Policy and licensing / Estonia

Estonia: Nuclear Energy and Nuclear Safety Act (Tuumaenergia ja -ohutuse seadus)

Estonia's parliament adopted a Nuclear Energy and Nuclear Safety Act on 17 June 2026, to take effect on 1 January 2027. It names the Consumer Protection and Technical Regulatory Authority as the competent authority for radiation and nuclear safety and requires a positive preliminary assessment, with a Riigikogu decision in that procedure, before an application for a construction permit. It licenses or sites no reactor.

Category
Laws, rules and executive directives
Status
Adopted, not yet in effect
Instrument
statute · Tuumaenergia ja -ohutuse seadus (TEnOS), adopted 17 June 2026, proclaimed by the President's resolution no. 772 of 2 July 2026, RT I, 11.07.2026, 1; to take effect 1 January 2027 (s. 134).
Issued by
Riigikogu (Parliament of Estonia)
Jurisdiction
Estonia
Affects
National reactor licensing, Siting
Effective date (not yet in effect)
1 Jan 2027 (planned)
Expiry or completion
None recorded
Operative text
Riigi Teataja: Tuumaenergia ja -ohutuse seadus (RT I, 11.07.2026, 1) (Original text as published in Riigi Teataja, RT I, 11.07.2026, 1)
Record reviewed · next review
11 Nov 2026 · 8 Jan 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

Regulates civil possession and handling of nuclear material, the nuclear fuel cycle, planning, construction, testing, operation and decommissioning of nuclear installations, local-benefit payments, emergency preparedness, nuclear security, nuclear waste and liability for nuclear damage (s. 1). Makes the Consumer Protection and Technical Regulatory Authority the competent authority (s. 13). A positive preliminary assessment is a precondition for applying for a construction permit (s. 20), and the Riigikogu decides whether to approve the Government's position on a draft preliminary assessment (s. 21).

Not approved or still pending

Not yet in force. Approves no site, design or project. Implementing regulations were not read. (Record checked .)

Dated lifecycle

Projects or designs named by the source