W-LFR
W-LFR, the Westinghouse Lead Fast Reactor, is a lead-cooled, fast-spectrum reactor concept, at conceptual design in its ARIS status report.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 2 Jun 2024: Conceptual design.
- Evidence
- One source (IAEA/NEA): ARIS original status report — W-LFR (2024-06-02). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2 Jun 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 2 Jun 2024
- Westinghouse Electric Company
- Fuel form
- Oxide (UO2 or MOX) (prototype) Advanced fuel(commercial)
- Development status (as stated)
- Conceptual design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- ARIS original status report — W-LFR (2024-06-02) (IAEA/NEA, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The only attached source is the ARIS status report for W-LFR of the United States. It identifies the design, classifies design status as conceptual design, and prints a published date prior to June 2021. That matches the stored status. ARIS ratings and parameter tables are not reusable, and no other source is attached. No module rating is proposed. Stored lead coolant, fast spectrum and Westinghouse vendor are held and are not re-proven from a quoted parameter line. This is an identity profile. Last checked 19 Oct 2026. ARIS original status report — W-LFR (2024-06-02)
What would change this
A Westinghouse page, outside ARIS, that states W-LFR coolant, spectrum and module output with a unit. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The only source is ARIS. That is a reuse limitation. Its parameters are not copied, and no rating is proposed. Last checked 19 Oct 2026. ARIS original status report — W-LFR (2024-06-02)
What would change this
A non-ARIS Westinghouse W-LFR datasheet. Next scheduled check: 19 Jan 2027.