Companies

Nuclear Power Ghana

Owner and operator named by the U.S. Department of Energy for the proposed NuScale VOYGR-12 plant in Ghana. The site of that plant is undisclosed and is not Nsuban.

Projects
Announced: Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed).
Evidence
4 sources; first primary source: DOE: Nuclear Power Ghana and Regnum agree to deploy one VOYGR-12 plant. Record reviewed 5 Oct 2026.

Key facts

Organization type
Operator
Category
operator
Country
Ghana
Listing status
State-controlled (not independently listed) · source Corporate Profile · listing checked 6 Nov 2026
Ownership / control
State-controlled
Graphic Online (28 Feb 2019) describes NPG as an SPV jointly owned by the Volta River Authority, Bui Power Authority and Ghana Atomic Energy Commission. NPG was registered as a limited liability company in July 2019. Ghana's SIGA says VRA is solely government-owned.
Website
https://nuclearpowergh.com/
Record reviewed
5 Oct 2026 (record review date, not proof of current activity)

All fields

(2 without a known value)
Aliases
None recorded in this release
Exchange / ticker
None recorded in this release

Linked designs

  • No designs tracked here.

Tracked deployment projects

1 linked project record: 1 announced, counting every project that names this organization in any recorded role (vendor, operator or participant). These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Ownership & relationships

Milestones

Not yet established about this organization

Sources

(4)

Cite or share this page

SMRMap. “Nuclear Power Ghana”. Record reviewed 5 Oct 2026. https://smrmap.com/companies/nuclear-power-ghana/ (accessed [date]).

“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.

Record details
Confidence (as stored in the record)
medium

Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.