Companies / org-hyundai-ec

Hyundai Engineering & Construction

The Pioneer filing says Holtec teamed with Hyundai Engineering & Construction for site engineering, balance-of-plant design and the planned general construction contractor role through its U.S. subsidiary Hyundai America. This does not establish that nuclear construction began.

Roles
Other
Organization type
other
Country
South Korea
Aliases
—
Listing status
Unknown
Exchange / ticker
—
Ownership / control
unknown
Website
—
Confidence
medium
Last verified
2026-10-09

Linked designs

Tracked deployment projects

1 linked project records: 1 licensing. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Ownership & relationships

Milestones

Organization-level unresolved information

Sources