Prismatic HTR
Prismatic HTR is a graphite-moderated, gas-cooled high-temperature reactor concept from General Atomics, at conceptual design in its ARIS status report. The opened report says it was published prior to June 2021; no exact publication day is stated. This historical design identity does not establish current availability, a deployment site, output, or regulatory permission.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated: Conceptual design.
- Evidence
- 2 sources; first primary source: ARIS original status report — Prismatic HTR (published prior to June 2021). Record reviewed 8 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s)
- General Atomics
- Fuel form
- UO2
- Development status (as stated)
- Conceptual design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 8 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- ARIS original status report — Prismatic HTR (published prior to June 2021) (IAEA/NEA, accessed 8 Oct 2026)
- NRC NUREG-1338: March 1989 draft MHTGR preapplication safety evaluation (regulator, accessed 8 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The ARIS report identifies Prismatic HTR for the United States, classifies design status as conceptual design, and prints a published date prior to June 2021. Its ratings and parameter tables are not reused. The attached 1989 NRC report discusses selection of prismatic fuel blocks over pebble-bed spheres. That passage does not name this design's module output, vendor or a dated licensing action. Stored helium coolant, thermal spectrum and General Atomics vendor are not re-proven by these two passages and are left in place. No module rating is proposed. Last checked 19 Oct 2026. ARIS original status report — Prismatic HTR (published prior to June 2021); NRC NUREG-1338: March 1989 draft MHTGR preapplication safety evaluation
What would change this
A General Atomics or later IAEA booklet section that states this prismatic HTR's module MWe or MWth outside an ARIS parameter table. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. ARIS parameters are a reuse limitation, not proof that no rating was ever published. The 1989 NUREG passage does not state this design's module output. No number is added. Last checked 19 Oct 2026. ARIS original status report — Prismatic HTR (published prior to June 2021); NRC NUREG-1338: March 1989 draft MHTGR preapplication safety evaluation
What would change this
A non-ARIS General Atomics specification for this prismatic HTR. Next scheduled check: 19 Jan 2027.