Changes to SMRMap

Selected improvements to the pages and downloads you use.

This is a selected release note, not a complete change history. Industry developments and their underlying dates are on Updates. The date below is when these site improvements were published; it does not date an industry event or a review of every source.

November 2026

  • 3D in one place, and on the pages you land on. A 3D link in the menu and on the home page leads to the reactor types, the globe and the vessels drawing. Project and design pages now show the reactor type near the top with a small schematic, labeled when it shows another design. Project pages count other records of the same design and link to the globe. The globe can filter by country, keep a filter in a shared link and say what each view leaves out.

1 to 3 November 2026

  • How small reactor types work. A hub and a page for each of ten reactor types, with a figure and a 3D view, each explained on one documented design. The design and project pages that use a type link to it.
  • Reactor vessels to scale. Vessels with qualified dimensions, drawn at one scale with the source of each size.
  • A globe on the home page. The home page links to the reactor types, and a button opens a globe of the mapped projects at each stage. The map view of Projects links to it.
  • Since your saved visit. Updates can remember a visit in your browser and list what SMRMap has newly published since.
  • Status first on project pages. Each project page opens with its status box, and that box starts with a line saying how current the record is.
  • Shorter pages. Long sections on project, design and company pages start closed, with their count in the heading.
  • Reviewed record corrections. Design types and project details were corrected from saved documents, with each data change independently checked. No project stage changed in those corrections.

Records added or changed in these days are listed by release day in the November digest.

Late October 2026

  • See when SMRMap last changed. Updates and the home page say when the site was last updated and what the week up to then added, counting older developments newly added to the record separately from new ones.
  • Policy news on the home page. The home page lists the newest developments from Updates, including policy steps and permissions, plus other recent policy steps. Policy now opens on its recent changes, and country pages link to their national policy page.
  • Feed titles say when an entry is history. An older development newly added to the record is titled "Added to the record". Entries already in the feed were retitled once on this release; their links and identifiers are unchanged.

These changes improve presentation. This release does not add project records or change accepted research answers or project stages; some review dates moved earlier to follow the deadlines they wait for.

24 October 2026

  • Save and cite a comparison. Select two to four projects or designs, copy a citation that names the selection and identifies its data, or print it with listed source references. Reopening a shared link shows current records. Save a PDF to keep the version you read; SMRMap does not provide historical page retrieval.
  • Find qualified statements about who is involved. Search now includes the reviewed statements shown in the table, including historical and conditional mentions. The organization and role filters still use recorded links; a name in prose does not create a role.
  • Keep qualifications when using project downloads. Full and filtered project CSVs retain summaries, review notes, source links and dates. Missing values stay distinct from zero. Citations identify the underlying dataset and build date; source, event and review dates keep their separate meanings.

These changes improve presentation and reuse. This release does not add project records or change accepted research answers, project stages or source-access dates.

Found a problem or need a different view? Suggest an update.