How small reactor types work · Designs of this type
How an integral pressurized water reactor works
CAREM-25 is an integral pressurized water reactor (iPWR): its core, steam generators, primary coolant and steam dome all sit inside a single pressure vessel.[1]
This page explains the layout on one documented design, simplified. It describes the design, not a project: the CAREM-25 project record carries its status.
A loop-type pressurized water reactor keeps its steam generators outside the vessel, on separate loops; an integral design keeps them inside. How a pressurized water reactor works.
The parts, numbered as in the figure
1. Reactor vessel
CAREM-25's forged-steel pressure vessel is about 11 meters high; the catalog gives its diameter as 3.2 m in its summary table and 3.4 m in its text.[1]
Its wall is 13 to 20 centimeters thick, with a stainless-steel lining inside.[1]
2. Core
The core holds 61 hexagonal fuel assemblies with 1.4 meters of active length.[1]
3. Steam generators inside the vessel
Twelve identical helical once-through steam generators are spaced evenly around the inner wall of the vessel.[1]
They pass heat from the primary water to the separate secondary circuit.[1]
4. Steam dome instead of a separate pressurizer
CAREM keeps its pressure by balancing steam production and condensation inside the vessel, so it has no separate pressurizer vessel; the steam dome sits at the top.[1]
5. Chimney and downcomer: the coolant path
Water enters the core from the lower plenum and, as it heats, rises through the chimney (the riser) to the steam dome.[1]
It then turns down through the steam generators, cooling as it goes, and returns through the downcomer to the core.[1]
Do all integral PWRs work without pumps?
No. CAREM moves its primary water without primary coolant pumps,[1] but other integral designs use them.[2] These are examples, not a full list, and the interactive view shows CAREM only.
Operating values
The catalog lists CAREM-25's primary operating pressure as 12.25 MPa and its core inlet and outlet coolant temperatures as 284 °C and 326 °C.[1]
Designs on SMRMap recorded as integral PWRs
24 designs. SMRMap records a design as an integral PWR only when a source calls it one, or places its steam generators or whole primary circuit inside the reactor vessel; a design whose sources say only "pressurized water reactor" is recorded as a PWR. Where the classification rests on the developer's own wording, the note says so.
| Design | Class | Electrical output | Tracked projects |
|---|---|---|---|
| ABV-6EThe IAEA's 2026 catalog section, supplied by its contributor, calls ABV-6E an integral PWR with its steam generators inside the reactor pressure vessel. | SMR | — | None tracked here |
| ABV-6M | SMR | 6 MWe (gross/net unspecified) · module | None tracked here |
| ACP100 (Linglong One) | SMR | 125 MWe (gross) · module | 1 |
| ACP100SThe IAEA's 2026 catalog section, supplied by its contributor, lists ACP100S as an integral PWR with its steam generators inside the reactor pressure vessel. | SMR | — | 1 |
| Apollo A-10The Integral PWR classification records the vendor’s wording, rather than independent certification of the internal configuration. | SMR | 10 MWe (gross/net unspecified) · module | None tracked here |
| CAP150 | SMR | 150 MWe (gross/net unspecified) · module | None tracked here |
| CAREM-25 | SMR | 25 MWe (net) · module | 1 |
| Daratha 10 MWe microreactor conceptThe Integral PWR classification records Daratha's own description, read on 9 November 2026: the core, four helical steam generators, four canned motor pumps and the pressurizer inside one reactor pressure vessel, with no external primary loop piping. | Microreactor | 10 MWe (gross/net unspecified) · module | None tracked here |
| ELENAThe IAEA's 2026 catalog section, supplied by its contributor, says the design is based on an integral reactor with its primary circuit enclosed in one vessel and lists the type as PWR, though it makes electricity with thermoelectric modules rather than a turbine. | Microreactor | — | None tracked here |
| FBNRThe ARIS status report classifies the FBNR as a PWR with an integral NSSS layout and says the steam generator and reactor core are housed in the same pressure vessel; its fuel is spherical elements held in the core by the coolant flow rather than fixed fuel assemblies. | SMR | — | None tracked here |
| Hadron HaloThe Integral PWR classification records the vendor’s wording, rather than independent certification of the internal configuration. | Microreactor | 10 MWe (gross/net unspecified) · module | None tracked here |
| i-SMR | SMR | — | 1 |
| mPower | SMR | 195 MWe (gross/net unspecified) · module | 1 |
| NuScale US600 | SMR | 50 MWe (gross/net unspecified) · module | None tracked here |
| NuScale VOYGR (US460 / NPM) | SMR | 77 MWe (gross) · module | 4 |
| RITM-200M | SMR | — | None tracked here |
| RITM-200N | SMR | 55 MWe (gross) · module | 3 |
| RITM-200SThe NEA SMR Dashboard describes the RITM-200S as an integral pressurised water reactor for floating nuclear power plants. | SMR | 58 MWe (gross) · module | 2 |
| SHELF-M | SMR | — | 1 |
| SMART | SMR | 100 MWe (gross/net unspecified) · module | None tracked here |
| SMART-CThe Integral PWR classification records the developer’s wording, rather than independent certification of the internal configuration. | SMR | 110 MWe (gross/net unspecified) · module | None tracked here |
| SMART100 | SMR | 110 MWe (gross/net unspecified) · module | None tracked here |
| UNITHERMThe IAEA's 2026 catalog section, supplied by its contributor, calls UNITHERM an integral type reactor with its nuclear steam supply system equipment inside the reactor pressure vessel, and lists the type as PWR. | Microreactor | — | None tracked here |
| VVER-IThe Integral PWR classification rests on the vendor’s statement that the coolant circulates only inside the reactor vessel, rather than on independent certification of the internal configuration. | SMR | — | None tracked here |
Sources
- Small Modular Reactor Technology Catalogue, 2024 edition: CAREM — International Atomic Energy Agency
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) — IAEA ARIS (catalog host; design profiles supplied by contributors)