How small reactor types work · Designs of this type
How a salt-cooled pebble bed reactor works
KP-FHR is a fluoride salt-cooled high-temperature reactor (FHR): molten salt at low pressure carries heat out of a bed of fuel pebbles.[1, p. 349] The salt passes its heat to an intermediate fluid and then to steam, which drives a turbine generator.[1, p. 350]
This page explains the type on one documented design, simplified; other designs of the type can differ. It describes the design, not a project: see the KP-FHR commercial plant record. SMRMap tracks 1 project using it, and that project's record carries its status.
- Primary salt, following the arrows on the catalog's diagram: the section's text does not describe this route
- Intermediate fluid carrying heat to the steam generators, as the section's text gives
- Intermediate fluid coming back, not described in the section's text: drawn from the catalog's diagram
- Steam going to the turbine generator
- Water coming back, not described in the section's text: drawn from the catalog's diagram
- Fuel pebbles moving through the core, as the section's text gives
The parts, numbered as in the figure
1. Reactor vessel
The catalog's table gives the vessel as 7.2 m high and 3.9 m in diameter.[1, p. 349] It is thin-walled stainless steel, because it runs at low pressure: the table lists under 0.2 MPa.[1, pp. 349, 351] Control equipment and other components pass through the top head.[1, p. 351]
2. Pebble bed core
The active part of the core is a bed of spherical fuel and moderator pebbles, each 4.0 cm across.[1, p. 350] The fuel pebbles hold TRISO particles, tiny coated grains set in a graphite matrix, enriched to 19.75%.[1, pp. 349, 351] The section's text calls the core cylindrical; inside that cylinder the catalog's diagram draws the bed narrowing to a thin column at the top and a cone at the bottom, which the figure follows.[1, p. 350]
3. Graphite reflector and core barrel
A graphite reflector surrounds the bed, with graphite structures above and below it.[1, p. 350] A core barrel and reflector support hold the graphite in place, and the graphite forms the main flow paths and the core's volume.[1, p. 351]
4. Control and shutdown elements
Control elements, used for normal maneuvering, go into the graphite reflector around the bed.[1, p. 350] Shutdown elements, for accidents, go straight into the pebble bed; they are gravity driven and released by the reactor protection system.[1, p. 350] Both are neutron absorber, natural boron carbide, in stainless steel cladding.[1, p. 350]
5. Pebble handling
The pebbles float in the salt, so they are added at the bottom and taken out at the top, while the reactor runs.[1, p. 351] A pebble taken out is checked for burnup, how much of its fuel has been used, and for damage, then goes back to the core or to spent fuel storage.[1, p. 354] On average a pebble passes through the core six times.[1, p. 354]
6. Exchanger to the intermediate fluid
Here the primary salt's heat passes to a separate intermediate fluid.[1, p. 350] The catalog's diagram labels it an intermediate heat exchanger, and draws it beside the reactor with salt coming in at the top.[1, p. 350]
7. Steam generators
The intermediate fluid brings the heat to steam generators, which the section says draw on power generation industry experience.[1, p. 350] The catalog's diagram splits this equipment into a superheater, a re-heater and an evaporator; the figure draws one plain block.[1, p. 350]
8. Steam turbine generator
The steam runs an ordinary steam cycle, in what the section calls a commercially available steam turbine generator.[1, p. 350]
The coolant path
- The table lists forced circulation, with the salt at 550 °C entering the core and 650 °C leaving it.[1, p. 349]
- The section's text does not describe the salt's route through the vessel, or where its pumps are.[1, pp. 349–355]
- So the salt lines are dashed, and they follow the arrows on the catalog's diagram: in near the top of the vessel, down its outer edge, up through the pebble bed and out near the top to the heat exchanger.[1, p. 350]
- The heat passes to the intermediate fluid and then to steam, which goes to the turbine generator.[1, p. 350]
- The pebbles also move through the core, from bottom to top, because they float in the salt.[1, p. 351]
Is this a molten salt reactor?
The catalog's table lists its reactor type as MSR, but here the salt is only the coolant: the fuel is solid pebbles.[1, pp. 349, 350] SMRMap's records file this design as an FHR, which is why it is on this page. These are examples from one catalog, not a full list, and the interactive view shows KP-FHR only.
- KP-FHR. Solid fuel pebbles cooled by molten salt; the pebbles float, so they enter at the bottom and leave at the top.[1, p. 351]
- IMSR400. The molten salt is both the fuel and the coolant, so that design has no pebbles.[1, p. 338]
- HTR-PM, for the other neighbor. The same idea with gas: solid fuel spheres, but cooled by helium instead of salt; the spheres drop in at the top and leave at the bottom.[1, pp. 230, 231]
Design values
These are values listed in the catalog section, which the developer supplied.[1, p. 349] SMRMap's record for the KP-FHR commercial plant rests on an earlier IAEA catalog chapter describing a single core and vessel, so its line in the list below does not match this table; the other records can rest on other sources too.
- Power. The table lists 376 MW(t) of heat and 150 MW(e) of electricity, marked as two units of 75 MW(e); the text describes one power block of two reactors with a shared power-conversion system generating up to 150 MW(e), so the electrical figure is for the pair, and the table does not say whether its heat figure is for one reactor or both.[1, pp. 349, 353]
- Pressure. The table lists under 0.2 MPa.[1, p. 349]
- Salt temperature. 550 °C at the core inlet and 650 °C at the core outlet.[1, p. 349]
- Design life. 20 years for the vessel and 80 years for the plant.[1, p. 349]
Designs on SMRMap recorded as this type
5 designs, with 3 tracked projects between them. Each design's own record files it as fluoride salt-cooled (FHR); the example above is one of them, and the others can differ from it, including in the form of their fuel.
| Design | Class | Electrical output | Tracked projects |
|---|---|---|---|
| Energy Well | Microreactor | — | None tracked here |
| Hermes / KP-FHR | SMR | — | 2 |
| KP-FHR commercial plant | SMR | 140 MWe (gross/net unspecified) · module | 1 |
| Mk1 PB-FHR | SMR | 100 MWe (net) · module | None tracked here |
| SmAHTR | SMR | — | None tracked here |
Sources
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). KP-FHR section, printed pages 349–355; IMSR400 section, printed page 338; HTR-PM section, printed pages 230–231. Each section is contributor material; the KP-FHR section was supplied by Kairos Power.