Projects / Ghana · Announced

Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed)

Nuclear Power Ghana and Regnum Technology Group's agreement, as reported by the U.S. Department of Energy, covers one proposed NuScale VOYGR-12 plant in Ghana.

Current status

Stage
Announced
How current
Record checked · Evidence reviewed · Next recheck due
Development and review dates

Newest recorded development . None of the 4 listed sources has a publication or document date recorded here. Status not rechecked since the record check; this project is not covered by the nightly status check. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
27 Mar 2025 · Recorded development: NPG describes 12 modules and says no contract is signed. Ghana News Agency: no formal contract had been signed. Source: Ghana News Agency: NPG on vendors, 12 modules and no signed contract. Updates entry
More on this development

NPG described 12 modules of 77 MW, totaling 924 MW, and said the location was still being determined.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
  • State or province is not recorded.
  • Not yet recorded for this stage: Site location recorded as disclosed (not stated in the sources read). Not recorded does not mean zero or that none exists; the description and sources may say more.
Same design
4 tracked: 1 licensing, 1 announced. Separately: 1 canceled, 1 proposal from an earlier plan. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Description

The U.S. Department of Energy reported on 29 August 2024 that Nuclear Power Ghana and Regnum Technology Group reached an agreement to deploy a single NuScale VOYGR-12 plant in Ghana. Twelve modules are the announced configuration, not twelve built reactors, and there is no construction start. The site is undisclosed. This record is not Nsuban. On 27 March 2025 the Ghana News Agency reported that no formal contract had been signed. Nuclear Power Ghana's executive director described 12 modules of 77 megawatts, totaling 924 megawatts, and said the location was still being determined. The Department of Energy article did not state 924 megawatts. It said the certified rating was 50 megawatts per module and that 77 megawatts per module was under Nuclear Regulatory Commission review. The 924 megawatt figure is Nuclear Power Ghana's March 2025 description and is kept separate from the design module rating. Regnum is the project developer, not the reactor vendor.

Key facts

Design
NuScale VOYGR (US460 / NPM) (SMR)
Technology
Integral pressurized water reactor (iPWR) · light water
Operator(s)
Not recorded
Vendor for linked design
NuScale Power
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Ghana VOYGR-12 site (not disclosed) · Ghana · precision: no site named
Searchable without an invented map pin. Not Nsuban.
Coordinates
No site named, no map pin
Electrical capacity
924 MWe (gross/net unspecified) · scope: plant
Thermal capacity
Not recorded
Modules planned
12
Record reviewed
5 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed) is recorded at Ghana VOYGR-12 site (not disclosed), state or province not recorded, Ghana. Operator: No operator is recorded. Recorded vendor: NuScale Power. Stage: Announced. Location precision: no site named; no site named, no map pin.

Recorded electrical output is 924 MWe (gross/net unspecified), scope plant. Modules planned: 12. Thermal output is not recorded on this project. The linked design record states 250 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project. The linked design record states 77 MWe (gross); the project figure is kept separate.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

DOE's 29 August 2024 article says Nuclear Power Ghana, Ghana's plant owner and operator, and Regnum plan to form a subsidiary to own and operate the VOYGR-12 plant to deliver electricity, and the Ghana News Agency's 27 March 2025 report describes national grid and industrial-tariff benefits. Neither names a buyer, quantity or power purchase agreement. DOE: Nuclear Power Ghana and Regnum agree to deploy one VOYGR-12 plant; Ghana News Agency: NPG on vendors, 12 modules and no signed contract

Contractor

The Ghana News Agency reported on 27 March 2025 that NuScale and Regnum, in partnership with unnamed Japanese firms, would construct the SMRs, that Ghana had signed a framework agreement with the vendors and that no formal contract had been signed. Regnum is the recorded proposer and NuScale the vendor, so no separate engineering or construction contractor is named. Ghana News Agency: NPG on vendors, 12 modules and no signed contract

Funding and government decisions

The Ghana News Agency reported on 27 March 2025 that the SMRs would be financed through public-private partnerships, a financing model without a named funder or amount. DOE's more than US$579 million since 2014 supported NuScale's VOYGR design and licensing, not this plant. Ghana News Agency: NPG on vendors, 12 modules and no signed contract; DOE: Nuclear Power Ghana and Regnum agree to deploy one VOYGR-12 plant

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

DOE's 29 August 2024 article and the Ghana News Agency's 27 March 2025 report describe the VOYGR-12 configuration and module ratings but name no fuel supplier, fabrication or delivery for the Ghana plant. DOE: Nuclear Power Ghana and Regnum agree to deploy one VOYGR-12 plant

Comparable schedule revision

Comparable schedule revision not established. The Ghana News Agency's 27 March 2025 report gives the government's plan to add one gigawatt of nuclear power to the grid by 2034, a national target stated once, and DOE's 2024 article gives no plant date. No earlier and later date for the same VOYGR-12 milestone is stated. Ghana News Agency: NPG on vendors, 12 modules and no signed contract

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Assessments of the design (not of this site)

(1)

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. On 29 August 2024 the U.S. Department of Energy reported that Nuclear Power Ghana and Regnum Technology Group reached an agreement to deploy one NuScale VOYGR-12 plant in Ghana, and that the two companies plan to form an unnamed subsidiary to own and operate it. The same page says the VOYGR module then certified by the NRC was 50 megawatts-electric, while 77 megawatts-electric per module was under review. On 27 March 2025 the Ghana News Agency reported Nuclear Power Ghana's executive director as saying no formal contract had been signed, that a framework agreement existed, that the SMRs would be 12 modules of 77 megawatts totaling 924 megawatts, and that the location was still being determined. The 1,200 megawatt figure and the build-operate-transfer model in that article belong to a separate China National Nuclear Corporation large reactor. A May 2024 Ghana Atomic Energy Commission page describes an industrial enclave and an NuScale training center, not a plant plot. No search beyond these pages was run. Last checked 19 Oct 2026. DOE: Nuclear Power Ghana and Regnum agree to deploy one VOYGR-12 plant; Ghana News Agency: NPG on vendors, 12 modules and no signed contract; GAEC: US-Ghana cooperation and an unnamed NuScale industrial enclave
    What would change this

    A named subsidiary, a site decision, or a signed construction contract would change this record. Next recheck due .

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The March 2025 Ghana News Agency report says experts are still gathering environmental and oceanic data to determine the plant location. That sentence also covers the vendors for the plants discussed, including the Chinese large reactor, so it is not a VOYGR-only plot. The enclave page does not name a site either. Last checked 19 Oct 2026. Ghana News Agency: NPG on vendors, 12 modules and no signed contract; GAEC: US-Ghana cooperation and an unnamed NuScale industrial enclave
    What would change this

    A Nuclear Power Ghana or regulator siting decision naming the plot would settle the site. Next recheck due .

  • Next decision and prerequisites. With only a framework agreement in place in March 2025, the next consequential steps reported are a formal contract with the vendors and selection of the plant's location; the government's stated plan is one gigawatt of nuclear power on the grid by 2034. No date for the contract or site decision is given. Last checked 23 Oct 2026. Ghana News Agency: NPG on vendors, 12 modules and no signed contract
    What would change this

    A signed contract with NuScale and Regnum, or announcement of the plant site. Next recheck due .

  • Permissions and public process. The Ghana News Agency reported on 27 March 2025 that Ghana had selected NuScale and Regnum for its small modular reactor plant and signed a framework agreement with the vendors, but that no formal contract had been signed. The report shows no siting, construction license or environmental approval for the VOYGR-12 plant. Last checked 23 Oct 2026. Ghana News Agency: NPG on vendors, 12 modules and no signed contract
    What would change this

    A signed project contract, or a Nuclear Regulatory Authority of Ghana site or construction license decision for the plant. Next recheck due .

  • Site dependencies (land, grid, water). The March 2025 Ghana News Agency report says experts were gathering environmental and oceanic data to determine the plant's location. No site, land arrangement, grid connection or cooling-water arrangement had been fixed in the sources reviewed. Last checked 23 Oct 2026. Ghana News Agency: NPG on vendors, 12 modules and no signed contract
    What would change this

    An announcement of the selected site for Ghana's VOYGR-12 plant. Next recheck due .

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 4 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: NPG describes 12 modules and says no contract is signed: 27 Mar 2025.4 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed) — https://smrmap.com/projects/ghana-voygr-12/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed)”. Record reviewed 5 Oct 2026. https://smrmap.com/projects/ghana-voygr-12/ (accessed [date]).

“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.

Record details
Inclusion basis
SMR by design class
Confidence (as stored in the record)
medium