Policy and licensing / Indonesia

Indonesia: BAPETEN Regulation No. 4 of 2018 on Safety Provisions for Site Evaluation of Nuclear Installations

Indonesia's 2018 BAPETEN regulation on site evaluation sets the technical rules a nuclear installation developer must follow to get BAPETEN approval to evaluate a site, carry out the evaluation and monitor the site. It lists hazards to assess and cases where a site is declared unsuitable, such as an unacceptable volcanic hazard zone within 5 km. It approves no site, design or project.

Category
Laws, rules and executive directives
Status
In effect
Instrument
final rule · Peraturan Badan Pengawas Tenaga Nuklir Nomor 4 Tahun 2018 tentang Ketentuan Keselamatan Evaluasi Tapak Instalasi Nuklir; enacted 23 July 2018; promulgated 8 August 2018; in force on promulgation
Issued by
Badan Pengawas Tenaga Nuklir (BAPETEN)
Jurisdiction
Indonesia
Affects
Siting
In effect from
8 Aug 2018
Expiry or completion
None recorded
Operative text
Indonesia: Peraturan Badan Pengawas Tenaga Nuklir Nomor 4 Tahun 2018 tentang Ketentuan Keselamatan Evaluasi Tapak Instalasi Nuklir (BAPETEN JDIH copy) (Certified copy (salinan) on the BAPETEN legal portal, status 'Baru')
Record reviewed · next review
29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

BAPETEN regulation setting the technical requirements for obtaining BAPETEN approval of a site evaluation, carrying out the site evaluation and monitoring the site of a nuclear installation (Article 2), applied through a graded approach depending on the installation's radiological hazard (Article 3). The site evaluation applicant may start only after the Head of BAPETEN approves the site evaluation, applying with a site evaluation program and a management system (Article 4). It sets evaluation requirements for external hazards, including volcanic hazards: a site is declared unsuitable where the area within 5 km is a disaster-prone zone that does not meet the conditions set by the national geology authority (Article 20(5)), or where a required geotechnical engineering solution is not implemented or does not meet safety requirements (Article 28(2)). It revoked the 1999 reactor siting guideline decree and BAPETEN Head Regulation No. 5 of 2007 (Article 56). It does not itself approve any site, design or project.

Not approved or still pending

Approves no site. BAPETEN's separate aspect-specific site evaluation regulations (seismic, volcanic, meteorology and hydrology, dispersion, human-induced external events) listed on the same portal were not opened. (Record checked .)

Dated lifecycle

Projects or designs named by the source

Sources