Designs

Allseas HTGR

Helium-cooled, graphite-moderated pebble-bed reactor with TRISO fuel. ANVS's SMR page, as read on 5 October 2026, lists Allseas Engineering BV's HTGR at 70 MWth (25 MWe) in orienting consultation. ANVS states that no Dutch SMR initiative has chosen a site or entered pre-application. No deployment site is named.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
2 sources; first primary source: Allseas: Nuclear. Record reviewed 5 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Key facts

Class
SMR
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s)
Allseas
Module electrical
25 MWe (gross/net unspecified)
Module thermal
70 MWth (nameplate; basis unspecified)
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
5 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(2)

Evidence and open questions

(1 note)
  • Evidence review. Allseas says it is developing a nuclear power system for energy-intensive offshore vessels and onshore industrial clusters, and it describes an HTGR that produces heat and electricity. The reactors are a 25 MWe class, use TRISO fuel, move heat with helium, and use graphite as a moderator that slows neutrons. The Dutch regulator ANVS lists Allseas HTGR, Allseas Engineering BV, gas (helium), 70 MWth (25 MWe). Stored 25 MWe and 70 MWth match that ANVS line. The Allseas page does not use the word thermal for the spectrum. No named project site is in these passages. Last checked 19 Oct 2026. Allseas: Nuclear; ANVS, Small modular reactors
    What would change this

    An ANVS or Allseas filing that names a site or states gross versus net for the 25 MWe class. Next scheduled check: 19 Jan 2027.