How small reactor types work
What kind of reactor is a project using, how does it work, and how does that type differ from the others? Each type page below answers that on one documented design, with a figure, a 3D view and every design recorded as that type.
Each page explains one documented design as an example, not every design of that type. The coolant and heat columns are that one design's, from its catalog section. The separate Blue Capsule article below is a 2D explanation of one design, not another type assignment. The order follows no ranking. Counts come from SMRMap's records, and tracked projects are the published projects linked to those designs. Every recorded design is on the design list.
181 of 216 recorded designs link to these explainers; 35 have no type-page assignment yet. Unassigned designs are not necessarily missing reactor types. This is coverage of SMRMap's records, not a complete worldwide inventory.
“Other” includes documented arrangements outside the listed groups and designs whose type is not established. Their descriptions and evidence show what is known; the label alone does not mean that nothing is known.
Another arrangement, explained in 2D
Does sodium cooling always mean a fast reactor?. A source-linked heat-transfer diagram of Blue Capsule. It is separate from the 10 interactive type examples below.
Compare two reactor types → side by side schematics, what each definition states, and optional 3D.
Integral pressurized water reactorSchematic of CAREM-25Open the 3D view
Boiling water reactorSchematic of BWRX-300Open the 3D view
Pressurized water reactorSchematic of Rolls-Royce SMROpen the 3D view
High-temperature gas-cooled reactorSchematic of HTR-PMOpen the 3D view
Sodium-cooled fast reactorSchematic of NatriumOpen the 3D view
Lead-cooled fast reactorSchematic of BREST-OD-300Open the 3D view
Molten salt reactorSchematic of IMSR (Integral Molten Salt Reactor)Open the 3D view
Fluoride salt-cooled high-temperature reactorSchematic of KP-FHR commercial plantOpen the 3D view
Gas-cooled fast reactorSchematic of EM2Open the 3D view
Heat-pipe microreactorSchematic of eVinciOpen the 3D view
| Type | Coolant in the example | In the example design, heat leaves by | Example design | Designs recorded | Projects tracked | Explainer |
|---|---|---|---|---|---|---|
| Integral pressurized water reactor (iPWR) | Light water[1, p. 27] | Steam generators inside the vessel pass heat to a separate secondary circuit.[1, p. 28] | CAREM-25 | 24 | 15 | How an integral PWR works |
| Boiling water reactor (BWR) | Light water[2, p. 25] | Steam from the core goes straight to the turbine; there is no steam generator.[2, pp. 26, 27] | BWRX-300 | 4 | 18 | How a boiling water reactor works |
| Pressurized water reactor (PWR) | Light water[2, p. 79] | Water carries heat out of the vessel to steam generators on three separate loops.[2, p. 81] | Rolls-Royce SMR | 37 | 35 | How a pressurized water reactor works |
| High-temperature gas-cooled reactor (HTGR) | Helium[2, p. 229] | Helium carries heat from the reactor to a separate steam generator.[2, p. 230] | HTR-PM | 39 | 27 | How a high-temperature gas reactor works |
| Sodium-cooled fast reactor (SFR) | Liquid sodium[2, p. 295] | A second sodium loop carries heat out of the vessel to molten salt, whose stored heat makes steam.[2, p. 296] | Natrium | 12 | 12 | How a sodium-cooled fast reactor works |
| Lead-cooled fast reactor (LFR) | Molten lead[2, p. 277] | Lead passes heat to water and steam inside steam generators in the same vessel.[2, pp. 278, 279] | BREST-OD-300 | 24 | 12 | How a lead-cooled fast reactor works |
| Molten salt reactor (MSR) | Molten salt, which is also the fuel[2, p. 338] | The fuel salt passes heat to a second salt circuit, and a third carries it to steam generators.[2, p. 339] | IMSR (Integral Molten Salt Reactor) | 24 | 14 | How a molten salt reactor works |
| Fluoride salt-cooled high-temperature reactor (FHR) | Molten fluoride salt[2, p. 349] | The salt passes heat to an intermediate fluid, which passes it to steam.[2, p. 350] | KP-FHR commercial plant | 5 | 3 | How a salt-cooled pebble bed reactor works |
| Gas-cooled fast reactor (GFR) | Helium[2, p. 179] | Hot helium drives a gas turbine directly, with no steam generator.[2, p. 180] | EM2 | 4 | 0 | How a gas-cooled fast reactor works |
| Heat-pipe microreactor | Sodium sealed in heat pipes[2, p. 413] | Sealed heat pipes carry heat to a heat exchanger and a power conversion system.[2, pp. 413, 415] | eVinci | 8 | 9 | How a heat-pipe microreactor works |
Sources
- Small Modular Reactor Technology Catalogue, 2024 edition: CAREM — International Atomic Energy Agency
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors)