How small reactor types work · Designs of this type

How a high-temperature gas reactor works

HTR-PM is a high-temperature gas-cooled reactor (HTGR): helium carries heat out of a bed of fuel spheres to a separate steam generator, and the steam goes on to a turbine.[1, pp. 229, 230] The plant has two such reactor modules feeding one steam turbine; the figure shows one.[1, p. 230]

This page explains the type on one documented design, simplified; other designs of the type can differ. It describes the design, not a project: see the HTR-PM record. SMRMap tracks 1 project using it, and that project's record carries its status.

HTR-PM high-temperature gas-cooled reactor, simplified side section of one module with numbered partsOn the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below. A horizontal hot gas duct leads right to a steam generator vessel that reaches lower than the reactor, with a helium blower on top of it. Solid arrows run from the bottom area inside the reactor vessel up channels in the reflector, across the top, down through the fuel spheres, and through the duct to the steam generator. Dashed arrows close the loop back to the reactor and are not described in the section's text.123456789Helium in, 250 °COut, 750 °CTo turbine, 567 °C
Simplified from the IAEA SMR Technology Catalogue 2026, HTR-PM section (printed pages 229–234). Parts and proportions not stated in the source are schematic. The figure shows one of the plant's two reactor modules, with far fewer fuel spheres than the catalog states, not to scale. The vessel's height and inner diameter are the catalog's. Numbers match the sections below; arrows show the coolant path.
  • Helium, on the route the section's text gives
  • Helium, not described in the section's text: drawn only to close the loop
  • Steam going to the turbine
  • Water and steam inside the steam generator, not described in the section's text

The parts, numbered as in the figure

1. Reactor pressure vessel

The catalog's table gives the vessel as 25 m high and 5.7 m across inside, weighing 800 metric tons.[1, p. 229] SMRMap's vessels page does not draw this vessel: its inside diameter and reactor-module scope remain under review. It is one of three pressure vessels in the primary pressure boundary, with those of the steam generator and the hot gas duct, all inside a concrete shielding cavity.[1, p. 231]

2. Pebble bed core

The fuel is a bed of spheres, 420 000 in each reactor module.[1, pp. 229, 230] Each sphere holds 7 grams of heavy metal, meaning uranium here, at 8.5% enrichment.[1, pp. 229, 230] Inside it, coated fuel particles sit in a graphite matrix 5 cm in diameter, surrounded by a 5 mm graphite layer.[1, p. 230]

3. Graphite reflector, carbon bricks and core barrel

Ceramic structures surround the core: a graphite reflector on the inside and layers of carbon brick outside it.[1, p. 231] They sit inside a metallic core barrel, which the vessel supports.[1, p. 231]

4. Side reflector channels

Channels in the side reflector carry the cold helium up past the core.[1, p. 230] The section says these cold helium borings act like a temperature screen, protecting the core barrel and the vessel from the core's heat.[1, p. 231]

5. Control rods and small absorber spheres

Two independent shutdown systems sit in holes in the graphite side reflector.[1, p. 231] The section lists 24 control rod assemblies, with 6 small absorber sphere systems as a reserve.[1, p. 231]

6. Fuel loading tube and extraction pipe

Fuel spheres are loaded and discharged continuously: they drop into the core from a central loading tube and leave through an extraction pipe at the bottom.[1, p. 231] A sphere that has reached its target burnup, the planned amount of use, goes to the spent fuel storage tank; any other goes back through the core.[1, p. 231]

7. Hot gas duct

Each module includes a hot gas duct with its own pressure vessel.[1, pp. 230, 231] The figure places it between the reactor and the steam generator, following the catalog's drawing; the text does not give its position.[1, p. 229]

8. Steam generator

The steam generator has its own pressure vessel, and the section places it lower than the core.[1, p. 231] Steam reaches the turbine entrance at 13.25 MPa and 567 °C.[1, p. 230]

9. Main helium blower

The table lists forced circulation, and the text gives a rated helium mass flow of 96 kg/s.[1, pp. 229, 230] Each module has a main helium blower, which the section also calls the helium circulator.[1, pp. 230, 231] The figure shows it on top of the steam generator, following the catalog's drawing; the text does not give its position.[1, p. 229]

The coolant path

  1. Helium comes in at the bottom of the reactor, inside the vessel, at 250 °C.[1, p. 230]
  2. It flows up through channels in the side reflector to the level of the top reflector.[1, p. 230]
  3. There it reverses and flows down into the pebble bed, where it is heated.[1, p. 230]
  4. Some helium is diverted as bypass flow to cool the fuel in the discharge tubes and the control rods in their channels.[1, p. 230]
  5. The helium mixes to an average outlet temperature of 750 °C and flows to the steam generator.[1, p. 230]
  6. The section's text does not describe how the helium gets from the steam generator back to the reactor inlet, or how water and steam move inside the steam generator, so the dashed lines in the figure only close those loops.[1, pp. 229–234]

Do all high-temperature gas reactors use fuel spheres and a steam generator?

No. HTR-PM uses both, but other sections of the same catalog differ.[1, pp. 190, 230] These are examples, not a full list, and the interactive view shows HTR-PM only.

  • HTR-PM. Fuel spheres, and helium that flows on to a steam generator.[1, p. 230]
  • Xe-100. Also a pebble bed design, with fuel spheres fed in at the top.[1, p. 253]
  • GTHTR300. 90 fuel columns of hexagonal graphite blocks rather than spheres, and a direct-cycle helium gas turbine in place of water and steam systems.[1, pp. 189, 190]

Design values

These are values listed in the catalog section, which the developer supplied.[1, p. 229]

  • Power. 250 MW(t) of heat for each reactor module, and 210 MW(e) of electricity from the one steam turbine the two modules feed.[1, p. 230]
  • Helium. 7.0 MPa, 250 °C at the core inlet and 750 °C at the core outlet, with a rated mass flow of 96 kg/s.[1, p. 230]
  • Steam. 13.25 MPa and 567 °C at the turbine entrance.[1, p. 230]
  • Fuel. 8.5% enrichment, with refueling while the reactor runs.[1, p. 229]

Designs on SMRMap recorded as this type

39 designs, with 27 tracked projects between them. Each design's type comes from its own record on SMRMap; the example above is one of them, and the others can differ from it.

DesignClassElectrical output Tracked projects
A-HTR-100SMR—None tracked here
Allseas HTGRSMR25 MWe (gross/net unspecified) · moduleNone tracked here
AMRMicroreactor—None tracked here
BARC high-temperature gas-cooled hydrogen reactorSMRthermal only (no MWe)1
Blossom Energy SMRSMR—None tracked here
BWXT BANRMicroreactor—3
Global First Power Micro Modular ReactorMicroreactor—1
GT-MHRSMR—None tracked here
GTHTR300The catalog and the NEA profile describe a high-temperature gas-cooled reactor.SMR—None tracked here
HECTARThe profile calls HECTAR a land-based high-temperature gas-cooled reactor.SMR—None tracked here
HOLOS-MONOMicroreactor—None tracked here
HOLOS-QUADMicroreactor—None tracked here
HTGR-POLASMR—1
HTMR-100SMR35 MWe (gross/net unspecified) · module1
HTR-10SMR—1
HTR-PMSMR210 MWe (gross) · plant (two reactor modules)1
HTR-PM600SMR—1
HTR50SThe catalog and the NEA profile call HTR50S a high-temperature gas-cooled reactor.SMR—None tracked here
HTTRSMR—1
Jimmy Fermi heat microreactorMicroreactorthermal only (no MWe)1
KaleidosMicroreactor1.2 MWe (gross/net unspecified) · module4
KRONOS MMRMicroreactor—2
LOKI MMRMicroreactor—1
MHR-100SMR—None tracked here
MHR-TSMR—None tracked here
MN-1Microreactor—None tracked here
NuGen EngineMicroreactor—None tracked here
PBMR (Pebble Bed Modular Reactor)SMR165 MWe (gross/net unspecified) · module1
PeLUIt-40SMR—None tracked here
Prismatic HTRSMR—None tracked here
Project Pele microreactor (BWXT HTGR)Microreactor1.5 MWe (gross/net unspecified) · module1
Rolls-Royce AMRSMRup to 25 MWe (gross/net unspecified) · moduleNone tracked here
SC-HTGR (Framatome steam-cycle HTGR)SMR272 MWe (gross/net unspecified) · moduleNone tracked here
StarCoreSMR14 MWe (gross/net unspecified) · moduleNone tracked here
TREDIC HTGR SMRSMR—None tracked here
U-BatteryMicroreactor4 MWe (gross/net unspecified) · module1
Ward 250Microreactor—1
Xe-100SMR80 MWe (net) · module4
XENITHMicroreactor—None tracked here

Sources

  1. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). HTR-PM section, printed pages 229–234; Xe-100 section, printed page 253; GTHTR300 section, printed pages 189–190. Each section is contributor material; the HTR-PM section was supplied by Tsinghua University.