Designs

Blossom Energy SMR

Blossom Energy SMR is Blossom Energy's cluster-type high-temperature gas-cooled reactor concept, with several reactors in parallel as a heat source.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
High-temperature gas-cooled reactor (HTGR)
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Blossom Energy
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Coolant (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(3 without a known value)
Coolant
Not recorded
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(2)

Evidence and open questions

(3 notes)
  • Evidence review. The NEA third edition describes the Blossom Energy SMR as a cluster-type high-temperature gas-cooled reactor whose modules couple to one heat exchanger, and it calls the concept a cluster-type HTGR. The developer page, fetched for this review, says Blossom Energy's systems cluster several reactors as a heat source and highlights high-temperature steam, but it does not name the coolant gas or a module output. No reusable source states a module rating, so none is stored. Stored vendor Blossom Energy, family HTGR and thermal spectrum stay. Coolant stays unknown. Linked deployments are empty and the NEA profile reports no siting information. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); Blossom Energy: cluster-type high-temperature gas-cooled reactor
    What would change this

    A Blossom Energy specification that names the coolant gas and, separately, a module output. Next scheduled check: 19 Jan 2027.

  • Coolant: Not disclosed in the reviewed evidence. The design is described as gas-cooled, but neither the NEA profile nor the developer page names the gas. Helium is not assumed. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); Blossom Energy: cluster-type high-temperature gas-cooled reactor
    What would change this

    A Blossom Energy technical page or filing that names the primary coolant. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. No reusable passage states a module output. NEA table figures are not reused. The developer page describes a cluster without a unit rating. Last checked 19 Oct 2026. Blossom Energy: cluster-type high-temperature gas-cooled reactor
    What would change this

    No reusable published source states a module output. A developer or regulator specification that does so would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.