Designs

Blue Capsule

Blue Capsule is Blue Capsule Technology's graphite-moderated, sodium-cooled high-temperature reactor concept from France. Its catalog section notes that it is liquid-metal cooled but not a fast-spectrum reactor.

Reactor type
No assignment to the existing type groups. How Blue Capsule uses sodium and graphite — 2D explanation. This describes Blue Capsule only.
Projects
No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Pre-conceptual design.
Evidence
4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Other (see description)
The 2024 IAEA catalog says Blue Capsule belongs to the ARIS Others category, and the 2026 table lists sodium coolant with a graphite moderator, so it is not recorded as a helium-cooled gas reactor.
Coolant
Sodium
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Blue Capsule Technology
Fuel form
Prismatic, TRISO with UO2 kernel
Development status (as stated)
Pre-conceptual design
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(4)

Evidence and open questions

(3 notes)
  • Evidence review. The 2024 edition of the IAEA SMR Technology Catalogue describes Blue Capsule as a sodium-cooled high-temperature reactor with TRISO fuel, producing industrial heat and up to 50 MWe from a 150 MWth reactor. The NEA third edition calls it a high-temperature, sodium-cooled, thermal-spectrum SMR using TRISO fuel and air as the heat sink, and says screening-phase pre-licensing with France's ASNR had been completed. Those statements support the stored vendor, sodium coolant and thermal spectrum. The family is other: the 2024 edition says it belongs to the ARIS Others category, and a sodium-cooled design isn't a helium-cooled gas reactor. The 2026 edition is attached for its reactor-type statements only; its 170 MW(t) gross and 60 MW(e) figures are not stored. The catalog output is not stored on this identity profile. No site is named. Linked deployments are empty. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    An ASNR preparatory-review result or a Blue Capsule specification that revises the catalog output. Next scheduled check: 19 Jan 2027.

  • Module rating. The 2024 edition of the IAEA catalog states 150 MWth and electricity up to 50 MWe per unit. The 2026 edition gives 170 MW(t) gross and 60 MW(e). Neither figure is stored on this identity profile, so no rating field is proposed. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A later developer or regulator specification that states this design's module output with an explicit basis. The figure would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.

  • Technology family. The 2024 IAEA catalog says Blue Capsule belongs to the ARIS Others category, and the 2026 table lists sodium coolant with a graphite moderator, so it is not recorded as a helium-cooled gas reactor. Last checked 3 Nov 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
    What would change this

    A Blue Capsule or IAEA document that states one reactor type for this design. Next scheduled check: 3 Feb 2027.