Project stages

What each recorded stage means, with a page of the projects at each stage. To combine a stage with other filters, use Stage on Projects. Stages are listed in lifecycle order; a stage is what the sources support, not a required sequence. How stages are assigned.

Counts include proposals and research reactors, not only power plants. A recorded stage is not a guarantee of current activity. Read each project's dated sources and permissions separately: a construction permit is not a construction start, and a startup test is not commercial operation.

From announcement to operation

  1. Announced · 96

    A deployment proposal has been made public; later activity is not yet established here.

  2. Siting · 65

    A proposed location is being selected, evaluated or characterized; pre-application regulator engagement alone remains here.

  3. Licensing · 19

    A formal project-specific application has been submitted or is under regulator review; design-only and pre-application advice do not qualify.

  4. Construction · 13

    Sources report physical construction for the project; a permit alone is insufficient.

  5. Commissioning · 5

    Startup, testing or preparation for operation is documented; electricity delivery is not implied.

  6. Operating · 6

    Reactor operation is documented, including heat-only or experimental operation where specified.

Suspended, canceled or deferred

These are different recorded statuses. A pause or postponement does not establish cancellation.