FUJI
FUJI is a graphite-moderated molten-salt reactor line from the International Thorium Molten-Salt Forum in Japan, at conceptual design in its ARIS status report. The IAEA's FUJI entries (2016-2024 SMR booklets) also list mini-FUJI as the pilot-plant design of the same line; the main description concerns the 200 MWe FUJI-U3.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 14 Oct 2024: Conceptual design.
- Evidence
- 2 sources; first primary source: ARIS original status report — FUJI (2024-10-14). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Molten salt reactor (MSR)
- Coolant
- Molten salt
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Oct 2024
- International Thorium Molten-Salt Forum (ITMSF)
- Fuel form
- LiF-BeF2-ThF4-233UF4 (71.76-16-12-0.24 mol%)
- Development status (as stated)
- Conceptual design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- ARIS original status report — FUJI (2024-10-14) (IAEA/NEA, accessed 2 Oct 2026)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The ARIS report identifies FUJI for Japan and classifies design status as conceptual design. It says MSR-FUJI was developed since the 1980s by the International Thorium Molten-Salt Forum. The 2020 IAEA booklet summary classifies FUJI as an MSR from that forum at experimental phase. The same booklet says the latest typical design, FUJI-U3, is 200 MW(e), and that FUJI-U3 thermal output is 450 MW(t). Those booklet figures are citable and are not stored, because this is an identity profile. ARIS ratings are not copied. Stored conceptual-design status matches ARIS and not the booklet's experimental-phase label. Last checked 19 Oct 2026. ARIS original status report — FUJI (2024-10-14); IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition)
What would change this
A decision on whether this identity record stays at ARIS conceptual design or follows the 2020 booklet's FUJI-U3 experimental-phase description. Next scheduled check: 19 Jan 2027.
- Module rating. The 2020 booklet states 200 MW(e) and 450 MW(t) for FUJI-U3. The figures are not stored because this is an identity-only profile. No module field is proposed. ARIS ratings are not used. Last checked 19 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition)
What would change this
Store the FUJI-U3 ratings only on a record allowed to carry a module output. Next scheduled check: 19 Jan 2027.