SmAHTR

SmAHTR is identified in ORNL/TM-2010/199 (December 2010) as a Fluoride-Salt-Cooled Small Modular Advanced High-Temperature Reactor. This dated design identity does not establish current availability, a deployment site, output, or regulatory permission. Technical values remain unknown here pending an independent scope and basis check; later SmAHTR-CTC (2014) is treated as a dated variant, not an automatic capacity transfer.

Reactor type
Fluoride salt-cooled high-temperature reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the source dated Dec 2010: Under Design.
Evidence
2 sources; first primary source: ORNL/TM-2010/199 Pre-Conceptual Design of SmAHTR (December 2010). Record reviewed 2 Oct 2026.
Schematic of KP-FHR commercial plant, this type's example. On the left, a reactor vessel holds a graphite reflector around a bed of fuel pebbles, with control and shutdown elements coming down from above and pebble tubes at the top and bottom.
Schematic of KP-FHR commercial plant, this type's example.

Catalog identity snapshot: Dec 2010 (ORNL report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Fluoride-salt-cooled high-temperature reactor (FHR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s) as of 2010-12
Oak Ridge National Laboratory
Fuel form
UCO
Enrichment
19.75 wt %
Development status (as stated)
Under Design
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. The 2010 ORNL report says SmAHTR is a 125 MWt integral primary-system fluoride-salt-cooled high-temperature reactor concept, intended to supply high-temperature process heat and electricity from a small plant that can be transported to remote sites. That figure is citable. This is an identity profile, so 125 MWt is not stored and no thermal-power field is proposed. The attached ARIS download is used only as an identity document here, and its parameters are not copied. Stored FHR family, molten-salt coolant and thermal spectrum agree with the ORNL description. Stored status remains Under Design. The ORNL sentence calls it a design concept and does not use those status words. Last checked 19 Oct 2026. ORNL/TM-2010/199 Pre-Conceptual Design of SmAHTR (December 2010); IAEA ARIS design record: SmAHTR
    What would change this

    A decision to store 125 MWt only on a record allowed to carry a module rating, plus a later ORNL status if Under Design is to be dated. Next scheduled check: 19 Jan 2027.

  • Module rating. ORNL states 125 MWt for SmAHTR. The figure is not stored because this is an identity-only profile. The ARIS copy of a rating is not used. Last checked 19 Oct 2026. ORNL/TM-2010/199 Pre-Conceptual Design of SmAHTR (December 2010)
    What would change this

    Store 125 MWt only if this profile is allowed to carry a module rating. Next scheduled check: 19 Jan 2027.