ARC Generator (ARC Reactor)
Molten-salt microreactor by Alpha Tech Research Corp. The IAEA's September 2026 microreactor outlook (IAEA/PAT/016) names it as under development and almost in the prototype construction phase and places it at 30 MWth and detailed design in its status figure. No electrical rating is stated. This is a dated IAEA description, not confirmation of current availability, a named deployment or authorization.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated: Detailed Design (IAEA 2026 Fig. 5); "almost in the prototype construction phase".
- Evidence
- One source (IAEA/NEA): IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016. Record reviewed 6 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- Molten salt reactor (MSR)
- Coolant
- Molten salt
- Developer / vendor(s)
- Alpha Tech Research Corp
- Module thermal
- 30 MWth (nameplate; basis unspecified)
- Development status (as stated)
- Detailed Design (IAEA 2026 Fig. 5); "almost in the prototype construction phase"
- Not yet recorded
- Neutron spectrum (not stated in the sources read). Not recorded does not mean zero or that none exists; the description and sources may say more.
- Record reviewed
- 6 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Spectrum
- Not recorded
- Module electrical
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016 (IAEA/NEA, accessed 6 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The 2026 IAEA microreactor outlook gives ARC Generator, or ARC Reactor, of Alpha Tech Research Corp as an example of a molten-salt microreactor that is almost in the prototype construction phase. The words fast and thermal spectra introduce that class and do not assign one spectrum to ARC. An earlier sentence says microreactors generally provide output under 30 MWth, which is a class bound rather than a stated ARC nameplate. Stored 30 MWth is therefore not confirmed and is not changed. Stored status also cites detailed design in IAEA 2026 Figure 5, and those words are not in the opened prose. No deployment is named. Last checked 19 Oct 2026. IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016
What would change this
The IAEA figure, or an Alpha Tech specification, that states ARC's own thermal power and one neutron spectrum. Next recheck due .
- Neutron spectrum: Not disclosed in the reviewed evidence. The outlook says molten-salt microreactors include fast and thermal spectra, then names ARC and Energy Well as examples. It does not say which spectrum ARC uses. Last checked 19 Oct 2026. IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016
What would change this
An Alpha Tech or IAEA design note that assigns one spectrum to the ARC Generator. Next recheck due .
Cite or share this page
SMRMap. “ARC Generator (ARC Reactor)”. Record reviewed 6 Oct 2026. https://smrmap.com/designs/dsn-arc-generator/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Inclusion basis
- Labeled microreactor
- Confidence (as stored in the record)
- medium
Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.