DF300
Full-scale Dual Fluid prototype planned after a non-electrical critical experiment. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- Dual Fluid Energy
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 128
Evidence and open questions
(2 notes)
- Evidence review. The NEA third edition describes a liquid lead-cooled reactor using liquid metallic fuel, and its spectrum line reads fast with a liquid metallic fuel alloy. It describes a Critical Demonstration Experiment in Rwanda, a non-electrical reactor to demonstrate the concept, followed by a full-scale prototype before serial production. RAEB may support a prototype on its site. No reusable source states a module output, so none is stored. Stored vendor, lead coolant and fast spectrum stay. The family is LFR because lead coolant and a fast spectrum determine it; the profile itself does not use the label LFR. The possible prototype is contingent and is not an SMRMap project. Linked deployments are empty. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A Dual Fluid or Rwanda Atomic Energy Board decision that commits a DF300 prototype site or states a module output outside the NEA tables. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. Only the NEA profile states an output, and its figures are not reusable. No other attached source describes the DF300. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
No reusable published source states a module output. A developer or regulator specification that does so would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.