Agreements

Ocean-Power and Copenhagen Atomics MoU to study thorium molten-salt reactors in Norway

Ocean-Power AS and Copenhagen Atomics signed a memorandum of understanding, announced in July 2025, to jointly study producing electricity and heat in Norway with thorium-based molten-salt reactors. The study is to cover technical and regulatory conditions, power and heat demand, site selection and a conceptual plant design. No site, unit count, order or license application is named.

Recorded status

Status not established. The July 2025 release reports a joint study only. No later report was read, and no site, order or license application is named. Read the source dates: this does not confirm continuing activity today.

Type
Cooperation agreement or MOU
Countries concerned
Norway
Participants and roles
Designs named
—
Scale as stated
No site, unit count or order named
Announced or first reported
23 Jul 2025
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Status. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
11 Nov 2026 (record review date, not proof of current activity)

Sources

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this agreement’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the agreement name and link: Ocean-Power and Copenhagen Atomics MoU to study thorium molten-salt reactors in Norway — https://smrmap.com/programmes/no-copenhagen-atomics-ocean-power-mou/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Ocean-Power and Copenhagen Atomics MoU to study thorium molten-salt reactors in Norway”. Record reviewed 11 Nov 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/programmes/no-copenhagen-atomics-ocean-power-mou/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.