SMR coverage: countries, sources and gaps
See where SMRMap has researched small modular reactor projects, which sources were checked and which questions remain open. Coverage is incomplete.
In short
- SMRMap publishes 222 source-linked projects and proposals; each record links to its sources and its review date.
- Research covered 122 countries; 30 had published projects or proposals in this research snapshot.
- 41 research rows are still open, and 73 UN member states have no country-specific source route, so the list is not a complete census.
- The rest of this page is the research ledger behind those records: country coverage, open questions, sources and how counts work.
Key numbers
These counts answer different questions; quote the one that fits.
- Published projects and proposals
- 222
- Source-linked project records of every stage, including canceled ones. Not a count of reactors built.
- Countries with a published project
- 30
- Countries where at least one of those projects is recorded.
- Countries with a program or agreement
- 62
- Countries that a published plan, agreement, study or government program concerns.
- Countries with a project or program
- 70
- Either of the two above; each has a country page.
- Countries researched
- 122
- At least one documented country-specific source route, research snapshot of 2 Oct 2026. It includes every country above and many with no published record.
Reconciled against these named source snapshots as of 2026-10-02; discovery routes, the 3 October 2026 worldwide audit and the 3 October 2026 US coverage finish (named US source snapshots) were reviewed to 2026-10-03, and the 6 October 2026 worldwide coverage pass (current inventory editions and original-language regulator, government, operator and developer routes) to 2026-10-06. The 8 October 2026 inventory-completion pass resolved JMR inclusion and read the named design and planning documents; The 13 October 2026 bounded qualification and project-depth pass reviewed selected primary documents and compared the current 121-entry ARIS enumeration with its saved snapshot; other project sources were not rechecked. This is not a claim that every SMR has been found.
This page covers deployment records and their sources. What the US policy review has and has not read, for all 50 states, the District of Columbia and five territories, is in the research coverage table on the policy page. Which sources are checked for new and changed records, and the remaining gaps by country and developer, are on how SMRMap finds and updates records.
Source snapshot cutoff 2026-10-02; latest dated research pass 2026-10-30. Counts on this page are read from the research ledger and the publication selection. A completed research pass does not remove an unresolved row.
122 countries investigated · 30 with published projects/proposals in this research snapshot · 73 UN members without a country-specific source route (including 73 without a country entry). Cross-border inventories are separate from country research. See Countries for current published project and program coverage.
Find country coverage
Countries and territories with documented research, plus every unreviewed UN member. Zero published records does not mean zero reactors. A reconciled listing is complete only for its named, dated snapshot.
197 countries and territories listed
No countries match these filters.
| Country or territory | Research status | Published records | Evidence |
|---|---|---|---|
| Afghanistan (AF) | Unreviewed | 0 records | No country route documented |
| Albania (AL) | Partially researched | 0 records | 1 documented routes |
| Algeria (DZ) | Partially researched | 0 records | 1 documented routes |
| Andorra (AD) | Unreviewed | 0 records | No country route documented |
| Angola (AO) | Partially researched | 0 records | 1 documented routes |
| Antarctica (AQ) | Candidate rows only | 0 records | No country route documented |
| Antigua and Barbuda (AG) | Unreviewed | 0 records | No country route documented |
| Argentina (AR) | Partially researched | 3 records | 15 documented routes |
| Armenia (AM) | Partially researched | 0 records | 2 documented routes |
| Australia (AU) | Partially researched | 0 records | 1 documented routes |
| Austria (AT) | Partially researched | 0 records | 1 documented routes |
| Azerbaijan (AZ) | Partially researched | 0 records | 1 documented routes |
| Bahamas (BS) | Unreviewed | 0 records | No country route documented |
| Bahrain (BH) | Partially researched | 0 records | 1 documented routes |
| Bangladesh (BD) | Partially researched | 0 records | 1 documented routes |
| Barbados (BB) | Unreviewed | 0 records | No country route documented |
| Belarus (BY) | Partially researched | 0 records | 1 documented routes |
| Belgium (BE) | Partially researched | 1 record | 5 documented routes |
| Belize (BZ) | Unreviewed | 0 records | No country route documented |
| Benin (BJ) | Unreviewed | 0 records | No country route documented |
| Bhutan (BT) | Partially researched | 0 records | 1 documented routes |
| Bolivia (BO) | Partially researched | 0 records | 1 documented routes |
| Bosnia and Herzegovina (BA) | Partially researched | 0 records | 1 documented routes |
| Botswana (BW) | Unreviewed | 0 records | No country route documented |
| Brazil (BR) | Partially researched | 1 record | 15 documented routes |
| Brunei (BN) | Unreviewed | 0 records | No country route documented |
| Bulgaria (BG) | Partially researched | 0 records | 5 documented routes |
| Burkina Faso (BF) | Partially researched | 0 records | 2 documented routes |
| Burundi (BI) | Partially researched | 0 records | 2 documented routes |
| Cabo Verde (CV) | Unreviewed | 0 records | No country route documented |
| Cambodia (KH) | Partially researched | 0 records | 2 documented routes |
| Cameroon (CM) | Unreviewed | 0 records | No country route documented |
| Canada (CA) | Reconciled listing | 11 records | 30 documented routes |
| Central African Republic (CF) | Unreviewed | 0 records | No country route documented |
| Chad (TD) | Unreviewed | 0 records | No country route documented |
| Chile (CL) | Partially researched | 0 records | 1 documented routes |
| China (CN) | Reconciled listing | 22 records | 45 documented routes |
| Colombia (CO) | Partially researched | 0 records | 2 documented routes |
| Comoros (KM) | Unreviewed | 0 records | No country route documented |
| Congo (CG) | Partially researched | 0 records | 2 documented routes |
| Costa Rica (CR) | Unreviewed | 0 records | No country route documented |
| Croatia (HR) | Partially researched | 0 records | 2 documented routes |
| Cuba (CU) | Unreviewed | 0 records | No country route documented |
| Cyprus (CY) | Unreviewed | 0 records | No country route documented |
| Czechia (CZ) | Reconciled listing | 3 records | 10 documented routes |
| Côte d'Ivoire (CI) | Partially researched | 0 records | 2 documented routes |
| DR Congo (CD) | Unreviewed | 0 records | No country route documented |
| Denmark (DK) | Partially researched | 0 records | 3 documented routes |
| Djibouti (DJ) | Unreviewed | 0 records | No country route documented |
| Dominica (DM) | Unreviewed | 0 records | No country route documented |
| Dominican Republic (DO) | Partially researched | 0 records | 1 documented routes |
| Ecuador (EC) | Partially researched | 0 records | 3 documented routes |
| Egypt (EG) | Partially researched | 0 records | 2 documented routes |
| El Salvador (SV) | Partially researched | 0 records | 2 documented routes |
| Equatorial Guinea (GQ) | Unreviewed | 0 records | No country route documented |
| Eritrea (ER) | Unreviewed | 0 records | No country route documented |
| Estonia (EE) | Partially researched | 1 record | 8 documented routes |
| Eswatini (SZ) | Unreviewed | 0 records | No country route documented |
| Ethiopia (ET) | Partially researched | 0 records | 1 documented routes |
| Fiji (FJ) | Unreviewed | 0 records | No country route documented |
| Finland (FI) | Reconciled listing | 3 records | 11 documented routes |
| France (FR) | Reconciled listing | 8 records | 19 documented routes |
| Gabon (GA) | Unreviewed | 0 records | No country route documented |
| Gambia (GM) | Unreviewed | 0 records | No country route documented |
| Georgia (GE) | Partially researched | 0 records | 1 documented routes |
| Germany (DE) | Partially researched | 0 records | 1 documented routes |
| Ghana (GH) | Partially researched | 1 record | 5 documented routes |
| Greece (GR) | Partially researched | 0 records | 1 documented routes |
| Greenland (GL) | Candidate rows only | 0 records | No country route documented |
| Grenada (GD) | Unreviewed | 0 records | No country route documented |
| Guatemala (GT) | Unreviewed | 0 records | No country route documented |
| Guinea (GN) | Partially researched | 0 records | 1 documented routes |
| Guinea-Bissau (GW) | Unreviewed | 0 records | No country route documented |
| Guyana (GY) | Unreviewed | 0 records | No country route documented |
| Haiti (HT) | Unreviewed | 0 records | No country route documented |
| Honduras (HN) | Unreviewed | 0 records | No country route documented |
| Hungary (HU) | Partially researched | 0 records | 7 documented routes |
| Iceland (IS) | Unreviewed | 0 records | No country route documented |
| India (IN) | Reconciled listing | 3 records | 15 documented routes |
| Indonesia (ID) | Reconciled listing | 6 records | 28 documented routes |
| Iran (IR) | Partially researched | 0 records | 5 documented routes |
| Iraq (IQ) | Partially researched | 0 records | 1 documented routes |
| Ireland (IE) | Partially researched | 0 records | 2 documented routes |
| Israel (IL) | Partially researched | 0 records | 5 documented routes |
| Italy (IT) | Partially researched | 0 records | 8 documented routes |
| Jamaica (JM) | Partially researched | 0 records | 2 documented routes |
| Japan (JP) | Partially researched | 1 record | 11 documented routes |
| Jordan (JO) | Partially researched | 0 records | 3 documented routes |
| Kazakhstan (KZ) | Partially researched | 1 record | 3 documented routes |
| Kenya (KE) | Partially researched | 0 records | 4 documented routes |
| Kiribati (KI) | Unreviewed | 0 records | No country route documented |
| Kuwait (KW) | Partially researched | 0 records | 1 documented routes |
| Kyrgyzstan (KG) | Partially researched | 0 records | 2 documented routes |
| Laos (LA) | Partially researched | 0 records | 1 documented routes |
| Latvia (LV) | Partially researched | 0 records | 3 documented routes |
| Lebanon (LB) | Unreviewed | 0 records | No country route documented |
| Lesotho (LS) | Partially researched | 0 records | 1 documented routes |
| Liberia (LR) | Unreviewed | 0 records | No country route documented |
| Libya (LY) | Partially researched | 0 records | 1 documented routes |
| Liechtenstein (LI) | Unreviewed | 0 records | No country route documented |
| Lithuania (LT) | Partially researched | 0 records | 4 documented routes |
| Luxembourg (LU) | Unreviewed | 0 records | No country route documented |
| Madagascar (MG) | Unreviewed | 0 records | No country route documented |
| Malawi (MW) | Unreviewed | 0 records | No country route documented |
| Malaysia (MY) | Partially researched | 0 records | 1 documented routes |
| Maldives (MV) | Unreviewed | 0 records | No country route documented |
| Mali (ML) | Partially researched | 0 records | 1 documented routes |
| Malta (MT) | Unreviewed | 0 records | No country route documented |
| Marshall Islands (MH) | Unreviewed | 0 records | No country route documented |
| Mauritania (MR) | Unreviewed | 0 records | No country route documented |
| Mauritius (MU) | Unreviewed | 0 records | No country route documented |
| Mexico (MX) | Partially researched | 0 records | 3 documented routes |
| Micronesia (FM) | Unreviewed | 0 records | No country route documented |
| Moldova (MD) | Partially researched | 0 records | 1 documented routes |
| Monaco (MC) | Unreviewed | 0 records | No country route documented |
| Mongolia (MN) | Partially researched | 0 records | 2 documented routes |
| Montenegro (ME) | Partially researched | 0 records | 1 documented routes |
| Morocco (MA) | Access blocked | 0 records | 1 documented routes |
| Mozambique (MZ) | Partially researched | 0 records | 1 documented routes |
| Myanmar (MM) | Partially researched | 1 record | 2 documented routes |
| Namibia (NA) | Access blocked | 0 records | 1 documented routes |
| Nauru (NR) | Unreviewed | 0 records | No country route documented |
| Nepal (NP) | Unreviewed | 0 records | No country route documented |
| Netherlands (NL) | Reconciled listing | 2 records | 14 documented routes |
| New Zealand (NZ) | Partially researched | 0 records | 1 documented routes |
| Nicaragua (NI) | Unreviewed | 0 records | No country route documented |
| Niger (NE) | Partially researched | 0 records | 1 documented routes |
| Nigeria (NG) | Partially researched | 0 records | 1 documented routes |
| North Korea (KP) | Partially researched | 0 records | 1 documented routes |
| North Macedonia (MK) | Partially researched | 0 records | 1 documented routes |
| Norway (NO) | Reconciled listing | 10 records | 14 documented routes |
| Oman (OM) | Partially researched | 0 records | 1 documented routes |
| Pakistan (PK) | Partially researched | 0 records | 1 documented routes |
| Palau (PW) | Unreviewed | 0 records | No country route documented |
| Panama (PA) | Partially researched | 0 records | 1 documented routes |
| Papua New Guinea (PG) | Unreviewed | 0 records | No country route documented |
| Paraguay (PY) | Partially researched | 0 records | 2 documented routes |
| Peru (PE) | Partially researched | 0 records | 1 documented routes |
| Philippines (PH) | Partially researched | 0 records | 17 documented routes |
| Poland (PL) | Reconciled listing | 12 records | 19 documented routes |
| Portugal (PT) | Partially researched | 0 records | 1 documented routes |
| Puerto Rico (PR) | Partially researched | 0 records | 3 documented routes |
| Qatar (QA) | Partially researched | 0 records | 1 documented routes |
| Romania (RO) | Reconciled listing | 3 records | 9 documented routes |
| Russia (RU) | Reconciled listing | 11 records | 24 documented routes |
| Rwanda (RW) | Reconciled listing | 1 record | 17 documented routes |
| Saint Kitts and Nevis (KN) | Unreviewed | 0 records | No country route documented |
| Saint Lucia (LC) | Unreviewed | 0 records | No country route documented |
| Saint Vincent and the Grenadines (VC) | Unreviewed | 0 records | No country route documented |
| Samoa (WS) | Unreviewed | 0 records | No country route documented |
| San Marino (SM) | Unreviewed | 0 records | No country route documented |
| Sao Tome and Principe (ST) | Unreviewed | 0 records | No country route documented |
| Saudi Arabia (SA) | Partially researched | 0 records | 7 documented routes |
| Senegal (SN) | Partially researched | 0 records | 1 documented routes |
| Serbia (RS) | Partially researched | 0 records | 2 documented routes |
| Seychelles (SC) | Unreviewed | 0 records | No country route documented |
| Sierra Leone (SL) | Unreviewed | 0 records | No country route documented |
| Singapore (SG) | Partially researched | 0 records | 2 documented routes |
| Slovakia (SK) | Partially researched | 1 record | 8 documented routes |
| Slovenia (SI) | Partially researched | 0 records | 3 documented routes |
| Solomon Islands (SB) | Unreviewed | 0 records | No country route documented |
| Somalia (SO) | Unreviewed | 0 records | No country route documented |
| South Africa (ZA) | Reconciled listing | 3 records | 18 documented routes |
| South Korea (KR) | Reconciled listing | 3 records | 12 documented routes |
| South Sudan (SS) | Unreviewed | 0 records | No country route documented |
| Spain (ES) | Partially researched | 0 records | 1 documented routes |
| Sri Lanka (LK) | Partially researched | 0 records | 1 documented routes |
| Sudan (SD) | Partially researched | 0 records | 2 documented routes |
| Suriname (SR) | Unreviewed | 0 records | No country route documented |
| Sweden (SE) | Reconciled listing | 6 records | 18 documented routes |
| Switzerland (CH) | Partially researched | 1 record | 3 documented routes |
| Syria (SY) | Unreviewed | 0 records | No country route documented |
| Taiwan (TW) | Partially researched | 0 records | 2 documented routes |
| Tajikistan (TJ) | Reconciled listing | 0 records | 1 documented routes |
| Tanzania (TZ) | Partially researched | 0 records | 1 documented routes |
| Thailand (TH) | Partially researched | 0 records | 5 documented routes |
| Timor-Leste (TL) | Unreviewed | 0 records | No country route documented |
| Togo (TG) | Unreviewed | 0 records | No country route documented |
| Tonga (TO) | Unreviewed | 0 records | No country route documented |
| Trinidad and Tobago (TT) | Unreviewed | 0 records | No country route documented |
| Tunisia (TN) | Partially researched | 0 records | 1 documented routes |
| Turkmenistan (TM) | Unreviewed | 0 records | No country route documented |
| Tuvalu (TV) | Unreviewed | 0 records | No country route documented |
| Türkiye (TR) | Partially researched | 0 records | 4 documented routes |
| Uganda (UG) | Partially researched | 0 records | 1 documented routes |
| Ukraine (UA) | Partially researched | 3 records | 7 documented routes |
| United Arab Emirates (AE) | Partially researched | 0 records | 12 documented routes |
| United Kingdom (GB) | Reconciled listing | 10 records | 32 documented routes |
| United States (US) | Reconciled listing | 89 records | 119 documented routes |
| Uruguay (UY) | Partially researched | 0 records | 1 documented routes |
| Uzbekistan (UZ) | Partially researched | 1 record | 5 documented routes |
| Vanuatu (VU) | Unreviewed | 0 records | No country route documented |
| Venezuela (VE) | Unreviewed | 0 records | No country route documented |
| Vietnam (VN) | Partially researched | 0 records | 10 documented routes |
| Yemen (YE) | Partially researched | 0 records | 1 documented routes |
| Zambia (ZM) | Partially researched | 0 records | 1 documented routes |
| Zimbabwe (ZW) | Partially researched | 0 records | 2 documented routes |
Country sources, snapshots and coverage limits
Country and source inventories
Completeness claims apply only to explicitly named, dated, fully enumerated source snapshots. Rows marked reconciled are finite, dated enumerations reconciled in full against that snapshot: a register or list page, a plan's tables, a company's full list as displayed, or an article or release that itself contains an explicitly bounded list (for example an official selection list). Rows marked incomplete are not a full enumeration: a listing read only in part, an article, release or project page without such a list, a search or look-up, or a secondary country profile; each note states its limit. A reconciled listing does not mean every project in that country has been found, and this release is not a complete worldwide SMR census.
Countries represented and investigated
A country is represented when it has a published record, or a deployment-level candidate row from any source that matches a record or is still open (32 countries); 2 more are listed only through program-context or outside-scope rows. It is investigated when at least one route was documented for that country itself (122 countries). 0 countries are represented only through global inventories or other countries' routes; 92 investigated countries have no published record. Countries with published records: 30. Cross-border inventories and search routes (61) are never counted as a country: 54 are listed below (with the routes, or with the coverage gaps when they have no single source), and 7 summaries of 177 multi-country sources read in the 3 October 2026 audit are kept in the research record because they have no single citation. Deployment rows naming several countries (14) or none (11) are not assigned to a country. Design rows are excluded because their country is the design's origin. No record means no supported deployment was found in these routes, not that none exists.
Research status, per country: reconciled listing means at least one finite, dated listing was reconciled in full (19 countries); partially researched means routes were documented but none was a full listing (101); access blocked means every documented route for that country could not be read (2); candidate rows only means the country appears only through rows from other sources (2). The 73 United Nations member states not in this table are unreviewed: no route was documented for them, which is not a finding that they have no small modular reactor activity. A reconciled listing never means every project in that country has been found.
73 UN member states have no country-specific source route: 73 have no country entry, and 0 have candidate or context rows only. A global inventory entry is not a national-source investigation.
| Country | Investigated | Research status | Published records | Country routes | Route types | Candidate outcomes (all sources) |
|---|---|---|---|---|---|---|
| United Arab Emirates (AE) | yes | partially researched | 0 | 12 | government, inventory, operator_host, other, regulator, vendor_portfolio | Outside scope: 1; Program or historical context: 6 |
| Albania (AL) | yes | partially researched | 0 | 1 | inventory | None recorded |
| Armenia (AM) | yes | partially researched | 0 | 2 | government, new_releases | Outside scope: 1; Program or historical context: 1 |
| Angola (AO) | yes | partially researched | 0 | 1 | inventory | None recorded |
| Antarctica (AQ) | no | candidate rows only | 0 | 0 | Program or historical context: 1 | |
| Argentina (AR) | yes | partially researched | 3 | 15 | government, new_releases, other, vendor_portfolio | Existing match: 8; Outside scope: 1; Program or historical context: 1 |
| Austria (AT) | yes | partially researched | 0 | 1 | government | None recorded |
| Australia (AU) | yes | partially researched | 0 | 1 | inventory | Program or historical context: 2 |
| Azerbaijan (AZ) | yes | partially researched | 0 | 1 | inventory | None recorded |
| Bosnia and Herzegovina (BA) | yes | partially researched | 0 | 1 | other | None recorded |
| Bangladesh (BD) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Belgium (BE) | yes | partially researched | 1 | 5 | new_releases, operator_host, regulator | Program or historical context: 1 |
| Burkina Faso (BF) | yes | partially researched | 0 | 2 | government, vendor_portfolio | Program or historical context: 2 |
| Bulgaria (BG) | yes | partially researched | 0 | 5 | government, new_releases, operator_host, regulator | Program or historical context: 2 |
| Bahrain (BH) | yes | partially researched | 0 | 1 | new_releases | Program or historical context: 1 |
| Burundi (BI) | yes | partially researched | 0 | 2 | new_releases, vendor_portfolio | None recorded |
| Bolivia (BO) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Brazil (BR) | yes | partially researched | 1 | 15 | government, inventory, new_releases, other, regulator | Existing match: 1; Outside scope: 1; Program or historical context: 8 |
| Bhutan (BT) | yes | partially researched | 0 | 1 | operator_host | None recorded |
| Belarus (BY) | yes | partially researched | 0 | 1 | new_releases | None recorded |
| Canada (CA) | yes | reconciled listing | 11 | 30 | government, operator_host, other, prior pass, regulator, vendor_portfolio | Duplicate: 2; Existing match: 19; Outside scope: 4; Program or historical context: 13 |
| Congo (CG) | yes | partially researched | 0 | 2 | new_releases | None recorded |
| Switzerland (CH) | yes | partially researched | 1 | 3 | operator_host, regulator, vendor_portfolio | Existing match: 3; Program or historical context: 1 |
| Côte d'Ivoire (CI) | yes | partially researched | 0 | 2 | government | None recorded |
| Chile (CL) | yes | partially researched | 0 | 1 | other | None recorded |
| China (CN) | yes | reconciled listing | 22 | 45 | government, inventory, new_releases, operator_host, other, prior pass, regulator, vendor_portfolio | Duplicate: 1; Existing match: 37; Outside scope: 5; Unresolved: 8; Program or historical context: 6 |
| Colombia (CO) | yes | partially researched | 0 | 2 | government, new_releases | Program or historical context: 1 |
| Czechia (CZ) | yes | reconciled listing | 3 | 10 | government, new_releases, operator_host, regulator | Existing match: 7; Program or historical context: 2 |
| Germany (DE) | yes | partially researched | 0 | 1 | government | Outside scope: 4; Program or historical context: 7 |
| Denmark (DK) | yes | partially researched | 0 | 3 | government, new_releases, vendor_portfolio | Program or historical context: 1 |
| Dominican Republic (DO) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Algeria (DZ) | yes | partially researched | 0 | 1 | other | Program or historical context: 2 |
| Ecuador (EC) | yes | partially researched | 0 | 3 | new_releases, other | Program or historical context: 2 |
| Estonia (EE) | yes | partially researched | 1 | 8 | government, new_releases, operator_host, regulator | Existing match: 4 |
| Egypt (EG) | yes | partially researched | 0 | 2 | inventory, other | Program or historical context: 1 |
| Spain (ES) | yes | partially researched | 0 | 1 | government | Outside scope: 1 |
| Ethiopia (ET) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Finland (FI) | yes | reconciled listing | 3 | 11 | government, new_releases, operator_host, regulator, vendor_portfolio | Existing match: 6; Outside scope: 2; Program or historical context: 1 |
| France (FR) | yes | reconciled listing | 8 | 19 | government, new_releases, operator_host, regulator, vendor_portfolio | Existing match: 12; Outside scope: 3; Unresolved: 1; Program or historical context: 4 |
| United Kingdom (GB) | yes | reconciled listing | 10 | 32 | government, new_releases, operator_host, other, prior pass, regulator, vendor_portfolio | Duplicate: 2; Existing match: 18; Outside scope: 13; Unresolved: 1; Program or historical context: 9 |
| Georgia (GE) | yes | partially researched | 0 | 1 | inventory | None recorded |
| Ghana (GH) | yes | partially researched | 1 | 5 | government, operator_host, other | Existing match: 1; Unresolved: 1 |
| Greenland (GL) | no | candidate rows only | 0 | 0 | Program or historical context: 1 | |
| Guinea (GN) | yes | partially researched | 0 | 1 | vendor_portfolio | Program or historical context: 1 |
| Greece (GR) | yes | partially researched | 0 | 1 | new_releases | None recorded |
| Croatia (HR) | yes | partially researched | 0 | 2 | government | None recorded |
| Hungary (HU) | yes | partially researched | 0 | 7 | government, new_releases, operator_host, regulator | Program or historical context: 2 |
| Indonesia (ID) | yes | reconciled listing | 6 | 28 | government, new_releases, operator_host, prior pass, regulator, vendor_portfolio | Duplicate: 1; Existing match: 15; Unresolved: 1; Program or historical context: 10 |
| Ireland (IE) | yes | partially researched | 0 | 2 | other | None recorded |
| Israel (IL) | yes | partially researched | 0 | 5 | new_releases | Program or historical context: 1 |
| India (IN) | yes | reconciled listing | 3 | 15 | government, new_releases, operator_host, regulator, vendor_portfolio | Excluded: 5; Existing match: 7; Outside scope: 3; Program or historical context: 8 |
| Iraq (IQ) | yes | partially researched | 0 | 1 | regulator | Program or historical context: 1 |
| Iran (IR) | yes | partially researched | 0 | 5 | government, inventory, new_releases, prior pass, vendor_portfolio | Outside scope: 3; Unresolved: 1; Program or historical context: 2 |
| Italy (IT) | yes | partially researched | 0 | 8 | government, new_releases, operator_host, regulator | Outside scope: 3; Program or historical context: 2 |
| Jamaica (JM) | yes | partially researched | 0 | 2 | government | Program or historical context: 2 |
| Jordan (JO) | yes | partially researched | 0 | 3 | government, inventory, other | Program or historical context: 3 |
| Japan (JP) | yes | partially researched | 1 | 11 | government, new_releases, operator_host, regulator, vendor_portfolio | Existing match: 3; Outside scope: 6; Program or historical context: 7 |
| Kenya (KE) | yes | partially researched | 0 | 4 | government, other | Outside scope: 3; Program or historical context: 2 |
| Kyrgyzstan (KG) | yes | partially researched | 0 | 2 | government, new_releases | Program or historical context: 3 |
| Cambodia (KH) | yes | partially researched | 0 | 2 | inventory, vendor_portfolio | None recorded |
| North Korea (KP) | yes | partially researched | 0 | 1 | prior pass | Outside scope: 2 |
| South Korea (KR) | yes | reconciled listing | 3 | 12 | government, new_releases, operator_host, regulator | Existing match: 6; Outside scope: 1; Program or historical context: 8 |
| Kuwait (KW) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Kazakhstan (KZ) | yes | partially researched | 1 | 3 | government, new_releases | Existing match: 1; Outside scope: 2; Program or historical context: 1 |
| Laos (LA) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Sri Lanka (LK) | yes | partially researched | 0 | 1 | government | Program or historical context: 2 |
| Lesotho (LS) | yes | partially researched | 0 | 1 | government | None recorded |
| Lithuania (LT) | yes | partially researched | 0 | 4 | government, new_releases, operator_host, regulator | Program or historical context: 2 |
| Latvia (LV) | yes | partially researched | 0 | 3 | government, new_releases, operator_host | Program or historical context: 1 |
| Libya (LY) | yes | partially researched | 0 | 1 | government | None recorded |
| Morocco (MA) | yes | access blocked | 0 | 1 | other | Program or historical context: 1 |
| Moldova (MD) | yes | partially researched | 0 | 1 | other | None recorded |
| Montenegro (ME) | yes | partially researched | 0 | 1 | government | None recorded |
| North Macedonia (MK) | yes | partially researched | 0 | 1 | other | None recorded |
| Mali (ML) | yes | partially researched | 0 | 1 | vendor_portfolio | Program or historical context: 1 |
| Myanmar (MM) | yes | partially researched | 1 | 2 | new_releases | Existing match: 2 |
| Mongolia (MN) | yes | partially researched | 0 | 2 | new_releases, operator_host | Program or historical context: 2 |
| Mexico (MX) | yes | partially researched | 0 | 3 | government, inventory, new_releases | Program or historical context: 2 |
| Malaysia (MY) | yes | partially researched | 0 | 1 | new_releases | Program or historical context: 1 |
| Mozambique (MZ) | yes | partially researched | 0 | 1 | inventory | None recorded |
| Namibia (NA) | yes | access blocked | 0 | 1 | government | Program or historical context: 1 |
| Niger (NE) | yes | partially researched | 0 | 1 | inventory | None recorded |
| Nigeria (NG) | yes | partially researched | 0 | 1 | regulator | Outside scope: 2; Program or historical context: 3 |
| Netherlands (NL) | yes | reconciled listing | 2 | 14 | government, new_releases, operator_host, other, regulator, vendor_portfolio | Existing match: 4; Outside scope: 2; Program or historical context: 5 |
| Norway (NO) | yes | reconciled listing | 10 | 14 | government, new_releases, operator_host, regulator | Existing match: 10; Program or historical context: 1 |
| New Zealand (NZ) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Oman (OM) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Panama (PA) | yes | partially researched | 0 | 1 | government | Program or historical context: 2 |
| Peru (PE) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Philippines (PH) | yes | partially researched | 0 | 17 | government, inventory, new_releases, operator_host, prior pass, vendor_portfolio | Outside scope: 1; Unresolved: 1; Program or historical context: 10 |
| Pakistan (PK) | yes | partially researched | 0 | 1 | operator_host | Outside scope: 2; Program or historical context: 1 |
| Poland (PL) | yes | reconciled listing | 12 | 19 | government, new_releases, operator_host, regulator | Existing match: 22; Outside scope: 1; Unresolved: 1; Program or historical context: 7 |
| Puerto Rico (PR) | yes | partially researched | 0 | 3 | government, operator_host | Program or historical context: 2 |
| Portugal (PT) | yes | partially researched | 0 | 1 | other | None recorded |
| Paraguay (PY) | yes | partially researched | 0 | 2 | government, new_releases | Program or historical context: 1 |
| Qatar (QA) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Romania (RO) | yes | reconciled listing | 3 | 9 | new_releases, operator_host, regulator, vendor_portfolio | Existing match: 10; Program or historical context: 3 |
| Serbia (RS) | yes | partially researched | 0 | 2 | new_releases, regulator | Program or historical context: 1 |
| Russia (RU) | yes | reconciled listing | 11 | 24 | government, new_releases, operator_host, prior pass, regulator, vendor, vendor_portfolio | Duplicate: 1; Existing match: 29; Outside scope: 5; Unresolved: 3; Program or historical context: 7 |
| Rwanda (RW) | yes | reconciled listing | 1 | 17 | government, operator_host, other, regulator, vendor_portfolio | Existing match: 2; Unresolved: 1; Program or historical context: 4 |
| Saudi Arabia (SA) | yes | partially researched | 0 | 7 | government, inventory, new_releases, other | Duplicate: 1; Program or historical context: 7 |
| Sudan (SD) | yes | partially researched | 0 | 2 | new_releases, other | None recorded |
| Sweden (SE) | yes | reconciled listing | 6 | 18 | government, new_releases, operator_host, prior pass, regulator, vendor_portfolio | Existing match: 11; Outside scope: 1; Unresolved: 1; Program or historical context: 7 |
| Singapore (SG) | yes | partially researched | 0 | 2 | government | Program or historical context: 3 |
| Slovenia (SI) | yes | partially researched | 0 | 3 | new_releases, operator_host, regulator | Outside scope: 1; Program or historical context: 1 |
| Slovakia (SK) | yes | partially researched | 1 | 8 | new_releases, operator_host, regulator, vendor_portfolio | Existing match: 3; Outside scope: 1; Program or historical context: 2 |
| Senegal (SN) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| El Salvador (SV) | yes | partially researched | 0 | 2 | government, new_releases | Program or historical context: 2 |
| Thailand (TH) | yes | partially researched | 0 | 5 | government, new_releases | Outside scope: 1; Program or historical context: 4 |
| Tajikistan (TJ) | yes | reconciled listing | 0 | 1 | new_releases | Program or historical context: 1 |
| Tunisia (TN) | yes | partially researched | 0 | 1 | other | Program or historical context: 1 |
| Türkiye (TR) | yes | partially researched | 0 | 4 | new_releases | Outside scope: 1; Program or historical context: 1 |
| Taiwan (TW) | yes | partially researched | 0 | 2 | new_releases, regulator | Program or historical context: 1 |
| Tanzania (TZ) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| Ukraine (UA) | yes | partially researched | 3 | 7 | new_releases, operator_host | Existing match: 5; Program or historical context: 2 |
| Uganda (UG) | yes | partially researched | 0 | 1 | other | Outside scope: 5 |
| United States (US) | yes | reconciled listing | 89 | 119 | government, inventory, new_releases, operator_host, other, prior pass, regulator, vendor_portfolio | Duplicate: 1; Excluded: 1; Existing match: 164; Outside scope: 36; Unresolved: 5; Program or historical context: 64 |
| Uruguay (UY) | yes | partially researched | 0 | 1 | other | None recorded |
| Uzbekistan (UZ) | yes | partially researched | 1 | 5 | government, new_releases, regulator, vendor_portfolio | Existing match: 4 |
| Vietnam (VN) | yes | partially researched | 0 | 10 | government, new_releases, operator_host | Outside scope: 1; Program or historical context: 5 |
| Yemen (YE) | yes | partially researched | 0 | 1 | government | Program or historical context: 1 |
| South Africa (ZA) | yes | reconciled listing | 3 | 18 | inventory, operator_host, other, regulator, vendor_portfolio | Existing match: 4; Outside scope: 1; Unresolved: 1; Program or historical context: 2 |
| Zambia (ZM) | yes | partially researched | 0 | 1 | government | Outside scope: 1 |
| Zimbabwe (ZW) | yes | partially researched | 0 | 2 | government, new_releases | None recorded |
Unreviewed United Nations member states (73)
Andorra (AD), Afghanistan (AF), Antigua and Barbuda (AG), Barbados (BB), Benin (BJ), Brunei (BN), Bahamas (BS), Botswana (BW), Belize (BZ), DR Congo (CD), Central African Republic (CF), Cameroon (CM), Costa Rica (CR), Cuba (CU), Cabo Verde (CV), Cyprus (CY), Djibouti (DJ), Dominica (DM), Eritrea (ER), Fiji (FJ), Micronesia (FM), Gabon (GA), Grenada (GD), Gambia (GM), Equatorial Guinea (GQ), Guatemala (GT), Guinea-Bissau (GW), Guyana (GY), Honduras (HN), Haiti (HT), Iceland (IS), Kiribati (KI), Comoros (KM), Saint Kitts and Nevis (KN), Lebanon (LB), Saint Lucia (LC), Liechtenstein (LI), Liberia (LR), Luxembourg (LU), Monaco (MC), Madagascar (MG), Marshall Islands (MH), Mauritania (MR), Malta (MT), Mauritius (MU), Maldives (MV), Malawi (MW), Nicaragua (NI), Nepal (NP), Nauru (NR), Papua New Guinea (PG), Palau (PW), Solomon Islands (SB), Seychelles (SC), Sierra Leone (SL), San Marino (SM), Somalia (SO), Suriname (SR), South Sudan (SS), Sao Tome and Principe (ST), Syria (SY), Eswatini (SZ), Chad (TD), Togo (TG), Timor-Leste (TL), Turkmenistan (TM), Tonga (TO), Trinidad and Tobago (TT), Tuvalu (TV), Saint Vincent and the Grenadines (VC), Venezuela (VE), Vanuatu (VU), Samoa (WS)
Source routes
Albania · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| AL | WNA Emerging Nuclear Energy Countries (Albania listed) + historic Croatia-Albania joint facility mention | incomplete | partial - emerging interest / historical joint-facility mention; no current SMR deployment |
Algeria · 1 cited routes
No published project record for Algeria in this release. All Algeria records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| DZ | TSA Algérie and Maghreb Emergent (15 Sep 2026): Algeria discusses SMRs with IAEA (TSA Algérie; Maghreb Emergent), 15 September 2026 | incomplete | partial: Two articles |
Angola · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| AO | WNISR 2024 Table 13 Rosatom/Africa agreements (Angola absent) | incomplete | partial - 2024 WNISR Rosatom-agreements table only; Angola is absent from that table. Absence from this limited list is not a full-country listing. |
Argentina · 15 cited routes
Published project records for Argentina (3): ACR-300 SMR proposal at Atucha (Meitner Energy), CAREM-25, Formosa commercial CAREM proposal (2010 agreement). All Argentina records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| AR | Infobae / UPI / Buenos Aires Herald on Meitner ACR-300 at Atucha (Jul 2026) | incomplete | partial - Government-announced private ACR-300 project at Atucha; no argentina.gob.ar primary located. |
| AR | Energía y Transporte: CAREM status (Apr 2026) | incomplete | partial - CAREM works ceased early 2025; CNEA downgrading project unit; paused, not canceled. |
| AR | WNA 'Nuclear Power in Argentina' (discovery) (World Nuclear Association (Information Library); Updated Friday, 31 July 2026) | incomplete | partial: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| AR | Argentina announces privately-financed SMR plan (World Nuclear News (trade press, quoting Economy Minister statement on X); 2026-07-10) | incomplete | partial: a single news article, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: Meitner Energy website (meitnerenergy.com) refused connection; INVAP /en/nuclear-area/ page 404 |
| AR | CNEA y la empresa NA-SA firman un contrato para completar la construcción del CAREM (Government of Argentina (argentina.gob.ar); 2021-07-05) | incomplete | partial: a single government release about one contract, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: Later 2025 contract release not fetched |
| AR | Cancelan el proyecto Atucha III y habilitan una licitación para un reactor privado en parte del predio (Dinamicarg), 2026-10-05 | incomplete | partial: Single article read in full. |
| AR | Atucha III: cancelan el Hualong y habilitan una nueva licitación nuclear en Lima (Diario La Primera (Zárate/Campana region)), 2026-10-05 | incomplete | partial: Single article read in full. |
| AR | Teófilo Lacroze renunció como CEO de Meitner y crecen las dudas sobre el proyecto (EconoJournal), 2026-08-28 | incomplete | partial: Single article read in full. |
| AR | Super RIGI: Meitner Energy presentó una inversión de US$1200 millones para construir su primer reactor SMR en Argentina (EconoJournal), 2026-07-02 | incomplete | partial: Single article read in full. |
| AR | El CAREM, en pausa: la CNEA desjerarquizará el proyecto (EconoJournal), 2026-04-02 | incomplete | partial: Single article read; already reflected in the existing CAREM-25 ledger row. |
| AR | Pequeños reactores modulares (SMR) – CNEA prototype page (Comisión Nacional de Energía Atómica (argentina.gob.ar)), undated live page | incomplete | partial: Whole page read; it describes the prototype and its Atucha location but gives no construction status. |
| AR | Central nuclear argentina ACR-300: el humo atómico (commentary) (AgendAR), 2026-09-02 | incomplete | partial: Opinion piece read; used only for context (CEO exit, regulatory path). |
| AR | Las inversiones asociadas a la revolución energética (opinion) (Infobae), 2026-09-06 | incomplete | partial: Opinion piece; it states USD 200 million for the private initiative, which conflicts with every other source (USD 1,200 million) and is treated as an error. |
| AR | Google News RSS search "reactor modular" (last 60 days, es-419/AR), feed as fetched 2026-10-06 | incomplete | partial: Discovery feed only; the feed returns at most ~100 items and ranks by relevance; titles read, relevant items followed up. |
| AR | Google News RSS search "Atucha" (last 14 days), feed as fetched 2026-10-06 | incomplete | partial: Discovery feed; 40 titles read. Página/12 and Ámbito originals (2–3 Oct 2026) could not be resolved from the encoded feed links and were not opened. |
Armenia · 2 cited routes
No published project record for Armenia in this release. All Armenia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| AM | Armenia: atomic-energy.ru Armenia tag page; "США предложили четыре проекта малых модульных реакторов для замены энергоблока Армянской АЭС" (2026-05-22); Strana Rosatom "Росатом предложил Армении проект нового атомного энергоблока" (2026-09-29) (Атомная энергия 2.0; Strana Rosatom), 2026-05-22; 2026-09-29 | incomplete | partial: Tag page screened; two items read. |
| AM | Armenian Prime Minister: second Nuclear Energy Summit address, 10 March 2026 | incomplete | partial: one official address. Armenia states its intention to pursue SMR technology while examining proposals. No selected design or described plant is identified; national program context is kept separate from deployments. |
Australia · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| AU | Australia's uranium / nuclear profile (countries-a-f/australia) (World Nuclear Association), Updated 4 February 2025 | incomplete | partial: Read; uranium/legislation focus; no SMR proposal content. |
Austria · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| AT | Austria federal ministry SMR position and commissioned study | incomplete | partial - national SMR policy position, not a reactor-project register; no Austrian deployment named in the opened page |
Azerbaijan · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| AZ | WNA Emerging Nuclear Energy Countries (Azerbaijan listed among emerging interest) | incomplete | partial - name listed; no named SMR host/site on page |
Bahrain · 1 cited routes
No published project record for Bahrain in this release. All Bahrain records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BH | Bahrain considers nuclear power option (Semafor (Gulf)), 2026-07-21 | incomplete | partial: article read |
Bangladesh · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BD | WNA 'Nuclear Power in Bangladesh' (World Nuclear Association (Information Library)), Updated Tuesday, 10 February 2026 | incomplete | partial: searched for SMR/floating/second-plant text; no named small-reactor proposal; second plant planning is large-reactor (2000 MWe) sites |
Belarus · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BY | Atomic-energy.ru Belarus tag page; result titles on the Belarusian NPP third-unit decision (Strana Rosatom 2025-11-24) and a planned 2026 agreement (Атомная энергия 2.0; Strana Rosatom (result titles)), tag page as of 2026-10-06; 2025-11-24 | incomplete | partial: Tag page screened; no small-reactor item. The third-unit article itself was not opened. |
Belgium · 4 cited routes
Published project records for Belgium (1): LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program). All Belgium records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BE | FANC: Nieuwe technologieën: Small Modular Reactors (Federaal Agentschap voor Nucleaire Controle (FANC/AFCN); 'Laatst aangepast op: 10/06/2026') | incomplete | partial: a topic page, not a register. 2 entries reconciled (accessed 3 Oct 2026); access limits: FANC page does not name the SCK CEN reactor or site; identity linked via SCK CEN news of 2026-10-02 naming LEANDREA in Mol. |
| BE | Engie/Electrabel and Belgian SMR plans (NucNet report (no Engie SMR release found); report of 2025-02-04) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: No Engie/Electrabel SMR announcement found; engie.com not opened |
| BE | FANC: Nieuwe technologieen: Small Modular Reactors (Federaal Agentschap voor Nucleaire Controle (FANC/AFCN)), Laatst aangepast op 10/06/2026 (unchanged since the 2026-10-03 read) | incomplete | partial: Topic page, not a register. Re-read for change only: still the same two items (SCK CEN lead-cooled SMR prelicensing started 5 May 2025; FANC joined the NUWARD Joint Early Review on 21 January 2026). No new Belgian project. |
| BE | SCK CEN: Small Modular Reactors (LEANDREA technology demonstrator page), page as read 2026-10-06 | incomplete | partial: Single program page: SCK CEN aims to build the LEANDREA lead-cooled SMR demonstrator by 2034. Matches the existing Mol record; no new site or second project. |
Bhutan · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BT | DHI InnoTech SMR research-project description | incomplete | partial - state holding-company research portfolio proposes studying SMR deployment in Bhutan, with phase one site selection and possible technologies; no selected design, host site, project configuration or deployment commitment beyond the generic program |
Bolivia · 1 cited routes
No published project record for Bolivia in this release. All Bolivia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BO | Estudio de implementación de reactores modulares pequeños (SMR) en Bolivia (Agencia Boliviana de Energía Nuclear (ABEN)), 2025, first edition | incomplete | partial: PDF text extracted; contents, recommended-design and potential-site sections skimmed (El Mutún, Salar de Uyuni regions). |
Bosnia and Herzegovina · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BA | WNA Emerging Nuclear Energy Countries page (Bosnia mentioned only in regional Belene/neighbour context) | incomplete | partial - no Bosnia SMR deployment identified |
Brazil · 15 cited routes
Published project records for Brazil (1): UCRI critical unit for the Brazilian microreactor program at IEN. All Brazil records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BR | WNA Brazil profile + WNN Brazil-Russia SMR (May 2025) + Rio Times (Petrobras) | incomplete | partial - Rosatom SMR cooperation intent; CNEN 3-5 MW containerized microreactor development project (Mar 2025); Petrobras floating SMR study; LABGENE naval prototype. No SMR host/site. |
| BR | Poder Naval: Navy report on PROSUB/LABGENE (Jul 2026) | incomplete | partial - LABGENE at Iperó; 1.7% physical progress in 2025. |
| BR | ANSN inicia processo de consulta para possível instalação de SMR em complexo termoelétrico de Santa Catarina (Autoridade Nacional de Segurança Nuclear (ANSN), gov.br), 2026-05-28 (modified 2026-06-01) | incomplete | partial: Whole news item read. |
| BR | ANSN visita complexo termoelétrico Jorge Lacerda para avaliar potencial de instalação do primeiro SMR do país (Instituto de Radioproteção e Dosimetria (IRD), gov.br), 2025-10-31 | incomplete | partial: Whole news item read. |
| BR | Autoridade Nuclear inicia consulta para possível instalação de reator em SC (CNN Brasil), 2026-06-01 | incomplete | partial: Single article read. |
| BR | Diamante, AIEA e Abdan vão estudar conversão de térmica a carvão em nuclear (CNN Brasil), 2026-09-16 | incomplete | partial: Single article read. |
| BR | Diamante Energia foca em baterias e energia nuclear no Ceará (O Povo), 2026-09-24 | incomplete | partial: Single article read. |
| BR | Exclusivo: Petrobras estuda entrada em energia nuclear com reator modular (CNN Brasil), 2026-07-01 | incomplete | partial: Single article read. Petrobras primary (IR site / Form 6-K) not opened: the SEC copy is on sec.gov, which requires a declared personal contact (identification_required; not attempted), and the Petrobras IR copy was not located without search. |
| BR | Projeto de microrreator nuclear com digital de SC pode revolucionar energia no Brasil (ND Mais), 2026-02-18 | incomplete | partial: Single article read. |
| BR | Nuclep e Rosatom Energy Projects assinam acordo na Conferência de Viena (Petronotícias), 2023-09-26 | incomplete | partial: Single article read; manufacturing MoU only. |
| BR | Grupo técnico vai estudar pequenos reatores nucleares (SMRs) (Agência eixos), 2026-01 (per search result titles) | incomplete | partial: access blocked (access refused, HTTP 403 (not bypassed)). the fixed-header fetch returned an access refusal (HTTP 403); content known only from a search result titles (MME-coordinated technical group, 180 days + 90). |
| BR | Google News RSS searches "pequeno reator modular" (90 days) and "SMR nuclear Brasil" (180 days), feeds as fetched 2026-10-06 | incomplete | partial: Discovery feeds; titles read (also gnews-reator-modular-pt-90d.xml). No Angra-site SMR item and no Eletronuclear or Amazul SMR deployment commitment appeared. |
| BR | ANSN: Brazilian microreactor critical-unit pre-licensing meeting | incomplete | partial — opened named article and its UCRI project description; not a complete Brazilian project or design inventory. |
| BR | IEN: Brazilian microreactor programme and critical-unit responsibilities | incomplete | partial — opened named article and its UCRI project description; not a complete Brazilian project or design inventory. |
| BR | CNEN: reported licensing request for the UCRI critical unit | incomplete | partial — opened named article and its UCRI project description; not a complete Brazilian project or design inventory. |
Bulgaria · 4 cited routes
No published project record for Bulgaria in this release. All Bulgaria records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BG | WNA Bulgaria + POWER magazine 2025-12-22 | incomplete | partial - Programs only: Blue Bird/SGE BWRX-300 (up to 6, sites still to be selected), BEH-Fluor NuScale coal-replacement study, and a USTDA site-evaluation grant. The 2021 NuScale-Kozloduy MoU source (SeeNews) was an access refusal (HTTP 403). |
| BG | BEH SMR technical assistance (USTDA notice) (U.S. Trade and Development Agency; notice (deadline 2026-03-16)) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: bgenh.com not opened |
| BG | World Nuclear News: Bulgaria tag listing, first page, with the BWRX-300 Bulgaria article (6 January 2026) | incomplete | partial: first page of a multi-page news listing; older pages not read. The Blue Bird Energy joint venture will select sites but names none (an existing research row). |
| BG | BNRA: Kozloduy NPP - new capacities; public registers; news (English and Bulgarian) (Bulgarian Nuclear Regulatory Agency (BNRA/AYaR)), pages as read 2026-10-06 (Bulgarian news latest May-July 2026) | incomplete | partial: New-capacities page is the Kozloduy 7/8 large-unit licensing history (site approval etc.); English news stale (2024); Bulgarian news first page has no SMR item. No SMR application or pre-licensing entry. Public registers page holds no SMR item. |
Burkina Faso · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BF | NEI Burkina Faso/Mali Rosatom MoUs (2023); Izvestia (2025); Rosatom newsletter (Jul 2025) | incomplete | partial - Burkina Faso and Mali IGAs (June 2025); Burkina low-power NPP up to 300 MW by 2030 aspiration; no sites. |
| BF | Ministère de l'Energie, des Mines et des Carrières: IGA signed for a civil nuclear power plant (20/06/2025); Sidwaya copy (Burkina Faso Ministry of Energy, Mines and Quarries; Sidwaya), 20 June 2025 | incomplete | partial: Single release (plus Sidwaya duplicate); confirms 19 June 2025 IGA date |
Burundi · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| BI | Rosatom media reference: cooperation between Rosatom and Burundi (25 July 2023) | incomplete | partial - reference page: 2021 memorandum with the Ministry of Hydraulics, Energy and Mines, 2022 roadmap and 2023 intergovernmental agreement; infrastructure and training, no plant or site. |
| BI | TASS, 10 July 2026: Russian foreign minister on Burundi's interest in small nuclear power plants | incomplete | partial - single article reporting a ministerial statement that Burundi is interested in small nuclear plants and has signed a memorandum; no design, plant, site or developer commitment (program context). |
Cambodia · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| KH | Rosatom Newsletter Cambodia civil nuclear cooperation 2017 | incomplete | partial - single cooperation announcement; program context; no plant |
| KH | WNA Emerging Nuclear Energy Countries (Cambodia listed) | incomplete | partial - emerging interest listing; no SMR proposal identified |
Canada · 29 cited routes
Published project records for Canada (11): ARC-100 proposal at the Port of Belledune Green Energy Hub, Belledune Prodigy transportable nuclear proposal, Darlington BWRX-300 Unit 1, Darlington BWRX-300 Units 2-4, Global First Power Chalk River MMR (paused), Moltex SSR-W at Point Lepreau, NB Power ARC-100 at Point Lepreau, SaskPower Rafferty SMR (Estevan area), SRC initial eVinci demonstration proposal (canceled), StarCore demonstration reactor at the Whiteshell Laboratories site, Pinawa, U-Battery first-of-a-kind siting bid at Chalk River (2019-2023). All Canada records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| CA | CNSC new reactor and power plant facilities | reconciled | complete for CNSC listed facilities page as retrieved 2026-10-02 |
| CA | CNSC new reactor and power plant projects index | reconciled | complete for the listed source as retrieved 2026-10-02 - 7 projects: GFP Chalk River, NB Power ARC-100, Darlington NNP, SaskPower SMR, Peace River (4,800 MWe), Bruce C (4,800 MWe), Wesleyville (10,000 MW). All project pages opened. |
| CA | CNSC vendor design review list | reconciled | complete for the listed source as retrieved 2026-10-02 - Current: Westinghouse eVinci Phase 2 'On hold'. Completed: Xe-100, BWRX-300, SSR-W300 (Ph1), SMR-160 (Ph1), ARC-100 (Ph1, Ph2 Jul 2025), USNC MMR (Ph1), IMSR400 (Ph1-2), plus large designs. VDRs are design reviews, not projects. |
| CA | Canadian Nuclear Laboratories siting program | incomplete | partial - Program described; no proponents named. CNL pages return 403 to bare clients. |
| CA | Capital Power 2025 Annual Information Form | incomplete | partial - Alberta SMR pre-feasibility with OPG on track; extended two years; no site. |
| CA | Moltex 'our first reactor' page and Nuclea acquisition release | incomplete | partial - SSR-W at Point Lepreau; Moltex in administration; Nuclea acquiring assets (2026-08-13). |
| CA | Government of Saskatchewan 2023 SRC microreactor release | incomplete | partial: a single government release about one program, not a listing; retrieved 2026-10-02 - CAD 80m program; no site. |
| CA | New reactor and power plant facilities (Canadian Nuclear Safety Commission; Date modified: 2026-03-04) | reconciled | complete: 7 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. |
| CA | Pre-licensing vendor design review (VDR): current and completed reviews (Canadian Nuclear Safety Commission; Date modified: 2026-03-03) | reconciled | complete: 12 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. Note the page no longer lists several earlier VDRs (e.g. NuScale, Kairos, Natrium, SEALER, StarCore, U-Battery) that older editions showed; only what the current page shows is enumerated. |
| CA | Preliminary regulatory design assessment: current and completed (Canadian Nuclear Safety Commission; Date modified: 2026-04-29) | reconciled | complete: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. |
| CA | NRCan Enabling Small Modular Reactors Program; programme page (Natural Resources Canada; page as retrieved 2026-10-03) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Funded-projects page not opened; the program funds waste and supply-chain R&D only, so it cannot name deployment sites. |
| CA | WNA 'Nuclear Power in Canada' (discovery) (World Nuclear Association (Information Library); page as retrieved 2026-10-03) | incomplete | partial: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| CA | Ontario Power Generation SMR announcements (Darlington, Wesleyville, Alberta partnership, Yukon groundwork) (Ontario Power Generation (opg.com); announcements to 2026-04-22 (LTO application 2026-03-25; Yukon agreement 2026-04-22)) | incomplete | partial: 6 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: not bypassed. OPG newsroom not enumerated item by item. |
| CA | Bruce Power new-nuclear announcements (Bruce Power (via WNN/POWER/NucNet reporting); as reported to 2026-01-04) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Bruce Power newsroom not opened |
| CA | SaskPower; Planning for nuclear power: Our progress and next steps; Government of Saskatchewan release 29 Sep 2026 (SaskPower; Government of Saskatchewan; page current 2026 (copyright 2026); government release 2026-09-29) | incomplete | partial: a single project page and one government release, not a listing. 2 entries reconciled (accessed 3 Oct 2026) |
| CA | CNSC; New Brunswick Power's ARC-100 Project page (Canadian Nuclear Safety Commission; page modified 2026-01-26) | incomplete | partial: a single project page, not a listing. 1 entries reconciled (accessed 3 Oct 2026) |
| CA | CNSC; New reactor and power plant projects index (Canadian Nuclear Safety Commission; page modified 2026-01-06) | reconciled | complete: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Alberta proposals mentioned generically, not named individually on the page |
| CA | Emissions Reduction Alberta project page: Assessing site and distribution infrastructure from transitioning a thermal power plant to an SMR (Emissions Reduction Alberta (provincial funding agency); funded 2024, completed 2025 (page © 2025)) | incomplete | partial: a single project page, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: TransAlta's own newsroom not opened (only SEC EDGAR copies surfaced in search; EDGAR not used per rules) |
| CA | Ontario provincial SMR MoUs with Yukon and Nova Scotia (Government of Yukon / WNN report of Nova Scotia–Ontario MoU; Yukon agreement 2026-04-22; Nova Scotia MoU (WNN)) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026) |
| CA | Moltex Energy website (home page live 2026-10-03 (latest item 2026-08-13)) | incomplete | partial: a home page, not a list. 1 entries reconciled (accessed 3 Oct 2026) |
| CA | Prodigy Clean Energy news and pilot page (22 items, 2021-05-14 to 2026-09-25) | reconciled | complete: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: none |
| CA | CNSC new reactor and power plant facilities (Canadian Nuclear Safety Commission), Date modified 2026-03-04 (unchanged) | incomplete | partial: Same 7 projects as 2026-10-02; no changes. |
| CA | CNSC pre-licensing vendor design review list (Canadian Nuclear Safety Commission), Date modified 2026-03-03 (unchanged) | reconciled | complete: Modified date predates the 2026-10-02 enumeration; no changes. |
| CA | CNSC news releases (Government of Canada news API, Atom) (Canadian Nuclear Safety Commission), feed read 2026-10-06 | incomplete | partial: 30 most recent releases read; none after 2026-10-03; the canada.ca HTML page is JavaScript-rendered. |
| CA | Natural Resources Canada news (Government of Canada news API, Atom), feed read 2026-10-06 | incomplete | partial: 40 most recent items; no SMR deployment item after 2026-10-03. |
| CA | Ontario Newsroom all-news RSS (Government of Ontario), feed read 2026-10-06 | incomplete | partial: 15 newest items; the release page itself is JavaScript-only, so the RSS title/description is the captured text. |
| CA | BWXT news release: BANR microreactor chosen for Canadian transportable nuclear power plant project (BWX Technologies), 5 October 2026 | incomplete | partial: Single release read in full. |
| CA | Prodigy Clean Energy news page, read 2026-10-06 | reconciled | complete: Whole news list read; the 5 Oct BANR item was not yet listed. |
| CA | NB Power news: 2026 Integrated Resource Plan, 2026 (release undated in capture; IRP approved by the province in September 2026) | incomplete | partial: Release read; the IRP document itself was not opened. |
Chile · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| CL | Energy for Growth Hub LatAm Nuclear Update June 2026 (Chile section) | incomplete | partial - secondary synthesis: research reactors; studying advanced nuclear for mining; no SMR deploy commitment |
China · 44 cited routes
Published project records for China (22): CGN Bohai ACPR50S floating SMR demonstration proposal, CNEC / Zheneng Sanmen HTGR power station, CNNC floating SMR demonstration proposal (2016), Daqing NHR-200 nuclear heating plant (1990s), HAPPY200 nuclear heating project at Baishan, Jilin, HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET, HTR-PM Shidaowan demonstration, Huakun One floating reactor platform demonstration at the Taipingling site, Huaneng Xiapu 600 MW HTGR unit (site plan), Huizhou HuaPeng-1 heating demonstration proposal, Liaoyuan DHR-400 heating demonstration proposal, Linglong One (ACP100) Changjiang, Maoming Green Energy HTGR proposal (Phase 1 planning), Ningdu multipurpose modular proposal (14th Five-Year plan), Ruijin HTR nuclear power proposal (Jiangxi), Shandong Haiyang integrated small reactor demonstration project (heat only), Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001), SINAP small modular thorium molten-salt research reactor (10 MWe), Minqin, SPIC Jiamusi nuclear heating demonstration (Hongxing site), TMSR-LF1 thorium molten-salt experimental reactor, Wuwei, Xuwei nuclear heating and power plant Unit 3 (HTGR), Yantai nuclear seawater desalination project (NHR200-I, 2003). All China records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| CN | CGN ACPR50S primary press + CNNC park spot checks | incomplete | incomplete ? Bohai ACPR50S and Maoming HTGR recorded; Putian ACP100 matched to Changjiang; not a national inventory |
| CN | NNSA 监管动态 news list (index + index_1..6) | incomplete | partial: the first seven pages of a longer news list (about 70 items, August and September 2026); older pages were not read; retrieved 2026-10-02 - ~70 recent items scanned (Aug-Sep 2026); SMR-relevant: Xuwei HTGR safety design criteria approval (2026-09-29), 9th small-reactor safety symposium (2026-09-18), IAEA ATLAS floating initiative (2026-09-11). Older item: Xuwei Unit 3 construction-license review start (2025-06-26). |
| CN | MEE licence notice (Changjiang unit 3) | incomplete | partial - Operating license for Huaneng Changjiang 3 (Hualong One) — confirms it is NOT Linglong One. |
| CN | Lianyungang government; Huaihe River Commission permit; CAEA news; Ningde government notice | incomplete | partial - Xuwei phase composition and HTGR rating; Xiapu 600 MW HTGR planning; Ruijin 2015 pre-feasibility. |
| CN | Baidu Baike / SPIC homepages | incomplete | partial - Baike returned ~2.5 KB challenge pages (blocked); SPIC homepages had no HAPPY200/Baishan item. |
| CN | World Nuclear Association: Nuclear Power in China (SMR, small modular HTGR, heating and floating entries) (Updated Wednesday, 30 September 2026) | incomplete | partial: secondary country profile, not a list of proposals. 22 entries reconciled (accessed 3 Oct 2026) |
| CN | NNSA (China) news/licensing notices on small, HTGR and molten-salt reactor licensing; plus State Council approval notice (National Nuclear Safety Administration / Ministry of Ecology and Environment (China); China Nuclear Energy Association…; Notices dated 2022-03-29, 2025-06-26, 2026-09-29; State Council approval reported 2024-08-20; NNSA homepage viewed 2026-10-03) | incomplete | partial: 6 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: No consolidated public NNSA register of construction/operating licenses by unit was found; NNSA 2025 annual summary gives only totals (12 construction licenses, 4 operating licenses, 4 siting opinions |
| CN | WNA 'Nuclear Power in China' (discovery); State Council approval batches 2024-2026 (World Nuclear Association (Information Library); page as retrieved 2026-10-03) | incomplete | partial: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| CN | CNNC English website; home and Innovation pages (ACP100, DHR-400, HTGR) (China National Nuclear Corporation; home as of 2026-10-03 (latest item 2026-09-21); innovation pages dated 2019-11-22) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: No site search or news archive enumeration; Chinese-language cnnc.com.cn newsroom not enumerated |
| CN | SPIC Nuclear Energy Multi-application for Decarbonization (IFNEC presentation) (State Power Investment Corporation (via IFNEC); PDF created 2018-11-29, slides marked (c)SPIC 2017, 24 pages) | incomplete | partial: a single 2017 company presentation, not a maintained list. 3 entries reconciled (accessed 3 Oct 2026) |
| CN | Jiemian News; 核能供热试点之争 (nuclear heating pilot contest) (Jiemian News (press); article 1950527, February 2018 (date not shown in fetched text; content dated to 2018-01/02)) | incomplete | partial: 8 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Extraction via fetch model; Shijiazhuang (heat-source search) and Qingdao (Haiyang AP1000 heat) mentions not entered as they are not reactor proposals. Press: discovery only |
| CN | SASAC article 中核集团助推烟台市建设核电装备千亿级产业集群 (Sina reprint) (State-owned Assets Supervision and Administration Commission (reprinted by Sina); 2018-01-29) | incomplete | partial: a single article (reprint), not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: Original SASAC URL not located; reprint used |
| CN | Sina Finance: State Council approval of four nuclear power projects (31 July 2026) | incomplete | partial: one news article read in full, not a listing. The approved projects are large reactors; no high-temperature gas-cooled or small reactor is among them. |
| CN | China News: Linglong One first-of-a-kind unit status (1 October 2026) | incomplete | partial: one news article read in full, not a listing. Status event on the existing Linglong One record; no follow-on ACP100 site named. |
| CN | Ministry of Ecology and Environment: THFR test reactor environmental impact document, Rongcheng (dated 1 December 2025) | incomplete | partial: one document, of which the first 15 pages were read; not a listing. THFR is an 80 MWt irradiation and isotope test reactor, not an SMR or microreactor design. |
| CN | National Nuclear Safety Administration: nuclear power units under construction (table updated 31 August 2026) | incomplete | partial: the 36-unit table was read only in summary form, so its rows were not checked one by one. The summary includes the Changjiang multipurpose small modular reactor (an existing record) and no high-temperature gas-cooled unit. |
| CN | Science and Technology Daily: CNNC Energy and IAEA cooperation agreement on high-temperature gas-cooled reactors (report of 17 September 2026) | incomplete | partial: one news article read in full, not a listing. Mentions only Shidaowan and Xuwei; no new site. |
| CN | National Nuclear Safety Administration: approval of safety design criteria for Xuwei Phase I Unit 3 (signed 31 August 2026) | incomplete | partial: one regulatory notice read in full, not a listing. Status event on the existing Xuwei Unit 3 record. |
| CN | National Nuclear Safety Administration: technical opinion on nuclear safety regulation of small reactors (11 August 2026) | incomplete | partial: one regulatory notice read in full, not a listing. It sets size limits for small reactors and names no site. |
| CN | Ministry of Ecology and Environment: environmental approval notices (index pages 1 to 4) and seven nuclear approval notices, 24 January to 23 September 2026 | incomplete | partial: every nuclear approval decision listed from 24 January to 23 September 2026 was checked; none concerns an SMR, high-temperature gas-cooled or heating reactor. A separate 9 April 2026 siting notice was not opened. |
| CN | NNSA regulated-object database: nuclear power units under construction (在建核电机组) (National Nuclear Safety Administration (MEE)), table updated 2026-08-31 | reconciled | complete: All 36 rows read one by one (prior route read it only in summary). Only row 3 is a small reactor. |
| CN | NNSA regulated-object database: operating nuclear power units (运行核电机组) (National Nuclear Safety Administration (MEE)), table updated 2026-08-31 | reconciled | complete: All 65 rows read. Small-reactor rows: Shidaowan HTGR demonstration only. Linglong One absent (no fuel-load approval by 2026-08-31). |
| CN | NNSA regulated-object common data list (常用数据清单) (National Nuclear Safety Administration (MEE)), updated 2026-08-31 | incomplete | partial: Counts only: 65 operating licenses, 36 construction licenses, 19 approved-not-started power units; 16 civil research reactors in service, 2 under construction, 3 decommissioning. No unit-level list of the 19 approved units or of research reactors is published there. |
| CN | NNSA bureau documents list (核安全局文件 / 文件): siting opinions, construction and operating licences, approvals (National Nuclear Safety Administration (MEE)), list pages index..index_60 (of 200) | incomplete | partial: Pages 0-60 read (915 unique items, 2018-10-29 to 2026-09-24), every title screened for small/modular/HTGR/heating/molten-salt/floating/research-reactor terms. Complete for that date window; pages 61-200 (before 2018-10-29) not read. |
| CN | MEE public notices (公示): EIA acceptance and proposed-approval notices for nuclear and radiation projects (核与辐射) (Ministry of Ecology and Environment), archive list pages index..index_33 plus current list (gsq) | reconciled | complete: All 34 archive list pages (490 notices, 2023-09-05 to 2026-09-24) plus the current list. All 165 nuclear-and-radiation notices and the 2 current ones were opened; every project row was screened for reactor/nuclear/heating/floating terms. Earlier notices (before 2023-09) are not on this list. |
| CN | NNSA regulatory news list (监管动态) pages index and index_7..index_52 (National Nuclear Safety Administration (MEE)), list of 84 pages | incomplete | partial: Pages 7-52 (about 2026-02-13 to 2026-05) read in addition to pages 0-6 already read by the prior route; titles screened; 6 SMR-related items opened. Pages 53-84 (before mid-February 2026) not read. |
| CN | SINAP small modular thorium molten-salt reactor research facility, siting-stage EIA (2024 edition, MEE-hosted) (Shanghai Institute of Applied Physics (CAS); hosted by MEE), report dated July 2024; file created 2024-08-19; posted 2024-11-26 | incomplete | partial: 221 pages; chapter 1 read (project, scale, schedule) |
| CN | SINAP small modular thorium molten-salt reactor research facility, siting-stage EIA (January 2026 resubmission, MEE-hosted) (Shanghai Institute of Applied Physics (CAS); hosted by MEE), report dated January 2026; file created 2026-03-09; posted 2026-03-12 | incomplete | partial: 225 pages; chapter 1 read. The gsq/ path for the same file returned an MEE not-found page; the archived wqgs_1/ path worked. |
| CN | SINAP notices list (通知公告) pages 0-3, the 2025-12-12 EIA public-participation notice, and the 2025-11-02 TMSR series article (Shanghai Institute of Applied Physics (CAS)), list as of 2026-09-29 | incomplete | partial: Notices from 2021-12 to 2026-09 screened (about 80 items); two EIA notices found (2022-08-02 and 2025-12-12). HTTPS endpoint has a self-signed certificate; HTTP used. The notice pages carry a named contact and e-mail, which are not reproduced. |
| CN | “华鲲一号”科技示范工程 environmental impact report (siting stage), MEE-hosted (CGN Ocean Energy Co. (中广核海洋能源有限公司); hosted by MEE), report dated November 2025 (file 2025-11-18); MEE acceptance 2025-12-02 | incomplete | partial: 333 pages; summary and chapter 1 read. URL located through a Baidu results page read with a rendered-text read (the MEE acceptance notice has no link). |
| CN | 山东海阳一体化小型堆示范工程: siting-stage EIA (MEE-hosted), NNSA siting-opinion notice 国核安发〔2024〕163号 and certificate 国核安证字第2414号 (SPIC Nuclear Energy Co. / Shandong Nuclear Power Co.; NNSA), EIA file 2023-09-26; acceptance 2023-11-23; proposed approval 2024-08-23; siting opinion signed 2024-09-10 | incomplete | partial: EIA chapters 1 and 4 opening read (267 pages); notice and 2-page certificate read in full. Certificate names legal representatives, which are not reproduced. |
| CN | China Nuclear Power Development Report 2026 (中国核电发展报告2026), China Nuclear Power Development Centre, published by NEA (National Energy Administration), July 2026 (PDF created 2026-08-06) | incomplete | partial: 56 pages; SMR, technology, 2025 approvals sections and Annex 2 (national unit table, 112 operating and approved units at end-2025) screened for small/HTGR/floating/MSR rows. |
| CN | NNSA interpretation of the technical opinion on small nuclear power reactor safety regulation (2026-09-02) (National Nuclear Safety Administration) | incomplete | partial: Single document read in full; names no project. |
| CN | Tsinghua INET website: key projects, NHR200 design page, news (2026) (INET, Tsinghua University), homepage as of 2026-10-06; design page undated | incomplete | partial: Homepage news (about 15 items) and the NHR200 page read; news archive not paged. |
| CN | NNSA-reposted industry articles: '2025全球新型核反应堆:谁在领跑?' (2026-05-26, source 中国核工业) and '核能小型堆产业化卡在哪' (2024-01-23, source 中国能源报) (NNSA (reposts)), 2026-05-26; 2024-01-23 | incomplete | partial: Two articles read; press reposts, context only. |
| CN | Baidu results pages read with a rendered-text read (华鲲一号 queries), 2026-10-06 | incomplete | partial: Two Huakun queries returned results (pointers: Aiqicha project entry 2026-08-04; Huizhou 15th FYP energy plan line on Huakun grid connection; BJX 2026-05-07 Guangdong key projects; Guangdong culture department archaeology survey 2025-12-26). Two other queries hit a Baidu CAPTCHA and were not retried. |
| CN | MEE: Shidaowan expansion Phase II siting-stage EIA (2025-12-01) (Huaneng Shidaowan Nuclear Power Development Co.; hosted by MEE), 2025-12-01 acceptance | incomplete | partial: First 40 pages; site-plan paragraph read. |
| CN | gov.cn policy-library search API (小型堆; 能源工作指导意见) and NEA 2025 energy work guidance page (State Council (gov.cn) / NEA), 2025-02-27 | incomplete | partial: Search returned token-split, irrelevant results for 小型堆; the 2025 guidance body is a .wps attachment that was not parsed; 2026 guidance not found in the gov.cn library. |
| CN | Operator/developer homepages: SPIC, Huaneng, CGN (home and R&D pages), CNNC (Chinese), CNNP, Chinergy (various), 2026-10-06 | incomplete | partial: Homepage link titles screened only. SPIC, Huaneng, CGN: no SMR item on the homepage. CNNC Chinese site: JavaScript anti-bot page; CNNP: an error response (HTTP 412); chinergy.com.cn: DNS failure. None bypassed. |
| CN | MEE older public-notice archive (公示 往期): EIA acceptance and approval notices 2017-2019 (Ministry of Ecology and Environment), archive list pages index..index_33 | reconciled | complete: All 34 list pages (500 notices, 2017-09-01 to 2019-11-18); all 173 EIA notices opened and every project row screened. Notices from 2019-12 to 2023-08 are on neither MEE archive list (the CMS lists stop at about 500 items), so that gap was not enumerated. |
| CN | INET presentation to IAEA INPRO by Wentao Hao, Development of NHR200-II, including the NHR200-I project list (2019) | incomplete | partial: One presentation. The NHR200-I history names a Yantai nuclear seawater desalination project as established in 2003. Not a listing of Chinese projects. |
| CN | IAEA-TECDOC-1561 Annex 2, nuclear seawater desalination using NHR-200 (INET case study) | incomplete | partial: One annex. An economic case study uses Yantai seawater assumptions and says the plant would possibly be in Shandong. It is not the 2003 approval and its ratings are not stored. |
| CN | Fujian 2026 emerging and future industry plan | incomplete | partial - SMR valves, cables and pumps industry capabilities, no new reactor commitment |
| CN | Guangdong energy technology research guide | incomplete | partial - printed page 10 sets research directions for smart modular, heat-only, floating and mobile reactors; no named design or site commitment in that section |
Colombia · 2 cited routes
No published project record for Colombia in this release. All Colombia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| CO | Colombia firma acuerdo con el OIEA para evaluar energía nuclear (Ministerio de Minas y Energía de Colombia), 2026-02-24 | incomplete | partial: Whole release read. |
| CO | Investigadores estudian si Colombia puede tener su propio reactor nuclear en el Eje Cafetero (El Colombiano), 2026-09-15 | incomplete | partial: Single article read. |
Congo · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| CG | Interfax, 18 July 2024: Rosatom and the Republic of the Congo sign memoranda on peaceful nuclear energy and hydropower | incomplete | partial - single article: cooperation memoranda and a 2019 intergovernmental agreement; no reactor plant, design or site named. |
| CG | Halldale, 9 August 2019: Republic of Congo and Rosatom sign roadmap | incomplete | partial - single article: two-year roadmap on a possible nuclear science and technology center and training; no power plant. |
Croatia · 2 cited routes
No published project record for Croatia in this release. All Croatia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| HR | Narodne novine NN 55/2026 Zakon o razvoju nuklearne energije u civilne svrhe (opened 2026-10-06) | incomplete | incomplete - single enacted statute read in full; program framework with SMR/MMR definitions; no finite project listing to reconcile for deployment inventory |
| HR | Ministarstvo gospodarstva news on final nuclear-law proposal (2026) | incomplete | partial - single ministry news page; program targets and plan timing |
Czechia · 9 cited routes
Published project records for Czechia (3): Rolls-Royce SMR Dětmarovice candidate location, Rolls-Royce SMR Tušimice candidate location, Temelin Rolls-Royce SMR. All Czechia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| CZ | MPO press release 2026-07-21 (MoU MPO-CEZ-Rolls-Royce SMR) | incomplete | partial: a single release on one memorandum of understanding, not a register; retrieved 2026-10-02 - Three named locations: Temelin first, in the second half of the 2030s, then Detmarovice and Tusimice, for up to 6 RR SMRs (up to 3 GW). Prunerov is not mentioned. |
| CZ | CEZ press release 2026-04-24 (Temelin early works contract) | incomplete | partial - Licensing and permitting documentation contract for Temelin. Explicitly not an investment decision. CEZ is also developing Tusimice and examining other sites. |
| CZ | SUJB | incomplete | partial - Not checked directly in this pass; no SUJB SMR siting license surfaced via CEZ/MPO/WNA. CEZ states that EIA and nuclear permitting documentation is being prepared. |
| CZ | SÚJB: Zahájená řízení o vydání povolení k činnosti související s využíváním jaderné energie (initiated licensing proceedings) (Státní úřad pro jadernou bezpečnost (SÚJB); list as as read 2026-10-03 (latest proceeding started 25.9.2026)) | reconciled | complete: 16 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: The issued-permits register (aplikace/ireg2) is a query application and was not queried. |
| CZ | ČEZ press releases and reported statements on SMR locations (ČEZ, a.s. (with Rolls-Royce SMR release; ČTK report of ČEZ statement); releases 2023-02-27 (ČTK), 2026-04-24, 2026-07-21) | incomplete | partial: several releases and reported statements, not a listing. 8 entries reconciled (accessed 3 Oct 2026); access limits: Full ČEZ press archive not paged; site list taken from ČEZ statements (ČTK) and later releases |
| CZ | World Nuclear Association country profile: Nuclear Power in the Czech Republic (updated 15 September 2026) | incomplete | partial: secondary country profile, not a list of proposals. Its SMR sites (Temelín, Tušimice, Dětmarovice, Prunéřov) are existing records or research rows. |
| CZ | World Nuclear News: Czech Republic tag listing, first page, with two linked articles (April to July 2026) | incomplete | partial: first page of a multi-page news listing; older pages not read. The Temelín, Tušimice and Dětmarovice items match existing records; a Saskatchewan cooperation item names no site. |
| CZ | SÚJB: Zahájená řízení o vydání povolení k činnosti související s využíváním jaderné energie (initiated licensing proceedings) (Státní úřad pro jadernou bezpečnost (SÚJB)), As read 2026-10-06 (latest proceeding listed 25.9.2026) | incomplete | partial: Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. All 16 rows are changes at Dukovany/Temelín, repositories or research reactors; no SMR siting (umístění) proceeding. |
| CZ | SÚJB news RSS feed (Aktuálně), 15 items, 1 Sep–5 Oct 2026 | reconciled | complete: All 15 feed items read by title; none concerns an SMR, a new-site license or Rolls-Royce SMR at Temelín. |
Côte d'Ivoire · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| CI | Government information centre (CICG) release of 18 March 2025: workshop on the national nuclear power programme implementing organisation | incomplete | partial - single release: a 17-21 March 2025 workshop on the roles and roadmap of the body in charge of the national nuclear power program; the energy ministry presents SMRs as a strategic option. No plant, design, site or vendor. |
| CI | Côte d'Ivoire national statement to the 67th IAEA General Conference (September 2023) | incomplete | partial - national statement on nuclear safety, security and cooperation; it names no power plant, design or site. |
Denmark · 2 cited routes
No published project record for Denmark in this release. All Denmark records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| DK | KEFM: Grundlaget for analysen af nye atomkraftteknologier er nu klart (Klima-, Energi- og Forsyningsministeriet), January 2026 | incomplete | partial: Single ministry release |
| DK | Copenhagen Atomics news (first page of 105 results) (Copenhagen Atomics A/S), as served 2026-10-06 | incomplete | partial: First page only (Jan to Sep 2026 items); no deployment or site item; the reported September 2026 Türkiye thorium cooperation not on this page |
Dominican Republic · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| DO | Ministro Joel Santos resalta oportunidades que abre acuerdo nuclear entre RD y EE. UU. (Ministerio de Energía y Minas (MEM), República Dominicana), 2026-06-21 | incomplete | partial: Release read. |
Ecuador · 3 cited routes
No published project record for Ecuador in this release. All Ecuador records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| EC | Gobierno tiene listo el proyecto de Ley de energía nuclear (Primicias), 2025-07-16 | incomplete | partial: Article read; the URL slug mentions Santa Elena but the captured text names no site. |
| EC | Ecuador Eyes Nuclear Power: 300 MW Reactor Tender Planned for 2026 (Ecuador Brief (citing Rio Times)), 2026-03-20 | incomplete | partial: Aggregator article read; it lists tender issuance as a thing to watch, i.e. no tender issued at that date. |
| EC | Ecuador suscribió un memorando con organismo internacional para definir dónde construir una planta nuclear (Ecuavisa), unknown | incomplete | partial: the fixed-header fetch returned HTTP 202 with an empty body; not retried. |
Egypt · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| EG | WNA Egypt profile | incomplete | partial - No SMR passages; El Dabaa VVER-1200 large units only. |
| EG | Egypt Independent (26 Aug 2026) and Bellona (31 Aug 2026) on Egypt-Rosatom SMR cooperation talks (Egypt Independent; Bellona), 25-31 August 2026 | incomplete | partial: Two articles |
El Salvador · 2 cited routes
No published project record for El Salvador in this release. All El Salvador records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| SV | NEI: El Salvador advances nuclear readiness (May 2026) | incomplete | partial - Long-term SMR intent; TEA research/MSR program; SEED mission May 2025; candidate areas San Vicente/Chalatenango unconfirmed. |
| SV | El Salvador firma acuerdo con Estados Unidos para desarrollar energía nuclear (El Diario de Hoy (elsalvador.com)), 2026-03-10 | incomplete | partial: Article read. |
Estonia · 7 cited routes
Published project records for Estonia (1): Fermi Energia Estonian BWRX-300 plant. All Estonia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| EE | Estonian Government (22 May 2025) + elektriala.ee (23 Jul 2026) | incomplete | partial - National designated spatial plan for a 600 MW plant; six candidate areas in Lüganuse and Viru-Nigula (July 2026); no final site. |
| EE | Kliimaministeerium: Eesti tuumaenergia programm (regulatory status page) (Ministry of Climate of Estonia; as read 2026-10-03; reports TEOS adopted 17 June 2026, in force 1 Jan 2027) | incomplete | partial: a single program status page, not a register. 1 entries reconciled (accessed 3 Oct 2026); access limits: No licensing register exists before 2027. |
| EE | TVO / TVO Nuclear Services SMR-related announcements (Teollisuuden Voima Oyj; search 2026-10-03) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: TVO release list not paged; no TVO SMR deployment proposal found; advisory item known only via trade press |
| EE | Fermi Energia news (homepage list) (Fermi Energia AS; news as shown 2026-10-03) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: fermi.ee/en/news/ returned a not-found error (HTTP 404); only the homepage news list was read |
| EE | Kliimaministeerium: Eesti tuumaenergia programm (Kliimaministeerium (Ministry of Climate of Estonia)), Viimati uuendatud 18.06.2026 | incomplete | partial: Re-read for change since 2026-10-03: page last updated 18 June 2026; unchanged (TEOS law, regulator from 1 January 2027, national designated spatial plan). No register and no selected site. |
| EE | Riigiplaneering.ee: Tuumaelektrijaama riigi eriplaneering (national designated spatial plan for a 600 MW nuclear plant) (Majandus- ja Kommunikatsiooniministeerium (planning organiser)), page as read 2026-10-06 (announces Fermi info sessions 6, 8, 20, 21 October 2026) | incomplete | partial: Planning page read: plan initiated 22 May 2025 (order 102) for 600 MWe; planning area spans parts of Haljala, Rakvere town and parish, Vinni, Viru-Nigula (Laane-Viru) and Kohtla-Jarve, Luganuse, Johvi (Ida-Viru) plus adjacent sea area; site still to be chosen in stage 1. No final site. |
| EE | Riigiplaneering: Tuumaelektrijaam (national designated spatial plan page) (Majandus- ja Kommunikatsiooniministeerium (riigiplaneering.ee)), last updated 2026-09-09 | incomplete | partial: Program status page; the documents list and map application not opened; news search page returned no rendered items |
Ethiopia · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| ET | Ethiopian Nuclear Energy Commission national programme page | incomplete | partial - national nuclear-power implementing body and feasibility-study program; no named SMR deployment on the opened page |
Finland · 9 cited routes
Published project records for Finland (3): Helen nuclear energy program plant in Helsinki, Keravan Energia / Steady Energy nuclear district-heating plant, Kuopion Energia small nuclear district-heating plant. All Finland records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| FI | Steady Energy newsroom | incomplete | partial - Finnish heating SMR projects in Helsinki, Kuopio, Kerava, Jyväskylä (Alva). Salmisaari pilot is electrically heated (non-nuclear). Fortum framework agreement (Jan 2026), KNXT Sweden partnership. |
| FI | TEM statement on Kuopion Energia EIA programme (17 Jul 2026) | incomplete | partial - Up to 4 heat reactors, max 150 MW; alternatives Hepomäki and Sorsasalo; technology TBD. |
| FI | Helen nuclear programme release (6 Nov 2025) | incomplete | partial - Three alternative sites: Vuosaari, Salmisaari, Norrberget (Östersundom). |
| FI | STUK Small modular reactors page: 'Discussions with designers and other actors in the field of small modular reactors' (Radiation and Nuclear Safety Authority (STUK); undated page; latest 'Further reading' item dated 26 June 2026; as read 2026-10-03) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: STUK publishes no license-application register for SMRs; no construction-license or decision-in-principle application for an SMR is listed. |
| FI | World Nuclear News: Finland tag listing, first page (10 items, 27 March to 15 September 2026) | incomplete | partial: first page of a multi-page news listing, re-read 3 October 2026; older pages not read. All 10 items classified: the Jyväskylä district-heating exploration (an existing program-context row), Steady Energy's design review and funding (no site), a national options study (program context) and six items on existing large plants, fuel, waste or emergency preparedness. No new site. |
| FI | STUK: Small modular reactors (discussions with designers and other actors) (Radiation and Nuclear Safety Authority (STUK)), Undated page; latest further-reading item 26 June 2026 | incomplete | partial: Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. STUK publishes no SMR license-application register. |
| FI | TEM (Ministry of Economic Affairs and Employment): Nuclear facilities and projects (navigation of all nuclear project pages) (Työ- ja elinkeinoministeriö (TEM)), As served 2026-10-06 (no page date) | incomplete | partial: Every project page in TEM's nuclear facilities and projects section read by title: Loviisa, Olkiluoto 1-2 (license, EIA), very-low-level waste EIA, Kuopion Energia SMR plant (+EIA program), Fennovoima (historical), FiR 1 decommissioning, Terrafame uranium, Posiva. Kuopio is the only SMR project with a TEM procedure; no Helen, Kerava or other SMR EIA/decision-in-principle file appears. |
| FI | Steady Energy news list (22 Aug 2024 to 16 Sep 2026) and three linked releases (Steady Energy Oy), list as served 2026-10-06 | reconciled | complete: Every item on the list (39) titled; Sweden entry, Baltic alliance and EIB releases opened. No site beyond Helsinki pilot (non-nuclear), Kuopio, Kerava, Helen/Helsinki and Jyväskylä (pre-study) |
| FI | Fortum release: Fortum deepens its collaboration with Steady Energy (Fortum Oyj), 2026-01-13 | incomplete | partial: Single release |
France · 17 cited routes
Published project records for France (8): Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte, Calogena nuclear heating plant at CEA Cadarache, Hexana first SMR in the Gard rhodanien area, Jimmy Cristanol Bazancourt heat microreactor proposal, newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-Véron, Otrera precursor (first demonstration) reactor at CEA Marcoule, Stellaria Alvin experimental reactor (INB Alpha) at Cadarache, Stellarium reactors for the Fos-sur-Mer integrated energy hub (2026 MoU). All France records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| FR | CNDP public debate brochure, newcleo (debate 2 Apr-30 Jul 2026) | incomplete | partial - 30 MWe LFR-AS-30 at Beaumont-en-Véron / Savigny-en-Véron (Indre-et-Loire) plus a MOX plant in Aube. Text extracted locally with pdftotext. |
| FR | France 2030 innovative-reactor winners via vendor/Sfen pages | incomplete | partial - Sited items: Calogena CAL30 at CEA Cadarache, Stellaria Alvin DAC at Cadarache, Hexana siting studies in Gard rhodanien, Otrera demo considering Marcoule. Jimmy: no new site beyond Bazancourt. No sites found for Naarea, Blue Capsule, NUWARD, Archeos. ASN/ASNR register not enumerated. |
| FR | NUWARD site via Internet Archive (live nuward.com access refused, HTTP 403 from VPS) | incomplete | partial - Current design: 1,150 MWth, up to 400 MWe. JER Phase 2 reports (Dec 2025) record the July 2024 pivot. JER Phase 3 launched Jan 2026. |
| FR | ASNR: Les projets de PRM et les usines de fabrication et d'assemblage de leurs combustibles (projects followed and phase table) (Autorité de sûreté nucléaire et de radioprotection (ASNR); 'Date de la dernière mise à jour : 18/08/2026' (page title dated 07/05/2026)) | reconciled | complete: 11 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. NUWARD is not on the list (no ASNR exchange phase listed). |
| FR | Westinghouse; Data4 AP300 memorandum (Westinghouse Electric Company / Data4; release 2025-03-11) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Data4 own newsroom not enumerated; release read via search summaries |
| FR | Stellaria release on the Fos-sur-Mer integrated energy hub (Stellaria (with Groupe Unitel and Energie Hub); release dated 2026-07-16/20 (French)) | incomplete | partial: a single release, not a listing. 1 entries reconciled (accessed 3 Oct 2026) |
| FR | Jimmy Energy 'Actualités' (Jimmy SAS; Live page, newest item 15 June 2026) | reconciled | complete: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: none |
| FR | Stellaria 'Actualités' (ressources page) (Stellaria SAS; Live page, 8 items shown (17 Jul 2025; 20 Jul 2026)) | incomplete | partial: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Older items sit behind a JavaScript 'Charger plus' button and were not loaded; stellaria.tech has a certificate hostname mismatch (redirect domain stellaria-energy.com -> stellaria.fr used) |
| FR | Otrera 'Actualités' and 'Presse' (Otrera New Energy; Live pages, newest item 3 July 2026) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Older items behind 'Entrées précédentes' pagination not opened |
| FR | World Nuclear News home page headline list (World Nuclear Association (World Nuclear News); Home page as served 2026-10-03 (newest item dated 2 October 2026)) | incomplete | partial: a rolling front page of 19 headlines, not a listing of proposals. 1 entries reconciled (accessed 3 Oct 2026); access limits: Home page only (19 headlines) |
| FR | World Nuclear News: EDF's Nuward plans 10 SMRs in five EU countries (21 September 2026) | incomplete | partial: one news article read in full, not a listing. A vendor plan naming partner countries but no site: program context. |
| FR | World Nuclear News: France tag listing, first page (10 items, 21 May to 21 September 2026) | incomplete | partial: first page of a multi-page news listing, re-read 3 October 2026; older pages not read. All 10 items classified: Stellaria's Fos-sur-Mer proposal (now a published record), newcleo's floating-plant concept (no site: program context), an EDF agreement with Serbia (Serbian program context) and seven items on large reactors, fuel, decommissioning or corporate news. |
| FR | Stellaria: Fos-sur-Mer integrated energy hub release (20 July 2026) and CEA letter of intent for INB ALPHA (23 April 2026) | incomplete | partial: individual releases read in full, not a listing. The Fos-sur-Mer hub is now a published record; the CEA letter of intent matches the existing Cadarache record. |
| FR | ASNR: Les projets de PRM et les usines de fabrication et d'assemblage de leurs combustibles (projects followed + exchange-phase table) (Autorité de sûreté nucléaire et de radioprotection (ASNR)), Page title dated 07/05/2026; 'Date de la dernière mise à jour : 18/08/2026' | incomplete | partial: All 8 reactor rows and 3 fuel-facility rows read. Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. The DAC (creation-authorization) requests named on the page are Jimmy (27 May 2024, Bazancourt; design-modification update 23 July 2026) and Stellaria INB ALPHA (19 Dec 2025, CEA Cadarache); safety-options opinion requests: Calogena, newcleo LFR-AS-30, Otrera ONE (30 July 2026). NUWARD is not listed. |
| FR | ASNR: Petits réacteurs modulaires hub and 'Les petits réacteurs modulaires (PRM) et leurs combustibles', 'Date de la dernière mise à jour : 07/05/2026' | incomplete | partial: Hub page and explanatory page read in full; they describe technology families and the France 2030 call but list no projects beyond route A-inventories-101. The ASNR site has no separate 'réacteurs modulaires' INB authorization-request list; DAC requests are reported inside route 101. |
| FR | CNDP: débat public 'Deux projets nucléaires dans l'Aube et en Indre-et-Loire' (newcleo) and notice 'Le compte-rendu et le bilan du débat public sont en ligne' (Commission nationale du débat public (CNDP)), Notice 'Date de dernière mise à jour : 30/09/2026'; report PDFs under /2026-09/ | incomplete | partial: A single debate page, not a list. Report PDFs (compte-rendu, bilan) not opened. |
| FR | World Nuclear News: Newcleo-led consortium to develop floating nuclear plant (World Nuclear Association), 2026-08-28 | incomplete | partial: Single article |
Cross-border inventories (GLOBAL) · 47 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| Cross-border | Wikipedia coordinates API (host facility coordinates only; aggregator) | incomplete | partial - Used for approximate coordinates of named host facilities (Hartlepool, Cottam, Ringhals, Wylfa, Oldbury, Dungeness, Borssele, PSI, Cadarache, Bohunice, Moorside). Integrator should re-verify against an official source. |
| Cross-border | WNA emerging nuclear countries + country profiles (TR, AM, BY, SK, SI, RO, PL, UA, HU, CZ, BG, KZ, UZ) | incomplete | partial: secondary country profiles used as pointers, not lists of proposals; retrieved 2026-10-02 - Used as pointers only. Serbia, Croatia, Slovenia, Armenia, Turkey and Azerbaijan have SMR programs but no named host sites. Belarus: no SMR text. Georgia, Moldova, Bosnia, Montenegro, North Macedonia, Albania and Turkmenistan: no SMR deployment found. |
| Cross-border | NEA SMR Digital Dashboard edition 4.0: siting and licensing points outside the US (map coordinates) | incomplete | partial: map points matched where identifiable; several remain likely or unresolved; retrieved 2026-10-02 - Points mapped to existing records: 48.40,17.74 = Newvys Bohunice; 52.03,21.37 = likely HTGR-POLA/NCBJ; 44.915,25.46 = Doicesti; 40.26,67.54 = Jizzakh; 69.93,135.55 = Ust-Kuyga; 69.62,170.14 and 68.00,166.39 = Baimsky/Nagloynyn; 56.57,84.85 = BREST. 66.36,-178.98 (Egvekinot) likely = Chukotka Shelf-M ASMM, since Sovinoe is in Iultinsky district (municipal center Egvekinot). Warsaw points likely = OSGE (7th site 'Warszawa' and HQ) and/or other Warsaw-HQ developers. Kyiv 50.51,30.55 = undisclosed Energoatom program. Slavutych 51.56,30.81 likely = Chornobyl exclusion-zone land offer. Budapest 47.45,19.14 and Sakhalin 46.96,142.72 are unr |
| Cross-border | World Nuclear News sitemap.xml (18,038 URLs) + RSS | incomplete | partial: sitemap slugs filtered by keyword (about 45 articles opened), not every listed article; retrieved 2026-10-02 - Slugs filtered by Asia-Pacific/SMR keywords; ~45 articles opened. No SMR deployment slugs found for Bangladesh, Nepal, Cambodia, Laos, Brunei, New Zealand, Pacific islands, Taiwan or North Korea; Taiwan items are large-plant restart only. |
| Cross-border | WNN RSS (2026-09-21..2026-10-02) and NNSA/KHNP lists | incomplete | partial - In-scope releases since 2026-09-01: NNSA Xuwei HTGR SDC approval (09-29); USTDA–EGAT SMR study (09-14/16); China GNSI launch (09-15); Changjiang 3 commissioning note confirming Linglong One still pre-commissioning (09-17); NPCIL–GSECL Gujarat siting MoU (10-02). No new Korean/Japanese SMR site releases after 2026-06-17. |
| Cross-border | World Nuclear Association - Emerging nuclear energy countries | incomplete | partial - Aggregator sweep of my countries: site-named items only Rwanda (Dual Fluid; NANO; Holtec SMR-300 fleet) and Ghana (NuScale; CNNC large); Ecuador 300 MWe SMR objective, no site. |
| Cross-border | IAEA ARIS public API POST /api/DSR/TechnicalData (121 designs) | incomplete | partial: look-ups of named designs, not a reconciliation of all 121 database entries; retrieved 2026-10-02 - HTMR100 = dsrId 155 (STL Nuclear (Pty) Ltd, 35 MWe, 100 MWth); NUWARD = dsrId 132 (170/185 MWe, 540 MWth). Ledger URLs DSR 147 (=AMR) and DSR 136 (server error, HTTP 500) are wrong ids. |
| Cross-border | IAEA PRIS Analytics API reactors-by-code (DE, FR, RU, SE, US) | incomplete | partial: look-ups of named historical reactors, not a reconciliation of the five country lists; retrieved 2026-10-02 - Type/model/capacity/dates for 12 of the 13 historical rows. Marcoule G-1 and the Seversk (Siberian) reactors are not in PRIS. |
| Cross-border | IAEA ARIS Publications list (RelatedPublication API behind aris.iaea.org/Publications), 13 items; newest insert 2025-01-16 (marine SMR booklet); newest SMR catalogue item inserted 2024-10-18 | reconciled | complete: All 13 publication rows read (PageSize=50 returned totalCount 13). Newest SMR catalog row is 'SMR catalog (2024)'; no 2025 or 2026 catalogue/booklet row. |
| Cross-border | IAEA ARIS Small Modular Reactor Technology Catalogue, 2024 Edition (supplement to 'Small Modular Reactors: Advances in Developments 2024'), Third edition: June 2025 (imprint lists First Oct 2024, Second Jan 2025, Third Jun 2025); PDF CreationDate 2025-07-02; 394 pages | incomplete | partial: Edition check only: re-fetched PDF text is identical (whitespace-insensitive) to the 2026-10-02 capture, so the prior full reconciliation stands; TOC not re-enumerated. |
| Cross-border | IAEA ARIS design records via public API GET /api/DSR/Get?Id=N (per-record sweep, ids 1-240) compared with the 2 Oct 2026 121-row technical-table baseline, Latest record PublishedDateTime: Aug 04, 2026 (HPR1000, id 171); previous: Apr 29, 2026 (SALUS-100, id 166) | reconciled | complete: Ids 1-240 requested; 121 returned a design record, all others a server error (HTTP 500) 'Something went wrong' (gap ids). Same 121 ids, short names, design organizations, countries, size categories and PDF paths as the 2026-10-02 baseline: 0 new, 0 removed, 0 changed. The POST /api/DSR/TechnicalData table itself was not re-queried because the mandated fetch tool is GET-only (GET returns error response, HTTP 405); per-record equivalence is the substitute. Ids above 240 not probed. |
| Cross-border | IAEA ARIS Archived Designs list (Archive PagedList API), 3 rows, all inserted 2025-09-24 | reconciled | complete: All 3 rows read. |
| Cross-border | iaea.org SMR topic page, publication search and news (GC70 SMR Platform event), not read | incomplete | partial: access blocked (Cloudflare challenge (403) for the fixed-header fetch; error response, HTTP 402 for a rendered-text read; tried topic page, /publications/search/type/non-serial-publications, a GC news item and doi.org redirect to /publications/16125.). Not read: the fixed-header fetch received Cloudflare 'Just a moment...' (access refused, HTTP 403) on www.iaea.org topic, publication search and news pages; a rendered-text read got an error response (HTTP 402). Search-engine result titles (before the session search allowance ran out) pointed to IAEA/PAT/016 and to an April 2026 trade-press summary of the June 2025 catalog; no 2026 SMR catalog page was surfaced. |
| Cross-border | IAEA, Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016, Printed September 2026; PDF created 2026-09-14; DOI 10.61092/iaea.knfn-4qoj (Crossref published 2026-09); 54 PDF pages | incomplete | partial: Read the full text and Fig. 5 (status/output chart of the '24 identified microreactors'), which names every concept. Enumerated all 24 plus 2 extra names in the text (Mark-0, Aalo-X) and ZiaCore. This is a newer IAEA technology-development edition than the June 2025 SMR catalog, but it covers microreactors only; it is not a full SMR catalog. |
| Cross-border | Crossref metadata for DOI 10.61092/iaea.knfn-4qoj (IAEA/PAT/016) (Crossref / IAEA), published-print/online 2026-09; record created 2026-09-10 | incomplete | partial: Single metadata record; used to confirm date and that data come from the 2026 ARIS update. |
| Cross-border | NEA Small Modular Reactor Digital Dashboard page (OECD Nuclear Energy Agency), Edition 4.0, launched 28 September 2026 ('the latest version'); no later edition named | incomplete | partial: Page text read in full. The 95 included designs live in a Power BI embed (same report URL as 2026-10-02) whose data requires POST queries; not re-enumerated. The page states 156 tracked, 95 included, 61 not included (about 33 under development that asked not to be listed; the rest inactive, without resources, canceled or paused). No names for the 61 are published on the page, the news brief or the download list. www.oecd-nea.org host returned Cloudflare 403; the bare oecd-nea.org host served the page. |
| Cross-border | NEA news brief: Release of the NEA Small Modular Reactor Digital Dashboard: Fourth Edition (OECD Nuclear Energy Agency), 28 September 2026 | incomplete | partial: Full brief read: cut-off 18 May 2026; 26 new projects added; 156 tracked/95 included; a dedicated trends report is to follow (not yet found). Earlier edition 3.1 brief dated 30 Jan 2026 listed under 'See also'. |
| Cross-border | Wayback Machine CDX index for the NEA dashboard page (fresh-discovery check for post-launch snapshots) (Internet Archive), latest snapshot 2026-07-22 | reconciled | complete: Last 10 snapshots listed; none after the 28 Sep 2026 launch, so no archived post-4.0 variant exists. |
| Cross-border | World Nuclear Association - Small Modular Reactor (SMR) Global Project Tracker page, page label 'Updated Wednesday, 29 July 2026' (unchanged since 2026-10-02) | incomplete | partial: Availability finding only (per brief): the page embeds a Tableau Public viz and offers no row/data export link. Tooltips not scraped; rows not read. |
| Cross-border | Tableau Public workbook metadata for the WNA tracker viz (SmallModularReactorSMRGlobalMap3) (Tableau Public (WNA viz author)), revision 4.6; lastPublishDate 2026-07-29 13:11 UTC | incomplete | partial: Metadata only: allowDataAccess=false (author has not enabled data download); views Sheet 1, Dashboard 2, Reset. No export offered. |
| Cross-border | World Nuclear News sitemap (article lastmod 2026-09-01..2026-10-06) keyword scan + 4 articles opened, sitemap lastmod 2026-10-06 | incomplete | partial: Fresh discovery: scanned slugs since 2026-09-01 for inventory/licensing keywords (23 hits). Opened 4 within this bundle (IAEA projections; Prodigy Belledune; Saskatchewan plan; Pioneer PSAR). Europe/Asia slugs left to the country route. |
| Cross-border | World Nuclear News country tag listings, first pages: Sweden (952), Finland (931), Netherlands (949), France (907), Czech Republic (882), Slovakia (984), Newest items: SE 3 Sep, FI 15 Sep, NL 29 Sep, FR 5 Oct, CZ 23 Sep, SK 22 Sep 2026 | incomplete | partial: First page of each tag only. Re-read to catch items after the 2026-10-03 reads: only FR has a newer item (5 Oct, Orano lead-212 facility: not SMR). CZ newest SMR item (23 Sep, Škoda JS control-rod drives for Rolls-Royce SMRs) is supply chain with no site. Other captures: FI-wnn-tag-931.html, NL-wnn-tag-949.html, FR-wnn-tag-907.html, CZ-wnn-tag-882.html, SK-wnn-tag-984.html. |
| Cross-border | European Industrial Alliance on SMRs - main page (timeline, documents) (European Commission, DG GROW), page as read 2026-10-06; latest timeline item 6 July 2026 (2nd call launched) | incomplete | partial: Whole page read: timeline, document list (1st PWG batch, Nov 2025 PWG reassessment, member list of 2026-07-08, strategy COM/2026/117). No second-call result or new project list is linked. |
| Cross-border | Second call for projects: European SMRs Industrial Alliance (call page) (European Commission, DG GROW), published 6 July 2026; status Closed; deadline 11 September 2026 | incomplete | partial: Call page read in full. It states review September-October 2026 and communication of results by end of October 2026. No list of selected second-call projects (new PWGs) is published as of 6 October 2026. |
| Cross-border | Project Working Groups (PWGs) assessment under the European Industrial Alliance on SMRs (13 November 2025) (European Commission / SMR Alliance Governing Board), 13 November 2025 (PDF created 2025-11-13) | reconciled | complete: All 9 first-call PWGs named; 8 confirmed, Project Quantum (Last Energy) suspended pending clarification. All 9 already present as eu_smr_alliance ledger rows (design-level matches). |
| Cross-border | European Industrial Alliance on SMRs - list of members (membership as of 1 July 2026) (European Commission, DG GROW), 2026-07-08 (PDF created 2026-07-08); membership as of 1 July 2026 | incomplete | partial: Organization membership list (about 403 bullet entries), not a project list. Read in full; only SMR developer/vendor names were cross-checked (Blykalla, Calogena, Copenhagen Atomics, Deep Atomic, Stellaria, Steady Energy, Thorizon, Transmutex, newcleo, Blue Capsule etc. all exist as organizations). Unmatched developer-like members not researched: Emerald Horizon AG, Thorgenx B.V., Urjanova Ltd, TSPC Energy Kft., The Binding Energy, TREK DEVELOPMENT SA. |
| Cross-border | 1st batch of project working groups (PWGs) under the European Industrial Alliance on SMRs (Docsroom 62274) (European Commission), October 2024 (per alliance page) | incomplete | partial: Link redirects to a CIRCABC library path that returns 404. The same nine PWGs are named in the November 2025 reassessment (route 203), so nothing is lost. |
| Cross-border | ENSREG topic page: Small Modular Reactors (European Nuclear Safety Regulators Group (ENSREG) / European Commission), page as read 2026-10-06; lists dashboards of April 2025, November 2025 and 3 March 2026 | incomplete | partial: Page read in full; links three ENSREG SMR Task Force dashboards. Newest is the March 2026 edition (route 207). No edition after March 2026 is linked. |
| Cross-border | ENSREG SMR Task Force Dashboard - March 2026 (HLG-p(2026-58)_226, third edition), third edition, dated 3 March 2026 (PDF created 2026-04-16) | reconciled | complete: All 4 pages read row by row: 10 Industrial Alliance PWG rows and 10 other SMR project rows (20 project rows, many with several regulator lines). Every row maps to an existing design/project; the dashboard is regulator engagement by design and does not name sites. New status facts: Thorizon joint FR/NL preparatory review halted 2026; Holtec SMR-300 and Copenhagen Atomics in early dialogue with Sweden; Last Energy Quantum in preparatory review in Romania; NuScale in Licensing in Romania; EAGLES 30 MWth (Belgium) and 300 MWth (Romania) in review and assessment. Compared with November 2025: NAAREA XAMR and NuScale-Poland (halted) dropped; Holtec SMR-300 (SE) added. |
| Cross-border | ENSREG SMR Task Force Dashboard - November 2025 (HLG-p(2025-57)_219, second edition), November 2025 (PDF created 2025-11-05) | incomplete | partial: Read only to diff against March 2026: rows present in Nov 2025 but not March 2026 are NAAREA XAMR (FR) and NuScale early dialogue with Poland (halted); NUWARD national review in FR shown halted (old 540 MWth design). No new names. |
| Cross-border | WENRA publications page (SMR statement 2023; RHWG report on applicability of safety objectives to SMRs) (Western European Nuclear Regulators Association (WENRA)), page as read 2026-10-06 | reconciled | complete: Publications list scanned for SMR items: two SMR documents (2023 statement, RHWG report), both generic safety documents; WENRA publishes no SMR project list. |
| Cross-border | Rosatom export pointers outside this bundle: atomic-energy.ru tags Rwanda, Burkina Faso, Niger, Ethiopia (Mali and Vietnam tags 404); Rwanda items 2026-05-14 and 2026-06-30; Kommersant "Росатом договорился о строительстве АЭС в Руанде и других странах" (2026-05-14); Strana Rosatom Brazil item (2026-07-22) (Атомная энергия 2.0; Kommersant; Strana Rosatom), 2025-06 to 2026-07 | incomplete | partial: Tag pages screened for small-plant items; only Rwanda named an SMR roadmap; no named small plant commitment in Mali, Burkina Faso, Niger, Ethiopia or Vietnam found here. |
| Cross-border | World Nuclear News sitemap (article slugs filtered for India/Korea/Japan/Taiwan terms, lastmod 2025-12-01 to 2026-10-06) plus RSS feed, sitemap lastmod 2026-10-06 | incomplete | partial: 86 slugs matched the country/company filter; titles screened; 6 articles opened (Gujarat MoU 2026-10-02, NTPC/Tarapur 2026-05-12, India hydrogen facility 2026-06-29, Korean HTGR MoU 2026-03-09, Korean floating SMR 2026-07-22, Japan replacement target 2026-06-05). Slug filter can miss articles whose slugs lack a country term. |
| Cross-border | WNA 'Emerging Nuclear Energy Countries' (Cambodia, Laos, Malaysia, Singapore, Myanmar sections) (World Nuclear Association (Information Library)), Updated Sunday, 27 September 2026 | incomplete | partial: only the Cambodia, Laos, Malaysia, Singapore and Myanmar sections read for this route; Thailand section not present as text in this capture |
| Cross-border | NucNet SMR tag listing, retrieved 2026-10-06 | incomplete | partial: listing captured; no Southeast Asian item beyond those already read was identified in the extracted text |
| Cross-border | World Nuclear News: Small Modular Reactors tag listing, pages 1-5 (56 items, 21 July to 2 October 2026) (World Nuclear Association), pages as shown 2026-10-06 | incomplete | partial: Pages 1-5 of a multi-page listing read (back to 21 July 2026); European items opened in full where they could name a site. Non-European items left to other research routes. |
| Cross-border | SGE news list and two linked articles (Hungary forum; Slovenské elektrárne MoU) (SGE S.A.), list as served 2026-10-06 (redirects to sge.eu/news/) | reconciled | complete: All 21 list items titled; Hungary and Slovakia items opened. Bulgaria, Lithuania, UK, Poland items already in existing rows |
| Cross-border | WNA Emerging Nuclear Energy Countries (re-read for 2026 Africa items) (World Nuclear Association), Updated 27 September 2026 | incomplete | partial: Grepped Africa sections for 2026 and SMR terms (Algeria, Ethiopia, Egypt, Ghana, Kenya, Morocco, Namibia, Nigeria, Rwanda, Senegal, Sudan, Tanzania, Uganda, Zambia) |
| Cross-border | News-search discovery feeds (Google News RSS: EN/FR/PT/AR SMR-Africa queries; Bing News RSS for link resolution) (Google News; Bing News), feeds as served 2026-10-06 (items Apr-Oct 2026) | incomplete | partial: Six Google News queries (190 items, headlines only) and ten Bing News queries; article links resolved only where a direct URL could be found |
| Cross-border | Emerging Nuclear Energy Countries (Middle East section: Bahrain, Iraq, Israel, Kuwait, Oman, Qatar, Syria, Yemen) (World Nuclear Association), Updated 27 September 2026 | incomplete | partial: Middle East and New Zealand mentions read; Africa/Latin America/Asia sections left to sibling route. |
| Cross-border | Google News RSS search index (MENA and Oceania queries, English/Arabic/Korean/Persian, mostly 'when:365d'), queries run 2026-10-06 | incomplete | partial: Headlines/dates/sources only (article links are opaque redirects that could not be resolved without a POST); ~30 queries: ENEC SMR, Saudi SMR, SMART100 Saudi (en/ko), Jordan, Oman, Qatar, Kuwait, Iraq (en/ar), Israel, Bahrain, UAE/Saudi microreactor, ADNOC/XRG/Masdar/G42, Australia microreactor/startup/Coalition/state bans, New Zealand SMR, Greenland, Pacific floating NPP, Iran-Rosatom (en/fa), Makran (fa). |
| Cross-border | IAEA And IDB To Cooperate On Nuclear In Latin America And Caribbean (NucNet), 2026-09-28 | incomplete | partial: Article read. |
| Cross-border | Google News RSS: "small modular reactor" with Caribbean country names (180 days); "reactores modulares/microrreactor" with Hispanic-American country names (120 days), feeds as fetched 2026-10-06 | incomplete | partial: Discovery feeds (also gnews-smr-hispam-120d.xml); titles read. No Guyana, Trinidad, Panama, Chile or Uruguay deployment item surfaced. |
| Cross-border | World Nuclear News RSS (World Nuclear Association), feed read 2026-10-06 | incomplete | partial: 45 feed items 22 Sep-5 Oct 2026; items after 3 Oct: UK Green Party policy, Polish timeline, Orano Pb-212, ITER - none a North American SMR site. |
| Cross-border | 2026 Update: Who in Africa is Ready for Nuclear Power? (Energy for Growth Hub), 18 September 2026 | incomplete | partial: Whole article read (country readiness tiers). Cross-check only: no project in it goes beyond what the Africa sub-bundle already recorded. |
| Cross-border | 2026 Update: Who in Latin America is Ready for Nuclear Power? (Energy for Growth Hub), 7 July 2026 | incomplete | partial: Whole article read. Cross-check only. |
| Cross-border | Google News RSS gap searches (Sudan/Mozambique/Angola/Cote d'Ivoire; French 'petit reacteur modulaire' Afrique; Rosatom small NPP Africa; Australia SMR proposals; Chile/Uruguay/Guyana/Trinidad/Panama), read 2026-10-06 | incomplete | partial: 119 headlines over five feeds; no SMR plant commitment found for Sudan, Mozambique, Angola, Cote d'Ivoire, Chile, Uruguay, Guyana, Trinidad, Panama or a named private Australian proposal. Headlines only; articles not opened unless listed elsewhere. |
Georgia · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| GE | WNA Emerging Nuclear Energy Countries (Georgia listed among emerging interest) | incomplete | partial - name listed; no SMR deployment rows on page |
Germany · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| DE | German Federal Environment Agency nuclear and SMR assessment | incomplete | partial - national policy and technology assessment, not a project list; existing German power-reactor operating permissions have expired, but this alone is not an inventory of every proposal |
Ghana · 5 cited routes
Published project records for Ghana (1): Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed). All Ghana records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| GH | US DOE NE article: Ghana NuScale agreement | incomplete | partial - Nuclear Power Ghana + Regnum agreement for one VOYGR-12 plant; no site named. Nsuban is covered by its own route. |
| GH | Nuclear Power Ghana site search (nuclearpowergh.com ?s=Nsuban/SMR/site/Western Region) | incomplete | partial - Nsuban: 0 hits. SMR/site queries: 6 articles opened; none links an SMR to Nsuban; 2025 items name only 'preferred' and 'backup' sites of 'the project'. npg.com.gh does not resolve. |
| GH | Ghana Atomic Energy Commission WordPress search | incomplete | partial: a site search, not a listing; retrieved 2026-10-02 - Nsuban: 0 results. 'small modular': 3 US-cooperation items, none naming a site. |
| GH | IAEA GC69 statement of Ghana (Sept 2025) | incomplete | partial - Two framework agreements (SMR and large reactor); preferred/backup sites mentioned without technology assignment. |
| GH | Energy Brief (EMG Ghana): AETC 2026 - President Mahama announces nuclear energy plans (EMG Ghana Energy Brief), 21 May 2026 | incomplete | partial: Single article |
Greece · 1 cited routes
No published project record for Greece in this release. All Greece records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| GR | WNN report of Greek Inter-Ministerial Committee on SMRs (4 Aug 2026) | incomplete | partial - single secondary article; PM quoted that committee is study/framework not construction |
Guinea · 1 cited routes
No published project record for Guinea in this release. All Guinea records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| GN | NucNet: Rosatom-Guinea floating plant MoU | incomplete | partial - June 2024 MoU on RITM-200 floating units; no site/port named. NEA ed.4 Conakry-area pointer remains non-binding and unconfirmed. |
Hungary · 6 cited routes
No published project record for Hungary in this release. All Hungary records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| HU | WNA Hungary profile + WNN 2025-08-01 + Holtec S-1 | incomplete | partial - Program-level MoUs only: Hunatom-Rolls-Royce (June 2025), Hunatom-SGE BWRX-300 up to 10 (July 2025), and MVM-Holtec SMR-300 up to 10 (Dec 2025). Holtec says the MVM agreement has an identified but unnamed site. HAEA was not checked; ceenergynews was bot-blocked. |
| HU | MVM / Hunatom SMR agreements (reported) (World Nuclear News report; report of 2025-08-01) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: mvm.hu not opened |
| HU | World Nuclear Association country profile: Nuclear Power in Hungary (updated 22 September 2026) | incomplete | partial: secondary country profile, not a list of proposals. Its SMR items (Hunatom agreements, MVM and Holtec, a US-supported design study) name no site. |
| HU | HAEA/OAH portal: Uj atomeromuvi blokkok letesitesenek hatosagi felugyelete (new units supervision) + news list (Orszagos Atomenergia Hivatal (HAEA)), news list as read 2026-10-06 (latest items late September/early October 2026) | incomplete | partial: New-units page covers only Paks II (large VVER) and announcements; first news page (about 15 items, Sept-Oct 2026) has no SMR item. HAEA publishes no SMR licensing list; older news pages and Hungarian decisions archive not paged. |
| HU | Portfolio.hu: Magyarország számára is fontos megállapodás született a kis moduláris atomreaktorok piacán, 2026-09-25 | incomplete | partial: Single article read via a rendered-text read (not captured) |
| HU | Atombiztos blog: Hármasfogat: Paks I. és Paks II. után a 'Paks III.' már SMR lehet; Telex SMR article (31 Mar 2026) (Atombiztos (Hárfás Zsolt blog); Telex), 2026-08-27; 2026-03-31 | incomplete | partial: access blocked (access refused, HTTP 403 twice per URL (the fixed-header fetch once, a rendered-text read once); not retried further). Both pages refused automated access (access refused, HTTP 403 via the fixed-header fetch and a rendered-text read); only search-result titles and result titles seen |
India · 15 cited routes
Published project records for India (3): BARC Visakhapatnam HTGCR hydrogen demonstration proposal, Tarapur BSMR-200 lead proposal, Tarapur SMR-55 lead proposal. All India records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| IN | AERB (India) 'Nuclear Projects' list (Facilities & Activities) (Atomic Energy Regulatory Board (India); archived copy 2026-06-25 (live site reset the connection on 2026-10-03)) | reconciled | complete: 21 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Live aerb.gov.in reset connections; Wayback copy of 2026-06-25 used, so July-October 2026 changes are not seen. |
| IN | WNA 'Nuclear Power in India' (discovery) (World Nuclear Association (Information Library); Updated Wednesday, 15 July 2026) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| IN | Maharashtra and Andhra Pradesh proposed for first Indian SMRs (reporting Lok Sabha written answers of 3 Dec 2025) (World Nuclear News (trade press citing Government of India parliamentary answers); 2025-12-10) | reconciled | complete: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: primary already behind existing records |
| IN | Deadline extended to allow wider participation in Indian small reactor RFP (World Nuclear News (trade press; discovery); 2025-10-08) | incomplete | partial: a single news article, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: NPCIL RFP documents not fetched |
| IN | Hindalco Sole Bidder for NPCIL 220 MW Small Nuclear Reactor (Whalesbook (press; discovery only); 2026-07-28) | incomplete | partial: a single news article, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: No Hindalco or NPCIL primary found without further search |
| IN | NPCIL Request for Proposal page: RFP No. NPCIL/BSR-220MWe/2024/01 for 220 MWe PHWR Bharat Small Reactors, with the RFP document, pre-proposal clarification response and corrigenda VII (29 Sep 2025) and VIII (6 Jan 2026) (Nuclear Power Corporation of India Limited), page lists items 31/12/2024 to 06/01/2026 | reconciled | complete: All 10 items on the RFP page listed; RFP document, clarification response and corrigenda VII and VIII read (corrigenda are scanned images, read by OCR). Corrigenda I-VI not opened (deadline/administrative items per their titles). |
| IN | Department of Atomic Energy parliament question-and-answer listings for the 2026 search allowance and Monsoon sessions (Lok Sabha and Rajya Sabha), with 12 answers on SMRs, BSRs and the Nuclear Energy Mission (Department of Atomic Energy, Government of India), answers dated 29 Jan 2026 to 6 Aug 2026 | incomplete | partial: Four session listings enumerated (152 rows); 39 rows matched SMR/BSR/mission/capacity title terms; the 12 most relevant answers read in full (LS 2841, 2793, 528, 3006, 468; RS 2087, 1287, 488, 487, 223, 2241, 11). Remaining matched rows were capacity, fuel-cycle or medical items. |
| IN | PIB release PRID 2238907 'Parliament question: Deployment of Small Modular Reactors (SMRs)' (Press Information Bureau), 2026 (exact date not seen) | incomplete | partial: access blocked (pib.gov.in returned an Akamai 'Access Denied' page twice to the research fetcher and access refused, HTTP 403 to a rendered-text read; no Wayback snapshot exists.). Not readable; content taken from the DAE-hosted answers instead (route 02). |
| IN | AERB 'Nuclear Projects' list (live site and latest archived copy) (Atomic Energy Regulatory Board), latest archived copy 2026-06-25 (same snapshot already used by SMRMap) | incomplete | partial: access blocked (Live aerb.gov.in reset the connection on both attempts (Errno 104); Wayback 'id_' latest redirected to the 2026-06-25 capture.). No newer snapshot than 2026-06-25 exists, so July-October 2026 consents (for example the HTGCR siting consent date) could not be checked on the regulator's list. Not re-reconciled. |
| IN | NPCIL press-release listing (page 1) and the 17 Nov 2025 NPCIL-MAHAGENCO-MITRA MoU release (Nuclear Power Corporation of India Limited), releases 26 Sep 2025 to 29 Sep 2026 | incomplete | partial: Page 1 of 3 (10 most recent releases) read; no release on BSMR, SMR-55 DPRs or BSR. Pages 2-3 (older) not opened. |
| IN | Mint: 'Barc in talks with NTPC, Adani, RIL to deploy small reactors' (BSMR-300 SPV; BSMR-300 DPR released 14 Aug 2026) (Mint (HT Media)), 2026-09-17 | incomplete | partial: Single article; anonymous sources for the SPV talks; the DPR release date is stated as fact. |
| IN | Power Peak Digest: 'NPCIL, BARC release DPR for indigenous 55 MW small modular reactor' (Power Peak Digest (trade press)), 2026-10-05 | incomplete | partial: Single article reporting an NPCIL/BARC event of 1 Oct 2026; NPCIL's own press listing has no release on it. |
| IN | Indian Defence News aggregator posts (12 Mar, 23 Jul, 19 Sep 2026) summarising parliament answers and press reports (Indian Defence News (aggregator; discovery only)), 2026-03-12 / 2026-07-23 / 2026-09-19 | incomplete | partial: Discovery only; every fact used was re-sourced to DAE answers or Mint. |
| IN | English-language India discovery: keyword search (before the session search allowance ran out) and Google News RSS (4 queries); Bing News RSS used to resolve two links (Various), 2024-12 to 2026-10-05 | incomplete | partial: Titles and result titles; Business Standard, BW Businessworld and Financial Express returned an access refusal (HTTP 403); facts used were re-sourced to DAE or NPCIL documents. |
| IN | BARC homepage news ticker and press-release index, read 2026-10-06 | incomplete | partial: Homepage ticker and the press-release table read in full. Newest press item is 29 July 2024. No BSMR-300 item. Not a design catalog. |
Indonesia · 28 cited routes
Published project records for Indonesia (6): BATAN/BRIN RDE experimental reactor at Serpong (PeLUIt-40 predecessor), Northern Halmahera floating nuclear power units (Rosatom, two FPU-100), Pupuk Kaltim nuclear-powered ammonia study at Bontang, Thorcon 500, Kelasa Island, West Kalimantan Rosatom floating RITM-200M proposal (2025), West Kalimantan Rosatom land-based SMR proposal (2025). All Indonesia records and agreements.
Iran · 5 cited routes
No published project record for Iran in this release. All Iran records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| IR | WNN Darkhovin + WNA Iran profile | incomplete | partial ? Darkhovin outside_scope (300 MWe PWR); Makran ACP100 still pending AEOI primary |
| IR | Interfax: Russia-Iran small NPP MoU (2025-09-24) | incomplete | partial - MoU on small NPPs; no site. Makran coast item excluded (covered by its own route). |
| IR | AEOI site search (aeoi.org.ir ShowPage Object=Search, 'مکران') | incomplete | partial: a site search (15 results, 5 opened), not a listing; retrieved 2026-10-02 - 15 news items 1394-1404; 5 opened. 1394/11/10 (2016-01-30) Salehi: negotiating with Chinese for two 100 MW reactors on Makran coast. No item names ACP100 or modular. |
| IR | Nuclear Power in Iran (World Nuclear Association), Updated 5 June 2026 | incomplete | partial: Whole profile read; checked for a new Makran commitment (trigger). |
| IR | Russia And Iran Have 'Finalised Agreement' For Eight More Nuclear Plants (NucNet), 2025-11-03 | incomplete | partial: Lead read; rest behind registration wall. |
Iraq · 1 cited routes
No published project record for Iraq in this release. All Iraq records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| IQ | Iraq Radiation Protection Centre national programme presentation at ANNuR, February 2024 | incomplete | partial - regulator described early national SMR power planning and technology assessment; no selected design, host, site, permit or operating plant is identified in the opened presentation |
Ireland · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| IE | Oireachtas Joint Committee debate page 24 Jun 2026 (error response, HTTP 405 / WAF human-verification block) | incomplete | blocked - access failure; statutory nuclear ban and SMR-before-2050 discussion not independently verified from this URL |
| IE | WNA Emerging Nuclear Energy Countries listing (Ireland named among European emerging interest) | incomplete | partial - country name on emerging list; no SMR project rows |
Israel · 5 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| IL | Israel, US plan AI hub with SMR power (Nuclear Engineering International), 2026-02-10 | incomplete | partial: article read (first read with a rendered-text read, then captured with the fixed-header fetch and re-checked) |
| IL | U.S. Tech Park in Israel May Have a Nuclear Power Plant (Neutron Bytes), 2026-02-07 | incomplete | partial: article read |
| IL | U.S. Investor Ezra Garnder Sees AI Driving SMRs for Israel (Neutron Bytes), 2026-09-14 | incomplete | partial: read with a rendered-text read; also captured with the fixed-header fetch |
| IL | Israel And US Planning Negev Desert Technology Facility Powered By Nuclear Reactors (NucNet), 2026-02 | incomplete | partial: Only title/meta description extractable; body behind registration wall. |
| IL | US tech park in Negev may have nuclear power plant (Globes), 2026-02 | incomplete | partial: Captured (HTTP 200) but article body not present in static HTML (ISO-8859; script-rendered); facts taken from NEI/Neutron Bytes, which quote Globes. |
Italy · 7 cited routes
No published project record for Italy in this release. All Italy records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| IT | Italian nuclear delegation law (Legge 29 settembre 2026 n.169) via misterlex | incomplete | partial - Enabling law; no sites. Decrees due within 12 months. |
| IT | Nuclitalia (Enel, Ansaldo Energia, Leonardo) (World Nuclear News report; report of 2025-05-15) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: enel.com release not opened; no A2A SMR item found |
| IT | World Nuclear News: Italy tag listing, first page (10 items, 22 October 2025 to 24 September 2026) | incomplete | partial: first page of a multi-page news listing, re-read 3 October 2026; older pages not read. All 10 items classified: three on the national return-to-nuclear law (an existing program-context row), three industry partnerships with no site, one on Italian firms' cooperation in Uzbekistan's project and three on decommissioning or waste. No Italian SMR site is named. |
| IT | ISIN homepage (Ispettorato nazionale per la sicurezza nucleare e la radioprotezione), news as read 2026-10-06 (latest REACT 2026, 30 Sept-1 Oct 2026) | incomplete | partial: Homepage news has no SMR item; ISIN keeps no new-reactor application list (the enabling law of 29 September 2026 sets decrees within 12 months). ENSREG dashboard shows ISIN only as observer to the NUWARD and EAGLES joint reviews. Older ISIN news not paged. |
| IT | World Nuclear News: Italy tag listing page 1 and 'Italy's Senate approves a return to nuclear power' (World Nuclear Association), listing as shown 2026-10-06; article 2026-09-24 | incomplete | partial: First page of a 4-page listing (22 Oct 2025 to 24 Sep 2026); same page an existing route read on 3 Oct; no new Italian SMR site |
| IT | ANSA: Edison, Edf e Nuward avanti con nucleare europeo, filiera italiana centrale, 2026-09-18 | incomplete | partial: Single news-agency article; Edison's own press-release list (edison.it) is a script-rendered page that returned no items |
| IT | Edison press-release list (comunicati stampa) (Edison S.p.A.), as served 2026-10-06 | incomplete | partial: Script-rendered shell only (no release items in the HTML); Edison's own September 2026 NUWARD release not read |
Jamaica · 2 cited routes
No published project record for Jamaica in this release. All Jamaica records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| JM | Jamaica Observer (Jun 2026) + UWI Mona (Feb 2026) | incomplete | partial - 2024 MoU with CNL/AECL; Nuclear Energy Working Committee; no host or vendor. |
| JM | Jamaica advancing plans for use of nuclear energy, says Wheatley (Jamaica Observer), 2026-06-06 | incomplete | partial: Article read (reports a ministerial statement to Parliament). |
Japan · 11 cited routes
Published project records for Japan (1): HTTR test reactor with planned hydrogen coupling, Oarai. All Japan records and agreements.
Jordan · 3 cited routes
No published project record for Jordan in this release. All Jordan records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| JO | WNN/NEI/WNA Jordan SMR items | incomplete | partial - JAEC MoUs with Rolls-Royce, X-energy, NuScale, CNNC (HTR-PM), Rosatom, KAERI; Aqaba floating concept (2023); no host/site selected for an SMR as of July 2026 update. |
| JO | Nuclear Power in Jordan (World Nuclear Association), Updated 3 July 2026 | incomplete | partial: Whole profile read; no SMR site or vendor selection recorded; latest SMR item is an October 2023 IAEA expert mission. |
| JO | JAEC, KHNP of South Korea ink MoU for feasibility study to build small modular reactor (Jordan Times), 2023-12-06 | incomplete | partial: article read |
Kazakhstan · 3 cited routes
Published project records for Kazakhstan (1): VBER-300 nuclear plant project near Aktau, Mangystau (2006). All Kazakhstan records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| KZ | WNA 'Nuclear Power in Kazakhstan' (discovery) (World Nuclear Association (Information Library); Updated Wednesday, 1 July 2026) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| KZ | World Nuclear Association country profile: Uranium and Nuclear Power in Kazakhstan (updated 1 July 2026) | incomplete | partial: secondary country profile, not a list of proposals; re-read 3 October 2026. It describes the VBER-300 plans of 2006 to 2015 (Aktau among the possible sites), now a published record. The other Kazakhstan route reads the same profile. |
| KZ | Atomic-energy.ru Kazakhstan tag page (EPC contract for Balkhash NPP with two VVER-1200, 2026-09-03; site field work 2026-07-27) (Атомная энергия 2.0), tag page as of 2026-10-06 | incomplete | partial: First tag page; all 2025-2026 headlines screened; no small-reactor item. |
Kenya · 4 cited routes
No published project record for Kenya in this release. All Kenya records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| KE | NEI: Kenya shifts nuclear outreach | incomplete | partial - NuPEA multi-module SMR target 1,000 MWe; Siaya County candidate area, no designated host; KNRR research reactor at Konza. |
| KE | Kenya Senate (Parliament) release: Senate committee on proposed Siaya nuclear power plant (Parliament of Kenya), 2026 (undated node; Feb-Mar 2026 context) | incomplete | partial: Single release |
| KE | NuPEA: Status of Kenya's nuclear power programme (IAEA INPRO DF25 presentation) and NuPEA homepage (NuPEA / IAEA INPRO), 2025 (INPRO DF25); homepage as served 2026-10-06 | incomplete | partial: Presentation text-extracted; RFI to vendors closing Nov 2025; candidate counties Kilifi, Kwale, Siaya |
| KE | The Star (17 Apr and 2 May 2026), Tech-ish (26 Mar 2026), Eastleigh Voice (3 Jul 2025) on Siaya plant (The Star; Tech-ish; Eastleigh Voice), Jul 2025 - May 2026 | incomplete | partial: Four articles read; reported capacity varies 1,000 / 2,000 / 3,000 / up to 6,000 MW; no vendor or design |
Kuwait · 1 cited routes
No published project record for Kuwait in this release. All Kuwait records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| KW | Kuwait government national report to the 2023 joint Convention on Nuclear Safety review meeting | incomplete | partial - 2023 national report says Kuwait then had no operating power or research reactors and no foreseeable nuclear-power program plan; historical national status evidence, not a current SMR-proposal census |
Kyrgyzstan · 2 cited routes
No published project record for Kyrgyzstan in this release. All Kyrgyzstan records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| KG | WNA 'Nuclear Power in Kyrgyzstan' (discovery) (World Nuclear Association (Information Library); Updated Tuesday, 18 August 2026) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| KG | Kyrgyzstan: Interfax "Росатом обсуждает с Киргизией строительство как малой, так и средней АЭС" (2026-03-23); atomic-energy.ru Kyrgyzstan tag page and RITM-200N exhibit in Bishkek (2026-06-22); Kyrgyz-Tajik partnership item (2026-08-20) (Interfax; Атомная энергия 2.0), 2026-03-23 to 2026-08-20 | incomplete | partial: Tag page screened; three items read. A neftegaz.ru copy timed out. |
Laos · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| LA | Russia, Laos ink agreement on cooperation in peaceful nuclear energy (KPL); NEI and Vientiane Times copies (Lao News Agency (KPL); Nuclear Engineering International; Vientiane Times), 2026-06-16 to 2026-06-18 | incomplete | partial: three articles read (also la_nei_russia.html, la_vientianetimes.html); the RITM-200 'most attractive' remark comes from a keyword search result titles of TASS/Jakarta Globe, not a captured page |
Latvia · 2 cited routes
No published project record for Latvia in this release. All Latvia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| LV | Latvian SMR assessment (Ministry of Climate and Energy; Latvenergo site map) (Ministry of Climate and Energy of Latvia (reported by NucNet); report of 2026-02-02) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: No Latvenergo primary SMR release found |
| LV | KEM: KEM izstrādājusi kodolenerģijas ziņojumu (nuclear information report to government) (Klimata un enerģētikas ministrija), Tuesday 6 May (2025) | incomplete | partial: Single ministry release |
Lesotho · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| LS | Lesotho ministry representative presentation at 2023 IAEA INPRO forum | incomplete | partial - needs study discusses possible SMR benefits; not a procurement, site selection or deployment commitment |
Libya · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| LY | Libyan Atomic Energy Establishment presentation at 2023 IAEA INPRO forum | incomplete | partial - dated agency presentation describes historical large-reactor siting and says SMRs may suit Libya; technical and logistical questions remain; no selected SMR deployment |
Lithuania · 3 cited routes
No published project record for Lithuania in this release. All Lithuania records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| LT | NucNet (27 Feb 2026) Altra/SGE/GEH MoU | incomplete | partial - Assessment MoU only, no site. Latvia: a EUR 1.42m assessment appears only in a search result; nothing was opened. |
| LT | Altra / Ignitis SMR announcements (Lithuania) (Altra (state nuclear company); Ignitis Group; MoU of 2026-02-25) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: no Ignitis SMR item found |
| LT | VATESI website and Ministry of Energy (enmin.lrv.lt) (VATESI; Lietuvos Respublikos energetikos ministerija), not read | incomplete | partial: access blocked (access refused, HTTP 403 (the fixed-header fetch x2 hosts, a rendered-text read x1)). Blocked: vatesi.lrv.lt and enmin.lrv.lt both return an access refusal (HTTP 403) (lrv.lt platform) to the research fetcher; a rendered-text read also 403. Existing Lithuanian rows (Altra/SGE/GEH BWRX-300 MoU; Ignalina-newcleo MoU) remain program context. |
Malaysia · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| MY | Nuclear energy still under study (The Star (Malaysia)), 2026-06-19 | incomplete | partial: single article |
Mali · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| ML | Rosatom newsletter, August 2024, Mali section | incomplete | partial - vendor says a Russian-designed SMR plant was discussed as a strategic possibility and records cooperation memorandums; no selected design, site, host or plant commitment is identified |
Mexico · 3 cited routes
No published project record for Mexico in this release. All Mexico records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| MX | WNA Mexico profile | incomplete | partial - ININ 2026-2030 institutional program includes SMR studies (Baja California focus); no vendor or site. |
| MX | Programa Institucional 2026-2030 del Instituto Nacional de Investigaciones Nucleares (Diario Oficial de la Federación / SENER (ININ)) | incomplete | partial: PDF text searched for SMR/modular passages (lines on cogeneration, Baja California, SMR studies); not read cover to cover. |
| MX | México evalúa reactores nucleares para Pemex y CFE (La Verdad (Mexico)), 2026-05-14 | incomplete | partial: Single article read. |
Moldova · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| MD | Parent batch research 2026-10-06: no Moldovan project in SMRMap; WNA emerging page opened without a Moldova deployment row | incomplete | partial - sources checked with no qualifying SMR deployment result |
Mongolia · 2 cited routes
No published project record for Mongolia in this release. All Mongolia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| MN | atomic-energy.ru tag pages for Kyrgyzstan, Mongolia and Kazakhstan | incomplete | partial - Mongolia: New Kharkhorin area is 'one of the potential sites' for a RITM-200 SMR (June 2026). Kyrgyzstan: only RITM-200N marketing (June 2026). Kazakhstan: no 2025-26 SMR headlines. The Tajikistan tag page returned a not-found error (HTTP 404). |
| MN | Atomic-energy.ru Mongolia tag page; items 2026-02-05 (information campaign; Mardai uranium deposit) and 2026-06-22 (New Kharkhorin small plant as flagship) (Атомная энергия 2.0 (citing TASS, Mongolian ministry)), 2026-02-05; 2026-06-22 | incomplete | partial: Tag page first page screened; two items read. |
Montenegro · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| ME | Montenegro Ministry of Energy and Mining: National Energy and Climate Plan PDF posted 22 December 2025 | incomplete | partial: 309-page PDF text screened for nuclear, atomic, SMR and modular terms; generation and innovation passages checked. Nuclear mentions concern a foreign ministry and general Energy Union research. No SMR deployment was identified in this limited review; unread sources and later developments remain outside it. The PDF title labels the document a proposal; the portal title does not settle adoption. |
Morocco · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| MA | Médias24: Nucléaire, pourquoi le Maroc revient dans la course (11 Mar 2026), 11 March 2026 | incomplete | partial: access blocked (access refused, HTTP 403). An access refusal (HTTP 403); content known only from search summary |
Mozambique · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| MZ | WNISR 2024 Table 13 Rosatom/Africa agreements (Mozambique absent) | incomplete | partial - 2024 WNISR Rosatom-agreements table only; Mozambique is absent from that table. Absence from this limited list is not a full-country listing. |
Myanmar · 2 cited routes
Published project records for Myanmar (1): Myanmar 110 MW SMR project (two RITM-200N; site not named). All Myanmar records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| MM | Atomic-energy.ru news: Myanmar small nuclear plant with two RITM-200N units (articles of 19 and 24 August 2026) | incomplete | partial: two news articles read in full, not a listing. Status events on the existing Myanmar record; no site is named. |
| MM | Atomic-energy.ru Myanmar tag page and "Россия начала реализацию проекта сооружения АЭС малой мощности в Мьянме" (2026-08-19) (Атомная энергия 2.0) | incomplete | partial: Tag page first page (5 items 2025-2026) screened; one new item read. No site named through 2026-10-06. |
Namibia · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| NA | Namibia Ministry of Mines and Energy 2022 electricity resource plan | incomplete | partial: access blocked - public web reader returned a server error (HTTP 502) and VPS retrieval failed name resolution; plan text not read and no finding about SMR activity follows |
Netherlands · 13 cited routes
Published project records for Netherlands (2): Thorizon One first commercial molten-salt reactor in Zeeland, Thorizon PIONEER molten-salt demonstrator at NRG PALLAS, Petten. All Netherlands records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| NL | Provincie Zeeland (Thorizon agreement 17 Apr 2026) | incomplete | partial - Thorizon One targeted at Borssele from 2034; PIONEER demonstrator at NRG PALLAS Petten 2028 (nature unverified). |
| NL | Dutch provincial SMR studies (Overijssel, WNN 11 Jun 2026) | incomplete | partial - Provincial siting studies name no sites. ULC-Energy/Rolls-Royce: no site (Rolls-Royce page refused). National large-reactor site narrowing (Eemshaven/Terneuzen) concerns large reactors, not SMRs (seen in a search result only). ANVS not enumerated here. |
| NL | ANVS: Small modular reactors; Lopende initiatieven (overview of 4 SMR initiatives in orientation talks) and NUWARD JER (Autoriteit Nucleaire Veiligheid en Stralingsbescherming (ANVS); as read 2026-10-03 (no update date on page)) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: ANVS states none of the initiatives has chosen a location and there is no 'vooroverleg' (pre-application) yet. |
| NL | EPZ, ULC-Energy and Eneco SMR announcements (via WNA Netherlands profile, updated 2026-10-02) (World Nuclear Association (discovery copy of host announcements); page updated 2026-10-02) | incomplete | partial: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Host releases (epz.nl, ulc-energy.nl, eneco.nl) not opened; WNA is a discovery route |
| NL | Thorizon newsroom (news list as shown 2026-10-03 (20 items, 2025-11-01 to 2026-07-15) plus homepage) | reconciled | complete: 3 entries reconciled from the 20-item news list as displayed (accessed 3 Oct 2026); access limits: items before November 2025 are not on the list page; a third-party claim of pre-feasibility work at three nuclear sites in France, Belgium and the Netherlands is not on Thorizon pages and was not pursued |
| NL | World Nuclear News: Netherlands tag listing, first page (10 items, 5 March to 29 September 2026) | incomplete | partial: first page of a multi-page news listing, re-read 3 October 2026; older pages not read. All 10 items classified: the Thorizon One agreement (an existing record), the Overijssel siting study and two ULC-Energy partnerships (existing program-context rows), a non-nuclear molten-salt component test facility and a research item (not deployments) and four items on large reactors or policy. |
| NL | ANVS: Small modular reactors - Lopende initiatieven (4 SMR initiatives in orientation talks) and NUWARD JER (Autoriteit Nucleaire Veiligheid en Stralingsbescherming (ANVS)), No update date on page; as read 2026-10-06 | incomplete | partial: Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. ANVS states it is in orientation talks with four parties planning to build an SMR in the Netherlands; none has a location or formal pre-application. |
| NL | Rijksoverheid topic pages on nuclear energy / SMRs (national SMR programme lists), n/a | incomplete | partial: the fixed-header fetch returned an empty Next.js error shell; a rendered-text read on the same URL and on /onderwerpen/kernenergie/small-modular-reactors returned a not-found error (HTTP 404). No national SMR site list read. |
| NL | World Nuclear News: McDermott to support Dutch deployment of Rolls-Royce SMR (World Nuclear Association), 2026-07-29 | incomplete | partial: Single article |
| NL | Gemeente Opmeer: Kernenergie: Small Modular Reactor (SMR) project page (timeline), timeline current to 23 Sep 2026 | incomplete | partial: Full municipal timeline Nov 2022 to Sep 2026 read; the linked PDF reports (Sep 2025 feasibility study, Feb 2026 phase-2 report) and the 23 Sep 2026 council letter were not opened |
| NL | OnsWestfriesland: College Opmeer geeft update over vervolgstappen rond Small Modular Reactor; Energienieuws: Opmeer zet stap richting kleine kerncentrale met Allseas (OnsWestfriesland; Energienieuws), 2026-02 (both) | incomplete | partial: Two regional news articles (Feb 2026); later items on delay (grid congestion) and the Sep 2026 regional approach seen only as search result titles |
| NL | Provincie Gelderland: Kernenergie (SMR) theme page; Binnenlands Bestuur: Dodewaard en Wijchen in beeld voor Gelderse SMR (Provincie Gelderland; Binnenlands Bestuur), page as served 2026-10-06; article 2026-06-23 | incomplete | partial: Provincial theme page and one trade article; the Haskoning location report itself not opened |
| NL | KVK public search page and a commercial register mirror for Orange Hills Energy B.V. | incomplete | partial: One KVK path returned a not-found error (HTTP 404). The public search page loaded as a script shell and did not return a company record. A commercial mirror states a corporate purpose of planning and advice, which is not a described plant. |
New Zealand · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| NZ | Ministry of Transport-commissioned zero-emission shipping report, prepared June 2024 | incomplete | partial - report discusses ship propulsion by SMRs and states the national prohibition on nuclear-powered ships entering New Zealand waters; this maritime route says nothing about a land-based SMR project or a current domestic power program |
Niger · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| NE | WNISR 2024 Table 13 Rosatom/Africa agreements (Niger absent; Nigeria present is a different state) | incomplete | partial - 2024 WNISR Rosatom-agreements table only; Niger is absent from that table and Nigeria is a different state. A separate title-only Niger agreement lead remains unresolved until a primary document is opened. |
Nigeria · 1 cited routes
No published project record for Nigeria in this release. All Nigeria records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| NG | IAEA CNS Nigeria 10th national report (Aug/Sep 2025) | incomplete | partial - Evaluating large and SMRs; Geregu and Itu are NPP candidate sites (not SMR-specific); FIRST program. |
North Korea · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| KP | 38 North / NTI Yongbyon and Taechon | incomplete | partial ? production/experimental reactors documented outside_scope; not an SMR inventory |
North Macedonia · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| MK | Parent batch research 2026-10-06: no North Macedonia project in SMRMap; WNA emerging page opened without an MK deployment row | incomplete | partial - sources checked with no qualifying SMR deployment result |
Norway · 13 cited routes
Published project records for Norway (10): Dalane / Lund SMR proposal, Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver), Grenland Kjernekraft SMR proposal at Herre, Bamble, Halden Kjernekraft SMR proposal at Femsjøen, Lister Kjernekraft SMR proposal (Lyngdal and Farsund), Narvik Kjernekraft SMR plant proposal at Fornes, Ballangen, Norsk Kjernekraft SMR proposal in Vardø, SEALER power plant proposal in Longyearbyen, Svalbard, Taftøy Aure / Heim SMR proposal, Øygarden / Alver SMR proposal. All Norway records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| NO | Norsk Kjernekraft homepage + Lister press release | incomplete | partial - Projects: Aure/Heim (government set impact-assessment program, 2026), Øygarden, Dalane/Lund, Halden, Lister (Lyngdal/Farsund). Vardø and Svalbard from other sources. |
| NO | Energidepartementet melding list | incomplete | partial - The ministry page was not opened. A search result states that 10 notifications were submitted, including Svalbard; individual notifications were checked through proponent and press sources. |
| NO | Norsk Kjernekraft project overview (homepage) (Norsk Kjernekraft AS; homepage as shown 2026-10-03) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: norskkjernekraft.no is a placeholder;.com read instead |
| NO | Norsk Kjernekraft press release: Grenland assessment notification sent to the Energy Ministry (27 August 2025) | incomplete | partial: one press release read in full, not a listing. It names an area at Herre, Bamble; now the published Grenland record. |
| NO | Austrheim municipality and Norsk Kjernekraft press release: Fensfjorden assessment notification sent to the Energy Ministry (1 September 2025) | incomplete | partial: one press release read in full, not a listing. Site near the Mongstad refinery; now the published Fensfjorden record. |
| NO | Norsk Kjernekraft press release: assessment work starts at Øygarden Kjernekraft (30 April 2026) | incomplete | partial: one press release read in full, not a listing. Source of the existing Øygarden record. |
| NO | Norsk Kjernekraft press releases: Finnmark notification naming Svartnes, Vardø (11 September 2025) and start of assessment work (22 April 2026) | incomplete | partial: two press releases read in full, not a listing. Source of the existing Vardø record. |
| NO | Norsk Kjernekraft press release “Norsk Kjernekraft og Ocean-Power inngår samarbeidsavtale om flytende kjernekraftløsninger”: floating nuclear cooperation agreement (12 August 2025) | incomplete | partial: one press release, re-read in full on 3 October 2026; not a listing. A floating-reactor cooperation with no site named: program context. |
| NO | Norsk Kjernekraft press release “Industrigigant signerer kjernekraftavtale”: energy-supply letter of intent with Glencore Nikkelverk, Kristiansand (12 June 2023) | incomplete | partial: one press release, re-read in full on 3 October 2026; not a listing. An offtake letter of intent that sites no plant: program context. |
| NO | Norsk Kjernekraft press release “Norsk Kjernekraft og Mo Industripark inngår intensjonsavtale om kraftleveranser i milliardklassen”: power-supply letter of intent (29 November 2023) | incomplete | partial: one press release, re-read in full on 3 October 2026; not a listing. An offtake letter of intent that sites no plant: program context. |
| NO | Energidepartementet: Kjernekraft topic page and melding/hearing pages on regjeringen.no (Norwegian Ministry of Energy (regjeringen.no)), not read | incomplete | partial: access blocked (access refused, HTTP 403 (the fixed-header fetch and a rendered-text read); not retried beyond twice). Blocked: regjeringen.no returned an access refusal (HTTP 403) to the research fetcher and to a rendered-text read; the Taftoy hearing page returned errors (HTTP 403/404). The ministry list of meldinger could not be read. Search result titles still say 10 notifications, which equals the 10 Norwegian records already published (Taftoy, Dalane, Oygarden, Svalbard, Vardo, Halden, Lister, Narvik/Fornes, Fensfjorden, Grenland). |
| NO | DSA: Horinger og tillatelser (atomsikkerheit og kjernekraft) + Kjernekraft i Norge page (Direktoratet for stralevern og atomsikkerhet (DSA)), hearings list as read 2026-10-06; Kjernekraft i Norge page dated 3 October 2023 | reconciled | complete: Hearings/permits list read in full: 3 entries, all decommissioning or waste licenses (NND KLDRA Himdalen, NND Halden, IFE Halden renewal). DSA publishes no SMR notification list; the Kjernekraft i Norge page is general (license from the King, Storting consent). No SMR license application exists. |
| NO | Norsk Kjernekraft: Våre prosjekter (project list) (Norsk Kjernekraft AS), list 'per 2026' as served 2026-10-06 | reconciled | complete: All 10 listed project companies read; all match published records |
Oman · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| OM | Oman national report to the 2023 Convention on Nuclear Safety review, dated 27 July 2022 | incomplete | partial - the dated government report says Oman then had no nuclear power installation and no plan to embark on a nuclear-power program; historical status, not a 2026 census of SMR proposals |
Pakistan · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| PK | Pakistan Atomic Energy Commission nuclear-power fleet page | incomplete | partial - PAEC operating and under-construction power fleet read; listed units are not documented as modular and the page is not a list of all future proposals |
Panama · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| PA | Panama national energy plan 2015-2050, published in the official gazette in 2016 | incomplete | partial - the opened 2000-2014 energy-balance table records zero nuclear primary energy; it does not establish current nuclear policy or an exhaustive SMR-proposal inventory. A replacement 2026-2040 plan was only in preparation at this check |
Paraguay · 2 cited routes
No published project record for Paraguay in this release. All Paraguay records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| PY | De la mano de EE.UU., se espera tener reactores nucleares dentro de 5 años (ABC Color), 2026-08-09 | incomplete | partial: Interview read. |
| PY | Paraguay alberga reunión regional sobre reactores modulares pequeños y financiamiento nuclear (Ministerio de Obras Públicas y Comunicaciones (MOPC)), 2026 (undated in captured text) | incomplete | partial: Release read. |
Peru · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| PE | Publican Ley que Promueve la Generación Eléctrica de Origen Nuclear y la Instalación de SMR (Ley N° 32560) (Payet, Rey, Cauvi, Pérez (law-firm bulletin summarising El Peruano)), 2026-03-23 | incomplete | partial: Bulletin read; the El Peruano gazette text itself was not opened. |
Philippines · 17 cited routes
No published project record for Philippines in this release. All Philippines records and agreements.
Poland · 18 cited routes
Published project records for Poland (12): HTGR-POLA research reactor (NCBJ), Last Energy first KSSE plant proposal, Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022), OSGE Dąbrowa Górnicza BWRX-300 proposal, OSGE Kraków / Nowa Huta BWRX-300 proposal, OSGE Ostrołęka BWRX-300 proposal, OSGE Stalowa Wola BWRX-300, OSGE Stawy Monowskie BWRX-300, OSGE Warsaw potential BWRX-300 location (2023 list), OSGE Wloclawek BWRX-300, SGP Industria Rolls-Royce SMR plant (2024 decision in principle), ZE PAK–SGE Pątnów BWRX-300 proposal. All Poland records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| PL | Program polskiej energetyki jadrowej wz. 2025 (gov.pl attachment, PDF created 2025-06-24) | reconciled | complete for the listed source as retrieved 2026-10-02 - Section 1.5.1 enumerates every holder of a decision-in-principle (DiP) outside the state program: PGE PAK Energia Jadrowa (large APR1400, not SMR), KGHM, SGP Industria, and six OSGE SPVs. That gives 8 SMR DiPs in total. Synthos (outside OSGE), ZE PAK SMR, Unimot/Last Energy, PGE SMR and Enea have NO DiP. |
| PL | gov.pl Ministry of Climate DiP page (Industria) and attempted DiP list page | incomplete | partial - The page covers the Industria Rolls-Royce SMR DiP of 2024-05-10. A guessed list page (gov.pl/web/polski-atom/decyzje-zasadnicze) returned no DiP list, so PPEJ 2025 serves as the enumerable list. |
| PL | PAA - Wydane ogolne opinie Prezesa PAA | reconciled | complete for the listed source as retrieved 2026-10-02 - 6 general opinions listed. SMR-relevant: OSGE BWRX-300 technical assumptions (2023-05-23), KGHM NuScale technical assumptions (2023-12-22) and KGHM NuScale NPM-20 safety-analysis methodologies (2024-04-22). The rest are PEJ large-plant opinions. No Rolls-Royce or HTGR-POLA opinion is listed. OSGE filed two more applications on 2026-06-19 (GNF2 fuel, TRACG). |
| PL | OSGE post sitemap and releases 2023-2026 | incomplete | partial - 2023-04-17: 7 potential sites, including Warszawa. June 2026: CfD application for 14 units at Wloclawek, Stawy Monowskie and Stalowa Wola, within a 26-unit program. Wloclawek: up to 6 reactors, first unit targeted for 2032. Stalowa Wola: ARP letter of intent of 2026-04-16 for the Euro-Park site. The osge.com/lokalizacje page is JS-rendered and its site list could not be read. |
| PL | Gramwzielone (2026-08-10) reporting a Ministry of Energy presentation to a Sejm subcommittee (July 2026) | incomplete | partial - Of the 8 DiPs, only the 6 OSGE projects continue. KGHM and Industria are not being implemented, and KGHM confirmed it withdrew. |
| PL | NCBJ news pages on HTGR-POLA | incomplete | partial - 30 MWt research/demonstration HTGR. Pre-licensing dialogue with PAA concluded, and a general-opinion application is planned. The construction site is not explicitly stated in the opened pages. |
| PL | PAA: Wydane ogólne opinie Prezesa PAA (general opinions issued by the President of the National Atomic Energy Agency) (Państwowa Agencja Atomistyki (PAA); page version 16.0 of 31.03.2025 (first published 28.08.2023)) | reconciled | complete: 6 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None; OSGE's 2026-06-19 applications (GNF2 fuel, TRACG) noted in the matrix have no published opinion yet. |
| PL | Ministry of Climate and Environment: decyzja zasadnicza for SGP Industria (Rolls-Royce SMR) (Ministerstwo Klimatu i Środowiska (gov.pl); decision dated 10 May 2024) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Not a list; the full DiP set (OSGE six sites 2023, KGHM, Industria, PEJ, PGE PAK) could not be enumerated from an official list page in this pass; the 2026-10-02 matrix used PPEJ 2025 as the enumerabl |
| PL | Program polskiej energetyki jądrowej (2025 update); section 1.5.1, nuclear projects outside the programme (Government of Poland (Ministry of Industry / gov.pl attachment); PDF created 2025-06-24) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 3 Oct 2026) |
| PL | OSGE (ORLEN Synthos Green Energy) news list (news list as shown 2026-10-03 (items 2025-07 to 2026-06-29)) | reconciled | complete: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Only items naming locations recorded; the other seven 2025-2026 items name no site (cooperation, research, PAA general-opinion request) |
| PL | Enea media releases on SMR (Enea S.A.; release of 2025-06-24) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Enea press archive not paged |
| PL | Tauron SMR statements (reported by trade press) (Tauron Polska Energia (statements reported by wnp.pl, teraz-srodowisko.pl); reports of 2022-04-22 and 2026-03-12) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: No Tauron primary release on SMR sites found; press reports of company statements only |
| PL | PGE / PGE GiEK SMR statements (reported) (PGE Polska Grupa Energetyczna (statement reported by wnp.pl); report of 2026-05-31) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: No PGE primary SMR release found |
| PL | OSGE news list (pages 1 and 2) and three linked articles (April to June 2026) | incomplete | partial: pages 3 to 7 of the news list (older than November 2025) were not read. Status events on existing records: the Stalowa Wola letter of intent, the Włocławek cooperation agreement and a contract-for-difference application for 14 units. |
| PL | PAA: Wydane ogólne opinie Prezesa PAA (general opinions issued) (Państwowa Agencja Atomistyki (PAA)), Page version 16.0 of 31.03.2025 | incomplete | partial: Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. No opinion issued on OSGE's 2026 requests yet. |
| PL | Program polskiej energetyki jądrowej 2026 (PPEJ update), section 1.5.1 'Projekty jądrowe poza Programem' (Ministerstwo Energii (gov.pl)), Final text file dated 19 June 2026 (PDF created 2026-06-19); Ministry of Energy release of 30.09.2026 reports Council of Ministers adoption | incomplete | partial: Section 1.5.1 read in full: it now says four projects outside the program hold decisions in principle (PGE EJ, KGHM, SGP Industria, six OSGE SPVs) - superseding the 2025 draft used in the 2026-10-03 matrix. PDF text extracted locally. Program page: PL-me-program-polskiej-energetyki-jadrowej.html; adoption release: PL-me-dwie-elektrownie-jadrowe-i-silny-krajowy-przemysl-rzad-przyjal-aktualizacje-ppej.html. |
| PL | Ministry of Energy site map (BIP view) searched for a decision-in-principle list; release 24 Feb 2026 on the OSGE-GEH generic BWRX-300 design agreement (Ministerstwo Energii (gov.pl)), Site map as served 2026-10-06 (1,183 links) | reconciled | complete: All 1,183 site-map links scanned for decyzja/zasadnicza/SMR/jądrow: no page lists decisions in principle; guessed list URLs (energia/decyzje-zasadnicze, klimat/decyzje-zasadnicze, polski-atom/decyzja-zasadnicza) redirect to the gov.pl home page. The PPEJ 2026 section 1.5.1 (route 115) therefore remains the enumerable DiP list. The 24 Feb 2026 release names Włocławek as the preferred first OSGE location (commercial start early 2030s). |
| PL | World Nuclear News: Polish entrepreneurs invest in SGE's BWRX-300 projects (World Nuclear Association), 2026-10-02 | incomplete | partial: Single article |
Portugal · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| PT | WNA Emerging Nuclear Energy Countries listing check for Portugal (not named in opened emerging list body as a deployment) | incomplete | partial - Portugal not found as a deployment candidate in the opened emerging-countries page body; no national SMR project identified |
Puerto Rico · 3 cited routes
No published project record for Puerto Rico in this release. All Puerto Rico records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| PR | Informe 2026-444, P. de la C. 1092 (Oficina de Presupuesto de la Asamblea Legislativa de Puerto Rico (OPAL)), 2026-04 | incomplete | partial: Whole report page read. |
| PR | Nuclear Alternative Project home page, live page 2026 | incomplete | partial: Home page only; feasibility report link not opened. |
| PR | The Nuclear Alternative Project Abstract (U.S. DOE Office of Nuclear Energy), 2021 (award abstract) | incomplete | partial: Abstract read. |
Qatar · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| QA | Qatar Ministry of Foreign Affairs statement at IAEA Board of Governors, 8 March 2024 | incomplete | partial - statement says Qatar is investing in small-reactor development with an unnamed global company; no Qatari site, plant or selected design is named |
Romania · 8 cited routes
Published project records for Romania (3): ALFRED lead-cooled demonstrator at Mioveni (EAGLES-300 program), Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan), NuScale VOYGR Doicești (Romania). All Romania records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| RO | Nuclearelectrica FID release 2026-02-12 + WNA Romania | incomplete | partial - Doicesti FID approved; 462 MW. Per WNA, shareholders rejected SNN's proposal to reassess other technologies and sites. No second Nuclearelectrica/RoPower SMR site has been named. |
| RO | Last Energy press pages (via lastenergy.com sitemap) | incomplete | partial - CEE items: Romania (2022 announcement; CNCAN authorization phase in Oct 2024, no site named) and Poland (2022 releases, titles only, no site text). Nothing for Serbia, Slovakia, Bulgaria or Hungary. |
| RO | RATEN IAEA 2026 LFR workshop deck + WNA Romania | incomplete | partial - ALFRED roadmap: pre-licensing with CNCAN began in 2025; siting permit 2031, construction permit 2032, operation 2037. WNA says it will be built at ICN Mioveni. |
| RO | Nuclearelectrica SMR project page and 2026 shareholder item (SN Nuclearelectrica SA; project page as shown 2026-10-03; WNN 2026-07-23) | incomplete | partial: a single project page and one news item, not a listing. 2 entries reconciled (accessed 3 Oct 2026) |
| RO | World Nuclear News: Romania tag listing, first page, with two linked articles (June and July 2026) | incomplete | partial: first page of a multi-page news listing (back to November 2025); older pages not read. The Doicești item matches an existing record and the Constanța port study an existing research row. |
| RO | CNCAN website (home, site map, news list, controlled nuclear installations page) (Comisia Nationala pentru Controlul Activitatilor Nucleare (CNCAN)), new site as read 2026-10-06 | reconciled | complete: Full site map (272 links) and news list scanned: CNCAN publishes no SMR or new-installation licensing register and no Doicesti/ALFRED/Last Energy item. Licensing status therefore taken from CNCAN reply quoted in press (route 215) and the ENSREG dashboard (route 207). |
| RO | DCBusiness: "Dosar SMR Doicesti. CNCAN confirma ..." (CNCAN written reply on Doicesti licensing) (DCBusiness (quoting CNCAN reply)), published 2026-06-01 | incomplete | partial: Single article read in full. CNCAN states RoPower Nuclear filed the request to initiate project and site authorization; documentation under evaluation; no opinion, approval or permit issued; preliminary geotechnical study under review; natural-gas emanations near the site (Soceram area) still being characterized. |
| RO | World Nuclear News: Nuclearelectrica's proposal to review SMR options rejected by ministry (World Nuclear Association), 2026-07-23 | incomplete | partial: Single article |
Russia · 24 cited routes
Published project records for Russia (11): Akademik Lomonosov floating NPP, Baim / Cape Nagloynyn floating PEB-106 (RITM-200S), BREST-OD-300 Seversk, Dimitrovgrad SVBR-100 pilot proposal (2013 land lease), First ELENA-AM thermoelectric heating pilot proposal, Floating nuclear power unit for Gazprom's Kirinskoye fields, Sakhalin, Kaliningrad floating small nuclear plants proposal, Norilsk land small nuclear plant (RITM-400), RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004), Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka, Yakutia land-based RITM-200N (Ust-Kuyga). All Russia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| RU | WNN SVBR-100 Dimitrovgrad + Interfax Primorsk VVER-1000 | incomplete | partial ? SVBR-100 historical; Primorsky floating FNPP study; Primorsk VVER outside_scope; not full Rosatom inventory |
| RU | atomic-energy.ru (Rosatom industry portal) news, Interfax, Kommersant, EPRussia | incomplete | partial - Yakutia ASMM: placement-license hearings for units 1 AND 2. Chukotka ASMM: Shelf-M at Sovinoe, with economic justification completed in July 2026. Norilsk RITM-400 ASMM agreement of Nov 2023. Additional Pevek floating unit request (2023). Four PEB-106 for Baimsky. Five Shelf-M Arctic candidate sites named in 2023. Rostekhnadzor's license registry was not checked. |
| RU | Rostekhnadzor (Russia) licences for small nuclear plants and BREST-OD-300 (as reported by Rosatom/official media) (Federal Service for Environmental, Technological and Nuclear Supervision (Rostekhnadzor); reports by Strana Rosatom…; Licences dated 2021-02-10, 2021-08, 2023-04-21) | incomplete | partial: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Rostekhnadzor's license register (gosnadzor.ru) was not enumerated; no license found for Baimsky floating units, Chukotka Shelf-M, Norilsk or Yakutia unit 2 |
| RU | General Scheme for the Placement of Electric Power Facilities to 2042; annexes 9-11 (nuclear plants planned for construction and commissioning) (Government of the Russian Federation; Order No. 4153-r of 30 December 2024 PDF) | reconciled | complete: 15 entries reconciled from this dated listing (accessed 3 Oct 2026) |
| RU | Government of Russia order No. 4153-r (30 December 2024): General Scheme for the placement of electric power facilities to 2042, nuclear annex tables | reconciled | complete: every nuclear new-build row of the annex tables (2025 to 2042) was read from the copy kept by the 2 October 2026 review. The five small plants it names (Norilsk, Yakutsk at Ust-Kuyga, Chukotka, the Baimsky floating units and BREST-OD-300 at Seversk) are existing records; the other rows are large reactors. |
| RU | World Nuclear Association country profile: Nuclear Power in Russia (updated 22 July 2026) | incomplete | partial: secondary country profile, not a list of proposals; read in summary form. Its historical named sites (VK-300 at Arkhangelsk, Chersky, RUTA-70 at Obninsk) are research rows; the Baimsky and Vilyuchinsk items match existing records. |
| RU | Atomic-energy.ru news: Chukotka small nuclear plant with the Shelf-M microreactor (articles of 9 and 30 July 2026) | incomplete | partial: two news articles read in full, not a listing. Status events on the existing Chukotka record; their dates conflict (start-up in 2030, or construction from 2027 and operation in 2032). |
| RU | Atomic-energy.ru news: public hearings on units 1 and 2 of the Yakutsk small nuclear plant at Ust-Kuyga (27 February 2026) | incomplete | partial: one news article read in full, not a listing. Status event on the existing Yakutsk record. |
| RU | Atomic-energy.ru news: Russian small-reactor concepts and Arctic strategy items (four articles, 8 June to 23 September 2026) | incomplete | partial: four news articles read in full, not a listing. The concepts (a floating unit with a data center, 5 to 50 MW data-center reactors, a 170 MW container reactor) name no site: program context. |
| RU | Rostekhnadzor (Ростехнадзор) central site: licensing section, nuclear section and the 170-FZ licence register (Сведения из реестра лицензий, 170-ФЗ) (Federal Service for Environmental, Technological and Nuclear Supervision (Rostekhnadzor)), daily-updated register (per regional notice) | incomplete | partial: access blocked (access refused, HTTP 403 x4 URLs (the fixed-header fetch); access refused, HTTP 403 (a rendered-text read) for /activity/license/; gosnadzor.gov.ru and dv-nrs.gosnadzor.ru: no DNS address.). Not read: www.gosnadzor.ru returned an access refusal (HTTP 403) for /activity/license/, /nuclear/, / and /service/list/reestr_licences_170fz/ (also 403 via the alternative page reader); gosnadzor.gov.ru does not resolve (DNS). Retried no more than twice per URL. |
| RU | Rostekhnadzor Interregional Territorial Department for Nuclear and Radiation Safety Supervision of Siberia and the Far East (МТУ по надзору за ЯРБ Сибири и Дальнего Востока): "Перечень действующих лицензий на 1 октября 2026 г." (register of licences issued, Excel) (Rostekhnadzor, Siberia and Far East nuclear-safety department), as of 2026-10-01 (file last saved 2026-10-02) | reconciled | complete: All 11 annual sheets (2016-2026), 1,122 rows, read row by row after parsing; filtered for placement/construction/operation licenses for nuclear plants, floating units, RITM, BREST, Yakutia, Chukotka. This regional register lists licenses the department itself issues (mainly equipment makers, contractors, service firms); unit-level placement/construction licenses for small plants and BREST-OD-300 are issued centrally and do not appear. The Volga department licensing pages (vol-nrs) were also read; they carry no unit register. |
| RU | Atomic-energy.ru: "В Ростехнадзоре прошло совещание по сооружению первого серийного плавучего энергоблока" (regulator meeting report) (Атомная энергия 2.0 (industry portal) reporting Rostekhnadzor), 2026-03-10 | incomplete | partial: One news item read in full. |
| RU | Kremlin transcript: Meeting with Rosatom head Alexei Likhachev (Встреча с главой госкорпорации «Росатом» Алексеем Лихачёвым) (President of Russia (kremlin.ru)), 2026-09-28 | incomplete | partial: Full transcript read for small-reactor and floating-unit statements. |
| RU | Kremlin transcript: Meeting on the development of nuclear energy (Совещание по вопросам развития атомной энергетики) (President of Russia (kremlin.ru)), 2026-08-20 | incomplete | partial: Full transcript searched for small, floating, RITM, Shelf, Elena and regional names; relevant passages read. |
| RU | Kremlin transcript: Meeting on the development of the Far East fuel and energy complex (Совещание по вопросам развития ТЭК Дальнего Востока) (President of Russia (kremlin.ru)), 2025-09-04 | incomplete | partial: Full transcript searched. |
| RU | Kremlin transcripts: XI Eastern Economic Forum plenary; Kremlin site searches for "Лихачев", "энергофлот", "плавучих атомных", "малой мощности атомных станций", "плавучих энергоблоков Калининградской" (President of Russia (kremlin.ru)), 2026-09-03 (plenary); searches run 2026-10-06 | incomplete | partial: First result page of each site search read (12 hits each); hits opened: 80870, 80563, 80677, 77919, 80663. No presidential instruction list naming floating units for Kaliningrad was found by search. |
| RU | Strana Rosatom (Страна Росатом, Rosatom corporate newspaper) articles 2026: Likhachev "horizons 2030" (1 Oct), RITM serial production (29 Sep), RITM-200S set for PEB-106 (24 Sep), IAEA General Conference (14 Sep), Murmansk floating-unit completion yard (1 Sep), Shelf-M investment justification and ASMM licensing interview (5 Jul), role of Rosatom (5 Oct), 2026-07-05 to 2026-10-05 | incomplete | partial: Eight articles read in full; not a listing. Captures: strana-likhachev-2030-20261001, strana-ritm-serial-20260929, strana-20260924-komplekt, strana-20260914-likhachev, strana-murmansk-floating-20260901, strana-20260705-obosnovanie, strana-20260705-likhachev, strana-likhachev-role-20261005. |
| RU | Strana Rosatom site searches: "АСММ", "Шельф-М", "плавучих энергоблоков", "Калининград", search run 2026-10-06 | incomplete | partial: First result page only for each query; 2025-2026 hits opened (five for АСММ, two for floating units); "Шельф-М" returned no linked items; "Калининград" hits were non-reactor (port, isotopes, gigafactory). |
| RU | Atomic-energy.ru tag pages for designs: РИТМ-200Н, РИТМ-200, РИТМ-400, Елена-АМ (tags АСММ, Шельф-М, ПАТЭС, FNPP, Akademik_Lomonosov returned a not-found error (HTTP 404)) (Атомная энергия 2.0), tag pages as of 2026-10-06 | incomplete | partial: First page of each tag (about 25-30 linked items per tag); every 2025-2026 headline listed and screened; relevant items opened. |
| RU | Atomic-energy.ru articles: Elena-AM (2024-09-25, 2024-10-25, 2024-12-28); Rosatom to build three small plants for Nornickel (2023-11-29); 13 RITM vessels in manufacture (2026-07-31); Sevmash may build floating units (2026-08-19); Rosatom 2025 results "100+ achievements" (2026-01-12) (Атомная энергия 2.0 (republishing TASS, Interfax, Rosatom)), 2023-11-29 to 2026-08-19 | incomplete | partial: Seven articles read in full; not a listing. |
| RU | Interfax: "Росатом планирует построить в России еще четыре плавучие атомные станции" (13 Aug 2026); "Атомный витязь на энергетическом распутье" (28 Dec 2021), 2026-08-13 | incomplete | partial: Two articles read in full. The 2021 "витязь" piece is a corporate feature; it describes no reactor design named Vityaz. |
| RU | Atom Media (Rosenergoatom press release): "Росэнергоатом получил статус эксплуатирующей организации АЭС малой мощности в Якутии" (Atom Media / Rosenergoatom), 2024-02-02 | incomplete | partial: One press release. |
| RU | Rosatom and design-bureau product pages: Rusatom Overseas SMR page; OKBM Afrikantov small and floating plants page; IPPE small-power NPP page; NIKIET home; rosatom.ru Yakutia news; Rosenergoatom floating plant (PATES) page (Rosatom group), not read | incomplete | partial: access blocked (rusatom-overseas.com: TLS unrecognized_name (both readers); okbm.nnov.ru: timeout; ippe.ru: timeout, then connection refused; nikiet.ru: certificate verification failure; rosatom.ru and rosenergoatom.ru: timeout.). None of these pages could be read; no product list enumerated. |
| RU | Rosatom 2019 ATGOR modular concept description | incomplete | partial - qualifying historical ATGOR design; no named deployment |
Rwanda · 17 cited routes
Published project records for Rwanda (1): Dual Fluid critical demonstration experiment in Rwanda. All Rwanda records and agreements.
Saudi Arabia · 7 cited routes
No published project record for Saudi Arabia in this release. All Saudi Arabia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| SA | WNN Saudi Arabia tag page | incomplete | partial - Only 2025-26 item: 2026-07-23 US-Saudi intergovernmental and safeguards agreements; no SMR site. Yanbu not found. |
| SA | WNN SMART100 standard design approval | incomplete | partial - SDA 2024-09-26 with KA-CARE co-applicant; no Saudi site named. |
| SA | WNA Saudi Arabia country profile | incomplete | partial - SMART (2015 MoU, PPE to 2017), KA-CARE-CNEC HTR (2016), Russia SMR program (2017); large-plant sites Jubail/Tabuk/Jizan/Duwaiheen; no SMR site; Yanbu absent. |
| SA | Nuclear Power in Saudi Arabia (World Nuclear Association), Updated 24 July 2026 | incomplete | partial: Whole profile read. |
| SA | US Signs Landmark Nuclear Deal With Saudi Arabia (NucNet (SMR portal)), 2026-07-23 | incomplete | partial: article read |
| SA | Small Modular Reactors (SMART) page (Saudi Ministry of Energy) | incomplete | partial: access blocked (timeouts). the fixed-header fetch timed out twice (read timeout; then network unreachable/timeout); a rendered-text read failed with no output. Only the search result titles (SMART 360 MWt / 110 MWe or 90 MWe + 40,000 t/day water) was seen. |
| SA | Saudi Aramco supports new small modular reactor technology (Arabic) (Attaqa), 2025-12-22 | incomplete | partial: article read |
Senegal · 1 cited routes
No published project record for Senegal in this release. All Senegal records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| SN | Senegal delegate statement in IAEA General Conference record GC(68)/OR.3, 17 September 2024 | incomplete | partial - distinguishes a research-reactor project from an intended future nuclear-power program; neither is established as an SMR deployment |
Serbia · 2 cited routes
No published project record for Serbia in this release. All Serbia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| RS | World Nuclear News: Serbia tag listing, first page, with two Serbia articles (15 and 30 July 2026) | incomplete | partial: first page of a multi-page news listing; older pages not read. Serbia's SMR aim and EDF's preliminary studies name no site (an existing program-context row). |
| RS | SRBATOM: answers to the third national report, tenth Convention on Nuclear Safety review (March 2026) | incomplete | partial: nuclear-program answers 6 and 13 read; the study compares large and small modular technologies without selecting a reactor type or committing a described plant. Site screening is planned, not site selection. |
Singapore · 2 cited routes
No published project record for Singapore in this release. All Singapore records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| SG | Written reply to PQ on planning parameters including potential locations for deploying SMR (Ministry of Trade and Industry (now METI), Singapore), 2026-08-04 | incomplete | partial: single parliamentary reply read in full |
| SG | Understanding Advanced Nuclear Energy Technologies: How Singapore Is Assessing Its Potential (Energy Market Authority), 2026 | incomplete | partial: access blocked (Incapsula challenge page; content not served to the research client. HTTP 200; sha256 d02032286070b4dd9d8fbd985a7bdca8af8edf52b89ff177db3bfcb2c8a9c43d). bot-protection (Incapsula) stub returned (212 bytes); not read |
Slovakia · 8 cited routes
Published project records for Slovakia (1): newcleo / JAVYS LFR-AS-200 study at Bohunice V1. All Slovakia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| SK | JAVYS press release (3 Jun 2025) | incomplete | partial - 1-4 LFR-AS-200 at the decommissioned V1 site, Jaslovské Bohunice. |
| SK | newcleo Ltd Form 424B3 (SEC, filed 2026-08-10) | incomplete | partial - Newvys (JAVYS 51% / newcleo 49%): up to four LFR-AS-200 at the retired Bohunice nuclear site, with a site-specific feasibility study under way. ÚJD SR is named as the regulator but no license is held. |
| SK | ÚJD SR | incomplete | partial - Not checked directly in this pass. WNA Slovakia lists only the large Bohunice unit 5 siting permit of May 2024. |
| SK | ÚJD SR úradná tabuľa: Prebiehajúce správne konania (ongoing administrative proceedings) (Úrad jadrového dozoru Slovenskej republiky (ÚJD SR); 'Aktualizácia: 02.10.2026'; 17 pages) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: The list gives participant only; each proceeding's subject is in a per-case PDF, and only 4 JAVYS forms were opened (building permits/early use/changes, none naming an SMR). No row has Newvys, newcleo |
| SK | Slovenské elektrárne / JAVYS SMR feasibility (Project Phoenix) (SITA report of Slovenské elektrárne release (seas.sk release redirected); report of 2026-01-15) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026) |
| SK | World Nuclear Association country profile: Nuclear Power in Slovakia (updated 2 October 2026) | incomplete | partial: secondary country profile, not a list of proposals. It covers Project Phoenix, the newcleo plan at Bohunice (an existing record) and a 2025 agreement to explore BWRX-300 deployment that names no site. |
| SK | World Nuclear News: Slovakia tag listing, first page, with the Project Phoenix article (16 January 2026) | incomplete | partial: first page of a multi-page news listing (back to October 2025); older pages not read. Project Phoenix's four candidate sites match an existing research row; no design or operator project was selected. |
| SK | ÚJD SR úradná tabuľa: Prebiehajúce správne konania (ongoing administrative proceedings), page 1 (Úrad jadrového dozoru SR (ÚJD SR)), 'Aktualizácia: 05.10.2026' | incomplete | partial: Page 1 of 17 diffed against the 2026-10-03 capture: two rows added/updated (3659-2026 VUJE, 2763-2026 SE) and two SE-EMO rows dropped off. Both changed rows opened (per-case notice PDFs SK-ujd-3659-2026-oznamenie.pdf, SK-ujd-2763-2026-oznamenie.pdf): an import/export permit for special materials (VUJE) and a change approval at an operating plant (Slovenské elektrárne). Neither concerns an SMR; no Newvys/newcleo/JAVYS SMR proceeding. Pages 2-17 not re-read. |
Slovenia · 2 cited routes
No published project record for Slovenia in this release. All Slovenia records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| SI | GEN energija SMR study (reported) (World Nuclear News report; report of 2024-11-28) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: gen-energija.si not opened; HEP (Croatia) only via search |
| SI | SNSA (URSJV) homepage news + GEN energija JEK2 "Mali modularni reaktorji" page (Uprava RS za jedrsko varnost; GEN energija d.o.o.), JEK2 site news to 18 September 2026; SMR page undated (cites NEA dashboard 2nd edition) | incomplete | partial: SNSA homepage news (Sept 2026) has no SMR item. GEN SMR page: technical review of SMR technologies and their possible use for JEK2; GEN will study SMR implementation options in Slovenia. No SMR project, site or vendor selection - program context. JEK2 itself is a large plant (existing outside_scope). |
South Africa · 18 cited routes
Published project records for South Africa (3): Necsa SMR demonstration reactor at Pelindaba, PBMR demonstration power plant at Koeberg (terminated), Stratek Global HTMR-100 at Zilkaats Estate. All South Africa records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| ZA | Necsa news (PBMR reactivation 2025; SMR EOI 2026-03-31) | incomplete | partial - EOI is technology-neutral; Necsa page does not itself name Pelindaba as demo site. /2026/09/ archive URL returned a not-found error (HTTP 404). |
| ZA | WNA South Africa country profile | incomplete | partial - PBMR history and Nov 2025 revival; STL HTMR-100 35 MWe; IRP 2019 two SMRs; 2.5 GWe procurement plan. No Eskom SMR site named in extracted passages. |
| ZA | IAEA CNS South Africa 7th national report (Aug 2016) | incomplete | partial - Confirms PBMR licensing application withdrawn and projects terminated in 2010. |
| ZA | STL Nuclear (thorium100.com), Stratek Holdings (stratek.co.za), Stratek Global (Wayback 2023-2024) | incomplete | partial - Both STL Nuclear and Stratek publish HTMR-100 as their design with identical 100 MWth/35 MWe; no page states a license, merger or succession. stratekglobal.com now redirects to ngnuclear.com (Next Gen Nuclear). |
| ZA | NNR (South Africa) 'Nuclear Licence Applications' page (National Nuclear Regulator (South Africa); Undated page (footer copyright 2022), viewed 2026-10-03) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: NNR per-licensee decision pages (e.g. nnr.co.za/necsa-pelindaba/) returned a not-found error (HTTP 404). |
| ZA | Stratek Global eyes private SMR project near Gauteng border (Energize (EE Publishers; trade press); 2025-07-10) | incomplete | partial: a single news article, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: Stratek primary page no longer available (domain redirects to ngnuclear.com) |
| ZA | Stratek Global leads small modular reactor project in SA (Construction Business News (press; discovery only); 2025-08-20) | incomplete | partial: a single news article, not a listing. 1 entries reconciled (accessed 3 Oct 2026) |
| ZA | South Africa revives PBMR project (Nuclear Engineering International (trade press; discovery); 2025-11-18) | incomplete | partial: a single news article, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: Government/DMRE primary not fetched |
| ZA | Necsa "Necsa in the News" category, page 1 (South African Nuclear Energy Corporation (Necsa); Page 1 as of 2026-10-03: 10 posts dated 2025-09-07 to 2026-04-28) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Page 1 only; older pages not enumerated; SMR posts (2026-04-17, 2026-04-28) do not name the demonstrator site in their text |
| ZA | NECSA advances SMR plans for Eskom coal fleet (Energize (EE Publishers; trade press); 2026-05-05) | incomplete | partial: a single news article, not a listing. 2 entries reconciled (accessed 3 Oct 2026) |
| ZA | Necsa news: Necsa attracts global interest in SMR programme (17 Apr 2026); Necsa seeks partners (28 Apr 2026); Necsa in the News listing, 17 and 28 April 2026 | incomplete | partial: Two news items plus the listing page 1 read |
| ZA | Engineering News: Necsa outlines plans (5 Jun 2026) and Necsa expects to identify SMR partner within a year (17 Jun 2026); Energize: Siemens Energy eyes power island role in NECSA SMRs (14 Jul 2026) (Creamer Media Engineering News; EE Publishers Energize), 5 Jun - 14 Jul 2026 | incomplete | partial: Engineering News 17 Jun body hidden behind subscriber wall (headline only); 5 Jun article read; Energize read |
| ZA | Eskom new nuclear power station draft scoping report (WSP, April 2026) and final scoping appendices (Eskom / WSP Group Africa), 1 April 2026 (DSR); FSR 2026 | incomplete | partial: access blocked (access refused, HTTP 403 on two different WSP URLs plus one a rendered-text read attempt [read_with originally: the fixed-header fetch; a rendered-text read]). Not readable: wsp.com returned an access refusal (HTTP 403) to the fixed-header fetch (DSR and an FSR appendix) and to a rendered-text read |
| ZA | Daily Maverick/GroundUp (14 Apr 2026) and St Francis Today SFPO summary of DFFE acceptance of final scoping report (23 Sep 2026) (Daily Maverick; St Francis Today), 14 Apr 2026; 23 Sep 2026 | incomplete | partial: Both articles read; neither mentions SMRs |
| ZA | WNA Nuclear Power in South Africa (re-read for 2026 items) (World Nuclear Association), Updated 29 September 2026 | incomplete | partial: Grepped for 2026, Thyspunt, Bantamsklip, Stratek/HTMR, Matlosana; no Matlosana, no new SMR project |
| ZA | NNR Nuclear Licence Applications page (re-check) (National Nuclear Regulator), as served 2026-10-06 | reconciled | complete: Listing re-read: Koeberg LTO, Necsa Thabana pipestore, Thyspunt NISL and others; zero SMR/HTMR/Stratek entries |
| ZA | Stratek coverage: Infrastructure News (30 Jan 2026), WNN Stratek-Albatros (Mar 2025), NEI Koya Capital (Apr 2024) (Infrastructure News; WNN; NEI), Jan 2026 and earlier | incomplete | partial: Three articles; no Matlosana agreement, no new site, no license filing |
| ZA | Infrastructure News press release: USP&E and BAM Energy launch BridgePower Nuclear (17 Jun 2026) (Infrastructure News (press release)), 17 June 2026 | incomplete | partial: Single release |
South Korea · 12 cited routes
Published project records for South Korea (3): Daegu i-SMR proposal at the Gunwi industrial complex, GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complex, KHNP SMR at the Gijang-gun candidate site (11th Basic Plan). All South Korea records and agreements.
Spain · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| ES | Spain energy ministry existing nuclear power-plant list | incomplete | partial - finite existing operating-plant table read; it does not enumerate new SMR proposals or design research |
Sri Lanka · 1 cited routes
No published project record for Sri Lanka in this release. All Sri Lanka records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| LK | Sri Lanka Atomic Energy Board nuclear-power programme page | incomplete | partial - national nuclear-power roadmap considers SMRs and site selection, but gives no selected SMR design, host plant or deployment commitment |
Sudan · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| SD | IAEA technical cooperation country sheet: Sudan (2020) | incomplete | partial - country program sheet lists review and updating of Sudan's nuclear power program; no plant, design or site. |
| SD | World Nuclear News, 29 January 2019: IAEA reports on Sudan's nuclear power infrastructure | incomplete | partial - single article: 2018 infrastructure review; a 2016 framework agreement with CNNC for one or two 600 MWe reactors (above the SMR size class) and a 2017 Rosatom memorandum. No SMR proposal; later program status not established. |
Sweden · 17 cited routes
Published project records for Sweden (6): Blykalla SEALER Norrsundet / Gävle proposal, Blykalla SEALER study at Hörby (withdrawn), Blykalla SEALER Untra / Tierp proposal, Kärnfull Next SMR park at Målma, Valdemarsvik, Studsvik new nuclear at the Nyköping home site, Videberg Kraft Rolls-Royce SMR plant on the Värö peninsula (Ringhals). All Sweden records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| SE | Blykalla company press (Untra + Norrsundet) | incomplete | partial for Blykalla named parks only; SSM national inventory not fetched as dated full list |
| SE | Vattenfall / Videberg Kraft supplier selection (15 Jun 2026) | incomplete | partial - Rolls-Royce SMR selected, three 470 MW units at Värö peninsula next to Ringhals. |
| SE | Kärnfull Next news list | incomplete | partial - Sites: Valdemarsvik (application Mar 2026), Nyköping, Motala (candidate municipality), Karlshamn (Elleholm, Guö-Köpegårda). Studsvik acquired KNXT 2026. |
| SE | Studsvik Nyköping application (Cision 25 May 2026); WNN 26 May 2026 | incomplete | partial - Three Swedish government applications in 2026: Valdemarsvik (Mar), Blykalla Norrsundet (May), Studsvik Nyköping (May). |
| SE | Blykalla newsroom | incomplete | partial - Tierp (state-financing application 31 Aug 2026), Gävle/Norrsundet, Hörby (withdrawn May 2026 per municipality), Svalbard (JV with Norsk Kjernekraft), Oskarshamn test facility. |
| SE | Hörby kommun project page | incomplete | partial - Blykalla SMR feasibility (LOI 18 Jun 2025) at Stavröd; Blykalla dropped SMR plan May 2026, now studying a factory. |
| SE | SSM: Vår granskning av ny kärnkraft; Yttranden över ansökningar om ny kärnkraft till regeringen (Strålsäkerhetsmyndigheten (SSM); 'Senast uppdaterad: 26 augusti 2026') | reconciled | complete: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: SSM states no license application under the Nuclear Activities Act exists yet; government-approval applications for Norrsundet (Blykalla) and Studsvik are not yet on SSM's statement list. |
| SE | WNA 'Nuclear Power in Sweden' (discovery); state-support and government-approval applications (World Nuclear Association (Information Library); Updated Wednesday, 16 September 2026) | incomplete | partial: 8 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| SE | Vattenfall / Videberg Kraft press releases on new nuclear (Cision) (Vattenfall AB; release of 2026-06-15) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Full Vattenfall newsroom not paged; only SMR-selection release opened |
| SE | Kärnfull Next newsroom and project pages (Kärnfull Next AB (Studsvik group since May 2026); news list as shown 2026-10-03 (19 items, June 2022 to 25 May 2026) plus pages /valdemarsvik, /karlshamn, /vastervik, /nykoping) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Motala page deliberately not re-fetched per open-queue rule |
| SE | World Nuclear News: Sweden tag listing, first page (10 items, 15 June to 3 September 2026) | incomplete | partial: first page of a multi-page news listing, re-read 3 October 2026; older pages not read. All 10 items classified: six concern existing Swedish records or research rows (Videberg Kraft, Blykalla at Untra, NuCore at Oskarshamn, the Studsvik consortium), one concerns two large reactors and three concern uranium, waste or law. |
| SE | Kärnfull Next news list and Nyköping page (as shown 3 October 2026) | incomplete | partial: this read recorded only the Nyköping application and the Motala candidate; the same news list is reconciled in full in the Kärnfull Next newsroom route. |
| SE | SSM: Vår granskning av ny kärnkraft; statements on applications for new nuclear to the Government (Strålsäkerhetsmyndigheten (SSM)), 'Senast uppdaterad: 26 augusti 2026' | incomplete | partial: Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. Still only the ReFirm Målma (Valdemarsvik) statement; Norrsundet and Studsvik government-approval applications not yet on SSM's list. |
| SE | SSM news list (nyheter), first page (Strålsäkerhetsmyndigheten (SSM)), Newest item 21 September 2026 | incomplete | partial: First page (10 of 150 items, 14 Apr–21 Sep 2026). No new-reactor application or SMR licensing item. |
| SE | World Nuclear News: Consortium formed for Swedish SMR project (World Nuclear Association), 2026-09-03 | incomplete | partial: Single article |
| SE | Government Offices of Sweden: status of applications for the Government's approval of nuclear facilities (page published 2 October 2026) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 10 Oct 2026): four existing records (Målma, Norrsundet, Studsvik, Untra) and Barsebäck, a two-unit large-reactor project outside scope. The page lists no application under the older Environmental Code process. |
| SE | Government Offices of Sweden: applications for state support for new nuclear reactors (page updated 2 September 2026) | reconciled | complete: 6 entries reconciled from this dated listing (accessed 10 Oct 2026): four concern existing records (one Studsvik application covers two alternative sites), Barsebäck is two large reactors, and Oskarshamn keeps its open row because both SMR and large-reactor options remain. |
Switzerland · 3 cited routes
Published project records for Switzerland (1): Copenhagen Atomics critical experiment at the Paul Scherrer Institute. All Switzerland records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| CH | PSI media release (1 Jul 2024) | incomplete | partial - Copenhagen Atomics thorium molten-salt critical experiment at PSI. ENSI register not enumerated. Superseded 6 October 2026: ENSI keeps no new-build or SMR licensing list because Swiss law still bars general licenses for new plants; its BALDER project page was read and recorded on the PSI record. |
| CH | Transmutex homepage (Transmutex SA; homepage as shown 2026-10-03) | incomplete | partial: a home page; the news page was not found. 1 entries reconciled (accessed 3 Oct 2026); access limits: /news 404 |
| CH | ENSI: Projekt BALDER (Kernanlagen des PSI) and ENSI site search 'modular' (Eidgenössisches Nuklearsicherheitsinspektorat (ENSI)), Page modified 2026-06-15 (article:modified_time) | incomplete | partial: ENSI has no new-build or SMR licensing list (Swiss law still bars general licenses for new NPPs). Full theme index of ensi.admin.ch scanned (CH-ensi-home.html) and site search for 'modular' (10 hits, CH-ensi-search-modular.html) read: BALDER is the only SMR item. |
Taiwan · 2 cited routes
No published project record for Taiwan in this release. All Taiwan records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| TW | Taiwanese-language discovery: Google News RSS (2 queries) (Various Taiwanese media), 2025-05 to 2026-09-25 | incomplete | partial: Titles only. CNA (6 Apr 2026) reports SMR research starting in 2026 with first power at the earliest in 2035; no named proposal or host. |
| TW | Taiwan NUSC policy-support report | incomplete | partial - domestic SMR research funding/collaboration, no named design/deployment in reviewed sections |
Tajikistan · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| TJ | Tajikistan: atomic-energy.ru Tajikistan tag page; "Таджикистан изучает предложение России по сооружению малой АЭС для добычных проектов" (2025-03-18, citing Izvestia) (Атомная энергия 2.0) | reconciled | complete: All 2024-2026 headlines on the tag page screened (uranium legacy remediation dominates); the single small-plant item was read. TASS original returned an access refusal (HTTP 403). |
Tanzania · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| TZ | Tanzania Ministry of Energy statement on ATLAS and early nuclear-power preparation, 27 August 2026 | incomplete | partial - ministry describes early nuclear-power preparation and learning about SMRs; no selected plant, vendor or permission |
Thailand · 5 cited routes
No published project record for Thailand in this release. All Thailand records and agreements.
Tunisia · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| TN | Maghrebnaute: Tunisia and IAEA sign new Country Programme Framework (24 Sep 2026), 24 September 2026 | incomplete | partial: Single article; states no nuclear plant is planned at this stage |
Türkiye · 3 cited routes
No published project record for Türkiye in this release. All Türkiye records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| TR | ARC Clean Technology news page (as shown 3 October 2026) | incomplete | partial: the page showed only April 2026 items, and ARC's July 2026 release on Idaho National Laboratory, published on the same site, was not among them, so it was not a full list. Its Türkiye item (an ARC-100 term sheet with IC Nuclear & Industry, 7 April 2026) names no site: program context. |
| TR | Atomic-energy.ru news: USTDA grant to TÜNAŞ for a Turkish SMR roadmap (25 September 2026) | incomplete | partial: one news article read in full, not a listing. A roadmap grant with no site, matching an existing program-context row. |
| TR | World Nuclear News: US-Turkey agreement to accelerate SMR deployment; Turkey tag listing page 1 (World Nuclear Association), article Sep 2026; listing 4 Mar to 24 Sep 2026 | incomplete | partial: Article plus first page of the Turkey tag (10 items: 8 Akkuyu, 1 CANDU, 1 SMR) |
Uganda · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| UG | WNN: Korea to evaluate proposed Ugandan NPP site | incomplete | partial - Buyende site evaluation for APR1400 large units; SMRs not mentioned. |
Ukraine · 5 cited routes
Published project records for Ukraine (3): Energoatom / Holtec Rivne SMR-160 proposal (MoU-era), Energoatom SMR at the Trypilska thermal plant site, TEPLATOR heat-only reactor for Slavutych district heating. All Ukraine records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| UA | Energoatom statement republished on kolrda.gov.ua (2024-12-11) | incomplete | partial - Ukrenergo supplied a list of 18 thermal-plant sites; Trypilska TPP is the first prospective SMR site. Also lists the Westinghouse AP300 MoU (Sept 2023), the EDF NUWARD agreement (June 2024) and the Rolls-Royce 2022 cooperation. energoatom.com.ua (Cloudflare) and mev.gov.ua (403) were blocked. SNRIU was not checked. |
| UA | Atomic-energy.ru news: potential SMR sites near Kopachi and Leliv in the Chornobyl exclusion zone (2 March 2026) | incomplete | partial: one news article read in full, not a listing; the Ukrainian agency's own release was not read. Matches an existing research row. |
| UA | World Nuclear Association country profile: Nuclear Power in Ukraine (updated 6 July 2026) | incomplete | partial: secondary country profile, not a list of proposals. Its vendor agreements (SMR-160, NuScale, AP300) match an existing research row; no new site. |
| UA | Energoatom newsroom (en and uk) (NNEGC Energoatom), n/a | incomplete | partial: access blocked (access refused, HTTP 403 (en, uk), one attempt each). An access refusal (HTTP 403) on both language versions; Interfax-Ukraine 2023 article read instead (20 SMRs to replace thermal units, program context) |
| UA | Interfax-Ukraine: Україна планує побудувати 20 ММР замість енергоблоків ТЕС, 2023-03-17 | incomplete | partial: Single 2023 article |
United Arab Emirates · 12 cited routes
No published project record for United Arab Emirates in this release. All United Arab Emirates records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| AE | WNN: ENEC signs multiple SMR MoUs (ADVANCE programme) | incomplete | partial - Dec 2023 MoUs: MoltexFLEX, X-energy, USNC; no UAE host named. |
| AE | WNN: ENEC-ADNOC strategic collaboration | incomplete | partial - Nov 2024 evaluation of SMRs for ADNOC operations; no SMR site; Barakah heat reuse only. |
| AE | MoltexFLEX news (MoltexFLEX Ltd; list as shown 2026-10-03 (10 items, 2023-04-06 to 2024-02-06; no later items shown, page 2 returns 404)) | incomplete | partial: the second page of the news list could not be opened, so the list was read only in part. 1 entries reconciled (accessed 3 Oct 2026); access limits: No items after 2024-02-06 are listed |
| AE | ENEC latest news (all, 2026 and 2025 year pages) (Emirates Nuclear Energy Company), listing as served 2026-10-06 | incomplete | partial: Static HTML shows only five items per year page; further items load by script. 2026 page: five non-SMR items (training, IP, government enablement, Ma'an, aerial systems). 2025 page: five items incl. Samsung C&T MoU; no SMR site or plant. |
| AE | ENEC and GE Vernova Hitachi sign small modular reactor deployment evaluation MoU during World Utilities Congress, 2025-05-27 | incomplete | partial: single release read in full |
| AE | KEPCO and ENEC enhance cooperation in nuclear energy (World Nuclear News), 2025-11-21 | incomplete | partial: single article |
| AE | ENEC signs collaboration deals with Korea, USA (World Nuclear News), 2025-07-28 | incomplete | partial: single article |
| AE | Enec And Newcleo Team Up On International Nuclear Deployment Project (NucNet), 2025-02-25 | incomplete | partial: Lead paragraph only; remainder behind a free-registration wall (not bypassed). |
| AE | NANO Nuclear Energy Signs Memorandum of Understanding with EHC Investment L.L.C to Advance Micro Modular Reactor Deployment in the UAE (NANO Nuclear Energy (GlobeNewswire release)), 2026-02-24 | incomplete | partial: single release read in full |
| AE | The UAE nuclear paradigm: navigating expansion, advanced technologies and geopolitics (Stephenson Harwood), 2026-09-30 | incomplete | partial: law-firm insight read in full; used only as a pointer to primaries |
| AE | Nuclear Power in the United Arab Emirates (World Nuclear Association), Updated 16 July 2026 | incomplete | partial: Whole profile read; it does not cover the ENEC ADVANCE SMR agreements; only SMR mention is Holtec Arabia (2016). |
| AE | FANR media centre news (Federal Authority for Nuclear Regulation), as served 2026-10-06 | incomplete | partial: News items load by script; static HTML lists none (total count 149 shown). |
United Kingdom · 26 cited routes
Published project records for United Kingdom (10): Cambridge Atomworks ODIN prototype at Berkeley Green, Centrica / X-energy Xe-100 plant at Hartlepool, Community Nuclear Power North Teesside AP300 proposal, Cwmni Egino small modular reactor proposal at Trawsfynydd, GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward), Holtec / EDF SMR-300 proposal at Cottam, Last Energy Llynfi PWR-20 proposal, Last Energy London Gateway PWR-20 proposal, Rolls-Royce SMR Wylfa, Shearwater NuScale Wylfa feasibility proposal (2021). All United Kingdom records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| GB | GOV.UK / GBE-Nuclear SMR selection | incomplete | partial |
| GB | ONR Generic Design Assessment page | reconciled | complete for the listed source as retrieved 2026-10-02 - Lists GDA designs: Rolls-Royce SMR (Step 3, checked word for word), plus Holtec SMR-300 and BWRX-300 statuses read in summary form. GDA is design-level, not site licensing; no new site records from this route. |
| GB | GOV.UK Advanced Nuclear Framework release (4 Feb 2026) | incomplete | partial: a single government release naming sites; the framework's own pipeline list is not public; retrieved 2026-10-02 - Names Hartlepool (X-energy/Centrica, 12 AMRs), Cottam (Holtec/EDF/Tritax), Wylfa, and NDA surplus land at Chapelcross, Pioneer Park (Cumbria), Trawsfynydd. Pipeline submissions opened March 2026; no public pipeline list found. |
| GB | GBE-N / Wylfa selection (WNN 13 Nov 2025; ANS 15 Apr 2026) | incomplete | partial - Wylfa selected for >=3 RR SMRs (up to 8); Oldbury-on-Severn bought from Hitachi, GBE-N still evaluating; no technology at Oldbury from GBE-N. greatbritishenergynuclear.uk not fetched directly. |
| GB | NCE report of government response listing six decommissioning sites (30 Sep 2025) | reconciled | complete for the listed source as retrieved 2026-10-02 - Wylfa, Oldbury, Pioneer Park (Moorside), Trawsfynydd (Cwmni Egino), Hartlepool, Dungeness. |
| GB | Centrica / X-energy Hartlepool JDA | incomplete | partial - Hartlepool preferred first site, 12 x Xe-100 (960 MW). Centrica's own page returned an access refusal (HTTP 403). |
| GB | Holtec/EDF Cottam (WNN 24 Jun 2026) | incomplete | partial - Up to four SMR-300 at former Cottam coal station; JV heads of terms. |
| GB | SGE (formerly Synthos Green Energy) UK fleet plan (ANS 7 Jul 2026; NCE 14 Sep 2026) | incomplete | partial - 14 BWRX-300 across three undisclosed UK sites; Oldbury reported by press as first site, GBE-N (owner) has no record of SGE interest. |
| GB | Cwmni Egino (Trawsfynydd) | incomplete | partial - Technology not selected; in discussions with several vendors. |
| GB | NuclearChain 'Cumbria nuclear power plant' row vs Wikipedia Moorside clean energy hub coordinates | incomplete | partial - Wikipedia coordinate 54.429566,-3.510911 equals NuclearChain 54.4296,-3.5109: the row is the 2020 Moorside clean energy hub proposal (now NDA 'Pioneer Park'). No primary source for 2 x 470 MW. |
| GB | ONR Generic Design Assessment: Assessment of reactors (active and previous assessments) (Office for Nuclear Regulation (with Environment Agency and Natural Resources Wales); page footer 'Updated: 31 March 2026') | reconciled | complete: 7 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None for the list. The page predates the 15 Sep 2026 Xe-100 GDA request, recorded separately (onr-news-20260915-xe100-gda). The 2024 AP300 entry approval and newcleo acceptance are not on this list (n |
| GB | ONR/EA/NRW early regulatory engagement on new nuclear projects: table of organisations in the process (Office for Nuclear Regulation; page footer 'Updated: 20 July 2026') | reconciled | complete: 7 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. |
| GB | ONR Licensing of new reactors: current, recent and inactive site-licensing projects (Office for Nuclear Regulation; page footer 'Updated: 2 February 2026') | reconciled | complete: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Page last updated 2 Feb 2026; it does not list GBE-N's Wylfa SMR engagement (ONR FOI release of June 2026 says Wylfa technical engagements are expected from FY2026/27). |
| GB | ONR news: Regulators asked to commence GDA on X-energy reactor design (Office for Nuclear Regulation; news item dated 15 September 2026) | incomplete | partial: a single news item, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: None. |
| GB | GOV.UK press release: Advanced Nuclear Framework (government to unlock advanced nuclear) (Department for Energy Security and Net Zero / HM Treasury (GOV.UK); Published 4 February 2026) | incomplete | partial: a single government release naming sites; the framework's own pipeline list is not public. 9 entries reconciled (accessed 3 Oct 2026) |
| GB | Great British Energy; Nuclear publications on GOV.UK (Great British Energy; Nuclear / DESNZ; GOV.UK search, newest first, page 1 of 5 (2026-10-03)) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Only page 1 of 5 read; Commercial Pipeline xlsx (procurement pipeline) not downloaded; gbe-n.co.uk news page rendered empty |
| GB | Cambridge Atomworks news and events (Cambridge Atomworks Ltd; list as shown 2026-10-03 (19 items, 2025-08-20 to 2026-09-16)) | reconciled | complete: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Individual items not opened beyond titles |
| GB | ONR Generic Design Assessment: assessment of reactors (active and previous) (Office for Nuclear Regulation), Page footer 'Updated: 31 March 2026' | incomplete | partial: Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. The 15 Sep 2026 Xe-100 GDA request is still only in ONR news, not on this list. |
| GB | ONR/EA/NRW early regulatory engagement on new nuclear projects (table) (Office for Nuclear Regulation), Page footer 'Updated: 20 July 2026' | incomplete | partial: Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. |
| GB | ONR Licensing of new reactors (current, recent and inactive site-licensing projects) (Office for Nuclear Regulation), Page footer 'Updated: 2 February 2026' | incomplete | partial: Text identical, line for line, to the 2026-10-03 capture of the same page (diffed); no new or changed rows. Still does not list GBE-N's Wylfa SMR site licensing. |
| GB | ONR news: all news, first page (Office for Nuclear Regulation), Newest item dated October 2026 (Hinkley Point B licence transfer) | incomplete | partial: First page only (6 items, Sept–Oct 2026). Only SMR item is the 15 Sep 2026 Xe-100 GDA request already recorded; no new site-license application news. |
| GB | GOV.UK publications from Great British Energy – Nuclear, newest first (page 1) (GBE-N / DESNZ (GOV.UK)), Search as served 2026-10-06 (newest item updated 1 Oct 2026) | incomplete | partial: Page 1 (10 items) of the organization listing; older pages not read. Items opened: Scotland siting advice, Wylfa naming release, The Spark September, Commercial Pipeline. Others (Armed Forces, Spark June, SMR Conflict of Interest Matrix, 'Locals to decide name', British contracts) concern the Wylfa SMR program or corporate matters. |
| GB | GBE-N Commercial Pipeline spreadsheet (August 2026) (Great British Energy – Nuclear (GOV.UK)), Published 4 August 2026 | reconciled | complete: All 115 text cells scanned for site/technology terms. Packages (delivery partner, site investigations, enabling works, marine off-loading facility, main works, financing, archaeology) all belong to the single SMR project at Wylfa; no other site named. |
| GB | World Nuclear News: Jacobs to assist in planning of UK SMR projects (World Nuclear Association), 2026-07-21 | incomplete | partial: Single article |
| GB | World Nuclear News: Jacobs to carry out environmental assessments for UK's Oldbury site (World Nuclear Association), 2026-05-21 | incomplete | partial: Single article; a first attempt with a guessed slug returned a not-found error (HTTP 404) and was replaced by the linked URL |
| GB | Office for Nuclear Regulation: new site licensing (page updated 2 February 2026) | incomplete | partial - process page, not an application register; the only decision it names is the May 2024 Sizewell C license (large reactor). It lists no SMR site-license application. |
United States · 118 cited routes
Published project records for United States (89): Aalo commercial proposal at Texas A&M-RELLIS, Aalo fleet proposal at Idaho Falls Power's Energy Research Park, Aalo Project Ascension power-reactor proposal at INL, Aalo-X at Idaho National Laboratory, AEP Joshua Falls SMR proposal, AEP Rockport BWRX-300 proposal, Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana), Ameren / Westinghouse SMR proposal at Callaway (2012), Ameresco–Terrestrial Energy IMSR at Aberdeen Proving Ground, Antares Mark-0 at Idaho National Laboratory, Antares Mark-1 electricity-producing microreactor at INL, Antares microreactor at Joint Base San Antonio (ANPI), Antares R1 microreactor siting at INL's Central Facilities Area, Antares R1 microreactors at Fort Bragg (Army Janus), ARC-100 first-of-a-kind deployment framework at Idaho National Laboratory, B&W mPower plan at TVA's Clinch River site (2013-2017), BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage), Beck Creek Energy SMR proposal (Amherst County), Blue Energy BWRX-300 at Port of Victoria, BlueCore BC-15 floating plant proposal at the Port of Long Beach, BWXT BANR at Fort Campbell (Army Janus), Cascade Advanced Energy Facility, Deep Atomic MK60 AI data-center campus proposal at INL, Deep Fission Gravity pilot, Parsons, Deployable Energy Unity at Idaho National Laboratory, Deployable Energy Unity full-power test in INL's DOME (2027), Deployable Energy–Hornbeck Unity maritime demonstration proposal, Dominion North Anna SMR proposal, Duke Belews Creek technology-neutral SMR proposal, Elementl Letart Township BWRX-300 proposal, eVinci DOME nuclear test reactor, First American Nuclear EAGL-1 energy park in Indiana (site not disclosed), General Atomics GA-TES at Fort Hood (Army Janus), Holtec Green River / Blue Castle, Utah proposal, Holtec Oyster Creek SMR proposal, Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades), Holtec SMR-160 proposal at Savannah River Site (2012), Holtec SMR-300 proposal in Brigham City, Utah, Hyperion / Gen4 Module proposal at Savannah River Site (2012), Idaho State University / NuCube Advanced Research and Test Reactor, Kairos commercial proposal at Texas A&M-RELLIS, Kairos Hermes 1, Kairos Hermes 2, Last Energy first commercial PWR-20 site, Caldwell County, Last Energy Haskell County PWR-20 campus, Last Energy PWR-5 pilot at Texas A&M-RELLIS, Long Mott Generating Station (Xe-100 at Dow Seadrift), MARVEL microreactor test bed at INL's TREAT facility, Meta–TerraPower initial dual-unit Natrium proposal, Microreactor at Naval Weapons Station Crane, Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County), NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU), Natrium Kemmerer Unit 1, Natura MSR-1 demonstration at Abilene Christian University, Natura MSR-100 proposal at Texas A&M-RELLIS, Next Generation Nuclear Plant prototype HTGR at INL (2005-2013), Nine Mile Point Gen III+ SMR early site permit evaluation, Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab, NuCube test microreactor at the Utah San Rafael Energy Lab, NuScale plant proposal at Savannah River Site (2012), Oklo Aurora at Eielson AFB (DAF microreactor pilot), Oklo Aurora campus, Pike County, Ohio, Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI), Oklo Aurora-INL, Penn State FRONTIER eVinci research proposal, Project Pele (INL microreactor demonstration), Project TETRA / TETRA-1 pilot at Texas A&M RELLIS, Purdue / Duke Energy SMR feasibility study for the Purdue campus, Pylon / LOKI MMR experiment proposal for INL's DOME, Radiant Kaleidos Buckley Space Force Base proposal, Radiant Kaleidos demonstration at INL DOME, Radiant Kaleidos microreactors at Fort Benning (Army Janus), Standard Power NuScale SMR facility in Ohio (site not disclosed), Standard Power NuScale SMR facility in Pennsylvania (site not disclosed), Surry Green Energy Center SMR campus proposal, Tata / BWXT BANR Green River, Wyoming proposal, Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, Valmeyer, Terrestrial Energy IMSR at Texas A&M-RELLIS, Toshiba 4S proposal at Galena, Alaska (mid-2000s), Transformational Challenge Reactor microreactor test proposal at ORNL (2019), TVA Clinch River BWRX-300, UAMPS Carbon Free Power Project (canceled), University of Illinois KRONOS MMR, USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP), Valar Atomics Ward 250, Valar Carbon County nuclear campus proposal (Project Beehive), Westinghouse eVinci at Fort Drum (Army Janus), Westinghouse eVinci at Malmstrom Air Force Base (ANPI), ZettaJoule ZJ0 research reactor at Texas A&M (TEES). All United States records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| US | SEDC Midpoint + POWER Surry GEC + WNN USNC INL + NRC highlights (still incomplete) | incomplete | partial ? Midpoint, Surry GEC, USNC INL historical, Nine Mile Point Gen III+ SMR ESP evaluation; NRC not full applicant inventory |
| US | NRC Advanced Reactor Application Projects | reconciled | complete for the listed source as retrieved 2026-10-02 - 6 rows (page updated 2026-06-18): Eden Isotope Production Complex -> exclude (2 MWth non-power isotope reactor); Pioneer Units 1-2 LWA -> Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades); UIUC KRONOS MMR -> University of Illinois KRONOS MMR (university applicant); Long Mott -> Long Mott Generating Station (Xe-100 at Dow Seadrift); TVA Clinch River CPA -> TVA Clinch River BWRX-300 (CP decision 2026-09-28, update); Belews Creek ESP -> Duke Belews Creek technology-neutral SMR proposal. No new commercial SMR application rows; Blue Energy CPA Part 1 (Sept 2026, per WNN) not yet listed. |
| US | NRC Pre-Application Activities for Advanced Reactors | reconciled | complete for the listed source as retrieved 2026-10-02 - 46 entries (updated 2026-10-02), all subpages fetched. Site-bearing rows: APCo Joshua Falls -> AEP Joshua Falls SMR proposal; Duke Belews Creek -> Duke Belews Creek technology-neutral SMR proposal; Energy Northwest -> Cascade Advanced Energy Facility (still pre-app, stage flag); Last Energy (Haskell) -> Last Energy Haskell County PWR-20 campus; Texas A&M RELLIS ESP -> RELLIS records (university applicant); Terra Innovatum SOLO (Rock City, IL) -> NEW; BlueCore (Port of Long Beach) -> NEW floating; Aalo Idaho Nuclear Project -> unresolved; First American Nuclear (Indiana, site undisclosed) -> unresolved; Deep Fission -> Deep Fission Gravity pilot, Parsons; Blue Energy -> Blue Energy BWRX-300 at Port of Victoria; ACU -> Natura MSR-1 demonstration at Abilene Christian University; A |
| US | NRC Early Site Permit applications page | reconciled | complete for the listed source as retrieved 2026-10-02 - Issued: Clinton, Grand Gulf, North Anna, Vogtle, PSEG, Clinch River. Under review: Grand Gulf renewal (exclude, no SMR stated), North Anna renewal (relates to Dominion North Anna SMR proposal; NRC page shows no SMR wording), Belews Creek (Duke Belews Creek technology-neutral SMR proposal). |
| US | NRC Combined License applications page | reconciled | complete for the listed source as retrieved 2026-10-02 - All rows are historical large-LWR COLs plus Aurora-Oklo (INL) and Fermi America Units 1-4 AP1000 (exclude, large). |
| US | NRC expected new reactor applications PDF | incomplete | partial - a server error (HTTP 503); not available. |
| US | NEA SMR Digital Dashboard edition 4.0: US siting points (map coordinates) | incomplete | partial: map points matched where identifiable; several remain tentative or unresolved; retrieved 2026-10-02 - Identified: 38.25,-90.31 = Terra Innovatum SOLO at Rock City, Valmeyer IL (NEW); 30.05,-94.75 = NANO/BaRupOn LAMP, Liberty TX (NEW); 31.91,-102.16 = Oklo-Diamondback near Midland TX (NEW); 44.33,-87.51 = Kewaunee (unresolved: technology unstated); 29.36,-98.55 = JBSA Antares (military, out of scope); 28.78,-97.04 = Blue Energy BWRX-300 at Port of Victoria; 37.37,-95.17 = Deep Fission Gravity pilot, Parsons; 41.55,-109.58 = Tata / BWXT BANR Green River, Wyoming proposal (not re-verified); 39.80,-74.28 = Holtec Oyster Creek SMR proposal; 38.04,-86.96 = AEP Rockport BWRX-300 proposal. Tentative (HQ-like, unverified): 40.65,-75.47 PPL HQ Allentown and 38.34,-85.72 Louisville -> LG&E/KU-X-energy program; 39.77,-8 |
| US | Utility/host releases (AEP, PPL/LG&E-KU, PacifiCorp, APS/SRP/TEP, EnergySolutions, Utah OED, Greenwood County KS, APPA on NYPA and Brigham City) | incomplete | partial - Opened primary releases for AEP, PPL (2024, 2026), PacifiCorp (2022), APS (2026-06-24), Utah OED (2025-08-25), Greenwood County, EnergySolutions/GlobeNewswire. Not checked in this pass: Duke beyond Belews Creek, Dominion North Anna technology choice, Entergy, Ameren, Evergy beyond MOU, Xcel, Georgia Power, NIPSCO, Constellation, Talen, Vistra, Santee Cooper, PGE, Energy Northwest beyond Cascade. |
| US | Vendor newsrooms and filings (NuScale, X-energy, Natura, Oklo, TerraPower, NANO, Terra Innovatum, Holtec S-1/A) | incomplete | partial - NuScale Q2-2026: TVA-ENTRA1 PPA still pending, no site. TerraPower 2026 headlines: no Meta/Utah/Kansas site. Holtec S-1/A (2026-08-21): Palisades, Oyster Creek, plus Pilgrim/Indian Point/Big Rock Point as prequalified locations. X-energy news: no new US site beyond Long Mott/Cascade; LG&E-KU collaboration (PPL). JS-rendered or blocked newsrooms gave no parsable lists: Kairos, Deep Fission, Last Energy, Aalo, Blue Energy, Elementl, ENTRA1, Hadron, Valar, Terrestrial. |
| US | World Nuclear News New Nuclear listing and ANS Nuclear Newswire SMR tag (since 2026-09-01) | incomplete | partial - US items since 2026-09-01: Clinch River CP (2026-09-28/30, update); Blue Energy CPA Part 1 (Sept 2026, update); Applied Atomics HQ New Orleans (2026-09-24, exclude); South Korea large-reactor investment (2026-10-01, exclude); Calvert Cliffs uprate (exclude); Deployable Energy DOME test (laboratory host); West Virginia NLIC proposal and Idaho NLIC (DOE campuses, not deployments); California new-plant bills (no project). |
| US | DOE Reactor Pilot Program page | reconciled | complete for the listed source as retrieved 2026-10-02 - 10 companies / 11 projects listed; criticality releases for Antares, Valar, Aalo linked. No later RPP additions; follow-on is NRIC Launch Pad. |
| US | DOE RPP initial selections release | reconciled | complete for the listed source as retrieved 2026-10-02 - 11 projects; confirms company list. |
| US | ANS Nuclear Newswire Launch Pad round 1 and 2 | incomplete | partial - Round 1: 4 companies (Apr 2026); round 2: 13 projects/12 companies (Aug 2026). Only ISU/NuCube, Deployable, Antares tied to sites. |
| US | U.S. Army Janus Program releases (army.mil) | reconciled | complete for the listed source as retrieved 2026-10-02 - 5 vendor-installation pairs (2026-08-26); 9 candidate installations named 2025-11-18 (article 289074); Fort Benning detail (295271). |
| US | Department of War releases (war.gov) | incomplete | partial - an access refusal (HTTP 403) to automated fetch; Navy Crane facts taken from WNN/ANS. |
| US | Westinghouse news index | incomplete | partial - Malmstrom (Apr 2026), Janus (Aug 2026), NCERC zero-power criticality (Aug/Sep 2026), 2023 SRC release. |
| US | Radiant Buckley release | incomplete | partial - Confirms DAF ANPI selection 2026-04-22. |
| US | WNN / ANS Air Force ANPI coverage | incomplete | partial - 3 pairings: Radiant-Buckley, Westinghouse-Malmstrom, Antares-JBSA. |
| US | DOE MARVEL project page | incomplete | partial: a single project page, not a listing; retrieved 2026-10-02 - MARVEL at TREAT; schedule 2026 install, 2027 criticality, 2028 full power. |
| US | DOE Gen III+ SMR Tier 2 awards | reconciled | complete for the listed source as retrieved 2026-10-02 - 8 awards: 2 ESPs (Constellation NY; NPPD NE) + 6 supply chain; Tier 1 (TVA, Holtec) restated. |
| US | University sources: ISU, TEES/Texas A&M, Purdue/Duke, Univ. of Utah, Texas Tech, Wisconsin PSC | incomplete | partial - ISU/NuCube ART and TEES/ZettaJoule ZJ0 found; Purdue study only; Utah TRIGA power demo; Texas Tech research only; Wisconsin study only; UAF: no reactor project found (only search-listing pointers to DIU/NLR MOUs, not opened); Penn State, UIUC, ACU, RELLIS already in SMRMap (UIUC CPA update). |
| US | Idaho Falls Power news | incomplete | partial - Aalo-1 fleet at Energy Research Park (2024). |
| US | Holtec news page | incomplete | partial - No Rwanda/Africa/Middle East/Latin America items; Holtec-Rwanda pointer (WNA) unverified. |
| US | OSTI.gov records API (DOE/AEC/NRC/CEA technical reports) | incomplete | partial: record look-ups, not an enumeration; retrieved 2026-10-02 - Class sentences found for Hallam, Piqua, La Crosse, Elk River, Saxton, VBWR, EL-4, G1, G2, KKN, KRB-A and Seversk. |
| US | NRC decommissioning facility pages | incomplete | partial: one facility page read; two other pages were not found; retrieved 2026-10-02 - VBWR page read (Power Reactor, DPR-1). Yankee Rowe and La Crosse pages are not at the old URLs (404 after site restructure). |
| US | Advanced Reactor Application Projects (US Nuclear Regulatory Commission; Page Last Reviewed/Updated Thursday, June 18, 2026) | reconciled | complete: 6 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. Note: page not updated since 2026-06-18, so completed reviews (Kemmerer, Hermes, Hermes 2, ACU) appear only on the Past Licensing Activities page and Blue Energy CPA Part 1 is not shown. |
| US | Pre-Application Activities for Advanced Reactors (US Nuclear Regulatory Commission; Page Last Reviewed/Updated Friday, October 02, 2026) | reconciled | complete: 42 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None for the pages. ADAMS documents linked from sub-pages were not opened except where noted. |
| US | Past Licensing Activities (advanced reactors) (US Nuclear Regulatory Commission; Page Last Reviewed/Updated Tuesday, June 09, 2026) | reconciled | complete: 8 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. |
| US | Non-Power Facilities: New Facility Licensing (US Nuclear Regulatory Commission; Page Last Reviewed/Updated Tuesday, September 15, 2026) | reconciled | complete: 7 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. |
| US | Early Site Permit Applications for New Reactors (US Nuclear Regulatory Commission; Page Last Reviewed/Updated Wednesday, September 23, 2026) | reconciled | complete: 9 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: None. |
| US | Combined License Applications for New Reactors (US Nuclear Regulatory Commission; Page Last Reviewed/Updated Monday, September 14, 2026) | reconciled | complete: 20 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Page tracks applications only until a license is issued; issued COLs (e.g. NuScale-free list) are on a separate holders page, not enumerated. |
| US | DOE Reactor Pilot Program; selections list (U.S. Department of Energy, Office of Nuclear Energy; page as retrieved 2026-10-03 (latest item: Aalo criticality, July 2026); selections announced 2025-08-12) | reconciled | complete: 11 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: The page names no sites; host attribution for Deep Fission, Last Energy, Natura and Terrestrial relies on existing SMRMap records and ledger rows. |
| US | DOE Advanced Reactor Demonstration Program award announcements (demonstrations, risk reduction, ARC-20) (U.S. Department of Energy, Office of Nuclear Energy; Announcements of 2020-10-13 (demonstrations), 2020-12-16 (risk reduction), 2020-12-22 (ARC-20)) | reconciled | complete: 10 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: the 2020 articles name no demonstration sites, which come from later SMRMap records. |
| US | DOE Generation III+ SMR Pathway to Deployment Program; Tier 1 and Tier 2 selections (U.S. Department of Energy; Tier 1 release 2025-12-02; Tier 2 release 2026-05-14) | reconciled | complete: 11 entries reconciled from this dated listing (accessed 3 Oct 2026) |
| US | DOE HALEU Allocation Process; conditional selections (rounds 1-3) (U.S. Department of Energy, Office of Nuclear Energy; Round 1 2025-04-09; Round 2 2025-08-26; Round 3 2026-07-23 (page as retrieved 2026-10-03)) | reconciled | complete: 10 entries reconciled from this dated listing (accessed 3 Oct 2026) |
| US | NRIC Nuclear Energy Launch Pad; first selections (Idaho National Laboratory / National Reactor Innovation Center (DOE); News release 2026-04-27 (archived copy 2026-09-25)) | reconciled | complete: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: the archived copy was used. The second-round release (nric-selects-new-nuclear-energy-launch-pad-participants...) is also 403 and has no archived copy, so it is not enumerated here. |
| US | DOE site selection for AI data centre and energy infrastructure on DOE lands (U.S. Department of Energy; Release 2025-07-24) | reconciled | complete: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Later RFAs (Sept-Oct 2025) and any partner selections were not found in the pages opened. |
| US | U.S. Army Janus Program; vendor and installation selections (U.S. Army (army.mil); Release 2026-08-26) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 3 Oct 2026) |
| US | Department of the Air Force ANPI microreactor selections (as reported by World Nuclear News) (World Nuclear News (reporting DAF/DIU); Article 2026-04-24) | reconciled | complete: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Trade-press report used because no DAF primary URL was available without search |
| US | DOE RFI for state-hosted Nuclear Lifecycle Innovation Campuses (U.S. Department of Energy; Release 2026-01-28 (responses due 2026-04-01)) | incomplete | partial: a single request for information with no selections. 1 entries reconciled (accessed 3 Oct 2026); access limits: State responses / any selections were not found in the pages opened. |
| US | Texas Advanced Nuclear Energy Office; news page and Texas Advanced Nuclear Development Fund pages (Office of the Texas Governor (TANEO); pages as retrieved 2026-10-03 (latest news item dated December 23, 2025)) | reconciled | complete: 1 entries reconciled from this dated listing (accessed 3 Oct 2026) |
| US | Utah Office of Energy Development; Operation Gigawatt and nuclear resource pages (pages as retrieved 2026-10-03) | incomplete | partial: program pages, not a listing. 1 entries reconciled (accessed 3 Oct 2026) |
| US | Tennessee Governor release: Tennessee selected as DOE Nuclear Lifecycle Innovation Campus finalist (Office of the Governor of Tennessee (tn.gov); Release Tuesday, July 28, 2026) | incomplete | partial: a single release, not a listing. 3 entries reconciled (accessed 3 Oct 2026); access limits: Tennessee Nuclear Energy Fund award lists were not found on the governor's news listing as retrieved (latest items July 2026); not enumerated. |
| US | WNA 'Nuclear Power in the USA' (discovery); state programme items (World Nuclear Association (Information Library); page as retrieved 2026-10-03) | incomplete | partial: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| US | TVA SMR announcements (TVA newsroom unreachable; enumerated via NRC, partner and vendor releases) (Tennessee Valley Authority / NRC / GE Vernova / NuScale / Kairos Power; as of 2026-10-03) | incomplete | partial: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: TVA IRP not opened; SEC EDGAR 10-K not used (identification_required policy). |
| US | Duke Energy SMR announcements (Belews Creek ESP; Purdue study) (Duke Energy / NRC; as of 2026-10-03) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: News-center search only shows 10 results per page in the fetched view; Duke Carolinas and Indiana IRP documents not opened |
| US | Dominion Energy SMR announcements (Virginia and South Carolina) (as of 2026-10-03) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Press-release listing not server-rendered; IRP not opened. |
| US | Santee Cooper nuclear announcements (as of 2026-10-03) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Newsroom not paged; 2023 IRP not opened. |
| US | Georgia Power new-nuclear site studies (PSC filing, reported) (Georgia Power (PSC filing 2026-09-10, via AJC); 2026-09 filing) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Georgia PSC docket document not opened; Alabama Power and Mississippi Power not checked. |
| US | AEP SMR site announcements (I&M Rockport; Appalachian Power Joshua Falls) (American Electric Power / NRC; AEP news 2025-01-17; NRC notice of intent ML25064A317) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: AEP news archive not paged; IRPs not opened. |
| US | FPL Ten Year Power Plant Site Plan 2026-2035 (Florida Power & Light Company (NextEra Energy); April 2026) | incomplete | partial: the plan was searched for SMR terms, not reconciled row by row. 1 entries reconciled (accessed 3 Oct 2026) |
| US | NextEra Energy new-nuclear statements (Q1 2026 call, reported) (NextEra Energy (via World Nuclear News)) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: NextEra IR site and SEC 10-K not used (EDGAR identification_required policy). |
| US | Constellation Energy new-nuclear announcements (as of 2026-10-03) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Press-release listing failed to load; SEC 8-K not used. |
| US | Vistra investor news (Vistra Corp.; first page as of 2026-10-03 (2026-07-29..09-29)) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Only first page of IR news read; no SMR item visible. |
| US | Entergy newsroom and Holtec-Entergy MOA (Entergy / Holtec International; Entergy newsroom 2026-09-25..10-02; Holtec release 2026-08-04) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Entergy newsroom archive not paged. |
| US | Holtec news (Holtec as owner-host of Palisades and Oyster Creek) (Holtec International; news page as of 2026-10-03) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Only host-site items recorded here. |
| US | Talen Energy / Amazon expanded nuclear relationship release (Talen Energy (GlobeNewswire); 2025-06-11 (archived copy 2026-01-06)) | incomplete | partial: a single release, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: Live IR page timed out (read via web.archive.org). |
| US | NPPD newsroom press releases (nuclear items) (Nebraska Public Power District; press-release listing as served 2026-10-03; releases dated 2025-12-01 and 2026-05-20) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Listing shows only recent releases; older nuclear releases (e.g. 2023 siting-study start) found via search, not by paging the archive; www.nppd.com/news returned a not-found error (HTTP 404) |
| US | APS, SRP and TEP Continue New Nuclear Exploration for Arizona (news release) (Pinnacle West Capital Corp. (APS); release dated 2026-06-24) | incomplete | partial: a single release, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: not bypassed |
| US | PacifiCorp 2025 Integrated Resource Plan, Volume I (2025 IRP Volume I, March 31, 2025) | incomplete | partial: the plan was searched for SMR terms, not reconciled row by row. 2 entries reconciled (accessed 3 Oct 2026) |
| US | TerraPower newsroom; host-utility items in this segment (news listing as served 2026-10-03 (62 items, 2021-08-12 to 2026-08-31)) | reconciled | complete: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Evergy investor-relations copy of the Kansas release timed out (60 s); TerraPower listing used |
| US | TerraPower Natrium Reactor Project (county post and proposal) (Greenwood County, Kansas; post dated 2025-11-13) | incomplete | partial: a single county post, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: Proposal PDF linked from the post not opened |
| US | Idaho Power 2025 Integrated Resource Plan (final) (Idaho Power Company; June 2025 final IRP) | incomplete | partial: the plan was searched for SMR terms, not reconciled row by row. 1 entries reconciled (accessed 3 Oct 2026) |
| US | Energy Northwest news releases, 2025 and 2026 categories (category listings as served 2026-10-03 (2026: 9 releases to 2026-08-20; 2025: 10 releases)) | reconciled | complete: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: 2024 and earlier categories not enumerated (Cascade 2024 announcement already a record) |
| US | Grant PUD Nuclear Power page and Road W (Marlin) property Q&A post (Public Utility District No. 2 of Grant County; pages as served 2026-10-03 (Q&A post dated 'March 28', year not shown)) | incomplete | partial: a project page and one post, not a listing. 1 entries reconciled (accessed 3 Oct 2026); access limits: Grant PUD newsroom/commission minutes not enumerated |
| US | NIPSCO 2024 Integrated Resource Plan (Northern Indiana Public Service Company; 2024 IRP (document headed 'NIPSCO 2024 Summary')) | incomplete | partial: the plan was searched for SMR terms, not reconciled row by row. 1 entries reconciled (accessed 3 Oct 2026) |
| US | Ameren Missouri updates 20-year energy roadmap (2026 IRP news release) (Ameren Missouri (via PR Newswire); release dated 2026-09-28) | incomplete | partial: a single release; the full plan filing was not opened. 1 entries reconciled (accessed 3 Oct 2026); access limits: Full 2026 IRP filing at the Missouri PSC not opened |
| US | NYPA advanced nuclear press releases (2026) (New York Power Authority; release dated 2026-06-23 ('One Year In...'); 2026-01-07 solicitations release found) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: NYPA press-release archive not paged; 2026-01-07 release not opened directly |
| US | UAMPS news page (Utah Associated Municipal Power Systems; page as served 2026-10-03 (newsletter items to 2026-05-13)) | reconciled | complete: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Press-release PDF undated on the listing; not opened |
| US | Press discovery for named hosts without a primary announcement (various) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: not retried |
| US | Amazon nuclear / SMR announcements (Amazon.com Inc. (with Energy Northwest, Dominion, X-energy, Talen, Constellation); aboutamazon page Oct 2024; Constellation release 2026-09-30) | incomplete | partial: 5 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: aboutamazon newsroom not enumerated page by page; Amazon-X-energy-KHNP-Doosan item (Aug 2025) seen only as a WNN title and not opened |
| US | Meta nuclear energy projects release (Meta Platforms Inc.; release dated 2026-01-09) | incomplete | partial: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Earlier Meta nuclear items (Dec 2024 RFP, Jun 2025 Clinton PPA) not opened; no primary found naming sites for the Meta-funded Natrium units |
| US | Microsoft nuclear announcements (via WNN site search) (Microsoft Corp. (with Constellation, Aalo Atomics); WNN items 2024-09 to 2026-03) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Microsoft newsroom not enumerated; Aalo collaboration item read from WNN title only |
| US | Switch; Oklo master power agreement (Switch (data centres) / Oklo; WNN item 2024-12-18) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Oklo/Switch primary release not opened (Oklo investor copy available); Switch newsroom not enumerated |
| US | Oklo; Wyoming Hyperscale (Prometheus Hyperscale) LOI (Oklo Inc. / Prometheus Hyperscale; Oklo release 2024-05-23; Prometheus news 2024-09-04) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Prometheus newsroom not enumerated beyond the 2024-09-04 item |
| US | Fermi America news page (news page as of 2026-09-28 (9 items listed)) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Only first index page read; earlier items not paginated |
| US | Elementl Power website and newsroom (newsroom newest item 2026-09-21) | reconciled | complete: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: none |
| US | Oklo Projects & Deployments pages (Oklo Inc.; pages live 2026-10-03 (Alaska, Idaho, Ohio, Tennessee, Texas)) | reconciled | complete: 5 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Alaska and Texas state pages not opened (projects already matched to records/ledger by name). |
| US | Deep Fission sites page and press releases (Deep Fission, Inc.; sites page live 2026-10-03; press releases pages 1-4 (38 items, 2024-08-22 to 2026-10-01)) | reconciled | complete: 6 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: none |
| US | Aalo Atomics website and updates (updates list newest 2026-08-04) | reconciled | complete: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: none |
| US | Radiant news page (archived copy) (Radiant Industries; archived copy 2026-09-25, page 1 of 5 (items 2026-04-22 to 2026-09-09)) | incomplete | partial: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Live site 403 (not bypassed); archived pages 2-5 not as read (Wayback 404). |
| US | Terrestrial Energy investor news releases (archived copy) (Terrestrial Energy Inc.; archived copy 2026-05-06; 2026 items 2026-01-06 to 2026-05-06) | incomplete | partial: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Live site timed out; items after 2026-05-06 and the 2025 year view not read. |
| US | Valar Atomics website (home page live 2026-10-03) | incomplete | partial: a home page with no news list. 1 entries reconciled (accessed 3 Oct 2026); access limits: No newsroom; only home page and its links. |
| US | Natura Resources press releases (page 1 of 3 (2026-02-03 to 2026-09-18)) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Pages 2-3 (before Feb 2026: ACU MSR-1 permit, RELLIS, Texas funding items) not read. |
| US | Hadron Energy stories (news) (91 items, 2024-08-09 to 2026-09-10) | reconciled | complete: 3 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: none |
| US | BWXT news and 2025 archive (BWX Technologies; 2026 page (newest 2026-10-01) and 2025 archive) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: 2024 and earlier archives (BANR Green River/Tata, Wyoming Energy Authority) not read. |
| US | General Atomics press releases (2026) (2026 year view) | incomplete | partial: 1 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Earlier years not read; /news returned a not-found error (HTTP 404). |
| US | Deployable Energy blog (posts to 2026-08-28) | reconciled | complete: 4 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: none |
| US | Terra Innovatum media page (media coverage list, undated items to 2026) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: investors.terrainnovatum.com timed out (60 s); company press releases not enumerated; media page is third-party coverage. |
| US | CORE POWER website (home page live 2026-10-03) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: One news-resources article (from technology to deployment) not opened; items in the August 2026 roundup are third-party press summaries. |
| US | NRIC Nuclear Energy Launch Pad; second selections (Idaho National Laboratory / National Reactor Innovation Center (DOE); news release 2026-08-24, archived copy 2026-09-08) | reconciled | complete: 13 projects from 12 companies reconciled from this dated listing (accessed 3 Oct 2026); access limits: the live release refuses automated access, so the archived copy was used; the release names companies only, so project identities come from company releases and trade press, and the Oklo and Valar projects remain unidentified. Five projects are fuel-cycle work, not reactors. |
| US | U.S. Energy Information Administration, Today in Energy: small modular reactor future development projects (article 2026-04-27, data as of February 2026) | reconciled | complete: 36 project rows reconciled from this dated table (accessed 3 Oct 2026); the article's five design tables (30 designs) list designs, not deployments. Two state entries conflict with primary sources (Antares Mark-0 and Project TETRA shown in Utah) and are not adopted. |
| US | DOE Idaho Operations Office NEPA categorical exclusion determinations (listing pages 1-10, determinations listed 2025-01-14 to 2026-06-15) | incomplete | partial: the 100 most recent determinations as listed (pages 1-10) were reconciled (accessed 3 Oct 2026); earlier pages were not read. 42 concern reactors, test beds or reactor fuel; the others name no reactor. |
| US | INL / NRIC test-bed review presentation (Idaho National Laboratory; GAIN-hosted slides, March 2026) | incomplete | partial: a presentation, not a listing (accessed 3 Oct 2026). Test-bed entries reconciled: DOME (Kaleidos, Unity), LOTUS (MCRE), TREAT (MARVEL), RACE at MFC-793 (Antares, VALKRE). |
| US | DOE NEPA record CX-035322: VALKRE kilowatt-class reactor experiment (U.S. Department of Energy, Idaho Operations Office; approved 2025-07-24) | incomplete | partial: a single record (accessed 3 Oct 2026). Covers only a non-radiological mock-up; the later nuclear demonstration's SMR or microreactor qualification is not stated, so it stays an open question. |
| US | Antares Nuclear updates listing (42 items, 2023-10-31 to 2026-09-17, as served 2026-10-03) | reconciled | complete: the listing as served was reconciled (accessed 3 Oct 2026); deployment items are the INL Central Facilities Area siting, Joint Base San Antonio, Fort Bragg and the Mark-0/Mark-1 tests; the R1-S space reactor demonstration names no site. |
| US | Georgia PSC staff report on Georgia Power plant held for future use (Georgia Public Service Commission) | incomplete | partial: the report was searched for nuclear site statements, not reconciled row by row (accessed 3 Oct 2026). Stewart County land is held for a possible new nuclear plant; no technology or SMR is stated. |
| US | Nebraska Public Power District Next Generation Nuclear: frequently asked questions (finalist communities) | reconciled | complete: the four finalist communities listed (Beatrice, Brownville, Norfolk, Sutherland) were reconciled (accessed 3 Oct 2026); no site has been selected. |
| US | Duke Energy 2025 Carolinas Resource Plan filing release (Duke Energy; 2025-10-01) | incomplete | partial: a single release (accessed 3 Oct 2026). Belews Creek is the SMR site; W.S. Lee is for a large reactor. |
| US | Dominion Energy Virginia 2025 Integrated Resource Plan update (Dominion Energy; 2025) | incomplete | partial: the plan was searched for SMR site statements, not reconciled row by row (accessed 3 Oct 2026). |
| US | LG&E and KU collaborate with X-energy to explore nuclear energy (LG&E and KU; release 2026-04-30) | incomplete | partial: a single release (accessed 3 Oct 2026). Statewide exploration; no site. |
| US | Prometheus Hyperscale launch release naming its Evanston, Wyoming flagship (Prometheus Hyperscale; 2024-09-04) | incomplete | partial: a single release (accessed 3 Oct 2026). Oklo is to supply 100 MW to its data centers; no powerhouse site is stated. |
| US | Selected US utilities: one check each of public resource plans and releases (25 utilities, including FirstEnergy, Oglethorpe, JEA, Dairyland, MidAmerican, Platte River, Puget Sound Energy, DTE and Minnesota Power) | incomplete | partial: one check of each utility's public material, not a full enumeration (accessed 3 Oct 2026). No named-site SMR proposal; Dairyland's Genoa site is a press-reported consideration only. |
| US | Nuclear Innovation Alliance - U.S. Nuclear Energy Project Tracker (page + Airtable interface embed), not verifiable (prior label 'Last updated: 9/16/2026', 31 rows) | incomplete | partial: access blocked (JavaScript-only Airtable interface; the GET-only fixed-header fetcher cannot load its data calls; no headless browser used.). Page HTML and the Airtable embed shell were fetched; the label and the 31 rows are rendered client-side by Airtable and are absent from both responses. a rendered-text read of the embed also shows no table data. Label and row count could NOT be re-verified; no changed/new rows can be reported. |
| US | NRC Advanced Reactor Application Projects (U.S. NRC), Page Last Reviewed/Updated Thursday, June 18, 2026 (unchanged) | reconciled | complete: Same 6 rows as 2026-10-02 (Eden, Pioneer LWA, UIUC KRONOS, Long Mott, TVA Clinch River CPA, Belews Creek ESP). No entries added since 3 Oct. Blue Energy CPA Part 1 (Sept 2026) and Holtec's 2 Oct 2026 PSAR (CPA part 2) are still not reflected on this page. |
| US | NRC Pre-Application Activities for Advanced Reactors (U.S. NRC), Page Last Reviewed/Updated Friday, October 02, 2026 (same label as the prior 2026-10-02 retrieval) | reconciled | complete: Update label unchanged since the prior complete enumeration; no entries dated after 3 Oct 2026. Sub-pages not re-opened. |
| US | NRC expected new reactor applications PDF (U.S. NRC), unavailable | incomplete | partial: Second attempt (first on 2026-10-02): a server error (HTTP 503) with a 'Page Not Found' body; document appears withdrawn after the NRC site reorganisation. Not retried further. |
| US | Westinghouse news release: eVinci Microreactor Achieves Zero-Power Criticality (25 Aug 2026) (Westinghouse Electric Company), 2026-08-25 | incomplete | partial: Single release, opened to settle IAEA/PAT/016 reference [12]. |
| US | NRC News Releases 2026 index (U.S. Nuclear Regulatory Commission), 2026 list read 2026-10-06 | reconciled | complete: Whole 2026 list read; no release dated after 2026-10-03 exists (newest 26-079, Clinch River construction permit). |
| US | DOE energy.gov newsroom and Office of Nuclear Energy landing page (U.S. Department of Energy), read 2026-10-06 | incomplete | partial: First newsroom page plus the NE landing page; items dated 3-6 Oct 2026 checked (cladding funding, Vistra uprate loan, Alaska transmission). /ne/listings/ne-news returned a not-found error (HTTP 404). |
| US | ANS Nuclear Newswire front page and SMR / microreactor tags (American Nuclear Society), read 2026-10-06 | incomplete | partial: Headline lists read; one new-reactor article (5 Oct, Valar Utah) opened. |
| US | SMR vendor newsrooms (NuScale, Holtec, X-energy, GE Vernova, Westinghouse, TerraPower, Radiant, Oklo, BWXT) (various), read 2026-10-06 | incomplete | partial: First list page of each; no SMR site announcement dated after 3 Oct except the BWXT/Prodigy item. Oklo and TerraPower pages carried no parseable dates. Pages 404/403/timeout: Aalo, Deep Fission, Valar /news, Last Energy /news, Kairos /news, Bruce Power /news, OPG /news (403), INL /news (403), Alberta /news (403), NANO Nuclear IR (timeout), Antares (DNS). |
| US | Neutron Bytes RSS (Neutron Bytes (blog)), feed read 2026-10-06 | incomplete | partial: 10 newest posts; nothing dated after 3 Oct. |
| US | Google News RSS: "small modular reactor" and "microreactor", last 3-4 days (US and Canada editions), read 2026-10-06 | incomplete | partial: 45 headlines across three feeds (gnews-na-smr-3d, gnews-na-micro-3d, gnews-ca-smr-4d). New North American SMR items after 3 Oct: BWXT BANR at Belledune (5 Oct) and Deployable Energy NUB DOME slot (existing). Toshiba 4S revival commentary (ANS, 5 Oct) not opened. |
| US | Nuclear Engineering International news list and NUB DOME article, 5 October 2026 | incomplete | partial: One article read. |
| US | Utah School and Institutional Trust Lands Administration board memorandum, 20 August 2026, and 17 September 2026 approval transcript | incomplete | partial: The Valar memorandum and the approval vote were read. SULA 2095-OBA covers up to 640 acres near Wellington. No reactor model or unit output. Not a statewide project list. |
| US | Bureau of Land Management ePlanning search path for Valar Atomics | incomplete | partial: access blocked. The search path returned a not-found error (HTTP 404) and is not an application record. Do not retry this URL. |
| US | Federal Register: NRC notices in 2026 on construction permit, early site permit, combined licence, operating licence and standard design actions (1 January to 9 October 2026) | reconciled | complete: 92 notices returned by the dated query reconciled: 28 concern existing records, 37 are operating-fleet lists or guidance, 11 concern operating large units, 7 are site context (North Anna early-site-permit renewal, a corporate license transfer, Oyster Creek), 5 are isotope facilities, 3 are large-reactor items and 1 is a large-reactor-era early site permit renewal. No new SMR deployment; the KRONOS docketing was added. |
Uruguay · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| UY | Energy for Growth Hub LatAm Nuclear Update June 2026 (Uruguay section) | incomplete | partial - secondary claim of legal nuclear prohibition; primary Uruguayan statute not opened this pass; no deployment |
Uzbekistan · 5 cited routes
Published project records for Uzbekistan (1): RITM-200N Jizzakh. All Uzbekistan records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| UZ | Trend.az citing the Uzbek Industrial, Radiation and Nuclear Safety Committee (2026-06-05) + WNA Uzbekistan | incomplete | partial - Construction license issued for a RITM-200N unit. Configuration is 2 RITM-200N + 2 VVER-1000 (agreed Sept 2025). The ase-ec.ru release was unreachable (ECONNREFUSED). |
| UZ | WNA 'Nuclear Power in Uzbekistan' (discovery) (World Nuclear Association (Information Library); Updated Wednesday, 30 September 2026) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| UZ | Rosatom Newsletter (English) articles (State Atomic Energy Corporation Rosatom; issues dated 2026-01-26 ('New Era of Nuclear Energy'; 'More Than Just Energy')) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Only two newsletter articles read; archive not enumerated. |
| UZ | Atomic-energy.ru news: RITM-200N unit in Farish district, Jizzakh region (four articles, 24 March to 31 July 2026) | incomplete | partial: four news articles read in full, not a listing. Status events on the existing Jizzakh record. The Uzbek agency's own site could not be reached. |
| UZ | Uzbekistan small plant: Strana Rosatom "Росатом и правительство Узбекистана подписали дорожную карту" (2026-03-25); PRIME/RIA "В Узбекистане утвердили схему размещения АСММ" (2025-05-08, citing Uzatom); atomic-energy.ru Uzbek NPP tag and WNS item (2026-09-28) (Strana Rosatom; PRIME (RIA Novosti); Атомная энергия 2.0), 2025-05-08 to 2026-09-28 | incomplete | partial: Three articles and one tag page (all 2025-2026 headlines screened). No second Uzbek small-plant site and no change to the two-RITM-200N count found. |
Vietnam · 10 cited routes
No published project record for Vietnam in this release. All Vietnam records and agreements.
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| VN | WNA 'Nuclear Power in Vietnam' (discovery) (World Nuclear Association (Information Library); Updated Wednesday, 12 August 2026) | incomplete | partial: 2 entries reconciled from this dated listing (accessed 3 Oct 2026); access limits: Discovery profile, not a government source |
| VN | Strategy for development of atomic energy for peaceful purposes approved (VGP English news) (Vietnam Government Portal (baochinhphu.vn)), 2026-03-17 | incomplete | partial: official government news summary of Decision 438/QD-TTg; full decision text not opened |
| VN | Phe duyet Chien luoc phat trien, ung dung nang luong nguyen tu vi muc dich hoa binh den nam 2035, tam nhin den nam 2050 (EVN (Vietnam Electricity)), 2026-03-17 (decision signed 2026-03-16) | incomplete | partial: state-utility summary of Decision 438/QD-TTg read in full; gives 2035 and 2050 nuclear targets; names only Ninh Thuan 1/2 as plants; SMR target has no site |
| VN | Phe duyet Chien luoc phat trien nang luong nguyen tu vi muc dich hoa binh (VietnamPlus (VNA)), 2026-03 (page body not extracted) | incomplete | partial: page fetched (HTTP 200) but article body not present in static HTML; superseded by EVN copy |
| VN | WNA 'Nuclear Power in Vietnam' (World Nuclear Association (Information Library)), Updated Wednesday, 12 August 2026 (same edition as index) | incomplete | partial: re-read for SMR items only; no SMR project or site named; Ninh Thuan 2 partner selection planned Q3 2026 |
| VN | Dong Nai muon tien phong thi diem du an Nha may dien hat nhan dung lo phan ung mo-dun nho (VnEconomy), 2026-07-01 | incomplete | partial: single article on the Dong Nai city implementation plan for Decision 438; the city plan itself not opened |
| VN | Thong diep tu hoi thao trien khai, an toan, cap phep lo phan ung mo-dun nho (SMR) tai Viet Nam (Tap chi Nang luong Viet Nam), 2026-02-04 (workshop 2026-02-03) | incomplete | partial: single workshop report read in full |
| VN | Vietnam can master small modular reactor technology by 2040: top scientist (VnExpress International), 2025-10-06 | incomplete | partial: single interview; found via the site's own search page (e.vnexpress.net/search) which returned one hit |
| VN | VnExpress site search (Vietnamese: 'lo phan ung mo-dun nho'; 'SMR hat nhan') and e.vnexpress search 'small modular reactor', retrieved 2026-10-06 | incomplete | partial: Vietnamese search returned no results for both phrasings (vn_vnexpress_search_smr.html, vn_vnexpress_search_smr2.html); English search returned one item (opened) |
| VN | Vietnam signed Decision 438 | incomplete | partial - signed 20-page decision read; 2035 and 2050 SMR targets, no named deployment |
Yemen · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| YE | Yemen delegate statement in IAEA General Conference official record, 19 September 2007 | incomplete | partial - delegate described nuclear-electricity talks and three unnamed sites under study in 2007; the statement does not qualify them as SMRs or establish that the program remains active in 2026 |
Zambia · 1 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| ZM | Zambia Ministry of Technology and Science presentation to IAEA INPRO | incomplete | partial - November 2025 ministry presentation says land-based and SMR options are under study; the cited 2,000 MW Russia agreement is not an SMR and no named SMR deployment is given |
Zimbabwe · 2 cited routes
| Country | Source inventory | Status | Snapshot note |
|---|---|---|---|
| ZW | Zimbabwe Ministry of Energy and Power Development: home page | incomplete | partial - home page read 2026-10-10; it lists no nuclear-power item. Not a project listing. |
| ZW | World Nuclear News, 27 August 2025: KHNP and Zimbabwe's Centre for Education, Innovation Research and Development agree an i-SMR preliminary feasibility study | incomplete | partial - single article: a memorandum for a preliminary feasibility study, expert training and information sharing; no site, plant or deployment commitment (program context). |
Coverage gaps without a single source
Routes that were not opened or searches that gave no single citable source. They record limits, not evidence.
| Country | Route | Limit |
|---|---|---|
| US | General web search (discovery only) | partial - Discovery searches were limited, so the remaining discovery used direct newsroom and regulator pages. Coverage gaps are listed in the operator and vendor routes. |
| CA | Provincial programs not enumerated (Nova Scotia, Quebec, Yukon/NWT, Alberta X-energy/ATCO, Bruce Power SMR, NPX, Hatch, First Nations partnerships, N. Ontario mining) | partial - Not researched in this pass; no sources were opened, so no candidates are recorded. |
| SE | SSM license register | partial - Not opened in this pass. Swedish new-build applications go first to the Government under the Act on Government Approval of Nuclear Facilities; three are recorded above. |
| FI | STUK / Fortum / TVO | partial - STUK not enumerated. No Fortum or TVO SMR site project found (Loviisa EIA was life extension only). Not exhaustive. |
| Cross-border | Countries with no candidate found | partial - IE, BE, LU, DE, AT, ES, PT, DK, IS, LV: no sited SMR deployment found. Not exhaustively searched: BE (SCK CEN LFR program), DK (Saltfoss/Copenhagen Atomics), Core Power, Allseas, MoltexFLEX, Urenco and OKG were not checked in this pass. |
| Cross-border | General web search (discovery only) | partial - Discovery searches were limited; the rest used direct reads of known primary and press pages and sitemaps. Kyrgyzstan, Tajikistan, Kazakhstan, Sakhalin, Kola and Turkey therefore have thinner coverage. |
| Cross-border | Countries not separately checked | partial - Not separately checked: QA, KW, OM, BH, IQ, SY, LB, IL, MA (beyond aggregator), TN, SN, NE, CI, CM, CD, MG, TZ, ET, SD, ZM, ZW, NA, BW, CL, PE, BO, PY, UY, CO, DO, CU, GT; INIR mission reports not individually opened; IAEA ARIS not queried. |
| Cross-border | General web search (discovery only) | partial - Discovery searches stopped partway through. Not attempted: Ghana Hansard; CNNC Ghana HTR; Philippine DOE/NEPIO, DTI/BOI and Senate/House; CNNC/China–Iran statements. Later routes used direct primary-site navigation and public APIs only. |
| CN | keyword search discovery queries (Chinese), before the shared session search allowance ran out | partial: result titles only, no single citable source. 12 queries ran (SMR 2026 start, Linglong follow-on, TMSR 10 MW, heating reactors, TMSR EIA, NNSA 2026 licenses, floating reactors, HTGR 2026, 300 MWe compact PWR, lead-bismuth, Linglong Two/ACP100+); then the shared 200-search session search allowance was exhausted, blocking 4 further queries (State Council 2026 approvals, CNOOC-CNNC floating, SPIC HAPPY200 2026, provincial 15th FYP small-reactor sites). |
| Cross-border | Web search discovery queries (Russian and English): АСММ 2026 соглашение площадка; Ростехнадзор лицензия на размещение АСММ 2026; Kyrgyzstan/Tajikistan RITM-200N 2026; Киргизия малой мощности; Таджикистан АСММ; Беларусь АСММ; Монголия РИТМ-200; Узбекистан вторая АСММ; Елена-АМ площадка; Витязь; плавучий энергоблок 2026; АСММ Красноярский/Архангельск/Хабаровск/Камчатка; Калининград энергофлот (x2); энергофлот; 62 малых реактора | partial: result titles only, no single citable source. 16 queries returned results; further queries were refused by the session search cap, so discovery continued through site searches (Kremlin, Strana Rosatom) and tag pages. |
| HU | Keyword search: Mátra erőmű kis moduláris reaktor SMR telephely 2026 | partial: result titles only, no single citable source. Ten results; Telex, Portfolio and Atombiztos followed up |
| SI | Keyword search: Slovenia SMR Šoštanj GEN energija small modular reactor site 2026 | partial: result titles only, no single citable source. result titles only; Chapter Zero Slovenia and US Embassy pages not opened |
| UA | Keyword search: Energoatom Holtec SMR-300 site Ukraine 2026 | partial: result titles only, no single citable source. result titles; Ukrinform Nov 2024 article opened by a rendered-text read (three US-Ukraine SMR program projects, no site) |
| UA | Keyword search: Енергоатом ММР майданчик 2026 Холтек SMR-300 Хмельницька AP300 | partial: result titles only, no single citable source. result titles; Interfax-Ukraine opened |
| BG | Keyword search: Bulgaria SMR site Maritsa East Bobov Dol BWRX-300 Blue Bird Energy 2026 | partial: result titles only, no single citable source. result titles only; matches existing BG program row |
| IT | Keyword search: Italia SMR sito ... Edison newcleo localizzazione 2026 | partial: result titles only, no single citable source. ANSA followed up |
| DK | Keyword search: Danmark atomkraft SMR 2026 ... Copenhagen Atomics placering | partial: result titles only, no single citable source. KEFM release followed up |
| TR | Keyword search: Türkiye SMR sahası 2026 ... EÜAŞ TÜNAŞ ARC IC İçtaş | partial: result titles only, no single citable source. WNN followed up |
| BE | Keyword search: België SMR locatie Doel Tihange ... 2026 Engie SCK CEN | partial: result titles only, no single citable source. Two result sets; no Belgian SMR site beyond Mol |
| LT | Keyword search: Lietuva mažieji moduliniai reaktoriai SMR aikštelė 2026 | partial: result titles only, no single citable source. result titles only |
| LV | Keyword search: Latvenergo mazie modulārie reaktori SMR atrašanās vieta 2026 | partial: result titles only, no single citable source. KEM release followed up |
| FI | Keyword search: Steady Energy LDR-50 new site agreement 2026 | partial: result titles only, no single citable source. Steady newsroom followed up |
| NO | Keyword search: Norsk Kjernekraft melding 2026 ny kommune | partial: result titles only, no single citable source. Lokasjoner page followed up |
| FR | Keyword search: Jimmy Energy deuxième site générateur thermique 2026 | partial: result titles only, no single citable source. result titles only |
| FR | Keyword search: Blue Capsule réacteur site implantation 2026 | partial: result titles only, no single citable source. result titles only; no reactor site named |
| GB | Keyword search: Last Energy UK new site PWR-20 2026 | partial: result titles only, no single citable source. result titles only |
| GB | Keyword search: newcleo UK site 2026 | partial: result titles only, no single citable source. result titles; bears on the open High Marnham row (no newcleo UK site expected) |
| GB | Keyword search: UK SMR data center 2026 site announced | partial: result titles only, no single citable source. result titles only |
| GB | Keyword search: UK advanced nuclear framework pipeline 2026 projects named sites | partial: result titles only, no single citable source. HSF Kramer report returned an access refusal (HTTP 403) to a rendered-text read |
| GB | Keyword search: GBE-N second SMR site 2026 Oldbury | partial: result titles only, no single citable source. WNN Jacobs articles followed up |
| GB | Keyword search: MoltexFLEX FLEX reactor first site 2026 | partial: result titles only, no single citable source. result titles only |
| PL | Keyword search: Poland SMR 2026 new location decision in principle | partial: result titles only, no single citable source. result titles only |
| NL | Keyword search: SMR Nederland locatie 2026 Chemelot Eemshaven Borssele gemeente | partial: result titles only, no single citable source. Opmeer and Gelderland followed up; Shell NL 'Venster 2026 SMR' page returned no body to a rendered-text read |
| CZ | Keyword search: ČEZ malý modulární reaktor nová lokalita 2026 | partial: result titles only, no single citable source. result titles only |
| RO | Keyword search: Nuclearelectrica RoPower al doilea amplasament SMR 2026 | partial: result titles only, no single citable source. WNN Jul 2026 followed up |
| EE | Keyword search: Fermi Energia tuumajaam asukoht riigi eriplaneering 2026 | partial: result titles only, no single citable source. riigiplaneering.ee followed up |
| Cross-border | keyword search discovery (session search tool) before its shared search allowance ran out | partial: result titles only, no single citable source. Nine queries (ENEC SMR 2026; Saudi SMART; Jordan JAEC; ENEC Arabic; ENEC US investment; Saudi 2026 SMR; Australia private proposal; Oman/Qatar/Kuwait; Iraq; Israel Negev; Fort Foundry One; SMART100 status; Aramco/NEOM/SEC; Saudi Arabic). Tool then refused further searches (session search allowance exhausted). |
| Cross-border | keyword search discovery queries (Spanish/Portuguese/English) for Argentina, Brazil, Mexico, Chile, Colombia, Peru, Bolivia, Paraguay, Uruguay, Ecuador, El Salvador, Dominican Republic, Jamaica, Puerto Rico, Guyana/Trinidad/Panama | partial: result titles only, no single citable source. About 25 queries before the shared session search allowance ran out; Chile, Uruguay, Guyana, Trinidad and Panama are known only from result titles (no deployment item). |
Acquisition channels with limits
| Channel | Status | Note |
|---|---|---|
| GEM official workbook | download requires a form | Access condition: GEM's form (name, email, organization, use statement) was not submitted, so the workbook and its NOTICE sheet were not read. GEM's download text names CC BY 4.0. The public map layer and the CC BY 4.0 NuclearChain export were used instead. |
| NEA Dashboard edition 4 | enumerated; license terms not found | Corrected 2026-10-02: the direct dashboard URL returns a Cloudflare block, but the public Power BI report embedded on the NEA landing page was read: 95 designs and 147 named siting entries were enumerated. No license statement was found and the NEA/OECD terms pages were not reachable, so only identity facts are used. The 61 tracked-but-not-included names are not published. |
| WNA Tableau tracker export | no row export offered | Availability limit: the dashboard's Download menu offers Image, Vector Image, PDF and PowerPoint only (checked 2026-10-02). Separately, WNA's permission page allows short attributed quotes. Nothing was copied. |
| NUWARD JER Phase2 PDF | unavailable | An access refusal (HTTP 403) prior; not retried. |
| HTMR-100 STL/Stratek host | unavailable | DNS/redirect failures prior; not retried. |
| NRC full applicant inventory pages | unavailable | Some 403/404 from this host; not retried without new route. |
| STUK Finland new-build page | unavailable | Prior 404; not retried. |
| IAEA ARIS live SMR booklet page | unavailable | The booklet page returned a not-found error (HTTP 404) earlier and was not retried. The ARIS technical design table (121 designs) and the 2024 SMR catalog PDF were enumerated instead. |
| ONR full new-reactor inventory | incomplete | Page fetched historically; not fully enumerated this pass. |
| SSM Sweden full SMR inventory | incomplete | Page fetched historically; not fully enumerated this pass. |
| USA NIA tracker | enumerated | Corrected 2026-10-02: all 31 rows of the tracker view labeled 16 September 2026 were enumerated and each mapped to one outcome (see the per-entry accounting). The view includes restarts and other non-SMR projects, which are recorded as outside scope. |
| China national SMR census | incomplete | Spot checks only; not a national inventory. |
| Russia Rosatom national inventory | incomplete | Named projects recorded; not full inventory. |
| Philippines STGR20 modular class | incomplete | Offer recorded; modular+host unresolved. |
| Iran Makran ACP100 primary | incomplete | WNA inference only; AEOI/IRNA modular/ACP100 unconfirmed. |
How counts work and what is published
What the counts measure
These are different measures and do not add up to one another. None of them is a count of projects; published projects are counted separately below.
| Measure | Count | Meaning |
|---|---|---|
| Source-register records | 18 | Named, dated sources with rights and access notes, including sources that could not be enumerated. |
| Reconciliation groups | 12 | Sources whose entries were mapped one by one (the GEM map layer is mapped separately from the NuclearChain export it mirrors). |
| Source-entry mappings | 4,785 | One outcome per source entry: 4,228 inventory entries plus 557 discovery-route entries. |
| Research-ledger rows | 1,479 | 226 canonical project rows plus 1253 research rows. |
| Research rows reviewed | 1,212 | Research rows with a recorded disposition. |
| Research rows still open | 41 | Each names the missing fact and the next route. |
Publication selection
Verified deployments: 222. Canonical project rows: 226. Program aggregates: 4. Mapped deployments: 151. Canceled or suspended deployments: 16. Drafts stay out of pages, exports and the sitemap. Program aggregates are not deployment counts.
Inventory accounting and source access
Source snapshots
| Source | Retrieved | Access | Enumerated | Reuse limit |
|---|---|---|---|---|
| NuclearChain reactors export, derived from GEM Global Nuclear Power Tracker, August 2026 | 2026-10-02 | Full CSV retrieved. Hash matches the 2026-10-01 snapshot. | rows: 1825; smr rows: 355; micro rows: 68; smr or micro rows: 423; site candidates: 169 | Structured discovery and attribution are allowed. Published facts still need SMR inclusion rules and primary verification. |
| GEM Global Nuclear Power Tracker workbook | 2026-10-02 | blocked | Not enumerated | No bulk republication. The download form was not submitted. Site coordinates come from the NuclearChain export instead. |
| GEM public map layer, August 2026 | 2026-10-02 | Layer retrieved. Feature count matches the NuclearChain unit count. | features: 1825 | Unit-count and coordinate cross-check only. Not copied into public downloads. Every SMRMap pin that cites GEM equals a point of the CC BY 4.0 NuclearChain reactors export, which is the coordinate source. |
| NEA SMR Digital Dashboard edition 4.0 | 2026-10-02 | partial | designs included: 95; named siting entries: 147; siting map points: 107; stated tracked: 156; stated not included: 61 | Design names, organization labels and short siting facts used as a discovery index. Grades, assessment text and parameters are not copied. |
| NEA Small Modular Reactor Dashboard: Third Edition | 2026-10-02 | Full PDF retrieved. Table 15 names extracted. | stated designs assessed: 74; stated technologies identified: 127; names extracted from table 15: 74 | Design names and the table's identity fields may be used with attribution. Assessment prose is not copied into the site. |
| IAEA ARIS technical design table | 2026-10-02 | Full 121-row response retrieved. | designs: 121 | Identity fields used as a discovery index. Thermal-hydraulic parameters are not republished. |
| IAEA Small Modular Reactor Technology Catalogue, third edition June 2025 | 2026-10-02 | Full PDF retrieved. The earlier web-reader size rejection does not apply to this local copy. | toc designs: 71 | Table-of-contents names used as a discovery index. Design prose is not copied. |
| World Nuclear Association SMR Global Project Tracker | 2026-10-08 | partial | Not enumerated | Not copied. |
| Nuclear Innovation Alliance U.S. Nuclear Energy Project Tracker | 2026-10-02 | Rendered Airtable view enumerated twice on 2026-10-02. | projects stated by view: 31; rows extracted: 31; rows changed since prior: 0 | Discovery pointer only. |
| NuclearChain SMR designs export | 2026-10-02 | Full CSV retrieved; hash unchanged from the 2026-10-01 snapshot. | designs: 26 | Identity mapping only; licensing fields are checked against primary records before use. |
| European Industrial Alliance on SMRs: project working groups (first batch) | 2026-10-02 | Full list retrieved. | project working groups: 9 | Design-level matches; the documents name no sites. |
| IAEA PRIS: units under construction at or below 350 MWe net | 2026-10-02 | Full under-construction list read; planned units are not tracked by PRIS. | units under construction: 78; at or below 350 mwe net: 4 | Cross-check only. |
| NEA SMR Digital Dashboard edition 4.0: named siting entries | 2026-10-02 | All 147 entries read from the 95 design detail pages; reuse limits are those listed under nea_dashboard_edition_4. | named siting entries: 147; with progress category: 107; siting map points: 107 | Entry identities only, kept in the research index; NEA text is not copied. |
| Country-by-source discovery routes (regulator, government, operator/host, vendor, news) | 2026-10-02 | Not an enumerable inventory: search routes are open-ended, so no fixed entry count exists. Each candidate found is one ledger row. | Not enumerated | Candidate identities and dispositions only. |
| IAEA ARIS publications: newer SMR catalog edition check | 2026-10-02 | ARIS publications list read; iaea.org year facets were Cloudflare-blocked. | newer editions found: 0 | Edition check only. |
| Worldwide omissions audit, 3 October 2026 (seven routes plus an independent blind challenge) | 2026-10-03 | Several sources were only partly read (search limits, bot challenges, refused connections); each route records its own access limits. | route entries: 1548; route sources: 393; blind entries: 194; evidence items: 45 | Facts paraphrased and linked; quotes stay in the research record. |
| Worldwide coverage pass, 6 October 2026 (current inventory editions; original-language regulator, government, operator and developer routes in seven regional bundles) | 2026-10-06 | Partial by design: the shared keyword-search allowance was exhausted early in every route, so later discovery relied on direct reads of regulator, ministry, operator and developer listings and on dated feeds; each route names its own access limits and blocked pages. | Not enumerated | Facts paraphrased and linked; quotations of 25 words or fewer stay in the research record. |
| Small Modular Reactor Technology Catalogue, 2026 edition (printed September 2026) | 2026-11-02 | Retained original PDF opened and hashed; 509 pages. | toc designs: 75 | Contents names used for identity reconciliation. Individually reviewed and cited facts inform original schematic comparisons, the reactor-type explainers and design type reviews; source prose, figures and tables are not redistributed or relicensed. |
Reconciliation
NuclearChain site candidates: 169. Other enumerated design and deployment-pointer rows: 1084.
Site candidates
| Disposition | Rows |
|---|---|
| Existing match | 73 |
| Program or historical context | 46 |
| Excluded | 6 |
| Outside scope | 42 |
| Unresolved | 2 |
Other enumerated rows
| Disposition | Rows |
|---|---|
| Existing match | 642 |
| Program or historical context | 278 |
| Outside scope | 116 |
| Unresolved | 39 |
| Duplicate | 9 |
Rows by source
| Source rows | Rows | Matched | Outside scope | Program or historical context | Unresolved |
|---|---|---|---|---|---|
| IAEA ARIS designs labeled SMR or microreactor | 78 | 78 | 0 | 0 | 0 |
| IAEA ARIS designs with other or unspecified size labels | 43 | 5 | 34 | 0 | 4 |
| Operator, vendor, news and independent discovery routes | 557 | 246 | 40 | 229 | 33 |
| European Industrial Alliance on SMRs project list | 9 | 9 | 0 | 0 | 0 |
| IAEA SMR catalog names not already listed | 3 | 3 | 0 | 0 | 0 |
| IAEA PRIS units under construction at or below 350 MWe | 4 | 4 | 0 | 0 | 0 |
| NEA digital dashboard edition 4.0 designs | 95 | 95 | 0 | 0 | 0 |
| NEA digital dashboard edition 4.0 siting map points | 147 | 105 | 0 | 42 | 0 |
| NEA dashboard third edition names not already in ARIS | 39 | 39 | 0 | 0 | 0 |
| Nuclear Innovation Alliance U.S. tracker | 31 | 24 | 6 | 0 | 1 |
| NuclearChain reactor export: SMR/micro size-class site candidates | 169 | 73 | 48 | 46 | 2 |
| NuclearChain SMR designs export | 26 | 26 | 0 | 0 | 0 |
| NuclearChain reactor export: large size-class sites reviewed individually | 52 | 8 | 36 | 7 | 1 |
Every source entry
Every enumerated entry of each named, dated source snapshot maps to exactly one outcome. Outcomes come from the research ledger; size-band exclusions are recorded per unit. This is not a claim that every SMR has been found.
| Source snapshot | Entries | Outcomes |
|---|---|---|
| discovery_routes | 557 | Duplicate: 9; Existing match: 246; Outside scope: 40; Unresolved: 33; Program or historical context: 229 |
| eu_smr_industrial_alliance | 9 | Existing match: 9 |
| gem_public_map_geojson | 1825 | Excluded: 17; large unit at reconciled site: 101; Existing match: 277; Outside scope: 159; outside scope legacy unit: 2; outside scope unit size: 1170; Unresolved: 17; Program or historical context: 82 |
| iaea_aris_technical | 121 | Existing match: 83; Outside scope: 34; Unresolved: 4 |
| iaea_pris_small_under_construction | 4 | Existing match: 4 |
| iaea_smr_catalogue_2024_third_edition | 71 | Existing match: 71 |
| nea_dashboard_edition_4 | 95 | Existing match: 95 |
| nea_dashboard_edition_4_siting | 147 | Existing match: 105; Program or historical context: 42 |
| nea_dashboard_third_edition_pdf | 74 | Existing match: 74 |
| nia_us_project_tracker | 31 | Existing match: 24; Outside scope: 6; Unresolved: 1 |
| nuclearchain_reactors_csv | 1825 | Excluded: 17; large unit at reconciled site: 101; Existing match: 277; Outside scope: 159; outside scope legacy unit: 2; outside scope unit size: 1170; Unresolved: 17; Program or historical context: 82 |
| nuclearchain_smr_designs_csv | 26 | Existing match: 26 |
Source access and reuse limits
These are three different kinds of limit. A download behind a form is an access condition; a dashboard with no license statement is an unresolved license question; a tracker with no row export is an availability limit. None of them is treated as a proven ban on commercial reuse, and none was treated as an empty inventory.
| Source | Limit | Detail |
|---|---|---|
| gem_workbook | Download requires a form (not submitted) | The public download script lists Global Nuclear Power Tracker, last update September 2025, slug nuclear-power-tracker. Retrieval still requires the form (name, email, organization, and a use statement) and a presign step. No form was submitted and no owner details were sent. The NOTICE sheet remains unread. On 2026-10-02 the tracker page, download page, public map and its config files showed no NOTICE or license text; the visible citation is 'August 2026 release' and the footer reads All Rights Reserved. The 6 December 2025 archived copy of the download page did carry GEM's CC BY 4.0 statement for tracker data. |
| nea_dashboard_edition_4 | License terms not found (unresolved) | Read by ordinary viewing of the public Power BI report embedded on the NEA landing page (the direct dashboard URL returns a Cloudflare block). 95 designs and 147 named siting entries (107 with a progress category, matching all 107 map points) were enumerated from per-design detail pages; map points are organization-located renderings, not site coordinates. No license statement was found on the report's About page, and the NEA and OECD terms pages returned a Cloudflare block, so only identity facts are used and no rows are redistributed. The 61 tracked-but-not-included names are not published. |
| wna_smr_global_tracker | No row export offered | The dashboard's Download menu offers only Image, Vector Image, PDF and PowerPoint; Data and Crosstab are not offered. The 8 October visible-tooltip review found one site-specific Uljin proposal confirmed on GS Energy's own page. Visible map marks do not expose a complete project register, and no hidden export was used. |
Open evidence questions (41)
These are research questions, not a count of confirmed missing reactors. Each row states the fact still needed.
Unresolved site candidates
2 NuclearChain site candidates still need a primary fact. Unresolved is not an exclusion.
| Country | Candidate | Next fact |
|---|---|---|
| GHA | Nsuban nuclear power plant | Open an NPG, GAEC, ministry or NRA document assigning an SMR or qualifying modular configuration to Nsuban. A vendor name, exact rating and coordinates are not independently required. |
| IRN | Makran Coast nuclear power plant | Open an AEOI or Chinese counterpart statement affirmatively proposing deployment of the Makran ACP100 units, including a conditional historical proposal. A concluded agreement, named locality, current status or new order is not required. |
Other unresolved rows
39 design-catalog, tracker, large size-class and discovery-route rows are still open. Design inclusion is separate from a deployment host: a design can have its own directory profile without a named site or a map pin. A missing host does not close a design. No plant is created from the name. The research ledger keeps each missing fact.
| Origin | Row | Next fact |
|---|---|---|
| IAEA ARIS designs with other or unspecified size labels | aris_non_smr: CLEAR-I | Obtain an INEST/FDS original or competent regulator/IAEA classification explicitly qualifying CLEAR-I itself as modular, factory-built or an SMR. CLEAR-M10 is separately covered; exact rating and a deployment are optional. |
| IAEA ARIS designs with other or unspecified size labels | aris_non_smr: ELECTRA | Open an original-ELECTRA developer description or competent classification establishing its modular/factory-built or SMR qualification. ELECTRA-FORTE already has a separate minimal profile; its full paper is optional enrichment, not a prerequisite for coverage. |
| IAEA ARIS designs with other or unspecified size labels | aris_non_smr: MYRRHA | Open a SCK CEN original-MYRRHA reactor specification or competent classification establishing reactor modular/factory-built or SMR qualification. The2014 battery-like derivative is already covered; its full thesis is optional enrichment. |
| IAEA ARIS designs with other or unspecified size labels | aris_non_smr: PEACER | Obtain an author or publisher abstract or full text establishing the exact PEACER-300 configuration and modular qualification, such as Lim/Kim DOI10.1016/j.pnucene.2006.12.004. Do not inherit PASCAR’s qualification or conflate PEACER-550; full text is unnecessary if an authoritative abstract settles the question. |
| Nuclear Innovation Alliance U.S. tracker | nia: Pluto Test Facility | Open an Oklo, DOE or laboratory technical description explicitly qualifying Pluto itself as modular, factory-built or a microreactor. The January2026 DOE package names a planned location near SRNL; exact output and host acceptance are not gates. |
| NuclearChain reactor export: large size-class sites reviewed individually | nuclearchain_large: Xin'an nuclear power plant | Open the original CNNC Xin’an HTGR procurement or regulator document identifying a qualifying modular configuration. A historical proposal can be recorded without current reaffirmation; keep the 2024 re-scoping separate. |
| Operator, vendor, news and independent discovery routes | discovery_route: EnergySolutions / WEC Energy new nuclear at Kewaunee Power Station site | Open an EnergySolutions, WEC or NRC Kewaunee proposal identifying an SMR or qualifying modular configuration. A named commercial vendor is optional once site-specific SMR qualification is established. |
| Operator, vendor, news and independent discovery routes | discovery_route: Advanced Energy Bridge Nuclear Vault System (NVS) | Open an AEB or NRC NVS description distinguishing the reactor configuration from the broader reactor-agnostic energy-center architecture and explicitly establishing modular/factory-built or SMR/microreactor qualification. Output and a full technical paper are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: Oklo Pluto plutonium-fueled fast test reactor (Reactor Pilot Program) | Open an Oklo, DOE or laboratory technical description explicitly qualifying Pluto itself as modular, factory-built or a microreactor. The January2026 DOE package names a planned location near SRNL; exact output and host acceptance are not gates. |
| Operator, vendor, news and independent discovery routes | discovery_route: CNEN 3-5 MW containerized microreactor development project | Open a Terminus, IEN or Diamante statement explicitly relating the commercial MNB concept to HARPIA or identifying a distinct configuration. Exact rating reconciliation is optional; preserve the dated thermal/electrical descriptions separately and keep UCRI distinct. |
| Operator, vendor, news and independent discovery routes | discovery_route: independent check - HTR-PM600 at Wan'an, Fujian | Obtain a readable CNEC, Chinergy or Fujian/Fuzhou original affirmatively proposing a modular HTGR plant at Wan’an. The located Fuzhou plan PDF is a targeted route; owner, current status and a precise parcel are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: independent check - HTR-PM600 feasibility sites Sanmen and Bai'an | Open a CNEC, Chinergy or Guangdong original affirmatively proposing a modular HTGR plant at Bai’an/百安. Preserve Sanmen’s existing match; current status, owner and exact parcel are not independently required. |
| Operator, vendor, news and independent discovery routes | discovery_route: independent check - Oskarshamn new nuclear (NuCore Energi / Fortum) | Open a NuCore or Fortum statement assigning an SMR class or qualifying modular configuration to Oskarshamn; a specific commercial model and rating are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: NUWARD demonstrator at CEA Marcoule (2023-2024 press reports) | Open an EDF, NUWARD or CEA historical statement affirmatively proposing a NUWARD unit at Marcoule. Current design continuity and current activity are optional for a dated historical proposal. |
| Operator, vendor, news and independent discovery routes | discovery_route: Jilin Baishan nuclear heating project: 2013 Chinergy shell-type reactor EPC agreement | Open a CNNC, SPIC, Chinergy or Baishan document relating the2013 shell-type project to HAPPY200, or identifying a distinct qualifying modular reactor. No fresh license or current-status proof is required. |
| Operator, vendor, news and independent discovery routes | discovery_route: TREDIC gas-to-nuclear retrofit claim in Poland | Open the TREDIC or utility instrument stating an affirmative intention to establish the described Polish SMR conversion plant, beyond a staged gas-to-nuclear framework. An undisclosed counterparty or site can remain unknown if a distinguishable plant proposal is supported. |
| Operator, vendor, news and independent discovery routes | discovery_route: CSMC POLAR-1 and ORCA-1 reactor designs | Open a CSMC ORCA-1 technical description explicitly establishing modular, factory-built or SMR/microreactor qualification for ORCA-1 itself. Numerical output and coolant are optional; do not inherit POLAR-1 qualification. |
| Operator, vendor, news and independent discovery routes | discovery_route: ACP100 at Zhangzhou Gulei, Fujian (two units reported 2011) | Open a CNNC New Energy, Zhangzhou or Fujian original affirmatively proposing the2011 Gulei ACP100 deployment. Approval, later disposition and current activity are not prerequisites for a historical proposal. |
| Operator, vendor, news and independent discovery routes | discovery_route: ACP100 at Hengfeng county, Shangrao, Jiangxi (2013 agreement reported) | Obtain the CNNC, Shangrao or Hengfeng original2013 agreement or announcement establishing ACP100 deployment intent rather than generic cooperation. Current reaffirmation is not required. |
| Operator, vendor, news and independent discovery routes | discovery_route: ABV-6 floating plant at Chersky, Yakutia (2007 agreement reported) | Obtain a Sakha or Rosenergoatom contemporary agreement or announcement affirmatively proposing the Chersky ABV-6 floating plant. A present-day status statement and precise berth are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: newcleo at High Marnham, Nottinghamshire (reported) | Open a newcleo, landowner or local-authority document connecting an intended newcleo plant specifically to High Marnham. A land opportunity or generic regional framework is insufficient. |
| Operator, vendor, news and independent discovery routes | discovery_route: Pantai Gosong, Bengkayang: proposed NPP strategic environmental assessment (BAPETEN, Nov 2025) | Open a BAPETEN, BRIN, PLN or ministry document identifying Pantai Gosong’s proposal as an SMR or assigning a qualifying modular configuration. Vendor name and exact rating are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: Stratek HTMR-100 land agreement with City of Matlosana (reported) | Open a Stratek or Matlosana statement affirmatively proposing HTMR-100 at Matlosana, or a readable municipal agreement describing that proposal. An NNR application, current status and precise parcel are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: CNNC-Yantai offshore clean-energy integrated supply platform (2018 agreement) | Open a CNNC or Yantai original explaining whether the2018 offshore platform includes an intended qualifying modular nuclear reactor. Exact offshore coordinates and a berth are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: CNNC pool-type low-temperature heating reactor project for Yantai (2018 agreement) | Open a CNNC, NNSA or Yantai document explicitly linking the2018 pool-heating proposal to DHR-400 or another qualified modular design. Do not infer identity from common pool-type technology. |
| Operator, vendor, news and independent discovery routes | discovery_route: AST-500 nuclear district-heating plant at Gorky (Nizhny Novgorod), built but never operated | Open an AST-500-specific OKBM or competent regulator/IAEA technical description establishing modular, factory-built or SMR qualification. Its construction history is already supported; do not convert thermal capacity or temperatures to electrical output. |
| Operator, vendor, news and independent discovery routes | discovery_route: AST-500 nuclear district-heating plant at Voronezh (reported) | Open an AST-500-specific OKBM or competent regulator/IAEA technical description establishing modular, factory-built or SMR qualification. Its construction history is already supported; do not convert thermal capacity or temperatures to electrical output. |
| Operator, vendor, news and independent discovery routes | discovery_route: VALKRE kilowatt-class reactor experiment at INL (DOE-ID CX-035322; RACE demonstration planned) | Open a DOE or INL technical description qualifying VALKRE’s reactor design as modular, transportable or a microreactor, distinguishing the nuclear design from its non-nuclear mock-up and a core experiment on an existing machine. Electrical generation is not required. |
| Operator, vendor, news and independent discovery routes | discovery_route: HT3R High-Temperature Teaching and Test Reactor, Andrews County, Texas (UTPB, 2006; independent challenge lead) | Open a UTPB, General Atomics, NRC, DOE or IAEA description explicitly qualifying HT3R itself as modular, factory-built, transportable or an SMR/microreactor. Rating and current activity are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: Power Cell Micro Reactor - IAEA microreactor outlook 2026 (designer and country not stated) | Open a PCMR or IAEA statement explicitly relating the IAEA Power Cell chart identity to AMR, or identifying a distinct configuration. Both dated descriptions are already represented; this is a relationship/counting question, not a missing-design-rating gate. |
| Operator, vendor, news and independent discovery routes | discovery_route: Unnamed 300 MWe-class passive compact small PWR submitted for an IAEA technical safety review (National Energy Administration report, July 2026) | Open an IAEA technical-safety-review announcement or underlying developer submission identifying the300MWe compact PWR configuration sufficiently to distinguish it from existing Chinese designs. A commercial model name and developer need not both be disclosed. |
| Operator, vendor, news and independent discovery routes | discovery_route: BSMR-300 (300 MWe uprate of the Bharat Small Modular Reactor) - DAE answer and press report, 2026 | Open a BARC, NPCIL or DAE statement explicitly relating the name BSMR-300 to BSMR-200 or identifying a distinct configuration. The dated related description is already public; this is a version/counting question rather than an output gate. |
| Operator, vendor, news and independent discovery routes | discovery_route: NuScale and Prime Infrastructure Philippines SMR plan (462 MW estimate, May 2023) | Open a Prime Infra or NuScale original statement affirmatively proposing the described Philippine SMR plant, including a conditional2023 historical proposal. A siting-study intention and investment estimate alone are insufficient; later activity, exact site and current schedule are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: Rwanda first small modular reactor plant of about 110 MWe (RAEB roadmap 2026; two candidate sites under approval) | Open a RAEB or ministry plant-specific decision assigning a qualifying modular configuration or named design to the first plant, beyond the national capacity-and-timeline roadmap. An approved site, binding vendor contract and exact module count are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: Brazil Finep and MCTI containerised 5 MWe microreactor development project (INB, Terminus, Diamante; IPEN and IEN) | Open a Terminus, IEN or Diamante statement explicitly relating the commercial MNB concept to HARPIA or identifying a distinct configuration. Exact rating reconciliation is optional; preserve the dated thermal/electrical descriptions separately and keep UCRI distinct. |
| Operator, vendor, news and independent discovery routes | discovery_route: coverage20261013 Atlas Atomics heavy-water design | Open an Atlas, DOE or INL description identifying a distinguishable reactor configuration and explicitly establishing modular, factory-built or SMR/microreactor qualification. A rating, commercial deployment and named site are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: coverage20261013 TEA homogeneous-fuel research/MSR identity | Open a TEA or technical-partner description identifying the homogeneous-fuel research reactor or MSTRR configuration and explicitly establishing modular/factory-built or SMR/microreactor qualification. Numerical rating, commercial deployment and a named site are optional. |
| Operator, vendor, news and independent discovery routes | discovery_route: open56 GH300 Guohe design identity | Open an SPIC, SNERDI or IAEA original identifying GH300 as a distinguishable qualifying modular reactor configuration. Numerical ratings are optional; do not borrow HuaPeng-1, CAP200 or another Guohe design identity. |
| Operator, vendor, news and independent discovery routes | discovery_route: open56 GH200T Guohe design identity | Open an SPIC, SNERDI or IAEA original identifying GH200T as a distinguishable qualifying modular reactor configuration. Numerical ratings are optional; do not borrow HuaPeng-1, CAP200 or another Guohe design identity. |
Supplemental queue
- NEA edition 4.0: the 61 tracked-but-not-included names, when published (every siting map point is now tied to a named entry).
- WNA Tableau underlying project rows, when a public export is available without a challenge page.
- GEM workbook bytes and NOTICE sheet, only after the owner authorizes the download form.
See also methodology.