OTRERA 300
OTRERA 300 is retained as a dated single-reactor ARIS identity distinct from the NEA Otrera 2x300 plant profile. Otrera's technology page describes a per-reactor cogeneration product; that supports keeping module-versus-plant scopes separate. This identity does not establish current availability, a deployment site, output, or regulatory permission. Capacities are not copied onto this profile.
- Reactor type
- Sodium-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 16 Jan 2025: Conceptual design.
- Evidence
- 2 sources; first primary source: Otrera — Technology and Fuel (company page). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 16 Jan 2025 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Sodium-cooled fast reactor (SFR)
- Coolant
- Sodium
- Spectrum
- Fast
- Developer / vendor(s) as of 16 Jan 2025
- Otrera New Energy
- Fuel form
- MOX / hexagonal
- Development status (as stated)
- Conceptual design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- Otrera — Technology and Fuel (company page) (company, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. Otrera's own technology page says Otrera is a fourth-generation sodium-cooled fast reactor designed to reuse nuclear materials. The catalog summary names OTRERA 300, Otrera Energy, France, sodium-cooled, conceptual design. The name contains 300 and the summary also contains 110. Neither figure has a unit in the quoted line, so neither is stored. Stored sodium coolant, fast spectrum and SFR family already match the company page. Stored conceptual-design status matches the catalog. This identity profile does not receive a module rating. No ARIS report is attached. Last checked 19 Oct 2026. Otrera — Technology and Fuel (company page); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
An Otrera datasheet that states whether 300 or 110 is the module output and whether it is MWe or MWth. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The company paragraph states no megawatt output. The catalog name and summary numeral are unlabeled. No rating is proposed for this identity profile. Last checked 19 Oct 2026. Otrera — Technology and Fuel (company page); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
An Otrera specification with module MWe or MWth and a basis. Next scheduled check: 19 Jan 2027.