ARCHEOS
Heat-only light-water reactor for industrial steam, developed by CEA and now carried by a CEA-NUVIA joint venture. Versions differ: an older CEA page gives 20-50 MW of heat up to 150 C; the current developer site gives 100 MWth for steam up to 200 C. No electricity output; no named site.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: ARCHEOS SAS: the ARCHEOS solution. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Other (see description)
- Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- ARCHEOS SAS, CEA
- Module electrical
- thermal only (no MWe)
- Module thermal
- 100 MWth (nameplate; basis unspecified)
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- ARCHEOS SAS: the ARCHEOS solution (company, accessed 2 Oct 2026)
- CEA: le projet Archeos (government, accessed 2 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The current ARCHEOS SAS page says ARCHEOS is a 100 MWth reactor designed to supply industrial steam up to 200 degrees. The CEA page describes Archeos as a nuclear heat generator using light water and supplying 20 to 50 MW of heat up to 150 degrees Celsius. Those are different thermal outputs and different temperatures, so the older CEA description is not written over the current 100 MWth figure. The French word thermique on the CEA page refers to heat supply, not a neutron spectrum. No electrical output and no site are stated. Stored 100 MWth and thermal-only electrical basis are left in place. Both organizations remain on the vendor list. Last checked 19 Oct 2026. ARCHEOS SAS: the ARCHEOS solution; CEA: le projet Archeos
What would change this
A dated ARCHEOS or CEA specification that says whether the 100 MWth steam unit replaces the 20 to 50 MW heat description. Next scheduled check: 19 Jan 2027.