Does sodium cooling always mean a fast reactor?

No. Sodium cooling does not by itself mean a fast reactor. The IAEA SMR Technology Catalog 2026 identifies Blue Capsule as metal-cooled and thermal spectrum; it lists sodium as coolant and graphite as moderator.[1, printed p. 7; p. 269]

These are different jobs. Graphite slows neutrons in the reactor; sodium carries heat away. “Thermal” describes the neutron spectrum, not the coolant temperature. Blue Capsule is a sodium-cooled, graphite-moderated thermal-spectrum concept.[1, printed pp. 7, 269]

Blue Capsule heat-transfer path, simplified Heat passes from fuel through graphite and a thermal binder to ceramic sleeves, then to naturally circulating sodium. Sodium transfers heat across sodium-to-air exchangers; heated air carries it to a user. Optional steam or electricity conversion is downstream. The stages are separate materials and circuits. Fuel heatfuel → graphite + thermal binder Across ceramic housingfuel stays separate from sodium Sodium carries heatnatural circulation Sodium-to-air heat exchangersheat enters a separate air stream Useful heat to an end usersteam / electricity optionaldownstream of the reactorair path: open or semi-open
Heat-transfer sequence described for Blue Capsule. Schematic, not to scale and not a reactor layout. Arrows mark heat transfer across material or circuit boundaries; they do not show one fluid flowing through every stage.[1, printed pp. 269, 271]

The documented heat path

  1. Fuel heat moves through graphite and a thermal binder into the ceramic housing by conduction.[1, printed p. 271]
  2. The ceramic housing is cooled by sodium in natural circulation. The catalog says the sodium does not directly contact the fuel.[1, printed p. 271]
  3. Sodium leaving the core is directed to sodium-to-air heat exchangers. Heat passes into a separate air stream; the catalog describes the ultimate heat sink as ambient air in an open circuit.[1, printed pp. 269, 271]
  4. Downstream systems can deliver hot air or transform energy into steam or electricity. Those options are beyond the reactor heat path shown here.[1, printed pp. 269–270]

This describes the conceptual Blue Capsule design as presented in the 2026 catalog, not an operating plant. The catalog says the Blue Capsule section was provided by and reproduced with permission of Blue Capsule Technology; inclusion in the catalog is not an IAEA endorsement. This schematic does not show reactor geometry.

For comparison, see the sodium fast-reactor explainer. That page describes a different design type; this comparison does not imply shared geometry.

Source

  1. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors)