STAR
STAR is a pressure-tube light-water reactor from the Swiss company STAR ENERGY SA, with fuel assemblies in individual pressure channels, at basic design in the 2024 catalog.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 15 Oct 2024: Basic design.
- Evidence
- 2 sources; first primary source: ARIS original status report — STAR (2024-10-15). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 15 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Other (see description)
- Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 15 Oct 2024
- STAR ENERGY SA
- Fuel form
- UO2 pellet assemblies in individual pressure channels
- Development status (as stated)
- Basic design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- ARIS original status report — STAR (2024-10-15) (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The ARIS report identifies STAR for Switzerland and classifies design status as basic design. The catalog summary names STAR, a PTWR, Star Energy, Switzerland, basic design. The numeral in that summary has no unit and is not stored. ARIS electrical and thermal figures are not copied. Stored basic-design status, light-water coolant and thermal spectrum stay. Family remains other because PTWR is not one of the stored family labels. This identity profile does not receive a module rating. Last checked 19 Oct 2026. ARIS original status report — STAR (2024-10-15); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A Star Energy specification, outside ARIS, that states module output with a unit. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. No unit-qualified rating is adopted. ARIS figures are a reuse limitation. The catalog numeral is unlabeled. Last checked 19 Oct 2026. ARIS original status report — STAR (2024-10-15); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A non-ARIS Star Energy datasheet with MWe or MWth. Next scheduled check: 19 Jan 2027.