About SMRMap

SMRMap is an independent, source-linked directory of small modular reactor (SMR) and microreactor projects, the companies and organizations behind them, their reactor designs, and the policies and permits that shape them.

What SMRMap covers

  • Projects: 222 projects and proposals in 30 countries, each with its recorded stage, from announced to operating, and suspended, deferred or canceled records, as a table or on a map, filtered by country, stage, company, design and more. Each country and each stage also has its own page (countries, stages).
  • Designs: 216 reactor designs, with the output, coolant and fuel their sources state.
  • Reactor types: how each type works, with a figure and a 3D view of one documented example.
  • Companies and organizations: 291 organizations that develop, supply, operate, host or buy from these projects.
  • Agreements: 231 agreements, national plans, studies and government programs that are not a single deployment project.
  • Policy and licensing: 192 selected laws, rules and funding measures, and the permits and applications recorded for projects.
  • Updates: dated developments and upcoming targets from all of the above.

What it does not cover

  • It is not a complete worldwide inventory. The coverage page lists the sources and countries reviewed and the gaps that remain.
  • It does not track the existing fleet of large nuclear power plants, and a project at an existing plant does not inherit that plant's status or output.
  • It does not rank, rate or recommend companies, projects, designs or countries, and it is not investment, legal or safety advice.
  • A fact SMRMap has not found is shown as unknown. A missing fact is not a finding that something does not exist.

How records are sourced and updated

Every record links to its sources: regulators, governments, the companies themselves, the IAEA or the OECD Nuclear Energy Agency, or reputable trade press. Primary sources are preferred, and each record shows when it was last reviewed. An announcement is recorded as an announcement, a permit as a permit, and a target as a target; none is shown as construction or operation unless a source documents it.

Daily checks of official feeds, regulator listings and developer newsrooms raise leads. A lead becomes part of a record only after its source has been reviewed, and changes are checked before they are published. AI tools assist with research, implementation and testing. The methodology sets out the inclusion rules and the distinctions each record keeps; how SMRMap finds and updates records lists the sources checked and how complete each kind of record is.

New and changed records are listed by month in the monthly digests and the RSS feed; changes to the site's pages and downloads are on site changes. Abbreviations are explained in the glossary.

Corrections

If something is wrong or missing, send the page link and a short description, with a source if you have one, to corrections@smrmap.com, or use the contact and corrections page. Suggestions are checked against sources before anything changes, and accepted corrections appear in a later update.

License and reuse

SMRMap's data is published under CC BY 4.0: you may reuse it, including commercially, with credit to SMRMap (smrmap.com). Quoted text and linked documents belong to their publishers. The full terms include the attributions for third-party data, and every file is on the downloads page.