CAP200
Pressurized-water reactor by SNERDI/SPIC, listed in the IAEA's 2020 SMR booklet at 660 MWt and more than 200 MWe with factory-fabricated main modules (conceptual design finished). Other names reported by directories are not confirmed here. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 8 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The IAEA's 2020 SMR booklet places the core and steam generators within an integral pressure vessel but also says the steam generators are connected to the reactor vessel directly; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 2020
- Shanghai Nuclear Engineering Research and Design Institute (SNERDI)
- Module thermal
- 660 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 8 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module electrical
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
- SNERDI: CAP50 small compact PWR concept (28 March 2016) (company, accessed 8 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The 2020 IAEA booklet section for CAP200 names SNERDI/SPIC and lists light water as coolant and moderator. Its capacity line reads 660 / greater than 200 after the MW(t)/MW(e) label. Stored 660 MWth matches the thermal figure. The electrical entry is greater than 200 MWe, so it is not stored as 200. A summary line in the same edition says CAP200, 200, PWR, SNERDI/SPIC, conceptual design. That summary numeral is not used in place of the section's greater-than figure. A SNERDI page calls cap200 a land-based passive compact pressurized-water reactor and names cap50 separately as a marine unit. No site is named. Last checked 19 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition); SNERDI: CAP50 small compact PWR concept (28 March 2016)
What would change this
A SNERDI datasheet that replaces the greater-than 200 MWe entry with a single electrical nameplate and a gross or net basis. Next scheduled check: 19 Jan 2027.
- Technology family. The IAEA's 2020 SMR booklet places the core and steam generators within an integral pressure vessel but also says the steam generators are connected to the reactor vessel directly; with these conflicting descriptions, the type is recorded as a pressurized water reactor without an integral claim. Last checked 1 Nov 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition)
What would change this
A developer, regulator or IAEA document that states this design's primary-circuit layout. Next scheduled check: 1 Feb 2027.