United States SMR projects
Projects · Agreements · Permissions
89 tracked projects and proposals in this directory. Named proposals, demonstrations and achieved deployments retain their recorded stages.
Announced: 44 · Siting: 20 · Licensing: 7 · Construction: 8 · Commissioning: 4 · Operating: 1 · Suspended: 1 · Canceled: 4
Open these projects in Projects (on the map) · Coverage and stage definitions · US policy and licensing (selected measures)
Counts describe the selected dataset, not a complete national or worldwide census. Sources and check dates are linked from each record.
Country brief
Policy and licensing in United States →
Recorded answers for these 89 projects — customer or offtaker: 12 of 89; contractor: 7 of 89; funding and government decisions: 16 of 89; fuel supplier named for this project: 12 of 89; programs and agreements naming the project: 18 of 89. Who is involved, project by project.
Latest recorded developments
Newest first: steps of these projects, the latest step of each of this country's policy measures, and agreements or programs that concern it.
- 9 Nov 2026 · Policy · Proposed regulatory enhancements for reactor licensing, decommissioning and operational oversight (comment period closed). Updates entry
- 9 Nov 2026 · Project · Long Mott Generating Station (Xe-100 at Dow Seadrift): NRC issues the Long Mott construction permit. Updates entry
- 9 Nov 2026 · Project · Long Mott Generating Station (Xe-100 at Dow Seadrift): Construction permit issued for the Long Mott Xe-100 station. Updates entry
- 6 Nov 2026 · Project · Long Mott Generating Station (Xe-100 at Dow Seadrift): Long Mott: Commission denies the intervenor's petition for review. Updates entry
- 5 Nov 2026 · Policy · NRC consultation: draft non-light-water reactor materials guidance (comment period closed). Updates entry
Next documented targets
Targets are plans, not achievements or commitments.
- Target 2026 · Deployable Energy Unity at Idaho National Laboratory: Unity reactor-physics testing incl. passive shutdown and decay-heat tests (planned). Updates entry
- Target 2026 · Last Energy PWR-5 pilot at Texas A&M-RELLIS: Last Energy targets a 2026 criticality demonstration for its RELLIS pilot. Updates entry
- Target 2026 · MARVEL microreactor test bed at INL's TREAT facility: MARVEL assembly expected to finish. Updates entry
- Target Dec 2026 · Duke Belews Creek technology-neutral SMR proposal: NRC target: advanced final safety evaluation report without open items for the Belews Creek ESP. Updates entry
- Target Dec 2026 · Duke Belews Creek technology-neutral SMR proposal: NRC target: draft environmental impact statement for the Belews Creek ESP. Updates entry
Documented schedule changes
- Duke Belews Creek technology-neutral SMR proposal: NRC target: draft environmental impact statement for the Belews Creek ESP
Feb 2027 (stated 8 Feb 2026) → Dec 2026 (stated 29 Sep 2026) · Moved earlier
Source: NRC letter: fixed fee cap and revised schedule for the Belews Creek early site permit review (ADAMS ML26259A008) (dated 29 Sep 2026); U.S. NRC: NRC draft safety evaluation sections completed for the Belews Creek ESP (published 7 Oct 2026). - Duke Belews Creek technology-neutral SMR proposal: NRC target: advanced final safety evaluation report without open items for the Belews Creek ESP
Mar 2027 (stated 8 Feb 2026) → Dec 2026 (stated 29 Sep 2026) · Moved earlier
Source: NRC letter: fixed fee cap and revised schedule for the Belews Creek early site permit review (ADAMS ML26259A008) (dated 29 Sep 2026); U.S. NRC: NRC draft safety evaluation sections completed for the Belews Creek ESP (published 7 Oct 2026). - Duke Belews Creek technology-neutral SMR proposal: NRC target: final safety evaluation for the Belews Creek ESP
May 2027 (stated 8 Feb 2026) → Feb 2027 (stated 29 Sep 2026) · Moved earlier
Source: NRC letter: fixed fee cap and revised schedule for the Belews Creek early site permit review (ADAMS ML26259A008) (dated 29 Sep 2026); U.S. NRC: NRC draft safety evaluation sections completed for the Belews Creek ESP (published 7 Oct 2026). - Duke Belews Creek technology-neutral SMR proposal: NRC target: final environmental impact statement for the Belews Creek ESP
May 2027 (stated 8 Feb 2026) → Mar 2027 (stated 29 Sep 2026) · Moved earlier
Source: NRC letter: fixed fee cap and revised schedule for the Belews Creek early site permit review (ADAMS ML26259A008) (dated 29 Sep 2026); U.S. NRC: NRC draft safety evaluation sections completed for the Belews Creek ESP (published 7 Oct 2026). - TVA Clinch River BWRX-300: NRC target: final safety evaluation for the Clinch River construction permit
Nov 2026 (stated 25 Jul 2025) → Jun 2026 (stated 18 Jun 2026) · Moved earlier
Source: NRC letter: Clinch River Unit 1 construction permit application review status (ADAMS ML26160A308) (dated 18 Jun 2026).
Projects
Showing 89 of 89 projects
No projects match these filters. Reset filters
| Project and category | Stage | Design | Capacity | Recorded organizations | Location | Record reviewed |
|---|---|---|---|---|---|---|
| Aalo commercial proposal at Texas A&M-RELLISSMR | Siting | Aalo pod (commercial proposal) | — |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event 4 Feb 2025 |
| Aalo fleet proposal at Idaho Falls Power's Energy Research ParkMicroreactor | Announced | Aalo-1 | — |
| Idaho Falls Power Energy Research ParkIdaho · town-level point (approximate) | 9 Oct 2026Latest source 15 Sep 2026Latest event: none dated |
| Aalo Project Ascension power-reactor proposal at INLSMR | Announced | Design profile not linked | 10 MWe (gross/net unspecified) · module |
| Project Ascension proposed area on the Aalo-X campus at INLIdaho · site-area point (approximate) | 15 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026 |
| Aalo-X at Idaho National LaboratoryMicroreactor | Commissioning | Aalo-X | 10 watts thermal (thermal only; zero-power limit) |
| Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate) | 18 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026 |
| AEP Joshua Falls SMR proposalSMR | Siting | Design profile not linked | — |
| Joshua Falls, Campbell CountyVirginia · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event 17 Jan 2025 |
| AEP Rockport BWRX-300 proposalSMR | Announced | BWRX-300 | — |
| Rockport Plant, Spencer County (I&M SMR site)Indiana · site-area point (approximate) | 10 Oct 2026Latest source 23 Jul 2026Latest event 17 Jan 2025 |
| Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana)SMR | Announced | Xe-100 | 960 MWe (gross/net unspecified) · plant |
| Former Breed Generating Station site, Sullivan CountyIndiana · named site, no map pin | 30 Oct 2026Latest source 19 Oct 2026Latest event: none dated |
| Ameren / Westinghouse SMR proposal at Callaway (2012)SMR | Announced | Design profile not linked | — |
| Callaway site (Ameren Missouri)Missouri · site-area point (approximate) | 2 Oct 2026Latest source 21 Feb 2014Latest event: none dated |
| Ameresco–Terrestrial Energy IMSR at Aberdeen Proving GroundSMR | Announced | IMSR (Integral Molten Salt Reactor) | — |
| Aberdeen Proving Ground (Phase 2 site)Maryland · site-area point (approximate) | 18 Oct 2026Latest source 9 Oct 2026Latest event 21 Sep 2026 |
| Antares Mark-0 at Idaho National LaboratoryMicroreactor | Commissioning | Antares Mark-0 | 100 watts thermal (thermal only; zero-power limit) |
| Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate) | 18 Oct 2026Latest source 23 Oct 2026Latest event 4 Jun 2026 |
| Antares Mark-1 electricity-producing microreactor at INLMicroreactor | Announced | Design profile not linked | — |
| MFC-793 test facility, INL Materials and Fuels ComplexIdaho · site-area point (approximate) | 24 Oct 2026Latest source 27 Oct 2026Latest event 23 Oct 2026 |
| Antares microreactor at Joint Base San Antonio (ANPI)Microreactor | Siting | R1 | — |
| Joint Base San AntonioTexas · named site, no map pin | 10 Oct 2026Latest source 23 Apr 2026Latest event: none dated |
| Antares R1 microreactor siting at INL's Central Facilities AreaMicroreactor | Siting | R1 | — |
| INL Central Facilities Area (candidate locations for an Antares R1 microreactor)Idaho · site-area point (approximate) | 3 Oct 2026Latest source, document dated 21 Aug 2025Latest event: none dated |
| Antares R1 microreactors at Fort Bragg (Army Janus)Microreactor | Announced | R1 | — |
| Fort BraggNorth Carolina · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| ARC-100 first-of-a-kind deployment framework at Idaho National LaboratorySMR | Announced | ARC-100 | 100 MWe (gross/net unspecified) · module |
| Idaho National Laboratory (ARC-100 first-of-a-kind; location within INL not stated)Idaho · town-level point (approximate) | 3 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026 |
| B&W mPower plan at TVA's Clinch River site (2013-2017)SMREarlier-plan record | Canceled | mPower | — |
| Clinch River Nuclear SiteTennessee · site-area point (approximate) | 19 Oct 2026Latest source: none datedLatest event: none dated |
| BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)Microreactor | Announced | KRONOS MMR | — |
| BaRupOn LAMP hub, LibertyTexas · town-level point (approximate) | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Beck Creek Energy SMR proposal (Amherst County)SMR | Announced | Design profile not linked | — |
| Beck Creek Energy site, eastern Amherst CountyVirginia · named site, no map pin | 30 Oct 2026Latest source 8 Oct 2026Latest event: none dated |
| Blue Energy BWRX-300 at Port of VictoriaSMR | Licensing | BWRX-300 | 1500 MWe (gross/net unspecified) · plant |
| Port of VictoriaTexas · named site, no map pin | 18 Oct 2026Latest source 8 Oct 2026Latest event 16 Sep 2026 |
| BlueCore BC-15 floating plant proposal at the Port of Long BeachSMR | Siting | BlueCore BC-15 | 15 MWe (gross) · module · 45 MWth (nameplate; basis unspecified) |
| Port of Long BeachCalifornia · named site, no map pin | 9 Oct 2026Latest source 13 Oct 2026Latest event: none dated |
| BWXT BANR at Fort Campbell (Army Janus)Microreactor | Announced | BWXT BANR | 20 MWe (gross/net unspecified) · plant |
| Fort CampbellKentucky · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| Cascade Advanced Energy FacilitySMR | Siting | Xe-100 | 320 MWe (net) · plant |
| Hanford Reservation Cascade / Columbia GS areaWashington · site-area point (approximate) | 18 Oct 2026Latest source 5 Nov 2026Latest event 5 Nov 2026 |
| Deep Atomic MK60 AI data-center campus proposal at INLSMR | Announced | MK60 | — |
| Idaho National Laboratory (proposed AI data-center campus)Idaho · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Deep Fission Gravity pilot, ParsonsSMR | Siting | Gravity | — |
| Great Plains Industrial Park, ParsonsKansas · site-area point (approximate) | 13 Oct 2026Latest source, document dated 17 Jul 2026Latest event 6 Aug 2026 |
| Deployable Energy Unity at Idaho National LaboratoryMicroreactor | Commissioning | Unity | 0 MWth (thermal only; zero-power limit) |
| Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate) | 18 Oct 2026Latest source 1 Jul 2026Latest event 30 Jun 2026 |
| Deployable Energy Unity full-power test in INL's DOME (2027)Microreactor | Siting | Unity | 1 MWe (gross/net unspecified) · module |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 13 Oct 2026Latest source 30 Sep 2026Latest event 30 Sep 2026 |
| Deployable Energy–Hornbeck Unity maritime demonstration proposalMicroreactor | Announced | Unity | — |
| Undisclosed | 13 Oct 2026Latest source 28 Aug 2026Latest event: none dated |
| Dominion North Anna SMR proposalSMR | Announced | Design profile not linked | — |
| North Anna Power Station, Louisa CountyVirginia · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Duke Belews Creek technology-neutral SMR proposalSMR | Licensing | Design profile not linked | — |
| Site near Belews Creek Steam Station, Stokes CountyNorth Carolina · site-area point (approximate) | 18 Oct 2026Latest source, document dated 1 Oct 2026Latest event 1 Oct 2026 |
| Elementl Letart Township BWRX-300 proposalSMR | Siting | BWRX-300 | — |
| Letart Township, Meigs CountyOhio · town-level point (approximate) | 11 Oct 2026Latest source 26 Oct 2026Latest event 26 Oct 2026 |
| eVinci DOME nuclear test reactorMicroreactor | Canceled | eVinci | — |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| First American Nuclear EAGL-1 energy park in Indiana (site not disclosed)SMR | Announced | EAGL-1 | — |
| Indianaregion only, no map pin | 11 Oct 2026Latest source 15 Apr 2026Latest event 4 Nov 2025 |
| General Atomics GA-TES at Fort Hood (Army Janus)Microreactor | Announced | GA-TES | 5 MWe (gross/net unspecified) · plant |
| Fort HoodTexas · site-area point (approximate) | 10 Oct 2026Latest source 15 Oct 2026Latest event: none dated |
| Holtec Green River / Blue Castle, Utah proposalSMR | Announced | Holtec SMR-300 | — |
| Green River, Blue Castle projectUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event 28 May 2026 |
| Holtec Oyster Creek SMR proposalSMR | Announced | Holtec SMR-300 | 1360 MWe (gross/net unspecified) · plant |
| Oyster Creek Generating Station site, Lacey TownshipNew Jersey · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event 30 Jul 2026 |
| Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)SMR | Licensing | Holtec SMR-300 | 680 MWe (gross/net unspecified) · plantHoltec states the two Pioneer units are designed to provide 680 MWe together, and the NRC's January 2026 release describes each SMR-300 unit as approximately 340 MWe. |
| Palisades Nuclear Plant areaMichigan · site-area point (approximate) | 18 Oct 2026Latest source 10 Nov 2026Latest event 30 Sep 2026 |
| Holtec SMR-160 proposal at Savannah River Site (2012)SMREarlier-plan record | Announced | Holtec SMR-160 | 160 MWe (gross/net unspecified) · module |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source 5 Mar 2012Latest event: none dated |
| Holtec SMR-300 proposal in Brigham City, UtahSMR | Announced | Holtec SMR-300 | — |
| Brigham CityUtah · town named, no map pin | 2 Oct 2026Latest source, document dated 19 Nov 2025Latest event: none dated |
| Hyperion / Gen4 Module proposal at Savannah River Site (2012)SMREarlier-plan record | Announced | G4M | 25 MWe (gross/net unspecified) · module · 70 MWth (nameplate; basis unspecified) |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source 24 Sep 2024Latest event: none dated |
| Idaho State University / NuCube Advanced Research and Test ReactorMicroreactor | Siting | Design profile not linked | thermal only |
| ISU Business and Research Park, PocatelloIdaho · town-level point (approximate) | 13 Oct 2026Latest source 16 Sep 2026Latest event 16 Sep 2026 |
| Kairos commercial proposal at Texas A&M-RELLISSMR | Siting | KP-FHR commercial plant | — |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event: none dated |
| Kairos Hermes 1SMR | Construction | Hermes / KP-FHR | 35 MWth (thermal only; nameplate; basis unspecified) |
| Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)Tennessee · site-area point (approximate) | 18 Oct 2026Latest source 15 Sep 2026Latest event 1 May 2025 |
| Kairos Hermes 2SMR | Construction | Hermes / KP-FHR | — |
| Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)Tennessee · site-area point (approximate) | 18 Oct 2026Latest source, document dated 1 Oct 2026Latest event 17 Apr 2026 |
| Last Energy first commercial PWR-20 site, Caldwell CountyMicroreactor | Licensing | PWR-20 | 20 MWe (net) · module · 80 MWth (nameplate; basis unspecified) |
| Maxwell, Caldwell CountyTexas · region only, no map pin | 28 Oct 2026Latest source 5 Nov 2026Latest event Jul 2026 |
| Last Energy Haskell County PWR-20 campusMicroreactor | Siting | PWR-20 | 20 MWe (gross) · module |
| Haskell CountyTexas · region only, no map pin | 9 Oct 2026Latest source Jul 2026Latest event 28 Feb 2025 |
| Last Energy PWR-5 pilot at Texas A&M-RELLISMicroreactor | Construction | Last Energy PWR-5 | 5 MWe (gross/net unspecified) · module |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 18 Oct 2026Latest source 16 Dec 2025Latest event 7 Oct 2026 |
| Long Mott Generating Station (Xe-100 at Dow Seadrift)SMR | Licensing | Xe-100 | 320 MWe (net) · plant · 800 MWth (nameplate; basis unspecified)The NRC application page lists a four-module plant at 800 MWth/320 MWe, intended to supply electricity and steam to Dow's adjacent Seadrift Operations, and says each module could produce 80 MWe of electricity or about 200 MWth of steam. |
| Dow UCC Seadrift / Long MottTexas · site-area point (approximate) | 18 Oct 2026Latest source 12 Nov 2026Latest event 9 Nov 2026 |
| MARVEL microreactor test bed at INL's TREAT facilityMicroreactor | Construction | MARVEL | 10 kWe (gross/net unspecified) · plant · 85 kWth (nameplate; basis unspecified) |
| TREAT facility, Idaho National LaboratoryIdaho · site-area point (approximate) | 18 Oct 2026Latest source 6 Oct 2026Latest event 6 Oct 2026 |
| Meta–TerraPower initial dual-unit Natrium proposalSMR | Announced | Natrium | 690 MWe (gross/net unspecified) · plant |
| Undisclosed | 13 Oct 2026Latest source 9 Jan 2026Latest event: none dated |
| Microreactor at Naval Weapons Station CraneMicroreactor | Announced | Kaleidos | — |
| Naval Weapons Station CraneIndiana · site-area point (approximate) | 25 Oct 2026Latest source 20 Oct 2026Latest event 20 Oct 2026 |
| Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)SMR | Announced | Design profile not linked | — | Midpoint SMR Project #1 (Jerome County BLM)Idaho · site-area point (approximate) | 2 Oct 2026Latest source 22 Aug 2025Latest event: none dated | |
| NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU)Microreactor | Announced | Design profile not linked | — |
| Digihost 60 MW power plant, North Tonawanda, New YorkNew York · site-area point (approximate) | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Natrium Kemmerer Unit 1SMR | Construction | Natrium | 345 MWe (gross/net unspecified) · module · 840 MWth (nameplate; basis unspecified) |
| Kemmerer Natrium siteWyoming · town-level point (approximate) | 18 Oct 2026Latest source 23 Sep 2026Latest event Sep 2026 |
| Natura MSR-1 demonstration at Abilene Christian UniversitySMR | Construction | Natura MSR-1 | thermal only |
| Science and Engineering Research Center, Abilene Christian UniversityTexas · site-area point (approximate) | 18 Oct 2026Latest source 22 Sep 2026Latest event 18 Sep 2026 |
| Natura MSR-100 proposal at Texas A&M-RELLISSMR | Siting | Natura MSR-100 | — |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event: none dated |
| Next Generation Nuclear Plant prototype HTGR at INL (2005-2013)SMREarlier-plan record | Suspended | Design profile not linked | — |
| Idaho National Laboratory (NGNP prototype; location within INL not fixed)Idaho · town-level point (approximate) | 19 Oct 2026Latest source Aug 2008Latest event: none dated |
| Nine Mile Point Gen III+ SMR early site permit evaluationSMR | Announced | Design profile not linked | — |
| Nine Mile Point Clean Energy Center (advanced/SMR ESP evaluation)New York · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Nuclea Morpheus test reactor siting at the Utah San Rafael Energy LabMicroreactor | Announced | Morpheus | — |
| Utah San Rafael Energy LabUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| NuCube test microreactor at the Utah San Rafael Energy LabMicroreactor | Announced | NuSun-1 | — |
| Utah San Rafael Energy LabUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| NuScale plant proposal at Savannah River Site (2012)SMREarlier-plan record | Announced | Design profile not linked | 45 MWe (gross/net unspecified) · module |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Oklo Aurora at Eielson AFB (DAF microreactor pilot)Microreactor | Siting | Aurora | — |
| Eielson Air Force BaseAlaska · site-area point (approximate) | 7 Oct 2026Latest source: none datedLatest event: none dated |
| Oklo Aurora campus, Pike County, OhioMicroreactor | Siting | Aurora | — |
| Pike County / former Portsmouth site (Oklo)Ohio · site-area point (approximate) | 10 Oct 2026Latest source 12 Nov 2026Latest event 1 Feb 2024 |
| Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI)Microreactor | Announced | Aurora | 50 MWe (gross/net unspecified) · plantProposed collective electricity supply under a non-binding letter of intent; this figure does not establish a selected plant or module nameplate. |
| Permian Basin operations near MidlandTexas · region only, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Oklo Aurora-INLMicroreactor | Construction | Aurora | — |
| Idaho National Laboratory — Aurora site south of the Materials and Fuels ComplexIdaho · site-area point (approximate) | 18 Oct 2026Latest source, document dated 6 Nov 2026Latest event 20 Jul 2026 |
| Penn State FRONTIER eVinci research proposalMicroreactor | Announced | eVinci | — |
| University Park campus, Penn StatePennsylvania · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Project Pele (INL microreactor demonstration)Microreactor | Construction | Project Pele microreactor (BWXT HTGR) | 1.5 MWe (gross/net unspecified) · module |
| INL CITRC Project Pele areaIdaho · town-level point (approximate) | 18 Oct 2026Latest source 7 Dec 2022Latest event Sep 2026 |
| Project TETRA / TETRA-1 pilot at Texas A&M RELLISSMR | Announced | IMSR (Integral Molten Salt Reactor) | — |
| Texas A&M RELLIS campus — TETRA-1 planned sitesite-area point (approximate) | 2 Oct 2026Latest source 8 Jan 2026Latest event: none dated |
| Purdue / Duke Energy SMR feasibility study for the Purdue campusSMR | Announced | Design profile not linked | — |
| Purdue University campus, West LafayetteIndiana · site-area point (approximate) | 2 Oct 2026Latest source 10 May 2023Latest event: none dated |
| Pylon / LOKI MMR experiment proposal for INL's DOMEMicroreactor | Announced | LOKI MMR | — |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 2 Oct 2026Latest source 7 Oct 2026Latest event: none dated |
| Radiant Kaleidos Buckley Space Force Base proposalMicroreactor | Siting | Kaleidos | — |
| Buckley Space Force Base, AuroraColorado · site-area point (approximate) | 10 Oct 2026Latest source 23 Jul 2026Latest event 23 Jul 2026 |
| Radiant Kaleidos demonstration at INL DOMEMicroreactor | Commissioning | Kaleidos | MWe not recorded · module · 3.5 MWth (nameplate; basis unspecified) |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 18 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026 |
| Radiant Kaleidos microreactors at Fort Benning (Army Janus)Microreactor | Announced | Kaleidos | 3 MWe (gross/net unspecified) · plant |
| Fort BenningGeorgia · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| Standard Power NuScale SMR facility in Ohio (site not disclosed)SMR | Announced | Design profile not linked | — |
| Ohioregion only, no map pin | 5 Oct 2026Latest source: none datedLatest event 6 Oct 2023 |
| Standard Power NuScale SMR facility in Pennsylvania (site not disclosed)SMR | Announced | Design profile not linked | — |
| Pennsylvaniaregion only, no map pin | 5 Oct 2026Latest source: none datedLatest event 6 Oct 2023 |
| Surry Green Energy Center SMR campus proposalSMR | Announced | Design profile not linked | — | Not recorded | Surry Green Energy Center SMR campus proposalVirginia · site-area point (approximate) | 2 Oct 2026Latest source 13 Feb 2024Latest event: none dated |
| Tata / BWXT BANR Green River, Wyoming proposalMicroreactor | Announced | BWXT BANR | — |
| Tata Chemicals Soda Ash Partners site, Green RiverWyoming · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, ValmeyerMicroreactor | Siting | SOLO | — |
| Rock City Admiral Parkway, ValmeyerIllinois · named site, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Terrestrial Energy IMSR at Texas A&M-RELLISSMR | Siting | IMSR (Integral Molten Salt Reactor) | — |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event 18 Jun 2026 |
| Toshiba 4S proposal at Galena, Alaska (mid-2000s)SMR | Canceled | 4S | 10 MWe (gross/net unspecified) · plant |
| Galena, AlaskaAlaska · town named, no map pin | 2 Oct 2026Latest source 6 May 2026Latest event: none dated |
| Transformational Challenge Reactor microreactor test proposal at ORNL (2019)Microreactor | Announced | Design profile not linked | — |
| Building 7709, Copper Ridge, Oak Ridge National LaboratoryTennessee · site-area point (approximate) | 3 Oct 2026Latest source Aug 2022Latest event: none dated |
| TVA Clinch River BWRX-300SMR | Licensing | BWRX-300 | 300 MWe (net) · moduleThe IAEA's 2026 reactor tables, which report Member State data to 31 December 2025, list Clinch River SMR-1 at 300 MW gross and 300 MW net with no thermal figure. |
| Clinch River Nuclear SiteTennessee · site-area point (approximate) | 18 Oct 2026Latest source, document dated 28 Sep 2026Latest event 29 Sep 2026 |
| UAMPS Carbon Free Power Project (canceled)SMREarlier-plan record | Canceled | NuScale VOYGR (US460 / NPM) | 462 MWe (gross/net unspecified) · plantThe WNA USA profile lists VOYGR-6 as 462 MWe and calls this project a VOYGR-6 plant. |
| INL / CFPP proposed NuScale siteIdaho · town-level point (approximate) | 19 Oct 2026Latest source, document dated 8 Nov 2023Latest event 8 Nov 2023 |
| University of Illinois KRONOS MMRMicroreactor | Licensing | KRONOS MMR | MWe not recorded · module · 45 MWth (nameplate; basis unspecified) |
| University of Illinois Urbana-Champaign campusIllinois · exact point | 18 Oct 2026Latest source 27 Oct 2026Latest event 27 Oct 2026 |
| USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)Microreactor | Announced | Design profile not linked | — |
| USNC MMR Idaho National Laboratory demonstration proposal (site agreement undisclosed)Idaho · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Valar Atomics Ward 250Microreactor | Operating | Ward 250 | MWe not recorded · module · 250 kWth (nameplate; basis unspecified) |
| Utah San Rafael Energy LabUtah · site-area point (approximate) | 18 Oct 2026Latest source 19 Jun 2026Latest event 2 Jul 2026 |
| Valar Carbon County nuclear campus proposal (Project Beehive)SMR | Siting | Design profile not linked | — |
| Valar Carbon County campus siteUtah · named site, no map pin | 13 Oct 2026Latest source, document dated 17 Sep 2026Latest event: none dated |
| Westinghouse eVinci at Fort Drum (Army Janus)Microreactor | Announced | eVinci | — |
| Fort DrumNew York · site-area point (approximate) | 10 Oct 2026Latest source 26 Aug 2026Latest event: none dated |
| Westinghouse eVinci at Malmstrom Air Force Base (ANPI)Microreactor | Siting | eVinci | — |
| Malmstrom Air Force BaseMontana · site-area point (approximate) | 10 Oct 2026Latest source 23 Apr 2026Latest event: none dated |
| ZettaJoule ZJ0 research reactor at Texas A&M (TEES)SMR | Announced | Design profile not linked | — |
| TEES Nuclear Engineering & Science Center area, College StationTexas · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
Research coverage for the 89 matching projects: of 801 answers to nine review questions, 355 have a supported statement, 386 were reviewed with a stated limit and 60 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.
No projects match, so there are no answers to count.
Coverage by question
Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.
| Question | Supported statement | Not disclosed | Not applicable | Conflicting evidence | Source unavailable | Not reviewed | Projects |
|---|---|---|---|---|---|---|---|
| Customer or offtaker | 28 | 58 | 0 | 0 | 0 | 3 | 89 |
| Contractor | 24 | 62 | 0 | 0 | 0 | 3 | 89 |
| Funding | 33 | 53 | 0 | 0 | 0 | 3 | 89 |
| Project fuel commitment | 19 | 67 | 0 | 0 | 0 | 3 | 89 |
| Comparable schedule revision | 7 | 79 | 0 | 1 | 0 | 2 | 89 |
| Permissions and public process | 71 | 16 | 0 | 0 | 0 | 2 | 89 |
| Site dependencies (land, grid, water) | 75 | 11 | 0 | 1 | 0 | 2 | 89 |
| Spent fuel, waste and closure | 30 | 16 | 1 | 1 | 2 | 39 | 89 |
| Next decision and prerequisites | 68 | 14 | 4 | 0 | 0 | 3 | 89 |
| All nine questions | 355 | 376 | 5 | 3 | 2 | 60 | 801 |
Agreements
(60)
Agreements, plans, studies and government programs that concern this country. They are not deployment projects and are not counted as projects or reactors.
- Dairyland Power and Applied Atomics letter of intent to evaluate SMRs at the Genoa site (Wisconsin) — Feasibility or siting study · Active · announced 22 Oct 2026
- Deep Fission and GPDA commercial power agreement at Great Plains Industrial Park — Customer agreement · Active · announced 20 Oct 2026
- AEP, Amazon and X-energy exploration agreement for the former Breed station in Indiana — Feasibility or siting study · Active · announced 19 Oct 2026
- FANCO–Floral Energy integrated-power opportunity evaluation — Feasibility or siting study · Active · announced 14 Oct 2026
Also concerns United Kingdom - TRISO-X–ORNL fuel-research agreement extension — Research program · Active · announced 11 Aug 2026
- Holtec, Entergy and Hyundai E&C agreement to evaluate SMR-300 projects across Entergy's territory (2026) — Cooperation agreement or MOU · Active · announced Aug 2026
- TerraPower and Hyundai E&C framework agreement: EPC for up to eight Natrium reactors (2026) — Fleet agreement · Active · announced Aug 2026
- NuCube Energy and Alaska Fund NuAlaska initiative for NuSun-1 projects in Alaska — Cooperation agreement or MOU · Active · announced 30 Jul 2026
- X-energy participation in Project Prometheus — Research program · Active · announced 22 Jul 2026
- FANCO–Hyundai E&C EAGL-1 cooperation framework — Cooperation agreement or MOU · Active · announced 14 Jul 2026
- Holtec plan to use its retired nuclear plant sites (Pilgrim, Indian Point, Big Rock Point) for future SMR-300 units — Feasibility or siting study · Active · announced 10 Jul 2026
- Natura and Quadrant prospective commercial-reactor HALEU framework — Cooperation agreement or MOU · Status not established · announced 11 Jun 2026
- FANCO–AtkinsRéalis EAGL-1 engineering alliance — Cooperation agreement or MOU · Active · announced 13 May 2026
- Nebraska Public Power District Gen III+ SMR early site permit program (DOE cost-shared) — Feasibility or siting study · Active · announced 8 May 2026
- Terrestrial Energy and Riot Platforms memorandum on IMSR plants for data centers (up to 4 GW, 2026) — Customer agreement · Active · announced 6 May 2026
- LG&E and KU (PPL) and X-energy collaboration to explore Xe-100 SMR deployment in Kentucky — Feasibility or siting study · Active · announced 30 Apr 2026
- Natura and HiFunda molten-salt chemistry sensor development — Research program · Status not established · announced 14 Apr 2026
- DOE / NRIC Nuclear Energy Launch Pad (reactor and fuel-cycle developer selections) — Government program · Active · announced Apr 2026
- FPL plan to begin early site permitting for a potential SMR next to an existing nuclear plant (Florida) — Feasibility or siting study · Active · announced Apr 2026
- Indiana Office of Energy Development and Eli Lilly letter of intent on SMR and advanced nuclear projects — Cooperation agreement or MOU · Active · announced Apr 2026
- US–Japan strategic investment in GE Vernova Hitachi BWRX-300 SMRs in Tennessee and Alabama (up to $40 billion) — Intergovernmental agreement · Active · announced 20 Mar 2026
- X-energy and Talen Energy letter of intent to assess three or more four-unit Xe-100 plants (Pennsylvania and PJM) — Fleet agreement · Active · announced 19 Mar 2026
- Natura Resources and NGL Water Solutions Permian agreement on MSR-100 power and produced-water treatment (Texas) — Cooperation agreement or MOU · Active · announced 3 Feb 2026
- Wisconsin PSC and UW-Madison nuclear power siting study (2025 Wisconsin Act 12) — Feasibility or siting study · Active · announced Feb 2026
- NANO Nuclear Energy and Ameresco memorandum on deploying NANO microreactors at US federal and commercial sites (2026) — Cooperation agreement or MOU · Active · announced Jan 2026
- NextEra Energy evaluation of 6 GW of SMR capacity at its nuclear sites and new sites (2026) — Feasibility or siting study · Active · announced Jan 2026
- Ontario Power Generation and New York Power Authority memorandum on advanced nuclear, including SMRs (2025) — Cooperation agreement or MOU · Active · announced 19 Dec 2025
Also concerns Canada - Natura acquisition of Shepherd Power and commercialization agreement with NOV — Cooperation agreement or MOU · Status not established · announced 10 Dec 2025
- Great Plains New Nuclear Consortium study of 1,000-2,000 MW of new nuclear, including SMRs, in Nebraska (2025) — Feasibility or siting study · Active · announced 1 Dec 2025
- Natura and 3M lithium-7 development and qualification agreement — Research program · Status not established · announced 4 Nov 2025
- Terra Innovatum and Uvation letter of intent for a SOLO microreactor pilot for data centers (2025) — Customer agreement · Active · announced Nov 2025
- U.S. Army Janus Program for commercial microreactors on Army installations — Government program · Active · announced 14 Oct 2025
- Terra Innovatum and Ameresco memorandum on siting and deploying SOLO micro-modular reactors (2025) — Cooperation agreement or MOU · Active · announced Oct 2025
- TerraPower, Evergy and Kansas Department of Commerce memorandum to explore siting a Natrium plant in Kansas — Cooperation agreement or MOU · Active · announced 23 Sep 2025
- Kairos Power and BWXT commercial TRISO fuel development collaboration — Research program · Status not established · announced 3 Sep 2025
- NANO Nuclear AFWERX research contract to explore a KRONOS MMR at Joint Base Anacostia-Bolling — Feasibility or siting study · Active · announced 2 Sep 2025
- Utah Office of Energy Development, TerraPower and Flagship Companies memorandum to explore siting a Natrium plant in… — Cooperation agreement or MOU · Status not established · announced 25 Aug 2025
- DOE Reactor Pilot Program (DOE-authorized advanced test reactors) — Government program · Active · announced 18 Jun 2025
- Constellation evaluation of an advanced reactor or SMR at the Clinton Clean Energy Center (Illinois) — Feasibility or siting study · Active · announced 3 Jun 2025
- New York Power Authority program for at least 1 GW of new nuclear in upstate New York (large reactors and/or SMRs) — Government program · Active · announced Jun 2025
- Nucleon and ARC memorandum to explore ARC-100 deployment in Alberta and Texas — Cooperation agreement or MOU · Superseded · announced 13 May 2025
Also concerns Canada - EnergySolutions, Intermountain Power Agency and Utah initiative to explore advanced nuclear, including SMRs, at the… — Feasibility or siting study · Status not established · announced 23 Apr 2025
- TerraPower–nVision Natrium development framework — Cooperation agreement or MOU · Status not established · announced 12 Feb 2025
- TerraPower–Sabey Data Centers exploratory Natrium memorandum — Cooperation agreement or MOU · Status not established · announced 21 Jan 2025
- Arkansas legislative feasibility study on new nuclear generation, including small modular and micro reactors (2025-2026) — Feasibility or siting study · Completed · announced 2025
- Texas Tech, Abilene Christian University, Natura Resources and Texas Produced Water Consortium molten-salt-reactor… — Research program · Active · announced Jan 2025
- ENTRA1 Energy and Tennessee Valley Authority agreement for up to 6 GW of NuScale SMR capacity — Fleet agreement · Active · announced 2025
- NANO Nuclear and DOE Idaho Operations Office memorandum to evaluate siting ZEUS and ODIN prototypes at INL — Cooperation agreement or MOU · Active · announced 4 Dec 2024
- Terrestrial Energy and EnergySolutions memorandum to site IMSR plants at EnergySolutions-owned sites — Cooperation agreement or MOU · Status not established · announced Dec 2024
- Nuclear Fuel Services selection for DOE HALEU deconversion IDIQ — Selection or award · Active · announced 8 Oct 2024
- Oklo and Wyoming Hyperscale non-binding letter of intent for 100 MW of Aurora power to a data-center campus — Customer agreement · Status not established · announced 23 May 2024
- Idaho Strategic Resources and Radiant memorandum on Kaleidos microreactors at a mine site (2024) — Customer agreement · Status not established · announced 8 May 2024
- BWXT and Wyoming Energy Authority contract to assess BANR microreactor deployment in Wyoming — Feasibility or siting study · Status not established · announced 12 Sep 2023
- PacifiCorp and TerraPower joint study of up to five additional Natrium reactors by 2035 — Feasibility or siting study · Status not established · announced 27 Oct 2022
- Maryland Energy Administration grant study of repurposing a Maryland coal plant with X-energy's Xe-100 — Feasibility or siting study · Completed · announced 14 Jun 2022
- Copper Valley Electric Association and Ultra Safe Nuclear Corporation Micro Modular Reactor feasibility study (Alaska) — Feasibility or siting study · Completed · announced Feb 2022
- SRNS and GE Hitachi agreement to explore a PRISM prototype at the Savannah River Site (2010) — Cooperation agreement or MOU · Ended · announced 27 Oct 2010
- DARPA Fast Capacitance (Fat Cat) autonomous fast-reactor research — Research program · Active · announced Date not recorded
- Indiana Advanced Nuclear Ready Communities program — Government program · Active · announced Date not recorded
- Valar Atomics NRC pre-application engagement — Regulatory engagement · Active · announced Date not recorded
Recorded project permissions and applications
(25)
These documents concern the linked projects only. A country-wide approval is not inferred; design assessments, site permissions, construction permissions and operating authority remain separate.
Site applications and decisions
- Belews Creek early site permit application — Duke Belews Creek technology-neutral SMR proposal
Site permission sought · Under review · NRC · submitted 30 Dec 2025 · docket 52-055 · ADAMS ML25364A004, ML26016A624, ML26259A008, ML26274A437 · 91 FR 5787 · 91 FR 542 · 91 FR 22549 · 91 FR 50896
Duke Energy Carolinas applied on 30 December 2025 for an early site permit for the Belews Creek site in Stokes and Forsyth counties, North Carolina. The NRC accepted and docketed the application in February 2026 under Docket No. 52-055, and it is under review. If issued, an early site permit approves a site independent of a specific plant design. It is not a construction permit or a combined license, and no reactor design is selected. The NRC gave notice on 27 April 2026 that it will prepare an environmental impact statement, and its project page marks the uncontested hearing of 17 September 2026 as held. On 29 September 2026, NRC letter ML26259A008 set a $2,178,000 cap on NRC review fees. That cap is not a project cost or a permit. The cap may be increased for applicant failure as defined in 10 CFR 170.3. The letter accelerates the 8 February 2026 schedule. NRC targets, not completed: advanced final safety evaluation report without open items December 2026 (from March 2027), draft environmental impact statement December 2026 (from February 2027), final safety evaluation February 2027 (from May 2027), and final environmental impact statement March 2027 (from May 2027). The decision date is listed as to be determined. Duke Energy Carolinas' Revision 2 cover letter (ML26274A437), dated 1 October 2026, states that Duke is not requesting a limited work authorization. The NRC project page lists the Revision 2 package as ML26274A436.
Sources: Federal Register 91 FR 5787 (9 Feb 2026): Belews Creek early site permit application, acceptance for docketing and opportunity to request a hearing; Federal Register 91 FR 542 (7 Jan 2026): Belews Creek early site permit application, notice of receipt; Federal Register 91 FR 22549 (27 Apr 2026): Belews Creek early site permit, notice of intent to prepare an environmental impact statement; Federal Register 91 FR 50896 (6 Aug 2026): Belews Creek early site permit application, notice of uncontested hearing; NRC: Duke Energy's Belews Creek early site permit application; NRC letter: fixed fee cap and revised schedule for the Belews Creek early site permit review (ADAMS ML26259A008); Duke Energy Carolinas letter RA-26-0157: Revision 2 of the Belews Creek early site permit application (ADAMS ML26274A437) - Clinch River Nuclear Site early site permit ESP-006 — TVA Clinch River BWRX-300
Site permission · Issued / approved · NRC · decided 19 Dec 2019 · submitted 12 May 2016 · permit ESP-006
NRC: application for two or more SMR modules (up to 800 MWe, 2420 MWt) submitted 12 May 2016, docketed 30 Dec 2016; Commission decision 17 Dec 2019.
Sources: U.S. NRC: Clinch River Nuclear Site early site permit ESP-006
Construction applications and decisions
- Long Mott construction permit — Long Mott Generating Station (Xe-100 at Dow Seadrift)
Construction permission · Issued / approved · NRC · decided 9 Nov 2026 · submitted 31 Mar 2025 · permit CPAR-3 · docket 50-614 · ADAMS ML26301A133 · 90 FR 24428 · 91 FR 53900 · 91 FR 72925
Long Mott Energy's construction permit application, dated 31 March 2025, was accepted and docketed by the NRC. NRC news release 26-083 of 9 November 2026 states that the NRC has issued the construction permit for the four-reactor Xe-100 Long Mott Generating Station in Calhoun County, Texas, that staff completed the safety evaluation in October, and that the permit authorizes building the facility but not operation; a separate operating license is required before fuel loading. The release gives no permit number; the permit itself is Construction Permit No. CPAR-3 (ADAMS ML26301A133), issued 9 November 2026, and the Federal Register notice of issuance (91 FR 72925, 12 November 2026) says it is immediately effective and authorizes construction of a power reactor facility in Calhoun County, Texas. The permit sets the earliest construction completion date as 1 July 2033 and the latest as 31 December 2033 and expires on that date. Its conditions include that Long Mott Energy notify the NRC when the site grading design and the passive engineered flooding protection design that may impact site grading are available for NRC staff examination, and that it perform geologic mapping of each foundation excavation for safety-related structures, evaluate it against the site characterization and notify the NRC when it is available for examination; the permit also incorporates an environmental protection plan. It says a license authorizing operation will not be issued unless the applicant submits the complete final safety analysis report, the Commission makes the stated findings on final design and environmental requirements, and the applicant submits proof of financial protection and executes an indemnity agreement. The NRC's project page, updated 12 November 2026, lists the hearing as held on 22 September 2026 and the construction permit decision as 8 November 2026; the permit and the Federal Register notice date issuance to 9 November 2026, and the one-day difference is unexplained in the sources read. Earlier steps: the uncontested (mandatory) hearing was held on 22 September 2026 in Port Lavaca; the Advisory Committee on Reactor Safeguards reported on 16 October 2026 that its review supports issuance; NRC issued an environmental assessment and finding of no significant impact plus related exemptions on 18 May 2026. In the contested proceeding, both admitted contentions were dismissed as moot in 2026 and on 7 August 2026 the Commission dismissed the applicant's appeal as moot; on 6 November 2026 the Commission denied the intervenor's separate petition for review (CLI-26-15). The permit is not an operating license. No construction start is recorded; a permit is not a physical construction start.
Sources: Federal Register 90 FR 24428 (10 Jun 2025): Long Mott Generating Station construction permit application; Federal Register 91 FR 53900 (20 Aug 2026): Long Mott Generating Station notice of hearing; NRC / ANS Dow Long Mott Xe-100 EA-FONSI; NRC Federal Register notice: Long Mott environmental assessment, FONSI and exemptions; NRC: Long Mott Generating Station Xe-100 application page; NRC Commission order CLI-26-10, Long Mott Energy, LLC (Docket 50-614-CP); NRC meeting notice: mandatory hearing on the Long Mott construction permit application; NRC Advisory Committee on Reactor Safeguards: report on the safety aspects of the Long Mott construction permit application (16 Oct 2026); Federal Register 2026-18898 (15 Sep 2026): 739th meeting of the Advisory Committee on Reactor Safeguards; X-energy: NRC completes safety review of the Xe-100 for Long Mott (final safety evaluation report), 30 Oct 2026; NRC news release 26-083: first construction permit in nearly 60 years for a high-temperature gas-cooled reactor (Long Mott); X-energy and Dow: proposed SMR project receives construction permit for nuclear-powered industrial site; Federal Register 91 FR 72925 (12 Nov 2026): Long Mott Generating Station construction permit CPAR-3, notice of issuance; NRC Construction Permit No. CPAR-3, Long Mott Generating Station (ML26301A133); NRC Commission order CLI-26-15, Long Mott Energy, LLC (Docket 50-614-CP) - Last Energy Caldwell site phased construction permit application, Part 1 (with limited work authorization request) — Last Energy first commercial PWR-20 site, Caldwell County
Construction permission sought · Application received · NRC · submitted 20 Oct 2026 · docket 99902140 · ADAMS ML26294A162 · 91 FR 69895
Last Energy filed Part 1 of a two-part phased construction permit application on 20 October 2026 for a PWR-20 facility at the Caldwell Site in Caldwell County, Texas. Part 1 includes a limited work authorization request under 10 CFR 50.10(d) covering early foundation work, with financial information, a preliminary safety analysis report for the LWA scope, an environmental report and a site redress plan. The NRC published a notice of receipt on 5 November 2026 (91 FR 69895). That notice reports receipt and says later notices will address whether the application is acceptable for docketing; it does not report an acceptance decision or grant a limited work authorization or construction permit. Receipt authorizes no construction.
Sources: Federal Register 91 FR 69895 (5 Nov 2026): Last Energy phased construction permit application with limited work authorization request, Caldwell site (notice of receipt) - Clinch River Unit 1 construction permit — TVA Clinch River BWRX-300
Construction permission · Issued / approved · NRC · decided 28 Sep 2026 · submitted 28 Apr 2025 · permit CPAR-2 · docket 50-615 · ADAMS ML26244A257, ML26243A056 · 91 FR 63311
The Federal Register published this notice on 5 October 2026 at 91 FR 63311. It states that construction permit CPAR-2 was issued to TVA on 28 September 2026 for Clinch River Nuclear Unit 1, is immediately effective, and authorizes construction of a power reactor facility in Roane County, Tennessee. The notice says the conditions in early site permit ESP-006 had been met except those listed in the construction permit. The permit sets the earliest construction completion date as 1 October 2031 and the latest as 30 September 2032, expires on that latest date and does not restate an output rating. TVA announced the permit on 29 September 2026. The permit is not an operating license. No construction start is recorded; a permit is not a physical construction start.
Sources: Federal Register 91 FR 63311 (5 Oct 2026): Clinch River Nuclear Unit 1 construction permit and record of decision; TVA construction permit announcement; NRC: TVA Clinch River construction permit application; NRC Construction Permit No. CPAR-2, Clinch River Nuclear Unit 1 (ML26243A056) - Blue Energy Center–Port of Victoria Nuclear Unit 1 phased construction permit application, Part 1 (with limited work authorization request) — Blue Energy BWRX-300 at Port of Victoria
Construction permission sought · Application received · NRC · submitted 15 Sep 2026 · docket 99902137 · ADAMS ML26265A371, ML26258A339 · 91 FR 64409
Blue Energy filed Part 1 of a phased construction permit application on 15 September 2026 for one BWRX-300 unit, Blue Energy Center–Port of Victoria Nuclear Unit 1, in Victoria, Texas. Part 1 includes a limited work authorization request, two related exemption requests and an environmental report. The NRC published a notice of receipt on 8 October 2026 (91 FR 64409). That notice reports receipt and says later notices will address whether the application is acceptable for docketing; it does not report an acceptance decision or grant a limited work authorization or construction permit. Receipt authorizes no construction. The applicant intends to file the full construction permit application within 18 months of Part 1.
Sources: Federal Register 91 FR 64409 (8 Oct 2026): Blue Energy Center–Port of Victoria Nuclear Unit 1 phased construction permit application with limited work authorization request (notice of receipt); Blue Energy letter submitting Construction Permit Application Part 1 (ADAMS ML26258A339); Federal Register 91 FR 64409 (8 Oct 2026), govinfo copy: Blue Energy Center–Port of Victoria Nuclear Unit 1 phased construction permit application, notice of receipt - NRC construction permit application for the University of Illinois KRONOS MMR — University of Illinois KRONOS MMR
Construction permission sought · Under review · NRC · submitted 31 Mar 2026 · docket 50-618 · ADAMS ML26090A463, ML26120A548 · 91 FR 21321 · 91 FR 30730
The university applied for a construction permit for one research reactor by letter dated 27 March 2026; the NRC records it as tendered on 31 March 2026, accepted it for docketing on 18 May 2026 as Docket No. 50-618 and published the hearing opportunity on 26 May 2026. The stated application power level is 45 MWth. No permit has been issued; target review dates in 2027 are not decisions.
Sources: NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application; Federal Register 91 FR 21321 (21 Apr 2026): University of Illinois construction permit application received; Federal Register 91 FR 30730 (26 May 2026): University of Illinois construction permit application docketedStatus confirmed on against NRC: University of Illinois Urbana-Champaign KRONOS MMR construction permit application. This confirms the recorded status only; the general record check date remains separate.
- TerraPower Natrium construction permit — Natrium Kemmerer Unit 1
Construction permission · Issued / approved · NRC · decided 9 Mar 2026 · submitted 28 Mar 2024 · permit CPAR-1 · docket 50-613 · ADAMS ML26034B247 · 91 FR 12628
The NRC issued construction permit CPAR-1 on 9 March 2026 to US SFR Owner, LLC (TerraPower) for Kemmerer Power Station Unit 1, after the Commission's 4 March 2026 decision on the uncontested hearing. The permit authorizes construction only; an operating license is a separate NRC decision.
Sources: Federal Register 91 FR 12628 (16 Mar 2026): Kemmerer Power Station Unit 1 construction permit and record of decision; NRC TerraPower Natrium / Kemmerer; U.S. NRC: Natrium Kemmerer Unit 1 - Pioneer Units 1 and 2 phased construction permit application (with limited work authorization request) — Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)
Construction permission sought · Under review · NRC · submitted 31 Dec 2025 · docket 50-616, 50-617 · 91 FR 62565 · 91 FR 66740 · 91 FR 72577
Holtec filed Part 1 of a phased construction permit application for two SMR-300 units (Pioneer 1 and 2) at the Palisades Energy Center on 31 December 2025, including a limited work authorization request. The NRC accepted it for docketing in February 2026 and began weekly notices of receipt on 1 October 2026. Its fourth notice, published 22 October, again records receipt and availability; it does not grant an LWA or construction permit. Part 2 (a complete preliminary safety analysis report, with an updated Quality Assurance Topical Report and exemption requests) was filed on 30 September 2026, according to the NRC's notice of receipt dated 5 November and published 10 November 2026 (91 FR 72577; ADAMS package ML26273A416), which began a second series of four weekly notices. The notice says the NRC staff was then undertaking its acceptance review of Part 2; no acceptance or docketing of Part 2 is recorded. The application remains recorded as under review; this receipt notice is not a new permission decision.
Sources: Federal Register 91 FR 62565 (1 Oct 2026): Pioneer Units 1 and 2 phased construction permit application with limited work authorization request; NRC news 26-008 Holtec Pioneer LWA; Holtec: Major regulatory developments in the Palisades Pioneer Unit 1 & 2 program (30 September 2026); NRC fourth weekly notice of receipt and availability: Pioneer Units 1 and 2 phased construction permit application; Federal Register 91 FR 72577 (10 Nov 2026): Pioneer Units 1 and 2, receipt of construction permit application (Part 2), first of four weekly notices; NRC Pioneer Units 1 and 2 LWA pageCould not be confirmed on . Attempted official source: NRC fourth weekly notice of receipt and availability: Pioneer Units 1 and 2 phased construction permit application. This is an access or status observation only; the record review date is unchanged.
- Kairos Hermes 2 construction permit — Kairos Hermes 2
Construction permission · Issued / approved · NRC · decided 21 Nov 2024 · submitted 14 Jul 2023 · permit CPTR-7, CPTR-8 · docket 50-611, 50-612 · ADAMS ML24324A021, ML24324A022 · 89 FR 94767
The NRC issued construction permits CPTR-7 and CPTR-8 for the two-unit Hermes 2 test reactor facility on 21 November 2024. Operation needs separate operating licenses.
Sources: Federal Register 89 FR 94767 (29 Nov 2024): Hermes 2 test reactor facility construction permits; NRC Kairos Hermes construction permit materials; U.S. NRC: Kairos Hermes 2 construction permit - ACU Molten Salt Research Reactor construction permit — Natura MSR-1 demonstration at Abilene Christian University
Construction permission · Issued / approved · NRC · decided 16 Sep 2024 · submitted 12 Aug 2022 · permit CPRR-124 · docket 50-610 · ADAMS ML24243A040 · 89 FR 77197
The NRC issued construction permit CPRR-124 to Abilene Christian University on 16 September 2024 for a non-power molten salt research reactor of up to 1 MWth in the Dillard Science and Engineering Research Center on its Abilene campus. ACU's application is dated 12 August 2022; the NRC notified ACU by letter dated 18 November 2022 that it was acceptable for docketing. Operation needs a separate operating license.
Sources: Federal Register 89 FR 77197 (20 Sep 2024): ACU Molten Salt Research Reactor construction permit; Federal Register 89 FR 18678 (14 Mar 2024): ACU Molten Salt Research Reactor environmental assessment; Federal Register 87 FR 73051 (28 Nov 2022): ACU construction permit application accepted for docketing - Kairos Hermes 1 construction permit — Kairos Hermes 1
Construction permission · Issued / approved · NRC · decided 14 Dec 2023 · submitted 29 Sep 2021 · permit CPTR-6 · docket 50-7513 · ADAMS ML23338A258 · 88 FR 88137 · 91 FR 28629
The NRC issued construction permit CPTR-6 for the Hermes non-power test reactor on 14 December 2023. A 13 May 2026 order extended the latest construction completion date from 31 December 2026 to 30 April 2029. Operation needs a separate operating license.
Sources: Federal Register 88 FR 88137 (20 Dec 2023): Hermes test reactor construction permit; Federal Register 91 FR 28629 (18 May 2026): Hermes test reactor construction completion date extension; NRC Kairos Hermes construction permit materials; U.S. NRC: Kairos Hermes 1 construction permit
Environmental decision
- DOE PWR-5 Phase 1 environmental categorical exclusion — Last Energy PWR-5 pilot at Texas A&M-RELLIS
Environmental decision · Issued / approved · U.S. Department of Energy, Office of Nuclear Energy · decided 30 Sep 2026
DOE approved NEPA determination DOE-ID-26-008 on 30 September 2026 for proposed PWR-5 Phase 1 initial criticality and low-power testing at RELLIS. The Phase 1 research configuration is bounded at 100 kWth, fewer than 1,000 cumulative operating hours and no grid export. The 19.5 MWth PWR-5 design point applies to later phases. This environmental decision is not DOE startup authorization, proof of achieved criticality, or authorization for later phases.
Sources: DOE PWR-5 Phase 1 NEPA categorical exclusion, DOE-ID-26-008 - NRC environmental assessment and FONSI for Pioneer excavation-wall exemption — Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)
Environmental decision · Issued / approved · NRC · decided 25 Aug 2026 · docket 50-616, 50-617 · 91 FR 54890
The NRC made an environmental assessment and finding of no significant impact available on 24 August 2026; its later exemption notice describes the finding as issued on 25 August. It addresses environmental effects of the requested support-of-excavation-wall exemption; it is not the 28 August exemption and does not issue an LWA or construction permit.
Sources: NRC environmental assessment and FONSI for Pioneer excavation-wall exemption; NRC exemption for specified Pioneer support-of-excavation walls - DOE Aurora-INL B5.26 environmental categorical exclusion — Oklo Aurora-INL
Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 20 Jul 2026
DOE Idaho approved environmental determination DOE-ID-INL-26-018 on 20 July 2026 for the proposed Aurora-INL reactor construction, installation and operation scope under B5.26. The document describes anticipated activities and a planned construction period; it is an environmental determination, not evidence that reactor construction occurred, an approval of the preliminary safety analysis, or authority to load fuel or operate.
Sources: DOE Aurora-INL B5.26 environmental determination, DOE-ID-INL-26-018 - Long Mott environmental assessment, FONSI and review exemptions — Long Mott Generating Station (Xe-100 at Dow Seadrift)
Environmental decision · Issued / approved · U.S. Nuclear Regulatory Commission · decided 18 May 2026 · 91 FR 29515
The NRC notice says the Long Mott construction-permit environmental assessment and finding of no significant impact were available on 18 May 2026 and that exemptions permitting this review in place of an environmental impact statement were issued the same day. The construction-permit application remains under review; this decision is not a construction permit or authority to operate.
Sources: NRC Federal Register notice: Long Mott environmental assessment, FONSI and exemptions - DOE categorical exclusion CX-271015 for the Ward250 research reactor — Valar Atomics Ward 250
Environmental decision · Issued / approved · U.S. Department of Energy, Office of Nuclear Energy · decided 22 Apr 2026
Signed 22 April 2026 under NEPA identification DOE-ID-26-005. Determines that the 250 kWth Ward250 research reactor at USREL fits a categorical exclusion. It states no authorization number and no electrical output, and it does not confirm the company's later electricity claim.
Sources: DOE categorical exclusion CX-271015 PDF: Ward250 research reactor - DOE Idaho categorical exclusion CX-271007 for the Unity zero-power test — Deployable Energy Unity at Idaho National Laboratory
Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 15 Apr 2026
Approved 15 April 2026 under posting DOE-ID-INL-26-011. Covers a zero-power criticality test bounded at 0 MWth and 0 kWe. It does not authorize the future 1 MWe configuration and is not an operating license.
Sources: DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality - DOE Idaho categorical exclusion CX-271002 for the Aalo-X critical assembly — Aalo-X at Idaho National Laboratory
Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 14 Apr 2026
Approved 14 April 2026 under posting DOE-ID-INL-26-013. Covers installation and zero-power operation of the critical assembly at no more than 10 watts thermal. It is an environmental categorical exclusion, not a construction permit or operating license, and it does not authorize a later power reactor.
Sources: DOE Idaho categorical exclusion CX-271002 PDF: Aalo-X critical assembly - DOE Idaho categorical exclusion CX-035340 for the Antares Mark-0 experiment — Antares Mark-0 at Idaho National Laboratory
Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 26 Jan 2026
Approved 26 January 2026 under posting DOE-ID-INL-25-037. Covers the zero-power Mark-0 heat-pipe experiment in MFC-793. No measurable thermal output is claimed. This is not an operating license, and it does not approve the later Mark-1 reactor.
Sources: DOE Idaho categorical exclusion CX-035340 PDF: Antares R1 Mark-0 - Project Pele record of decision (prototype mobile microreactor environmental impact statement) — Project Pele (INL microreactor demonstration)
Environmental decision · Issued / approved · U.S. Department of Defense, Strategic Capabilities Office · decided 5 Apr 2022 · 87 FR 22521
Signed 5 April 2022 and published 15 April 2022 at 87 FR 22521. The Strategic Capabilities Office decided to implement the proposed action of its final environmental impact statement: fabricate the prototype mobile microreactor and its fuel at existing off-site commercial facilities and demonstrate it at the Idaho National Laboratory Site. This is a National Environmental Policy Act decision. This record addresses the environmental decision; it does not establish the status of any separate DOE safety authorization. No such authorization document was opened.
Sources: Federal Register 87 FR 22521 (15 Apr 2022): Record of Decision, Construction and Demonstration of a Prototype Mobile Microreactor - DOE finding of no significant impact for MARVEL (DOE/EA-2146) — MARVEL microreactor test bed at INL's TREAT facility
Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 12 Nov 2021
Issued at Idaho Falls on 12 November 2021 for environmental assessment DOE/EA-2146. DOE found that designing and demonstrating MARVEL in the north high bay of the Transient Reactor Test facility would not significantly affect the human environment, so no environmental impact statement is required. It is an environmental finding. It is not approval of a safety analysis and not authority to load fuel or operate. The 2021 text describes about 20 kW electric; DOE's current project page gives 85 kW thermal and about 10 kW electric.
Sources: DOE/EA-2146 Finding of No Significant Impact: MARVEL microreactor
Other applications and decisions
- NRC exemption for specified Pioneer support-of-excavation walls before LWA — Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)
Other regulatory action · Issued / approved · NRC · decided 28 Aug 2026 · docket 50-616, 50-617 · 91 FR 55628
The NRC issued a narrow exemption on 28 August 2026 allowing specified permanent support-of-excavation walls at Pioneer Units 1 and 2 before a limited work authorization. The notice does not issue or commit to an LWA or construction permit. The exemption does not show that physical work began or authorize all construction.
Sources: NRC exemption for specified Pioneer support-of-excavation walls - Kemmerer Unit 1 exemption for energy-island work before a construction permit — Natrium Kemmerer Unit 1
Other regulatory action · Issued / approved · NRC · decided 7 May 2025 · submitted 28 Feb 2025 · docket 50-613 · 90 FR 20692
The Federal Register notice (90 FR 20692, 15 May 2025) states that the NRC issued an exemption on 7 May 2025, in response to TerraPower's 28 February 2025 request for US SFR Owner, LLC, modifying the definition of construction for Kemmerer Unit 1. It allows specified work for non-safety-related structures, systems and components on the energy island, such as pile driving and foundations, before a construction permit and without a limited work authorization. It is not a construction permit or operating authority.
Sources: Federal Register 90 FR 20692 (15 May 2025): US SFR Owner, LLC; Kemmerer Power Station, Unit 1; Exemption - Oklo Aurora custom combined license application (2020), denied without prejudice — Oklo Aurora-INL
Other regulatory action · Denied · NRC · decided 6 Jan 2022 · submitted 11 Mar 2020 · docket 52-049 · ADAMS ML20075A001, ML21357A034 · 87 FR 1441
Oklo Power applied on 11 March 2020 for a custom combined license, which covers construction and operation, for one Aurora microreactor at Idaho National Laboratory. The NRC denied it without prejudice by letter of 6 January 2022 because requested information was not provided, and said Oklo may resubmit. This is an earlier application than the current Aurora powerhouse, which is following DOE authorization under the Reactor Pilot Program. The NRC's page, last reviewed 15 September 2026, lists pre-application activity only (project 99902095) and no docketed application.
Sources: Federal Register 87 FR 1441 (11 Jan 2022): Oklo Aurora combined license application, denial; NRC pre-application activities: Oklo Aurora Powerhouse
Selected jurisdiction context
Selected federal measures · State, district and territory policy research coverage. Location does not establish project approval or program eligibility.
Designs developed here (70)
Designs whose developer organization is based in this country. A design developed here is not a deployment here.
The first 12 of 70, alphabetically. All 70 designs in the directory.
Organizations here (107)
The first 12 of 107, alphabetically. All 107 organizations in the directory.
Cite or share this page
SMRMap. “United States SMR projects”. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-15. https://smrmap.com/countries/us/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.