Designs

CMSR

CMSR, the Compact Molten Salt Reactor, is a graphite-moderated, thermal-spectrum molten-salt reactor concept from Saltfoss Energy, integrated into a floating power barge. Saltfoss (originally Seaborg Technologies) now presents the seaMSR-100 for floating power platforms; NEA's 2026 dashboard lists the line as MSPB. Identity link only; no parameters transferred.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Conceptual design.
Evidence
4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Saltfoss Energy
Fuel form
LEU / molten salt fuel
Development status (as stated)
Conceptual design
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (4)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. The IAEA catalog describes the Seaborg CMSR as a graphite-moderated molten-salt reactor of 250 MWth, converted to more than 100 MWe, deployed on a non-self-propelled power barge. The NEA third edition calls it a multi-module liquid-fluoride molten-salt reactor on a power barge and records a letter of intent with Norsk Kjernekraft about Indonesia and Norway. Saltfoss's about page says the company was originally Seaborg Technologies, which supports the stored vendor. The current reactor page names seaMSR-100 and does not name CMSR, so those later figures are not applied here. The catalog output is not stored. Linked deployments are empty. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025); Saltfoss: about; Saltfoss: reactor
    What would change this

    A Saltfoss statement that either still specifies the CMSR by that name or identifies seaMSR-100 as its successor with a dated output. Next scheduled check: 19 Jan 2027.

  • Module rating. The catalog states 250 MWth and more than 100 MWe for the CMSR. The figure is not stored on this identity profile. The company page's seaMSR-100 figures are not used because that page does not name CMSR. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); Saltfoss: reactor
    What would change this

    A later developer or regulator specification that states this design's module output with an explicit basis. The figure would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.