United States SMR projects

89 tracked projects and proposals in this directory. Named proposals, demonstrations and achieved deployments retain their recorded stages.

Announced: 44 · Siting: 20 · Licensing: 7 · Construction: 8 · Commissioning: 4 · Operating: 1 · Suspended: 1 · Canceled: 4

Open these projects in Projects (on the map) · Coverage and stage definitions · US policy and licensing (selected measures)

Counts describe the selected dataset, not a complete national or worldwide census. Sources and check dates are linked from each record.

Country brief

Recorded answers for these 89 projects — customer or offtaker: 12 of 89; contractor: 7 of 89; funding and government decisions: 16 of 89; fuel supplier named for this project: 12 of 89; programs and agreements naming the project: 18 of 89. Who is involved, project by project.

Latest recorded developments

Newest first: steps of these projects, the latest step of each of this country's policy measures, and agreements or programs that concern it.

Next documented targets

Targets are plans, not achievements or commitments.

Documented schedule changes

Projects

Showing 89 of 89 projects

Project and categoryStageDesignCapacityRecorded organizationsLocationRecord reviewed
Aalo commercial proposal at Texas A&M-RELLISSMRSitingAalo pod (commercial proposal)—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 4 Feb 2025
Aalo fleet proposal at Idaho Falls Power's Energy Research ParkMicroreactorAnnouncedAalo-1—Idaho Falls Power Energy Research ParkIdaho · town-level point (approximate)9 Oct 2026Latest source 15 Sep 2026Latest event: none dated
Aalo Project Ascension power-reactor proposal at INLSMRAnnouncedDesign profile not linked10 MWe (gross/net unspecified) · moduleProject Ascension proposed area on the Aalo-X campus at INLIdaho · site-area point (approximate)15 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026
Aalo-X at Idaho National LaboratoryMicroreactorCommissioningAalo-X10 watts thermal (thermal only; zero-power limit)Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate)18 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026
AEP Joshua Falls SMR proposalSMRSitingDesign profile not linked—Joshua Falls, Campbell CountyVirginia · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 17 Jan 2025
AEP Rockport BWRX-300 proposalSMRAnnouncedBWRX-300—Rockport Plant, Spencer County (I&M SMR site)Indiana · site-area point (approximate)10 Oct 2026Latest source 23 Jul 2026Latest event 17 Jan 2025
Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana)SMRAnnouncedXe-100960 MWe (gross/net unspecified) · plantFormer Breed Generating Station site, Sullivan CountyIndiana · named site, no map pin30 Oct 2026Latest source 19 Oct 2026Latest event: none dated
Ameren / Westinghouse SMR proposal at Callaway (2012)SMRAnnouncedDesign profile not linked—Callaway site (Ameren Missouri)Missouri · site-area point (approximate)2 Oct 2026Latest source 21 Feb 2014Latest event: none dated
Ameresco–Terrestrial Energy IMSR at Aberdeen Proving GroundSMRAnnouncedIMSR (Integral Molten Salt Reactor)—Aberdeen Proving Ground (Phase 2 site)Maryland · site-area point (approximate)18 Oct 2026Latest source 9 Oct 2026Latest event 21 Sep 2026
Antares Mark-0 at Idaho National LaboratoryMicroreactorCommissioningAntares Mark-0100 watts thermal (thermal only; zero-power limit)Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate)18 Oct 2026Latest source 23 Oct 2026Latest event 4 Jun 2026
Antares Mark-1 electricity-producing microreactor at INLMicroreactorAnnouncedDesign profile not linked—MFC-793 test facility, INL Materials and Fuels ComplexIdaho · site-area point (approximate)24 Oct 2026Latest source 27 Oct 2026Latest event 23 Oct 2026
Antares microreactor at Joint Base San Antonio (ANPI)MicroreactorSitingR1—Joint Base San AntonioTexas · named site, no map pin10 Oct 2026Latest source 23 Apr 2026Latest event: none dated
Antares R1 microreactor siting at INL's Central Facilities AreaMicroreactorSitingR1—INL Central Facilities Area (candidate locations for an Antares R1 microreactor)Idaho · site-area point (approximate)3 Oct 2026Latest source, document dated 21 Aug 2025Latest event: none dated
Antares R1 microreactors at Fort Bragg (Army Janus)MicroreactorAnnouncedR1—Fort BraggNorth Carolina · site-area point (approximate)10 Oct 2026Latest source: none datedLatest event: none dated
ARC-100 first-of-a-kind deployment framework at Idaho National LaboratorySMRAnnouncedARC-100100 MWe (gross/net unspecified) · moduleIdaho National Laboratory (ARC-100 first-of-a-kind; location within INL not stated)Idaho · town-level point (approximate)3 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026
B&W mPower plan at TVA's Clinch River site (2013-2017)SMREarlier-plan recordCanceledmPower—Clinch River Nuclear SiteTennessee · site-area point (approximate)19 Oct 2026Latest source: none datedLatest event: none dated
BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)MicroreactorAnnouncedKRONOS MMR—BaRupOn LAMP hub, LibertyTexas · town-level point (approximate)3 Oct 2026Latest source: none datedLatest event: none dated
Beck Creek Energy SMR proposal (Amherst County)SMRAnnouncedDesign profile not linked—Beck Creek Energy site, eastern Amherst CountyVirginia · named site, no map pin30 Oct 2026Latest source 8 Oct 2026Latest event: none dated
Blue Energy BWRX-300 at Port of VictoriaSMRLicensingBWRX-3001500 MWe (gross/net unspecified) · plantPort of VictoriaTexas · named site, no map pin18 Oct 2026Latest source 8 Oct 2026Latest event 16 Sep 2026
BlueCore BC-15 floating plant proposal at the Port of Long BeachSMRSitingBlueCore BC-1515 MWe (gross) · module · 45 MWth (nameplate; basis unspecified)Port of Long BeachCalifornia · named site, no map pin9 Oct 2026Latest source 13 Oct 2026Latest event: none dated
BWXT BANR at Fort Campbell (Army Janus)MicroreactorAnnouncedBWXT BANR20 MWe (gross/net unspecified) · plantFort CampbellKentucky · site-area point (approximate)10 Oct 2026Latest source: none datedLatest event: none dated
Cascade Advanced Energy FacilitySMRSitingXe-100320 MWe (net) · plantHanford Reservation Cascade / Columbia GS areaWashington · site-area point (approximate)18 Oct 2026Latest source 5 Nov 2026Latest event 5 Nov 2026
Deep Atomic MK60 AI data-center campus proposal at INLSMRAnnouncedMK60—Idaho National Laboratory (proposed AI data-center campus)Idaho · town-level point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Deep Fission Gravity pilot, ParsonsSMRSitingGravity—Great Plains Industrial Park, ParsonsKansas · site-area point (approximate)13 Oct 2026Latest source, document dated 17 Jul 2026Latest event 6 Aug 2026
Deployable Energy Unity at Idaho National LaboratoryMicroreactorCommissioningUnity0 MWth (thermal only; zero-power limit)Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate)18 Oct 2026Latest source 1 Jul 2026Latest event 30 Jun 2026
Deployable Energy Unity full-power test in INL's DOME (2027)MicroreactorSitingUnity1 MWe (gross/net unspecified) · moduleDOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)13 Oct 2026Latest source 30 Sep 2026Latest event 30 Sep 2026
Deployable Energy–Hornbeck Unity maritime demonstration proposalMicroreactorAnnouncedUnity—Undisclosed13 Oct 2026Latest source 28 Aug 2026Latest event: none dated
Dominion North Anna SMR proposalSMRAnnouncedDesign profile not linked—North Anna Power Station, Louisa CountyVirginia · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Duke Belews Creek technology-neutral SMR proposalSMRLicensingDesign profile not linked—Site near Belews Creek Steam Station, Stokes CountyNorth Carolina · site-area point (approximate)18 Oct 2026Latest source, document dated 1 Oct 2026Latest event 1 Oct 2026
Elementl Letart Township BWRX-300 proposalSMRSitingBWRX-300—Letart Township, Meigs CountyOhio · town-level point (approximate)11 Oct 2026Latest source 26 Oct 2026Latest event 26 Oct 2026
eVinci DOME nuclear test reactorMicroreactorCanceledeVinci—DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
First American Nuclear EAGL-1 energy park in Indiana (site not disclosed)SMRAnnouncedEAGL-1—Indianaregion only, no map pin11 Oct 2026Latest source 15 Apr 2026Latest event 4 Nov 2025
General Atomics GA-TES at Fort Hood (Army Janus)MicroreactorAnnouncedGA-TES5 MWe (gross/net unspecified) · plantFort HoodTexas · site-area point (approximate)10 Oct 2026Latest source 15 Oct 2026Latest event: none dated
Holtec Green River / Blue Castle, Utah proposalSMRAnnouncedHoltec SMR-300—Green River, Blue Castle projectUtah · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event 28 May 2026
Holtec Oyster Creek SMR proposalSMRAnnouncedHoltec SMR-3001360 MWe (gross/net unspecified) · plantOyster Creek Generating Station site, Lacey TownshipNew Jersey · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event 30 Jul 2026
Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)SMRLicensingHoltec SMR-300680 MWe (gross/net unspecified) · plantHoltec states the two Pioneer units are designed to provide 680 MWe together, and the NRC's January 2026 release describes each SMR-300 unit as approximately 340 MWe.Palisades Nuclear Plant areaMichigan · site-area point (approximate)18 Oct 2026Latest source 10 Nov 2026Latest event 30 Sep 2026
Holtec SMR-160 proposal at Savannah River Site (2012)SMREarlier-plan recordAnnouncedHoltec SMR-160160 MWe (gross/net unspecified) · moduleSavannah River SiteSouth Carolina · site-area point (approximate)2 Oct 2026Latest source 5 Mar 2012Latest event: none dated
Holtec SMR-300 proposal in Brigham City, UtahSMRAnnouncedHoltec SMR-300—Brigham CityUtah · town named, no map pin2 Oct 2026Latest source, document dated 19 Nov 2025Latest event: none dated
Hyperion / Gen4 Module proposal at Savannah River Site (2012)SMREarlier-plan recordAnnouncedG4M25 MWe (gross/net unspecified) · module · 70 MWth (nameplate; basis unspecified)Savannah River SiteSouth Carolina · site-area point (approximate)2 Oct 2026Latest source 24 Sep 2024Latest event: none dated
Idaho State University / NuCube Advanced Research and Test ReactorMicroreactorSitingDesign profile not linkedthermal onlyISU Business and Research Park, PocatelloIdaho · town-level point (approximate)13 Oct 2026Latest source 16 Sep 2026Latest event 16 Sep 2026
Kairos commercial proposal at Texas A&M-RELLISSMRSitingKP-FHR commercial plant—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event: none dated
Kairos Hermes 1SMRConstructionHermes / KP-FHR35 MWth (thermal only; nameplate; basis unspecified)Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)Tennessee · site-area point (approximate)18 Oct 2026Latest source 15 Sep 2026Latest event 1 May 2025
Kairos Hermes 2SMRConstructionHermes / KP-FHR—Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)Tennessee · site-area point (approximate)18 Oct 2026Latest source, document dated 1 Oct 2026Latest event 17 Apr 2026
Last Energy first commercial PWR-20 site, Caldwell CountyMicroreactorLicensingPWR-2020 MWe (net) · module · 80 MWth (nameplate; basis unspecified)Maxwell, Caldwell CountyTexas · region only, no map pin28 Oct 2026Latest source 5 Nov 2026Latest event Jul 2026
Last Energy Haskell County PWR-20 campusMicroreactorSitingPWR-2020 MWe (gross) · moduleHaskell CountyTexas · region only, no map pin9 Oct 2026Latest source Jul 2026Latest event 28 Feb 2025
Last Energy PWR-5 pilot at Texas A&M-RELLISMicroreactorConstructionLast Energy PWR-55 MWe (gross/net unspecified) · moduleTexas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)18 Oct 2026Latest source 16 Dec 2025Latest event 7 Oct 2026
Long Mott Generating Station (Xe-100 at Dow Seadrift)SMRLicensingXe-100320 MWe (net) · plant · 800 MWth (nameplate; basis unspecified)The NRC application page lists a four-module plant at 800 MWth/320 MWe, intended to supply electricity and steam to Dow's adjacent Seadrift Operations, and says each module could produce 80 MWe of electricity or about 200 MWth of steam.Dow UCC Seadrift / Long MottTexas · site-area point (approximate)18 Oct 2026Latest source 12 Nov 2026Latest event 9 Nov 2026
MARVEL microreactor test bed at INL's TREAT facilityMicroreactorConstructionMARVEL10 kWe (gross/net unspecified) · plant · 85 kWth (nameplate; basis unspecified)TREAT facility, Idaho National LaboratoryIdaho · site-area point (approximate)18 Oct 2026Latest source 6 Oct 2026Latest event 6 Oct 2026
Meta–TerraPower initial dual-unit Natrium proposalSMRAnnouncedNatrium690 MWe (gross/net unspecified) · plantUndisclosed13 Oct 2026Latest source 9 Jan 2026Latest event: none dated
Microreactor at Naval Weapons Station CraneMicroreactorAnnouncedKaleidos—Naval Weapons Station CraneIndiana · site-area point (approximate)25 Oct 2026Latest source 20 Oct 2026Latest event 20 Oct 2026
Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)SMRAnnouncedDesign profile not linked—Midpoint SMR Project #1 (Jerome County BLM)Idaho · site-area point (approximate)2 Oct 2026Latest source 22 Aug 2025Latest event: none dated
NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU)MicroreactorAnnouncedDesign profile not linked—Digihost 60 MW power plant, North Tonawanda, New YorkNew York · site-area point (approximate)13 Oct 2026Latest source: none datedLatest event: none dated
Natrium Kemmerer Unit 1SMRConstructionNatrium345 MWe (gross/net unspecified) · module · 840 MWth (nameplate; basis unspecified)Kemmerer Natrium siteWyoming · town-level point (approximate)18 Oct 2026Latest source 23 Sep 2026Latest event Sep 2026
Natura MSR-1 demonstration at Abilene Christian UniversitySMRConstructionNatura MSR-1thermal onlyScience and Engineering Research Center, Abilene Christian UniversityTexas · site-area point (approximate)18 Oct 2026Latest source 22 Sep 2026Latest event 18 Sep 2026
Natura MSR-100 proposal at Texas A&M-RELLISSMRSitingNatura MSR-100—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event: none dated
Next Generation Nuclear Plant prototype HTGR at INL (2005-2013)SMREarlier-plan recordSuspendedDesign profile not linked—Idaho National Laboratory (NGNP prototype; location within INL not fixed)Idaho · town-level point (approximate)19 Oct 2026Latest source Aug 2008Latest event: none dated
Nine Mile Point Gen III+ SMR early site permit evaluationSMRAnnouncedDesign profile not linked—Nine Mile Point Clean Energy Center (advanced/SMR ESP evaluation)New York · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Nuclea Morpheus test reactor siting at the Utah San Rafael Energy LabMicroreactorAnnouncedMorpheus—Utah San Rafael Energy LabUtah · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
NuCube test microreactor at the Utah San Rafael Energy LabMicroreactorAnnouncedNuSun-1—Utah San Rafael Energy LabUtah · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
NuScale plant proposal at Savannah River Site (2012)SMREarlier-plan recordAnnouncedDesign profile not linked45 MWe (gross/net unspecified) · moduleSavannah River SiteSouth Carolina · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Oklo Aurora at Eielson AFB (DAF microreactor pilot)MicroreactorSitingAurora—Eielson Air Force BaseAlaska · site-area point (approximate)7 Oct 2026Latest source: none datedLatest event: none dated
Oklo Aurora campus, Pike County, OhioMicroreactorSitingAurora—Pike County / former Portsmouth site (Oklo)Ohio · site-area point (approximate)10 Oct 2026Latest source 12 Nov 2026Latest event 1 Feb 2024
Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI)MicroreactorAnnouncedAurora50 MWe (gross/net unspecified) · plantProposed collective electricity supply under a non-binding letter of intent; this figure does not establish a selected plant or module nameplate.Permian Basin operations near MidlandTexas · region only, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Oklo Aurora-INLMicroreactorConstructionAurora—Idaho National Laboratory — Aurora site south of the Materials and Fuels ComplexIdaho · site-area point (approximate)18 Oct 2026Latest source, document dated 6 Nov 2026Latest event 20 Jul 2026
Penn State FRONTIER eVinci research proposalMicroreactorAnnouncedeVinci—University Park campus, Penn StatePennsylvania · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Project Pele (INL microreactor demonstration)MicroreactorConstructionProject Pele microreactor (BWXT HTGR)1.5 MWe (gross/net unspecified) · moduleINL CITRC Project Pele areaIdaho · town-level point (approximate)18 Oct 2026Latest source 7 Dec 2022Latest event Sep 2026
Project TETRA / TETRA-1 pilot at Texas A&M RELLISSMRAnnouncedIMSR (Integral Molten Salt Reactor)—Texas A&M RELLIS campus — TETRA-1 planned sitesite-area point (approximate)2 Oct 2026Latest source 8 Jan 2026Latest event: none dated
Purdue / Duke Energy SMR feasibility study for the Purdue campusSMRAnnouncedDesign profile not linked—Purdue University campus, West LafayetteIndiana · site-area point (approximate)2 Oct 2026Latest source 10 May 2023Latest event: none dated
Pylon / LOKI MMR experiment proposal for INL's DOMEMicroreactorAnnouncedLOKI MMR—DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)2 Oct 2026Latest source 7 Oct 2026Latest event: none dated
Radiant Kaleidos Buckley Space Force Base proposalMicroreactorSitingKaleidos—Buckley Space Force Base, AuroraColorado · site-area point (approximate)10 Oct 2026Latest source 23 Jul 2026Latest event 23 Jul 2026
Radiant Kaleidos demonstration at INL DOMEMicroreactorCommissioningKaleidosMWe not recorded · module · 3.5 MWth (nameplate; basis unspecified)DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)18 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026
Radiant Kaleidos microreactors at Fort Benning (Army Janus)MicroreactorAnnouncedKaleidos3 MWe (gross/net unspecified) · plantFort BenningGeorgia · site-area point (approximate)10 Oct 2026Latest source: none datedLatest event: none dated
Standard Power NuScale SMR facility in Ohio (site not disclosed)SMRAnnouncedDesign profile not linked—Ohioregion only, no map pin5 Oct 2026Latest source: none datedLatest event 6 Oct 2023
Standard Power NuScale SMR facility in Pennsylvania (site not disclosed)SMRAnnouncedDesign profile not linked—Pennsylvaniaregion only, no map pin5 Oct 2026Latest source: none datedLatest event 6 Oct 2023
Surry Green Energy Center SMR campus proposalSMRAnnouncedDesign profile not linked—Not recordedSurry Green Energy Center SMR campus proposalVirginia · site-area point (approximate)2 Oct 2026Latest source 13 Feb 2024Latest event: none dated
Tata / BWXT BANR Green River, Wyoming proposalMicroreactorAnnouncedBWXT BANR—Tata Chemicals Soda Ash Partners site, Green RiverWyoming · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, ValmeyerMicroreactorSitingSOLO—Rock City Admiral Parkway, ValmeyerIllinois · named site, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Terrestrial Energy IMSR at Texas A&M-RELLISSMRSitingIMSR (Integral Molten Salt Reactor)—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 18 Jun 2026
Toshiba 4S proposal at Galena, Alaska (mid-2000s)SMRCanceled4S10 MWe (gross/net unspecified) · plantGalena, AlaskaAlaska · town named, no map pin2 Oct 2026Latest source 6 May 2026Latest event: none dated
Transformational Challenge Reactor microreactor test proposal at ORNL (2019)MicroreactorAnnouncedDesign profile not linked—Building 7709, Copper Ridge, Oak Ridge National LaboratoryTennessee · site-area point (approximate)3 Oct 2026Latest source Aug 2022Latest event: none dated
TVA Clinch River BWRX-300SMRLicensingBWRX-300300 MWe (net) · moduleThe IAEA's 2026 reactor tables, which report Member State data to 31 December 2025, list Clinch River SMR-1 at 300 MW gross and 300 MW net with no thermal figure.Clinch River Nuclear SiteTennessee · site-area point (approximate)18 Oct 2026Latest source, document dated 28 Sep 2026Latest event 29 Sep 2026
UAMPS Carbon Free Power Project (canceled)SMREarlier-plan recordCanceledNuScale VOYGR (US460 / NPM)462 MWe (gross/net unspecified) · plantThe WNA USA profile lists VOYGR-6 as 462 MWe and calls this project a VOYGR-6 plant.INL / CFPP proposed NuScale siteIdaho · town-level point (approximate)19 Oct 2026Latest source, document dated 8 Nov 2023Latest event 8 Nov 2023
University of Illinois KRONOS MMRMicroreactorLicensingKRONOS MMRMWe not recorded · module · 45 MWth (nameplate; basis unspecified)University of Illinois Urbana-Champaign campusIllinois · exact point18 Oct 2026Latest source 27 Oct 2026Latest event 27 Oct 2026
USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)MicroreactorAnnouncedDesign profile not linked—USNC MMR Idaho National Laboratory demonstration proposal (site agreement undisclosed)Idaho · town-level point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Valar Atomics Ward 250MicroreactorOperatingWard 250MWe not recorded · module · 250 kWth (nameplate; basis unspecified)Utah San Rafael Energy LabUtah · site-area point (approximate)18 Oct 2026Latest source 19 Jun 2026Latest event 2 Jul 2026
Valar Carbon County nuclear campus proposal (Project Beehive)SMRSitingDesign profile not linked—Valar Carbon County campus siteUtah · named site, no map pin13 Oct 2026Latest source, document dated 17 Sep 2026Latest event: none dated
Westinghouse eVinci at Fort Drum (Army Janus)MicroreactorAnnouncedeVinci—Fort DrumNew York · site-area point (approximate)10 Oct 2026Latest source 26 Aug 2026Latest event: none dated
Westinghouse eVinci at Malmstrom Air Force Base (ANPI)MicroreactorSitingeVinci—Malmstrom Air Force BaseMontana · site-area point (approximate)10 Oct 2026Latest source 23 Apr 2026Latest event: none dated
ZettaJoule ZJ0 research reactor at Texas A&M (TEES)SMRAnnouncedDesign profile not linked—TEES Nuclear Engineering & Science Center area, College StationTexas · town-level point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated

Research coverage for the 89 matching projects: of 801 answers to nine review questions, 355 have a supported statement, 386 were reviewed with a stated limit and 60 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.

Coverage by question

Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.

QuestionSupported statementNot disclosedNot applicableConflicting evidenceSource unavailableNot reviewedProjects
Customer or offtaker2858000389
Contractor2462000389
Funding3353000389
Project fuel commitment1967000389
Comparable schedule revision779010289
Permissions and public process7116000289
Site dependencies (land, grid, water)7511010289
Spent fuel, waste and closure30161123989
Next decision and prerequisites6814400389
All nine questions35537653260801

Agreements

(60)

Agreements, plans, studies and government programs that concern this country. They are not deployment projects and are not counted as projects or reactors.

Recorded project permissions and applications

(25)

These documents concern the linked projects only. A country-wide approval is not inferred; design assessments, site permissions, construction permissions and operating authority remain separate.

Site applications and decisions

Construction applications and decisions

Environmental decision

  • DOE PWR-5 Phase 1 environmental categorical exclusion — Last Energy PWR-5 pilot at Texas A&M-RELLIS
    Environmental decision · Issued / approved · U.S. Department of Energy, Office of Nuclear Energy · decided 30 Sep 2026
    DOE approved NEPA determination DOE-ID-26-008 on 30 September 2026 for proposed PWR-5 Phase 1 initial criticality and low-power testing at RELLIS. The Phase 1 research configuration is bounded at 100 kWth, fewer than 1,000 cumulative operating hours and no grid export. The 19.5 MWth PWR-5 design point applies to later phases. This environmental decision is not DOE startup authorization, proof of achieved criticality, or authorization for later phases.
    Sources: DOE PWR-5 Phase 1 NEPA categorical exclusion, DOE-ID-26-008
  • NRC environmental assessment and FONSI for Pioneer excavation-wall exemption — Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)
    Environmental decision · Issued / approved · NRC · decided 25 Aug 2026 · docket 50-616, 50-617 · 91 FR 54890
    The NRC made an environmental assessment and finding of no significant impact available on 24 August 2026; its later exemption notice describes the finding as issued on 25 August. It addresses environmental effects of the requested support-of-excavation-wall exemption; it is not the 28 August exemption and does not issue an LWA or construction permit.
    Sources: NRC environmental assessment and FONSI for Pioneer excavation-wall exemption; NRC exemption for specified Pioneer support-of-excavation walls
  • DOE Aurora-INL B5.26 environmental categorical exclusion — Oklo Aurora-INL
    Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 20 Jul 2026
    DOE Idaho approved environmental determination DOE-ID-INL-26-018 on 20 July 2026 for the proposed Aurora-INL reactor construction, installation and operation scope under B5.26. The document describes anticipated activities and a planned construction period; it is an environmental determination, not evidence that reactor construction occurred, an approval of the preliminary safety analysis, or authority to load fuel or operate.
    Sources: DOE Aurora-INL B5.26 environmental determination, DOE-ID-INL-26-018
  • Long Mott environmental assessment, FONSI and review exemptions — Long Mott Generating Station (Xe-100 at Dow Seadrift)
    Environmental decision · Issued / approved · U.S. Nuclear Regulatory Commission · decided 18 May 2026 · 91 FR 29515
    The NRC notice says the Long Mott construction-permit environmental assessment and finding of no significant impact were available on 18 May 2026 and that exemptions permitting this review in place of an environmental impact statement were issued the same day. The construction-permit application remains under review; this decision is not a construction permit or authority to operate.
    Sources: NRC Federal Register notice: Long Mott environmental assessment, FONSI and exemptions
  • DOE categorical exclusion CX-271015 for the Ward250 research reactor — Valar Atomics Ward 250
    Environmental decision · Issued / approved · U.S. Department of Energy, Office of Nuclear Energy · decided 22 Apr 2026
    Signed 22 April 2026 under NEPA identification DOE-ID-26-005. Determines that the 250 kWth Ward250 research reactor at USREL fits a categorical exclusion. It states no authorization number and no electrical output, and it does not confirm the company's later electricity claim.
    Sources: DOE categorical exclusion CX-271015 PDF: Ward250 research reactor
  • DOE Idaho categorical exclusion CX-271007 for the Unity zero-power test — Deployable Energy Unity at Idaho National Laboratory
    Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 15 Apr 2026
    Approved 15 April 2026 under posting DOE-ID-INL-26-011. Covers a zero-power criticality test bounded at 0 MWth and 0 kWe. It does not authorize the future 1 MWe configuration and is not an operating license.
    Sources: DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality
  • DOE Idaho categorical exclusion CX-271002 for the Aalo-X critical assembly — Aalo-X at Idaho National Laboratory
    Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 14 Apr 2026
    Approved 14 April 2026 under posting DOE-ID-INL-26-013. Covers installation and zero-power operation of the critical assembly at no more than 10 watts thermal. It is an environmental categorical exclusion, not a construction permit or operating license, and it does not authorize a later power reactor.
    Sources: DOE Idaho categorical exclusion CX-271002 PDF: Aalo-X critical assembly
  • DOE Idaho categorical exclusion CX-035340 for the Antares Mark-0 experiment — Antares Mark-0 at Idaho National Laboratory
    Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 26 Jan 2026
    Approved 26 January 2026 under posting DOE-ID-INL-25-037. Covers the zero-power Mark-0 heat-pipe experiment in MFC-793. No measurable thermal output is claimed. This is not an operating license, and it does not approve the later Mark-1 reactor.
    Sources: DOE Idaho categorical exclusion CX-035340 PDF: Antares R1 Mark-0
  • Project Pele record of decision (prototype mobile microreactor environmental impact statement) — Project Pele (INL microreactor demonstration)
    Environmental decision · Issued / approved · U.S. Department of Defense, Strategic Capabilities Office · decided 5 Apr 2022 · 87 FR 22521
    Signed 5 April 2022 and published 15 April 2022 at 87 FR 22521. The Strategic Capabilities Office decided to implement the proposed action of its final environmental impact statement: fabricate the prototype mobile microreactor and its fuel at existing off-site commercial facilities and demonstrate it at the Idaho National Laboratory Site. This is a National Environmental Policy Act decision. This record addresses the environmental decision; it does not establish the status of any separate DOE safety authorization. No such authorization document was opened.
    Sources: Federal Register 87 FR 22521 (15 Apr 2022): Record of Decision, Construction and Demonstration of a Prototype Mobile Microreactor
  • DOE finding of no significant impact for MARVEL (DOE/EA-2146) — MARVEL microreactor test bed at INL's TREAT facility
    Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 12 Nov 2021
    Issued at Idaho Falls on 12 November 2021 for environmental assessment DOE/EA-2146. DOE found that designing and demonstrating MARVEL in the north high bay of the Transient Reactor Test facility would not significantly affect the human environment, so no environmental impact statement is required. It is an environmental finding. It is not approval of a safety analysis and not authority to load fuel or operate. The 2021 text describes about 20 kW electric; DOE's current project page gives 85 kW thermal and about 10 kW electric.
    Sources: DOE/EA-2146 Finding of No Significant Impact: MARVEL microreactor

Other applications and decisions

  • NRC exemption for specified Pioneer support-of-excavation walls before LWA — Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)
    Other regulatory action · Issued / approved · NRC · decided 28 Aug 2026 · docket 50-616, 50-617 · 91 FR 55628
    The NRC issued a narrow exemption on 28 August 2026 allowing specified permanent support-of-excavation walls at Pioneer Units 1 and 2 before a limited work authorization. The notice does not issue or commit to an LWA or construction permit. The exemption does not show that physical work began or authorize all construction.
    Sources: NRC exemption for specified Pioneer support-of-excavation walls
  • Kemmerer Unit 1 exemption for energy-island work before a construction permit — Natrium Kemmerer Unit 1
    Other regulatory action · Issued / approved · NRC · decided 7 May 2025 · submitted 28 Feb 2025 · docket 50-613 · 90 FR 20692
    The Federal Register notice (90 FR 20692, 15 May 2025) states that the NRC issued an exemption on 7 May 2025, in response to TerraPower's 28 February 2025 request for US SFR Owner, LLC, modifying the definition of construction for Kemmerer Unit 1. It allows specified work for non-safety-related structures, systems and components on the energy island, such as pile driving and foundations, before a construction permit and without a limited work authorization. It is not a construction permit or operating authority.
    Sources: Federal Register 90 FR 20692 (15 May 2025): US SFR Owner, LLC; Kemmerer Power Station, Unit 1; Exemption
  • Oklo Aurora custom combined license application (2020), denied without prejudice — Oklo Aurora-INL
    Other regulatory action · Denied · NRC · decided 6 Jan 2022 · submitted 11 Mar 2020 · docket 52-049 · ADAMS ML20075A001, ML21357A034 · 87 FR 1441
    Oklo Power applied on 11 March 2020 for a custom combined license, which covers construction and operation, for one Aurora microreactor at Idaho National Laboratory. The NRC denied it without prejudice by letter of 6 January 2022 because requested information was not provided, and said Oklo may resubmit. This is an earlier application than the current Aurora powerhouse, which is following DOE authorization under the Reactor Pilot Program. The NRC's page, last reviewed 15 September 2026, lists pre-application activity only (project 99902095) and no docketed application.
    Sources: Federal Register 87 FR 1441 (11 Jan 2022): Oklo Aurora combined license application, denial; NRC pre-application activities: Oklo Aurora Powerhouse

Selected jurisdiction context

Selected federal measures · State, district and territory policy research coverage. Location does not establish project approval or program eligibility.

Designs developed here (70)

Designs whose developer organization is based in this country. A design developed here is not a deployment here.

The first 12 of 70, alphabetically. All 70 designs in the directory.

Organizations here (107)

The first 12 of 107, alphabetically. All 107 organizations in the directory.

Cite or share this page

SMRMap. “United States SMR projects”. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-15. https://smrmap.com/countries/us/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.