Policy and licensing / South Africa
South Africa: Regulations on Licensing of Sites for New Nuclear Installations (GN R. 927 of 11 November 2011)
South Africa's 2011 site licensing regulations require anyone wishing to site a new nuclear installation to apply to the National Nuclear Regulator for a nuclear installation site license supported by a Site Safety Report. They list the factors used to evaluate sites. A site license is valid indefinitely, with updated information needed before construction after five years. They approve no site.
- Category
- Laws, rules and executive directives
- Status
- In effect
- Instrument
- final rule · Regulations on Licensing of Sites for New Nuclear Installations, Government Notice No. R. 927, Government Gazette No. 34735 of 11 November 2011, made under s. 36 read with s. 47 of the National Nuclear Regulator Act, 1999
- Issued by
- Minister of Energy, on the recommendation of the Board of the National Nuclear Regulator
- Jurisdiction
- South Africa
- Affects
- Siting, National reactor licensing
- Effective date
- Not recorded
- Expiry or completion
- None recorded
- Operative text
- South Africa: Regulations on Licensing of Sites for New Nuclear Installations, GN R. 927, Government Gazette No. 34735 (11 November 2011) (Government Gazette No. 34735 of 11 November 2011 (scanned copy reproduced by Sabinet, hosted by the NNR))
- Record reviewed · next review
- 29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)
Legal and geographic scope
Regulations made by the Minister of Energy under s. 36 read with s. 47 of the National Nuclear Regulator Act on the recommendation of the NNR board. Their purpose is to establish requirements for applications for nuclear installation site licenses (reg. 2). Anyone wishing to site a nuclear installation under s. 21(1) of the Act must lodge an application for a nuclear installation site license with the NNR chief executive officer, supported by a Site Safety Report (reg. 3). Regulation 4 lists factors for evaluating sites, including all nuclear installations in the vicinity, the proposed design and site characteristics, acceptably low radiological doses and risks, natural and man-made hazards, emergency plans and security measures, and cumulative radiological impact. Regulation 5 sets the Site Safety Report contents. A site license is valid for an indefinite period, but if five years have passed since it was granted the holder must supply updated information before construction and the Regulator decides whether to confirm or withdraw the license, and a site license is not a nuclear installation license, which must be applied for separately (reg. 6). Regulation 7 names them the Regulations on Licencing of Sites for New Nuclear Installations, 2010. They do not themselves license or approve any site, design or project.
Not approved or still pending
Approves no site. The Gazette copy read is a scanned text with character recognition errors. The in-force date is not stated in the text read. The NNR's siting guidance RG-0011 was not opened. (Record checked .)
Dated lifecycle
- 11 Nov 2011 · Published — Government Notice No. R. 927, Government Gazette No. 34735. (South Africa: Regulations on Licensing of Sites for New Nuclear Installations, GN R. 927, Government Gazette No. 34735 (11 November 2011))
Definitions in this instrument
- new nuclear installation (reg. 1): A nuclear installation constructed after the date on which these Regulations come into effect.
Legal definition used by these South African regulations only; SMRMap's inclusion rule for SMRs is separate and unchanged.
Projects or designs named by the source
- None. Location in this jurisdiction does not make a project eligible for, or approved under, this measure.