AHWR-300
BARC’s vertical pressure-tube reactor uses boiling light-water cooling and heavy-water moderation. The 2016 IAEA ARIS supplement profiles AHWR-300 among land-based small modular designs, at 304 MWe and 920 MWth; BARC explicitly calls the 304 MWe figure gross. The supplement carries an unreviewed/non-official disclaimer and is not regulatory endorsement. Its general profile includes thorium fuel options and is not a second deployment or a separate AHWR300-LEU profile. BARC’s LEU brochure describes a 300 MWe variant; that figure is not substituted into this general profile. No current commercialization, site or licence is inferred.
Catalogue identity snapshot: 2016-08 (dated technical description; not confirmation of current development or availability). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
- Class
- SMR
- Technology
- Other
- Coolant
- light water
- Spectrum
- thermal
- Developer / vendor(s) as of 2016-08
- Bhabha Atomic Research Centre
- Module electrical
- 304 MWe (gross)
- Module thermal
- 920 MWth (nameplate; basis unspecified)
- Inclusion basis
- smr_by_design_class
- Confidence
- medium
- Last verified
- 2026-10-13
Tracked deployment projects
- No projects tracked here.
Design sources
- IAEA ARIS supplement: AHWR-300 (2016) (iaea_or_nea, dated Aug 2016, accessed 2026-10-13)
- BARC: AHWR main design features (government_primary, accessed 2026-10-13)
- BARC: AHWR300-LEU brochure (government_primary, accessed 2026-10-13)