FBNR
FBNR, the Fixed Bed Nuclear Reactor, is an integral pressurized light-water reactor concept with spherical fuel, at conceptual design in its ARIS status report, which is attributed to FURGS.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 1 Jun 2024: Conceptual design.
- Evidence
- One source (IAEA/NEA): ARIS original status report — FBNR (2024-06-01). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 1 Jun 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Integral pressurized water reactor (iPWR)
The ARIS status report classifies the FBNR as a PWR with an integral NSSS layout and says the steam generator and reactor core are housed in the same pressure vessel; its fuel is spherical elements held in the core by the coolant flow rather than fixed fuel assemblies. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 1 Jun 2024
- FURGS
- Fuel form
- CERMET (Coated UO2 fuel embedded in a zirconium matrix which is further coated in a zirconium protective layer
- Development status (as stated)
- Conceptual design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- ARIS original status report — FBNR (2024-06-01) (IAEA/NEA, accessed 2 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. The only attached source is the ARIS status report for FBNR of Brazil. It identifies the design, classifies design status as conceptual design, and prints a published date of prior to June 2021. No catalog page is attached. ARIS ratings and parameter tables are not reusable, so no module output is proposed. Stored conceptual-design status matches the status line. Stored vendor, coolant and spectrum are held and are not re-proven from a quoted parameter table. This is an identity profile. The family rests on the report's classification fields (reactor type PWR, NSSS layout integral) and its layout sentence, not on its technical parameter tables. Last checked 19 Oct 2026. ARIS original status report — FBNR (2024-06-01)
What would change this
A non-ARIS UFRGS or catalog source that states FBNR module output with a unit. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The only attached source is ARIS. That is a reuse limitation. The report's parameters are not copied, and no other source states a reusable rating. No number is added. Last checked 19 Oct 2026. ARIS original status report — FBNR (2024-06-01)
What would change this
A non-ARIS FBNR datasheet with module MWe or MWth. Next scheduled check: 19 Jan 2027.
- Technology family. The ARIS status report classifies the FBNR as a PWR with an integral NSSS layout and says the steam generator and reactor core are housed in the same pressure vessel; its fuel is spherical elements held in the core by the coolant flow rather than fixed fuel assemblies. Last checked 3 Nov 2026. ARIS original status report — FBNR (2024-06-01)
What would change this
A FURGS or IAEA document that changes the FBNR reactor type or layout. Next scheduled check: 3 Feb 2027.