Companies / org-general-atomics-electromagnetic-systems
General Atomics Electromagnetic Systems
The U.S. Army named General Atomics Electromagnetic Systems as its Janus contractor for Fort Hood, Texas. The Army states that the prototype reactors will be contractor-owned and operated. This identifies an intended operator arrangement, not an operating installation or a reactor licence. Corporate relationships and current ownership have not been independently reviewed.
- Roles
- Operator
- Organization type
- operator
- Country
- United States
- Aliases
- —
- Listing status
- Unknown
- Exchange / ticker
- —
- Ownership / control
- Unknown
- Website
- —
- Confidence
- medium
- Record reviewed
- 2026-10-17 (record review date, not proof of current activity)
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project records: 1 announced. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- General Atomics GA-TES at Fort Hood (Army Janus) — Announced · United States
Recorded link: operator/host field · project record checked 2026-10-10 · permission status · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- None recorded in this release.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
- Army reaches agreement with private industry for nuclear micro reactors (government_primary, accessed 2026-10-17)