A-HTR-100
A-HTR-100 is Eskom's modular high-temperature gas-cooled reactor concept, cooled by helium and moderated by graphite. The 2020 IAEA booklet lists it as a completed concept design with research and development in progress.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Concept design completed; R&D activities in progress.
- Evidence
- 2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Eskom
- Fuel form
- pebble bed with coated particle fuel
- Development status (as stated)
- Concept design completed; R&D activities in progress
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 130 - IAEA 2020 SMR book: HTR-10 technical table (IAEA/NEA, accessed 8 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The 2020 IAEA SMR booklet profiles Eskom's AHTR-100, the pebble-bed concept stored as A-HTR-100, as a high-temperature helium-cooled and graphite-moderated reactor for electricity and process heat with intermediate storage. The NEA third edition describes the same named design as a very high-temperature pebble-bed gas reactor and says Eskom anticipated a demonstration at the Pelindaba Nuclear Facility. The booklet dates the concept design as completed, with research and development in progress. No reusable prose states a module output, so none is stored. Stored vendor Eskom, family HTGR, helium coolant and thermal spectrum stay. Linked deployments are empty. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table; NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A later Eskom or South African government instrument that names the A-HTR-100 at a specific site or states a module output in prose. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The opened booklet and NEA profile identify the reactor, but no reusable passage states a module output. NEA table figures are not reused and are not quoted. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
No reusable published source states a module output. A developer or regulator specification that does so would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.