr-nuclear-working-group-smr-siting-announced",
    "update-prg-hu-hunatom-rolls-royce-smr-mou-announced",
    "update-prg-hu-hunatom-sge-bwrx300-loi-announced",
    "update-prg-hu-mvm-holtec-smr300-mou-announced",
    "update-prg-hu-us-funded-smr-feed-study-announced",
    "update-prg-hu-us-hungary-nuclear-mou-2025-announced",
    "update-prg-id-pertamina-nre-saltfoss-cmsr-announced",
    "update-prg-id-rosatom-halmahera-floating-power-agreement-announced",
    "update-prg-in-ru-rosatom-india-fnpp-working-group-announced",
    "update-prg-iq-smr-consideration-russia-talks-announced",
    "update-prg-ir-aeoi-rosatom-small-npp-mou-announced",
    "update-prg-it-edf-nuward-edison-italy-announced",
    "update-prg-jm-nuclear-smr-assessment-announced",
    "update-prg-jo-jaec-khnp-ismr-feasibility-mou-announced",
    "update-prg-jo-jaec-smr-programme-announced",
    "update-prg-jo-jaec-xenergy-xe100-mou-announced",
    "update-prg-jp-htgr-demonstration-reactor-announced",
    "update-prg-jp-meti-small-lwr-development-announced",
    "update-prg-ke-nupea-first-npp-programme-announced",
    "update-prg-kr-busan-smr-special-zone-announced",
    "update-prg-kr-kaeri-kocia-htgr-mou-announced",
    "update-prg-kr-nano-ds-danseok-mmr-mou-announced",
    "update-prg-kr-nssc-smr-pre-review-announced",
    "update-prg-kr-terrapower-sk-innovation-natrium-term-sheet-announced",
    "update-prg-kw-kisr-smr-assessment-announced",
    "update-prg-lk-national-nuclear-programme-announced",
    "update-prg-lt-inpp-newcleo-feasibility-mou-announced",
    "update-prg-lt-sge-altra-gvh-bwrx300-mou-announced",
    "update-prg-lv-nuclear-informative-report-announced",
    "update-prg-ng-national-nuclear-programme-smr-announced",
    "update-prg-nl-hexana-atoomcooperatie-mou-announced",
    "update-prg-nl-opmeer-smr-feasibility-announced",
    "update-prg-nl-overijssel-smr-siting-study-announced",
    "update-prg-nl-rotterdam-smr-supply-chain-study-announced",
    "update-prg-nl-ulc-energy-rolls-royce-smr-announced",
    "update-prg-no-aecon-norsk-kjernekraft-bwrx300-announced",
    "update-prg-no-norsk-kjernekraft-hexana-mou-announced",
    "update-prg-no-norsk-kjernekraft-saltfoss-loi-announced",
    "update-prg-no-nuclear-commission-nou-2026-4-announced",
    "update-prg-ph-doe-khnp-smart-prefeasibility-ceza-announced",
    "update-prg-ph-doe-rosatom-smr-cooperation-announced",
    "update-prg-ph-meralco-usnc-mmr-prefeasibility-announced",
    "update-prg-ph-mgen-ustda-smr-feasibility-study-announced",
    "update-prg-ph-national-nuclear-programme-announced",
    "update-prg-ph-stgr20-letter-of-intent-announced",
    "update-prg-pl-enea-last-energy-loi-announced",
    "update-prg-pl-last-energy-ksse-announced",
    "update-prg-pl-respect-energy-edf-nuward-announced",
    "update-prg-pl-unimot-getka-nuscale-announced",
    "update-prg-pr-nuclear-alternative-project-smr-siting-study-announced",
    "update-prg-py-us-ncmou-smr-microreactor-plans-announced",
    "update-prg-ro-dp-world-constanta-smr-study-announced",
    "update-prg-ro-last-energy-cncan-licensing-announced",
    "update-prg-rs-smr-1200mw-target-announced",
    "update-prg-ru-gazprom-tambey-fpu-study-announced",
    "update-prg-ru-pevek-additional-fpu-study-announced",
    "update-prg-ru-rosatom-small-npp-programme-announced",
    "update-prg-ru-shelf-m-prospective-arctic-sites-announced",
    "update-prg-ru-vk300-arkhangelsk-feasibility-announced",
    "update-prg-rw-holtec-raeb-smr300-announced",
    "update-prg-rw-nano-raeb-mou-announced",
    "update-prg-rw-rosatom-smr-roadmap-announced",
    "update-prg-sa-dl-ec-swcc-smr-desalination-mou-announced",
    "update-prg-sa-kacare-cnec-htr-announced",
    "update-prg-sa-kacare-kaeri-smart-announced",
    "update-prg-se-blykalla-evroc-studsvik-feasibility-announced",
    "update-prg-se-blykalla-neext-sealer-engineering-2026-announced",
    "update-prg-se-copenhagen-atomics-regulatory-dialogue-announced",
    "update-prg-se-holtec-smr300-regulatory-dialogue-announced",
    "update-prg-se-knxt-refirm-south-announced",
    "update-prg-se-steady-energy-sweden-entry-announced",
    "update-prg-sg-ema-khnp-smr-study-mou-announced",
    "update-prg-sg-government-nuclear-smr-study-announced",
    "update-prg-si-smr-option-studies-announced",
    "update-prg-sk-javys-westinghouse-ap300-mou-announced",
    "update-prg-sk-project-phoenix-smr-feasibility-announced",
    "update-prg-sk-sge-slovenske-elektrarne-mou-announced",
    "update-prg-sn-nuclear-power-programme-smr-announced",
    "update-prg-sv-nuclear-programme-announced",
    "update-prg-th-cn-egat-cnos-smr-mou-announced",
    "update-prg-th-egat-ustda-smr-feasibility-study-announced",
    "update-prg-th-gpsc-saltfoss-cmsr-announced",
    "update-prg-th-kr-khnp-egat-smr-mou-announced",
    "update-prg-thorizon-tno-materials-2026-announced",
    "update-prg-tr-arc-icn-arc100-term-sheet-announced",
    "update-prg-tr-smr-5000mwe-2050-target-announced",
    "update-prg-tr-ustda-tunas-smr-roadmap-announced",
    "update-prg-trisox-ornl-research-2026-announced",
    "update-prg-ua-chornobyl-zone-smr-siting-announced",
    "update-prg-ua-energoatom-edf-nuward-announced",
    "update-prg-ua-energoatom-holtec-smr160-announced",
    "update-prg-ua-energoatom-nuscale-mou-announced",
    "update-prg-ua-energoatom-rolls-royce-smr-mou-announced",
    "update-prg-ua-energoatom-westinghouse-ap300-mou-announced",
    "update-prg-ua-smr-roadmap-and-draft-law-announced",
    "update-prg-us-aep-amazon-xenergy-breed-exploration-announced",
    "update-prg-us-army-janus-program-announced",
    "update-prg-us-bwxt-nfs-haleu-deconversion-2024-announced",
    "update-prg-us-bwxt-wyoming-energy-authority-banr-study-announced",
    "update-prg-us-constellation-clinton-smr-evaluation-announced",
    "update-prg-us-cvea-usnc-mmr-feasibility-announced",
    "update-prg-us-deep-fission-gpda-commercial-power-agreement-announced",
    "update-prg-us-doe-nric-nuclear-energy-launch-pad-announced",
    "update-prg-us-doe-reactor-pilot-program-announced",
    "update-prg-us-energysolutions-ipa-intermountain-nuclear-announced",
    "update-prg-us-fpl-smr-early-site-permit-plan-announced",
    "update-prg-us-great-plains-new-nuclear-consortium-announced",
    "update-prg-us-holtec-entergy-hyundai-smr300-announced",
    "update-prg-us-holtec-smr300-decommissioning-sites-announced",
    "update-prg-us-idaho-strategic-radiant-kaleidos-announced",
    "update-prg-us-indiana-oed-eli-lilly-nuclear-loi-announced",
    "update-prg-us-japan-gvh-bwrx300-tennessee-alabama-announced",
    "update-prg-us-kairos-bwxt-triso-collaboration-2025-announced",
    "update-prg-us-kr-terrapower-hdec-natrium-epc-announced",
    "update-prg-us-lgeku-xenergy-xe100-kentucky-announced",
    "update-prg-us-maryland-mea-xenergy-coal-to-nuclear-study-announced",
    "update-prg-us-nano-afwerx-kronos-jbab-study-announced",
    "update-prg-us-nano-ameresco-microreactor-mou-announced",
    "update-prg-us-nano-doe-id-zeus-odin-siting-mou-announced",
    "update-prg-us-natura-3m-lithium7-cooperation-2025-announced",
    "update-prg-us-natura-hifunda-sensor-development-2026-announced",
    "update-prg-us-natura-ngl-permian-produced-water-announced",
    "update-prg-us-natura-nov-shepherd-commercialisation-2025-announced",
    "update-prg-us-natura-quadrant-haleu-framework-2026-announced",
    "update-prg-us-nextera-smr-colocation-evaluation-announced",
    "update-prg-us-nppd-gen3-smr-early-site-permit-announced",
    "update-prg-us-nucube-alaska-fund-nualaska-announced",
    "update-prg-us-nypa-upstate-advanced-nuclear-announced",
    "update-prg-us-oklo-wyoming-hyperscale-loi-announced",
    "update-prg-us-pacificorp-terrapower-natrium-study-announced",
    "update-prg-us-srns-geh-prism-srs-2010-announced",
    "update-prg-us-terra-innovatum-ameresco-solo-mou-announced",
    "update-prg-us-terra-innovatum-uvation-solo-loi-announced",
    "update-prg-us-terrapower-evergy-kansas-natrium-mou-announced",
    "update-prg-us-terrapower-nvision-natrium-framework-announced",
    "update-prg-us-terrapower-sabey-natrium-mou-announced",
    "update-prg-us-terrestrial-energysolutions-imsr-siting-mou-announced",
    "update-prg-us-terrestrial-riot-imsr-data-centres-announced",
    "update-prg-us-texas-tech-acu-natura-produced-water-msr-announced",
    "update-prg-us-utah-terrapower-flagship-natrium-mou-announced",
    "update-prg-us-wisconsin-psc-uw-nuclear-siting-study-announced",
    "update-prg-us-xenergy-talen-xe100-loi-announced",
    "update-prg-vn-decision-438-atomic-energy-strategy-announced",
    "update-prg-vn-dong-nai-pilot-smr-plan-announced",
    "update-prg-vn-pecc2-saltfoss-siemens-floating-study-announced",
    "update-prg-xenergy-prometheus-research-2026-announced",
    "update-prg-za-irp2025-nuclear-necsa-smr-announced"
   ]
  },
  {
   "date": "2026-11-01",
   "added": {
    "events": [
     "evt-longmott-acrs-report-20261016",
     "evt-longmott-final-se-announced-20261030"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aurora-inl",
     "prj-belews-creek",
     "prj-blykalla-horby",
     "prj-httr-oarai",
     "prj-inl-marvel",
     "prj-isu-nucube-art",
     "prj-kuopio-smr-heat",
     "prj-last-energy-haskell",
     "prj-last-energy-rellis",
     "prj-lister-smr",
     "prj-lomonosov",
     "prj-long-mott",
     "prj-mpower-clinch-river",
     "prj-narvik-fornes",
     "prj-natrium-kemmerer",
     "prj-ngnp-inl",
     "prj-oklo-eielson",
     "prj-osge-dabrowa-gornicza",
     "prj-osge-nowa-huta",
     "prj-osge-ostroleka",
     "prj-osge-stalowa-wola",
     "prj-osge-stawy-monowskie",
     "prj-osge-wloclawek",
     "prj-oygarden-smr",
     "prj-radiant-buckley",
     "prj-rde-serpong",
     "prj-rr-wylfa",
     "prj-sanmen-htgr",
     "prj-sask-rafferty",
     "prj-sealer-norrsundet",
     "prj-sealer-untra",
     "prj-stellaria-alvin-cadarache",
     "prj-studsvik-nykoping",
     "prj-svalbard-sealer",
     "prj-tarapur-bsmr-200",
     "prj-thorcon-kelasa",
     "prj-trawsfynydd-egino",
     "prj-ucri-ien",
     "prj-uiuc-kronos",
     "prj-unity-dome-2027",
     "prj-videberg-varo-rr-smr",
     "prj-xuwei-htgr-unit3"
    ],
    "designs": [
     "dsn-acr-300",
     "dsn-ap300",
     "dsn-apollo-a-10",
     "dsn-aris-marvel",
     "dsn-aris-vber-300",
     "dsn-cap200",
     "dsn-catalogue-nhr200-ii",
     "dsn-catalogue-nuclearis-n1",
     "dsn-catalogue-nuward-smr",
     "dsn-daratha-microreactor",
     "dsn-flexblue",
     "dsn-halo-mmr",
     "dsn-holtec-smr-160",
     "dsn-huapeng-one",
     "dsn-jh-100",
     "dsn-klt40s",
     "dsn-natrium",
     "dsn-pwr-20",
     "dsn-pwr-5",
     "dsn-ritm-200s",
     "dsn-rr-smr",
     "dsn-ruta-70",
     "dsn-smart-c",
     "dsn-smr-300",
     "dsn-voygr",
     "dsn-vver-i",
     "dsn-xe-100"
    ],
    "regulatory_actions": [
     "reg-acu-msrr-cp-2024",
     "reg-cnsc-vdr-arc100-2025",
     "reg-cnsc-vdr-bwrx300-2023",
     "reg-cnsc-vdr-imsr-2023",
     "reg-cnsc-vdr-xe100-2023",
     "reg-darlington-bwrx-original-darlington-new-nuclear-project-site",
     "reg-kr-smart-sda-2012",
     "reg-longmott-cp",
     "reg-nrc-us460-sda-2025",
     "reg-nrc-us600-dc-2023",
     "reg-nrc-us600-sda-2020",
     "reg-uk-gda-rr-smr-step2-2024",
     "reg-uk-gda-smr300-2026"
    ],
    "events": [
     "evt-darlington-physical-start-20260422",
     "evt-longmott-final-se-target"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-longmott-acrs-report-20261016",
    "update-evt-longmott-final-se-announced-20261030",
    "update-reg-acu-msrr-cp-2024-application",
    "update-reg-darlington-bwrx-original-darlington-new-nuclear-project-site-application",
    "update-reg-kr-smart-sda-2012-application",
    "update-reg-nrc-us600-sda-2020-application",
    "update-reg-uk-gda-smr300-2026-application"
   ]
  },
  {
   "date": "2026-11-02",
   "added": {
    "policies": [
     "pol-us-army-doe-advanced-reactor-catex-2026",
     "pol-us-marad-marine-smr-rfi-2026",
     "pol-us-nrc-material-compatibility-draft-2026",
     "pol-us-nrc-materials-modernization-2026",
     "pol-us-nrc-package-certification-proposal-2026",
     "pol-us-nrc-training-review-draft-2026"
    ]
   },
   "restored": {},
   "changed": {},
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-pol-us-army-doe-advanced-reactor-catex-2026-1",
    "update-pol-us-army-doe-advanced-reactor-catex-2026-2",
    "update-pol-us-marad-marine-smr-rfi-2026-1",
    "update-pol-us-nrc-material-compatibility-draft-2026-1",
    "update-pol-us-nrc-materials-modernization-2026-1",
    "update-pol-us-nrc-package-certification-proposal-2026-1",
    "update-pol-us-nrc-training-review-draft-2026-1"
   ]
  },
  {
   "date": "2026-11-03",
   "added": {
    "programmes": [
     "prg-us-in-advanced-nuclear-ready-communities"
    ],
    "policies": [
     "pol-in-dor-ib124-202506"
    ],
    "events": [
     "evt-fermi-estonia-first-reactor-target-2035",
     "evt-hermes-2-operations-target-2030",
     "evt-linglong-fuel-grid-target-2026",
     "evt-osge-wloclawek-first-unit-target-2032"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aep-amazon-xenergy-breed",
     "prj-arc100-lepreau",
     "prj-belews-creek",
     "prj-fermi-estonia",
     "prj-hermes-2",
     "prj-linglong-one",
     "prj-natrium-kemmerer",
     "prj-natura-msr-1-acu",
     "prj-osge-wloclawek",
     "prj-pele-inl",
     "prj-ward-250"
    ],
    "designs": [
     "dsn-aris-abv-6e",
     "dsn-aris-acp100s",
     "dsn-aris-bandi",
     "dsn-aris-elena",
     "dsn-aris-fbnr",
     "dsn-aris-shelf-m",
     "dsn-aris-unitherm",
     "dsn-aris-vber-300",
     "dsn-bluecore-bc-15",
     "dsn-bsmr-200",
     "dsn-catalogue-acpr50s",
     "dsn-catalogue-blue-capsule",
     "dsn-catalogue-cal-30",
     "dsn-catalogue-df300",
     "dsn-catalogue-dfbr-1",
     "dsn-catalogue-em2",
     "dsn-catalogue-fmr",
     "dsn-catalogue-gthtr300",
     "dsn-catalogue-happy200",
     "dsn-catalogue-hectar",
     "dsn-catalogue-htgr-pola",
     "dsn-catalogue-htr50s",
     "dsn-catalogue-ldr-50",
     "dsn-catalogue-leunr",
     "dsn-catalogue-mn-1",
     "dsn-deep-atomic-mk60",
     "dsn-forge-ember",
     "dsn-gravity",
     "dsn-grem",
     "dsn-hermes",
     "dsn-htr-pm",
     "dsn-imsr",
     "dsn-kp-fhr",
     "dsn-mn-350",
     "dsn-otrera-one",
     "dsn-ritm-400",
     "dsn-vber-150"
    ],
    "programmes": [
     "prg-us-aep-amazon-xenergy-breed-exploration"
    ],
    "regulatory_actions": [
     "reg-asnr-otrera-one-options-2026",
     "reg-clinch-cp-20260929",
     "reg-cnsc-vdr-mmr-2019",
     "reg-darlington-bwrx-original-darlington-new-nuclear-project-site",
     "reg-dod-pele-rod-2022",
     "reg-haiyang-small-reactor-siting-opinion-2024",
     "reg-nrc-belews-creek-esp-2025",
     "reg-ritm-jizzakh-licence-for-construction-of-an-npp-power-unit-w",
     "reg-ritm-jizzakh-permit-to-use-the-site-for-nuclear-installation"
    ],
    "events": [
     "evt-natrium-cp",
     "evt-natrium-kemmerer-construction-completion-target-2030",
     "evt-natrium-official-construction-start-2026-04-23",
     "evt-tmsr-lf1-wuwei-first-criticality-2023-10-11",
     "evt-tmsr-lf1-wuwei-other-2022-08"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-fermi-estonia-first-reactor-target-2035",
    "update-evt-hermes-2-operations-target-2030",
    "update-evt-linglong-fuel-grid-target-2026",
    "update-evt-osge-wloclawek-first-unit-target-2032",
    "update-pol-in-dor-ib124-202506-1"
   ]
  },
  {
   "date": "2026-11-04",
   "added": {
    "regulatory_actions": [
     "reg-huakun-one-siting-opinion-2026"
    ],
    "events": [
     "evt-arc100-inl-hyundai-mou-20261029",
     "evt-doicesti-ropower-interim-report-target-20261231",
     "evt-huakun-one-siting-opinion-20261102",
     "evt-radiant-dsa-approval-statement-20261029",
     "evt-ucri-ien-other-2026-01-21",
     "evt-uiuc-kronos-hyundai-mou-20261027",
     "evt-xuwei-u3-construction-licence-20261102"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-ameren-callaway-wsmr",
     "prj-antares-mark1-inl",
     "prj-arc100-inl",
     "prj-hermes-2",
     "prj-holtec-palisades",
     "prj-htr10-inet",
     "prj-huakun-one-taipingling",
     "prj-last-energy-ksse-first",
     "prj-last-energy-legnica",
     "prj-linglong-one",
     "prj-natrium-kemmerer",
     "prj-nuscale-romania",
     "prj-ornl-tcr",
     "prj-radiant-kaleidos-inl",
     "prj-ruta70-ippe-obninsk",
     "prj-ubattery-chalk-river",
     "prj-ucri-ien",
     "prj-uiuc-kronos",
     "prj-xuwei-htgr-unit3"
    ],
    "designs": [
     "dsn-acpr100",
     "dsn-allseas-htgr",
     "dsn-aris-abv-6e",
     "dsn-aris-acp100s",
     "dsn-aris-bandi",
     "dsn-aris-copenhagen-atomics-waste-burner",
     "dsn-aris-fbnr",
     "dsn-aris-fuji",
     "dsn-aris-g4m",
     "dsn-aris-gt-mhr",
     "dsn-aris-mhr-100",
     "dsn-aris-mhr-t",
     "dsn-aris-peluit-40",
     "dsn-aris-prismatic-htr",
     "dsn-aris-shelf-m",
     "dsn-aris-smahtr",
     "dsn-aris-star",
     "dsn-aris-vber-300",
     "dsn-aris-w-lfr",
     "dsn-banr",
     "dsn-barc-htgcr",
     "dsn-bwrx-300",
     "dsn-carem25",
     "dsn-catalogue-4s",
     "dsn-catalogue-a-htr-100",
     "dsn-catalogue-blossom-energy-smr",
     "dsn-catalogue-blue-capsule",
     "dsn-catalogue-cmsr",
     "dsn-catalogue-hexana",
     "dsn-catalogue-htmr-100",
     "dsn-catalogue-loki-mmr",
     "dsn-catalogue-movelux",
     "dsn-catalogue-ssr-w",
     "dsn-catalogue-start",
     "dsn-catalogue-thorizon-one",
     "dsn-catalogue-xamr",
     "dsn-deep-atomic-mk60",
     "dsn-dhr400",
     "dsn-gravity",
     "dsn-grem",
     "dsn-hermes",
     "dsn-holtec-smr-160",
     "dsn-huakun-one",
     "dsn-imsr",
     "dsn-jay-1",
     "dsn-jimmy-heat",
     "dsn-kaleidos",
     "dsn-kp-fhr",
     "dsn-kronos-mmr",
     "dsn-mark-0",
     "dsn-mcsfr",
     "dsn-microuranus",
     "dsn-mn-350",
     "dsn-morpheus",
     "dsn-nugen-engine",
     "dsn-nuscale-us600",
     "dsn-nusun-1",
     "dsn-otrera-one",
     "dsn-pwr-20",
     "dsn-rapid",
     "dsn-ritm-200n",
     "dsn-sealer",
     "dsn-smr-300",
     "dsn-smr-55",
     "dsn-unity",
     "dsn-voygr",
     "dsn-ward-250",
     "dsn-xenith"
    ],
    "organizations": [
     "org-allseas",
     "org-amazon",
     "org-ameren",
     "org-ameresco",
     "org-appalachian-power",
     "org-archeos-sas",
     "org-aris-cnnc-npic",
     "org-aris-copenhagen-atomics",
     "org-aris-kepco-e-c",
     "org-aris-stl-nuclear-pty-ltd",
     "org-atomflot",
     "org-barc",
     "org-blue-energy",
     "org-bwxt-advanced-technologies",
     "org-cambridge-atomworks",
     "org-catalogue-afrikantov-okbm",
     "org-catalogue-calogena",
     "org-catalogue-cgn",
     "org-catalogue-eskom",
     "org-catalogue-general-atomics",
     "org-catalogue-moltex-energy",
     "org-catalogue-moltexflex",
     "org-catalogue-newcleo",
     "org-catalogue-nuward",
     "org-catalogue-otrera",
     "org-catalogue-spic",
     "org-catalogue-steady-energy",
     "org-catalogue-toshiba",
     "org-centrica",
     "org-cez",
     "org-cgn-ocean-energy",
     "org-chinergy",
     "org-cnnc",
     "org-cnnc-sueneng-nuclear-power",
     "org-cnnp",
     "org-constellation",
     "org-cwmni-egino",
     "org-deep-fission",
     "org-energoatom",
     "org-energy-northwest-new-nuclear",
     "org-epz",
     "org-framatome",
     "org-framatome-inc",
     "org-gazprom",
     "org-general-atomics-electromagnetic-systems",
     "org-global-first-power",
     "org-hadron-energy",
     "org-hainan-nuclear-power",
     "org-holtec",
     "org-indiana-michigan-power",
     "org-jhatom",
     "org-kaist",
     "org-karnfull-next",
     "org-keravan-energia",
     "org-kghm",
     "org-long-mott-energy",
     "org-meitner-energy",
     "org-mitsubishi-heavy-industries",
     "org-natura",
     "org-naval-group",
     "org-norsk-kjernekraft",
     "org-nuclear-power-ghana",
     "org-nuclearelectrica",
     "org-okb-gidropress",
     "org-pacificorp",
     "org-palisades-energy",
     "org-prodigy",
     "org-radiant",
     "org-reploy",
     "org-rolls-royce-plc",
     "org-rolls-royce-smr",
     "org-shandong-nuclear-power",
     "org-skhk",
     "org-spic-nuclear-energy",
     "org-studsvik",
     "org-tata-chemicals-na",
     "org-terra-innovatum",
     "org-tredic",
     "org-triso-x",
     "org-trondheimsleia",
     "org-us-sfr-owner",
     "org-videberg-kraft",
     "org-westinghouse",
     "org-westinghouse-government-services",
     "org-witkowitz-atomica",
     "org-zepak"
    ],
    "policies": [
     "pol-jp-reactor-regulation-act",
     "pol-tx-hb14-2025",
     "pol-us-doe-gen3-smr-program",
     "pol-us-eo-14300",
     "pol-us-gen3-selection-holtec-2025",
     "pol-us-gen3-selection-tva-2025",
     "pol-us-gen3-tier2-selections-2026",
     "pol-us-nrc-licensing-siting-proposed-2026",
     "pol-us-nrc-microreactor-proposed-2026"
    ],
    "regulatory_actions": [
     "reg-asnr-stellaria-alpha-2025",
     "reg-cncan-doicesti-siting-application",
     "reg-nnsa-htr10-ol-1405",
     "reg-nnsa-xuwei-u3-cl-review-2025"
    ],
    "events": [
     "evt-doicesti-snn-egms-20261029",
     "evt-natrium-official-construction-start-2026-04-23",
     "evt-pioneer-draft-eis-target-20261031",
     "evt-radiant-dome-completion-report-20260930"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-arc100-inl-hyundai-mou-20261029",
    "update-evt-doicesti-ropower-interim-report-target-20261231",
    "update-evt-huakun-one-siting-opinion-20261102",
    "update-evt-radiant-dsa-approval-statement-20261029",
    "update-evt-ucri-ien-other-2026-01-21",
    "update-evt-uiuc-kronos-hyundai-mou-20261027",
    "update-evt-xuwei-u3-construction-licence-20261102",
    "update-pol-us-eo-14300-3",
    "update-reg-huakun-one-siting-opinion-2026-decision",
    "update-reg-nnsa-xuwei-u3-cl-review-2025-decision"
   ]
  },
  {
   "date": "2026-11-10",
   "added": {
    "policies": [
     "pol-us-nrc-contested-adjudications-2026"
    ],
    "regulatory_actions": [
     "reg-nrc-last-energy-caldwell-cp-lwa-part1-2026"
    ],
    "events": [
     "evt-longmott-cp-issued-20261109",
     "evt-longmott-final-se-completed-202610",
     "evt-xuwei-u3-first-concrete-20261106"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-dimitrovgrad-svbr100",
     "prj-fermi-estonia",
     "prj-last-energy-caldwell",
     "prj-long-mott",
     "prj-psi-copenhagen-atomics",
     "prj-xuwei-htgr-unit3"
    ],
    "designs": [
     "dsn-alfred",
     "dsn-daratha-microreactor"
    ],
    "organizations": [
     "org-kairos"
    ],
    "regulatory_actions": [
     "reg-longmott-cp"
    ],
    "events": [
     "evt-balder-earliest-tests-2028",
     "evt-longmott-final-se-announced-20261030",
     "evt-longmott-final-se-target",
     "evt-xuwei-htgr-unit3-first-concrete-2026"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-dimitrovgrad-svbr100",
     "from": "announced",
     "to": "cancelled"
    },
    {
     "id": "prj-xuwei-htgr-unit3",
     "from": "licensing",
     "to": "construction"
    }
   ],
   "new_updates": [
    "update-evt-longmott-cp-issued-20261109",
    "update-evt-longmott-final-se-completed-202610",
    "update-evt-xuwei-u3-first-concrete-20261106",
    "update-pol-us-nrc-contested-adjudications-2026-1",
    "update-reg-longmott-cp-decision",
    "update-reg-nrc-last-energy-caldwell-cp-lwa-part1-2026-application"
   ]
  },
  {
   "date": "2026-11-11",
   "added": {
    "projects": [
     "prj-calogena-pierrelatte"
    ],
    "programmes": [
     "prg-cz-se-sujb-ssm-rolls-royce-smr-mou",
     "prg-kr-steady-energy-kdhc-cooperation",
     "prg-nl-thorizon-pronto-mooi-2026",
     "prg-no-copenhagen-atomics-ocean-power-mou",
     "prg-tr-ustda-tupras-smr-roadmap",
     "prg-tw-nthu-nucube-mmr-assessment",
     "prg-us-dairyland-applied-atomics-genoa-loi"
    ],
    "policies": [
     "pol-ee-nuclear-energy-safety-act-2026"
    ],
    "events": [
     "evt-cascade-enw-fluor-nuclear-island-20261105",
     "evt-doicesti-control-body-report-published-20260911",
     "evt-doicesti-feed2-work-completed-2025",
     "evt-elementl-letart-dsip-partnership-loi-20261026",
     "evt-longmott-steam-generator-tubing-order-20261104",
     "evt-osge-wloclawek-first-unit-mid-2030s",
     "evt-rr-wylfa-iacc-collaboration-20260325"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aep-amazon-xenergy-breed",
     "prj-aurora-inl",
     "prj-calogena-cadarache",
     "prj-cascade-enw",
     "prj-elementl-letart",
     "prj-helen-helsinki-smr",
     "prj-last-energy-caldwell",
     "prj-long-mott",
     "prj-nuscale-romania",
     "prj-osge-stawy-monowskie",
     "prj-osge-wloclawek",
     "prj-radiant-kaleidos-inl",
     "prj-rr-wylfa"
    ],
    "designs": [
     "dsn-kaleidos"
    ],
    "organizations": [
     "org-aris-kepco-e-c",
     "org-elementl",
     "org-fanco",
     "org-nucube",
     "org-radiant",
     "org-triso-x"
    ],
    "programmes": [
     "prg-fanco-hyundai-framework-2026"
    ],
    "policies": [
     "pol-kr-nuclear-safety-act",
     "pol-nl-mooi-nuclear-innovation-theme",
     "pol-us-marad-marine-smr-rfi-2026",
     "pol-us-nrc-enhancements-proposed-20260924",
     "pol-us-nrc-material-compatibility-draft-2026",
     "pol-us-nrc-training-review-draft-2026"
    ],
    "events": [
     "evt-aurora-inl-commercial-operation-2028",
     "evt-doicesti-control-body-response-2026-07-28",
     "evt-osge-wloclawek-first-unit-target-2032"
    ]
   },
   "removed": {},
   "stage_changes": [
    {
     "id": "prj-last-energy-caldwell",
     "from": "siting",
     "to": "licensing"
    }
   ],
   "new_updates": [
    "update-evt-cascade-enw-fluor-nuclear-island-20261105",
    "update-evt-doicesti-control-body-report-published-20260911",
    "update-evt-doicesti-feed2-work-completed-2025",
    "update-evt-elementl-letart-dsip-partnership-loi-20261026",
    "update-evt-longmott-steam-generator-tubing-order-20261104",
    "update-evt-osge-wloclawek-first-unit-mid-2030s",
    "update-evt-rr-wylfa-iacc-collaboration-20260325",
    "update-pol-ee-nuclear-energy-safety-act-2026-1",
    "update-pol-ee-nuclear-energy-safety-act-2026-2",
    "update-pol-ee-nuclear-energy-safety-act-2026-3",
    "update-pol-nl-mooi-nuclear-innovation-theme-7",
    "update-pol-us-nrc-enhancements-proposed-20260924-2",
    "update-pol-us-nrc-material-compatibility-draft-2026-2",
    "update-pol-us-nrc-training-review-draft-2026-2",
    "update-prg-cz-se-sujb-ssm-rolls-royce-smr-mou-announced",
    "update-prg-kr-steady-energy-kdhc-cooperation-announced",
    "update-prg-nl-thorizon-pronto-mooi-2026-announced",
    "update-prg-no-copenhagen-atomics-ocean-power-mou-announced",
    "update-prg-tr-ustda-tupras-smr-roadmap-announced",
    "update-prg-tw-nthu-nucube-mmr-assessment-announced",
    "update-prg-us-dairyland-applied-atomics-genoa-loi-announced"
   ]
  },
  {
   "date": "2026-11-13",
   "added": {
    "events": [
     "evt-darlington-opg-q3-2026-unit1-no-longer-meeting-cod-cost-20261110",
     "evt-longmott-cli-26-15"
    ]
   },
   "restored": {},
   "changed": {
    "projects": [
     "prj-aurora-inl",
     "prj-darlington-bwrx",
     "prj-darlington-bwrx-units-2-4",
     "prj-holtec-palisades",
     "prj-httr-oarai",
     "prj-last-energy-rellis",
     "prj-long-mott",
     "prj-natrium-kemmerer",
     "prj-unity-inl",
     "prj-ward-250",
     "prj-xuwei-htgr-unit3"
    ],
    "organizations": [
     "org-long-mott-energy",
     "org-us-doe"
    ],
    "regulatory_actions": [
     "reg-longmott-cp",
     "reg-pioneer-cp-lwa-application-2026"
    ],
    "events": [
     "evt-longmott-cli-26-10",
     "evt-longmott-cp-issued-20261109",
     "evt-wc-pioneer-psar-2026"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [
    "update-evt-darlington-opg-q3-2026-unit1-no-longer-meeting-cod-cost-20261110",
    "update-evt-longmott-cli-26-15"
   ]
  },
  {
   "date": "2026-11-14",
   "added": {},
   "restored": {},
   "changed": {
    "projects": [
     "prj-oklo-ohio"
    ],
    "regulatory_actions": [
     "reg-nrc-blue-energy-cp-lwa-part1-2026",
     "reg-pioneer-cp-lwa-application-2026"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": []
  },
  {
   "date": "2026-11-15",
   "added": {},
   "restored": {},
   "changed": {
    "projects": [
     "prj-stellaria-fos-sur-mer",
     "prj-trypilska-smr"
    ]
   },
   "removed": {},
   "stage_changes": [],
   "new_updates": [],
   "evidence_only": {
    "projects": [
     "prj-aep-joshua-falls",
     "prj-blue-energy-victoria",
     "prj-knxt-valdemarsvik",
     "prj-newcleo-veron-lfr-as-30",
     "prj-sealer-norrsundet",
     "prj-studsvik-nykoping"
    ]
   }
  }
 ],
 "state": {
  "projects": {
   "prj-elementl-letart": [
    "77c2d24e8b40c639",
    "Elementl Letart Township BWRX-300 proposal",
    "siting"
   ],
   "prj-htr-pm-shidaowan": [
    "2ad55c078e0d3dcf",
    "HTR-PM Shidaowan demonstration",
    "operating"
   ],
   "prj-lomonosov": [
    "aef19a2adc5c3d08",
    "Akademik Lomonosov floating NPP",
    "operating"
   ],
   "prj-linglong-one": [
    "480da14a408e45e1",
    "Linglong One (ACP100) Changjiang",
    "commissioning"
   ],
   "prj-carem25": [
    "4b2e3d7f67c4b66c",
    "CAREM-25",
    "suspended"
   ],
   "prj-darlington-bwrx": [
    "1f4420f6ec8ec587",
    "Darlington BWRX-300 Unit 1",
    "construction"
   ],
   "prj-natrium-kemmerer": [
    "ba5763fc5bcc767d",
    "Natrium Kemmerer Unit 1",
    "construction"
   ],
   "prj-hermes-1": [
    "7ec5b76689080018",
    "Kairos Hermes 1",
    "construction"
   ],
   "prj-hermes-2": [
    "6d5c81b1e7cd2fcf",
    "Kairos Hermes 2",
    "construction"
   ],
   "prj-long-mott": [
    "0c5a32a44bb670e4",
    "Long Mott Generating Station (Xe-100 at Dow Seadrift)",
    "licensing"
   ],
   "prj-clinch-river-bwrx": [
    "838b4f9ea13af8c9",
    "TVA Clinch River BWRX-300",
    "licensing"
   ],
   "prj-aurora-inl": [
    "76c21fe65e8d81f4",
    "Oklo Aurora-INL",
    "construction"
   ],
   "prj-arc100-lepreau": [
    "02ea534d9b1dcf26",
    "NB Power ARC-100 at Point Lepreau",
    "licensing"
   ],
   "prj-brest-od-300": [
    "42a8d4fb41c25c3d",
    "BREST-OD-300 Seversk",
    "construction"
   ],
   "prj-ritm-jizzakh": [
    "837e7896f92267b3",
    "RITM-200N Jizzakh",
    "construction"
   ],
   "prj-rr-wylfa": [
    "e2a5bc0545d682e4",
    "Rolls-Royce SMR Wylfa",
    "siting"
   ],
   "prj-nuscale-romania": [
    "6d9a7138ecd19239",
    "NuScale VOYGR Doicești (Romania)",
    "licensing"
   ],
   "prj-holtec-palisades": [
    "88dfae5f6de7a758",
    "Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)",
    "licensing"
   ],
   "prj-uamps-cfpp": [
    "e1f99b62a791724b",
    "UAMPS Carbon Free Power Project (cancelled)",
    "cancelled"
   ],
   "prj-cascade-enw": [
    "ed11623211e9abde",
    "Cascade Advanced Energy Facility",
    "siting"
   ],
   "prj-rr-temelin": [
    "6b9a1f430a5200df",
    "Temelin Rolls-Royce SMR",
    "siting"
   ],
   "prj-osge-wloclawek": [
    "79db42ce75c4e09f",
    "OSGE Wloclawek BWRX-300",
    "siting"
   ],
   "prj-osge-stawy-monowskie": [
    "2c671a50489d3444",
    "OSGE Stawy Monowskie BWRX-300",
    "siting"
   ],
   "prj-osge-stalowa-wola": [
    "58a0008cac0d723d",
    "OSGE Stalowa Wola BWRX-300",
    "siting"
   ],
   "prj-sask-rafferty": [
    "b8d6cadafdf682cd",
    "SaskPower Rafferty SMR (Estevan area)",
    "siting"
   ],
   "prj-pele-inl": [
    "268c72baca4ee62e",
    "Project Pele (INL microreactor demonstration)",
    "construction"
   ],
   "prj-fermi-estonia": [
    "6a88163c650bcada",
    "Fermi Energia Estonian BWRX-300 plant",
    "siting"
   ],
   "prj-yakutia-ritm": [
    "b483d1b1a92d9f2d",
    "Yakutia land-based RITM-200N (Ust-Kuyga)",
    "licensing"
   ],
   "prj-baimsky-floating": [
    "14bb19459fc286a6",
    "Baim / Cape Nagloynyn floating PEB-106 (RITM-200S)",
    "construction"
   ],
   "prj-oklo-eielson": [
    "d94b45e262e11ba3",
    "Oklo Aurora at Eielson AFB (DAF microreactor pilot)",
    "siting"
   ],
   "prj-aalo-x-inl": [
    "67a1c077519380c4",
    "Aalo-X at Idaho National Laboratory",
    "commissioning"
   ],
   "prj-antares-mark0-inl": [
    "90776ba5e9cbe41a",
    "Antares Mark-0 at Idaho National Laboratory",
    "commissioning"
   ],
   "prj-unity-inl": [
    "a9a41e281c91b3d9",
    "Deployable Energy Unity at Idaho National Laboratory",
    "commissioning"
   ],
   "prj-ward-250": [
    "2d9606cf044bf2d9",
    "Valar Atomics Ward 250",
    "operating"
   ],
   "prj-aalo-rellis": [
    "4f1931b9b2225c5c",
    "Aalo commercial proposal at Texas A&M-RELLIS",
    "siting"
   ],
   "prj-kairos-rellis": [
    "5d7d1ed75f5042b9",
    "Kairos commercial proposal at Texas A&M-RELLIS",
    "siting"
   ],
   "prj-natura-rellis": [
    "f3814c67455f92d2",
    "Natura MSR-100 proposal at Texas A&M-RELLIS",
    "siting"
   ],
   "prj-imsr-rellis": [
    "8ad36ab27c4c9766",
    "Terrestrial Energy IMSR at Texas A&M-RELLIS",
    "siting"
   ],
   "prj-last-energy-rellis": [
    "22471e324dc1a0d2",
    "Last Energy PWR-5 pilot at Texas A&M-RELLIS",
    "construction"
   ],
   "prj-oklo-ohio": [
    "93a70d1fb3c7a049",
    "Oklo Aurora campus, Pike County, Ohio",
    "siting"
   ],
   "prj-thorcon-kelasa": [
    "c673748502ccf733",
    "Thorcon 500, Kelasa Island",
    "siting"
   ],
   "prj-osge-ostroleka": [
    "b7b29d3adb357dea",
    "OSGE Ostrołęka BWRX-300 proposal",
    "siting"
   ],
   "prj-osge-dabrowa-gornicza": [
    "c95e08f7030d6007",
    "OSGE Dąbrowa Górnicza BWRX-300 proposal",
    "siting"
   ],
   "prj-osge-nowa-huta": [
    "34a972d56b7e221c",
    "OSGE Kraków / Nowa Huta BWRX-300 proposal",
    "siting"
   ],
   "prj-rr-tusimice": [
    "040b309a9b4de1b7",
    "Rolls-Royce SMR Tušimice candidate location",
    "siting"
   ],
   "prj-rr-detmarovice": [
    "745b499b6685f40e",
    "Rolls-Royce SMR Dětmarovice candidate location",
    "siting"
   ],
   "prj-sealer-untra": [
    "a9451620fbee32fa",
    "Blykalla SEALER Untra / Tierp proposal",
    "licensing"
   ],
   "prj-sealer-norrsundet": [
    "1ca4edfb4c5756ce",
    "Blykalla SEALER Norrsundet / Gävle proposal",
    "licensing"
   ],
   "prj-belews-creek": [
    "6ac0ab07e8be8aa9",
    "Duke Belews Creek technology-neutral SMR proposal",
    "licensing"
   ],
   "prj-holtec-oyster-creek": [
    "9a9e6bf8f4349d07",
    "Holtec Oyster Creek SMR proposal",
    "announced"
   ],
   "prj-holtec-blue-castle": [
    "2857446d1b49bff0",
    "Holtec Green River / Blue Castle, Utah proposal",
    "announced"
   ],
   "prj-last-energy-haskell": [
    "3edd07d897a268bd",
    "Last Energy Haskell County PWR-20 campus",
    "siting"
   ],
   "prj-last-energy-caldwell": [
    "e4380ce2f2286b1c",
    "Last Energy first commercial PWR-20 site, Caldwell County",
    "licensing"
   ],
   "prj-last-energy-llynfi": [
    "a4dcc2ef69ef6406",
    "Last Energy Llynfi PWR-20 proposal",
    "siting"
   ],
   "prj-last-energy-london-gateway": [
    "07035b449b1cfba0",
    "Last Energy London Gateway PWR-20 proposal",
    "announced"
   ],
   "prj-aep-rockport": [
    "63f56b671d844edf",
    "AEP Rockport BWRX-300 proposal",
    "announced"
   ],
   "prj-aep-joshua-falls": [
    "5fe2e289fba41cb9",
    "AEP Joshua Falls SMR proposal",
    "siting"
   ],
   "prj-north-anna-smr": [
    "b395a1eb5a6deeb5",
    "Dominion North Anna SMR proposal",
    "announced"
   ],
   "prj-chalk-river-mmr": [
    "eafa5632f1ef1576",
    "Global First Power Chalk River MMR (paused)",
    "suspended"
   ],
   "prj-ap300-teesside": [
    "845b990d79c9044e",
    "Community Nuclear Power North Teesside AP300 proposal",
    "announced"
   ],
   "prj-taftoy-smr": [
    "2afb4f0388574441",
    "Taftøy Aure / Heim SMR proposal",
    "siting"
   ],
   "prj-dalane-smr": [
    "7101d4b2b4fc9aa9",
    "Dalane / Lund SMR proposal",
    "siting"
   ],
   "prj-oygarden-smr": [
    "2ef2b03cf0cb1ba0",
    "Øygarden / Alver SMR proposal",
    "siting"
   ],
   "prj-tarapur-bsmr-200": [
    "6efc42b42a7726ce",
    "Tarapur BSMR-200 lead proposal",
    "siting"
   ],
   "prj-tarapur-smr-55": [
    "8d2457bca44a1495",
    "Tarapur SMR-55 lead proposal",
    "siting"
   ],
   "prj-barc-vizag-htgcr": [
    "c88d9b16fb4e46a1",
    "BARC Visakhapatnam HTGCR hydrogen demonstration proposal",
    "siting"
   ],
   "prj-radiant-kaleidos-inl": [
    "a2c65c755dadce7f",
    "Radiant Kaleidos demonstration at INL DOME",
    "commissioning"
   ],
   "prj-radiant-buckley": [
    "1b9e6842353d2516",
    "Radiant Kaleidos Buckley Space Force Base proposal",
    "siting"
   ],
   "prj-prodigy-belledune": [
    "27002bbf30a020ed",
    "Belledune Prodigy transportable nuclear proposal",
    "announced"
   ],
   "prj-natura-msr-1-acu": [
    "1f5361ff9f26f67d",
    "Natura MSR-1 demonstration at Abilene Christian University",
    "construction"
   ],
   "prj-atucha-new-smr": [
    "604d13da3d3a0c98",
    "ACR-300 SMR proposal at Atucha (Meitner Energy)",
    "announced"
   ],
   "prj-bwxt-green-river": [
    "6dffbcb1ea47fa0a",
    "Tata / BWXT BANR Green River, Wyoming proposal",
    "announced"
   ],
   "prj-jimmy-bazancourt": [
    "10af792bc4d02833",
    "Jimmy Cristanol Bazancourt heat microreactor proposal",
    "licensing"
   ],
   "prj-penn-state-frontier": [
    "b88998623666efe9",
    "Penn State FRONTIER eVinci research proposal",
    "announced"
   ],
   "prj-uiuc-kronos": [
    "08e5b09fa02b20b4",
    "University of Illinois KRONOS MMR",
    "licensing"
   ],
   "prj-deep-fission-parsons": [
    "8402b35aed2b9115",
    "Deep Fission Gravity pilot, Parsons",
    "siting"
   ],
   "prj-evinci-dome": [
    "e0fbeeccf3b2838e",
    "eVinci DOME nuclear test reactor",
    "cancelled"
   ],
   "prj-blue-energy-victoria": [
    "d9cff433e70e3323",
    "Blue Energy BWRX-300 at Port of Victoria",
    "licensing"
   ],
   "prj-tetra-1-rellis": [
    "ec83624f68d1f638",
    "Project TETRA / TETRA-1 pilot at Texas A&M RELLIS",
    "announced"
   ],
   "prj-wylfa-nuscale-shearwater": [
    "8f5b29287dc32bed",
    "Shearwater NuScale Wylfa feasibility proposal (2021)",
    "announced"
   ],
   "prj-ningdu-modular-plan": [
    "9768e884112abf5e",
    "Ningdu multipurpose modular proposal (14th Five-Year plan)",
    "announced"
   ],
   "prj-patnow-zepak-smr": [
    "3fc6cb58e0949082",
    "ZE PAK–SGE Pątnów BWRX-300 proposal",
    "announced"
   ],
   "prj-rivne-smr160": [
    "bb3b001e189c277a",
    "Energoatom / Holtec Rivne SMR-160 proposal (MoU-era)",
    "announced"
   ],
   "prj-cgn-bohai-acpr50s": [
    "9668f074a1923d21",
    "CGN Bohai ACPR50S floating SMR demonstration proposal",
    "announced"
   ],
   "prj-west-kalimantan-ritm-floating": [
    "2cabc9b7e54014c8",
    "West Kalimantan Rosatom floating RITM-200M proposal (2025)",
    "announced"
   ],
   "prj-west-kalimantan-land-smr": [
    "3638d7a8b3c80a35",
    "West Kalimantan Rosatom land-based SMR proposal (2025)",
    "announced"
   ],
   "prj-dimitrovgrad-svbr100": [
    "112c1ebf23a918ee",
    "Dimitrovgrad SVBR-100 pilot proposal (2013 land lease)",
    "cancelled"
   ],
   "prj-usnc-inl-mmr-proposal": [
    "029d5c98897e9b67",
    "USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)",
    "announced"
   ],
   "prj-midpoint-smr": [
    "0fb484334f3be2d1",
    "Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)",
    "announced"
   ],
   "prj-surry-gec": [
    "42a45f31b05929d1",
    "Surry Green Energy Center SMR campus proposal",
    "announced"
   ],
   "prj-maoming-green-energy-htgr": [
    "f90bd0ed35bda5fd",
    "Maoming Green Energy HTGR proposal (Phase 1 planning)",
    "announced"
   ],
   "prj-nine-mile-point-advanced-smr": [
    "90fd9056e3fd8b3b",
    "Nine Mile Point Gen III+ SMR early site permit evaluation",
    "announced"
   ],
   "prj-hartlepool-xe100": [
    "726204a58a6718e3",
    "Centrica / X-energy Xe-100 plant at Hartlepool",
    "announced"
   ],
   "prj-cottam-smr300": [
    "33f4ee54a93d2912",
    "Holtec / EDF SMR-300 proposal at Cottam",
    "announced"
   ],
   "prj-trawsfynydd-egino": [
    "2f7754fbaeb28e52",
    "Cwmni Egino small modular reactor proposal at Trawsfynydd",
    "deferred"
   ],
   "prj-videberg-varo-rr-smr": [
    "392509d5786f42fc",
    "Videberg Kraft Rolls-Royce SMR plant on the Värö peninsula (Ringhals)",
    "siting"
   ],
   "prj-knxt-valdemarsvik": [
    "6064fc36741ccb51",
    "Kärnfull Next SMR park at Målma, Valdemarsvik",
    "licensing"
   ],
   "prj-studsvik-nykoping": [
    "178572aebc4b090a",
    "Studsvik new nuclear at the Nyköping home site",
    "licensing"
   ],
   "prj-blykalla-horby": [
    "c9ecb7a0e696c4b2",
    "Blykalla SEALER study at Hörby (withdrawn)",
    "cancelled"
   ],
   "prj-svalbard-sealer": [
    "8b782f9d796f469c",
    "SEALER power plant proposal in Longyearbyen, Svalbard",
    "siting"
   ],
   "prj-vardo-smr": [
    "bdf6dd54865a44da",
    "Norsk Kjernekraft SMR proposal in Vardø",
    "siting"
   ],
   "prj-halden-smr": [
    "a1b629d82c108ea7",
    "Halden Kjernekraft SMR proposal at Femsjøen",
    "siting"
   ],
   "prj-lister-smr": [
    "597cf8e94fc96aed",
    "Lister Kjernekraft SMR proposal (Lyngdal and Farsund)",
    "siting"
   ],
   "prj-kuopio-smr-heat": [
    "8ba18ce8287984de",
    "Kuopion Energia small nuclear district-heating plant",
    "siting"
   ],
   "prj-helen-helsinki-smr": [
    "ac09f80bd11be3a5",
    "Helen nuclear energy programme plant in Helsinki",
    "siting"
   ],
   "prj-kerava-ldr50": [
    "69af1d8906e35f57",
    "Keravan Energia / Steady Energy nuclear district-heating plant",
    "announced"
   ],
   "prj-psi-copenhagen-atomics": [
    "8e47ef1113ffcd06",
    "Copenhagen Atomics critical experiment at the Paul Scherrer Institute",
    "siting"
   ],
   "prj-newcleo-veron-lfr-as-30": [
    "a13e4cffb411f3be",
    "newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-Véron",
    "siting"
   ],
   "prj-calogena-cadarache": [
    "34aebe4748e6e74e",
    "Calogena nuclear heating plant at CEA Cadarache",
    "siting"
   ],
   "prj-stellaria-alvin-cadarache": [
    "7310b5ad58ec700f",
    "Stellaria Alvin experimental reactor (INB Alpha) at Cadarache",
    "licensing"
   ],
   "prj-hexana-gard-rhodanien": [
    "d17b7c9f6ceef277",
    "Hexana first SMR in the Gard rhodanien area",
    "announced"
   ],
   "prj-thorizon-zeeland": [
    "90230e514926ed6b",
    "Thorizon One first commercial molten-salt reactor in Zeeland",
    "announced"
   ],
   "prj-newcleo-bohunice": [
    "f63fb1e7e441c397",
    "newcleo / JAVYS LFR-AS-200 study at Bohunice V1",
    "siting"
   ],
   "prj-dual-fluid-rwanda": [
    "9cc3ea3db79287f3",
    "Dual Fluid critical demonstration experiment in Rwanda",
    "licensing"
   ],
   "prj-necsa-pelindaba-smr-demo": [
    "3dd7977af316a736",
    "Necsa SMR demonstration reactor at Pelindaba",
    "announced"
   ],
   "prj-pbmr-koeberg": [
    "55f42ed029c619bd",
    "PBMR demonstration power plant at Koeberg (terminated)",
    "cancelled"
   ],
   "prj-solo-valmeyer": [
    "54e32097a13f2a0c",
    "Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, Valmeyer",
    "siting"
   ],
   "prj-nano-barupon-liberty": [
    "987c7184f44f2920",
    "BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)",
    "announced"
   ],
   "prj-oklo-diamondback": [
    "6cbd852d21ef7a0e",
    "Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI)",
    "announced"
   ],
   "prj-holtec-brigham-city": [
    "b0d0d09a44190d9a",
    "Holtec SMR-300 proposal in Brigham City, Utah",
    "announced"
   ],
   "prj-janus-fort-bragg-antares": [
    "7961e6c55dfd8ad0",
    "Antares R1 microreactors at Fort Bragg (Army Janus)",
    "announced"
   ],
   "prj-janus-fort-campbell-banr": [
    "d814a00aa7b0479b",
    "BWXT BANR at Fort Campbell (Army Janus)",
    "announced"
   ],
   "prj-janus-fort-hood-ga-tes": [
    "951c761a07d0a742",
    "General Atomics GA-TES at Fort Hood (Army Janus)",
    "announced"
   ],
   "prj-janus-fort-benning-kaleidos": [
    "72d73c25ca77b42d",
    "Radiant Kaleidos microreactors at Fort Benning (Army Janus)",
    "announced"
   ],
   "prj-janus-fort-drum-evinci": [
    "e585277117acd7e5",
    "Westinghouse eVinci at Fort Drum (Army Janus)",
    "announced"
   ],
   "prj-anpi-malmstrom-evinci": [
    "3c1f865b91c6f1e2",
    "Westinghouse eVinci at Malmstrom Air Force Base (ANPI)",
    "siting"
   ],
   "prj-anpi-jbsa-antares": [
    "e2493e3af991b34c",
    "Antares microreactor at Joint Base San Antonio (ANPI)",
    "siting"
   ],
   "prj-navy-crane-microreactor": [
    "b35988d088c59a34",
    "Microreactor at Naval Weapons Station Crane",
    "announced"
   ],
   "prj-inl-marvel": [
    "6c952f8f84516a3b",
    "MARVEL microreactor test bed at INL's TREAT facility",
    "construction"
   ],
   "prj-isu-nucube-art": [
    "04c914dd369d0ca3",
    "Idaho State University / NuCube Advanced Research and Test Reactor",
    "siting"
   ],
   "prj-unity-dome-2027": [
    "61dadffce5d56626",
    "Deployable Energy Unity full-power test in INL's DOME (2027)",
    "siting"
   ],
   "prj-aalo-idaho-falls-erp": [
    "3caad580b71cdcf1",
    "Aalo fleet proposal at Idaho Falls Power's Energy Research Park",
    "announced"
   ],
   "prj-zettajoule-tees-zj0": [
    "df8e970fd246d6f5",
    "ZettaJoule ZJ0 research reactor at Texas A&M (TEES)",
    "announced"
   ],
   "prj-nuclea-morpheus-usrel": [
    "24d2d56daa099e31",
    "Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab",
    "announced"
   ],
   "prj-darlington-bwrx-units-2-4": [
    "f2273c4c86b9abc7",
    "Darlington BWRX-300 Units 2-4",
    "siting"
   ],
   "prj-moltex-ssrw-lepreau": [
    "234f5cd390a3b1e1",
    "Moltex SSR-W at Point Lepreau",
    "announced"
   ],
   "prj-osge-warszawa": [
    "eda4c11bebf96573",
    "OSGE Warsaw potential BWRX-300 location (2023 list)",
    "announced"
   ],
   "prj-industria-rr-smr": [
    "4b22a7d89dbc5f5e",
    "SGP Industria Rolls-Royce SMR plant (2024 decision in principle)",
    "suspended"
   ],
   "prj-htgr-pola-ncbj": [
    "d7b662e00ca2c4d9",
    "HTGR-POLA research reactor (NCBJ)",
    "announced"
   ],
   "prj-trypilska-smr": [
    "479f7f3b7b01d68c",
    "Energoatom SMR at the Trypilska thermal plant site",
    "announced"
   ],
   "prj-chukotka-sovinoe-shelf-m": [
    "15c3943860145837",
    "Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka",
    "siting"
   ],
   "prj-xuwei-htgr-unit3": [
    "d2425083eee2a05f",
    "Xuwei nuclear heating and power plant Unit 3 (HTGR)",
    "construction"
   ],
   "prj-xiapu-htgr": [
    "086f2ffe2b61c554",
    "Huaneng Xiapu 600 MW HTGR unit (site plan)",
    "announced"
   ],
   "prj-ruijin-htr": [
    "959002a6f3046116",
    "Ruijin HTR nuclear power proposal (Jiangxi)",
    "announced"
   ],
   "prj-tmsr-lf1-wuwei": [
    "0e1c8e34cd7e809d",
    "TMSR-LF1 thorium molten-salt experimental reactor, Wuwei",
    "operating"
   ],
   "prj-httr-oarai": [
    "8377f777da313208",
    "HTTR test reactor with planned hydrogen coupling, Oarai",
    "operating"
   ],
   "prj-gijang-smr": [
    "0110b944e01f990e",
    "KHNP SMR at the Gijang-gun candidate site (11th Basic Plan)",
    "siting"
   ],
   "prj-daegu-gunwi-ismr": [
    "cb98cdf37a594765",
    "Daegu i-SMR proposal at the Gunwi industrial complex",
    "deferred"
   ],
   "prj-bontang-pkt-msr": [
    "b9ce599f9a1fd3c2",
    "Pupuk Kaltim nuclear-powered ammonia study at Bontang",
    "announced"
   ],
   "prj-myanmar-ritm-smr": [
    "34e1dc4d636e6011",
    "Myanmar 110 MW SMR project (two RITM-200N; site not named)",
    "announced"
   ],
   "prj-sellafield-prism": [
    "3061da194805f336",
    "GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward)",
    "cancelled"
   ],
   "prj-alfred-mioveni": [
    "af18c1c9dd5e3521",
    "ALFRED lead-cooled demonstrator at Mioveni (EAGLES-300 programme)",
    "announced"
   ],
   "prj-leandrea-mol": [
    "579a01a26a25ce9b",
    "LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 programme)",
    "announced"
   ],
   "prj-baishan-happy200": [
    "017eb36cfaae50a3",
    "HAPPY200 nuclear heating project at Baishan, Jilin",
    "announced"
   ],
   "prj-galena-4s": [
    "ff571629084a8681",
    "Toshiba 4S proposal at Galena, Alaska (mid-2000s)",
    "cancelled"
   ],
   "prj-starcore-pinawa": [
    "a3ba9dafb5e07735",
    "StarCore demonstration reactor at the Whiteshell Laboratories site, Pinawa",
    "announced"
   ],
   "prj-ameren-callaway-wsmr": [
    "2ed4dac8edf79ca5",
    "Ameren / Westinghouse SMR proposal at Callaway (2012)",
    "announced"
   ],
   "prj-purdue-duke-smr": [
    "4ac74d9c8dbdad9c",
    "Purdue / Duke Energy SMR feasibility study for the Purdue campus",
    "announced"
   ],
   "prj-antares-mark1-inl": [
    "7e9fea428ce6ef6f",
    "Antares Mark-1 electricity-producing microreactor at INL",
    "announced"
   ],
   "prj-deep-atomic-mk60-inl": [
    "4335f27290ed8dfd",
    "Deep Atomic MK60 AI data-centre campus proposal at INL",
    "announced"
   ],
   "prj-loki-mmr-dome-inl": [
    "acca0233744e5f5c",
    "Pylon / LOKI MMR experiment proposal for INL's DOME",
    "announced"
   ],
   "prj-nucube-usrel": [
    "a12ac682c0d01871",
    "NuCube test microreactor at the Utah San Rafael Energy Lab",
    "announced"
   ],
   "prj-narvik-fornes": [
    "25009681f4b1d9ce",
    "Narvik Kjernekraft SMR plant proposal at Fornes, Ballangen",
    "siting"
   ],
   "prj-thorizon-pioneer-petten": [
    "48a80d172a1a9eda",
    "Thorizon PIONEER molten-salt demonstrator at NRG PALLAS, Petten",
    "announced"
   ],
   "prj-teplator-slavutych": [
    "26872a4bc6dbf4f4",
    "TEPLATOR heat-only reactor for Slavutych district heating",
    "announced"
   ],
   "prj-last-energy-legnica": [
    "16aa7a7962d7fbdb",
    "Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022)",
    "announced"
   ],
   "prj-last-energy-mioveni": [
    "d78a17f5ff52671f",
    "Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan)",
    "announced"
   ],
   "prj-hyperion-srs-2012": [
    "934a2c8cd5e7deda",
    "Hyperion / Gen4 Module proposal at Savannah River Site (2012)",
    "announced"
   ],
   "prj-holtec-smr160-srs-2012": [
    "e67fcbc2175039a3",
    "Holtec SMR-160 proposal at Savannah River Site (2012)",
    "announced"
   ],
   "prj-nuscale-srs-2012": [
    "94352d93b3282247",
    "NuScale plant proposal at Savannah River Site (2012)",
    "announced"
   ],
   "prj-bluecore-long-beach": [
    "b206e53faaba6876",
    "BlueCore BC-15 floating plant proposal at the Port of Long Beach",
    "siting"
   ],
   "prj-htr10-inet": [
    "a949c25af7481b45",
    "HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET",
    "operating"
   ],
   "prj-sanmen-htgr": [
    "9e8dc18a5e321b08",
    "CNEC / Zheneng Sanmen HTGR power station",
    "siting"
   ],
   "prj-daqing-nhr200": [
    "95100bf94809d16e",
    "Daqing NHR-200 nuclear heating plant (1990s)",
    "licensing"
   ],
   "prj-rde-serpong": [
    "d4ed0b916ebd0959",
    "BATAN/BRIN RDE experimental reactor at Serpong (PeLUIt-40 predecessor)",
    "suspended"
   ],
   "prj-stratek-zilkaats": [
    "d459dc6a8180c5bc",
    "Stratek Global HTMR-100 at Zilkaats Estate",
    "announced"
   ],
   "prj-belledune-arc100": [
    "c8c57f6fb6e6e1b6",
    "ARC-100 proposal at the Port of Belledune Green Energy Hub",
    "announced"
   ],
   "prj-gazprom-kirinskoye-floating": [
    "cb9e99b16eb22129",
    "Floating nuclear power unit for Gazprom's Kirinskoye fields, Sakhalin",
    "announced"
   ],
   "prj-otrera-marcoule": [
    "5c776d6f1f85fc5d",
    "Otrera precursor (first demonstration) reactor at CEA Marcoule",
    "announced"
   ],
   "prj-odin-berkeley-green": [
    "84400a6d81306327",
    "Cambridge Atomworks ODIN prototype at Berkeley Green",
    "announced"
   ],
   "prj-norilsk-asmm-ritm400": [
    "c2217aeb13b13b60",
    "Norilsk land small nuclear plant (RITM-400)",
    "announced"
   ],
   "prj-ngnp-inl": [
    "baf03e86171336ba",
    "Next Generation Nuclear Plant prototype HTGR at INL (2005-2013)",
    "suspended"
   ],
   "prj-mpower-clinch-river": [
    "123be74f94b280b0",
    "B&W mPower plan at TVA's Clinch River site (2013-2017)",
    "cancelled"
   ],
   "prj-arc100-inl": [
    "41164a9c27cbd736",
    "ARC-100 first-of-a-kind deployment framework at Idaho National Laboratory",
    "announced"
   ],
   "prj-jiamusi-nuclear-heating": [
    "6adc20a6ccc08108",
    "SPIC Jiamusi nuclear heating demonstration (Hongxing site)",
    "siting"
   ],
   "prj-vber300-aktau": [
    "aef971198ff0f7d8",
    "VBER-300 nuclear plant project near Aktau, Mangystau (2006)",
    "suspended"
   ],
   "prj-fensfjorden-smr": [
    "1dfcd055cc9cc295",
    "Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver)",
    "siting"
   ],
   "prj-grenland-smr": [
    "0705d521635d0133",
    "Grenland Kjernekraft SMR proposal at Herre, Bamble",
    "siting"
   ],
   "prj-nano-digihost-north-tonawanda": [
    "b74ea2a2c1579dde",
    "NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU)",
    "announced"
   ],
   "prj-stellaria-fos-sur-mer": [
    "3813704616707131",
    "Stellarium reactors for the Fos-sur-Mer integrated energy hub (2026 MoU)",
    "announced"
   ],
   "prj-ubattery-chalk-river": [
    "c0cd38e8a8b7df5e",
    "U-Battery first-of-a-kind siting bid at Chalk River (2019-2023)",
    "siting"
   ],
   "prj-antares-r1-inl-cfa": [
    "7f86f5524a48c724",
    "Antares R1 microreactor siting at INL's Central Facilities Area",
    "siting"
   ],
   "prj-ornl-tcr": [
    "869061a812d64108",
    "Transformational Challenge Reactor microreactor test proposal at ORNL (2019)",
    "announced"
   ],
   "prj-ruta70-ippe-obninsk": [
    "b7aa10bebd7eb63e",
    "RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004)",
    "announced"
   ],
   "prj-ghana-voygr12": [
    "0f283979faff50ac",
    "Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed)",
    "announced"
   ],
   "prj-standard-power-ohio": [
    "e69f4c29b24ed50a",
    "Standard Power NuScale SMR facility in Ohio (site not disclosed)",
    "announced"
   ],
   "prj-standard-power-pennsylvania": [
    "605dfb690c5cb7e0",
    "Standard Power NuScale SMR facility in Pennsylvania (site not disclosed)",
    "announced"
   ],
   "prj-fanco-eagl1-indiana": [
    "88d50e85da43e568",
    "First American Nuclear EAGL-1 energy park in Indiana (site not disclosed)",
    "announced"
   ],
   "prj-sinap-minqin-smtmsr": [
    "533880d7b51758e6",
    "SINAP small modular thorium molten-salt research reactor (10 MWe), Minqin",
    "siting"
   ],
   "prj-huakun-one-taipingling": [
    "9e1b3582307d9d18",
    "Huakun One floating reactor platform demonstration at the Taipingling site",
    "siting"
   ],
   "prj-haiyang-integrated-small-reactor": [
    "3f44384cf7cc654f",
    "Shandong Haiyang integrated small reactor demonstration project (heat only)",
    "siting"
   ],
   "prj-shenyang-nhr200-2001": [
    "03bcebe128cffc14",
    "Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001)",
    "cancelled"
   ],
   "prj-yantai-nhr200-desalination-2003": [
    "f57a59051dbbfb0b",
    "Yantai nuclear seawater desalination project (NHR200-I, 2003)",
    "announced"
   ],
   "prj-gs-energy-uljin": [
    "0ec81b6e11001100",
    "GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complex",
    "announced"
   ],
   "prj-ucri-ien": [
    "85c7a64873312287",
    "UCRI critical unit for the Brazilian microreactor programme at IEN",
    "licensing"
   ],
   "prj-meta-terrapower-initial": [
    "936732cd31adafe5",
    "Meta–TerraPower initial dual-unit Natrium proposal",
    "announced"
   ],
   "prj-formosa-carem-commercial": [
    "6910c2a91f9eb66a",
    "Formosa commercial CAREM proposal (2010 agreement)",
    "siting"
   ],
   "prj-kaliningrad-floating-smr-proposal": [
    "1e2e3c5b3796d625",
    "Kaliningrad floating small nuclear plants proposal",
    "announced"
   ],
   "prj-valar-carbon-county-campus": [
    "e0da5a34c174de6f",
    "Valar Carbon County nuclear campus proposal (Project Beehive)",
    "siting"
   ],
   "prj-liaoyuan-dhr400": [
    "82d50428ee63ad18",
    "Liaoyuan DHR-400 heating demonstration proposal",
    "announced"
   ],
   "prj-huizhou-huapeng-one": [
    "54c2c6fa95eebae1",
    "Huizhou HuaPeng-1 heating demonstration proposal",
    "siting"
   ],
   "prj-elena-am-pilot": [
    "debbb10fbd4aa315",
    "First ELENA-AM thermoelectric heating pilot proposal",
    "announced"
   ],
   "prj-unity-hornbeck-maritime": [
    "e08098635dee293d",
    "Deployable Energy–Hornbeck Unity maritime demonstration proposal",
    "announced"
   ],
   "prj-src-initial-evinci": [
    "c78d51b3da0ad921",
    "SRC initial eVinci demonstration proposal (cancelled)",
    "cancelled"
   ],
   "prj-cnnc-floating-demo-2016": [
    "9dba33cc6aa49874",
    "CNNC floating SMR demonstration proposal (2016)",
    "announced"
   ],
   "prj-last-energy-ksse-first": [
    "1c300753ece77335",
    "Last Energy first KSSE plant proposal",
    "announced"
   ],
   "prj-aalo-ascension-inl": [
    "461e8cff7a87905c",
    "Aalo Project Ascension power-reactor proposal at INL",
    "announced"
   ],
   "prj-ameresco-imsr-aberdeen": [
    "b3df6a5f117863b3",
    "Ameresco–Terrestrial Energy IMSR at Aberdeen Proving Ground",
    "announced"
   ],
   "prj-geenex-beck-creek": [
    "2678d6be81727919",
    "Beck Creek Energy SMR proposal (Amherst County)",
    "announced"
   ],
   "prj-aep-amazon-xenergy-breed": [
    "55b61fe9fb063a0d",
    "Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana)",
    "announced"
   ],
   "prj-rosatom-north-halmahera-floating": [
    "6838a406ec379925",
    "Northern Halmahera floating nuclear power units (Rosatom, two FPU-100)",
    "announced"
   ],
   "prj-calogena-pierrelatte": [
    "7ca7b1ea3cfb4b4d",
    "Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte",
    "announced"
   ]
  },
  "designs": {
   "dsn-bwrx-300": [
    "48730f45c1796889",
    "BWRX-300",
    null
   ],
   "dsn-natrium": [
    "c537f95ee4b493bd",
    "Natrium",
    null
   ],
   "dsn-hermes": [
    "562374c88f5a2768",
    "Hermes / KP-FHR",
    null
   ],
   "dsn-xe-100": [
    "f66c3923bcf888d8",
    "Xe-100",
    null
   ],
   "dsn-aurora": [
    "c89d09b9b9b9dfb8",
    "Aurora",
    null
   ],
   "dsn-voygr": [
    "54f8024a1154c798",
    "NuScale VOYGR (US460 / NPM)",
    null
   ],
   "dsn-rr-smr": [
    "deed5ed36e3f0984",
    "Rolls-Royce SMR",
    null
   ],
   "dsn-arc-100": [
    "08ee631c9425ffd5",
    "ARC-100",
    null
   ],
   "dsn-htr-pm": [
    "6c35257c2b46673e",
    "HTR-PM",
    null
   ],
   "dsn-acp100": [
    "62945cab541cebd8",
    "ACP100 (Linglong One)",
    null
   ],
   "dsn-carem25": [
    "718d82d947ee4b63",
    "CAREM-25",
    null
   ],
   "dsn-klt40s": [
    "f14e71c63790a586",
    "KLT-40S",
    null
   ],
   "dsn-brest-od-300": [
    "5bca56fc0962b4ac",
    "BREST-OD-300",
    null
   ],
   "dsn-ritm-200n": [
    "7e50e113441d4d09",
    "RITM-200N",
    null
   ],
   "dsn-smr-300": [
    "75f9249ab7477e6c",
    "Holtec SMR-300",
    null
   ],
   "dsn-banr": [
    "d4c3413c4f6fef40",
    "BWXT BANR",
    null
   ],
   "dsn-imsr": [
    "493ee93b4ab40f51",
    "IMSR (Integral Molten Salt Reactor)",
    null
   ],
   "dsn-pele": [
    "62eda2ff2bb84c67",
    "Project Pele microreactor (BWXT HTGR)",
    null
   ],
   "dsn-ritm-200s": [
    "9ac52bf81445e118",
    "RITM-200S",
    null
   ],
   "dsn-aalo-x": [
    "980bff19f46ed4ac",
    "Aalo-X",
    null
   ],
   "dsn-aalo-pod": [
    "1eeed0f771df2364",
    "Aalo pod (commercial proposal)",
    null
   ],
   "dsn-kp-fhr": [
    "470c6403b97b787e",
    "KP-FHR commercial plant",
    null
   ],
   "dsn-natura-msr-100": [
    "43f70b4de714f07e",
    "Natura MSR-100",
    null
   ],
   "dsn-mark-0": [
    "98813f107e20571c",
    "Antares Mark-0",
    null
   ],
   "dsn-ward-250": [
    "e961c5d6273bb2c4",
    "Ward 250",
    null
   ],
   "dsn-unity": [
    "8b6860e92600bc1a",
    "Unity",
    null
   ],
   "dsn-pwr-5": [
    "62a106c5e5ce24a1",
    "Last Energy PWR-5",
    null
   ],
   "dsn-thorcon-500": [
    "0c92a73f046f55f2",
    "Thorcon 500 (TMSR500)",
    null
   ],
   "dsn-sealer": [
    "0bf93c2ccf2dde81",
    "SEALER",
    null
   ],
   "dsn-pwr-20": [
    "0622cc8bb4289287",
    "PWR-20",
    null
   ],
   "dsn-gfp-mmr": [
    "bfceb1c07cd1229c",
    "Global First Power Micro Modular Reactor",
    null
   ],
   "dsn-ap300": [
    "295f9d12a32125b7",
    "AP300",
    null
   ],
   "dsn-bsmr-200": [
    "d5152b658d73301e",
    "Bharat Small Modular Reactor (BSMR-200)",
    null
   ],
   "dsn-smr-55": [
    "548536f254d6ad71",
    "BARC SMR-55",
    null
   ],
   "dsn-barc-htgcr": [
    "2327776c945e3b95",
    "BARC high-temperature gas-cooled hydrogen reactor",
    null
   ],
   "dsn-kaleidos": [
    "b0027bc96c72048a",
    "Kaleidos",
    null
   ],
   "dsn-msr-1": [
    "d55d0784de9687fa",
    "Natura MSR-1",
    null
   ],
   "dsn-jimmy-heat": [
    "d89963c702f86d80",
    "Jimmy Fermi heat microreactor",
    null
   ],
   "dsn-evinci": [
    "c136fb7616963d63",
    "eVinci",
    null
   ],
   "dsn-kronos-mmr": [
    "35714741512dd223",
    "KRONOS MMR",
    null
   ],
   "dsn-gravity": [
    "033c23d46877b91c",
    "Gravity",
    null
   ],
   "dsn-catalogue-r1": [
    "3443634a649ece2d",
    "R1",
    null
   ],
   "dsn-catalogue-blossom-energy-smr": [
    "9955c7f0978e392e",
    "Blossom Energy SMR",
    null
   ],
   "dsn-catalogue-blue-capsule": [
    "f52a9ebd2a93d058",
    "Blue Capsule",
    null
   ],
   "dsn-catalogue-sealer-one": [
    "31ed431b8f588e55",
    "SEALER-One",
    null
   ],
   "dsn-catalogue-cal-30": [
    "b6c097189d7f64e9",
    "CAL-30",
    null
   ],
   "dsn-catalogue-acpr50s": [
    "b19e8e6e5fc87d72",
    "ACPR50S",
    null
   ],
   "dsn-catalogue-leunr": [
    "da60bd00dc56da5c",
    "LEUNR",
    null
   ],
   "dsn-catalogue-energy-well": [
    "2dadc1994bb08cf5",
    "Energy Well",
    null
   ],
   "dsn-catalogue-dfbr-1": [
    "7e5098d8ec380ad0",
    "DFBR-1",
    null
   ],
   "dsn-catalogue-df300": [
    "68c664fde02b21d5",
    "DF300",
    null
   ],
   "dsn-catalogue-a-htr-100": [
    "e0b0ae0f9eeaf39c",
    "A-HTR-100",
    null
   ],
   "dsn-catalogue-lftr": [
    "d6a5d4ba511b06d4",
    "LFTR",
    null
   ],
   "dsn-catalogue-fmr": [
    "086a09eaa7c8b5af",
    "FMR",
    null
   ],
   "dsn-catalogue-em2": [
    "f4c1fce439a931a1",
    "EM2",
    null
   ],
   "dsn-catalogue-hexana": [
    "cd37425e20c34182",
    "HEXANA",
    null
   ],
   "dsn-catalogue-nhr200-ii": [
    "160de4d168dddb01",
    "NHR200-II",
    null
   ],
   "dsn-catalogue-i-smr": [
    "910c7e7858db11e6",
    "i-SMR",
    null
   ],
   "dsn-catalogue-gthtr300": [
    "cb264ffc579cfb84",
    "GTHTR300",
    null
   ],
   "dsn-catalogue-httr": [
    "4b86e99c9db85471",
    "HTTR",
    null
   ],
   "dsn-catalogue-htr50s": [
    "fcadef17c0f56c41",
    "HTR50S",
    null
   ],
   "dsn-catalogue-smart100": [
    "32b6d16546da6606",
    "SMART100",
    null
   ],
   "dsn-catalogue-salus-100": [
    "6b882be584500c43",
    "SALUS-100",
    null
   ],
   "dsn-catalogue-hectar": [
    "945232b1a4f52d6a",
    "HECTAR",
    null
   ],
   "dsn-catalogue-mn-1": [
    "bd05dfbed2650294",
    "MN-1",
    null
   ],
   "dsn-catalogue-ssr-w": [
    "e3ba1c0f529dd4db",
    "SSR-W",
    null
   ],
   "dsn-catalogue-flex": [
    "861f1b709849af1b",
    "FLEX",
    null
   ],
   "dsn-catalogue-xamr": [
    "f44c6e7a406c7823",
    "XAMR",
    null
   ],
   "dsn-catalogue-odin": [
    "6ab5778cc5ad4d91",
    "ODIN",
    null
   ],
   "dsn-catalogue-loki-mmr": [
    "2f768c8a32705a10",
    "LOKI MMR",
    null
   ],
   "dsn-catalogue-htgr-pola": [
    "94a1262d5c3486c2",
    "HTGR-POLA",
    null
   ],
   "dsn-catalogue-lfr-as-200": [
    "d896bdbcaa6f7619",
    "LFR-AS-200",
    null
   ],
   "dsn-catalogue-lfr-as-30": [
    "c29fa247c9060f55",
    "LFR-AS-30",
    null
   ],
   "dsn-catalogue-nuclearis-n1": [
    "a1e92dcc56e58fb1",
    "Nuclearis N1",
    null
   ],
   "dsn-catalogue-nuward-smr": [
    "268eac0480c0b7c4",
    "NUWARD SMR",
    null
   ],
   "dsn-catalogue-ritm-200m": [
    "2f82753a0f276cf8",
    "RITM-200M",
    null
   ],
   "dsn-catalogue-otrera-2x300": [
    "639430e052d82156",
    "Otrera 2x300",
    null
   ],
   "dsn-catalogue-cmsr": [
    "5f61cf6bfe1f462f",
    "CMSR",
    null
   ],
   "dsn-catalogue-happy200": [
    "5f42e922f204ab88",
    "HAPPY200",
    null
   ],
   "dsn-catalogue-ldr-50": [
    "ff4f1fadb3b16812",
    "LDR-50",
    null
   ],
   "dsn-catalogue-stellarium": [
    "38ccca994aeea9d9",
    "Stellarium",
    null
   ],
   "dsn-catalogue-htmr-100": [
    "f8d810a4fbb30de5",
    "HTMR-100",
    null
   ],
   "dsn-catalogue-thorizon-one": [
    "9370c36b0c374a17",
    "Thorizon One",
    null
   ],
   "dsn-catalogue-movelux": [
    "32fd5f4c5e15ba84",
    "MoveluX",
    null
   ],
   "dsn-catalogue-4s": [
    "a5bd123cf720d011",
    "4S",
    null
   ],
   "dsn-catalogue-start": [
    "c372e54b9d8672b6",
    "START",
    null
   ],
   "dsn-catalogue-teplator": [
    "fdebb1e09878eed0",
    "TEPLATOR",
    null
   ],
   "dsn-aris-abv-6e": [
    "7fb2cc0ef89bbc38",
    "ABV-6E",
    null
   ],
   "dsn-aris-acp100s": [
    "b2a225bbe217178d",
    "ACP100S",
    null
   ],
   "dsn-aris-amr": [
    "2590c731e8aad89e",
    "AMR",
    null
   ],
   "dsn-aris-bandi": [
    "9089155e8e694796",
    "BANDI",
    null
   ],
   "dsn-aris-copenhagen-atomics-waste-burner": [
    "efbe027241ca795a",
    "Copenhagen Atomics Waste Burner",
    null
   ],
   "dsn-aris-elena": [
    "a84cbfb43aceb3c5",
    "ELENA",
    null
   ],
   "dsn-aris-fbnr": [
    "d878f8d121aa18ee",
    "FBNR",
    null
   ],
   "dsn-aris-fuji": [
    "210b5773f4e2a64a",
    "FUJI",
    null
   ],
   "dsn-aris-g4m": [
    "58544dea628f34cc",
    "G4M",
    null
   ],
   "dsn-aris-gt-mhr": [
    "cbdd3993ab019992",
    "GT-MHR",
    null
   ],
   "dsn-aris-holos-mono": [
    "9b522c403cd95e5a",
    "HOLOS-MONO",
    null
   ],
   "dsn-aris-holos-quad": [
    "ca0e9f0a84a22608",
    "HOLOS-QUAD",
    null
   ],
   "dsn-aris-htr-10": [
    "d623756f5210022e",
    "HTR-10",
    null
   ],
   "dsn-aris-marvel": [
    "8ffabd400a243b2d",
    "MARVEL",
    null
   ],
   "dsn-aris-mhr-100": [
    "a2dc17293527eba9",
    "MHR-100",
    null
   ],
   "dsn-aris-mhr-t": [
    "7ff264cbbbb860b3",
    "MHR-T",
    null
   ],
   "dsn-aris-peluit-40": [
    "a2711bdf15424fe9",
    "PeLUIt-40",
    null
   ],
   "dsn-aris-prismatic-htr": [
    "d24045f7d31f94f8",
    "Prismatic HTR",
    null
   ],
   "dsn-aris-shelf-m": [
    "6ea219eb1c6e0812",
    "SHELF-M",
    null
   ],
   "dsn-aris-smart": [
    "f30fd47637eb5788",
    "SMART",
    null
   ],
   "dsn-aris-star": [
    "ac07a96e19b9c290",
    "STAR",
    null
   ],
   "dsn-aris-unitherm": [
    "526ab8e2e9209a17",
    "UNITHERM",
    null
   ],
   "dsn-aris-vber-300": [
    "404b7d8ba134a8ea",
    "VBER-300",
    null
   ],
   "dsn-aris-w-lfr": [
    "af9ca497c26a9831",
    "W-LFR",
    null
   ],
   "dsn-aris-smahtr": [
    "326aa516e09de0bf",
    "SmAHTR",
    null
   ],
   "dsn-aris-prism": [
    "efa58925801c84d0",
    "PRISM",
    null
   ],
   "dsn-aris-otrera-300": [
    "a3cccf67c884f822",
    "OTRERA 300",
    null
   ],
   "dsn-holtec-smr-160": [
    "78ecbecc31271609",
    "Holtec SMR-160",
    null
   ],
   "dsn-svbr-100": [
    "3ecf40bd9bdac1ff",
    "SVBR-100",
    null
   ],
   "dsn-polar-1": [
    "8153cb9ed078ba04",
    "POLAR-1",
    null
   ],
   "dsn-eagles-300": [
    "d9ec3c5a01b7c327",
    "EAGLES-300",
    null
   ],
   "dsn-eagl-1": [
    "f6a4d4e65b11c3b7",
    "EAGL-1",
    null
   ],
   "dsn-halo-mmr": [
    "a843372dda62c766",
    "Hadron Halo",
    null
   ],
   "dsn-nusun-1": [
    "62f36b9e4e3b2592",
    "NuSun-1",
    null
   ],
   "dsn-hefasto": [
    "abc293610925d563",
    "HeFASTo",
    null
   ],
   "dsn-pbmr": [
    "7d293e6f8e65aab4",
    "PBMR (Pebble Bed Modular Reactor)",
    null
   ],
   "dsn-acr-300": [
    "221e8a2eddf2c27f",
    "ACR-300",
    null
   ],
   "dsn-solo": [
    "229e7ae2bc24ce70",
    "SOLO",
    null
   ],
   "dsn-morpheus": [
    "97de6e1b9d3f6fed",
    "Morpheus",
    null
   ],
   "dsn-ga-tes": [
    "8960b4f745488dc2",
    "GA-TES",
    null
   ],
   "dsn-htr-pm600": [
    "8620c5ff37079f21",
    "HTR-PM600",
    null
   ],
   "dsn-deep-atomic-mk60": [
    "f1a23f303817fb4e",
    "MK60",
    null
   ],
   "dsn-allseas-htgr": [
    "ceaa216725c395ca",
    "Allseas HTGR",
    null
   ],
   "dsn-archeos": [
    "ea452a05d197f832",
    "ARCHEOS",
    null
   ],
   "dsn-jh-100": [
    "bf69ac9ee0b6a948",
    "JH-100 (Junhe One)",
    null
   ],
   "dsn-mn-350": [
    "e09371a3b6506e5f",
    "MN-350 Mobile Power Module",
    null
   ],
   "dsn-tredic-htgr": [
    "b2c08096f0024f8a",
    "TREDIC HTGR SMR",
    null
   ],
   "dsn-bluecore-bc-15": [
    "53d8396ef9a65b0e",
    "BlueCore BC-15",
    null
   ],
   "dsn-jay-1": [
    "f5a1aa0f5692c28e",
    "JAY-1",
    null
   ],
   "dsn-marina": [
    "0683cf482182823b",
    "MARINA (marine molten-salt reactor)",
    null
   ],
   "dsn-ritm-400": [
    "91aa6b1196776614",
    "RITM-400",
    null
   ],
   "dsn-karat-45": [
    "a052c22916a6fa63",
    "KARAT-45",
    null
   ],
   "dsn-karat-100": [
    "6da8e2e48e280e6c",
    "KARAT-100",
    null
   ],
   "dsn-vk-300": [
    "8248f9b6a5ce2db5",
    "VK-300",
    null
   ],
   "dsn-ruta-70": [
    "33ccffe79bf136d4",
    "RUTA-70",
    null
   ],
   "dsn-cap150": [
    "22981fdee5a3b806",
    "CAP150",
    null
   ],
   "dsn-cap200": [
    "001b84e9fa4d6aea",
    "CAP200",
    null
   ],
   "dsn-acpr100": [
    "32a2d7e863b9a049",
    "ACPR100",
    null
   ],
   "dsn-sc-htgr": [
    "79d3d864d2bc9dc2",
    "SC-HTGR (Framatome steam-cycle HTGR)",
    null
   ],
   "dsn-flexblue": [
    "8e8c7173054db462",
    "Flexblue",
    null
   ],
   "dsn-u-battery": [
    "862345d36b6c9172",
    "U-Battery",
    null
   ],
   "dsn-mcsfr": [
    "da5c9ac6d793c05e",
    "MCSFR (molten chloride salt fast reactor)",
    null
   ],
   "dsn-mpower": [
    "04757a1e21b5023f",
    "mPower",
    null
   ],
   "dsn-mk1-pb-fhr": [
    "8a84428563291cc7",
    "Mk1 PB-FHR",
    null
   ],
   "dsn-leadir-ps100": [
    "d8fc9df0940ebd84",
    "LEADIR-PS100",
    null
   ],
   "dsn-starcore": [
    "f51fd3f04d58670d",
    "StarCore",
    null
   ],
   "dsn-microuranus": [
    "6b427f3113e643c7",
    "MicroURANUS",
    null
   ],
   "dsn-enhs": [
    "9cbe2dd317a463a6",
    "ENHS (Encapsulated Nuclear Heat Source)",
    null
   ],
   "dsn-sstar": [
    "18d2021dc0cc62a4",
    "SSTAR (Small Secure Transportable Autonomous Reactor)",
    null
   ],
   "dsn-star-lm": [
    "1ee443bba5ddacb0",
    "STAR-LM (Secure Transportable Autonomous Reactor - Liquid Metal)",
    null
   ],
   "dsn-star-h2": [
    "d57b46ef44135151",
    "STAR-H2",
    null
   ],
   "dsn-lspr": [
    "eda8fc3991133a0b",
    "LSPR",
    null
   ],
   "dsn-rapid": [
    "94ef570f3430e66d",
    "RAPID",
    null
   ],
   "dsn-xenith": [
    "ce56947f9d546b37",
    "XENITH",
    null
   ],
   "dsn-lfr-tl-30": [
    "549f8e4351e3eb73",
    "LFR-TL-30",
    null
   ],
   "dsn-nuscale-microreactor": [
    "e5fea613fb5c207f",
    "NuScale microreactor",
    null
   ],
   "dsn-abv-6m": [
    "298ea005583b567a",
    "ABV-6M",
    null
   ],
   "dsn-ssr-thermal-spectrum": [
    "67cc94b835a265de",
    "Stable Salt Reactor - Thermal Spectrum (SSR-U with optional SSR-Th blanket)",
    null
   ],
   "dsn-otrera-one": [
    "f3f69e47486c45e4",
    "OTRERA ONE",
    null
   ],
   "dsn-arc-generator": [
    "5cef12d7639b409f",
    "ARC Generator (ARC Reactor)",
    null
   ],
   "dsn-harpia": [
    "3741e83ca87f1dd3",
    "HARPIA",
    null
   ],
   "dsn-nugen-engine": [
    "4104fe8ecc83eec3",
    "NuGen Engine",
    null
   ],
   "dsn-sinap-smtmsr-10mwe": [
    "bb3613098393323b",
    "SINAP small modular thorium molten-salt research reactor (10 MWe)",
    null
   ],
   "dsn-huakun-one": [
    "d5c69f9a67705ddd",
    "Huakun One floating reactor platform",
    null
   ],
   "dsn-jereh-micro-reactor": [
    "10dc99619a5bdc95",
    "Jereh Micro Reactor (JMR)",
    null
   ],
   "dsn-atgor": [
    "95fbd2d4ed1ce0eb",
    "ATGOR",
    null
   ],
   "dsn-deer": [
    "8ea43ce18a7ecb0f",
    "DEER (Deployable Electric Energy Reactor)",
    null
   ],
   "dsn-grem": [
    "b6bfd8b419f485c3",
    "GREM",
    null
   ],
   "dsn-vityaz": [
    "402a7e20f5170429",
    "Vityaz",
    null
   ],
   "dsn-rapid-l": [
    "c8be1466ec209496",
    "RAPID-L (lunar concept)",
    null
   ],
   "dsn-aalo-1": [
    "5ec4dc18b18908a1",
    "Aalo-1",
    null
   ],
   "dsn-reploy-sps": [
    "29bcb52ec9cf12b2",
    "REPLOY Submersible Power System (SPS)",
    null
   ],
   "dsn-elyon-5": [
    "c30e83d4745130be",
    "ELYON-5",
    null
   ],
   "dsn-apollo-a-10": [
    "21b43f9677e9cac8",
    "Apollo A-10",
    null
   ],
   "dsn-cr-100": [
    "00816b8b96fac721",
    "CR-100",
    null
   ],
   "dsn-david-smr": [
    "3049f5ee4c696b64",
    "DAVID SMR",
    null
   ],
   "dsn-mhi-multipurpose-microreactor": [
    "6488e9dc7f2ad51f",
    "MHI multi-purpose microreactor",
    null
   ],
   "dsn-kaist-atom": [
    "1d826e2b4e3bc1ae",
    "KAIST ATOM",
    null
   ],
   "dsn-barc-chtr": [
    "86b8b4f3b07fd1b7",
    "BARC Compact High Temperature Reactor (CHTR)",
    null
   ],
   "dsn-vver-i": [
    "e7e861bbc0084e7d",
    "VVER-I",
    null
   ],
   "dsn-vber-150": [
    "2dfea14e940fdd99",
    "VBER-150",
    null
   ],
   "dsn-kaist-mmr": [
    "c2b336c92d46149e",
    "KAIST Micro Modular Reactor (MMR)",
    null
   ],
   "dsn-thorizon-pioneer": [
    "b43105e5c5800f96",
    "Thorizon PIONEER nuclear demonstrator",
    null
   ],
   "dsn-pgsfr": [
    "11a6e281ef0ed4b9",
    "PGSFR (Prototype Gen-IV Sodium-cooled Fast Reactor)",
    null
   ],
   "dsn-alfred": [
    "fe21ccac12ca179b",
    "ALFRED lead-cooled fast-reactor demonstrator",
    null
   ],
   "dsn-tmsr-lf1": [
    "861b8b315b9ddca6",
    "TMSR-LF1 experimental molten-salt reactor",
    null
   ],
   "dsn-balder": [
    "532da462dbf01a4d",
    "BALDER experimental configuration",
    null
   ],
   "dsn-df-cde": [
    "db9624162d2a8f6a",
    "DF-CDE critical demonstration experiment",
    null
   ],
   "dsn-alvin": [
    "bfc47fe3a5332dc9",
    "Alvin experimental molten-salt reactor",
    null
   ],
   "dsn-ahwr-300": [
    "52247c714d63742b",
    "AHWR-300",
    null
   ],
   "dsn-allegro": [
    "429c0538e0e10272",
    "ALLEGRO gas-cooled fast-reactor demonstrator",
    null
   ],
   "dsn-pascar": [
    "c0b0e3ffc49182e1",
    "PASCAR transportable capsule reactor",
    null
   ],
   "dsn-uranus-40": [
    "cb2f2c4877d701f1",
    "URANUS-40",
    null
   ],
   "dsn-clear-m10": [
    "4d03ddaf6e417976",
    "CLEAR-M10",
    null
   ],
   "dsn-pearl": [
    "1673ef3e897bff6a",
    "Pearl",
    null
   ],
   "dsn-forge-ember": [
    "38c008dfe3fe9d3f",
    "Ember",
    null
   ],
   "dsn-zap-zmr": [
    "01de593750cbe52c",
    "ZMR",
    null
   ],
   "dsn-daratha-microreactor": [
    "6f9096f41a7f6d63",
    "Daratha 10 MWe microreactor concept",
    null
   ],
   "dsn-electra-forte": [
    "8b415080e75995e0",
    "ELECTRA-FORTE",
    null
   ],
   "dsn-myrrha-battery-smr-2014": [
    "e55ce25a8d1db267",
    "MYRRHA-derived battery-like SMR (2014 academic concept)",
    null
   ],
   "dsn-vver-300-v478": [
    "30b8f2fa8d402f66",
    "VVER-300 (V-478)",
    null
   ],
   "dsn-dhr400": [
    "094c80f240680f4a",
    "Yanlong DHR-400",
    null
   ],
   "dsn-ziacore": [
    "dec10ffb0e049489",
    "ZiaCore",
    null
   ],
   "dsn-huapeng-one": [
    "2a4833f619a95057",
    "HuaPeng-1",
    null
   ],
   "dsn-elena-am": [
    "b24c5323840c9f83",
    "ELENA-AM",
    null
   ],
   "dsn-rolls-royce-amr": [
    "8cb6f051b274d651",
    "Rolls-Royce AMR",
    null
   ],
   "dsn-megalvin": [
    "63cb93b55d06315c",
    "MegAlvin",
    null
   ],
   "dsn-smart-c": [
    "f6978cfb65ca15ba",
    "SMART-C",
    null
   ],
   "dsn-nuscale-us600": [
    "c5fa143b4e7212a8",
    "NuScale US600",
    null
   ]
  },
  "organizations": {
   "org-triso-x": [
    "3cbf5234f151eb1b",
    "TRISO-X, LLC",
    null
   ],
   "org-atkinsrealis": [
    "d4f452de43ac078d",
    "AtkinsRéalis",
    null
   ],
   "org-tno": [
    "c41feb8ee5b5294f",
    "TNO",
    null
   ],
   "org-elementl": [
    "a15ae552c59d81b8",
    "Elementl Power",
    null
   ],
   "org-opg": [
    "9d606d7e4f362839",
    "Ontario Power Generation",
    null
   ],
   "org-gevh": [
    "156c8e4f4f197838",
    "GE Vernova Hitachi Nuclear Energy",
    null
   ],
   "org-terrapower": [
    "ff015be70c67b28f",
    "TerraPower",
    null
   ],
   "org-kairos": [
    "a38703e58e777eba",
    "Kairos Power",
    null
   ],
   "org-xenergy": [
    "3c75f756fa19b0de",
    "X-energy",
    null
   ],
   "org-dow": [
    "4cdc65e76163163f",
    "Dow",
    null
   ],
   "org-oklo": [
    "04d130d10de4e6be",
    "Oklo Inc.",
    null
   ],
   "org-nuscale": [
    "d76297b9efb68166",
    "NuScale Power",
    null
   ],
   "org-rolls-royce-smr": [
    "392ba87404957ab9",
    "Rolls-Royce SMR",
    null
   ],
   "org-arc": [
    "130b6e3152056803",
    "ARC Clean Technology",
    null
   ],
   "org-nbpower": [
    "cb7fd5b67054f60c",
    "NB Power",
    null
   ],
   "org-tva": [
    "56226ce7950fa7f7",
    "Tennessee Valley Authority",
    null
   ],
   "org-cnnc": [
    "1c152cfdcbd12e10",
    "China National Nuclear Corporation",
    null
   ],
   "org-huaneng": [
    "b7b054815b540af6",
    "China Huaneng Group",
    null
   ],
   "org-huaneng-shidaowan": [
    "30dd48923c80d17a",
    "Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.",
    null
   ],
   "org-cnea": [
    "8b4480d65975354b",
    "CNEA (Argentina)",
    null
   ],
   "org-rosatom": [
    "a08dd5f42962c9ea",
    "Rosatom",
    null
   ],
   "org-holtec": [
    "2c806a87b5b3de09",
    "Holtec International",
    null
   ],
   "org-uamps": [
    "1d8407756299c01c",
    "Utah Associated Municipal Power Systems",
    null
   ],
   "org-nano-nuclear": [
    "00f1d554cba43dbe",
    "NANO Nuclear Energy",
    null
   ],
   "org-terrestrial": [
    "445c0a64feb13f11",
    "Terrestrial Energy",
    null
   ],
   "org-bwxt": [
    "38a288ee479289c3",
    "BWX Technologies",
    null
   ],
   "org-energy-northwest": [
    "c9fdb09e9bfc201d",
    "Energy Northwest",
    null
   ],
   "org-cez": [
    "ef1763afacdaf200",
    "CEZ Group",
    null
   ],
   "org-osge": [
    "1516c8e9228e81ea",
    "ORLEN Synthos Green Energy",
    null
   ],
   "org-saskpower": [
    "8ac4109d2faf1488",
    "SaskPower",
    null
   ],
   "org-fermi-energia": [
    "95b28350ca62e838",
    "Fermi Energia",
    null
   ],
   "org-dod-sco": [
    "974a98b44cc47dbf",
    "U.S. DoD Strategic Capabilities Office",
    null
   ],
   "org-kghm": [
    "121fb616dd380614",
    "KGHM Polska Miedź",
    null
   ],
   "org-aalo": [
    "a1f87f6c955b3f84",
    "Aalo Atomics",
    null
   ],
   "org-natura": [
    "0c927fec5eab1dd4",
    "Natura Resources",
    null
   ],
   "org-antares": [
    "e595f62cc472e369",
    "Antares Nuclear",
    null
   ],
   "org-valar": [
    "9a6c28c1643f755b",
    "Valar Atomics",
    null
   ],
   "org-deployable-energy": [
    "84b848a12c232214",
    "Deployable Energy",
    null
   ],
   "org-last-energy": [
    "d857afc7bb99bb7e",
    "Last Energy",
    null
   ],
   "org-thorcon": [
    "5c2f1bf23ff7c8fc",
    "PT Thorcon Power Indonesia",
    null
   ],
   "org-blykalla": [
    "65b26f18def515b4",
    "Blykalla",
    null
   ],
   "org-duke-energy": [
    "074a87744405b8d4",
    "Duke Energy",
    null
   ],
   "org-aep": [
    "85e5d60dc65d998f",
    "American Electric Power",
    null
   ],
   "org-appalachian-power": [
    "9e17bf651e53c971",
    "Appalachian Power",
    null
   ],
   "org-dominion-energy": [
    "4727cc12693e2ec3",
    "Dominion Energy",
    null
   ],
   "org-global-first-power": [
    "492fa3465b329d83",
    "Global First Power",
    null
   ],
   "org-westinghouse": [
    "1eb8b5301bb5ba0f",
    "Westinghouse Electric Company",
    null
   ],
   "org-trondheimsleia": [
    "e011a25a8b26783f",
    "Trondheimsleia Kjernekraft AS",
    null
   ],
   "org-norsk-kjernekraft": [
    "1046e3bbea815d89",
    "Norsk Kjernekraft",
    null
   ],
   "org-barc": [
    "17e47e6cddd5a005",
    "Bhabha Atomic Research Centre",
    null
   ],
   "org-radiant": [
    "3b2eccc30430efed",
    "Radiant Industries",
    null
   ],
   "org-prodigy": [
    "4d4c81af36d29ee1",
    "Prodigy Clean Energy",
    null
   ],
   "org-tata-chemicals-na": [
    "ab65a413266d73cd",
    "Tata Chemicals North America",
    null
   ],
   "org-jimmy": [
    "dfe6c85d5fb1b0af",
    "Jimmy",
    null
   ],
   "org-penn-state": [
    "78e89acfb2b3b7eb",
    "Penn State University",
    null
   ],
   "org-uiuc": [
    "bd6333fcbdfd095c",
    "University of Illinois Urbana-Champaign",
    null
   ],
   "org-deep-fission": [
    "680f14119d2cc1f2",
    "Deep Fission",
    null
   ],
   "org-blue-energy": [
    "fc0793dcce362094",
    "Blue Energy",
    null
   ],
   "org-catalogue-blossom-energy": [
    "c400efc93304f085",
    "Blossom Energy",
    null
   ],
   "org-catalogue-blue-capsule-technology": [
    "8ed9f8f13902fb91",
    "Blue Capsule Technology",
    null
   ],
   "org-catalogue-calogena": [
    "d58951c1ab18d516",
    "Calogena",
    null
   ],
   "org-catalogue-cgn": [
    "b392e41519ffe453",
    "China General Nuclear Power Group",
    null
   ],
   "org-catalogue-csmc": [
    "701abb31ce7969ea",
    "Canadian Strategic Missions Corporation",
    null
   ],
   "org-catalogue-cv": [
    "75456f09e9336d92",
    "Research Centre Řež",
    null
   ],
   "org-catalogue-dual-fluid-energy": [
    "6da1db986d55f510",
    "Dual Fluid Energy",
    null
   ],
   "org-catalogue-eskom": [
    "be49b10611f28cd5",
    "Eskom",
    null
   ],
   "org-catalogue-flibe-energy": [
    "7dad8053f9444b66",
    "Flibe Energy",
    null
   ],
   "org-catalogue-general-atomics": [
    "8c78f4b6f2aa77d1",
    "General Atomics",
    null
   ],
   "org-catalogue-hexana": [
    "914932fb0df6c488",
    "HEXANA",
    null
   ],
   "org-catalogue-inet-and-cgn": [
    "de56ba439f1913a2",
    "INET and China General Nuclear Power Group",
    null
   ],
   "org-catalogue-khnp-and-kaeri": [
    "5cd7f8e4026bbc0c",
    "i-SMR Development Agency, KHNP and KAERI",
    null
   ],
   "org-catalogue-jaea": [
    "fb5c2f51f9c5eeaf",
    "Japan Atomic Energy Agency",
    null
   ],
   "org-catalogue-kaeri": [
    "b723fe3a2e2a1629",
    "Korea Atomic Energy Research Institute",
    null
   ],
   "org-catalogue-mobilenuclear-energy": [
    "76f77629551b39a7",
    "MobileNuclear Energy",
    null
   ],
   "org-catalogue-moltex-energy": [
    "21069dd26de0f61a",
    "Moltex Energy",
    null
   ],
   "org-catalogue-moltexflex": [
    "e4f8be5a011280d1",
    "MoltexFLEX",
    null
   ],
   "org-catalogue-naarea": [
    "f316b2b37c1d0330",
    "NAAREA",
    null
   ],
   "org-catalogue-ncbj": [
    "3023aaa1264ccc33",
    "National Centre for Nuclear Research",
    null
   ],
   "org-catalogue-newcleo": [
    "a0082a4c975c3277",
    "newcleo",
    null
   ],
   "org-catalogue-nuclearis-energy": [
    "248f64f213f464b9",
    "Nuclearis Energy",
    null
   ],
   "org-catalogue-nuward": [
    "336be1ecb667d1bd",
    "NUWARD",
    null
   ],
   "org-catalogue-otrera": [
    "d37cfcfcb0f7816c",
    "Otrera New Energy",
    null
   ],
   "org-catalogue-saltfoss": [
    "5daa8e9a9ce4a1c8",
    "Saltfoss Energy",
    null
   ],
   "org-catalogue-spic": [
    "d8a2f93bb54052df",
    "State Power Investment Corporation",
    null
   ],
   "org-catalogue-steady-energy": [
    "3daf2ac0ff383690",
    "Steady Energy",
    null
   ],
   "org-catalogue-stellaria": [
    "922f60e1d5d5bb21",
    "Stellaria",
    null
   ],
   "org-catalogue-stratek-global": [
    "d92200275d6c959b",
    "Stratek Global",
    null
   ],
   "org-catalogue-thorizon": [
    "2fef845aa41273af",
    "Thorizon",
    null
   ],
   "org-catalogue-toshiba": [
    "1beeb93599158277",
    "Toshiba Energy Systems & Solutions Corporation",
    null
   ],
   "org-catalogue-transmutex": [
    "1dba4a55ce9cc739",
    "Transmutex",
    null
   ],
   "org-catalogue-uwb-and-ciirc-ctu": [
    "cf335d208998ab15",
    "University of West Bohemia and Czech Technical University in Prague",
    null
   ],
   "org-aris-stl-nuclear-pty-ltd": [
    "b13866fcb7a7e9cf",
    "STL Nuclear (Pty) Ltd",
    null
   ],
   "org-aris-kepco-e-c": [
    "ebb50aea0058543d",
    "KEPCO E&C",
    null
   ],
   "org-aris-copenhagen-atomics": [
    "b69771808283f31d",
    "Copenhagen Atomics",
    null
   ],
   "org-aris-nrc-kurchatov-institute": [
    "33a153d0a1a03d7a",
    "NRC “Kurchatov Institute”",
    null
   ],
   "org-aris-furgs": [
    "85d2e377ce29178b",
    "FURGS",
    null
   ],
   "org-aris-international-thorium-molten-salt-forum-itmsf": [
    "f0a75aed00b0ab04",
    "International Thorium Molten-Salt Forum (ITMSF)",
    null
   ],
   "org-aris-gen4-energy-inc": [
    "d65f24103f507640",
    "Gen4 Energy Inc.",
    null
   ],
   "org-aris-holosgen-llc": [
    "f06b37a0c854edbe",
    "HolosGen LLC",
    null
   ],
   "org-aris-inet-tsinghua-university": [
    "86751f446385f2b7",
    "INET, Tsinghua University",
    null
   ],
   "org-aris-idaho-national-laboratory": [
    "9966cb18ffaea905",
    "Idaho National Laboratory",
    null
   ],
   "org-aris-national-research-and-innovation-agency-brin-bandung-institute-of-technology-itb": [
    "eadeea4835a3356c",
    "National Research and Innovation Agency (BRIN) & Bandung Institute of Technology (ITB)",
    null
   ],
   "org-aris-nikiet": [
    "89d10107cbdc02d8",
    "NIKIET",
    null
   ],
   "org-aris-star-energy-sa": [
    "85be5c24197a46e2",
    "STAR ENERGY SA",
    null
   ],
   "org-aris-akme-engineering-jsc": [
    "bb3a6713602ae251",
    "AKME-engineering JSC",
    null
   ],
   "org-catalogue-afrikantov-okbm": [
    "63ac13f0f62757e1",
    "Afrikantov OKBM",
    null
   ],
   "org-aris-cnnc-npic": [
    "f961b752774c06cf",
    "CNNC / NPIC",
    null
   ],
   "org-aris-ornl": [
    "5adf5e2942f27dca",
    "Oak Ridge National Laboratory",
    null
   ],
   "org-shearwater": [
    "79fefb1e72839d07",
    "Shearwater Energy",
    null
   ],
   "org-standard-power": [
    "225b2737f20dc5c9",
    "Standard Power",
    null
   ],
   "org-zepak": [
    "6f67df75e47264d2",
    "ZE PAK",
    null
   ],
   "org-energy-alberta": [
    "e3a0cce9fb9060d1",
    "Energy Alberta",
    null
   ],
   "org-energoatom": [
    "25806156c6e25906",
    "Energoatom",
    null
   ],
   "org-usnc": [
    "fb3db5cd5775f372",
    "Ultra Safe Nuclear Corporation",
    null
   ],
   "org-sawtooth-sedc": [
    "80e90da4bd072c5e",
    "Sawtooth Energy & Development Corporation",
    null
   ],
   "org-southern-infrastructure": [
    "d27441c266299109",
    "Southern Infrastructure Pty. Ltd.",
    null
   ],
   "org-constellation": [
    "8a4b39efec15fbbb",
    "Constellation Energy Corporation",
    null
   ],
   "org-constellation-smr-dev": [
    "587fa6b998ad9999",
    "Constellation SMR Development, LLC",
    null
   ],
   "org-chinergy": [
    "766ebf159b4505fd",
    "Chinergy / CNNC Energy Technology",
    null
   ],
   "org-eagles-consortium": [
    "2ef88102151e3ad7",
    "EAGLES-300 consortium",
    null
   ],
   "org-fanco": [
    "0d35a50cb28d522e",
    "First American Nuclear",
    null
   ],
   "org-hadron-energy": [
    "db902e8173c3331f",
    "Hadron Energy",
    null
   ],
   "org-nucube": [
    "ae309ad710a5751b",
    "NuCube Energy",
    null
   ],
   "org-ujv-rez": [
    "4757c4bc339bc85a",
    "ÚJV Řež",
    null
   ],
   "org-centrica": [
    "383ae3c9dadbdb9e",
    "Centrica",
    null
   ],
   "org-edf": [
    "b92796ad2d272543",
    "EDF",
    null
   ],
   "org-cwmni-egino": [
    "f49243d5920db5d7",
    "Cwmni Egino",
    null
   ],
   "org-videberg-kraft": [
    "c456c1edd241c2e3",
    "Videberg Kraft",
    null
   ],
   "org-karnfull-next": [
    "d43b95076c056145",
    "Kärnfull Next",
    null
   ],
   "org-studsvik": [
    "74f6123749987ec7",
    "Studsvik",
    null
   ],
   "org-kuopion-energia": [
    "1346f20cb7c56401",
    "Kuopion Energia",
    null
   ],
   "org-helen": [
    "1cc97a753b5f8c75",
    "Helen",
    null
   ],
   "org-keravan-energia": [
    "3337291ad843cd1b",
    "Keravan Energia",
    null
   ],
   "org-psi": [
    "fd74f6a544f80510",
    "Paul Scherrer Institute",
    null
   ],
   "org-cea": [
    "b77f8e31e1e84b6d",
    "CEA",
    null
   ],
   "org-epz": [
    "0f34f6a78808379d",
    "EPZ",
    null
   ],
   "org-javys": [
    "e74cc5f09858b614",
    "JAVYS",
    null
   ],
   "org-necsa": [
    "dc95296fff9b790e",
    "Necsa",
    null
   ],
   "org-pbmr": [
    "51fe7dc0fcebdcdd",
    "PBMR (Pty) Ltd",
    null
   ],
   "org-invap": [
    "7871ed3fbd2a0808",
    "INVAP",
    null
   ],
   "org-meitner-energy": [
    "795acfb2b704d9fd",
    "Meitner Energy",
    null
   ],
   "org-terra-innovatum": [
    "aeefc0dbdd311744",
    "Terra Innovatum",
    null
   ],
   "org-us-army": [
    "7db18082558708ba",
    "U.S. Army",
    null
   ],
   "org-us-air-force": [
    "06868c111feef2c7",
    "U.S. Department of the Air Force",
    null
   ],
   "org-us-navy": [
    "1cb00df9c5d5b7de",
    "U.S. Navy",
    null
   ],
   "org-idaho-state-university": [
    "8046558187cddb7a",
    "Idaho State University",
    null
   ],
   "org-tees": [
    "a80e4f40070a925b",
    "Texas A&M Engineering Experiment Station",
    null
   ],
   "org-nuclea-energy": [
    "a873a7cc4dff9a0c",
    "Nuclea Energy",
    null
   ],
   "org-industria": [
    "ceaaf947ba4f02af",
    "SGP Industria",
    null
   ],
   "org-khnp": [
    "d6e7a1f7e86275a8",
    "Korea Hydro & Nuclear Power",
    null
   ],
   "org-sinap": [
    "16ee61ed5edcfc90",
    "Shanghai Institute of Applied Physics",
    null
   ],
   "org-pupuk-kaltim": [
    "463bda336100da3d",
    "Pupuk Kalimantan Timur",
    null
   ],
   "org-raten": [
    "806c471b865a4422",
    "RATEN",
    null
   ],
   "org-sck-cen": [
    "d155ea743ae48353",
    "SCK CEN",
    null
   ],
   "org-spic": [
    "dce4252045242141",
    "SPIC",
    null
   ],
   "org-starcore": [
    "bf41d1d88ce6a544",
    "StarCore Nuclear",
    null
   ],
   "org-ameren": [
    "290ca51488413adf",
    "Ameren Missouri",
    null
   ],
   "org-purdue": [
    "2b64e70f7a209c66",
    "Purdue University",
    null
   ],
   "org-city-of-galena": [
    "3d71b8d2470e3a04",
    "City of Galena, Alaska",
    null
   ],
   "org-deep-atomic": [
    "97b1bcd967611661",
    "Deep Atomic",
    null
   ],
   "org-allseas": [
    "8c6700a4ee5f4e86",
    "Allseas",
    null
   ],
   "org-archeos-sas": [
    "5cf9efb3660593bc",
    "ARCHEOS SAS",
    null
   ],
   "org-jhatom": [
    "d744feb2559a6054",
    "Shanghai JHATOM Atomic Technology",
    null
   ],
   "org-scaled-atomics": [
    "dd6847560ce7f038",
    "Scaled Atomics",
    null
   ],
   "org-tredic": [
    "d7d535f9467a9aa9",
    "TREDIC Corporation",
    null
   ],
   "org-bluecore-energy": [
    "848453ff9a9e3b7a",
    "BlueCore Energy",
    null
   ],
   "org-world-thermoexport": [
    "f3abcb643c693f61",
    "World ThermoExport",
    null
   ],
   "org-nrg-pallas": [
    "dbee426e64f76c1e",
    "NRG PALLAS",
    null
   ],
   "org-gazprom": [
    "c86b400d61ad2da8",
    "Gazprom",
    null
   ],
   "org-cambridge-atomworks": [
    "4e73b05b8560ba64",
    "Cambridge Atomworks",
    null
   ],
   "org-framatome-inc": [
    "7cdd91a3c645e436",
    "Framatome Inc.",
    null
   ],
   "org-snerdi": [
    "5d9ff199f36757c4",
    "Shanghai Nuclear Engineering Research and Design Institute (SNERDI)",
    null
   ],
   "org-elysium-industries": [
    "e18c20e56221f89f",
    "Elysium Industries",
    null
   ],
   "org-uc-berkeley": [
    "1a937fc43c55b6cc",
    "University of California, Berkeley",
    null
   ],
   "org-llnl": [
    "1c56b32158f40adf",
    "Lawrence Livermore National Laboratory",
    null
   ],
   "org-anl": [
    "4bf7d8d9cbb7130f",
    "Argonne National Laboratory",
    null
   ],
   "org-naval-group": [
    "48390c554bc4e2db",
    "Naval Group (formerly DCNS)",
    null
   ],
   "org-northern-nuclear-industries": [
    "3f2fc74b90e81295",
    "Northern Nuclear Industries Incorporated",
    null
   ],
   "org-tokyo-tech": [
    "b8ff7d09fc7ff66e",
    "Tokyo Institute of Technology",
    null
   ],
   "org-unist": [
    "5b9c124f30241ea8",
    "Ulsan National Institute of Science and Technology (UNIST)",
    null
   ],
   "org-generation-mpower": [
    "8533260285e16f36",
    "Generation mPower LLC",
    null
   ],
   "org-criepi": [
    "93109ef97fb9308f",
    "Central Research Institute of Electric Power Industry (CRIEPI)",
    null
   ],
   "org-urenco": [
    "a13a2e53b15e459b",
    "Urenco",
    null
   ],
   "org-nuclear-power-ghana": [
    "86e012ff68e7fdb7",
    "Nuclear Power Ghana",
    null
   ],
   "org-regnum": [
    "23a21f83f45f4818",
    "Regnum Technology Group",
    null
   ],
   "org-alpha-tech-research": [
    "21562f7a84aedfdf",
    "Alpha Tech Research Corp",
    null
   ],
   "org-terminus-rd-energy": [
    "e551d6a3a8425203",
    "Terminus R&D in Energy S.A.",
    null
   ],
   "org-nugen-llc": [
    "76892224deb766da",
    "NuGen LLC",
    null
   ],
   "org-cgn-ocean-energy": [
    "a2cb05629cd08085",
    "CGN Ocean Energy",
    null
   ],
   "org-spic-nuclear-energy": [
    "6264fbe1e2f91746",
    "SPIC Nuclear Energy Co.",
    null
   ],
   "org-shandong-nuclear-power": [
    "19a9cdabe8e22901",
    "Shandong Nuclear Power Co.",
    null
   ],
   "org-rosenergoatom": [
    "841d28d7be297407",
    "Rosenergoatom",
    null
   ],
   "org-palisades-energy": [
    "8ce6c79ef5cc9fb3",
    "Palisades Energy, LLC",
    null
   ],
   "org-palisades-smr": [
    "169ce6cbf468534f",
    "Palisades SMR, LLC",
    null
   ],
   "org-holtec-smr-llc": [
    "4718a5a20dd84e4c",
    "SMR, LLC (Holtec)",
    null
   ],
   "org-holtec-palisades": [
    "65b7c4bccaca9f8c",
    "Holtec Palisades, LLC",
    null
   ],
   "org-hyundai-ec": [
    "271f743dbb190ae3",
    "Hyundai Engineering & Construction",
    null
   ],
   "org-reploy": [
    "934b58d9c6a6eecb",
    "REPLOY Power, Inc.",
    null
   ],
   "org-ee-capital": [
    "c3ab28345396f332",
    "EE Capital, LLC",
    null
   ],
   "org-apollo-atomics": [
    "0c1eebc42bbfc220",
    "Apollo Atomics, Inc.",
    null
   ],
   "org-long-mott-energy": [
    "468bfcc0fd28a59f",
    "Long Mott Energy, LLC",
    null
   ],
   "org-us-sfr-owner": [
    "0ea3179f8b225ba4",
    "US SFR Owner, LLC",
    null
   ],
   "org-hainan-nuclear-power": [
    "d55b48ec86d0171f",
    "Hainan Nuclear Power Company",
    null
   ],
   "org-skhk": [
    "528bafb42fed6a11",
    "Siberian Chemical Plant JSC (Siberian Chemical Combine)",
    null
   ],
   "org-indiana-michigan-power": [
    "6210d1dfafa2381d",
    "Indiana Michigan Power (I&M)",
    null
   ],
   "org-meta-platforms": [
    "ce3a8967c59e6e5c",
    "Meta Platforms",
    null
   ],
   "org-witkowitz-atomica": [
    "0f18305c5c1c707d",
    "Witkowitz Atomica",
    null
   ],
   "org-mitsubishi-heavy-industries": [
    "f321128f4ef0af9e",
    "Mitsubishi Heavy Industries",
    null
   ],
   "org-kaist": [
    "33371123f2a61003",
    "Korea Advanced Institute of Science and Technology (KAIST)",
    null
   ],
   "org-okb-gidropress": [
    "05eb8d0d996c4f27",
    "OKB Gidropress",
    null
   ],
   "org-cnnc-sueneng-nuclear-power": [
    "68d2ed3e57963595",
    "CNNC Sueneng Nuclear Power Company",
    null
   ],
   "org-ien": [
    "fade674b48039145",
    "Instituto de Engenharia Nuclear (IEN/CNEN)",
    null
   ],
   "org-diamante-energia": [
    "4fc65804cfb606f0",
    "Diamante Energia",
    null
   ],
   "org-snu-nutreck": [
    "05886e9bfa526f4c",
    "Seoul National University / NUTRECK",
    null
   ],
   "org-inest-fds": [
    "3401bf7dfbc20735",
    "INEST / FDS, Chinese Academy of Sciences",
    null
   ],
   "org-bam-energy": [
    "c09def4864fa8526",
    "BAM Energy",
    null
   ],
   "org-forge-atomics": [
    "f097de5fb237cee2",
    "Forge Atomics",
    null
   ],
   "org-zap-energy": [
    "c65a53ff70fb78fc",
    "Zap Energy",
    null
   ],
   "org-daratha-atomics": [
    "b4df471b137d4aa6",
    "Daratha Atomics",
    null
   ],
   "org-los-alamos-national-laboratory": [
    "c7472894c18f0b85",
    "Los Alamos National Laboratory",
    null
   ],
   "org-rolls-royce-plc": [
    "5103620c80a1ffc2",
    "Rolls-Royce plc",
    null
   ],
   "org-ropower-nuclear": [
    "eacd0eda1bc4430d",
    "RoPower Nuclear S.A.",
    null
   ],
   "org-sge": [
    "3b1100b4a17af637",
    "SGE S.A.",
    null
   ],
   "org-general-atomics-electromagnetic-systems": [
    "acf194447a09c3f9",
    "General Atomics Electromagnetic Systems",
    null
   ],
   "org-westinghouse-government-services": [
    "5f7fdfd0a201ae1d",
    "Westinghouse Government Services",
    null
   ],
   "org-bwxt-advanced-technologies": [
    "7a71c2a46c19762c",
    "BWXT Advanced Technologies, LLC",
    null
   ],
   "org-sister-1-llc": [
    "59a2bfb9676a80ee",
    "Sister 1 LLC",
    null
   ],
   "org-barnard-construction": [
    "6913c164511e75e0",
    "Barnard Construction Company",
    null
   ],
   "org-texas-am-university-system": [
    "e35c5ee4e6fe2628",
    "The Texas A&M University System",
    null
   ],
   "org-abilene-christian-university": [
    "34082319cb58694a",
    "Abilene Christian University",
    null
   ],
   "org-atomflot": [
    "ab9fb3d37d2e0f2d",
    "Atomflot",
    null
   ],
   "org-rosatom-engineering-division": [
    "c13e288dbd89d71e",
    "Rosatom Engineering Division",
    null
   ],
   "org-rusatom-overseas": [
    "f81629a3e0589b54",
    "Rusatom Overseas",
    null
   ],
   "org-uz-npp-construction-directorate": [
    "dab688f6529a0f67",
    "Directorate for the Construction of the Nuclear Power Plant",
    null
   ],
   "org-refirm-malma": [
    "dccb1cc8b3b1476e",
    "ReFirm Målma AB",
    null
   ],
   "org-latona-group": [
    "d7e2f74c1de16228",
    "Latona Group",
    null
   ],
   "org-cristanol": [
    "bb3cea71b0b29cfc",
    "Cristanol",
    null
   ],
   "org-ameresco": [
    "cd9a436c0ad7cd28",
    "Ameresco",
    null
   ],
   "org-energy-northwest-new-nuclear": [
    "197a26cb5211d0b6",
    "Energy Northwest New Nuclear, LLC",
    null
   ],
   "org-amazon": [
    "c64f17a0bb983490",
    "Amazon",
    null
   ],
   "org-diamondback-ep": [
    "a285e95aa132b2c6",
    "Diamondback E&P LLC",
    null
   ],
   "org-pabineau-first-nation": [
    "ec681f49010355f4",
    "Pabineau First Nation",
    null
   ],
   "org-eel-river-bar-first-nation": [
    "d33b8769fc1cf14a",
    "Eel River Bar First Nation",
    null
   ],
   "org-government-new-brunswick": [
    "a364ab1899971829",
    "Government of New Brunswick",
    null
   ],
   "org-dalane-kjernekraft": [
    "f8462bedf1af4511",
    "Dalane Kjernekraft AS",
    null
   ],
   "org-narvik-kjernekraft": [
    "6992e104d681467b",
    "Narvik Kjernekraft AS",
    null
   ],
   "org-huaneng-xiapu-nuclear": [
    "6eec6ebd32e0b803",
    "Huaneng Xiapu Nuclear Power Co.",
    null
   ],
   "org-samsung-ct": [
    "5dc689f925fa4da8",
    "Samsung C&T",
    null
   ],
   "org-seligdar": [
    "475d573dbaf8b96b",
    "Seligdar",
    null
   ],
   "org-titan-2": [
    "1af5332e1cbddf95",
    "Titan-2",
    null
   ],
   "org-gdk-baimskaya": [
    "05497af204e93726",
    "GDK Baimskaya",
    null
   ],
   "org-atomenergomash": [
    "52d1cf6149ab8665",
    "Atomenergomash",
    null
   ],
   "org-baltic-shipyard": [
    "c14861f9045087ae",
    "Baltic Shipyard (Baltiysky Zavod)",
    null
   ],
   "org-tvel": [
    "c0bca5f606b93779",
    "TVEL (Rosatom Fuel Division)",
    null
   ],
   "org-atomstroyexport": [
    "86c85945b8e9919b",
    "Atomstroyexport",
    null
   ],
   "org-us-exim": [
    "0cf957795a6da592",
    "Export-Import Bank of the United States",
    null
   ],
   "org-nuclearelectrica": [
    "3af8ac99f6e6792b",
    "SN Nuclearelectrica SA",
    null
   ],
   "org-nova-power-gas": [
    "5cf2228ff99f9e81",
    "Nova Power & Gas",
    null
   ],
   "org-cnnp": [
    "267044da2aafce2c",
    "China National Nuclear Power Co., Ltd.",
    null
   ],
   "org-lianyungang-jinlian": [
    "5cd5b9ffb2d24272",
    "Lianyungang Jinlian Energy Investment Co., Ltd.",
    null
   ],
   "org-jiangsu-guoxin": [
    "deeca77b359f23ca",
    "Jiangsu Guoxin Group Co., Ltd.",
    null
   ],
   "org-jiangsu-power-construction-no3": [
    "3194275ae8274d64",
    "China Energy Engineering Jiangsu Electric Power Construction No 3 Company",
    null
   ],
   "org-cnnc-huachen": [
    "1bdfd119dd5508c0",
    "China National Nuclear Huachen Construction Engineering Company",
    null
   ],
   "org-cnec": [
    "0ef6c08103777254",
    "China Nuclear Engineering Corporation (CNEC)",
    null
   ],
   "org-cnnc-north-fuel": [
    "79ffc1bbeed33aa9",
    "CNNC North Nuclear Fuel Element Co., Ltd.",
    null
   ],
   "org-meti-anre": [
    "9996c2ce3824901b",
    "Agency for Natural Resources and Energy (METI)",
    null
   ],
   "org-finep": [
    "ea2d3d98dac4f23b",
    "Financiadora de Estudos e Projetos (Finep)",
    null
   ],
   "org-us-doe": [
    "760a1925eb2fdde2",
    "U.S. Department of Energy",
    null
   ],
   "org-framatome": [
    "bba0b86c35ef2fef",
    "Framatome",
    null
   ],
   "org-crusoe": [
    "8769ddc0c2ad697f",
    "Crusoe",
    null
   ],
   "org-pacificorp": [
    "18ee7f245bef5729",
    "PacifiCorp (Rocky Mountain Power)",
    null
   ],
   "org-asp-isotopes": [
    "5c7e9e69e9fdb6b2",
    "ASP Isotopes Inc.",
    null
   ],
   "org-aecon-kiewit-nuclear-partners": [
    "e2396b2ed744cecd",
    "Aecon Kiewit Nuclear Partners",
    null
   ],
   "org-cameco": [
    "d23826f6ba9a4c1c",
    "Cameco",
    null
   ],
   "org-orano": [
    "03cf96f8e35a5810",
    "Orano",
    null
   ],
   "org-gnf-a": [
    "cf4d35b0d361f7fd",
    "Global Nuclear Fuel-Americas, LLC",
    null
   ],
   "org-canada-infrastructure-bank": [
    "09e199c1fdd9063c",
    "Canada Infrastructure Bank",
    null
   ],
   "org-canada-growth-fund": [
    "4ec45ab1c7b82de4",
    "Canada Growth Fund Inc.",
    null
   ],
   "org-building-ontario-fund": [
    "0c1c4156998880c1",
    "Building Ontario Fund",
    null
   ],
   "org-canada-indigenous-loan-guarantee": [
    "e65f6eb5f20d3f37",
    "Canada Indigenous Loan Guarantee Corporation",
    null
   ],
   "org-williams-treaties-first-nations": [
    "e996458489011e7c",
    "Williams Treaties First Nations",
    null
   ],
   "org-standard-nuclear": [
    "3d00dc1f1c082c73",
    "Standard Nuclear",
    null
   ],
   "org-kiewit-nuclear-solutions": [
    "a4f6304367f03589",
    "Kiewit Nuclear Solutions Co.",
    null
   ],
   "org-google": [
    "52a4e6f8a364443d",
    "Google",
    null
   ],
   "org-triga-international": [
    "1cec5e6221bcadca",
    "TRIGA International",
    null
   ],
   "org-uk-government": [
    "f1db68f396335b65",
    "UK Government",
    null
   ],
   "org-cascade-nuclear-partners": [
    "7e0c6502dfc527ad",
    "Cascade Nuclear Partners",
    null
   ],
   "org-dp-world": [
    "31f4a9c9170c5205",
    "DP World",
    null
   ],
   "org-tata-chemicals-soda-ash-partners": [
    "81a2a1bc6f4e2164",
    "Tata Chemicals Soda Ash Partners LLC",
    null
   ],
   "org-legnica-special-economic-zone": [
    "9ef1ce19ffe8c14b",
    "Legnica Special Economic Zone",
    null
   ],
   "org-geenex-power": [
    "a0e6dea2a1d388fe",
    "Geenex Power",
    null
   ]
  },
  "programmes": {
   "prg-se-blykalla-evroc-studsvik-feasibility": [
    "7387ccb4fae00f3f",
    "Blykalla–evroc–Studsvik nuclear-powered data-centre feasibility memorandum",
    null
   ],
   "prg-us-terrapower-nvision-natrium-framework": [
    "58544838ca9aab0c",
    "TerraPower–nVision Natrium development framework",
    null
   ],
   "prg-us-terrapower-sabey-natrium-mou": [
    "13a6941997011846",
    "TerraPower–Sabey Data Centers exploratory Natrium memorandum",
    null
   ],
   "prg-trisox-ornl-research-2026": [
    "25699c70918e4dd4",
    "TRISO-X–ORNL fuel-research agreement extension",
    null
   ],
   "prg-xenergy-prometheus-research-2026": [
    "e505b48584bd456b",
    "X-energy participation in Project Prometheus",
    null
   ],
   "prg-fanco-atkins-engineering-alliance-2026": [
    "8ca4e7eb589c8153",
    "FANCO–AtkinsRéalis EAGL-1 engineering alliance",
    null
   ],
   "prg-fanco-hyundai-framework-2026": [
    "ff2ccd8337a3e210",
    "FANCO–Hyundai E&C EAGL-1 cooperation framework",
    null
   ],
   "prg-thorizon-tno-materials-2026": [
    "9dadee1d339610ca",
    "Thorizon–TNO molten-salt reactor materials programme",
    null
   ],
   "prg-ae-enec-adnoc-smr-assessment": [
    "dee6e3d8de535e01",
    "ENEC and ADNOC agreement to assess SMRs and advanced reactors for ADNOC operations",
    null
   ],
   "prg-ae-enec-advance-programme": [
    "5c684ed055d3e8c2",
    "ENEC ADVANCE programme for advanced reactors and its COP28 SMR memoranda",
    null
   ],
   "prg-ae-nano-ehc-kronos-mou": [
    "6254f825e03006ed",
    "NANO Nuclear Energy and EHC Investment memorandum on KRONOS MMR deployment in the UAE",
    null
   ],
   "prg-am-smr-replacement-unit": [
    "1a6fab2a3b503f44",
    "Armenia's plan for an SMR as its next nuclear unit (US FIRST pre-feasibility study, US-Armenia nuclear agreement)",
    null
   ],
   "prg-bg-beh-fluor-nuscale-mou": [
    "647b5c64b8a0ec26",
    "Bulgarian Energy Holding and Fluor memorandum on NuScale SMRs to replace coal units",
    null
   ],
   "prg-bg-blue-bird-sge-bwrx300-jv-loi": [
    "7b19b18e26471520",
    "Blue Bird Energy and SGE letter of intent for a joint venture to build up to six BWRX-300s in Bulgaria",
    null
   ],
   "prg-bg-nuscale-kozloduy-mou": [
    "77f8b5a6f414a139",
    "NuScale and Kozloduy NPP - New Build memorandum to evaluate NuScale SMRs at the Kozloduy site",
    null
   ],
   "prg-bg-ustda-beh-smr-prefeasibility-grant": [
    "e05ed7aa745e2a70",
    "USTDA grant to Bulgarian Energy Holding for SMR design-option and site evaluation",
    null
   ],
   "prg-bh-bapco-smr-study": [
    "eac3ff786cd687b8",
    "Bapco Energies study of a small modular nuclear plant for Bahrain",
    null
   ],
   "prg-bo-aben-smr-implementation-study": [
    "cce16f2e464fae82",
    "Bolivia ABEN study on implementing small modular reactors (2025)",
    null
   ],
   "prg-br-cdpnb-smr-technical-group": [
    "ec1c08c8003c3e88",
    "Brazil federal technical group on land-based small and micro modular reactors (CDPNB Resolution 43, January 2026)",
    null
   ],
   "prg-br-diamante-jorge-lacerda-smr-evaluation": [
    "6405b90f49ee65c0",
    "Diamante Energia evaluation of an SMR at the Jorge Lacerda coal complex (ANSN pre-licensing consultation, IAEA/ABDAN…",
    null
   ],
   "prg-br-government-rosatom-smr-cooperation": [
    "25c1e6a18d2d44e6",
    "Brazil Ministry of Mines and Energy and Rosatom (Tenex) cooperation on uranium and small modular reactors (2025)",
    null
   ],
   "prg-br-nuclep-rosatom-mou": [
    "fb9b694a190e1d52",
    "Nuclep and Rosatom Energy Projects memorandum on large and smaller nuclear projects, including SMR manufacturing (2023)",
    null
   ],
   "prg-ca-capital-power-opg-alberta-smr": [
    "aa83e977f3bec306",
    "Capital Power and Ontario Power Generation assessment of grid-scale SMRs for Alberta",
    null
   ],
   "prg-ca-dnd-aecl-northern-microreactor-feasibility": [
    "b1b5a59e5629aac5",
    "Canada's National Defence and AECL joint feasibility programme on Canadian-controlled microreactors for the North (2026)",
    null
   ],
   "prg-ca-kaeri-aecl-smart-mou": [
    "eaa8c9d63d61ba24",
    "KAERI and AECL memorandum seeking a SMART demonstration at an AECL-owned site in Canada",
    null
   ],
   "prg-ca-kr-us-khnp-arc-nb-power-arc100-fleet": [
    "1c9c923f137b96e2",
    "KHNP, ARC Clean Technology and NB Power collaboration on global ARC-100 fleet deployment (2023-2024)",
    null
   ],
   "prg-ca-mcmaster-usnc-mmr-feasibility": [
    "7bfbae3992afffd7",
    "McMaster University, USNC and Global First Power Micro Modular Reactor deployment feasibility study (Ontario)",
    null
   ],
   "prg-ca-nova-scotia-ontario-smr-mou": [
    "70d2268ef137c6df",
    "Nova Scotia and Ontario memorandum of understanding on small modular reactors (2025)",
    null
   ],
   "prg-ca-nuclear-energy-strategy-2026": [
    "bc7b2d8aaaff7c3b",
    "Nuclear Energy Strategy for Canada (2026): SMR and microreactor objectives",
    null
   ],
   "prg-ca-nucleon-arc-nuarc-alberta": [
    "14c679acbd3bbbad",
    "Nucleon Energy and ARC Clean Technology NuARC partnership to deploy ARC-100 SMRs, starting in Alberta",
    null
   ],
   "prg-ca-opg-xenergy-xe100-industrial-framework": [
    "8bd8b4f758ff8216",
    "OPG and X-energy framework agreement to deploy Xe-100 SMRs at industrial sites in Canada",
    null
   ],
   "prg-ca-prodigy-des-nedhe-tnpp-mou": [
    "3265aba46f4ad7d9",
    "Prodigy Clean Energy and Des Nëdhé Group memorandum on transportable microreactor plants for remote Canada",
    null
   ],
   "prg-ca-src-microreactor-demonstration": [
    "6ce15d08ddebd890",
    "Saskatchewan Research Council microreactor demonstration programme (installation paused)",
    null
   ],
   "prg-ca-us-opg-nypa-advanced-nuclear-mou": [
    "2645e827751c044a",
    "Ontario Power Generation and New York Power Authority memorandum on advanced nuclear, including SMRs (2025)",
    null
   ],
   "prg-ca-xenergy-alberta-xe100-feasibility": [
    "40594dd84549bc81",
    "X-energy Canada study of repurposing an Alberta thermal power site with Xe-100 reactors (2025)",
    null
   ],
   "prg-cn-cgn-tsinghua-nhr200ii-heating-demonstration": [
    "3221751e44aa5085",
    "CGN and Tsinghua NHR200-II nuclear district-heating demonstration: NEA-approved preliminary work (2018)",
    null
   ],
   "prg-cn-cnnc-acp100s-floating-demonstration": [
    "d2db37c43f38d1ab",
    "CNNC ACP100S floating nuclear power plant demonstration programme (2016 plan inclusion)",
    null
   ],
   "prg-cn-guizhou-small-reactor-demonstration": [
    "72d6ef63f813f974",
    "Guizhou provincial plan for a CGN small-reactor nuclear demonstration (4 x 100 MW, 13th Five-Year Plan draft)",
    null
   ],
   "prg-cn-htgr-industrial-chain-alliance": [
    "676d3da5d1e76967",
    "China's HTGR Modern Industrial Chain Alliance led by CNNC's Chinergy (2025)",
    null
   ],
   "prg-cn-sinap-thorium-msr-prototype": [
    "d1cec1f291caeb6f",
    "SINAP thorium molten-salt reactor programme: 100 MWt prototype targeted by 2035",
    null
   ],
   "prg-co-eje-cafetero-smr-viability-study": [
    "c6ca1b09fb8d468c",
    "Universidad Nacional-led study of SMR viability in Colombia's Eje Cafetero (coffee region)",
    null
   ],
   "prg-co-minenergia-iaea-mou": [
    "6a437f0664352029",
    "Colombia Ministry of Mines and Energy and IAEA memorandum covering nuclear planning and small modular reactors…",
    null
   ],
   "prg-cz-mpo-cez-rolls-royce-additional-sites-mou": [
    "020cc139af3092cc",
    "Czech Industry Ministry, ČEZ and Rolls-Royce SMR memorandum to prepare additional SMR sites",
    null
   ],
   "prg-dk-smr-analysis": [
    "9edc016836aee26c",
    "Danish government analysis of serially produced SMRs and the 1985 nuclear ban",
    null
   ],
   "prg-dz-iaea-joint-statement-smr": [
    "2a440db4f6d3a549",
    "Algeria and IAEA joint statement prioritising SMRs for electricity and desalination (December 2025)",
    null
   ],
   "prg-ec-nuclear-plan-modular-reactor": [
    "8089818f80a9333c",
    "Ecuador nuclear power plan: first-stage 300 MW modular reactor (Ministry of Energy)",
    null
   ],
   "prg-eu-sge-gev-hitachi-samsung-bwrx300-europe": [
    "e635cd352b2268e3",
    "SGE, GE Vernova, Hitachi and Samsung C&T cooperation on BWRX-300 fleet deployment in Central and Eastern Europe and…",
    null
   ],
   "prg-fi-alva-steady-energy-jyvaskyla-prestudy": [
    "0d669329e1d48393",
    "Alva and Steady Energy one-year pre-study of nuclear district heating for Jyväskylä",
    null
   ],
   "prg-fi-se-fortum-gevh-bwrx300-early-works": [
    "b6f27fc37b2d1729",
    "Fortum and GE Vernova Hitachi early works agreement for BWRX-300 SMRs in Finland and Sweden (2025)",
    null
   ],
   "prg-fi-tem-afry-nuclear-promotion-study": [
    "b1a2c4581fa7e294",
    "Finnish government-commissioned AFRY study on promoting nuclear energy, including SMR electricity and heat options…",
    null
   ],
   "prg-fr-ppe3-first-smr-target": [
    "6301a7cf682b3216",
    "France's third Multiannual Energy Programme (PPE3): first small reactor targeted around the early 2030s (2026)",
    null
   ],
   "prg-fr-stellaria-equinix-preorder": [
    "ccae27fb8dfa2aa5",
    "Stellaria and Equinix pre-order agreement for power from Stellarium reactors (2025)",
    null
   ],
   "prg-gb-advanced-nuclear-framework": [
    "eb804bc50ad828c0",
    "UK Advanced Nuclear Framework and pipeline for private advanced, small and micro modular reactor projects (2026)",
    null
   ],
   "prg-gb-gbe-n-scotland-siting-study": [
    "5efa1abbc61e5136",
    "GBE-N desktop study of land in Scotland technically suitable for new nuclear, including SMRs and microreactors",
    null
   ],
   "prg-gb-sge-bwrx300-fleet": [
    "03b6179c66ed01e2",
    "SGE plan for a 14-unit BWRX-300 fleet at three UK sites",
    null
   ],
   "prg-gb-terrapower-kbr-natrium-uk-siting": [
    "f0b8d78c059ee6f1",
    "TerraPower and KBR studies of potential UK sites for Natrium reactors (2025)",
    null
   ],
   "prg-gb-ulc-energy-chiltern-vital-smr-clusters": [
    "7f28ce581c57a659",
    "ULC-Energy and Chiltern Vital Group letter of intent on SMR-powered clean-energy clusters at UK business parks",
    null
   ],
   "prg-gn-rosatom-floating-npp-mou": [
    "c7de9a807e9710fc",
    "Rosatom and Guinea memorandum to study floating nuclear power plants with RITM-200 reactors",
    null
   ],
   "prg-gr-fnpp-joint-development-program-study": [
    "befbcf3b6dde2a86",
    "ABS, Core Power and Athlos Energy assessment of floating nuclear power plants for Greece (Deon Policy Institute…",
    null
   ],
   "prg-gr-inter-ministerial-committee-smr": [
    "a7845ef3e3821770",
    "Greece's Inter-Ministerial Committee to examine small modular reactors (2026)",
    null
   ],
   "prg-hr-nuclear-working-group-smr-siting": [
    "9d3b79f39ea13e99",
    "Croatia's Working Group for Nuclear Energy: siting studies and SMR-versus-large comparison",
    null
   ],
   "prg-hu-hunatom-rolls-royce-smr-mou": [
    "f9cd41221dd57b53",
    "Hunatom and Rolls-Royce SMR memorandum on potential use of Rolls-Royce SMRs in Hungary",
    null
   ],
   "prg-hu-hunatom-sge-bwrx300-loi": [
    "1647784c7a9fa8e5",
    "Hunatom and Synthos Green Energy letter of intent on up to 10 BWRX-300 SMRs in Hungary",
    null
   ],
   "prg-hu-mvm-holtec-smr300-mou": [
    "1aef7bdf9c21d870",
    "MVM and Holtec memorandum to explore SMR-300 deployment in Hungary",
    null
   ],
   "prg-hu-us-funded-smr-feed-study": [
    "0921662f0cb0e9a5",
    "US-funded phase-one FEED study for SMR pre-construction activities in Hungary",
    null
   ],
   "prg-hu-us-hungary-nuclear-mou-2025": [
    "d5ee07808cea5cfc",
    "US-Hungary nuclear energy memorandum covering SMRs (November 2025)",
    null
   ],
   "prg-id-brin-peluit40-pln-nusantara": [
    "31ffe896be12e7f0",
    "BRIN PeLUIt-40 HTGR development with PLN Nusantara Power (de-dieselisation target)",
    null
   ],
   "prg-id-national-nuclear-programme-ruptl": [
    "f3240614f483ede6",
    "Indonesia's first nuclear power programme: 2 x 250 MWe in the RUPTL 2025-2034, with SMR technology planned",
    null
   ],
   "prg-id-pertamina-nre-saltfoss-cmsr": [
    "d9f990fd85ac37da",
    "Pertamina NRE and Seaborg (now Saltfoss) memorandum on a CMSR Power Barge in Indonesia (2023)",
    null
   ],
   "prg-id-west-kalimantan-smr-feasibility-study": [
    "893edd6ca870c830",
    "West Kalimantan SMR feasibility and FEED study with the United States and Japan",
    null
   ],
   "prg-in-ru-rosatom-india-fnpp-working-group": [
    "2c4b78047fc94b39",
    "Rosatom and India's Ministry of Ports, Shipping and Waterways working group on floating nuclear power plants (2025)",
    null
   ],
   "prg-iq-smr-consideration-russia-talks": [
    "eb4307f3873242ff",
    "Iraq's consideration of SMRs and small-reactor cooperation talks with Russia",
    null
   ],
   "prg-ir-aeoi-rosatom-small-npp-mou": [
    "67f8500170b8f3d8",
    "Iran (AEOI) and Rosatom memorandum on building small nuclear power plants in Iran",
    null
   ],
   "prg-it-edf-nuward-edison-italy": [
    "34eefe89f1de793c",
    "EDF, Nuward and Edison NUWARD SMR partnership for Italy (second-of-series plant targeted by 2035)",
    null
   ],
   "prg-jm-nuclear-smr-assessment": [
    "72e272b010c84745",
    "Jamaica nuclear energy assessment focused on SMRs (Nuclear Energy Working Committee, CNL/AECL memorandum)",
    null
   ],
   "prg-jo-jaec-khnp-ismr-feasibility-mou": [
    "9b89188503618796",
    "JAEC and KHNP memorandum for a feasibility study of an i-SMR in Jordan",
    null
   ],
   "prg-jo-jaec-smr-programme": [
    "addce1934db9b7f1",
    "Jordan Atomic Energy Commission SMR programme (vendor studies, floating plant at Aqaba considered)",
    null
   ],
   "prg-jo-jaec-xenergy-xe100-mou": [
    "9287295606b91266",
    "JAEC and X-energy memorandum to assess Xe-100 deployment in Jordan",
    null
   ],
   "prg-jp-htgr-demonstration-reactor": [
    "a399f3d0b5a1b568",
    "Japan's HTGR demonstration reactor programme (METI/ANRE, MHI core company, site not selected)",
    null
   ],
   "prg-jp-meti-small-lwr-development": [
    "7593a1009aa9c6da",
    "METI next-generation reactor support: MHI domestic small light-water reactor (SMR) development (2026)",
    null
   ],
   "prg-ke-nupea-first-npp-programme": [
    "edea8a74e10ad9e3",
    "Kenya first nuclear power plant programme (NuPEA, SMR option under evaluation, Siaya County preferred area)",
    null
   ],
   "prg-kg-rosatom-small-npp": [
    "3ede514a450950c8",
    "Kyrgyzstan and Rosatom small nuclear power plant memorandum and RITM-200N pre-feasibility work",
    null
   ],
   "prg-kr-busan-smr-special-zone": [
    "0c1d110a558f878b",
    "Busan Metropolitan City plan for an SMR special zone and marine SMR industry (2026)",
    null
   ],
   "prg-kr-kaeri-kocia-htgr-mou": [
    "31aab76a0c4231d7",
    "KAERI and Korea Chemical Industry Association memorandum on HTGRs for petrochemicals (2026)",
    null
   ],
   "prg-kr-nano-ds-danseok-mmr-mou": [
    "7efde8c826304b48",
    "NANO Nuclear Energy and DS Danseok memorandum on introducing micro modular reactors in South Korea (2026)",
    null
   ],
   "prg-kr-nssc-smr-pre-review": [
    "d0d3898d97e8ac04",
    "Korea's NSSC SMR regulatory roadmap and pre-review system (companies signal intent, 2026)",
    null
   ],
   "prg-kr-terrapower-sk-innovation-natrium-term-sheet": [
    "807d1ca51e970d4b",
    "TerraPower and SK Innovation term sheet to develop Korea's first commercial Natrium plant (2026)",
    null
   ],
   "prg-kw-kisr-smr-assessment": [
    "016060ad2c5e5828",
    "KISR preliminary assessment of SMRs for non-electric applications in Kuwait",
    null
   ],
   "prg-lk-national-nuclear-programme": [
    "ebd7c63f3f6803bd",
    "Sri Lanka nuclear power programme roadmap and siting (SMR capability considered)",
    null
   ],
   "prg-lt-inpp-newcleo-feasibility-mou": [
    "47ffb81c25a62001",
    "Ignalina NPP and newcleo memorandum to study LFR deployment feasibility in Lithuania",
    null
   ],
   "prg-lt-sge-altra-gvh-bwrx300-mou": [
    "87383201dad50017",
    "SGE, Altra and GE Vernova Hitachi memorandum to assess BWRX-300 deployment in Lithuania",
    null
   ],
   "prg-lv-nuclear-informative-report": [
    "9dae7f5608808d73",
    "Latvia Ministry of Climate and Energy informative report on nuclear energy and SMRs",
    null
   ],
   "prg-mn-small-npp-rosatom-talks": [
    "2fb5ecc0a274dc39",
    "Mongolia's small nuclear power plant plans and talks with Rosatom (RITM-200 offered)",
    null
   ],
   "prg-mx-inin-smr-studies-2026-2030": [
    "23062941809eb069",
    "Mexico ININ institutional programme 2026-2030: SMR and microreactor studies (no CFE decision)",
    null
   ],
   "prg-ng-national-nuclear-programme-smr": [
    "7740a199672a960d",
    "Nigeria national nuclear power programme evaluating SMRs and large reactors (NAEC, Geregu and Itu candidate sites)",
    null
   ],
   "prg-nl-gelderland-smr-location-study": [
    "c206f49565255678",
    "Province of Gelderland SMR action plan and location studies (Dodewaard, Wijchen)",
    null
   ],
   "prg-nl-hexana-atoomcooperatie-mou": [
    "f368e359f4973d38",
    "Hexana and Atoomcoöperatie memorandum on Hexana SMR deployment in the Netherlands (2025)",
    null
   ],
   "prg-nl-opmeer-smr-feasibility": [
    "07d8186612fe3183",
    "Opmeer municipality SMR feasibility programme (Allseas explored as initiator)",
    null
   ],
   "prg-nl-overijssel-smr-siting-study": [
    "d3546ca0c7afacba",
    "Province of Overijssel SMR siting study (Tractebel)",
    null
   ],
   "prg-nl-ulc-energy-rolls-royce-smr": [
    "eb1bee787c3cad6a",
    "ULC-Energy exclusive agreement with Rolls-Royce SMR for deployment in the Netherlands",
    null
   ],
   "prg-no-aecon-norsk-kjernekraft-bwrx300": [
    "8b8aac5fbcc71f99",
    "Aecon and Norsk Kjernekraft strategic cooperation on BWRX-300 SMRs in Norway (2025)",
    null
   ],
   "prg-no-norsk-kjernekraft-hexana-mou": [
    "17f9cac0cf6c0ba3",
    "Norsk Kjernekraft and Hexana memorandum on advanced reactor deployment in Norway (2025)",
    null
   ],
   "prg-no-norsk-kjernekraft-saltfoss-loi": [
    "43a84513f941fa75",
    "Norsk Kjernekraft and Seaborg (now Saltfoss) letter of intent on CMSR deployment in Norway (2023)",
    null
   ],
   "prg-no-nuclear-commission-nou-2026-4": [
    "f8ac5b546f3a572f",
    "Norwegian Nuclear Commission report (NOU 2026:4): prepare for possible future nuclear power but start no process now…",
    null
   ],
   "prg-ph-doe-khnp-smart-prefeasibility-ceza": [
    "404bb6d623fa015f",
    "Philippine DOE and KHNP SMART pre-feasibility study at CEZA, Santa Ana, Cagayan (2018-2019)",
    null
   ],
   "prg-ph-doe-rosatom-smr-cooperation": [
    "96de19268bfd8a8c",
    "Philippine DOE and Rosatom cooperation on small modular reactor feasibility (2017 memorandum, 2019 agreement)",
    null
   ],
   "prg-ph-meralco-usnc-mmr-prefeasibility": [
    "0782c7cfa4778774",
    "Meralco and Ultra Safe Nuclear micro-modular reactor pre-feasibility study (2023, ended)",
    null
   ],
   "prg-ph-mgen-ustda-smr-feasibility-study": [
    "f491fe123c98476e",
    "Meralco PowerGen SMR feasibility study funded by USTDA (Meralco NEST programme)",
    null
   ],
   "prg-ph-national-nuclear-programme": [
    "60781dfed9a62f46",
    "Philippine national nuclear energy programme (first plant targeted for 2032, SMRs among options)",
    null
   ],
   "prg-ph-stgr20-letter-of-intent": [
    "3c70e391d0c810d6",
    "Southern Infrastructure and Kaizen ANZ letter of intent for a 40 MW thorium STGR20 reactor in the Philippines (2023)",
    null
   ],
   "prg-pl-enea-last-energy-loi": [
    "ae507a3ac872fe27",
    "Enea and Last Energy letter of intent to cooperate on SMRs in Poland",
    null
   ],
   "prg-pl-kghm-smr-programme": [
    "96b6412c74396a17",
    "KGHM Polska Miedź SMR programme (suspended)",
    null
   ],
   "prg-pl-last-energy-ksse": [
    "fbf3f098764092d0",
    "Last Energy power purchase agreement for ten 20 MWe plants in the Katowice Special Economic Zone",
    null
   ],
   "prg-pl-respect-energy-edf-nuward": [
    "d58013fe7ccd13e8",
    "Respect Energy and EDF agreement to develop NUWARD SMR projects in Poland",
    null
   ],
   "prg-pl-unimot-getka-nuscale": [
    "79f6ba50b551d63a",
    "Unimot and Getka agreement with NuScale to explore coal-repurposing SMRs in Poland",
    null
   ],
   "prg-pr-nuclear-alternative-project-smr-siting-study": [
    "a0bf3009998e743a",
    "Nuclear Alternative Project study of SMR and microreactor site suitability in Puerto Rico (DOE-funded)",
    null
   ],
   "prg-py-us-ncmou-smr-microreactor-plans": [
    "4c0f0697fbf2807a",
    "Paraguay SMR and microreactor plans under the US-Paraguay strategic civil nuclear memorandum (August 2026)",
    null
   ],
   "prg-ro-dp-world-constanta-smr-study": [
    "a09e50ac704c6547",
    "DP World, CEA and TerraWater Institute SMR feasibility study for the Port of Constanța",
    null
   ],
   "prg-ro-last-energy-cncan-licensing": [
    "8d63f56e02b81665",
    "Last Energy PWR-20 licensing engagement with Romania's regulator CNCAN",
    null
   ],
   "prg-rs-smr-1200mw-target": [
    "0ceefcded60c1dee",
    "Serbia's goal of 1,200 MW from small modular reactors (four SMRs)",
    null
   ],
   "prg-ru-gazprom-tambey-fpu-study": [
    "2a40da616758aec8",
    "Gazprom study of four floating nuclear power units for the Tambey field cluster (Yamal)",
    null
   ],
   "prg-ru-pevek-additional-fpu-study": [
    "3f830297bcaa40fd",
    "Rosatom early study of an additional modernised floating power unit for Pevek (Chukotka request)",
    null
   ],
   "prg-ru-primorsky-floating-units-study": [
    "363bcb955bb4943b",
    "Primorsky Krai floating nuclear power units study (Rosatom)",
    null
   ],
   "prg-ru-rosatom-small-npp-programme": [
    "15d7be0138244657",
    "Rosatom small nuclear power plant programme (62 small reactors by 2039, four more floating plants)",
    null
   ],
   "prg-ru-shelf-m-prospective-arctic-sites": [
    "af37487b86682b1c",
    "Rosatom list of prospective Arctic sites for SHELF-M microreactor plants (Yakutia, Krasnoyarsk, Chukotka)",
    null
   ],
   "prg-ru-vk300-arkhangelsk-feasibility": [
    "25ab583439e95fad",
    "Feasibility study for a four-unit VK-300 nuclear cogeneration plant in the Arkhangelsk region",
    null
   ],
   "prg-rw-holtec-raeb-smr300": [
    "5e4cbf46ae19fb7a",
    "Holtec International and Rwanda Atomic Energy Board development agreement for SMR-300 units (up to about 5 GW)",
    null
   ],
   "prg-rw-nano-raeb-mou": [
    "25aa0e2a0a66b490",
    "NANO Nuclear Energy and Rwanda Atomic Energy Board memorandum on SMRs and microreactors (ZEUS, ODIN)",
    null
   ],
   "prg-rw-rosatom-smr-roadmap": [
    "371b72b05a945cfe",
    "Rwanda Atomic Energy Board and Rosatom roadmap on small modular reactors (first Joint Coordinating Committee, 2026)",
    null
   ],
   "prg-sa-dl-ec-swcc-smr-desalination-mou": [
    "9c32e29d9e2624e0",
    "DL E&C and Saline Water Conversion Corporation memorandum on SMRs for desalination",
    null
   ],
   "prg-sa-kacare-cnec-htr": [
    "082d29baea218cb8",
    "K.A.CARE and CNEC memorandum and feasibility study for a high-temperature gas-cooled reactor in Saudi Arabia",
    null
   ],
   "prg-sa-kacare-kaeri-smart": [
    "da3f4291673b284f",
    "K.A.CARE and KAERI cooperation on SMART/SMART100 SMRs for Saudi Arabia",
    null
   ],
   "prg-se-copenhagen-atomics-regulatory-dialogue": [
    "bdfef7890723186a",
    "Copenhagen Atomics thorium molten-salt reactor early regulatory dialogue with Sweden (ENSREG SMR dashboard)",
    null
   ],
   "prg-se-holtec-smr300-regulatory-dialogue": [
    "ab31323d70913a75",
    "Holtec SMR-300 early regulatory dialogue with Sweden (ENSREG SMR dashboard)",
    null
   ],
   "prg-se-knxt-refirm-south": [
    "6c337e8c10cb1bc0",
    "Kärnfull Next Re:Firm South programme: candidate SMR sites in Karlshamn, Motala and Västervik",
    null
   ],
   "prg-se-steady-energy-sweden-entry": [
    "f87669b01e197a83",
    "Steady Energy LDR-50 district-heating market entry in Sweden (with Kärnfull Next partnership)",
    null
   ],
   "prg-sg-ema-khnp-smr-study-mou": [
    "3c874d5b1918cdc3",
    "Singapore EMA and KHNP memorandum on joint SMR studies (2026)",
    null
   ],
   "prg-sg-government-nuclear-smr-study": [
    "b11c9d6d2dba7b7e",
    "Singapore government study of nuclear energy and SMRs (no deployment decision, IAEA INIR planned)",
    null
   ],
   "prg-si-smr-option-studies": [
    "65c864b6aa17040b",
    "Slovenia SMR option studies: US Project Phoenix pre-feasibility support and GEN energija SMR assessment",
    null
   ],
   "prg-sk-javys-westinghouse-ap300-mou": [
    "01c7d307c74a5123",
    "JAVYS and Westinghouse memoranda on AP300 SMR (and AP1000) deployment in Slovakia",
    null
   ],
   "prg-sk-project-phoenix-smr-feasibility": [
    "8890c1bfbdbb4419",
    "US Project Phoenix coal-to-SMR feasibility study for Slovakia (four sites found suitable)",
    null
   ],
   "prg-sk-sge-slovenske-elektrarne-mou": [
    "d6b57bceb26c3748",
    "SGE and Slovenské elektrárne MoU to explore BWRX-300 opportunities in Slovakia, Czech Republic and the UK",
    null
   ],
   "prg-sn-nuclear-power-programme-smr": [
    "22aec56b80dba839",
    "Senegal nuclear power programme focused on small modular reactors (launched September 2026)",
    null
   ],
   "prg-sv-nuclear-programme": [
    "d6c3fb6ff13bc7ca",
    "El Salvador nuclear power programme with early SMR evaluation (OIPEN, US DOE memorandum, 2026)",
    null
   ],
   "prg-th-cn-egat-cnos-smr-mou": [
    "80e665c8768fdb08",
    "EGAT and CNNC Overseas memorandum on SMR knowledge exchange (2024)",
    null
   ],
   "prg-th-draft-pdp-smr-plan": [
    "92f2b977bba10f3b",
    "Thailand's draft Power Development Plan: two SMR plants (600 MW) prepared by EGAT",
    null
   ],
   "prg-th-egat-ustda-smr-feasibility-study": [
    "087c5d934bf0b0d6",
    "EGAT SMR feasibility study funded by the US Trade and Development Agency (about 600 MWe)",
    null
   ],
   "prg-th-gpsc-saltfoss-cmsr": [
    "85a32868e8730fdc",
    "GPSC and Seaborg (now Saltfoss) memorandum on a CMSR Power Barge study in Thailand (2024)",
    null
   ],
   "prg-th-kr-khnp-egat-smr-mou": [
    "9de390dd1c58adb7",
    "KHNP and EGAT memorandum on SMR cooperation in Thailand (2025)",
    null
   ],
   "prg-tr-smr-5000mwe-2050-target": [
    "dee4d9c9f64a230d",
    "Türkiye national target of 5,000 MWe of SMR capacity by 2050",
    null
   ],
   "prg-tr-ustda-tunas-smr-roadmap": [
    "50380ee207c99227",
    "USTDA-funded SMR deployment roadmap study for TÜNAŞ",
    null
   ],
   "prg-ua-chornobyl-zone-smr-siting": [
    "22591e032856dc1a",
    "Energoatom and the exclusion-zone agency: SMR siting in the Chornobyl exclusion zone (Kopachi, Leliv)",
    null
   ],
   "prg-ua-energoatom-edf-nuward": [
    "1118bbf44ffafc38",
    "Energoatom and EDF cooperation agreement covering study of NUWARD SMR technology",
    null
   ],
   "prg-ua-energoatom-holtec-smr160": [
    "4bbf384cf2479598",
    "Energoatom and Holtec cooperation agreement for up to 20 SMR-160 plants in Ukraine",
    null
   ],
   "prg-ua-energoatom-nuscale-mou": [
    "168d362c44b92727",
    "Energoatom and NuScale memorandum to explore NuScale SMRs replacing fossil plants in Ukraine",
    null
   ],
   "prg-ua-energoatom-rolls-royce-smr-mou": [
    "618122d8f5b3b865",
    "Energoatom and Rolls-Royce SMR memorandum on SMR deployment for Ukraine's recovery",
    null
   ],
   "prg-ua-energoatom-westinghouse-ap300-mou": [
    "582ea7fae1cc63b9",
    "Energoatom and Westinghouse memorandum on AP300 SMR deployment in Ukraine",
    null
   ],
   "prg-ua-smr-roadmap-and-draft-law": [
    "91d58d8d4d5eb643",
    "Ukraine's draft SMR implementation roadmap and draft law on small modular reactors (2025)",
    null
   ],
   "prg-us-arkansas-nuclear-feasibility-study": [
    "a65f5d11482a8c5b",
    "Arkansas legislative feasibility study on new nuclear generation, including small modular and micro reactors (2025-2026)",
    null
   ],
   "prg-us-army-janus-program": [
    "09fa087cf4de431c",
    "U.S. Army Janus Program for commercial microreactors on Army installations",
    null
   ],
   "prg-us-bwxt-wyoming-energy-authority-banr-study": [
    "03b6b8950bcb1ade",
    "BWXT and Wyoming Energy Authority contract to assess BANR microreactor deployment in Wyoming",
    null
   ],
   "prg-us-constellation-clinton-smr-evaluation": [
    "d0042e14d565ce52",
    "Constellation evaluation of an advanced reactor or SMR at the Clinton Clean Energy Center (Illinois)",
    null
   ],
   "prg-us-cvea-usnc-mmr-feasibility": [
    "9641da424e418129",
    "Copper Valley Electric Association and Ultra Safe Nuclear Corporation Micro Modular Reactor feasibility study (Alaska)",
    null
   ],
   "prg-us-doe-nric-nuclear-energy-launch-pad": [
    "d2017d87a5c2ebef",
    "DOE / NRIC Nuclear Energy Launch Pad (reactor and fuel-cycle developer selections)",
    null
   ],
   "prg-us-energysolutions-ipa-intermountain-nuclear": [
    "114a98b581b00ccd",
    "EnergySolutions, Intermountain Power Agency and Utah initiative to explore advanced nuclear, including SMRs, at the…",
    null
   ],
   "prg-us-fpl-smr-early-site-permit-plan": [
    "b81b243a152b1e2b",
    "FPL plan to begin early site permitting for a potential SMR next to an existing nuclear plant (Florida)",
    null
   ],
   "prg-us-great-plains-new-nuclear-consortium": [
    "1155246d15876698",
    "Great Plains New Nuclear Consortium study of 1,000-2,000 MW of new nuclear, including SMRs, in Nebraska (2025)",
    null
   ],
   "prg-us-holtec-entergy-hyundai-smr300": [
    "b357c1b1fd7f10dd",
    "Holtec, Entergy and Hyundai E&C agreement to evaluate SMR-300 projects across Entergy's territory (2026)",
    null
   ],
   "prg-us-holtec-smr300-decommissioning-sites": [
    "ee851db1a1fcdf11",
    "Holtec plan to use its retired nuclear plant sites (Pilgrim, Indian Point, Big Rock Point) for future SMR-300 units",
    null
   ],
   "prg-us-idaho-strategic-radiant-kaleidos": [
    "7669dbd3244c54d1",
    "Idaho Strategic Resources and Radiant memorandum on Kaleidos microreactors at a mine site (2024)",
    null
   ],
   "prg-us-indiana-oed-eli-lilly-nuclear-loi": [
    "9a115b8463192724",
    "Indiana Office of Energy Development and Eli Lilly letter of intent on SMR and advanced nuclear projects",
    null
   ],
   "prg-us-japan-gvh-bwrx300-tennessee-alabama": [
    "9d2a4c24f9e27cca",
    "US–Japan strategic investment in GE Vernova Hitachi BWRX-300 SMRs in Tennessee and Alabama (up to $40 billion)",
    null
   ],
   "prg-us-kr-terrapower-hdec-natrium-epc": [
    "7ad93eb5cdaca844",
    "TerraPower and Hyundai E&C framework agreement: EPC for up to eight Natrium reactors (2026)",
    null
   ],
   "prg-us-lgeku-xenergy-xe100-kentucky": [
    "bd77711f038c2949",
    "LG&E and KU (PPL) and X-energy collaboration to explore Xe-100 SMR deployment in Kentucky",
    null
   ],
   "prg-us-maryland-mea-xenergy-coal-to-nuclear-study": [
    "163358f23ad59fee",
    "Maryland Energy Administration grant study of repurposing a Maryland coal plant with X-energy's Xe-100",
    null
   ],
   "prg-us-nano-afwerx-kronos-jbab-study": [
    "dd5783d071db6fd1",
    "NANO Nuclear AFWERX research contract to explore a KRONOS MMR at Joint Base Anacostia-Bolling",
    null
   ],
   "prg-us-nano-ameresco-microreactor-mou": [
    "2ae043fa44bc3137",
    "NANO Nuclear Energy and Ameresco memorandum on deploying NANO microreactors at US federal and commercial sites (2026)",
    null
   ],
   "prg-us-nano-doe-id-zeus-odin-siting-mou": [
    "448f457667ec682e",
    "NANO Nuclear and DOE Idaho Operations Office memorandum to evaluate siting ZEUS and ODIN prototypes at INL",
    null
   ],
   "prg-us-natura-ngl-permian-produced-water": [
    "73f81f41da12dde5",
    "Natura Resources and NGL Water Solutions Permian agreement on MSR-100 power and produced-water treatment (Texas)",
    null
   ],
   "prg-us-nextera-smr-colocation-evaluation": [
    "d787596179176868",
    "NextEra Energy evaluation of 6 GW of SMR capacity at its nuclear sites and new sites (2026)",
    null
   ],
   "prg-us-nppd-gen3-smr-early-site-permit": [
    "2aaf834bb808f84b",
    "Nebraska Public Power District Gen III+ SMR early site permit programme (DOE cost-shared)",
    null
   ],
   "prg-us-nucube-alaska-fund-nualaska": [
    "5f424981a3ef3da1",
    "NuCube Energy and Alaska Fund NuAlaska initiative for NuSun-1 projects in Alaska",
    null
   ],
   "prg-us-nypa-upstate-advanced-nuclear": [
    "c22360bcc88600bf",
    "New York Power Authority programme for at least 1 GW of new nuclear in upstate New York (large reactors and/or SMRs)",
    null
   ],
   "prg-us-oklo-wyoming-hyperscale-loi": [
    "5372b66d35985341",
    "Oklo and Wyoming Hyperscale non-binding letter of intent for 100 MW of Aurora power to a data-centre campus",
    null
   ],
   "prg-us-pacificorp-terrapower-natrium-study": [
    "b770320ace383847",
    "PacifiCorp and TerraPower joint study of up to five additional Natrium reactors by 2035",
    null
   ],
   "prg-us-srns-geh-prism-srs-2010": [
    "185c684e247fdcca",
    "SRNS and GE Hitachi agreement to explore a PRISM prototype at the Savannah River Site (2010)",
    null
   ],
   "prg-us-terra-innovatum-ameresco-solo-mou": [
    "51ba8e614dc70e19",
    "Terra Innovatum and Ameresco memorandum on siting and deploying SOLO micro-modular reactors (2025)",
    null
   ],
   "prg-us-terra-innovatum-uvation-solo-loi": [
    "4a311aa3c6a70310",
    "Terra Innovatum and Uvation letter of intent for a SOLO microreactor pilot for data centres (2025)",
    null
   ],
   "prg-us-terrapower-evergy-kansas-natrium-mou": [
    "f4205e83c4fcf261",
    "TerraPower, Evergy and Kansas Department of Commerce memorandum to explore siting a Natrium plant in Kansas",
    null
   ],
   "prg-us-terrestrial-energysolutions-imsr-siting-mou": [
    "573a316bb2dd5c34",
    "Terrestrial Energy and EnergySolutions memorandum to site IMSR plants at EnergySolutions-owned sites",
    null
   ],
   "prg-us-terrestrial-riot-imsr-data-centres": [
    "3e341dbd4a93b8b4",
    "Terrestrial Energy and Riot Platforms memorandum on IMSR plants for data centres (up to 4 GW, 2026)",
    null
   ],
   "prg-us-texas-tech-acu-natura-produced-water-msr": [
    "42f3551f5e0ab521",
    "Texas Tech, Abilene Christian University, Natura Resources and Texas Produced Water Consortium molten-salt-reactor…",
    null
   ],
   "prg-us-tva-entra1-nuscale-6gw": [
    "c858241e9b9a6b41",
    "ENTRA1 Energy and Tennessee Valley Authority agreement for up to 6 GW of NuScale SMR capacity",
    null
   ],
   "prg-us-utah-terrapower-flagship-natrium-mou": [
    "5af98be54eb43d8d",
    "Utah Office of Energy Development, TerraPower and Flagship Companies memorandum to explore siting a Natrium plant in…",
    null
   ],
   "prg-us-wisconsin-psc-uw-nuclear-siting-study": [
    "763951eb3342f08d",
    "Wisconsin PSC and UW-Madison nuclear power siting study (2025 Wisconsin Act 12)",
    null
   ],
   "prg-us-xenergy-talen-xe100-loi": [
    "be992a5fdff1c4db",
    "X-energy and Talen Energy letter of intent to assess three or more four-unit Xe-100 plants (Pennsylvania and PJM)",
    null
   ],
   "prg-vn-decision-438-atomic-energy-strategy": [
    "4801fce41b077842",
    "Vietnam atomic energy strategy (Decision 438/QD-TTg, 2026): at least one SMR project by 2035, 10-15 SMRs by 2050",
    null
   ],
   "prg-vn-dong-nai-pilot-smr-plan": [
    "f29f3f9725ecb07f",
    "Dong Nai city plan seeking selection to pilot an SMR power plant by 2035",
    null
   ],
   "prg-vn-pecc2-saltfoss-siemens-floating-study": [
    "48b3b4a8ce57d9f2",
    "PECC2, Seaborg (now Saltfoss) and Siemens Energy joint study on floating CMSR power plants in Vietnam (2022)",
    null
   ],
   "prg-za-irp2025-nuclear-necsa-smr": [
    "4f72a23b2149de20",
    "South Africa IRP 2025 new-nuclear plan and Necsa SMR partner selection",
    null
   ],
   "prg-fanco-floral-power-evaluation-2026": [
    "b35517a441ee702a",
    "FANCO–Floral Energy integrated-power opportunity evaluation",
    null
   ],
   "prg-tr-arc-icn-arc100-term-sheet": [
    "b41f592c00bbe4a4",
    "ARC Clean Technology and IC Nuclear & Industry term sheet for ARC-100 deployment in Türkiye",
    null
   ],
   "prg-gb-amr-rdd-htgr-demonstration": [
    "10071f6b651d4363",
    "UK Advanced Modular Reactor RD&D programme HTGR demonstrator (Hartlepool proposed as host by EDF)",
    null
   ],
   "prg-us-natura-nov-shepherd-commercialisation-2025": [
    "e3795770d8d685e2",
    "Natura acquisition of Shepherd Power and commercialization agreement with NOV",
    null
   ],
   "prg-us-natura-3m-lithium7-cooperation-2025": [
    "5819fcc20122c593",
    "Natura and 3M lithium-7 development and qualification agreement",
    null
   ],
   "prg-us-bwxt-nfs-haleu-deconversion-2024": [
    "96ff68f829bfd4e9",
    "Nuclear Fuel Services selection for DOE HALEU deconversion IDIQ",
    null
   ],
   "prg-ca-bwxt-westinghouse-ap300-components-mou-2024": [
    "9d3becf9a9ab0906",
    "BWXT Canada and Westinghouse AP300/AP1000 component-manufacturing memorandum",
    null
   ],
   "prg-gb-terrestrial-springfields-imsr-fuel-pilot-2025": [
    "3641a119e294fa4b",
    "Terrestrial Energy and Springfields IMSR fuel-pilot manufacturing contract",
    null
   ],
   "prg-br-mnb-technology-development": [
    "fbd637878d63db74",
    "Brazilian Microreactor (MNB) technology-development programme",
    null
   ],
   "prg-us-kairos-bwxt-triso-collaboration-2025": [
    "cace2e186faae860",
    "Kairos Power and BWXT commercial TRISO fuel development collaboration",
    null
   ],
   "prg-us-natura-quadrant-haleu-framework-2026": [
    "75ca7d3369f7744e",
    "Natura and Quadrant prospective commercial-reactor HALEU framework",
    null
   ],
   "prg-us-natura-hifunda-sensor-development-2026": [
    "69b9dcdbfe0fce82",
    "Natura and HiFunda molten-salt chemistry sensor development",
    null
   ],
   "prg-us-aep-amazon-xenergy-breed-exploration": [
    "b9339e5684fe5830",
    "AEP, Amazon and X-energy exploration agreement for the former Breed station in Indiana",
    null
   ],
   "prg-nl-rotterdam-smr-supply-chain-study": [
    "35f13c3303b5d9e1",
    "Port of Rotterdam preliminary SMR supply-chain study",
    null
   ],
   "prg-id-rosatom-halmahera-floating-power-agreement": [
    "e40eaa81cab2465f",
    "Rosatom and PT Pembangkit Listrik Nuklir floating power agreement for northern Halmahera",
    null
   ],
   "prg-us-deep-fission-gpda-commercial-power-agreement": [
    "790dab1cc544eb51",
    "Deep Fission and GPDA commercial power agreement at Great Plains Industrial Park",
    null
   ],
   "prg-us-valar-nrc-preapplication-engagement": [
    "cd963cd01a6056e2",
    "Valar Atomics NRC pre-application engagement",
    null
   ],
   "prg-ca-us-nucleon-arc-mou-20250513": [
    "0fda23a6a32315b2",
    "Nucleon and ARC memorandum to explore ARC-100 deployment in Alberta and Texas",
    null
   ],
   "prg-ca-arc-invest-alberta-mou-20230324": [
    "9585cae1d8038abe",
    "ARC and Invest Alberta commercialization memorandum",
    null
   ],
   "prg-us-darpa-fat-cat-autonomous-reactor-research": [
    "c2dd6633997bf4e2",
    "DARPA Fast Capacitance (Fat Cat) autonomous fast-reactor research",
    null
   ],
   "prg-fr-newcleo-mox-pilot-safety-options-2026": [
    "6af799b0151447f5",
    "Newcleo MOX fuel-fabrication pilot safety-options review",
    null
   ],
   "prg-se-blykalla-neext-sealer-engineering-2026": [
    "280c0c4e9ee81893",
    "Blykalla and NEEXT SEALER basic-design engineering cooperation",
    null
   ],
   "prg-us-doe-reactor-pilot-program": [
    "6c018e6c479af44c",
    "DOE Reactor Pilot Program (DOE-authorized advanced test reactors)",
    null
   ],
   "prg-us-in-advanced-nuclear-ready-communities": [
    "c027ab4e817a5939",
    "Indiana Advanced Nuclear Ready Communities programme",
    null
   ],
   "prg-us-dairyland-applied-atomics-genoa-loi": [
    "74cd09ca22d911db",
    "Dairyland Power and Applied Atomics letter of intent to evaluate SMRs at the Genoa site (Wisconsin)",
    null
   ],
   "prg-tr-ustda-tupras-smr-roadmap": [
    "ab82ed92e848b4d2",
    "USTDA-funded SMR assessment and roadmap for TÜPRAŞ refining operations",
    null
   ],
   "prg-no-copenhagen-atomics-ocean-power-mou": [
    "ade998c810e1a26f",
    "Ocean-Power and Copenhagen Atomics MoU to study thorium molten-salt reactors in Norway",
    null
   ],
   "prg-kr-steady-energy-kdhc-cooperation": [
    "3ab788b0947bbd8e",
    "Steady Energy and Korea District Heating Corp. cooperation on heat-only SMRs",
    null
   ],
   "prg-tw-nthu-nucube-mmr-assessment": [
    "0b82112352889ff6",
    "National Tsing Hua University and NuCube Energy assessment of a microreactor on the NTHU campus",
    null
   ],
   "prg-nl-thorizon-pronto-mooi-2026": [
    "1c456376db3ea946",
    "Thorizon-led Project Pronto under the Dutch MOOI Kernenergie scheme",
    null
   ],
   "prg-cz-se-sujb-ssm-rolls-royce-smr-mou": [
    "f6333936d1ff6eb2",
    "SÚJB and SSM memorandum on regulatory cooperation for the Rolls-Royce SMR",
    null
   ]
  },
  "policies": {
   "pol-us-nrc-radiation-proposed-20260715": [
    "f84a72c3632f35cf",
    "Proposed modernization of NRC radiation-protection standards",
    null
   ],
   "pol-us-nrc-nepa-proposed-20260707": [
    "a05c93db0c8e4dba",
    "Proposed revisions to NRC implementation of NEPA",
    null
   ],
   "pol-us-advance-act-2024": [
    "b47e6dc4c67fb4ba",
    "ADVANCE Act of 2024",
    null
   ],
   "pol-us-nrc-part-53-2026": [
    "af247ce43b968f35",
    "10 CFR Part 53: risk-informed, technology-inclusive licensing framework",
    null
   ],
   "pol-us-nrc-new-reactor-geis-2026": [
    "f1b98ff0c32f5b85",
    "Generic environmental impact statement rule for licensing new nuclear reactors",
    null
   ],
   "pol-us-nrc-microreactor-proposed-2026": [
    "598a8a5df929989f",
    "Proposed licensing requirements for microreactors and comparable reactors",
    null
   ],
   "pol-us-nrc-licensing-siting-proposed-2026": [
    "6cf35a2557798afb",
    "Proposed modernization of reactor licensing, safety oversight and siting practices",
    null
   ],
   "pol-us-eo-14299": [
    "58f96564ad82916f",
    "Executive Order 14299: advanced reactors for national security",
    null
   ],
   "pol-us-eo-14300": [
    "74583d2ee6a4db79",
    "Executive Order 14300: reform of the Nuclear Regulatory Commission",
    null
   ],
   "pol-us-eo-14301": [
    "199dbca6f36e96af",
    "Executive Order 14301: reactor testing at the Department of Energy",
    null
   ],
   "pol-us-eo-14302": [
    "cba6c0b984bcd89d",
    "Executive Order 14302: nuclear industrial base",
    null
   ],
   "pol-us-doe-reactor-pilot-program": [
    "01f1f509a79fe370",
    "DOE Reactor Pilot Program",
    null
   ],
   "pol-us-doe-ardp": [
    "324b96c5bec960b2",
    "DOE Advanced Reactor Demonstration Program (demonstration awards)",
    null
   ],
   "pol-us-ardp-award-terrapower-2020": [
    "553053b67c246f87",
    "ARDP demonstration award: TerraPower (Natrium)",
    null
   ],
   "pol-us-ardp-award-xenergy-2020": [
    "cdc877b6c56b4bf6",
    "ARDP demonstration award: X-energy (Xe-100)",
    null
   ],
   "pol-us-doe-gen3-smr-program": [
    "c6f33f8bb5fdc2f0",
    "DOE Generation III+ Small Modular Reactor programme",
    null
   ],
   "pol-us-gen3-selection-tva-2025": [
    "d53c299bfa91248d",
    "Gen III+ SMR selection: TVA (Clinch River BWRX-300)",
    null
   ],
   "pol-us-gen3-selection-holtec-2025": [
    "9bfa0d714e1146df",
    "Gen III+ SMR selection: Holtec (Palisades SMR-300)",
    null
   ],
   "pol-us-gen3-tier2-selections-2026": [
    "8e1c97f2705bcbd3",
    "Gen III+ SMR selections of May 2026: early site permits and supply chain",
    null
   ],
   "pol-us-nrc-smr-emergency-preparedness-2023": [
    "b475a590f1b32685",
    "Emergency preparedness rule for small modular reactors and other new technologies",
    null
   ],
   "pol-tx-hb14-2025": [
    "fbc16c07d7925096",
    "Texas HB 14 (2025): Texas Advanced Nuclear Energy Office and development fund",
    null
   ],
   "pol-tx-tandf": [
    "4a751fcea6d70c27",
    "Texas Advanced Nuclear Development Fund",
    null
   ],
   "pol-tx-taneo-grant-rules-2026": [
    "6455673924ed6b40",
    "TANEO grant rules (10 TAC chapter 331)",
    null
   ],
   "pol-in-smr-certificate-statute": [
    "a187f40b67365809",
    "Indiana Code 8-1-8.5-12.1: small modular nuclear reactor certificates",
    null
   ],
   "pol-in-sea424-2025": [
    "1482d60d5cef2711",
    "Indiana SEA 424 (2025): SMR development cost recovery",
    null
   ],
   "pol-in-sea423-2025": [
    "d21daa18720d1b9a",
    "Indiana SEA 423 (2025): SMR pilot programme and partnerships",
    null
   ],
   "pol-ca-prc-25524-1": [
    "ee07b6bdefab15dc",
    "California Public Resources Code § 25524.1: reprocessing condition",
    null
   ],
   "pol-ca-prc-25524-2": [
    "c8565c9a36557494",
    "California Public Resources Code § 25524.2: waste-disposal condition",
    null
   ],
   "pol-mn-216b243-3b": [
    "97c183d3565c0ed9",
    "Minnesota Statutes § 216B.243, subdivision 3b: nuclear certificate of need",
    null
   ],
   "pol-va-56-585-1-14": [
    "91d24fcb9e5b17cb",
    "Virginia § 56-585.1:14: Phase II small modular reactor development-cost recovery",
    null
   ],
   "pol-va-56-585-1-15": [
    "f5ce076a333196c4",
    "Virginia § 56-585.1:15: Phase I small modular nuclear facility development-cost recovery",
    null
   ],
   "pol-id-eo-2025-06": [
    "e0b7e47a0550f17d",
    "Idaho Executive Order 2025-06: Advanced Nuclear Energy Task Force",
    null
   ],
   "pol-me-35a-4302": [
    "31c5e0b3894b518f",
    "Maine Title 35-A, § 4302: nuclear construction referendum",
    null
   ],
   "pol-wv-sb4-2022": [
    "a467b14465993ec4",
    "West Virginia Enrolled Senate Bill 4 (2022): repeal of the nuclear-construction article",
    null
   ],
   "pol-ky-164-2805": [
    "f704b69e899e6514",
    "Kentucky KRS 164.2805: Nuclear Reactor Site Readiness Pilot Program",
    null
   ],
   "pol-ky-278-615": [
    "3867a8d6bf8baea5",
    "Kentucky KRS 278.615: nuclear permit and license cost recovery",
    null
   ],
   "pol-wi-act-2015-344": [
    "cdbfb37b491077c9",
    "2015 Wisconsin Act 344: repeal of the nuclear-construction conditions",
    null
   ],
   "pol-wi-act-2025-12": [
    "7c2a3569c2fa3ad4",
    "2025 Wisconsin Act 12: nuclear power siting study",
    null
   ],
   "pol-id-39-3027": [
    "5ec3ba953f660607",
    "Idaho Code § 39-3027: voter submission before a law prohibiting nuclear generation",
    null
   ],
   "pol-id-eo-2021-02": [
    "5d6e5a5c5c82649b",
    "Idaho Executive Order 2021-02: Leadership in Nuclear Energy Commission",
    null
   ],
   "pol-mi-hb4128-2025": [
    "bfc82e67ea2ff3b4",
    "Michigan 2025 House Bill 4128: proposed credit for small modular reactor and uprate electricity",
    null
   ],
   "pol-wy-ch103-2022": [
    "726ffe22459e9c14",
    "Wyoming 2022 Chapter 103: advanced nuclear reactor requirements",
    null
   ],
   "pol-fl-366-93": [
    "e1b3736f859ced25",
    "Florida Statutes § 366.93: nuclear and gasification plant cost recovery",
    null
   ],
   "pol-nj-pl2026-c9": [
    "f719e8c81f0aa21d",
    "New Jersey P.L. 2026, chapter 9: nuclear facility permit finding",
    null
   ],
   "pol-oh-4164": [
    "2455d657ddbb74d4",
    "Ohio Revised Code Chapter 4164: Nuclear Development Authority",
    null
   ],
   "pol-wa-rcw-80-50": [
    "e9ed17c665cd1528",
    "Washington RCW 80.50: energy facility site certification",
    null
   ],
   "pol-ak-ch4-sla-2022": [
    "13b8640e8613f0f8",
    "Alaska Chapter 4, SLA 2022: microreactor siting",
    null
   ],
   "pol-sc-58-33-196": [
    "4a7d5c1e2b962300",
    "South Carolina section 58-33-196: advanced nuclear study costs",
    null
   ],
   "pol-sc-blra-2007": [
    "31582a711468e51a",
    "South Carolina Base Load Review Act",
    null
   ],
   "pol-nc-gs-62-133-8": [
    "a1054b49f97af7de",
    "North Carolina G.S. 62-133.8: clean energy portfolio standard",
    null
   ],
   "pol-nc-gs-166a-29": [
    "cf0b369bca67ec6d",
    "North Carolina G.S. 166A-29: fixed nuclear facility emergency-planning fee",
    null
   ],
   "pol-ar-act707-2025": [
    "1d323c6cd912493a",
    "Arkansas Act 707 of 2025: nuclear generation feasibility study",
    null
   ],
   "pol-ar-act373-2025": [
    "1fd4652d655632ba",
    "Arkansas Act 373 of 2025: advanced-energy strategic investment rider",
    null
   ],
   "pol-pa-rpa-402-1": [
    "cb7c10eb0cc8aa57",
    "Pennsylvania Radiation Protection Act section 402.1: small modular reactor and microreactor fees",
    null
   ],
   "pol-id-ipuc-37049": [
    "30e2dff35e584554",
    "Idaho PUC Order 37049: Kemmerer Unit 1 solicitation waiver",
    null
   ],
   "pol-la-act111-2025": [
    "330fb2c0565967d2",
    "Louisiana Act 111 of 2025: small modular reactor environmental permitting",
    null
   ],
   "pol-la-act462-2025": [
    "52edc8074491a925",
    "Louisiana Act 462 of 2025: green energy includes nuclear reactors",
    null
   ],
   "pol-az-ch56-2025": [
    "f73633df5973fd8b",
    "Arizona Chapter 56 of 2025: nuclear emergency management fund appropriation",
    null
   ],
   "pol-va-pur-2025-00085": [
    "2abbe9449b14a3e4",
    "Virginia SCC final order: Appalachian Power Joshua Falls development costs",
    null
   ],
   "pol-la-eo-jml-25-074": [
    "68a27cceb7c9bd51",
    "Louisiana Executive Order JML 25-074: environmental permitting review",
    null
   ],
   "pol-oh-4906-01": [
    "7e555b5b37bd18dd",
    "Ohio power-siting definition of a major utility facility",
    null
   ],
   "pol-oh-4906-04": [
    "3db4c0da534e20eb",
    "Ohio certificate required before major-utility construction",
    null
   ],
   "pol-wy-35-11-2101": [
    "660444690eccac41",
    "Wyoming advanced nuclear reactor requirements",
    null
   ],
   "pol-ny-psc-26-e-0335": [
    "29261ae69908df0a",
    "New York PSC nuclear reliability backbone process",
    null
   ],
   "pol-mt-75-20-206": [
    "851adec9b589f11b",
    "Montana legislative conditions for uranium conversion and enrichment",
    null
   ],
   "pol-ia-hf2757-2026": [
    "0f299fdc20ad687a",
    "Iowa House File 2757: nuclear generation tax treatment and workforce fund",
    null
   ],
   "pol-ia-eo17-2026": [
    "732c9719ab104000",
    "Iowa Executive Order 17: Nuclear Energy Task Force",
    null
   ],
   "pol-mi-pa235-2023": [
    "3691f0d041e8464e",
    "Michigan 2023 Public Act 235: nuclear generation in the clean-energy standard",
    null
   ],
   "pol-mi-pa218-2022": [
    "17e928ab3b407fde",
    "Michigan 2022 Public Act 218: nuclear feasibility study",
    null
   ],
   "pol-sc-act41-nuclear-advisory-council": [
    "8846b711d8234511",
    "South Carolina Act 41 of 2025: Governor's Nuclear Advisory Council",
    null
   ],
   "pol-il-eo-2026-01": [
    "cfdb4e2241b993fe",
    "Illinois Executive Order 2026-01: nuclear notice of inquiry",
    null
   ],
   "pol-co-ch45-2025": [
    "154e790e713be3eb",
    "Colorado Chapter 45 of 2025: nuclear energy in the clean-energy definitions",
    null
   ],
   "pol-or-469-595": [
    "9d37cc5e8f5d0e10",
    "Oregon conditions for a nuclear-fueled thermal power plant",
    null
   ],
   "pol-az-sb1418-2026": [
    "3bc97d4c8ee08feb",
    "Arizona S.B. 1418, vetoed: corporation commission and small modular reactors",
    null
   ],
   "pol-az-eo-2025-13": [
    "9d5fa607a0ab2863",
    "Arizona Executive Order 2025-13: energy task force",
    null
   ],
   "pol-hi-xi-8": [
    "b8b5ed35c950edce",
    "Hawaii Constitution article XI, section 8: nuclear fission plants",
    null
   ],
   "pol-ks-nuclear-siting": [
    "2973477a1c0bed1f",
    "Kansas nuclear generation facility siting permit",
    null
   ],
   "pol-ks-79-266": [
    "0661e89067a3885d",
    "Kansas property-tax exemption for certain new electric generation, including nuclear",
    null
   ],
   "pol-nd-hb1025-2025": [
    "778b260a9ca7cb51",
    "North Dakota 2025 House Bill 1025: advanced nuclear study and appropriation",
    null
   ],
   "pol-ok-osl491-2025": [
    "5858eac4849836b1",
    "Oklahoma 2025 chapter 491: nuclear energy feasibility study",
    null
   ],
   "pol-nv-459-910": [
    "20ce5542ff83dd7d",
    "Nevada prohibition on storing high-level radioactive waste",
    null
   ],
   "pol-ri-39-31-5": [
    "b4351d889c9d5966",
    "Rhode Island authorization to participate in nuclear-power procurement",
    null
   ],
   "pol-ri-42-98-4": [
    "98b8113e74866316",
    "Rhode Island energy facility siting licence",
    null
   ],
   "pol-sd-49-41b-4": [
    "fdb75eb3c4f4d6d3",
    "South Dakota energy facility construction permit",
    null
   ],
   "pol-nm-17-9-592": [
    "98b021febb58e633",
    "New Mexico location approval for a large capacity plant",
    null
   ],
   "pol-ky-ch51-2025": [
    "cc195f94864b3999",
    "Kentucky Chapter 51 of 2025: nuclear energy development grant appropriation",
    null
   ],
   "pol-id-39-3020": [
    "e7e124c70761eacf",
    "Idaho Code § 39-3020: Western Interstate Nuclear Compact",
    null
   ],
   "pol-ky-164-2803": [
    "a4168187ddc12326",
    "Kentucky KRS 164.2803: nuclear energy development grant cap",
    null
   ],
   "pol-nj-eo-2-2026": [
    "2b93f4b4121cdb58",
    "New Jersey Executive Order No. 2: Nuclear Power Task Force",
    null
   ],
   "pol-mi-pa121-2024": [
    "5c56462fcd7e388b",
    "Michigan 2024 Public Act 121: targeted energy investment",
    null
   ],
   "pol-tn-pc530-2025": [
    "a06a0367043deb1d",
    "Tennessee Public Chapter 530: nuclear supply-chain carry-forward",
    null
   ],
   "pol-mo-393-1400": [
    "db8177043536d12a",
    "Missouri section 393.1400: new nuclear units excluded from qualifying-plant rate treatment",
    null
   ],
   "pol-vt-act52-2021": [
    "586bc4b39ccf5cfc",
    "Vermont Act 52 of 2021: radiological emergency response plan fund",
    null
   ],
   "pol-ne-71-3505": [
    "4895191c2f1df36e",
    "Nebraska section 71-3505: nuclear-plant emergency-response and surveillance fee",
    null
   ],
   "pol-nh-162-f-1": [
    "90fc80446afb7c56",
    "New Hampshire RSA 162-F:1: decommissioning funding responsibility",
    null
   ],
   "pol-in-eo-25-48": [
    "b897fb4b42384bc0",
    "Indiana Executive Order 25-48: Nuclear Indiana Coalition",
    null
   ],
   "pol-mp-2-cmc-1326": [
    "2db3ca33312064c2",
    "Northern Mariana Islands 2 CMC § 1326: small modular reactor exemption from the nuclear-free zone law",
    null
   ],
   "pol-pr-pc1092-2026": [
    "1c3407cc0a4a10db",
    "Puerto Rico House Bill 1092 (2026): nuclear energy and small modular reactors in the energy policy act",
    null
   ],
   "pol-mn-rule-7855": [
    "e3c8456c2ad83076",
    "Minnesota Rules chapter 7855: certificate applications for nuclear fuel and waste facilities",
    null
   ],
   "pol-mo-psc-eo-2024-0056": [
    "14ad161e33cb1106",
    "Missouri PSC order on Wolf Creek decommissioning costs",
    null
   ],
   "pol-ri-445-ricr-1": [
    "5f2af44a714cadbe",
    "Rhode Island Energy Facility Siting Board rules",
    null
   ],
   "pol-hr-nuclear-development-law-2026": [
    "9f6a3cee9e16cfc9",
    "Croatia: Law on the Development of Nuclear Energy for Civil Purposes (NN 55/2026)",
    null
   ],
   "pol-ca-ita-127-45-small-nuclear-itc": [
    "590cf29e6308b423",
    "Canada: Clean technology investment tax credit for small nuclear energy property (Income Tax Act s. 127.45)",
    null
   ],
   "pol-ca-physical-activities-regs-item-27": [
    "693a222a884d33af",
    "Canada: Physical Activities Regulations, Schedule item 27 – new fission or fusion reactors (SOR/2019-285)",
    null
   ],
   "pol-us-nrc-enhancements-proposed-20260924": [
    "438e49391d7f7af5",
    "Proposed regulatory enhancements for reactor licensing, decommissioning and operational oversight",
    null
   ],
   "pol-ca-nuclear-safety-and-control-act": [
    "6947c4bfeae3eff1",
    "Canada: Nuclear Safety and Control Act (S.C. 1997, c. 9)",
    null
   ],
   "pol-ca-class-i-nuclear-facilities-regulations": [
    "a4e44d38a19c2d7a",
    "Canada: Class I Nuclear Facilities Regulations (SOR/2000-204)",
    null
   ],
   "pol-ca-nrcan-enabling-smr-program": [
    "a8ebd7fcf81a5e4a",
    "Canada: Enabling Small Modular Reactors Program (Natural Resources Canada)",
    null
   ],
   "pol-se-act-on-nuclear-activities-1984-3": [
    "658cd6c36c2cbada",
    "Sweden: Act on Nuclear Activities (SFS 1984:3, lag om kärnteknisk verksamhet)",
    null
   ],
   "pol-se-government-approval-nuclear-facilities-2026-585": [
    "96bcba4541f34cd4",
    "Sweden: Act on Government Approval of Nuclear Facilities (SFS 2026:585)",
    null
   ],
   "pol-se-state-support-new-nuclear-2025-587": [
    "2d35f91047057577",
    "Sweden: Act on State Support for Investment in New Nuclear Power (SFS 2025:587)",
    null
   ],
   "pol-ro-law-111-1996-nuclear-activities": [
    "3f66793e1f56f8d8",
    "Romania: Law 111/1996 on the safe conduct, regulation, licensing and control of nuclear activities",
    null
   ],
   "pol-ro-cncan-nsn-01-npp-siting": [
    "52a0fc7bec55c731",
    "Romania: CNCAN nuclear safety norms on the siting of nuclear power plants (NSN-01)",
    null
   ],
   "pol-br-law-14222-2021-ansn": [
    "a08c7c06eda4340e",
    "Brazil: Law 14.222/2021 creating the National Nuclear Safety Authority (ANSN)",
    null
   ],
   "pol-br-constitution-art-225-6-nuclear-plant-location": [
    "827f57d20632c494",
    "Brazil: Federal Constitution art. 225 § 6, location of nuclear power plants defined by federal law",
    null
   ],
   "pol-cn-nuclear-safety-law-2017": [
    "ebbdab49a2766fae",
    "China: Nuclear Safety Law of the People's Republic of China (2017)",
    null
   ],
   "pol-cn-atomic-energy-law-2025": [
    "bd1a58ed040bb96b",
    "China: Atomic Energy Law of the People's Republic of China (2025)",
    null
   ],
   "pol-cn-mee-order-8-licensing-procedure-2019": [
    "9120093920e525b1",
    "China: Safety licensing procedure for nuclear power plants, research reactors and fuel cycle facilities (MEE Order No. 8, 2019)",
    null
   ],
   "pol-jp-reactor-regulation-act": [
    "ea388a323f8fdcdd",
    "Japan: Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors (Act No. 166 of 1957)",
    null
   ],
   "pol-jp-nra-rule-5-power-reactor-siting-standards": [
    "70bcae9e33af3e77",
    "Japan: NRA rule on standards for the location, structure and equipment of commercial power reactors (NRA Rule No. 5 of 2013)",
    null
   ],
   "pol-jp-long-term-decarbonization-power-auction": [
    "ddc12010de9cf643",
    "Japan: Long-Term Decarbonization Power Source Auction (capacity market, from FY2023)",
    null
   ],
   "pol-ru-federal-law-170-fz-atomic-energy": [
    "fd36a119c218c231",
    "Russia: Federal Law No. 170-FZ 'On the Use of Atomic Energy' (1995)",
    null
   ],
   "pol-ru-np-032-19-npp-site-safety-requirements": [
    "28cf05dfb1e897a0",
    "Russia: Federal norms and rules NP-032-19 'Nuclear power plant site. Safety requirements' (Rostekhnadzor Order No. 287, 2019)",
    null
   ],
   "pol-ru-general-scheme-power-facilities-2042": [
    "2855f7d7bdf7a6dd",
    "Russia: General Scheme for the placement of electric power facilities to 2042 (Government Order No. 4153-r, 2024)",
    null
   ],
   "pol-uz-law-zru-565-peaceful-atomic-energy": [
    "3a465f6d1b159675",
    "Uzbekistan: Law No. ZRU-565 on the Use of Atomic Energy for Peaceful Purposes (2019)",
    null
   ],
   "pol-uz-committee-resolution-39-npp-site-requirements": [
    "bd9a1ebb41d89549",
    "Uzbekistan: Requirements for the site and territory of a nuclear power plant (Committee resolution No. 39, 2026)",
    null
   ],
   "pol-uz-pp-188-atomic-energy-agency-fund": [
    "03ef33dd0367b723",
    "Uzbekistan: Presidential Resolution PP-188 on the Atomic Energy Agency and its development fund (2024)",
    null
   ],
   "pol-rw-law-59-2017-radiation-protection": [
    "23b8a7a747eed4f0",
    "Rwanda: Law N° 59/2017 governing radiation protection",
    null
   ],
   "pol-rw-rura-regulation-013-2024-nuclear-installations": [
    "516966c6f50c0acd",
    "Rwanda: RURA Regulation No 013/2024 governing licensing of nuclear installations",
    null
   ],
   "pol-rw-presidential-order-127-01-raeb": [
    "7309c0008c2de25e",
    "Rwanda: Presidential Order N° 127/01 establishing the Rwanda Atomic Energy Board (2020)",
    null
   ],
   "pol-gb-onr-relevant-good-practice-202609": [
    "0ebd8074bbd42805",
    "ONR policy on using relevant good practice",
    null
   ],
   "pol-us-nrc-prior-doe-dod-authorizations-20261026": [
    "ef0f38d68f38f725",
    "NRC reviews of reactor designs previously authorized by DOE or the Department of War",
    null
   ],
   "pol-pl-prawo-atomowe": [
    "f83709baf85f88c4",
    "Poland: Atomic Law (Ustawa z dnia 29 listopada 2000 r. – Prawo atomowe)",
    null
   ],
   "pol-pl-nuclear-investments-special-act-2011": [
    "53a8c1aabcbba632",
    "Poland: Act on preparing and carrying out investments in nuclear power facilities and accompanying investments (2011 special act)",
    null
   ],
   "pol-pl-ppej-2026": [
    "248aee2e24de5c8f",
    "Poland: Polish Nuclear Power Programme, 2026 update (Council of Ministers Resolution No. 198 of 29 September 2026)",
    null
   ],
   "pol-cz-atomic-act-263-2016": [
    "97494567824a3d81",
    "Czechia: Atomic Act (Act No. 263/2016 Coll., atomový zákon)",
    null
   ],
   "pol-cz-sujb-decree-378-2016-siting": [
    "020ddc00b61f1ee1",
    "Czechia: SÚJB Decree No. 378/2016 Coll. on siting of a nuclear installation",
    null
   ],
   "pol-nl-kernenergiewet": [
    "1c8f1912d321cb40",
    "Netherlands: Nuclear Energy Act (Kernenergiewet)",
    null
   ],
   "pol-nl-bkl-nuclear-plant-locations": [
    "d0cc092a11e6c83b",
    "Netherlands: Environmental Quality Decree (Besluit kwaliteit leefomgeving), nuclear power plant locations",
    null
   ],
   "pol-nl-mooi-nuclear-innovation-theme": [
    "f9e668304057e371",
    "Netherlands: MOOI subsidy module, nuclear energy innovation theme (Missiegedreven Onderzoek, Ontwikkeling en Innovatie)",
    null
   ],
   "pol-no-atomic-energy-act-1972-28": [
    "03b414751f79a7b7",
    "Norway: Act on Atomic Energy Activities (LOV-1972-05-12-28, atomenergiloven)",
    null
   ],
   "pol-no-impact-assessment-regulations-2017-854": [
    "06527eed887544a6",
    "Norway: Regulations on impact assessments (FOR-2017-06-21-854), Annex I item 2 b on nuclear reactors",
    null
   ],
   "pol-fi-nuclear-energy-act-990-1987": [
    "4df9fb6e89b88174",
    "Finland: Nuclear Energy Act (ydinenergialaki 990/1987)",
    null
   ],
   "pol-fi-nuclear-energy-act-775-2026": [
    "181178a87cab9e7e",
    "Finland: Nuclear Energy Act (ydinenergialaki 775/2026)",
    null
   ],
   "pol-eu-nuclear-safety-directive-2009-71": [
    "86bba22d7f384507",
    "EU: Council Directive 2009/71/Euratom on the nuclear safety of nuclear installations, as amended by Directive 2014/87/Euratom",
    null
   ],
   "pol-eu-euratom-treaty": [
    "5a51215fffcf3159",
    "EU: Treaty establishing the European Atomic Energy Community (Euratom Treaty), consolidated version 2016",
    null
   ],
   "pol-eu-net-zero-industry-act-2024-1735": [
    "9a9bce31eda78df2",
    "EU: Net-Zero Industry Act (Regulation (EU) 2024/1735)",
    null
   ],
   "pol-eu-taxonomy-nuclear-delegated-regulation-2022-1214": [
    "3c41468408a73721",
    "EU: Commission Delegated Regulation (EU) 2022/1214 adding nuclear energy activities to the EU taxonomy",
    null
   ],
   "pol-in-shanti-act-2025": [
    "249f6d476d1d5e7a",
    "India: Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Act, 2025 (No. 39 of 2025)",
    null
   ],
   "pol-in-draft-shanti-rules-2026": [
    "32ced4048e9e4dde",
    "India: Draft SHANTI Rules, 2026 (Department of Atomic Energy consultation)",
    null
   ],
   "pol-in-draft-shanti-regulations-2026": [
    "d2c9a68a8d78cae4",
    "India: Draft SHANTI Regulations, 2026 (Atomic Energy Regulatory Board consultation)",
    null
   ],
   "pol-in-nuclear-energy-mission-smr": [
    "70a8c4d94e9891a5",
    "India: Nuclear Energy Mission for small modular reactors (Union Budget 2025-26 announcement)",
    null
   ],
   "pol-kr-nuclear-safety-act": [
    "683ebc179f39da97",
    "South Korea: Nuclear Safety Act (원자력안전법)",
    null
   ],
   "pol-kr-radiological-emergency-planning-zones": [
    "2cb5aa2599749620",
    "South Korea: Act on Physical Protection and Radiological Emergency (원자력시설 등의 방호 및 방사능 방재 대책법), emergency planning zones",
    null
   ],
   "pol-kr-smr-development-promotion-act": [
    "5aa59b8b63df168f",
    "South Korea: Special Act on the Promotion of and Support for Small Modular Reactor Development (소형모듈원자로 개발 촉진 및 지원에 관한 특별법)",
    null
   ],
   "pol-kr-ismr-technology-development-programme": [
    "d5c62ba1cccf2ced",
    "South Korea: Innovative SMR (i-SMR) Technology Development Programme (혁신형 소형모듈원자로 기술개발사업)",
    null
   ],
   "pol-fr-environment-code-inb-regime": [
    "7edcd76be56aa877",
    "France: Basic nuclear installation (INB) regime, Code de l'environnement, livre V, titre IX",
    null
   ],
   "pol-fr-law-2023-491-new-reactors-existing-sites": [
    "1addc1f5f147277d",
    "France: Loi n° 2023-491 du 22 juin 2023 (accélération des procédures nucléaires près des sites existants)",
    null
   ],
   "pol-fr-france-2030-innovative-reactors-call": [
    "0798d894c2f733e2",
    "France: France 2030 call for projects « Réacteurs nucléaires innovants » (first call)",
    null
   ],
   "pol-id-nuclear-energy-act-10-1997": [
    "6dde9c933e0d6b6c",
    "Indonesia: Law No. 10 of 1997 on Nuclear Energy (Undang-Undang Nomor 10 Tahun 1997 tentang Ketenaganukliran)",
    null
   ],
   "pol-id-nuclear-installation-licensing-pp-2-2014": [
    "8d444d875a6e26f7",
    "Indonesia: Government Regulation No. 2 of 2014 on Licensing of Nuclear Installations and Use of Nuclear Material (Peraturan Pemerintah Nomor 2 Tahun 2014)",
    null
   ],
   "pol-id-bapeten-site-evaluation-reg-4-2018": [
    "570a5a51fc4c9cf1",
    "Indonesia: BAPETEN Regulation No. 4 of 2018 on Safety Provisions for Site Evaluation of Nuclear Installations",
    null
   ],
   "pol-id-national-energy-policy-pp-40-2025": [
    "663254ce1c0d05ce",
    "Indonesia: Government Regulation No. 40 of 2025 on National Energy Policy (Peraturan Pemerintah Nomor 40 Tahun 2025 tentang Kebijakan Energi Nasional)",
    null
   ],
   "pol-ar-national-nuclear-activity-law-24804": [
    "f39601bbe0ab0e09",
    "Argentina: Law 24.804, National Nuclear Activity Law (Ley Nacional de la Actividad Nuclear)",
    null
   ],
   "pol-ar-science-technology-guidelines-2025-2027": [
    "5c4a5e89d39d8c7f",
    "Argentina: Strategic Guidelines on Innovation, Science and Technology 2025-2027 (Resolución 282/2025)",
    null
   ],
   "pol-za-national-nuclear-regulator-act-47-1999": [
    "c733507e1adeb524",
    "South Africa: National Nuclear Regulator Act, 1999 (Act No. 47 of 1999)",
    null
   ],
   "pol-za-nuclear-energy-act-46-1999": [
    "f3ce951423acdeee",
    "South Africa: Nuclear Energy Act, 1999 (Act No. 46 of 1999)",
    null
   ],
   "pol-za-site-licensing-regulations-r927": [
    "f75426a7f633a32c",
    "South Africa: Regulations on Licensing of Sites for New Nuclear Installations (GN R. 927 of 11 November 2011)",
    null
   ],
   "pol-ua-snriu-regulation-cmu-363-2014": [
    "a70b48bbc823ed41",
    "Ukraine: Regulation on the State Nuclear Regulatory Inspectorate (Cabinet of Ministers Resolution No. 363 of 20 August 2014, Положення про Державну інспекцію ядерного регулювання України)",
    null
   ],
   "pol-us-nrc-fy2026-fee-rule": [
    "9451dab0a7a27592",
    "NRC final rule: Fee Schedules; Fee Recovery for Fiscal Year 2026 (with Executive Order 14300 fixed fee caps)",
    null
   ],
   "pol-us-nrc-mandatory-hearing-flexibility-2026": [
    "40faf4bd11142a64",
    "NRC final rule: Increased Flexibility in the Mandatory Hearing Process",
    null
   ],
   "pol-us-nrc-modernization-direct-final-2026": [
    "86907d535c9fa378",
    "NRC direct final rule: NRC Modernization: Rulemaking Procedure, Federal Advisory Committee Act Alignment, Access, and Security",
    null
   ],
   "pol-us-nrc-design-certification-duration-2025": [
    "2bfdd54e9c0aebbb",
    "NRC direct final rule: Revising the Duration of Design Certifications",
    null
   ],
   "pol-us-nrc-categorical-exclusions-2026": [
    "83e2fbe46967a2f1",
    "NRC final rule: Categorical Exclusions From Environmental Review",
    null
   ],
   "pol-us-irc-45y-48e-clean-electricity-credits": [
    "154ed0da221442f0",
    "Internal Revenue Code sections 45Y and 48E: clean electricity production and investment credits, as amended by Public Law 119-21",
    null
   ],
   "pol-us-doe-haleu-availability-program": [
    "7953acd1e09b58d7",
    "DOE HALEU Availability Program and HALEU allocation process",
    null
   ],
   "pol-gb-nuclear-installations-act-1965": [
    "48859e35991f4124",
    "United Kingdom: Nuclear Installations Act 1965 (c. 57), nuclear site licensing",
    null
   ],
   "pol-gb-energy-act-2013-part-3-onr": [
    "a107f91092edf8ba",
    "United Kingdom: Energy Act 2013 (c. 32), Part 3, Office for Nuclear Regulation",
    null
   ],
   "pol-gb-en7-nps-nuclear-2025": [
    "4d7602bb9ad96e70",
    "United Kingdom: National Policy Statement for nuclear energy generation (EN-7)",
    null
   ],
   "pol-gb-nuclear-regulatory-review-response-2026": [
    "1c0e64aafb836768",
    "United Kingdom: Building our nuclear nation, government response to the Nuclear Regulatory Review 2025",
    null
   ],
   "pol-gb-gben-smr-programme": [
    "3ebe3707dbd91796",
    "United Kingdom: Great British Energy – Nuclear small modular reactor programme and technology selection",
    null
   ],
   "pol-gb-gben-rolls-royce-smr-award-2026": [
    "7358f2bf9faa6257",
    "United Kingdom: GBE-N selection of, and contract with, Rolls-Royce SMR",
    null
   ],
   "pol-ca-building-canada-act-2025": [
    "17bfcd5313a0709a",
    "Canada: Building Canada Act (S.C. 2025, c. 2, s. 4), national interest projects",
    null
   ],
   "pol-us-nrc-materials-modernization-2026": [
    "43565b377648bd7d",
    "NRC proposal: modernizing materials licensing",
    null
   ],
   "pol-us-marad-marine-smr-rfi-2026": [
    "ade1744fea4946d4",
    "MARAD consultation: a marine SMR concept",
    null
   ],
   "pol-us-nrc-material-compatibility-draft-2026": [
    "9f24e3f102af0197",
    "NRC consultation: draft non-light-water reactor materials guidance",
    null
   ],
   "pol-us-army-doe-advanced-reactor-catex-2026": [
    "940b2534b1e7f0bf",
    "Army adoption of DOE advanced-reactor categorical exclusion",
    null
   ],
   "pol-us-nrc-package-certification-proposal-2026": [
    "249919ce001f2c28",
    "NRC proposal: package certification and microreactor transport",
    null
   ],
   "pol-us-nrc-training-review-draft-2026": [
    "abd63f0a27c20636",
    "NRC consultation: draft training-review guidance",
    null
   ],
   "pol-in-dor-ib124-202506": [
    "7907c4d004b66c30",
    "Indiana tax guidance on the SMR manufacturing expense credit",
    null
   ],
   "pol-us-nrc-contested-adjudications-2026": [
    "ba975e00716dfeb4",
    "NRC final rule: Streamlining Contested Adjudications in Licensing Proceedings",
    null
   ],
   "pol-ee-nuclear-energy-safety-act-2026": [
    "0487995cab19a2df",
    "Estonia: Nuclear Energy and Nuclear Safety Act (Tuumaenergia ja -ohutuse seadus)",
    null
   ]
  },
  "regulatory_actions": {
   "reg-opg-ltc-2025": [
    "265da23de9d85daf",
    "OPG licence to construct BWRX-300",
    null
   ],
   "reg-opg-lto-2026": [
    "c38797db7073ba02",
    "OPG licence to operate application",
    null
   ],
   "reg-hermes1-cp": [
    "7b8e3e4a708359d0",
    "Kairos Hermes 1 construction permit",
    null
   ],
   "reg-hermes2-cp": [
    "abd2658b7f99c1d2",
    "Kairos Hermes 2 construction permit",
    null
   ],
   "reg-natrium-cp": [
    "063073db93aac83f",
    "TerraPower Natrium construction permit",
    null
   ],
   "reg-longmott-cp": [
    "33548f32a897a0f4",
    "Long Mott construction permit",
    null
   ],
   "reg-longmott-ea-fonsi-2026": [
    "79e9d992d4a01c6d",
    "Long Mott environmental assessment, FONSI and review exemptions",
    null
   ],
   "reg-nb-ltps": [
    "bf71ac1afe3b08f2",
    "NB Power licence to prepare site application",
    null
   ],
   "reg-rr-gda": [
    "56cfaa31c84d45f0",
    "Rolls-Royce SMR Generic Design Assessment",
    null
   ],
   "reg-bapeten-kelasa-2025": [
    "5c799c26c0772604",
    "BAPETEN Kelasa site-evaluation approval",
    null
   ],
   "reg-clinch-cp-20260929": [
    "b93e84b1bc20b5d2",
    "Clinch River Unit 1 construction permit",
    null
   ],
   "reg-acu-msrr-cp-2024": [
    "f0dee21327fa8fc9",
    "ACU Molten Salt Research Reactor construction permit",
    null
   ],
   "reg-pioneer-cp-lwa-application-2026": [
    "d2ed63c0b1a5ca6c",
    "Pioneer Units 1 and 2 phased construction permit application (with limited work authorization request)",
    null
   ],
   "reg-pioneer-excavation-walls-exemption-2026": [
    "d338f88cdb2a4a30",
    "NRC exemption for specified Pioneer support-of-excavation walls before LWA",
    null
   ],
   "reg-pioneer-excavation-ea-fonsi-2026": [
    "316c99ebe9c61891",
    "NRC environmental assessment and FONSI for Pioneer excavation-wall exemption",
    null
   ],
   "reg-doe-cx-271002-aalo": [
    "76f840566ac2146b",
    "DOE Idaho categorical exclusion CX-271002 for the Aalo-X critical assembly",
    null
   ],
   "reg-doe-cx-035340-mark0": [
    "fe671af0505efb51",
    "DOE Idaho categorical exclusion CX-035340 for the Antares Mark-0 experiment",
    null
   ],
   "reg-doe-cx-271007-unity": [
    "7b9f3b0b8cef43fa",
    "DOE Idaho categorical exclusion CX-271007 for the Unity zero-power test",
    null
   ],
   "reg-doe-cx-271015-ward": [
    "193ae1a915538b98",
    "DOE categorical exclusion CX-271015 for the Ward250 research reactor",
    null
   ],
   "reg-nrc-uiuc-kronos-cp-2026": [
    "23bf8acffb9b4d72",
    "NRC construction permit application for the University of Illinois KRONOS MMR",
    null
   ],
   "reg-asnr-jimmy-dac-2024": [
    "4cb9c890aac0405c",
    "Jimmy Bazancourt creation-authorization application",
    null
   ],
   "reg-asnr-stellaria-alpha-2025": [
    "c81df76fdc86786e",
    "Stellaria INB Alpha creation-authorization application",
    null
   ],
   "reg-asnr-calogena-options-2024": [
    "60e066a7911e5207",
    "Calogena CAL30 safety-options requests",
    null
   ],
   "reg-asnr-lfr-as-30-options-2025": [
    "73192a4e1bf47091",
    "newcleo LFR-AS-30 safety-options request",
    null
   ],
   "reg-asnr-otrera-one-options-2026": [
    "19ec68450477cd40",
    "OTRERA ONE safety-options request",
    null
   ],
   "reg-nrc-belews-creek-esp-2025": [
    "16c579c31179196f",
    "Belews Creek early site permit application",
    null
   ],
   "reg-dod-pele-rod-2022": [
    "5a62845bb3e69957",
    "Project Pele record of decision (prototype mobile microreactor environmental impact statement)",
    null
   ],
   "reg-doe-marvel-fonsi-2021": [
    "b1ff652c0e9f82ce",
    "DOE finding of no significant impact for MARVEL (DOE/EA-2146)",
    null
   ],
   "reg-nrc-aurora-col-2020-denied": [
    "a1a0430ec8af1722",
    "Oklo Aurora custom combined licence application (2020), denied without prejudice",
    null
   ],
   "reg-haiyang-small-reactor-siting-opinion-2024": [
    "34f1ab8a3023b3ab",
    "NNSA site-selection review opinion No. 2414, Haiyang integrated small reactor demonstration",
    null
   ],
   "reg-doe-aurora-nepa-20260720": [
    "accb569ffebb1b77",
    "DOE Aurora-INL B5.26 environmental categorical exclusion",
    null
   ],
   "reg-doe-pwr5-phase1-nepa-20260930": [
    "70341b5362553bb6",
    "DOE PWR-5 Phase 1 environmental categorical exclusion",
    null
   ],
   "reg-cncan-doicesti-siting-application": [
    "62e4ce4c0bc6dac3",
    "Doicești NuScale siting licence application",
    null
   ],
   "reg-nrc-blue-energy-cp-lwa-part1-2026": [
    "c3e84d0c02c1bd7e",
    "Blue Energy Center–Port of Victoria Nuclear Unit 1 phased construction permit application, Part 1 (with limited work authorization request)",
    null
   ],
   "reg-nrc-us460-sda-2025": [
    "6676cdccf18d8454",
    "NRC standard design approval for the NuScale US460",
    null
   ],
   "reg-nnsa-xuwei-u3-cl-review-2025": [
    "a60bca9668ef6e27",
    "NNSA construction licence 国核安证字第2621号 for Xuwei Phase I Unit 3 (HTGR)",
    null
   ],
   "reg-nnsa-xuwei-htgr-design-criteria-2026": [
    "b351416181214323",
    "NNSA approval of the Xuwei HTGR safety design criteria",
    null
   ],
   "reg-se-gov-approval-malma-2026": [
    "8b20abe7eccd20c7",
    "Swedish Government approval application for a nuclear facility at Målma, Valdemarsvik",
    null
   ],
   "reg-se-gov-approval-norrsundet-2026": [
    "ee7a1f9828a17352",
    "Swedish Government approval application for a nuclear facility at Norrsundet, Gävle",
    null
   ],
   "reg-se-gov-approval-studsvik-2026": [
    "729e2f1bff263286",
    "Swedish Government approval application for a nuclear facility at Studsvik, Nyköping",
    null
   ],
   "reg-se-gov-approval-untra-2026": [
    "8fcc68b2e88c0628",
    "Swedish Government approval application for a nuclear facility at Untra, Tierp",
    null
   ],
   "reg-nnsa-tmsr-lf1-operating-2023": [
    "1796c57dd6db7b42",
    "TMSR-LF1 operating licence 2307",
    null
   ],
   "reg-ansn-ucri-request-2025": [
    "4a0a5da0345b817c",
    "Reported IEN request to construct the UCRI critical unit",
    null
   ],
   "reg-darlington-bwrx-cnsc-consent-to-remove-regulatory-hold-point": [
    "09df78573db02924",
    "CNSC consent to remove Regulatory Hold Point 1 (reactor building foundation)",
    null
   ],
   "reg-darlington-bwrx-renewal-of-darlington-new-nuclear-project-si": [
    "986ed98569583fd7",
    "Renewal of Darlington New Nuclear Project site preparation licence (PRSL 18.00/2031)",
    null
   ],
   "reg-darlington-bwrx-original-darlington-new-nuclear-project-site": [
    "44973ab036e1ee38",
    "Original Darlington New Nuclear Project site preparation licence (PRSL 18.00/2022)",
    null
   ],
   "reg-clinch-river-bwrx-clinch-river-nuclear-site-early-site-permi": [
    "bfadf810093be415",
    "Clinch River Nuclear Site early site permit ESP-006",
    null
   ],
   "reg-ritm-jizzakh-permit-to-use-the-site-for-nuclear-installation": [
    "010987e2f1c5264f",
    "Permit to use the site for nuclear installations (Farish district NPP site)",
    null
   ],
   "reg-ritm-jizzakh-licence-for-construction-of-an-npp-power-unit-w": [
    "7570e9d6e13b7d00",
    "Licence for construction of an NPP power unit with a RITM-200N reactor",
    null
   ],
   "reg-htr10-inet-nnsa-first-fuel-loading-licence-for-htr-10": [
    "c9a7f517f488284d",
    "NNSA first fuel loading licence for HTR-10",
    null
   ],
   "reg-nnsa-htrpm-ol-2119": [
    "55b402738acd7ef7",
    "NNSA operating licence for the Shidaowan HTR-PM demonstration",
    null
   ],
   "reg-nnsa-htr10-ol-1405": [
    "fe71601b32ea8b84",
    "HTR-10 operating licence issued in 2014, valid through June 2024",
    null
   ],
   "reg-nra-httr-installation-change-2020-06-03": [
    "27b562a569f6ce0f",
    "NRA decision to grant the HTTR installation-change permit",
    null
   ],
   "reg-asnr-hexana-options-2026": [
    "cba4febe8acd4435",
    "HEXANA first safety-options request",
    null
   ],
   "reg-kr-smart100-sda-2024": [
    "3e20fd3bb5dfb278",
    "Korean standard design approval for SMART100",
    null
   ],
   "reg-mee-xuwei-phase1-siting-eia-2024-04-17": [
    "738227553d4754ae",
    "MEE siting-stage environmental impact report approval for Xuwei Phase I (including the HTR-PM600S unit)",
    null
   ],
   "reg-nnsa-linglong-construction-licence-2117-2021": [
    "ce904eaaca00a9e4",
    "NNSA construction licence 国核安证字第2117号 for the Hainan Changjiang multi-purpose modular small reactor demonstration project (Linglong One)",
    null
   ],
   "reg-natrium-kemmerer-energy-island-exemption-20250507": [
    "a0d1b460c8102fe5",
    "Kemmerer Unit 1 exemption for energy-island work before a construction permit",
    null
   ],
   "reg-uk-gda-bwrx300-2025": [
    "3024034f172de7ad",
    "BWRX-300 UK Generic Design Assessment (two steps)",
    null
   ],
   "reg-uk-gda-smr300-2026": [
    "06844ab6c12af7c7",
    "Holtec SMR-300 UK Generic Design Assessment (two steps)",
    null
   ],
   "reg-uk-gda-rr-smr-step2-2024": [
    "f29e42fd5bcb6c31",
    "Rolls-Royce SMR UK Generic Design Assessment, Step 2",
    null
   ],
   "reg-uk-gda-natrium-2026": [
    "96d0a8fdb4c90912",
    "Natrium UK Generic Design Assessment",
    null
   ],
   "reg-uk-gda-xe100-2026": [
    "7dabdce2941fd8aa",
    "Xe-100 UK Generic Design Assessment (requested)",
    null
   ],
   "reg-cnsc-vdr-bwrx300-2023": [
    "6b8519033767bec6",
    "CNSC vendor design review, Phases 1 and 2 (BWRX-300)",
    null
   ],
   "reg-cnsc-vdr-xe100-2023": [
    "b447a6c886405ebd",
    "CNSC vendor design review, Phases 1 and 2 (Xe-100)",
    null
   ],
   "reg-cnsc-vdr-arc100-2025": [
    "cbc05aee33894d0f",
    "CNSC vendor design review, Phase 2 (ARC-100)",
    null
   ],
   "reg-cnsc-vdr-imsr-2023": [
    "c1ceec5476020fab",
    "CNSC vendor design review, Phase 2 (IMSR400)",
    null
   ],
   "reg-cnsc-vdr-ssrw-2021": [
    "82419b55dff797be",
    "CNSC vendor design review, Phase 1 (SSR-W)",
    null
   ],
   "reg-cnsc-vdr-smr160-2020": [
    "169807bd49febac0",
    "CNSC vendor design review, Phase 1 (SMR-160)",
    null
   ],
   "reg-cnsc-vdr-evinci-2023": [
    "c4e9b908d78b378b",
    "CNSC vendor design review, Phase 2 (eVinci)",
    null
   ],
   "reg-nrc-us600-dc-2023": [
    "e4e90fed6f7c5f56",
    "NRC design certification of the NuScale US600",
    null
   ],
   "reg-kr-smart-sda-2012": [
    "f05b73b232d5f058",
    "Korean standard design approval for SMART",
    null
   ],
   "reg-nrc-us600-sda-2020": [
    "e6519f04b2fd5d43",
    "NRC standard design approval for the NuScale US600",
    null
   ],
   "reg-cnsc-vdr-mmr-2019": [
    "27589d87c6b95037",
    "CNSC vendor design review, Phase 1 (USNC MMR)",
    null
   ],
   "reg-huakun-one-siting-opinion-2026": [
    "1c67892c9fc8cd5a",
    "NNSA site-selection review opinion No. 2620, Huakun One science and technology demonstration project",
    null
   ],
   "reg-nrc-last-energy-caldwell-cp-lwa-part1-2026": [
    "5ed326fe4d134366",
    "Last Energy Caldwell site phased construction permit application, Part 1 (with limited work authorization request)",
    null
   ]
  },
  "events": {
   "evt-next-doicesti-fid": [
    "b4be0cc0f307012c",
    "Doicești conditional shareholder investment decision",
    null
   ],
   "evt-next-doicesti-conditions": [
    "b7b92c76d9a0cba1",
    "Doicești FID conditions remain unresolved",
    null
   ],
   "evt-next-wylfa-contract": [
    "15fa2bae2f529349",
    "Wylfa programme design contract signed",
    null
   ],
   "evt-next-letart": [
    "b95f6478c8ca1e39",
    "Elementl announces Letart BWRX-300 proposal",
    null
   ],
   "evt-darlington-ltc": [
    "743720eb291643fb",
    "CNSC grants Darlington construction licence",
    null
   ],
   "evt-darlington-lto-app": [
    "b9d6baf740f97749",
    "OPG applies for operating licence",
    null
   ],
   "evt-htrpm-cod": [
    "a4c1e4c5860cdc8c",
    "HTR-PM commercial operation",
    null
   ],
   "evt-cfpp-cancel": [
    "38e09927be7397eb",
    "UAMPS CFPP cancelled",
    null
   ],
   "evt-aurora-pdsa": [
    "0419906a7c148168",
    "Oklo announces DOE approval of the Aurora-INL preliminary safety analysis",
    null
   ],
   "evt-longmott-fonsi": [
    "44357f8e0515feb3",
    "X-energy reports Long Mott environmental finding",
    null
   ],
   "evt-natrium-cp": [
    "273c1022bde04276",
    "Natrium construction permit",
    null
   ],
   "evt-hermes2-groundbreak": [
    "b8e74334c2ed1882",
    "Hermes 2 groundbreaking",
    null
   ],
   "evt-rellis-2025-02-04": [
    "48ff3780f9b3c3a9",
    "Texas A&M offers RELLIS land to four reactor companies",
    null
   ],
   "evt-imsr-rellis-lease": [
    "f11e1da8efe98cf7",
    "Terrestrial Energy RELLIS ground lease",
    null
   ],
   "evt-mark0-criticality": [
    "b5f7bf12e3d534b2",
    "Antares Mark-0 zero-power criticality",
    null
   ],
   "evt-ward250-criticality": [
    "f3a3522894334855",
    "Ward 250 zero-power criticality",
    null
   ],
   "evt-unity-criticality": [
    "55cbce9f3ba3d7cc",
    "Unity criticality demonstration",
    null
   ],
   "evt-aalo-x-criticality": [
    "84be50e882516221",
    "Aalo-X zero-power criticality",
    null
   ],
   "evt-oklo-sodi-option": [
    "aa9b134a105d9cf5",
    "Oklo SODI land option for two Ohio powerhouses",
    null
   ],
   "evt-bapeten-kelasa": [
    "93b48b9faf10e0a9",
    "BAPETEN approves Kelasa site evaluation",
    null
   ],
   "evt-parent-osge-ostroleka": [
    "5f4514d74526e2f5",
    "OSGE Ostrołęka BWRX-300 proposal documented",
    null
   ],
   "evt-parent-osge-dabrowa-gornicza": [
    "416c317bb9ce5519",
    "OSGE Dąbrowa Górnicza BWRX-300 proposal documented",
    null
   ],
   "evt-parent-osge-nowa-huta": [
    "f399ec401605b334",
    "OSGE Kraków / Nowa Huta BWRX-300 proposal documented",
    null
   ],
   "evt-parent-rr-tusimice": [
    "2513810e06f761d1",
    "Rolls-Royce SMR Tušimice candidate location proposal documented",
    null
   ],
   "evt-parent-rr-detmarovice": [
    "2282a4e01b0afb0d",
    "Rolls-Royce SMR Dětmarovice candidate location proposal documented",
    null
   ],
   "evt-parent-sealer-untra": [
    "0f958addb1728630",
    "Blykalla SEALER Untra / Tierp proposal documented",
    null
   ],
   "evt-parent-sealer-norrsundet": [
    "496cbef2b375cb45",
    "Blykalla SEALER Norrsundet / Gävle proposal documented",
    null
   ],
   "evt-parent-belews-creek": [
    "12903bdc7e575eb4",
    "Duke Belews Creek technology-neutral SMR proposal documented",
    null
   ],
   "evt-parent-holtec-oyster-creek": [
    "56c047ff988771d6",
    "Holtec Oyster Creek SMR proposal documented",
    null
   ],
   "evt-parent-holtec-blue-castle": [
    "5bd665f57bd72d56",
    "Holtec Green River / Blue Castle, Utah proposal documented",
    null
   ],
   "evt-parent-last-energy-haskell": [
    "de74735d4f08925d",
    "Last Energy Haskell County PWR-20 campus proposal documented",
    null
   ],
   "evt-parent-last-energy-llynfi": [
    "4c141c0423ca6eb6",
    "Last Energy Llynfi PWR-20 proposal documented",
    null
   ],
   "evt-parent-last-energy-london-gateway": [
    "ef5c385ff56764d5",
    "Last Energy London Gateway PWR-20 proposal documented",
    null
   ],
   "evt-parent-aep-rockport": [
    "71bf2ad1e460a2b5",
    "AEP Rockport BWRX-300 proposal documented",
    null
   ],
   "evt-parent-aep-joshua-falls": [
    "41cd882ba4723bdf",
    "AEP Joshua Falls SMR proposal documented",
    null
   ],
   "evt-parent-ap300-teesside": [
    "00890150c76d1780",
    "Community Nuclear Power North Teesside AP300 proposal documented",
    null
   ],
   "evt-parent-taftoy-smr": [
    "f55628bdec561764",
    "Taftøy Aure / Heim SMR proposal documented",
    null
   ],
   "evt-parent-tarapur-bsmr-200": [
    "aec6652536ea726e",
    "Tarapur BSMR-200 lead proposal documented",
    null
   ],
   "evt-parent-tarapur-smr-55": [
    "cae172f71a912d28",
    "Tarapur SMR-55 lead proposal documented",
    null
   ],
   "evt-parent-barc-vizag-htgcr": [
    "b59f24a676478c65",
    "BARC Visakhapatnam HTGCR hydrogen demonstration proposal documented",
    null
   ],
   "evt-parent-radiant-buckley": [
    "edd898648faa11e8",
    "Radiant Kaleidos Buckley Space Force Base proposal documented",
    null
   ],
   "evt-parent-prodigy-belledune": [
    "fe686f39272199a4",
    "Belledune Prodigy transportable nuclear proposal documented",
    null
   ],
   "evt-clinch-cp-20260929": [
    "f2c4c0804fd63baa",
    "TVA announces Clinch River Unit 1 construction permit",
    null
   ],
   "evt-last-energy-pdsa-statement-2026": [
    "74a43f73991067f1",
    "Last Energy states DOE approved a PWR-5 preliminary safety analysis",
    null
   ],
   "evt-uiuc-kronos-acceptance-2026": [
    "417dd22920830fa6",
    "NRC completes acceptance review of the KRONOS construction permit application",
    null
   ],
   "evt-uiuc-kronos-schedule-2026": [
    "0ba877d008898275",
    "NRC issues the KRONOS review schedule",
    null
   ],
   "evt-uiuc-kronos-draft-se-target": [
    "dc4b344adb76bbfe",
    "NRC target for a draft KRONOS safety evaluation",
    null
   ],
   "evt-uiuc-kronos-final-se-target": [
    "a50bcd823390d721",
    "NRC target for a final KRONOS safety evaluation",
    null
   ],
   "evt-uiuc-kronos-draft-ea-target": [
    "c4f7acfa0d363525",
    "NRC target for a draft KRONOS environmental assessment",
    null
   ],
   "evt-uiuc-kronos-final-ea-target": [
    "42bd0c964988a3bb",
    "NRC target for a final KRONOS environmental assessment",
    null
   ],
   "evt-jimmy-dac-update-20260723": [
    "a2bec8c71626682f",
    "Jimmy submits an updated Bazancourt creation-authorization file",
    null
   ],
   "evt-stellaria-alpha-seized-20251222": [
    "4819155b0e7be915",
    "MSNR asks ASNR to review the Stellaria INB Alpha application",
    null
   ],
   "evt-ssm-malma-opinion-20260603": [
    "f959e6d33e01b0ab",
    "SSM opinion on the ReFirm Målma government-approval application",
    null
   ],
   "evt-belews-esp-docketed-2026": [
    "0cdf3445900e3e1e",
    "Federal Register notice: NRC has accepted and docketed the Belews Creek early site permit application",
    null
   ],
   "evt-belews-esp-eis-scoping-2026": [
    "4bc998073b18cb0c",
    "NRC gives notice it will prepare an environmental impact statement for the Belews Creek early site permit",
    null
   ],
   "evt-belews-esp-hearing-2026": [
    "8d73583a0f17fc30",
    "Uncontested hearing on the Belews Creek early site permit application",
    null
   ],
   "evt-pele-fuel-delivery-2025": [
    "abb54d92b1492493",
    "Advanced nuclear fuel delivered to INL for Project Pele",
    null
   ],
   "evt-radiant-dome-selection-2025": [
    "89902879c438471e",
    "DOE conditionally selects Radiant for the first DOME tests",
    null
   ],
   "evt-radiant-dome-campaign-2026": [
    "f273242314d56747",
    "DOME test bed complete; Radiant begins its test campaign",
    null
   ],
   "evt-blue-energy-cpa-statement-2026": [
    "1990005b78637dae",
    "Blue Energy states it submitted the first part of an NRC construction permit application",
    null
   ],
   "evt-aalo-x-dsa-2026": [
    "9060577552f3f1ac",
    "DOE approves the Aalo-X documented safety analysis",
    null
   ],
   "evt-mark0-dsa-2026": [
    "dad37b78752e342e",
    "DOE approves the Antares Mark-0 documented safety analysis",
    null
   ],
   "evt-unity-dsa-2026": [
    "8648edc8397fcc06",
    "DOE approves the Unity critical experiment documented safety analysis",
    null
   ],
   "evt-ward250-dsa-2026": [
    "131bd866ff584238",
    "DOE approves the Ward 250 documented safety analysis",
    null
   ],
   "evt-ward250-full-power-2026": [
    "1a218df354f4c220",
    "Ward 250 reaches 100 kW thermal with electricity generation (DOE update)",
    null
   ],
   "evt-marvel-criticality-target-2027": [
    "ded90a133f41b549",
    "MARVEL dry initial criticality anticipated",
    null
   ],
   "evt-marvel-full-power-target-2028": [
    "651c1265608dd23e",
    "MARVEL full-power operation and electricity generation anticipated",
    null
   ],
   "evt-aurora-nrc-feedback-20260605": [
    "111e4091baf8f089",
    "NRC preliminary feedback on its observation of Aurora-INL DOE submittals",
    null
   ],
   "evt-blue-energy-cpa-letter-20260915": [
    "430b80c370b12cf8",
    "Blue Energy files Construction Permit Application Part 1 for Port of Victoria Unit 1",
    null
   ],
   "evt-army-pele-fuel-report-20251203": [
    "01dab37f5dac426a",
    "Army reports the first TRISO fuel delivery to INL that week",
    null
   ],
   "evt-marvel-assembly-target-2026": [
    "5066a2a5d8db8cd0",
    "MARVEL assembly expected to finish",
    null
   ],
   "evt-marvel-process-heat-estimate-2029": [
    "45efc1fdaee64f5e",
    "MARVEL process-heat stage likely",
    null
   ],
   "evt-ghana-voygr12-agreement": [
    "d69174ef53d6580b",
    "DOE reports the Ghana VOYGR-12 agreement",
    null
   ],
   "evt-ghana-voygr12-npg-2025": [
    "47bafe3f2b15184a",
    "NPG describes 12 modules and says no contract is signed",
    null
   ],
   "evt-standard-power-ohio-2023": [
    "461af08fad648a18",
    "NuScale announces the Standard Power Ohio facility",
    null
   ],
   "evt-standard-power-pennsylvania-2023": [
    "cd07ed1a97740e92",
    "NuScale announces the Standard Power Pennsylvania facility",
    null
   ],
   "evt-fanco-indiana-park-2025": [
    "7954689a9ac3d1e2",
    "First American Nuclear and Indiana announce an EAGL-1 energy park plan",
    null
   ],
   "evt-wc-haiyang-siting-opinion-2024": [
    "d814cb77ba1b6bfa",
    "Haiyang integrated small reactor: regulator siting review opinion issued",
    null
   ],
   "evt-wc-huakun-eia-accepted-2025": [
    "4d538bb543c56994",
    "Huakun One: siting-stage environmental assessment accepted",
    null
   ],
   "evt-wc-sinap-smtmsr-eia-2026": [
    "7ae7aaaeaa93aea5",
    "SINAP small modular thorium molten-salt research reactor: siting-stage assessment resubmitted",
    null
   ],
   "evt-wc-shenyang-nhr200-approval-2001": [
    "a03212785f602fd7",
    "Shenyang nuclear heating project: state approval of the project proposal",
    null
   ],
   "evt-wc-belledune-banr-selected-2026": [
    "e072b201023aeabb",
    "Belledune transportable plant: BWXT BANR microreactor selected",
    null
   ],
   "evt-wc-atucha-tender-authorised-2026": [
    "d3422e4a10b6e03a",
    "Reported: Atucha shareholders authorise a public tender for a privately financed reactor",
    null
   ],
   "evt-wc-studsvik-partners-2026": [
    "054ace27460cba77",
    "Studsvik selects GE Vernova Hitachi and Samsung C&T for a four-unit BWRX-300 project",
    null
   ],
   "evt-wc-doicesti-gms-2026": [
    "f9ceb6eb00884ab7",
    "Doicești: shareholders reject a strategy reassessment and note unmet investment-decision conditions",
    null
   ],
   "evt-wc-pioneer-psar-2026": [
    "4a7f8d354842536c",
    "Pioneer 1 and 2: preliminary safety analysis report submitted (construction permit application part 2)",
    null
   ],
   "evt-pioneer-excavation-walls-exemption-2026": [
    "9d9aa5ff35c4b3ea",
    "NRC issued narrow Pioneer excavation-wall exemption",
    null
   ],
   "evt-wc-veron-debate-report-2026": [
    "7743718b48ae6af9",
    "Véron: CNDP notice updated; debate reports available",
    null
   ],
   "evt-wc-myanmar-implementation-2026": [
    "f08e3763b2b6b528",
    "Myanmar: Russia says implementation of the agreements is starting",
    null
   ],
   "evt-wc-tarapur-aec-site-2026": [
    "ad64bb6d2ad8909d",
    "Tarapur: DAE tells Parliament the Atomic Energy Commission approved the site for the BSMR-200 and SMR-55 lead units",
    null
   ],
   "evt-wc-vizag-siting-consent-2026": [
    "70287f504c2f5ecc",
    "BARC Visakhapatnam hydrogen reactor: siting consent and environmental terms of reference reported",
    null
   ],
   "evt-wc-daegu-bid-lapsed-2026": [
    "0e39e231e2d1e283",
    "Daegu Gunwi: first-unit bid lapses after KHNP's coastal-site requirement",
    null
   ],
   "evt-wc-yantai-nhr200-approval-2003": [
    "4cd7dad2ba0137b8",
    "Yantai nuclear seawater desalination project: state approval of the project proposal",
    null
   ],
   "evt-aurora-nepa-20260720": [
    "27252c80d3c691e8",
    "DOE approves Aurora-INL environmental categorical exclusion",
    null
   ],
   "evt-pwr5-nepa-20260930": [
    "dd2b1405a21cd3b4",
    "DOE approves PWR-5 Phase 1 environmental categorical exclusion",
    null
   ],
   "evt-pwr5-dsa-announcement-20261007": [
    "53866a7c7592ab86",
    "Last Energy announces DOE approval of PWR-5 final safety analysis",
    null
   ],
   "evt-marvel-pdsa-approval-20260311": [
    "c91a06f7e904246a",
    "INL reports DOE approval of MARVEL's preliminary documented safety analysis",
    null
   ],
   "evt-marvel-fdsa-approval-20261006": [
    "ac92450d9186a739",
    "INL reports DOE approval of MARVEL's final documented safety analysis",
    null
   ],
   "evt-radiant-kaleidos-dark-statement-20260209": [
    "fb9606e09b17f3c8",
    "Radiant announces DOE approval of the Kaleidos authorization request (DARK)",
    null
   ],
   "evt-egino-wind-down-statement-20251203": [
    "d46d0ed1cecbd325",
    "Welsh Government announces intention to dissolve Cwmni Egino",
    null
   ],
   "evt-darlington-physical-start-20260422": [
    "ef545ec006d87a2c",
    "IAEA PRIS records construction start for Darlington SMR1",
    null
   ],
   "evt-pioneer-draft-eis-target-20261031": [
    "9b58b7d6f4730bd3",
    "NRC target for Pioneer draft environmental impact statement",
    null
   ],
   "evt-pioneer-advanced-ser-target-20270131": [
    "aa5cff249798b0c9",
    "NRC target for Pioneer advanced safety evaluation report",
    null
   ],
   "evt-pioneer-final-ser-target-20270331": [
    "9848fae8715b7b47",
    "NRC target for Pioneer final safety evaluation report",
    null
   ],
   "evt-pioneer-final-eis-target-20270331": [
    "0c5fdc873517c135",
    "NRC target for Pioneer final environmental impact statement",
    null
   ],
   "evt-se-videberg-state-aid-application-2025": [
    "e162705637e0bdf0",
    "Swedish Government announces receipt of Videberg Kraft's state-support application",
    null
   ],
   "evt-se-videberg-state-stake-2026": [
    "24b8a1e2e781ad8c",
    "Swedish Government decides to take a 60% stake in Videberg Kraft",
    null
   ],
   "evt-longmott-final-se-target": [
    "8a0342126a3ef5db",
    "NRC target for the Long Mott final safety evaluation",
    null
   ],
   "evt-longmott-acrs-report-20261016": [
    "e08a12c988ca500c",
    "NRC's reactor safeguards committee reports on Long Mott; its review supports issuing the construction permit",
    null
   ],
   "evt-longmott-final-se-announced-20261030": [
    "d77181d66851ef9d",
    "X-energy announces that the NRC has completed its final safety evaluation for Long Mott",
    null
   ],
   "evt-letart-unit1-construction-target": [
    "a8115304b00724fd",
    "Elementl target for starting construction of the first Letart unit",
    null
   ],
   "evt-longmott-cli-26-10": [
    "18957f4c8c040890",
    "NRC Commission dismisses the applicant's intervention appeal as moot (CLI-26-10)",
    null
   ],
   "evt-unity-dome-selection-20260930": [
    "613078c220a72267",
    "INL announces Unity selection for a conditional DOME test",
    null
   ],
   "evt-unity-dome-target-2027": [
    "caa8ce61603daa6d",
    "Unity full-power DOME test targeted",
    null
   ],
   "evt-radiant-dome-completion-report-20260930": [
    "ba74e4cdae0f03b0",
    "INL reports Radiant completed the first DOME test",
    null
   ],
   "evt-isu-art-site-20260916": [
    "60044c83bed3ee13",
    "ISU identifies its Business and Research Park as the ART site",
    null
   ],
   "evt-deep-fission-parsons-target-2027": [
    "b6ca736df7aa0199",
    "Deep Fission Parsons DOE pilot targeted",
    null
   ],
   "evt-starcore-first-power-target-2030": [
    "7549aaf82fcca8c8",
    "StarCore targets first commercial power",
    null
   ],
   "evt-yakutia-environment-announcement-2024": [
    "03bb559aa986e37f",
    "Yakutia: environmental-expert conclusion on Unit 1 licence materials reported",
    null
   ],
   "evt-alfred-roadmap-2031": [
    "0c044cd81eb1c032",
    "ALFRED: RATEN roadmap target for siting permit",
    null
   ],
   "evt-alfred-roadmap-2032": [
    "0ce71e871064e770",
    "ALFRED: RATEN roadmap target for construction permit",
    null
   ],
   "evt-alfred-roadmap-2036": [
    "aade25a315c471ec",
    "ALFRED: RATEN roadmap target for commissioning permit",
    null
   ],
   "evt-alfred-roadmap-2037": [
    "7e6c2f6dec77d000",
    "ALFRED: RATEN roadmap target for operation",
    null
   ],
   "evt-yakutia-hearings-reported-2026": [
    "860cbfbf8c1e812e",
    "Yakutia: Units 1 and 2 siting-material hearings reported",
    null
   ],
   "evt-yakutia-operation-target-2031": [
    "490910a534d80384",
    "Yakutia: reported operation target",
    null
   ],
   "evt-xuwei-preconstruction-inspection-20261009": [
    "6c38cea5fbcc1dc5",
    "Xuwei Unit 3: NNSA inspection finds preparations meet construction-licence conditions",
    null
   ],
   "evt-balder-earliest-tests-2028": [
    "442acf58c825ba0c",
    "BALDER: first tests no earlier than 2028",
    null
   ],
   "evt-alvin-criticality-target-2029-stated-20250312": [
    "68c929410f3ad78e",
    "Alvin: company target for first criticality (March 2025 statement)",
    null
   ],
   "evt-alvin-criticality-target-2030": [
    "78a40edd7708cc51",
    "Alvin: company target for first criticality",
    null
   ],
   "evt-htr-pm-shidaowan-construction-start-2012-12-09": [
    "920b242bab61c620",
    "HTR-PM construction start (IAEA PRIS)",
    null
   ],
   "evt-htr-pm-shidaowan-first-criticality-2021-09-12": [
    "0a7985ec5a52c6a3",
    "HTR-PM first criticality (IAEA PRIS unit date)",
    null
   ],
   "evt-htr-pm-shidaowan-grid-connection-2021-12-14": [
    "7cece07f5fd56db9",
    "HTR-PM grid connection",
    null
   ],
   "evt-lomonosov-construction-start-2007-04-15": [
    "30b5ce74ee7484e5",
    "Akademik Lomonosov construction start (both units, IAEA PRIS)",
    null
   ],
   "evt-lomonosov-first-criticality-2018-11-02": [
    "9653899e38305235",
    "Akademik Lomonosov Unit 1 first criticality",
    null
   ],
   "evt-lomonosov-first-criticality-2018-11-08": [
    "de660147d89ea354",
    "Akademik Lomonosov Unit 2 first criticality",
    null
   ],
   "evt-lomonosov-grid-connection-2019-12-19": [
    "2da095ebcc78ef11",
    "Akademik Lomonosov grid connection (both units)",
    null
   ],
   "evt-lomonosov-commercial-operation-2020-05-22": [
    "d0503dc58638a04e",
    "Akademik Lomonosov commercial operation (both units)",
    null
   ],
   "evt-linglong-one-construction-start-2021-07-13": [
    "285bb8da18211979",
    "Linglong-1 construction start (IAEA PRIS)",
    null
   ],
   "evt-natrium-kemmerer-regulatory-step-2024-05-21": [
    "6cbd2eb94a3960ea",
    "NRC dockets Kemmerer Unit 1 construction permit application",
    null
   ],
   "evt-natrium-kemmerer-other-2026-03-04": [
    "b51af2ab79c02686",
    "NRC mandatory hearing on Kemmerer Unit 1 construction permit",
    null
   ],
   "evt-hermes-1-regulatory-step-2021-11-29": [
    "d365f4e18869eac6",
    "NRC dockets Hermes construction permit application",
    null
   ],
   "evt-hermes-1-groundbreaking-2024-07": [
    "7c070a8350cd9cab",
    "Kairos breaks ground at the Hermes site",
    null
   ],
   "evt-hermes-1-construction-start-2025-05-01": [
    "31d044b552ef2209",
    "Hermes nuclear safety-related construction begins",
    null
   ],
   "evt-hermes-1-first-concrete-2025-05": [
    "c2f80bbf1b103024",
    "First nuclear safety-related concrete at Hermes",
    null
   ],
   "evt-hermes-2-regulatory-step-2023-09-11": [
    "760542d874efcc09",
    "NRC dockets Hermes 2 construction permit application",
    null
   ],
   "evt-long-mott-regulatory-step-2025-05-12": [
    "b3187078893b395c",
    "NRC dockets Long Mott construction permit application",
    null
   ],
   "evt-clinch-river-bwrx-regulatory-step-2025-05-20": [
    "bdf4af3901ce7af4",
    "TVA submits construction permit application Part Two (PSAR)",
    null
   ],
   "evt-clinch-river-bwrx-regulatory-step-2025-07-09": [
    "c067e543d56088f4",
    "NRC completes PSAR acceptance review (application docketed)",
    null
   ],
   "evt-clinch-river-bwrx-other-2026-08-13": [
    "afa36563c282f478",
    "NRC mandatory hearing on Clinch River construction permit",
    null
   ],
   "evt-aurora-inl-construction-start-2025": [
    "4c1dcaf1a8281618",
    "Oklo-reported Aurora-INL construction start",
    null
   ],
   "evt-aurora-inl-commercial-operation-2028": [
    "887ee38798719c29",
    "Aurora-INL commercial deployment target",
    null
   ],
   "evt-brest-od-300-regulatory-step-2021-02-10": [
    "62263bc39338246b",
    "Rostekhnadzor construction licence for BREST-OD-300 issued to Siberian Chemical Combine",
    null
   ],
   "evt-brest-od-300-construction-start-2021-06-08": [
    "9b34d450c4f49dd1",
    "BREST-OD-300 construction start (IAEA PRIS)",
    null
   ],
   "evt-brest-od-300-other-2026-09-14": [
    "f74181d291f8a14d",
    "First stage of concreting the BREST-OD-300 reactor-vessel inner cavity completed (TVEL release)",
    null
   ],
   "evt-brest-od-300-other-2027": [
    "ecbb0e0c28d66f6c",
    "Concreting of the BREST-OD-300 reactor vessel to finish (company target)",
    null
   ],
   "evt-ritm-jizzakh-other-2026-03-24": [
    "c13b29969a4e26e6",
    "Concrete works begin on foundation preparation for the small (RITM-200N) unit, same day as supplementary agreement",
    null
   ],
   "evt-ritm-jizzakh-other-2026-06": [
    "a1d92728a0871517",
    "First concrete poured for the foundation of the first RITM-200N unit (Uzatom)",
    null
   ],
   "evt-ritm-jizzakh-first-criticality-2029": [
    "85f31c3742c90245",
    "First criticality of first RITM-200N unit (expected late 2029)",
    null
   ],
   "evt-holtec-palisades-regulatory-step-2026-02-13": [
    "3b335122ad32d7b4",
    "NRC finds Part 1 of the Pioneer phased CP application (with LWA request) acceptable for docketing",
    null
   ],
   "evt-holtec-palisades-other-2026-08-31": [
    "61d1053eee24cb5b",
    "NRC draft safety evaluation report (with information gaps) completed",
    null
   ],
   "evt-holtec-palisades-other-2026-12-31": [
    "332fdaa447d9bed4",
    "Applicant-requested date for LWA and 10 CFR 50.10(d) exemption issuance",
    null
   ],
   "evt-holtec-palisades-construction-start-2028-4": [
    "5a4371f5620e1a67",
    "Start of full-scope nuclear construction (applicant expectation)",
    null
   ],
   "evt-holtec-palisades-other-2031": [
    "9e45a3a2aba476f1",
    "Construction of both Pioneer units completed (applicant expectation)",
    null
   ],
   "evt-pele-inl-other-2025-11-05": [
    "73e16bc12aa7d34b",
    "Pele TRISO core (40,000 fuel compacts) delivered to INL TREAT facility (day per INL)",
    null
   ],
   "evt-pele-inl-other-2025-07": [
    "2d20cc0f98744878",
    "BWXT core assembly production began",
    null
   ],
   "evt-pele-inl-other-2026-06": [
    "4005228974986602",
    "Pele core stacking complete (BWXT)",
    null
   ],
   "evt-pele-inl-other-2027": [
    "de8bd36f982404be",
    "Formal Pele system testing (BWXT plan, as early as)",
    null
   ],
   "evt-pele-inl-other-2028": [
    "e7d95d3ddc43b822",
    "Pele first electricity at INL (BWXT plan, as soon as)",
    null
   ],
   "evt-yakutia-ritm-regulatory-step-2023-04-21": [
    "13fdd6ffe8a87a2c",
    "Rostekhnadzor issues Rosenergoatom a siting licence for the Yakutia land-based SMR (Ust-Yansky ulus) (reported)",
    null
   ],
   "evt-baimsky-floating-other-2026-05": [
    "ea6ea01048198f2d",
    "First RITM-200S reactor for the first PEB-106 floating unit manufactured",
    null
   ],
   "evt-baimsky-floating-other-2026-09-24": [
    "9cbb9fac62a8748d",
    "Second RITM-200S completed at ZiO-Podolsk, completing the reactor set for the first PEB-106",
    null
   ],
   "evt-baimsky-first-unit-target-2027-stated-20220831": [
    "7dc56bdc96333002",
    "First Baimsky floating unit: reported power-service target (August 2022)",
    null
   ],
   "evt-baimsky-floating-commercial-operation-2028": [
    "f0812a27b4c5ba60",
    "First Baimsky floating unit: reported power-service target",
    null
   ],
   "evt-baimsky-floating-commercial-operation-2031": [
    "06abeee1a43f3471",
    "Fourth Baimsky floating power unit commissioned (target)",
    null
   ],
   "evt-aalo-x-inl-other-2026-03-03": [
    "8ca5df75ab936544",
    "DOE approves the Aalo-X preliminary documented safety analysis",
    null
   ],
   "evt-aalo-x-inl-other-2027": [
    "933d5be98b170c68",
    "Aalo-X full-power test (30 MWth, ~10 MWe) planned",
    null
   ],
   "evt-antares-mark0-inl-other-2026-01": [
    "bd16a9707c72a029",
    "DOE approves the Antares Mark-0 preliminary documented safety analysis",
    null
   ],
   "evt-unity-inl-other-2026-05-22": [
    "feb03b7951f8bd43",
    "DOE approves the Unity critical experiment preliminary documented safety analysis",
    null
   ],
   "evt-unity-inl-other-2026": [
    "55694c8c01df1889",
    "Unity reactor-physics testing incl. passive shutdown and decay-heat tests (planned)",
    null
   ],
   "evt-ward-250-other-2025-11-17": [
    "71c5ea15474e334b",
    "Project Nova: Valar zero-power test core operated by Los Alamos at NCERC (Nevada)",
    null
   ],
   "evt-ward-250-other-2026-02-15": [
    "67fb5e7a929f2d17",
    "Operation Windlord: Ward 250 modules airlifted by C-17 to Hill AFB, then trucked to Emery County",
    null
   ],
   "evt-ward-250-other-2026-02": [
    "1e1092e3e1a33f12",
    "DOE approves the Ward 250 preliminary documented safety analysis",
    null
   ],
   "evt-ward-250-other-2026-06-26": [
    "d01e1c911f5c136a",
    "Ward 250 passive-safety demonstration: shutdown with all active cooling off and simulated total loss of power",
    null
   ],
   "evt-ward-250-other-2026-07-01": [
    "fe707f2ef1f6c25d",
    "Ward 250 first electricity",
    null
   ],
   "evt-last-energy-rellis-construction-start-2026": [
    "f17a57bb21693125",
    "Last Energy states it began PWR-5 construction at RELLIS",
    null
   ],
   "evt-last-energy-rellis-other-2025-08": [
    "29f09fa9a609f554",
    "Last Energy selected for DOE's Reactor Pilot Program",
    null
   ],
   "evt-sealer-untra-other-2026-08-28": [
    "9b3d449befa7fe84",
    "Government assigns Uppsala county administrative board to draft a facility plan for Untra",
    null
   ],
   "evt-sealer-untra-other-2027-04-30": [
    "ec60383f7cff9063",
    "Untra facility plan proposal due to the Government",
    null
   ],
   "evt-sealer-untra-other-2026-08-31": [
    "c548d50c384e4a07",
    "Untra Nuclear Power AB applies for Swedish state support",
    null
   ],
   "evt-sealer-norrsundet-other-2026-05-28": [
    "d0b7108688d67555",
    "Government assigns Gävleborg county administrative board to draft a facility plan for Norrsundet",
    null
   ],
   "evt-sealer-norrsundet-other-2026-12-31": [
    "868004e96d661359",
    "Norrsundet facility plan proposal due to the Government",
    null
   ],
   "evt-sealer-norrsundet-other-2026-06-05": [
    "ce916d8e925d14d7",
    "Government receives Blykalla's state-support application for Norrsundet",
    null
   ],
   "evt-belews-creek-other-2026-07": [
    "a8d1d9f26645b8ca",
    "NRC draft safety evaluation sections completed for the Belews Creek ESP",
    null
   ],
   "evt-belews-creek-other-2026-09-29": [
    "7b1b950becc4acbf",
    "NRC fixed-fee-cap letter and updated review schedule for the Belews Creek ESP",
    null
   ],
   "evt-belews-creek-other-2026-10-01": [
    "cab497827cce4bf9",
    "Duke submits Revision 2 of the Belews Creek ESP application",
    null
   ],
   "evt-belews-creek-afser-target-20260208": [
    "730ec8b4abd52c79",
    "NRC target: advanced final safety evaluation report without open items for the Belews Creek ESP (February 2026 schedule)",
    null
   ],
   "evt-belews-creek-other-2026-12": [
    "95213ce2e6c28b45",
    "NRC target: advanced final safety evaluation report without open items for the Belews Creek ESP",
    null
   ],
   "evt-belews-creek-draft-eis-target-20260208": [
    "efc2a3efa99196fe",
    "NRC target: draft environmental impact statement for the Belews Creek ESP (February 2026 schedule)",
    null
   ],
   "evt-belews-creek-draft-eis-2026-12": [
    "84a6deb1a8310f37",
    "NRC target: draft environmental impact statement for the Belews Creek ESP",
    null
   ],
   "evt-belews-creek-final-se-target-20260208": [
    "47e03faa51da3d1b",
    "NRC target: final safety evaluation for the Belews Creek ESP (February 2026 schedule)",
    null
   ],
   "evt-belews-creek-other-2027-02": [
    "d28299e8a8dd6c29",
    "NRC target: final safety evaluation for the Belews Creek ESP",
    null
   ],
   "evt-belews-creek-final-eis-target-20260208": [
    "479b64055fa466f7",
    "NRC target: final environmental impact statement for the Belews Creek ESP (February 2026 schedule)",
    null
   ],
   "evt-belews-creek-other-2027-03": [
    "c7df0fcd648648d0",
    "NRC target: final environmental impact statement for the Belews Creek ESP",
    null
   ],
   "evt-belews-creek-commercial-operation-2036": [
    "a178eb59d11ca5ef",
    "Duke conditional plan: first SMR on line at Belews Creek in 2036",
    null
   ],
   "evt-radiant-kaleidos-inl-other-2026-07-01": [
    "c60606bbc2db1a90",
    "Radiant receives first TRISO fuel tranche at INL's DOME facility",
    null
   ],
   "evt-radiant-kaleidos-inl-other-2026-08": [
    "57e27e2608fc4ee5",
    "Kaleidos reactor ships from El Segundo to INL",
    null
   ],
   "evt-radiant-kaleidos-inl-other-2026-3": [
    "c0abf2c6482b73df",
    "Radiant target: 150-hour continuous full-power run at DOME",
    null
   ],
   "evt-natura-msr-1-acu-regulatory-step-2022-08-12": [
    "406ba58118b5cd29",
    "ACU submits construction permit application for the Molten Salt Research Reactor",
    null
   ],
   "evt-natura-msr-1-acu-regulatory-step-2022-11-28": [
    "817cf5fc61a7b321",
    "Federal Register notice: NRC accepts and dockets the ACU construction permit application",
    null
   ],
   "evt-natura-msr-1-acu-other-2024-03-14": [
    "3d0cd8fc15c9483f",
    "NRC issues environmental assessment and FONSI for the ACU construction permit",
    null
   ],
   "evt-natura-msr-1-acu-other-2025": [
    "563b9b636ef54455",
    "Natura (MSR-1) selected for DOE's Reactor Pilot Program",
    null
   ],
   "evt-natura-msr-1-acu-announcement-2026-07-21": [
    "e2cae54e89dfa721",
    "Natura announces DOE approval of the Nuclear Safety Design Agreement for MSR-1",
    null
   ],
   "evt-natura-msr-1-acu-other-2026-09-18": [
    "835a81a9f72f107c",
    "Natura receives FLiBe coolant salt for MSR-1",
    null
   ],
   "evt-uiuc-kronos-other-2026-06-23": [
    "7ff92f0ef91e12ce",
    "NRC formal review activities begin for the KRONOS construction permit application",
    null
   ],
   "evt-uiuc-kronos-construction-start-2027": [
    "9eacd6d8361c13cb",
    "NANO expectation: initial construction activities at U. of I. in the second half of 2027",
    null
   ],
   "evt-uiuc-kronos-other-2029": [
    "d9af9492e27e2e0d",
    "U. of I. expectation: system on-line in 2029–2030",
    null
   ],
   "evt-blue-energy-victoria-commercial-operation-2032": [
    "724828c7a4cdda57",
    "Blue Energy target: five BWRX-300 units on line in 2032",
    null
   ],
   "evt-blue-energy-victoria-regulatory-step-2027": [
    "f7a5ee1efaa75b5a",
    "Blue Energy target: submit the remaining construction permit application (Part 2) in 2027",
    null
   ],
   "evt-knxt-valdemarsvik-other-2025-02-18": [
    "8d91204a57a052c1",
    "Kärnfull Next secures permanent land rights for an SMR park at Målma",
    null
   ],
   "evt-knxt-valdemarsvik-other-2026-05-08": [
    "7979d97efdfba054",
    "Government assigns Östergötland county administrative board to draft a facility plan for Målma",
    null
   ],
   "evt-knxt-valdemarsvik-other-2026-12-31": [
    "61b5475ed232e35d",
    "Målma facility plan proposal due to the Government",
    null
   ],
   "evt-knxt-valdemarsvik-other-2026-05-11": [
    "d77c36db56c9abf8",
    "Studsvik completes its acquisition of Kärnfull Next",
    null
   ],
   "evt-knxt-valdemarsvik-other-2026-06-12": [
    "975d4dd0b9520c40",
    "Government receives Studsvik's state-support application covering Valdemarsvik and Nyköping",
    null
   ],
   "evt-knxt-valdemarsvik-other-2026-09-03": [
    "03e0d37293b24e12",
    "Studsvik selects GE Vernova Hitachi and Samsung C&T for an initial four-unit BWRX-300 project",
    null
   ],
   "evt-stellaria-alvin-cadarache-other-2026-04-23": [
    "362957f2406276a5",
    "Stellaria and CEA sign letter of intent on INB Alpha feasibility at Cadarache",
    null
   ],
   "evt-stellaria-alvin-cadarache-other-2032": [
    "1a52bafe7f0917ab",
    "INB Alpha: company target to convert the facility to MegAlvin",
    null
   ],
   "evt-dual-fluid-rwanda-other-2023-09": [
    "5c578f41d63b712d",
    "RAEB and Dual Fluid sign the CDE cooperation agreement",
    null
   ],
   "evt-dual-fluid-rwanda-other-2024-03-25": [
    "9e0199bc85c16171",
    "IAEA expert mission on CDE safety analysis and design safety features",
    null
   ],
   "evt-dual-fluid-rwanda-other-2024-04": [
    "301e82afcdf920b8",
    "Preliminary site survey report finds the site suitable",
    null
   ],
   "evt-dual-fluid-rwanda-other-2025-02": [
    "823e491a89049437",
    "Initial Safety Assessment Report (ISAR) review begins",
    null
   ],
   "evt-dual-fluid-rwanda-construction-start-2026": [
    "6a0f0f44e36a2ef4",
    "CDE construction start (company target stated in February 2026, not reconfirmed by the May edition)",
    null
   ],
   "evt-dual-fluid-rwanda-other-2028": [
    "92983ba05e404420",
    "CDE testing phase (company target stated in February 2026, not reconfirmed by the May edition)",
    null
   ],
   "evt-xuwei-htgr-unit3-first-concrete-2026": [
    "1c41f2d861695460",
    "Xuwei Unit 3 (HTGR) first concrete expected",
    null
   ],
   "evt-xuwei-htgr-unit3-commercial-operation-2031": [
    "623e5e5561522669",
    "Xuwei Phase I (all three units) full completion expected",
    null
   ],
   "evt-tmsr-lf1-wuwei-construction-start-2018-09": [
    "dcd921ba4e944ab5",
    "TMSR-LF1 construction begins",
    null
   ],
   "evt-tmsr-lf1-wuwei-other-2022-08": [
    "e1eafa2474d7b1a7",
    "Ministry of Ecology and Environment approves TMSR-LF1 commissioning plan",
    null
   ],
   "evt-tmsr-lf1-wuwei-first-criticality-2023-10-11": [
    "c45319f657653230",
    "TMSR-LF1 first criticality",
    null
   ],
   "evt-tmsr-lf1-wuwei-other-2024-10": [
    "ea017bd7a40cc636",
    "First thorium addition to TMSR-LF1",
    null
   ],
   "evt-tmsr-lf1-wuwei-other-2025-11-01": [
    "ab8824a7a035c2f0",
    "SINAP announces first thorium-to-uranium fuel conversion",
    null
   ],
   "evt-httr-oarai-first-criticality-1998-11": [
    "6841d1f27fc85146",
    "HTTR first criticality",
    null
   ],
   "evt-httr-oarai-other-2001": [
    "da3bec706bce901a",
    "HTTR reaches full-power operation",
    null
   ],
   "evt-httr-oarai-other-2010-03": [
    "219e060111409fdc",
    "HTTR 50-day continuous operation at 950°C",
    null
   ],
   "evt-httr-oarai-other-2021-07": [
    "56c8555b6f4d8423",
    "HTTR resumes operation after new-regulatory-standard review",
    null
   ],
   "evt-httr-oarai-regulatory-step-2025-03-27": [
    "906023c1d32691cb",
    "JAEA applies to the NRA to connect a hydrogen production plant to HTTR",
    null
   ],
   "evt-httr-oarai-other-2025-09-26": [
    "e08fed24d1a21cab",
    "JAEA files an amendment to the HTTR hydrogen-coupling application",
    null
   ],
   "evt-httr-oarai-other-2030": [
    "719856b86627da4b",
    "HTTR hydrogen production (JAEA target)",
    null
   ],
   "evt-htr10-inet-construction-start-1995-06": [
    "2b2698c66fb2479b",
    "HTR-10 construction begins",
    null
   ],
   "evt-htr10-inet-other-2000-04": [
    "148a1dbc92a1d82b",
    "HTR-10 system commissioning begins",
    null
   ],
   "evt-htr10-inet-fuel-load-2000-11-20": [
    "ed67b448a0ecea24",
    "HTR-10 first fuel loading begins",
    null
   ],
   "evt-htr10-inet-first-criticality-2000-12-01": [
    "868f6af0f8adfb89",
    "HTR-10 initial criticality",
    null
   ],
   "evt-htr10-inet-other-2003-01-26": [
    "fef1858ad3c5aae7",
    "HTR-10 reaches full power (10 MW thermal)",
    null
   ],
   "evt-daqing-nhr200-other-1991": [
    "4fc3558b8eeb1af3",
    "Decision to build an NHR-200 demonstration heating plant at Daqing",
    null
   ],
   "evt-daqing-nhr200-other-1993": [
    "903169425e8e3411",
    "Daqing siting report, EIA and feasibility study approved",
    null
   ],
   "evt-daqing-nhr200-construction-start-1997": [
    "8473a7dc5a9e5e0f",
    "Daqing NHR-200 construction start (historical target, not met)",
    null
   ],
   "evt-ucri-ien-other-2025-03": [
    "5528513cbcfa46be",
    "Finep approves funding for the Brazilian microreactor project",
    null
   ],
   "evt-ucri-ien-other-2025-10-06": [
    "b25f75a78d92a32f",
    "ANSN pre-licensing harmonisation meeting at AMAZUL",
    null
   ],
   "evt-ucri-ien-other-2025-12-09": [
    "e797372498d42c98",
    "CNEN ceremony marks formal start of UCRI site licensing",
    null
   ],
   "evt-deep-fission-parsons-regulatory-step-2026-08-06": [
    "cad8dee637f6b97b",
    "Deep Fission announces DOE approval of the Gravity pilot NSDA",
    null
   ],
   "evt-deep-fission-parsons-groundbreaking-2025-12": [
    "c30ede3945ba3e22",
    "Groundbreaking for the Gravity pilot at Great Plains Industrial Park, Parsons",
    null
   ],
   "evt-rr-temelin-regulatory-step-2026-10": [
    "c2fff3d9e5e69b9d",
    "ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment",
    null
   ],
   "evt-rr-temelin-other-2027": [
    "f3dfa3e74a569c47",
    "Temelín SMR EIA process expected to be completed",
    null
   ],
   "evt-aalo-ascension-announcement-20260704": [
    "113e9caaab2a409d",
    "Aalo announces Project Ascension",
    null
   ],
   "evt-aalo-ascension-datacenter-target-2027": [
    "ebdae6f8a07d39ea",
    "Ascension on-site data-center supply target",
    null
   ],
   "evt-doicesti-snn-egms-20261029": [
    "3dccbe343dbdbf3a",
    "Nuclearelectrica shareholders adopt measures for RoPower Nuclear and note the Doicești conditions",
    null
   ],
   "evt-lomonosov-operating-licence-2019-06": [
    "4e0cf3e5ccd30171",
    "NucNet reports receipt of Akademik Lomonosov operating licence",
    null
   ],
   "evt-myanmar-survey-plans-reported-2026-08-24": [
    "2c65c6ef21eb8990",
    "Report describes Rosatom survey-contract and 2027 site-work plans for Myanmar",
    null
   ],
   "evt-radiant-buckley-haleu-commitment-2026-07-23": [
    "b7e3b67c2c910e3a",
    "DOE conditional HALEU commitment for the Buckley microreactor",
    null
   ],
   "evt-httr-oarai-full-power-2021-09-19": [
    "2ef03a1a842338c0",
    "HTTR reaches 100% power and 850°C after restart",
    null
   ],
   "evt-httr-oarai-full-power-safety-test-2024-03": [
    "2f97b90e763c4d1f",
    "HTTR full-power thermal safety demonstration",
    null
   ],
   "evt-vardo-assessment-programme-held-2024-11-22": [
    "5f7c3ca2078c896a",
    "Regional councils report the Energy Ministry's interim reply holding the Vardø assessment programme",
    null
   ],
   "evt-natrium-official-construction-start-2026-04-23": [
    "7a4b54f477f0170a",
    "TerraPower announces the official start of construction at Kemmerer Unit 1",
    null
   ],
   "evt-natrium-kemmerer-bechtel-exit-2026-09": [
    "7eff78c08be615dd",
    "Bechtel and TerraPower part ways on Kemmerer Unit 1; EPC contract to be rebid",
    null
   ],
   "evt-natrium-kemmerer-wyoming-permit-2025-01-14": [
    "288fd253b6833c34",
    "TerraPower reports Wyoming Industrial Siting Council permit for Kemmerer Unit 1",
    null
   ],
   "evt-natrium-kemmerer-construction-completion-target-2030": [
    "addac189131e8ee9",
    "TerraPower target: Kemmerer Unit 1 construction completion in 2030",
    null
   ],
   "evt-clinch-river-doe-gen3-selection-2025-12-02": [
    "906562cefcd1ff08",
    "DOE selects TVA for $400 million to advance a BWRX-300 at Clinch River",
    null
   ],
   "evt-holtec-palisades-doe-gen3-selection-2025-12-02": [
    "86b8c45577c628dc",
    "DOE selects Holtec for $400 million to deploy two SMR-300 reactors at Palisades",
    null
   ],
   "evt-hermes-1-construction-completion-target-2028": [
    "6dc0aab68c6a28f6",
    "Kairos expects to complete Hermes construction in 2028",
    null
   ],
   "evt-aalo-x-inl-groundbreaking-2025-08": [
    "c51ec5458b9bcc12",
    "Aalo breaks ground at its Aalo-X site next to INL's Materials and Fuels Complex",
    null
   ],
   "evt-antares-mark0-haleu-commitment-2025-08-26": [
    "09e236ac9b26cd8d",
    "DOE makes a conditional HALEU commitment to Antares for its first reactor",
    null
   ],
   "evt-antares-mark0-doe-agreement-2025-09": [
    "c9c87bfb2d91d5c2",
    "Antares executes its agreement with DOE to take a reactor critical by 4 July 2026",
    null
   ],
   "evt-pele-inl-groundbreaking-2024-09": [
    "2c3e283860150624",
    "Department of Defense breaks ground for Project Pele at INL",
    null
   ],
   "evt-pele-inl-core-barrel-2026-09": [
    "27f2971a80bb7fb5",
    "BWXT completes Pele core barrel cartridge installation",
    null
   ],
   "evt-pele-inl-bwxt-contract-2022-06": [
    "333bb58661c5ef79",
    "Strategic Capabilities Office awards BWXT the contract to build and deliver the Pele prototype",
    null
   ],
   "evt-last-energy-rellis-announced-2025-10-15": [
    "aa380235f66e06c9",
    "Last Energy and the Texas A&M System announce the PWR-5 pilot at RELLIS",
    null
   ],
   "evt-last-energy-rellis-criticality-target-2026": [
    "eccfd5ba8eccae1c",
    "Last Energy targets a PWR-5 criticality demonstration in 2026",
    null
   ],
   "evt-last-energy-llynfi-exim-letter-2024-12-13": [
    "2e3edf4053e5f128",
    "EXIM issues a non-binding letter of interest for the first Llynfi microreactor",
    null
   ],
   "evt-last-energy-llynfi-grid-offer-2025-01-16": [
    "82d26b1c52c080c2",
    "Last Energy accepts an NGED grid connection offer for the first Llynfi unit",
    null
   ],
   "evt-natura-msr-1-haleu-commitment-2025-08-26": [
    "039363232217788c",
    "DOE makes a conditional HALEU commitment to ACU and Natura for the research reactor",
    null
   ],
   "evt-natura-msr-1-doe-ota-2025-12": [
    "e6b61d289a5a414a",
    "Natura executes an Other Transaction Agreement with DOE for MSR-1",
    null
   ],
   "evt-ward-250-groundbreaking-2025-09-17": [
    "d6208c077b1e3237",
    "Valar breaks ground on Ward 250 at the Utah San Rafael Energy Lab",
    null
   ],
   "evt-tmsr-lf1-wuwei-full-power-2024-06": [
    "8f8a809663568f34",
    "TMSR-LF1 first reaches full power",
    null
   ],
   "evt-httr-oarai-permit-application-1989-02": [
    "c3b193c833eb19d5",
    "HTTR installation-permit application filed",
    null
   ],
   "evt-httr-oarai-installation-permit-1990-11": [
    "1c7e2289abff7d70",
    "HTTR installation permit granted (JAEA account)",
    null
   ],
   "evt-httr-oarai-construction-start-1991": [
    "e0f59213ab50cb43",
    "HTTR construction begins",
    null
   ],
   "evt-brest-od-300-turbine-hall-separators-2026-10-07": [
    "04bad4d94569cd52",
    "Separator-superheaters installed in BREST-OD-300 turbine hall (Rosatom, reported)",
    null
   ],
   "evt-brest-od-300-fuel-module-pilot-2024-12-25": [
    "2d7b88c3dd45af44",
    "BREST-OD-300 fuel fabrication module enters pilot-industrial operation",
    null
   ],
   "evt-baimsky-floating-keel-laying-2022-08": [
    "2b1d48f1ffedfc30",
    "Keel laid for the first Cape Nagloynyn floating unit's barge",
    null
   ],
   "evt-yakutia-ritm-rusatom-overseas-licence-report-2021-08-06": [
    "dafa083c6bcbdffa",
    "Rusatom Overseas reports a Rostekhnadzor licence for construction of nuclear installations (Yakutia)",
    null
   ],
   "evt-darlington-ontario-fid-2025-05-08": [
    "b26a69ccd101760c",
    "Ontario announces final investment decision for the first Darlington BWRX-300",
    null
   ],
   "evt-darlington-cgf-bof-equity-2025-10": [
    "9a780a08c579334c",
    "Canada Growth Fund and Building Ontario Fund commit equity to the Darlington New Nuclear Project",
    null
   ],
   "evt-darlington-first-nations-investment-2026-06-23": [
    "75750e8af1c38113",
    "Williams Treaties First Nations announce C$700 million investment in the Darlington New Nuclear Project",
    null
   ],
   "evt-darlington-basemat-lift-2026-04": [
    "c3dfb3afd119d73a",
    "Reactor building basemat module lifted into the Darlington BWRX-300 shaft",
    null
   ],
   "evt-darlington-bwxt-rpv-contract-2025-01-27": [
    "fd928943e57ad1a4",
    "GE Hitachi awards BWXT the reactor pressure vessel contract for the first Darlington BWRX-300",
    null
   ],
   "evt-darlington-cnsc-12-2-request-2025-07-25": [
    "bd88544bf09d9dd9",
    "CNSC issues a subsection 12(2) request to OPG after worker injuries at the Darlington new-build site",
    null
   ],
   "evt-arc100-lepreau-iaa-no-designation-2022-12-22": [
    "682033f4d021ed17",
    "Federal minister decides the Point Lepreau SMR project does not warrant a federal impact assessment",
    null
   ],
   "evt-sealer-norrsundet-plan-consultation-2026-10-09": [
    "6e21b12119887c6d",
    "Gävleborg county board opens consultation on the proposed Norrsundet facility plan",
    null
   ],
   "evt-jimmy-bazancourt-complements-2025-02-13": [
    "8030039337aef880",
    "Ministry requests further information on the Jimmy Bazancourt application",
    null
   ],
   "evt-stellaria-alvin-cadarache-complements-2026-06-16": [
    "52e5d784362a6b6b",
    "Ministry requests further information on the INB Alpha application",
    null
   ],
   "evt-doicesti-fluor-feed2-contract-2024-07": [
    "1ffd3947056a0f29",
    "RoPower and Nuclearelectrica sign the FEED Phase 2 contract with Fluor",
    null
   ],
   "evt-doicesti-exim-pre-project-loan-2024": [
    "be368aa16cabd82d",
    "US EXIM approves a USD 98 million loan for Doicești pre-project services",
    null
   ],
   "evt-doicesti-us-finance-letters-2026-05": [
    "be3653a100bd10cc",
    "RoPower reports non-binding US EXIM and DFC financing interest",
    null
   ],
   "evt-doicesti-control-body-response-2026-07-28": [
    "dd0e5e3906754fe0",
    "Nuclearelectrica responds to the Prime Minister's Control Body report on the Doicești project",
    null
   ],
   "evt-ameresco-imsr-aberdeen-selection-2026-09-21": [
    "397e4635c2d3b3d3",
    "Army selects Ameresco to negotiate Aberdeen Proving Ground lease; IMSR planned for Phase 2",
    null
   ],
   "evt-cascade-enw-nrc-preapplication-2024-08": [
    "78653fd926e11847",
    "Energy Northwest begins NRC pre-application engagement for Cascade",
    null
   ],
   "evt-cascade-enw-amazon-agreement-2024-10-16": [
    "4a8f98585200d772",
    "Amazon and Energy Northwest agreement to fund Cascade feasibility phase",
    null
   ],
   "evt-cascade-enw-design-build-negotiations-2025-10-23": [
    "d3710202bb17bb7e",
    "Energy Northwest enters progressive design-build negotiations with Cascade Nuclear Partners",
    null
   ],
   "evt-cascade-enw-engagement-plan-rev3-2026-03-26": [
    "016df8b8b02993a7",
    "ENNN files Regulatory Engagement Plan Revision 3 planning a two-part construction permit application",
    null
   ],
   "evt-htr10-inet-electricity-generation-2004-10": [
    "d4e25aa79d801d76",
    "HTR-10 combined heat-and-power trial operation",
    null
   ],
   "evt-clinch-final-se-target-202611-stated-20250725": [
    "1724e940476d2025",
    "NRC target: final safety evaluation for the Clinch River construction permit (July 2025 schedule)",
    null
   ],
   "evt-clinch-final-se-target-202606-stated-20260618": [
    "9f5ebd865b1a6648",
    "NRC target: final safety evaluation for the Clinch River construction permit",
    null
   ],
   "evt-clinch-final-ser-issued-20260625": [
    "3afbbe08aa754701",
    "NRC issues the final safety evaluation report for the Clinch River construction permit application",
    null
   ],
   "evt-natrium-cod-target-2028-stated-20211116": [
    "4981fbdef7a63fa1",
    "TerraPower target: Natrium commercial operation (November 2021 statement)",
    null
   ],
   "evt-natrium-online-target-2031-stated-20260123": [
    "1c16ca26dd31124b",
    "Kemmerer Unit 1: reported online target at the end of 2031",
    null
   ],
   "evt-darlington-grid-target-2029-stated-20231130": [
    "3eafef28c6bf0e0e",
    "OPG target: Darlington BWRX-300 Unit 1 online (November 2023 statement)",
    null
   ],
   "evt-darlington-grid-target-2030-stated-20251024": [
    "0592a296dbd990a4",
    "OPG target: connect Darlington BWRX-300 Unit 1 to the grid by the end of 2030",
    null
   ],
   "evt-antares-mark1-nsda-announcement-20261023": [
    "1a0649339c02e165",
    "Antares reports DOE approval of the Mark-1 safety-design agreement",
    null
   ],
   "evt-antares-mark1-electricity-target-2027": [
    "d57c7909971582af",
    "Antares target: Mark-1 electricity production at INL in 2027",
    null
   ],
   "evt-antares-mark0-nsda-reported-202510": [
    "cacb4d632a37295d",
    "Antares reports Mark-0 safety-design agreement approval in October 2025",
    null
   ],
   "evt-radiant-crane-selection-announced-20261020": [
    "fa094cf1b428ca11",
    "Radiant announces Navy selection of Kaleidos for Crane",
    null
   ],
   "evt-linglong-operator-licences-202503": [
    "ebff0ff0b29384f3",
    "First 34 Linglong One reactor operators licensed",
    null
   ],
   "evt-linglong-cold-functional-202510": [
    "fbc12b286f2083b5",
    "Linglong One cold functional testing completed",
    null
   ],
   "evt-linglong-nnsa-key-issues-20260316": [
    "d81f6fd7190bc657",
    "NNSA supervision meeting names key Linglong One review issues",
    null
   ],
   "evt-linglong-nnsa-workgroup-20260605": [
    "c49372c6bb947110",
    "NNSA working group reviews Linglong One safety issues and urges pre-fuel-load preparation",
    null
   ],
   "evt-linglong-nnsa-commissioning-20260818": [
    "c20d5545e5ab7205",
    "NNSA working group reviews Linglong One commissioning anomalies",
    null
   ],
   "evt-linglong-hot-functional-20261001": [
    "c0aaee7d7779851b",
    "Linglong One in hot functional testing",
    null
   ],
   "evt-last-energy-caldwell-rep-202607": [
    "2a2575c129bc45ba",
    "Last Energy's NRC engagement plan names Caldwell County for its first commercial unit",
    null
   ],
   "evt-natrium-kemmerer-supplier-awards-20260831": [
    "5eb6699e2ad183df",
    "TerraPower announces 12 supplier awards for the Natrium plant and sodium test facility",
    null
   ],
   "evt-rr-tusimice-eia-notification-20250506": [
    "c482fa3a3321c59e",
    "Czech environment ministry receives ČEZ's assessment notification for a Tušimice SMR plant",
    null
   ],
   "evt-rr-tusimice-eia-screening-20251222": [
    "f795213b4413b5ff",
    "Czech environment ministry issues screening conclusion for the Tušimice SMR assessment",
    null
   ],
   "evt-rr-tusimice-preferred-site-20230227": [
    "24af6092dbbfb03e",
    "ČEZ names Tušimice a preferred SMR site and begins site exploration",
    null
   ],
   "evt-rr-detmarovice-preferred-site-20230227": [
    "1cc9ffaac4445cde",
    "ČEZ names Dětmarovice a preferred SMR site and begins site exploration",
    null
   ],
   "evt-linglong-fuel-grid-target-2026": [
    "7f2609f3d7b4fab6",
    "Reported target: Linglong One fuel loading and grid connection within 2026",
    null
   ],
   "evt-osge-wloclawek-first-unit-target-2032": [
    "a6886db006993717",
    "OSGE assumption: first BWRX-300 unit commissioned at Włocławek in 2032",
    null
   ],
   "evt-fermi-estonia-first-reactor-target-2035": [
    "bbf5db9179d8b137",
    "Fermi Energia application: first reactor could start operating in 2035 at the earliest",
    null
   ],
   "evt-hermes-2-operations-target-2030": [
    "942f2df1c3e0c3d2",
    "Kairos target: Hermes 2 to begin operations in 2030",
    null
   ],
   "evt-radiant-dsa-approval-statement-20261029": [
    "a992876d5b691130",
    "Radiant announces DOE approval of the Kaleidos Documented Safety Analysis",
    null
   ],
   "evt-doicesti-ropower-interim-report-target-20261231": [
    "b444966bf6ace3c1",
    "Target: interim report on RoPower Nuclear's measures",
    null
   ],
   "evt-uiuc-kronos-hyundai-mou-20261027": [
    "d7029383ab517d84",
    "NANO Nuclear announces a memorandum with Hyundai Engineering on KRONOS at the University of Illinois",
    null
   ],
   "evt-arc100-inl-hyundai-mou-20261029": [
    "75dc63e7486998fa",
    "ARC announces a memorandum with Hyundai Engineering on ARC-100 deployment",
    null
   ],
   "evt-ucri-ien-other-2026-01-21": [
    "67b634911ad89b2e",
    "ANSN meets IEN and Terminus on licensing the critical unit",
    null
   ],
   "evt-xuwei-u3-construction-licence-20261102": [
    "1914293dd33f9cc7",
    "Xuwei Unit 3 construction licence issued",
    null
   ],
   "evt-huakun-one-siting-opinion-20261102": [
    "c452cbf502f395d1",
    "Huakun One: regulator siting review opinion issued",
    null
   ],
   "evt-longmott-cp-issued-20261109": [
    "8adae4fc42b4c460",
    "NRC issues the Long Mott construction permit",
    null
   ],
   "evt-xuwei-u3-first-concrete-20261106": [
    "577910d8e9bf6b65",
    "Xuwei Unit 3 (HTGR) first nuclear-island concrete",
    null
   ],
   "evt-longmott-final-se-completed-202610": [
    "11970971513be2ba",
    "NRC completes the Long Mott safety evaluation",
    null
   ],
   "evt-cascade-enw-fluor-nuclear-island-20261105": [
    "c18011b57c984b60",
    "X-energy announces Fluor selection for Cascade nuclear-island engineering",
    null
   ],
   "evt-longmott-steam-generator-tubing-order-20261104": [
    "7061ea3df54abf40",
    "X-energy announces first steam-generator tubing order for the Dow plant",
    null
   ],
   "evt-elementl-letart-dsip-partnership-loi-20261026": [
    "9bf7880fd6598cad",
    "Elementl announces a proposed development partnership covering its Ohio project",
    null
   ],
   "evt-doicesti-feed2-work-completed-2025": [
    "d78ee79336c8ff0b",
    "NuScale reports its FEED Phase 2 work for RoPower was completed in late 2025",
    null
   ],
   "evt-osge-wloclawek-first-unit-mid-2030s": [
    "81052ffb9df0a206",
    "OSGE states first Włocławek BWRX-300 unit is to be commissioned in the mid-2030s",
    null
   ],
   "evt-rr-wylfa-iacc-collaboration-20260325": [
    "b39cf4e70d0e07d4",
    "GBE-N and Isle of Anglesey County Council sign a Collaboration Agreement for Wylfa",
    null
   ],
   "evt-doicesti-control-body-report-published-20260911": [
    "b6ae48c23e2f074a",
    "Nuclearelectrica publishes the Prime Minister's Control Body report on the Doicești project",
    null
   ],
   "evt-darlington-opg-q3-2026-unit1-no-longer-meeting-cod-cost-20261110": [
    "8e4fdf76e42fce95",
    "OPG says Darlington BWRX-300 Unit 1 is no longer expected to meet its October 2030 commercial-operation target or C$7.7 billion estimate",
    null
   ],
   "evt-longmott-cli-26-15": [
    "d68fe1765cf4d787",
    "NRC Commission denies the intervenor's petition for review (CLI-26-15)",
    null
   ]
  }
 },
 "evidence_state": {
  "projects": {
   "prj-elementl-letart": "38f9abfc01ef6de4",
   "prj-htr-pm-shidaowan": "7f63fe6f9b017f16",
   "prj-lomonosov": "b7bec9923312f4ac",
   "prj-linglong-one": "1fffbd6b87010ab7",
   "prj-carem25": "8bf48e3cf9f41180",
   "prj-darlington-bwrx": "05a5d19f8f69222d",
   "prj-natrium-kemmerer": "06d588852272d0fb",
   "prj-hermes-1": "f4dbe310fdf035d4",
   "prj-hermes-2": "8d8fda39c59bb415",
   "prj-long-mott": "0a0253bda6d718a1",
   "prj-clinch-river-bwrx": "b71827b4e3661c9d",
   "prj-aurora-inl": "a520d50109eb3870",
   "prj-arc100-lepreau": "b76dacc38e6ae1d9",
   "prj-brest-od-300": "e3737ae62df0e7bf",
   "prj-ritm-jizzakh": "4409e508170c6568",
   "prj-rr-wylfa": "f82330e26cd0f1e1",
   "prj-nuscale-romania": "27155c70433d98cb",
   "prj-holtec-palisades": "0ca2a4a9f9a65e71",
   "prj-uamps-cfpp": "089c30570bb08ccf",
   "prj-cascade-enw": "2e4c0c635a7023b1",
   "prj-rr-temelin": "cce136be6c1885cd",
   "prj-osge-wloclawek": "ad901c846020b2df",
   "prj-osge-stawy-monowskie": "e3d321b1278e3a88",
   "prj-osge-stalowa-wola": "65dd5c37c5789f60",
   "prj-sask-rafferty": "a554ca1d9696f7f8",
   "prj-pele-inl": "e98f5bd6e8f7e75c",
   "prj-fermi-estonia": "4e6c7156c3db02dd",
   "prj-yakutia-ritm": "4798c7bd630844dc",
   "prj-baimsky-floating": "07084903e684043c",
   "prj-oklo-eielson": "e951ea1eb110d971",
   "prj-aalo-x-inl": "1bb20c24492291da",
   "prj-antares-mark0-inl": "f95ddc575ab76090",
   "prj-unity-inl": "86aa0849e6a69321",
   "prj-ward-250": "5ee1ba80c22a4113",
   "prj-aalo-rellis": "a4a1ae0bf4cd39ab",
   "prj-kairos-rellis": "2fc584b67d9e99b4",
   "prj-natura-rellis": "b9341e9aa0d19290",
   "prj-imsr-rellis": "41cece7bb35023a9",
   "prj-last-energy-rellis": "36ebdc8d6749eed2",
   "prj-oklo-ohio": "89c67afff47da548",
   "prj-thorcon-kelasa": "da497d4166e556fb",
   "prj-osge-ostroleka": "26f59b2d4e169c92",
   "prj-osge-dabrowa-gornicza": "c6e38a36bb26d73d",
   "prj-osge-nowa-huta": "c82339d116709878",
   "prj-rr-tusimice": "ff416061ac378591",
   "prj-rr-detmarovice": "7e19e3f979476e73",
   "prj-sealer-untra": "3072704a162f0375",
   "prj-sealer-norrsundet": "06d4711877f575d9",
   "prj-belews-creek": "9c88b651238c893b",
   "prj-holtec-oyster-creek": "bfcf328ac61d1be4",
   "prj-holtec-blue-castle": "4119ec9925de27b2",
   "prj-last-energy-haskell": "2a2088dec95a1fe7",
   "prj-last-energy-caldwell": "53a51d63758974c8",
   "prj-last-energy-llynfi": "42089237c1719497",
   "prj-last-energy-london-gateway": "71aa3a3d7ff70388",
   "prj-aep-rockport": "9b12e17018d9c171",
   "prj-aep-joshua-falls": "ed10562c36a50153",
   "prj-north-anna-smr": "c0e7dd9b8b3beda0",
   "prj-chalk-river-mmr": "3046886ad30c6f48",
   "prj-ap300-teesside": "5b9a534fe53c718d",
   "prj-taftoy-smr": "5f829d912c461a4a",
   "prj-dalane-smr": "1b351673de775640",
   "prj-oygarden-smr": "305bf0f9ba0e763c",
   "prj-tarapur-bsmr-200": "3390f75ade011bc2",
   "prj-tarapur-smr-55": "7b39b4bcfdd147fe",
   "prj-barc-vizag-htgcr": "8c945b234b66e536",
   "prj-radiant-kaleidos-inl": "1370c29317c9712d",
   "prj-radiant-buckley": "9f4ae7923299c774",
   "prj-prodigy-belledune": "f655cd3bb84dfbf6",
   "prj-natura-msr-1-acu": "20d7f6152b185736",
   "prj-atucha-new-smr": "1dd7f0e57a228bf7",
   "prj-bwxt-green-river": "ec8560e847f8d277",
   "prj-jimmy-bazancourt": "b24f57c58d4dae37",
   "prj-penn-state-frontier": "6ec5f6350fb9ffe2",
   "prj-uiuc-kronos": "71bb24c21d5783ac",
   "prj-deep-fission-parsons": "997ffef5ff39c5ad",
   "prj-evinci-dome": "51da3d2a9ec279a9",
   "prj-blue-energy-victoria": "e6e466a0737c4083",
   "prj-tetra-1-rellis": "484045a76430fe75",
   "prj-wylfa-nuscale-shearwater": "e107137172895525",
   "prj-ningdu-modular-plan": "edae267819e617d1",
   "prj-patnow-zepak-smr": "288b7e786316dfd5",
   "prj-rivne-smr160": "b58dc91925b122ce",
   "prj-cgn-bohai-acpr50s": "e33e8c774a4ea90c",
   "prj-west-kalimantan-ritm-floating": "62affacd642cf32a",
   "prj-west-kalimantan-land-smr": "9d0fbe6e535b58df",
   "prj-dimitrovgrad-svbr100": "f21a5c5b59aebcee",
   "prj-usnc-inl-mmr-proposal": "dbfd4c55711438e6",
   "prj-midpoint-smr": "79122faafe810ac3",
   "prj-surry-gec": "7bd1266be013320e",
   "prj-maoming-green-energy-htgr": "2127b02cfe5a229a",
   "prj-nine-mile-point-advanced-smr": "3cdc4f4d81e26395",
   "prj-hartlepool-xe100": "73ab42ec06c8e804",
   "prj-cottam-smr300": "b895fc60268de1f0",
   "prj-trawsfynydd-egino": "57d50143317594d0",
   "prj-videberg-varo-rr-smr": "6cd18b9f54918209",
   "prj-knxt-valdemarsvik": "cd200de8f6725dd8",
   "prj-studsvik-nykoping": "47c2cb396fe8dbe2",
   "prj-blykalla-horby": "88280dfd4eb3104d",
   "prj-svalbard-sealer": "4d60b4deb65abd25",
   "prj-vardo-smr": "656b785eceb69550",
   "prj-halden-smr": "aa8fbe38d4c83893",
   "prj-lister-smr": "22c10651ac72a003",
   "prj-kuopio-smr-heat": "ecaa2ded0679610a",
   "prj-helen-helsinki-smr": "1a1ad897bfa75930",
   "prj-kerava-ldr50": "9d9b3e565203e73c",
   "prj-psi-copenhagen-atomics": "48f98233ad136234",
   "prj-newcleo-veron-lfr-as-30": "d3caced8b43d2c00",
   "prj-calogena-cadarache": "b9c3ffdedff3ec29",
   "prj-stellaria-alvin-cadarache": "98e937d5c688395c",
   "prj-hexana-gard-rhodanien": "3e454af5d475133c",
   "prj-thorizon-zeeland": "818448f900206f22",
   "prj-newcleo-bohunice": "1e4634ba7e367e19",
   "prj-dual-fluid-rwanda": "eebc71f219e52f0b",
   "prj-necsa-pelindaba-smr-demo": "b84cf4945c95c944",
   "prj-pbmr-koeberg": "751d2c11ddf3ad26",
   "prj-solo-valmeyer": "10716248b80f036d",
   "prj-nano-barupon-liberty": "4ac6492d61f0f1a9",
   "prj-oklo-diamondback": "4830e6aa340ab806",
   "prj-holtec-brigham-city": "8343763f8118265c",
   "prj-janus-fort-bragg-antares": "00b0c1faf103ea7b",
   "prj-janus-fort-campbell-banr": "e0edf43cc778d14d",
   "prj-janus-fort-hood-ga-tes": "89e1d3b1fa40bf8d",
   "prj-janus-fort-benning-kaleidos": "fb5a11bea1858cae",
   "prj-janus-fort-drum-evinci": "9829a347abe43fcf",
   "prj-anpi-malmstrom-evinci": "3cedd21987de6e2e",
   "prj-anpi-jbsa-antares": "9c7c7d44fa89fa71",
   "prj-navy-crane-microreactor": "f0db077339d160d7",
   "prj-inl-marvel": "95eaff665f6e2a45",
   "prj-isu-nucube-art": "7f70b668f279123f",
   "prj-unity-dome-2027": "9419c43356e9b81f",
   "prj-aalo-idaho-falls-erp": "58026dbe2f4e1165",
   "prj-zettajoule-tees-zj0": "6d082c2e31b8c0a9",
   "prj-nuclea-morpheus-usrel": "86785fab0d623811",
   "prj-darlington-bwrx-units-2-4": "e77fd8d4cd08b129",
   "prj-moltex-ssrw-lepreau": "fd6e1e91b8136c39",
   "prj-osge-warszawa": "8388520b1e9120cf",
   "prj-industria-rr-smr": "4f45201a276960bc",
   "prj-htgr-pola-ncbj": "b121094ce2177c14",
   "prj-trypilska-smr": "52f82c1ca96cf7ea",
   "prj-chukotka-sovinoe-shelf-m": "b5d5c33ac4b8f87f",
   "prj-xuwei-htgr-unit3": "ac020a122e07d85c",
   "prj-xiapu-htgr": "7da20944677f2889",
   "prj-ruijin-htr": "2d6e4b60da15cb84",
   "prj-tmsr-lf1-wuwei": "7aabe57addcc3fb5",
   "prj-httr-oarai": "69fd57fb418e4dea",
   "prj-gijang-smr": "ec04d20bb7628991",
   "prj-daegu-gunwi-ismr": "3ef0d058e680ecef",
   "prj-bontang-pkt-msr": "7adfa768db6c203e",
   "prj-myanmar-ritm-smr": "07fbf97d57fa5be2",
   "prj-sellafield-prism": "b56223fc3d728683",
   "prj-alfred-mioveni": "8ab3021f2bceddc2",
   "prj-leandrea-mol": "2325b005c0e3e9ae",
   "prj-baishan-happy200": "5da0000b8a2b0b6d",
   "prj-galena-4s": "51f79c6714bd0992",
   "prj-starcore-pinawa": "fae69b60126ccae2",
   "prj-ameren-callaway-wsmr": "0e80d82e91931e10",
   "prj-purdue-duke-smr": "9a13761a7d964ba3",
   "prj-antares-mark1-inl": "d8d6c3aa8116b7ef",
   "prj-deep-atomic-mk60-inl": "5510e83f03388d04",
   "prj-loki-mmr-dome-inl": "a47adcefcbc1c87c",
   "prj-nucube-usrel": "82a5938843387a87",
   "prj-narvik-fornes": "cfccf2f9dffc822d",
   "prj-thorizon-pioneer-petten": "c78a6466f9f1e8e7",
   "prj-teplator-slavutych": "89b3b3387d7d1431",
   "prj-last-energy-legnica": "275df5f7636cb195",
   "prj-last-energy-mioveni": "115722ff4a4e11df",
   "prj-hyperion-srs-2012": "7e4f90af8259fd61",
   "prj-holtec-smr160-srs-2012": "75a395f4c9ad3b9e",
   "prj-nuscale-srs-2012": "d7c129b368efe196",
   "prj-bluecore-long-beach": "e677ceaa7d4094b6",
   "prj-htr10-inet": "2724883276a951c9",
   "prj-sanmen-htgr": "751e5e4f08f31803",
   "prj-daqing-nhr200": "5f587ce8fa5a7445",
   "prj-rde-serpong": "34546a592d8a6a5e",
   "prj-stratek-zilkaats": "638f8c4c583cd819",
   "prj-belledune-arc100": "3f9f5aa557c568c4",
   "prj-gazprom-kirinskoye-floating": "503db58b257363c7",
   "prj-otrera-marcoule": "8e790702c00c370c",
   "prj-odin-berkeley-green": "4beb38427f3b73de",
   "prj-norilsk-asmm-ritm400": "3391e8b59c0d4a41",
   "prj-ngnp-inl": "ce1483e245f9f76b",
   "prj-mpower-clinch-river": "a97e8e7801e6179f",
   "prj-arc100-inl": "9254fa5cf06ceb26",
   "prj-jiamusi-nuclear-heating": "98f88820a711f65b",
   "prj-vber300-aktau": "4bdfddeb879415fa",
   "prj-fensfjorden-smr": "8037fbc6dd64ef1c",
   "prj-grenland-smr": "6409ff923204a05e",
   "prj-nano-digihost-north-tonawanda": "cfd0890e72959731",
   "prj-stellaria-fos-sur-mer": "d0bf18b3a031418b",
   "prj-ubattery-chalk-river": "ce0cf7c266d302bd",
   "prj-antares-r1-inl-cfa": "6e89532bebed317f",
   "prj-ornl-tcr": "e7d5f0a72bc6598f",
   "prj-ruta70-ippe-obninsk": "e4b3795b188261ed",
   "prj-ghana-voygr12": "5120900e727216d6",
   "prj-standard-power-ohio": "e6f51a86acfb320d",
   "prj-standard-power-pennsylvania": "2b7c1369e9a2d94d",
   "prj-fanco-eagl1-indiana": "fc8ccb80bb3c919f",
   "prj-sinap-minqin-smtmsr": "c58782f945bfd631",
   "prj-huakun-one-taipingling": "781626deae262159",
   "prj-haiyang-integrated-small-reactor": "2a2a0b338782cd7f",
   "prj-shenyang-nhr200-2001": "ea6590adf84545af",
   "prj-yantai-nhr200-desalination-2003": "b4cf4c1c6a4d468b",
   "prj-gs-energy-uljin": "65cbec8b86e5a27a",
   "prj-ucri-ien": "9cafdb21840d7354",
   "prj-meta-terrapower-initial": "c3eb1d676ec78e1d",
   "prj-formosa-carem-commercial": "3fa6c9a388babf97",
   "prj-kaliningrad-floating-smr-proposal": "c4fd42e9d69618cd",
   "prj-valar-carbon-county-campus": "fa60bf0194a7b508",
   "prj-liaoyuan-dhr400": "71da5c28485b1ce6",
   "prj-huizhou-huapeng-one": "f0b707d6766e0c01",
   "prj-elena-am-pilot": "2936d6984026965e",
   "prj-unity-hornbeck-maritime": "bc578d10b667fdc0",
   "prj-src-initial-evinci": "39c256421c79fdea",
   "prj-cnnc-floating-demo-2016": "b808adf39ff7e61c",
   "prj-last-energy-ksse-first": "7cca43d942a2efb5",
   "prj-aalo-ascension-inl": "dc1fc4058bc3fe2c",
   "prj-ameresco-imsr-aberdeen": "955ff1d52b3351db",
   "prj-calogena-pierrelatte": "b0fac7959a22d2b7"
  },
  "designs": {
   "dsn-bwrx-300": "37f19e1e22b304c4",
   "dsn-natrium": "bb4a6d8ecf1ce683",
   "dsn-hermes": "0a00d3cb7d0b04dc",
   "dsn-xe-100": "b03627dfea367006",
   "dsn-aurora": "7528db5b5b6579eb",
   "dsn-voygr": "6a0577ff59f7338d",
   "dsn-rr-smr": "4968ec240810d581",
   "dsn-arc-100": "5f56c3d09928be5a",
   "dsn-htr-pm": "dcca2cfcab7ce847",
   "dsn-acp100": "d8f25b43cf3a4133",
   "dsn-carem25": "3f06856bab01e877",
   "dsn-klt40s": "c438f9c434d9f791",
   "dsn-brest-od-300": "85dde7b14ce4244c",
   "dsn-ritm-200n": "acf3ee260a841ace",
   "dsn-smr-300": "a459a065578d6b83",
   "dsn-banr": "45f66fbb9d7b61c1",
   "dsn-imsr": "bfce20be2ee40018",
   "dsn-pele": "a231a1585a6b33f5",
   "dsn-ritm-200s": "d343adc1b089fef0",
   "dsn-aalo-x": "b8a0eb0409202ab3",
   "dsn-aalo-pod": "3d741fb5a90ef448",
   "dsn-kp-fhr": "e360e8c937ab3d52",
   "dsn-natura-msr-100": "0edde4491d4db152",
   "dsn-mark-0": "85168c9fef4a38d6",
   "dsn-ward-250": "9f4688895dc787da",
   "dsn-unity": "f6ff2505ebd1e31c",
   "dsn-pwr-5": "b48dd041db26797a",
   "dsn-thorcon-500": "8da92d6df6ec4d4c",
   "dsn-sealer": "61c9f7034af96ff3",
   "dsn-pwr-20": "01cd0761782fbcbd",
   "dsn-gfp-mmr": "e201eaff0d9aa6b6",
   "dsn-ap300": "3ba65cf278f7d504",
   "dsn-bsmr-200": "3dd120b575ab8a9c",
   "dsn-smr-55": "df716ac2da323797",
   "dsn-barc-htgcr": "7f4a8089e6971155",
   "dsn-kaleidos": "506535e3efa5287f",
   "dsn-msr-1": "ea73e5c7b844e65c",
   "dsn-jimmy-heat": "2bb941780cff7dae",
   "dsn-evinci": "c87fdb2c813f35f0",
   "dsn-kronos-mmr": "cca16564a04f286c",
   "dsn-gravity": "ae3fd077e8ed518b",
   "dsn-catalogue-r1": "60bb332ab003d176",
   "dsn-catalogue-blossom-energy-smr": "e39f7ebf19698319",
   "dsn-catalogue-blue-capsule": "ffcc0bd0d109f0b6",
   "dsn-catalogue-sealer-one": "18a55becc39d8795",
   "dsn-catalogue-cal-30": "902289a7acbb837b",
   "dsn-catalogue-acpr50s": "36761e77fb9d8b5d",
   "dsn-catalogue-leunr": "c2e0c06267ee1630",
   "dsn-catalogue-energy-well": "dc7578460f4e5a44",
   "dsn-catalogue-dfbr-1": "8bc5c451e084a8b6",
   "dsn-catalogue-df300": "8e209820132c5125",
   "dsn-catalogue-a-htr-100": "c54507a02ddf7e0c",
   "dsn-catalogue-lftr": "d39e601f316b18d5",
   "dsn-catalogue-fmr": "56a5fd69214d396f",
   "dsn-catalogue-em2": "bd410381b8e797fa",
   "dsn-catalogue-hexana": "09b56ddee0b6c271",
   "dsn-catalogue-nhr200-ii": "79103ad399c47494",
   "dsn-catalogue-i-smr": "e25e546ef731ef30",
   "dsn-catalogue-gthtr300": "cba8f3c4eb96f681",
   "dsn-catalogue-httr": "136e407d3d8a1a1e",
   "dsn-catalogue-htr50s": "2200066874264e95",
   "dsn-catalogue-smart100": "b3acb28f1c5423d7",
   "dsn-catalogue-salus-100": "6521b09ecfefb78c",
   "dsn-catalogue-hectar": "463398c915ba2678",
   "dsn-catalogue-mn-1": "0b204d4a15a4943f",
   "dsn-catalogue-ssr-w": "0cf9eab33a608eed",
   "dsn-catalogue-flex": "8d3bd668587b8e45",
   "dsn-catalogue-xamr": "d5ae2ab328d3b679",
   "dsn-catalogue-odin": "940b8b49be004dce",
   "dsn-catalogue-loki-mmr": "0012eb314f2d24d8",
   "dsn-catalogue-htgr-pola": "bb39c8029fd4cd93",
   "dsn-catalogue-lfr-as-200": "f3bb7673abdb5817",
   "dsn-catalogue-lfr-as-30": "56103d0ce203c472",
   "dsn-catalogue-nuclearis-n1": "621b4fa018a5a915",
   "dsn-catalogue-nuward-smr": "0b6fa6ef97f88b81",
   "dsn-catalogue-ritm-200m": "c754bee0cbf5cfff",
   "dsn-catalogue-otrera-2x300": "68c2ba1e06b18b43",
   "dsn-catalogue-cmsr": "6602a48911c345ed",
   "dsn-catalogue-happy200": "45569d01a7cbc918",
   "dsn-catalogue-ldr-50": "a44bb5c5256ad347",
   "dsn-catalogue-stellarium": "ed9dcf2363fd5ec6",
   "dsn-catalogue-htmr-100": "7a9a35d50188d87d",
   "dsn-catalogue-thorizon-one": "aca0f7b5dffbdf8c",
   "dsn-catalogue-movelux": "4a026387669aaa9b",
   "dsn-catalogue-4s": "39708de89ed200e5",
   "dsn-catalogue-start": "d17c8204c73b410a",
   "dsn-catalogue-teplator": "93a0101f17f56ea4",
   "dsn-aris-abv-6e": "67ba4fec4a3446a4",
   "dsn-aris-acp100s": "bb5102071384a46d",
   "dsn-aris-amr": "00d085f9eeef3309",
   "dsn-aris-bandi": "b9838437b278cf92",
   "dsn-aris-copenhagen-atomics-waste-burner": "5697d4c065ba885b",
   "dsn-aris-elena": "d7983a2be09213f5",
   "dsn-aris-fbnr": "a25fb7d5d4fb6021",
   "dsn-aris-fuji": "a0291a47f3eac7ac",
   "dsn-aris-g4m": "5e268e9d13d2dfc5",
   "dsn-aris-gt-mhr": "92901b024fcc300a",
   "dsn-aris-holos-mono": "ecf9977111031a80",
   "dsn-aris-holos-quad": "ef92a5f73c74e5ee",
   "dsn-aris-htr-10": "81de5f9bc926a977",
   "dsn-aris-marvel": "e5fb5a8cbdd25e58",
   "dsn-aris-mhr-100": "2650e4e38dbb8ae7",
   "dsn-aris-mhr-t": "61786c4d0ba327c8",
   "dsn-aris-peluit-40": "0ab5b30ca3dc53c6",
   "dsn-aris-prismatic-htr": "a8c5f3a34f6e5912",
   "dsn-aris-shelf-m": "77e7805431ba4bd0",
   "dsn-aris-smart": "f051f81a5a11e6e0",
   "dsn-aris-star": "3ac7ddeee349c9ba",
   "dsn-aris-unitherm": "a1d0931fc2d8bf89",
   "dsn-aris-vber-300": "45f6742fc09d0c68",
   "dsn-aris-w-lfr": "0ee3864f76553365",
   "dsn-aris-smahtr": "67359c54e0f96f74",
   "dsn-aris-prism": "b3359e39bfe25af8",
   "dsn-aris-otrera-300": "3711824e433c67ff",
   "dsn-holtec-smr-160": "82947bc00a1da1b9",
   "dsn-svbr-100": "b898580a1587db96",
   "dsn-polar-1": "e94c81b3ecaf0305",
   "dsn-eagles-300": "3adc225d45bf9b6d",
   "dsn-eagl-1": "5c455cff4900b171",
   "dsn-halo-mmr": "5a3267c4d38ea632",
   "dsn-nusun-1": "fc873f3189a165d4",
   "dsn-hefasto": "df7e84969e3431c5",
   "dsn-pbmr": "03200dd0474a6a73",
   "dsn-acr-300": "1d353cc79459dc63",
   "dsn-solo": "03afa58c4dbded74",
   "dsn-morpheus": "4bc0359171bac217",
   "dsn-ga-tes": "a598a1ac10d86fef",
   "dsn-htr-pm600": "3eba9fdc0eb10307",
   "dsn-deep-atomic-mk60": "a21257635c9f265d",
   "dsn-allseas-htgr": "dd7167b05fee0e0c",
   "dsn-archeos": "83031174574de557",
   "dsn-jh-100": "00475804d442ed4f",
   "dsn-mn-350": "2063d7c8219d63f0",
   "dsn-tredic-htgr": "14bc839e625415ac",
   "dsn-bluecore-bc-15": "f70ccc711a004c12",
   "dsn-jay-1": "88659e165ea090ea",
   "dsn-marina": "349a6a6d4ca2ea22",
   "dsn-ritm-400": "5b10976d6eb541c3",
   "dsn-karat-45": "2bd21ddc6d7a4ec0",
   "dsn-karat-100": "d2073b007737f6a5",
   "dsn-vk-300": "12209112cf15d1b9",
   "dsn-ruta-70": "5a0794011e630f6d",
   "dsn-cap150": "3b10bfc8710e4498",
   "dsn-cap200": "bf8e029ab6cb5d59",
   "dsn-acpr100": "65a0a1b40b3af3e6",
   "dsn-sc-htgr": "3062fe2850906378",
   "dsn-flexblue": "4c68406089bb5422",
   "dsn-u-battery": "24094eb44547701e",
   "dsn-mcsfr": "fd50163e66846e96",
   "dsn-mpower": "d0268c509d71d12e",
   "dsn-mk1-pb-fhr": "dbfa2a23583bb2af",
   "dsn-leadir-ps100": "8acbb6124a45d3c8",
   "dsn-starcore": "cc97196dc892c5c7",
   "dsn-microuranus": "433b0f236bff2cba",
   "dsn-enhs": "86c05f0d4582f5a6",
   "dsn-sstar": "592b0e3471fb8bc7",
   "dsn-star-lm": "68a5c38c7a2e7a49",
   "dsn-star-h2": "6abe7df71d075caa",
   "dsn-lspr": "437cea89477bf550",
   "dsn-rapid": "7890984e66f3402f",
   "dsn-xenith": "9c6306fc0f9a34cd",
   "dsn-lfr-tl-30": "dda2bba69abe6265",
   "dsn-nuscale-microreactor": "9d22c2d894fd10d3",
   "dsn-abv-6m": "59bccec473d091f0",
   "dsn-ssr-thermal-spectrum": "045bdb07da6f8fc2",
   "dsn-otrera-one": "c9c038f124607b71",
   "dsn-arc-generator": "d2377b96e53a7388",
   "dsn-harpia": "46895bb91d2e626d",
   "dsn-nugen-engine": "fc2859e16887c54d",
   "dsn-sinap-smtmsr-10mwe": "650b73dd96a1c1e0",
   "dsn-huakun-one": "568308c040e01a6f",
   "dsn-jereh-micro-reactor": "9a67ad31f96ed8a6",
   "dsn-atgor": "24113d5b7450cf58",
   "dsn-deer": "235b8a4a21aeb67f",
   "dsn-grem": "8f778f6c430dcfcd",
   "dsn-vityaz": "6bb99b6b280937b3",
   "dsn-rapid-l": "676011ba71c2a7af",
   "dsn-aalo-1": "9ffb36b9265204cf",
   "dsn-reploy-sps": "465e0db05b6bb918",
   "dsn-elyon-5": "43d21f27098218c2",
   "dsn-apollo-a-10": "26d6360259060e30",
   "dsn-cr-100": "d42a1d92fe25d7b2",
   "dsn-david-smr": "d442c4f7483fb4d1",
   "dsn-mhi-multipurpose-microreactor": "e443918ec3cddef7",
   "dsn-kaist-atom": "eba8e5b110b152e8",
   "dsn-barc-chtr": "ee05af3e68bb2a66",
   "dsn-vver-i": "45d3f3a298ccaef0",
   "dsn-vber-150": "17632d30486c42d0",
   "dsn-kaist-mmr": "79c5d93aa3ae8a7e",
   "dsn-thorizon-pioneer": "0bbec2b9f941c887",
   "dsn-pgsfr": "6c504fb988a50e9d",
   "dsn-alfred": "fc75185f9765a55e",
   "dsn-tmsr-lf1": "ed6065913ac38e10",
   "dsn-balder": "2821dc86987ec59c",
   "dsn-df-cde": "991da4a7753c62c4",
   "dsn-alvin": "d2a56bdacc68b62c",
   "dsn-ahwr-300": "f49898635366a387",
   "dsn-allegro": "581a4aafac52142e",
   "dsn-pascar": "8fd64981df2c293a",
   "dsn-uranus-40": "b67e6fd274989583",
   "dsn-clear-m10": "af4b8b3e901e4abf",
   "dsn-pearl": "3cd6f107288e544a",
   "dsn-forge-ember": "ad07c98fb48aaa79",
   "dsn-zap-zmr": "22de31df5be050c9",
   "dsn-daratha-microreactor": "5ce1f27a4621be7d",
   "dsn-electra-forte": "c4379b4b623302c4",
   "dsn-myrrha-battery-smr-2014": "702c141c00fa8fab",
   "dsn-vver-300-v478": "5921a3dcca80f51f",
   "dsn-dhr400": "aee5300b9a69990b",
   "dsn-ziacore": "8376bdb1494a44ee",
   "dsn-huapeng-one": "0cf94d06d22c19b7",
   "dsn-elena-am": "43ed2c42d6a59a73",
   "dsn-rolls-royce-amr": "76b7390b8aa84a92",
   "dsn-megalvin": "e8f4f230e3be4cf2",
   "dsn-smart-c": "048b973bf73467f2",
   "dsn-nuscale-us600": "14f8ae7712094bbf"
  },
  "organizations": {
   "org-holtec": "a1b8179d4210ae23",
   "org-westinghouse": "e9ddc546246f9e41",
   "org-aris-kepco-e-c": "d4aed83f5af4a86f",
   "org-zepak": "765f93c5bef2090b"
  },
  "programmes": {
   "prg-se-blykalla-evroc-studsvik-feasibility": "05f6d89a641216d0",
   "prg-us-terrapower-nvision-natrium-framework": "025794dd54f67f42",
   "prg-us-terrapower-sabey-natrium-mou": "b48994fb7258afc4",
   "prg-fanco-atkins-engineering-alliance-2026": "5bbadec9380a3e4b",
   "prg-fanco-hyundai-framework-2026": "34dafc99846ddb69",
   "prg-ae-enec-adnoc-smr-assessment": "46654ec20d2e6fa1",
   "prg-am-smr-replacement-unit": "d02e3d956826daa5",
   "prg-bg-beh-fluor-nuscale-mou": "a233facb7e8f31b5",
   "prg-bg-blue-bird-sge-bwrx300-jv-loi": "07a8e41ed5efbc68",
   "prg-bg-nuscale-kozloduy-mou": "685a1dfad954339a",
   "prg-bg-ustda-beh-smr-prefeasibility-grant": "9e2b5e709f3c76f4",
   "prg-bh-bapco-smr-study": "36d7d6a1f841c295",
   "prg-br-cdpnb-smr-technical-group": "763a73fc069f401c",
   "prg-br-government-rosatom-smr-cooperation": "b025178f41ad9c59",
   "prg-br-nuclep-rosatom-mou": "0014286c19b8941f",
   "prg-ca-kaeri-aecl-smart-mou": "674fc674c92affe2",
   "prg-ca-kr-us-khnp-arc-nb-power-arc100-fleet": "4d0da3aa632c21bc",
   "prg-ca-mcmaster-usnc-mmr-feasibility": "62ae408005d723f6",
   "prg-ca-opg-xenergy-xe100-industrial-framework": "823f6ba7b2b3965c",
   "prg-ca-prodigy-des-nedhe-tnpp-mou": "b66979789bd139fe",
   "prg-ca-xenergy-alberta-xe100-feasibility": "dc378a5f0e9657f2",
   "prg-cn-cgn-tsinghua-nhr200ii-heating-demonstration": "5ffe6e164d6328f1",
   "prg-cn-cnnc-acp100s-floating-demonstration": "4bf937c41caf5957",
   "prg-cn-guizhou-small-reactor-demonstration": "ac3a71371e0bca1e",
   "prg-cn-htgr-industrial-chain-alliance": "4eb4f6a0cd6867a2",
   "prg-cn-sinap-thorium-msr-prototype": "d1d44192c1488f5e",
   "prg-co-eje-cafetero-smr-viability-study": "4c5bf76b928fe19e",
   "prg-ec-nuclear-plan-modular-reactor": "8bd5f16b0ccf5848",
   "prg-fr-ppe3-first-smr-target": "1852e72fd851aecc",
   "prg-fr-stellaria-equinix-preorder": "061ad9b5ce2ad9f8",
   "prg-gb-terrapower-kbr-natrium-uk-siting": "1f8be3da478d5c7c",
   "prg-gb-ulc-energy-chiltern-vital-smr-clusters": "e818c7385114d6cf",
   "prg-gn-rosatom-floating-npp-mou": "130a6ee8ab7ee091",
   "prg-gr-fnpp-joint-development-program-study": "430186fd850b4761",
   "prg-gr-inter-ministerial-committee-smr": "5f47e92348186caf",
   "prg-hr-nuclear-working-group-smr-siting": "b534f55e3dc56b4c",
   "prg-hu-hunatom-sge-bwrx300-loi": "ae69564e8bcc4e7b",
   "prg-hu-mvm-holtec-smr300-mou": "1ac5cd6e73cb697d",
   "prg-hu-us-hungary-nuclear-mou-2025": "ace3a3fcfa47c943",
   "prg-id-brin-peluit40-pln-nusantara": "4405666ef791fb05",
   "prg-id-pertamina-nre-saltfoss-cmsr": "6002b86d74e90c58",
   "prg-id-west-kalimantan-smr-feasibility-study": "cb8bfa32d05e56de",
   "prg-in-ru-rosatom-india-fnpp-working-group": "3b7917c5fcc42505",
   "prg-iq-smr-consideration-russia-talks": "37e31a70cb7fbfdf",
   "prg-ir-aeoi-rosatom-small-npp-mou": "3d01dac24f1afd44",
   "prg-it-edf-nuward-edison-italy": "8d99df107a2f51c6",
   "prg-jo-jaec-khnp-ismr-feasibility-mou": "bec6458536f76dec",
   "prg-jo-jaec-xenergy-xe100-mou": "ca54e8c8fef90537",
   "prg-kg-rosatom-small-npp": "f01abdea1d89de91",
   "prg-kr-busan-smr-special-zone": "c41fd89ec793a070",
   "prg-kr-kaeri-kocia-htgr-mou": "7c0c39f90b148ae5",
   "prg-kr-nano-ds-danseok-mmr-mou": "01a0cca4ae5199c9",
   "prg-kr-nssc-smr-pre-review": "6a7e5bf687a32151",
   "prg-kr-terrapower-sk-innovation-natrium-term-sheet": "79cfbca8f1901a2d",
   "prg-lt-inpp-newcleo-feasibility-mou": "097b0aa16b766f45",
   "prg-lt-sge-altra-gvh-bwrx300-mou": "86a5a54341ba27c5",
   "prg-nl-hexana-atoomcooperatie-mou": "fef21f28993fb58c",
   "prg-nl-overijssel-smr-siting-study": "d27b48e96b8c697c",
   "prg-no-aecon-norsk-kjernekraft-bwrx300": "eebc71bc5dbd38c4",
   "prg-no-norsk-kjernekraft-hexana-mou": "e4fb43c7c441bf16",
   "prg-no-norsk-kjernekraft-saltfoss-loi": "d8dd60b88c041195",
   "prg-no-nuclear-commission-nou-2026-4": "c40422ae71a6cab4",
   "prg-ph-doe-rosatom-smr-cooperation": "398a38522020a6b8",
   "prg-ph-meralco-usnc-mmr-prefeasibility": "5e31e4d8247f1532",
   "prg-ph-national-nuclear-programme": "4af5feb9dbea3e1c",
   "prg-ph-stgr20-letter-of-intent": "131c42c667c1e546",
   "prg-pl-enea-last-energy-loi": "b91f98de1f43b52d",
   "prg-pl-last-energy-ksse": "3387d9e25a23c398",
   "prg-pl-respect-energy-edf-nuward": "8907e54a65d7be25",
   "prg-pl-unimot-getka-nuscale": "381d784568058186",
   "prg-pr-nuclear-alternative-project-smr-siting-study": "1c5e397b5fe5c27e",
   "prg-py-us-ncmou-smr-microreactor-plans": "67fd9c4d216affec",
   "prg-ro-last-energy-cncan-licensing": "6ed411a24f67b713",
   "prg-rs-smr-1200mw-target": "746b2acddcc91223",
   "prg-ru-gazprom-tambey-fpu-study": "67790d6fffbbbc7c",
   "prg-ru-pevek-additional-fpu-study": "c1a963cdd543aff1",
   "prg-ru-primorsky-floating-units-study": "4e037ba6977bbe9c",
   "prg-ru-shelf-m-prospective-arctic-sites": "5a812a77582ce839",
   "prg-ru-vk300-arkhangelsk-feasibility": "89330c76ee8edc4c",
   "prg-rw-nano-raeb-mou": "6b0d37aaf57b4a67",
   "prg-sa-dl-ec-swcc-smr-desalination-mou": "8c38cf833ee8de5e",
   "prg-sa-kacare-cnec-htr": "10ee5aa2e66c2b9d",
   "prg-sa-kacare-kaeri-smart": "59d58b946b9e57cd",
   "prg-sg-ema-khnp-smr-study-mou": "32e2921a6bf11616",
   "prg-si-smr-option-studies": "4d92226636c7e971",
   "prg-sk-javys-westinghouse-ap300-mou": "1ebeebc62af12cd6",
   "prg-sk-project-phoenix-smr-feasibility": "d9b55e9f7e7c9705",
   "prg-sn-nuclear-power-programme-smr": "5177eef5aed30d44",
   "prg-sv-nuclear-programme": "0d5552fd3dbc3ac4",
   "prg-th-egat-ustda-smr-feasibility-study": "ff24bcbf9ef4237f",
   "prg-th-gpsc-saltfoss-cmsr": "bb8827f7173df565",
   "prg-th-kr-khnp-egat-smr-mou": "f0fdd5195f54f51a",
   "prg-tr-smr-5000mwe-2050-target": "fb38b59e02f9e36c",
   "prg-tr-ustda-tunas-smr-roadmap": "3435582093289024",
   "prg-ua-chornobyl-zone-smr-siting": "3f746c2910cf8d97",
   "prg-ua-energoatom-edf-nuward": "d7a5f8ee536a82f7",
   "prg-ua-energoatom-nuscale-mou": "36f9c4a8052b93af",
   "prg-ua-energoatom-rolls-royce-smr-mou": "453943a0827c3383",
   "prg-ua-energoatom-westinghouse-ap300-mou": "20a824f95a38843a",
   "prg-ua-smr-roadmap-and-draft-law": "c274a9b44a8fbc86",
   "prg-us-arkansas-nuclear-feasibility-study": "1c38ef54b3177091",
   "prg-us-bwxt-wyoming-energy-authority-banr-study": "24edd6a043f7d45b",
   "prg-us-constellation-clinton-smr-evaluation": "35e356c5315a88cc",
   "prg-us-cvea-usnc-mmr-feasibility": "f97efc949e899021",
   "prg-us-energysolutions-ipa-intermountain-nuclear": "4066911250974450",
   "prg-us-holtec-entergy-hyundai-smr300": "99e67165f5c36114",
   "prg-us-holtec-smr300-decommissioning-sites": "7e8ae4c53f317c8f",
   "prg-us-idaho-strategic-radiant-kaleidos": "1f658e629de32c0f",
   "prg-us-indiana-oed-eli-lilly-nuclear-loi": "fb6b9c5c0e958b2c",
   "prg-us-maryland-mea-xenergy-coal-to-nuclear-study": "961164267550b120",
   "prg-us-nano-afwerx-kronos-jbab-study": "48c134fad72cc8bc",
   "prg-us-nano-ameresco-microreactor-mou": "58258f7155475f06",
   "prg-us-nano-doe-id-zeus-odin-siting-mou": "436e82d21dfb0b11",
   "prg-us-nextera-smr-colocation-evaluation": "5ee5f198c6dd7098",
   "prg-us-nypa-upstate-advanced-nuclear": "5cf254be742f781f",
   "prg-us-oklo-wyoming-hyperscale-loi": "dfde56d55461d635",
   "prg-us-pacificorp-terrapower-natrium-study": "bb1d7de1ada2e230",
   "prg-us-srns-geh-prism-srs-2010": "d0ac6b140d2c5bdc",
   "prg-us-terra-innovatum-ameresco-solo-mou": "da796c0e41bc8d12",
   "prg-us-terra-innovatum-uvation-solo-loi": "f45a6f3864a31a98",
   "prg-us-terrestrial-energysolutions-imsr-siting-mou": "3ab37ecaa39054d7",
   "prg-us-texas-tech-acu-natura-produced-water-msr": "a1fb5513f0b14432",
   "prg-us-utah-terrapower-flagship-natrium-mou": "ea325067589cad64",
   "prg-vn-dong-nai-pilot-smr-plan": "49b315f3006f6719",
   "prg-vn-pecc2-saltfoss-siemens-floating-study": "f4bd73eb6f5557f0",
   "prg-za-irp2025-nuclear-necsa-smr": "7538fa1aa7dee285",
   "prg-gb-amr-rdd-htgr-demonstration": "6109fab19d87fd46",
   "prg-us-natura-nov-shepherd-commercialisation-2025": "671190e8766d7a20",
   "prg-us-natura-3m-lithium7-cooperation-2025": "63b24a0987fba382",
   "prg-us-bwxt-nfs-haleu-deconversion-2024": "22932abff9adfe42",
   "prg-ca-bwxt-westinghouse-ap300-components-mou-2024": "a08d529a0c9116a8",
   "prg-gb-terrestrial-springfields-imsr-fuel-pilot-2025": "6fa93caf66746226",
   "prg-br-mnb-technology-development": "be5d988bfd8bcae1",
   "prg-us-kairos-bwxt-triso-collaboration-2025": "84fb0363e487f17f",
   "prg-us-natura-quadrant-haleu-framework-2026": "556b1f10733cdb23",
   "prg-us-natura-hifunda-sensor-development-2026": "eb754e5efada9911",
   "prg-nl-rotterdam-smr-supply-chain-study": "c8fe5c63245a67db",
   "prg-ca-us-nucleon-arc-mou-20250513": "95106dd34158febe",
   "prg-ca-arc-invest-alberta-mou-20230324": "5306ac131b072641",
   "prg-us-darpa-fat-cat-autonomous-reactor-research": "72c43fada74c5e86",
   "prg-fr-newcleo-mox-pilot-safety-options-2026": "f330cf6cf9c2ff6b"
  },
  "policies": {},
  "regulatory_actions": {},
  "events": {}
 },
 "seed": {
  "paths": [
   "dist/site/data/smrmap-dataset.json",
   "dist/site/updates.html",
   "dist/site/data/policies.json",
   "dist/site/data/regulatory-actions.json",
   "dist/site/data/events.json"
  ],
  "first_commit": "bfa5e29e7b7c4bd0bf1559f9f41e7f6be2ca543c",
  "last_commit": "38d3e2ded31107c0f42d6634cbce5c89c7efd677",
  "versions": 144
 }
}
