BANDI
BANDI is KEPCO E&C's floating semi-integral pressurized water reactor. KEPCO E&C's section of the 2026 catalog, which is contributor material, lists basic design; the 2024 ARIS report says conceptual design.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 9 Sep 2024: Conceptual design.
- Evidence
- 2 sources; first primary source: ARIS original status report — BANDI (2024-09-09). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 9 Sep 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The IAEA's 2026 catalog section, supplied by its contributor, lists BANDI as a semi-integral PWR, with the steam generator in a block separate from the reactor vessel, so it is not recorded as integral. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 9 Sep 2024
- KEPCO E&C
- Fuel form
- UO2
- Development status (as stated)
- Conceptual design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- ARIS original status report — BANDI (2024-09-09) (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) (IAEA/NEA, published Sep 2026, accessed 2 Nov 2026)
Evidence and open questions
(3 notes)
- Evidence review. The ARIS status report for BANDI of the Republic of Korea identifies the design and classifies the design status as conceptual design. That matches the stored status text. ARIS ratings and other parameters are not reusable, and no developer page is attached to this record. The 2026 catalog section is attached for the reactor type only; its output figures aren't stored here. Its table says Basic Design, later than the 2024 ARIS status stored here; the stored status isn't changed by this type correction. No module rating is proposed. This remains an identity profile. The quoted lines do not name the stored vendor organization in those words. Last checked 19 Oct 2026. ARIS original status report — BANDI (2024-09-09)
What would change this
A KEPCO E&C or catalog line, attached as a citable source, that states BANDI module output with a unit. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The only attached source is an ARIS report. Its parameters are a reuse limitation, not a finding that the author published no number. No reusable published source is attached, so no rating is stated for the record and none is proposed. Last checked 19 Oct 2026. ARIS original status report — BANDI (2024-09-09)
What would change this
A non-ARIS KEPCO E&C datasheet with BANDI module MWe or MWth. Next scheduled check: 19 Jan 2027.
- Technology family. The IAEA's 2026 catalog section, supplied by its contributor, lists BANDI as a semi-integral PWR, with the steam generator in a block separate from the reactor vessel, so it is not recorded as integral. Printed pages 141 and 142. Last checked 3 Nov 2026. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
What would change this
A KEPCO E&C or IAEA document that changes the BANDI reactor type or layout. Next scheduled check: 3 Feb 2027.