Designs / dsn-apollo-a-10
Apollo A-10
Apollo's 2026 NRC engagement plan describes an approximately 10 MWe integral PWR-based SMR. Gross/net basis is unspecified. The plan proposes future construction-permit engagement; it does not establish a filed project application, site or permit.
- Class
- SMR
- Technology
- Integral pressurized water reactor (iPWR)
- Coolant
- light water
- Spectrum
- thermal
- Developer / vendor(s)
- Apollo Atomics, Inc.
- Module electrical
- 10 MWe (nameplate (gross/net unspecified))
- Inclusion basis
- smr_by_vendor_claim_with_capacity_check
- Confidence
- medium
- Last verified
- 2026-10-09
Tracked deployment projects
- No projects tracked here.
Design sources
- Apollo A-10 regulatory engagement plan (ML26092A285) (regulator_primary, accessed 2026-10-09)