Designs / dsn-aris-svbr-100

SVBR-100

SVBR-100 is identified as a small modular reactor design in the ARIS status report dated 2024-10-15, attributed to AKME-engineering JSC. This dated design identity does not establish current availability, a deployment site, output, or regulatory permission. Technical values remain unknown here pending an independent scope and basis check.

Source snapshot: 2024-10-15 (ARIS report publication). Source review does not establish current availability or a deployment.

Class
SMR
Technology
Other
Coolant
unknown
Spectrum
unknown
Developer / vendor(s)
AKME-engineering JSC
Module electrical
—
Module thermal
—
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-02

Tracked deployment projects