Designs

CAP150

Integral pressurized-water reactor by SNERDI/SNPTC, described in the IAEA's 2016 SMR booklet as a small modular reactor of 450 MWt and 150 MWe (conceptual design finished). This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
One source (IAEA/NEA): IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition). Record reviewed 3 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 2016 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 2016
Shanghai Nuclear Engineering Research and Design Institute (SNERDI)
Module electrical
150 MWe (gross/net unspecified)
Module thermal
450 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(1 note)
  • Evidence review. The 2016 IAEA advances booklet says the concept designs for CAP150 and CAP200 use passive safety features and simplified systems to generate 150 MW(e) and 200 MW(e) respectively. Stored 150 MWe matches the CAP150 figure. The same attached booklet does not, in this paragraph, state the stored 450 MWth value, and a nearby 45000 figure is fuel burnup rather than thermal power. No thermal change is proposed. The paragraph does not say gross or net, does not name a site, and does not give a design-stage date. A country table in the same edition pairs CAP150/200 with CGNPC, while the stored vendor is SNERDI. The vendor is not replaced from that combined table cell. Last checked 19 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
    What would change this

    The CAP150 design section of a later booklet that states thermal power and the design organization of record. Next scheduled check: 19 Jan 2027.