How small reactor types work · Designs of this type

How a pressurized water reactor works

Rolls-Royce SMR is a three-loop pressurized water reactor (PWR): water carries heat from the core out of the vessel to steam generators, and pumps return it.[1, pp. 79, 81]

This page explains the type on one documented design, simplified; other designs of the type can differ. It describes the design, not a project: see the Rolls-Royce SMR record. SMRMap tracks 6 projects using it, and each project's record carries its status.

An integral design keeps its steam generators inside the reactor vessel; a loop design like this one keeps them outside it, on separate loops. How an integral pressurized water reactor works.

Rolls-Royce SMR pressurized water reactor, simplified side section of one of its three loops with numbered partsOn the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head. A hot pipe leaves the vessel to the right and rises to a tall steam generator, which sits higher than the vessel. A pressurizer stands on the hot pipe. A pump directly below the steam generator returns the water through a lower pipe to the vessel. Solid arrows show the water going down inside the vessel wall, up through the core, out along the hot pipe, and back from the pump. Dashed arrows inside the steam generator's tubes and on its outer side are not traced in the section's text.12345678Core in, 295 °CCore out, 322 °CFeedwater
Simplified from the IAEA SMR Technology Catalogue 2026, Rolls-Royce SMR section (printed pages 79–84). Parts and proportions not stated in the source are schematic. The figure shows one of the three loops, one set of pipes and a schematic number of rods and tubes. The vessel's height and diameter are the catalog's; the sizes of the steam generator, pump and pressurizer are not stated. The catalog's pictures of this design are not labeled, so the arrangement follows the section's text: the pressurizer on the hot leg, the pump on the steam generator's outlet, the pipes entering the vessel's upper shell, and the steam generator above the vessel. The heights of the pipes, the side of the vessel each leaves on, how far above the vessel the steam generator stands, and the straight tubes are schematic. Numbers match the sections below; arrows show the coolant path.
  • Coolant water, on the route the section's text gives
  • Coolant water inside the U-tubes, not traced in the section's text
  • Water and steam on the steam generator's outer side, not traced in the section's text

The parts, numbered as in the figure

1. Reactor pressure vessel

The catalog's table gives the vessel as 7.82 m high and 4.20 m in diameter, weighing 169 metric tons.[1, p. 79] Its upper shell holds the six coolant loop nozzles, two for each loop; below that are a lower shell and the lower head.[1, p. 80]

2. Core

The core holds 121 fuel assemblies with an active fueled length of 2.8 m.[1, p. 80] The fuel is uranium dioxide enriched up to 4.95%, in zirconium alloy cladding and a 17x17 array.[1, p. 80]

3. Control rods and drive mechanisms

Control rods move in and out of the core; the section says no soluble boron is kept in the water for routine reactivity control.[1, p. 80] The drive mechanisms belong to the head assembly, and housing columns in the upper internals align the rods and their drive shafts.[1, pp. 80, 81]

4. Core barrel and flow distribution device

The core barrel holds the fuel and diverts coolant from the vessel's inlets to a flow distribution device.[1, p. 80] That device turns, straightens and spreads the flow before it enters the inlet plenum, the space the water reaches just before the fuel.[1, p. 80] A radial neutron reflector is part of these lower internals.[1, p. 80]

5. Upper internals

The upper internals take the coolant from the top of the fuel assemblies and send it to the vessel's outlets.[1, p. 80] They also include the upper support barrel, which holds the fuel in place.[1, p. 81]

6. Steam generator

Each of the three loops has a vertical U-tube steam generator (its tubes are bent into a U, so water rises in one leg and falls in the other), placed around the vessel.[1, p. 81] Each is raised above the vessel; the section says this gives enough of a buoyancy push (its words: thermal driving head) for the water to circulate on its own when the pumps are not available.[1, p. 81] Feedwater is steered to the cold side of the tube bundle by a built-in preheater.[1, p. 81]

7. Reactor coolant pump

A centrifugal pump is mounted directly on the outlet nozzle of each steam generator, so the plant has three.[1, p. 81] They use a seal-less design, with no rotating shaft seal between the reactor water and the outside, and drive the flow during power operation.[1, p. 81]

8. Pressurizer

The pressurizer is a vertical cylindrical vessel connected to the hot leg, the pipe carrying hot water from the vessel.[1, p. 81] It holds steam and water together, and controls primary pressure with electric heaters at its base and a spray nozzle at its top.[1, p. 81]

The coolant path

  1. Water comes into the vessel through the inlets in its upper shell, and the core barrel diverts it down to the flow distribution device.[1, p. 80]
  2. From the inlet plenum, the water rises through the fuel assemblies, entering at 295 °C and leaving at 322 °C.[1, pp. 79, 80]
  3. The upper internals pass the hot water to the outlets, and it goes on to a steam generator along the hot leg.[1, pp. 80, 81]
  4. It leaves the steam generator through the outlet nozzle, straight into the pump, which sends it back to the vessel.[1, p. 81]
  5. The section's text does not trace the water through the U-tubes, or the water and steam on the steam generator's outer side, so those lines are dashed.[1, pp. 79–84]

How does this differ from an integral pressurized water reactor?

The two differ in where the steam generators sit and what moves the water in the reactor circuit: steam generators outside the vessel and pumps in Rolls-Royce SMR, steam generators inside it and natural circulation in CAREM.[1, pp. 32, 81] Only the first difference is what makes a design integral or loop type; natural circulation is CAREM's own choice. The integral PWR page's section on pumps gives sourced examples: Do all integral PWRs work without pumps? Rolls-Royce SMR and CAREM are two examples from one catalog, and the interactive view shows Rolls-Royce SMR only.

  • Rolls-Royce SMR. Three loops, each with its own steam generator and pump, connected to the vessel by pipework.[1, p. 81]
  • CAREM. The core, steam generators and primary water are all in one pressure vessel, and natural circulation moves the water through the core.[1, p. 32]
  • Natural circulation. Rolls-Royce SMR's table lists it as a backup for removing the heat the fuel gives off after shutdown; CAREM's lists it as the primary circulation. This is about the reactor circuit in each case, not every pump in the plant.[1, pp. 31, 79]

Design values

These are values listed in the catalog section, which the developer supplied.[1, p. 79]

  • Power. 1,358 MW(t) of heat and 470 MW(e) of electricity.[1, p. 79]
  • Pressure. 15.5 MPa in the primary water and 7.4 MPa on the secondary, steam side.[1, p. 79]
  • Coolant temperature. 295 °C at the core inlet and 322 °C at the core outlet.[1, p. 79]
  • Fuel. Enrichment up to 4.95%, on a fuel cycle of 18 months.[1, pp. 79, 80, 84]

Designs on SMRMap recorded as this type

37 designs, with 35 tracked projects between them. Each design's type comes from its own record on SMRMap; the example above is one of them, and the others can differ from it.

DesignClassElectrical output Tracked projects
ACPR50SThe IAEA's 2020 SMR booklet calls the ACPR50S a loop-type PWR, so it is not recorded as integral.SMR—1
ACR-300The attached report says the ACR-300 uses PWR technology but does not describe its primary-circuit layout, so no integral layout is recorded.SMR300 MWe (gross/net unspecified) · module1
AP300The 2024 SMR Technology Catalogue describes a one-loop pressurized water reactor, so no integral layout is recorded.SMR300 MWe (gross/net unspecified) · module1
BANDIThe IAEA's 2026 catalog section, supplied by its contributor, lists BANDI as a semi-integral PWR, with the steam generator in a block separate from the reactor vessel, so it is not recorded as integral.SMR—None tracked here
BARC SMR-55India's Department of Atomic Energy says the SMR-55 is based on a pressurized water reactor design.SMR55 MWe (gross/net unspecified) · module1
Bharat Small Modular Reactor (BSMR-200)BARC, the developer, describes BSMR-200 as a pressurised water reactor based plant in its January 2026 presentation.SMR220 MWe (gross/net unspecified) · module1
BlueCore BC-15The NRC's pre-application page says BlueCore is developing a 45 MWt pressurized water reactor, at pre-application stage.SMR15 MWe (gross) · module1
CAL-30The IAEA's 2026 catalog section, supplied by its contributor, lists CAL-30 as PWR (pool-type), but it is a heat-only design at low pressure with its vessel immersed in a pool, unlike a power plant's PWR, and the catalog's own summary table gives only pool type.Microreactor—1
CAP200The IAEA's 2020 SMR booklet places the core and steam generators within an integral pressure vessel but also says the steam generators are connected to the reactor vessel directly; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim.SMR—None tracked here
CR-100SMR—None tracked here
DAVID SMRSMR50 MWe (gross/net unspecified) · moduleNone tracked here
DEER (Deployable Electric Energy Reactor)SMR—None tracked here
DFBR-1The NEA third edition describes DFBR-1 as an underground, borehole-deployed, pressurised water SMR.SMR—None tracked here
EmberSMR25 MWe (gross/net unspecified) · moduleNone tracked here
FlexblueThe IAEA's 2016 SMR booklet describes a two-loop pressurized water reactor with two horizontal steam generators, so no integral layout is recorded.SMR160 MWe (gross/net unspecified) · moduleNone tracked here
GravitySMRup to 15 MWe (gross/net unspecified) · module1
HAPPY200The IAEA's 2026 catalog section, supplied by its contributor, lists HAPPY200 as PWR, while its text calls it a pool-loop combined type with features of a swimming pool reactor and a PWR to some extent and its table gives thermal power only, so it is a heat-only design at low pressure.SMR—1
Holtec SMR-160The IAEA's 2016 SMR booklet lists the SMR-160 among integral designs, but its 2020 edition describes a steam generator joined to the reactor vessel by a single connection; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim.SMR160 MWe (gross/net unspecified) · module2
Holtec SMR-300The 2024 SMR Technology Catalogue describes a two-loop pressurized water reactor, so no integral layout is recorded.SMR300 MWe (net) · module5
Huakun One floating reactor platformSMR50 MWe (gross/net unspecified) · module1
JH-100 (Junhe One)The developer's page names the JH-100 a small modular pressurized water reactor but does not describe an integral layout, so none is recorded.SMR100 MWe (gross/net unspecified) · moduleNone tracked here
KAIST ATOMSMR—None tracked here
KLT-40SThe IAEA's 2018 SMR booklet describes a four-loop primary circuit, so no integral layout is recorded.SMR35 MWe (gross) · module1
Last Energy PWR-5Microreactor5 MWe (gross/net unspecified) · module1
LDR-50The NEA third edition calls the LDR-50 a simplified light water PWR for low temperature heat, and its developer says it has no turbines or generators.SMRthermal only (no MWe)1
LEUNRThe NEA third edition describes LEUNR as a pressurised light water microreactor; its developer has since retired the concept.Microreactor—None tracked here
MK60Deep Atomic, the developer, says the MK60 is built on pressurized water reactor principles and uses conventional PWR components.SMR60 MWe (gross/net unspecified) · module1
NHR200-IIINET, a 2021 Tsinghua journal article and the NEA SMR Dashboard describe an integrated pressurized water reactor, but none of the attached sources states that its heat exchangers sit inside the reactor vessel, so the integral classification is not recorded.SMR—None tracked here
Nuclearis N1The NEA SMR Dashboard describes the N1 as an integrated PWR without stating where its primary circuit sits, so the integral classification is not recorded; the developer's own pages returned access-denied responses.Microreactor—None tracked here
NUWARD SMRSMRMap treats the fully integrated PWR in the IAEA's October 2024 status report as the historical two-reactor ARIS design and does not classify the revised single-reactor configuration's primary-circuit layout, so no integral claim is recorded.SMR—None tracked here
PWR-20The 2024 SMR Technology Catalogue describes a single-loop pressurized water reactor, so no integral layout is recorded.Microreactor20 MWe (gross/net unspecified) · module6
REPLOY Submersible Power System (SPS)SMR300 MWe (gross/net unspecified) · moduleNone tracked here
RITM-400Nornickel's 2023 release calls RITM-400 a pressurised water reactor and no opened source states its layout, so no integral claim is recorded.SMR—1
Rolls-Royce SMRThe 2024 SMR Technology Catalogue describes a three-loop pressurized water reactor, so no integral layout is recorded.SMR470 MWe (net) · module6
VBER-150IAEA-TECDOC-1536 (2007) calls the VBER-150 a small sized loop type pressurized water reactor and lists its type as PWR.SMRapproximately 110 MWe (gross/net unspecified) · moduleNone tracked here
VBER-300The 2024 SMR Technology Catalogue labels the VBER-300 an integral PWR, while its description and the IAEA's 2020 SMR booklet describe steam-generator and pump vessels and a primary loop connected directly to the reactor vessel; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim.SMR—1
VVER-300 (V-478)SMRapproximately 300 MWe (gross/net unspecified) · moduleNone tracked here

Sources

  1. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). Rolls-Royce SMR section, printed pages 79–84; CAREM section, printed pages 31–32. Each section is contributor material; the Rolls-Royce SMR section was supplied by Rolls-Royce.