Policy and licensing / South Korea

South Korea: Nuclear Safety Act (원자력안전법)

South Korea's Nuclear Safety Act requires a Nuclear Safety and Security Commission permit to build a nuclear power reactor and a separate license to operate it, and allows prior approval of a site and approval of a standard design for repeated construction. A 2026 amendment adds a design pre-review before licensing, which the regulator says applies from November 2026. It approves no reactor or project.

Category
Laws, rules and executive directives
Status
In effect
Instrument
statute · 원자력안전법 (Nuclear Safety Act), Act No. 10911 of 25 July 2011, as last amended by Act No. 21679 of 19 May 2026
Issued by
National Assembly of the Republic of Korea
Jurisdiction
South Korea
Affects
National reactor licensing, Siting
Effective date
Not recorded
Expiry or completion
None recorded
Operative text
Korea Legislation Research Institute: 원자력안전법 / Nuclear Safety Act (Korean-English parallel text, current to Act No. 21065) (KLRI Korean-English parallel text current to Act No. 21065 of 1 October 2025. The national law portal lists Act No. 21679 of 19 May 2026 as current, but its article text was not readable.)
Record reviewed · next review
11 Nov 2026 · 23 Nov 2026 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

Korean statute on safety management in the research, development, production and use of nuclear energy (art. 1). The Nuclear Safety and Security Commission, established under art. 3 of the Act on the Establishment and Operation of the Nuclear Safety and Security Commission, is the licensing authority. Anyone intending to construct a nuclear power reactor and related facilities must obtain the Commission's construction permit, applying with a radiological environmental impact assessment, preliminary safety analysis report, quality assurance plan and decommissioning plan (art. 10(1)-(2)). Before applying, an applicant may seek the Commission's prior approval of the site, supported by an environmental report and site investigation report, and may then carry out limited works (art. 10(3)-(5)). Operating a nuclear power reactor needs a separate operating license from the Commission (art. 20). A standard design may be approved for repeated construction, valid for ten years (art. 12), and research or educational reactors need a construction permit by type (art. 30). The amendment approved by the Cabinet on 12 May 2026 and promulgated on 19 May 2026 as Act No. 21679 adds, according to the Commission's press release, a pre-review of reactor designs before license applications (new art. 100-2) applying from 20 November 2026, according to the government's legislative entry for the enforcement rule, with other changes from 1 January 2027. The Act does not itself license, site or approve any reactor, design or project.

Not approved or still pending

Grants no permit, site approval or standard design approval to any project or design. The text of amending Act No. 21679 was not read because the national law portal shows article text only with scripts; its content is taken from the Commission's press release of 12 May 2026. The KLRI English translation is for reference only. The Enforcement Decree and Commission rules were not read. (Record checked .)