Copenhagen Atomics Waste Burner

Copenhagen Atomics Waste Burner is a thermal-spectrum molten-salt reactor from the Danish company Copenhagen Atomics, at detailed design in the 2024 catalog's summary table.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 15 Oct 2024: Detailed design / Equipment manufacturing in progress.
Evidence
2 sources; first primary source: ARIS original status report — Copenhagen Atomics Waste Burner (2024-10-15). Record reviewed 2 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Catalog identity snapshot: 15 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s) as of 15 Oct 2024
Copenhagen Atomics
Fuel form
7LiF-UF4 or 7LiF-ThF4-(TRU)F3
Development status (as stated)
Detailed design / Equipment manufacturing in progress
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. The ARIS status report identifies the Copenhagen Atomics Waste Burner for Denmark and classifies design status as detailed design. The June 2025 catalog summary states CA Waste Burner, 100 MW(t), MSR, Copenhagen Atomics, Denmark, detailed design. That catalog figure is citable, but this identity profile does not store it and no thermal-power field is proposed. The stored status also says equipment manufacturing is in progress, which the quoted status and catalog lines do not say. Family is proposed as MSR from the catalog classification. ARIS parameter tables are not copied. Last checked 19 Oct 2026. ARIS original status report — Copenhagen Atomics Waste Burner (2024-10-15); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A Copenhagen Atomics notice that confirms or drops the equipment-manufacturing clause, and a non-identity record if the 100 MW(t) figure is to be stored. Next scheduled check: 19 Jan 2027.

  • Module rating. The catalog summary states 100 MW(t) for CA Waste Burner. The figure is not stored because this is an identity-only profile. No module thermal field is proposed. ARIS parameters other than design status are not used. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A decision to keep a non-identity design record if the 100 MW(t) catalog figure should be stored. Next scheduled check: 19 Jan 2027.