Designs

HOLOS-QUAD

HOLOS-QUAD is identified as a microreactor design in the ARIS status report dated 2024-10-16, attributed to HolosGen LLC. This dated design identity does not establish current availability, a deployment site, output, or regulatory permission. Technical values remain unknown here pending an independent scope and basis check.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 16 Oct 2024: Detailed design.
Evidence
2 sources; first primary source: ARIS original status report — HOLOS-QUAD (2024-10-16). Record reviewed 2 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Catalog identity snapshot: 16 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s) as of 16 Oct 2024
HolosGen LLC
Fuel form
Qualified TRISO-UCO compacts
Development status (as stated)
Detailed design
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(2)

Evidence and open questions

(2 notes)