Policy and licensing / Ukraine

Ukraine: Regulation on the State Nuclear Regulatory Inspectorate (Cabinet of Ministers Resolution No. 363 of 20 August 2014, Положення про Державну інспекцію ядерного регулювання України)

Ukraine's 2014 Cabinet regulation on the State Nuclear Regulatory Inspectorate (SNRIU) makes it the central executive body for nuclear safety regulation. SNRIU licenses the operating organization for each life-cycle stage of a nuclear installation, issues separate permits for construction, commissioning, operation and decommissioning works, and supervises compliance. It approves no site, design or project.

Category
Laws, rules and executive directives
Status
In effect
Instrument
final rule · Постанова Кабінету Міністрів України від 20 серпня 2014 р. № 363 «Про затвердження Положення про Державну інспекцію ядерного регулювання України» (Офіційний вісник України, 2014, № 69, ст. 1925); amended by Resolution No. 268 of 10 March 2023
Issued by
Кабінет Міністрів України (Cabinet of Ministers of Ukraine)
Jurisdiction
Ukraine
Affects
National reactor licensing
Effective date
Not recorded
Expiry or completion
None recorded
Operative text
Кабінет Міністрів України: Постанова від 20 серпня 2014 р. № 363 «Про затвердження Положення про Державну інспекцію ядерного регулювання України» (As-adopted text of 20 August 2014 on the Cabinet's official portal (no consolidated version offered), read together with the changes approved by Resolution No. 268 of 10 March 2023. Any other amendments were not verified because the parliament's consolidated legislation portal did not respond.)
Record reviewed · next review
29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

Cabinet regulation setting the status and powers of Ukraine's nuclear regulator, the State Nuclear Regulatory Inspectorate (Держатомрегулювання, SNRIU). Point 1 makes it a central executive body, directed and coordinated by the Cabinet of Ministers, that forms and implements state policy on nuclear safety. Point 3 tasks it with state regulation of nuclear safety. Under point 4 it approves safety requirements and license conditions (4.7), assesses the safety of nuclear installations (4.12) and conducts the state nuclear and radiation safety review (4.13). It licenses the operating organization's activity at each separate stage of a nuclear installation's life cycle (4.14), issues separate permits for works or operations during construction, commissioning, operation and decommissioning (4.18) and supervises compliance with permits and safety rules (4.41). Its Head is appointed and dismissed by the Cabinet on the Prime Minister's proposal (point 11). Resolution No. 268 of 10 March 2023 added powers to recognize radiation protection experts and to organize, at least every 10 years, an evaluation of the regulatory framework and regulator with international experts. The regulation does not itself license, site or approve any reactor, design or project. The Law on the Use of Nuclear Energy and Radiation Safety, under which the licensing operates, is not yet recorded.

Not approved or still pending

Grants no license or permit. The Law on the Use of Nuclear Energy and Radiation Safety (No. 39/95-ВР) and the other statutes on nuclear permits are not yet recorded because the parliament's legislation portal did not respond. Amendments to this regulation other than Resolution No. 268 of 2023, and the regulator's own orders on licensing procedure, were not checked. (Record checked .)

Dated lifecycle

Projects or designs named by the source

Sources