How small reactor types work · Designs of this type
How a lead-cooled fast reactor works
BREST-OD-300 is a lead-cooled fast reactor (LFR): pumps move molten lead through the core and through steam generators, and core, pumps and steam generators all sit inside one metal-concrete vessel.[1, pp. 277, 279] Water and steam in the steam generators form a second circuit, which drives a turbine.[1, p. 277]
This page explains the type on one documented design, simplified; other designs of the type can differ. It describes the design, not a project: see the BREST-OD-300 record. SMRMap tracks 1 project using it, and that project's record carries its status.
- Lead, on the route the section's text gives; short bars mark lead levels
- Steam going to the turbine
- Water and steam inside the steam generator's tubes, route not described in the section's text
The parts, numbered as in the figure
1. Metal-concrete vessel
The catalog's table gives the vessel as 17.5 m high and 26 m in diameter, weighing 27 000 metric tons: wider than it is tall.[1, p. 277] It is multilayer metal concrete, with one central cavity and four peripheral cavities that are connected so the lead can pass between them.[1, pp. 278, 279] The peripheral cavities also hold heat exchangers for the emergency and normal cooldown systems, and filters; the figure does not draw these.[1, p. 279]
2. Core and side reflector
"Fast" here describes the neutrons, not the lead. The core holds 169 fuel assemblies, with a side reflector around them, in the central cavity.[1, pp. 277, 279] The fuel is mixed uranium plutonium nitride. The table lists 'fuel enrichment' as up to 14.5% without defining the percentage's basis.[1, p. 277] The core stands on a support grid; the fuel assembly design lets lead also move sideways in the core, which the section says prevents overheating of a damaged assembly.[1, pp. 278, 279]
3. Control and protection rods
The central cavity holds rods of the control and protection system: reactivity compensation, emergency protection and automatic control members.[1, pp. 277, 279] The section says that when the core is run with what it calls a "zero" reactivity margin for fuel burnup, the reactivity compensation and emergency protection members are out of the core during a cycle and only two pairs of automatic control members stay partly in.[1, p. 279]
4. Shell between hot and cold lead
A shell in the central cavity keeps the hot lead rising from the core apart from the cold lead coming down around it.[1, p. 278] The section also calls this separating part the reactor core barrel.[1, p. 279]
5. Spent fuel assembly storage
Used fuel assemblies are stored in the central cavity too, in what the section calls in-reactor storage.[1, p. 279] The catalog's plan drawing marks it next to the core.[1, p. 278]
6. Main circulation pumps
The pumps sit in the peripheral cavities and lift lead about 2 m above the lead level in their suction chamber, where they draw it in.[1, pp. 278, 279] From there the lead reaches the open top surface of the annular pressure chamber, where they deliver it; the figure draws that chamber as the ring around the shell.[1, p. 279]
7. Steam generators
The steam generators sit in the peripheral cavities, in the lead, with lead outside their tubes and water and steam inside.[1, p. 279] The tubes are single-walled and twisted, with no welds along their length.[1, p. 279] The catalog's plan drawing shows two large round units in each cavity and labels one of them a steam generator unit; it also labels a circulation pump, too small to pick out. The figure simplifies each cavity to one steam generator and one pump.[1, p. 278]
The coolant path
- The pumps lift the lead about 2 m above the level in their suction chamber and deliver it to the open top surface of the annular pressure chamber.[1, p. 279]
- The lead runs down to the grid under the core and flows up through the core, leaving at 535 °C.[1, p. 279]
- It enters a shared hot chamber, flows up, and enters the steam generators through distributing nozzles.[1, p. 279]
- It flows down between the tubes, passing heat to the water and steam inside them, and cools to about 420 °C.[1, p. 279]
- It rises through the annulus, a ring-shaped gap, into the pump suction chamber, and the pumps send it round again.[1, p. 279]
- The section's text does not describe which way the water and steam move inside the tubes, so that dashed line only shows they pass through.[1, pp. 277–282]
What moves the lead through the core?
The section says the lead moves because of the difference between the levels of cold and hot lead, and that the pumps create that difference.[1, p. 279] This is BREST-OD-300. Other lead-cooled reactors can differ, and the interactive view shows BREST-OD-300 only.
- The pumps. They lift the lead up into the pressure chamber, and it runs down from there to the grid under the core.[1, p. 279]
- If a pump stops. The section says that with one pump shut down the lead flow still shares evenly among the steam generators, and that in a sudden pump shutdown the levels in the discharge and suction chambers evening out keeps the lead moving for a time, which it calls flow inertia.[1, p. 279]
- Pressure. The table lists 0.1 MPa in the lead circuit, against 17 to 18.5 MPa in the water and steam.[1, p. 277]
Design values
These are values listed in the catalog section, which the developer supplied.[1, p. 277]
- Power. 700 MW(t) of heat and 300 MW(e) of electricity.[1, p. 277]
- Lead temperature. 420 °C at the core inlet and 535 °C at the core outlet.[1, p. 277]
- Steam. A nominal flow of about 1500 t/h to the turbine.[1, p. 279]
- Secondary pressure. The table lists the secondary circuit's operating pressure as 17 to 18.5 MPa.[1, p. 277]
- Refueling. The table lists a cycle of 36 to 78 months.[1, p. 277]
Designs on SMRMap recorded as this type
24 designs, with 12 tracked projects between them. Each design's type comes from its own record on SMRMap; the example above is one of them, and the others can differ from it. "Lead-cooled" here covers designs cooled by lead or by a lead-bismuth mix, as their records tag them.
| Design | Class | Electrical output | Tracked projects |
|---|---|---|---|
| ALFRED lead-cooled fast-reactor demonstrator | SMR | — | 1 |
| BREST-OD-300 | SMR | 300 MWe (gross) · module | 1 |
| CLEAR-M10 | SMR | — | None tracked here |
| DF300 | SMR | — | None tracked here |
| EAGL-1 | SMR | 240 MWe (gross/net unspecified) · module | 1 |
| EAGLES-300 | SMR | 300 MWe (gross/net unspecified) · module | None tracked here |
| ENHS (Encapsulated Nuclear Heat Source) | SMR | 50 MWe (gross/net unspecified) · module | None tracked here |
| G4M | SMR | — | 1 |
| LFR-AS-200 | SMR | — | 1 |
| LFR-AS-30 | SMR | — | 1 |
| LFR-TL-30 | SMR | 30 MWe (gross/net unspecified) · module | None tracked here |
| LSPR | SMR | 53 MWe (gross/net unspecified) · module | None tracked here |
| MicroURANUS | Microreactor | 20 MWe (gross/net unspecified) · module | None tracked here |
| Morpheus | Microreactor | — | 1 |
| PASCAR transportable capsule reactor | SMR | 35 MWe (gross/net unspecified) · module | None tracked here |
| SEALER | SMR | 55 MWe (gross/net unspecified) · module | 4 |
| SEALER-One | SMR | — | None tracked here |
| SSTAR (Small Secure Transportable Autonomous Reactor) | SMR | 20 MWe (gross/net unspecified) · module | None tracked here |
| STAR-H2 | SMR | thermal only (no MWe) | None tracked here |
| STAR-LM (Secure Transportable Autonomous Reactor - Liquid Metal) | SMR | 178 MWe (gross/net unspecified) · module | None tracked here |
| START | SMR | — | None tracked here |
| SVBR-100 | SMR | — | 1 |
| URANUS-40 | SMR | 40 MWe (gross/net unspecified) · module | None tracked here |
| W-LFR | SMR | — | None tracked here |
Sources
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). BREST-OD-300 section, printed pages 277–282. Each section is contributor material; the BREST-OD-300 section was supplied by NIKIET.