Companies

AKME-engineering JSC

The ARIS status report dated 2024-10-15 identifies AKME-engineering JSC as the designer of SVBR-100. This is a dated attribution; current corporate status and ownership have not been verified.

Projects
No live project recorded here; 1 canceled (Dimitrovgrad SVBR-100 pilot proposal). 1 design.
Evidence
One source (IAEA/NEA): ARIS original status report — SVBR-100 (2024-10-15). Record reviewed 2 Oct 2026.

Key facts

Organization type
Reactor developer
Category
vendor
Country
Russia
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current activity)

All fields

(5 without a known value)
Aliases
None recorded in this release
Listing status
Unknown (no listing is recorded here; this does not mean the organization is private)
Exchange / ticker
None recorded in this release
Ownership / control
Unknown (no owner or controller is recorded here)
Website
None recorded in this release

Linked designs

  • SVBR-100 — Lead-cooled fast reactor (LFR) · SMR

Tracked deployment projects

1 linked project record: 1 canceled, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Ownership & relationships

Milestones

Organization-level unresolved information

Sources

(1)